CN106968435A - A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction - Google Patents

A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction Download PDF

Info

Publication number
CN106968435A
CN106968435A CN201710167190.XA CN201710167190A CN106968435A CN 106968435 A CN106968435 A CN 106968435A CN 201710167190 A CN201710167190 A CN 201710167190A CN 106968435 A CN106968435 A CN 106968435A
Authority
CN
China
Prior art keywords
wall
steel pipe
skeleton
wood
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710167190.XA
Other languages
Chinese (zh)
Inventor
贾磊
赵立财
练继建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201710167190.XA priority Critical patent/CN106968435A/en
Publication of CN106968435A publication Critical patent/CN106968435A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/001Corner fastening or connecting means for forming or stiffening elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction, including L-shaped short-limb wall wall 1 and L-shaped manomelia wall top plate 2, outside wood plywood template 3 and inner side wood plywood template 4 are respectively arranged with the outside and inner side of L-shaped short-limb wall wall 1 and L-shaped manomelia wall top plate 2, and end template 7 is provided with end, the outside back cord lumps of wood 9 is provided between skeleton 11 outside outer side rail plywood form 3 and double steel pipe, the inner side back cord lumps of wood 10 is provided between interior side rail plywood form 4 and double steel pipe inner frame 12, the outside of end template 7 is provided with end lumps of wood back cord 24, end lumps of wood back cord 24 is placed between end both sides' steel skeleton 21 and end template 7, the inner side back cord lumps of wood 10, the outside back cord lumps of wood 9 is to utilize the colligation of iron wire 20 outside double steel pipe inner frame 12 and double steel pipe on skeleton 11.

Description

A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction
Technical field
It is more particularly to a kind of suitable the present invention relates to a kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction The integrated poured construction of wall column and top plate for multi-storey building shear wall with short piers.
Background technology
L-type shear wall with short piers is that vertical member is arranged using wall displacement is spaced, and shearing wall limb structure type complexity has length Have short, corner is more, Special-Shaped Column is more.Existing L-type shear wall with short piers concrete construction method is to utilize steel pipe scaffold, cross Fastener, steel pipe back cord composition support system are reinforced to big small steel templates, and reinforcing mode is " wall of first constructing, then top of constructing Plate " is separately performed.Exist in L-type shear wall with short piers construction speed slowly using this method, template resistance to overturning is poor, easy nest Work, template is scrappy, big to vertical transport dependence, and turnover is inefficient, and formwork reinforcement is difficult and can not meet many size members Template assembly technique the shortcomings of, the phenomenon for causing concrete structure Forming Quality bad happens occasionally.Such as using traditional punching block Plate carries out L-type shear wall with short piers concrete pouring construction, and the cost of its form work engineering accounts for short-shear wall structure reinforced concrete 30% or so of native project total cost, 40% or so of total amount of labour used, considerably increase construction costs.
The content of the invention
The purpose of the present invention be overcome prior art it is above-mentioned it is not enough can disposably one-piece casting, structure there is provided one kind The formwork reinforcement system of the preferable L-type shear wall with short piers one-piece casting construction of Forming Quality, technical scheme is as follows:
A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction, including L-shaped short-limb wall wall 1 and L-shaped it is short Limb wall top plate 2, it is characterised in that outside wood plywood is provided with the outside of L-shaped short-limb wall wall 1 and L-shaped manomelia wall top plate 2 Template 3, inner side wood plywood template 4 is provided with the inner side of L-shaped short-limb wall wall 1 and L-shaped manomelia wall top plate 2, in outer side rail The upper end corner of plywood form 3 is provided with wall external corner 5, and the upper end corner of interior side rail plywood form 4 is provided with wall Body inner corner trim 6, end template 7, end mould are provided with the end of the end of L-shaped short-limb wall wall 1 and L-shaped manomelia wall top plate 2 Piece between plate 7 and outside wood plywood template 3, inner side wood plywood template 4, wall external corner 5, wall internal corner 6 is to pass through Sticky sponge strip 8 is engaging one another together, and being provided with outside between skeleton 11 outside outer side rail plywood form 3 and double steel pipe carries on the back The stupefied lumps of wood 9, is provided with the inner side back cord lumps of wood 10, in end mould between interior side rail plywood form 4 and double steel pipe inner frame 12 The outside of plate 7 is provided with end lumps of wood back cord 24, end lumps of wood back cord 24 be placed in end both sides' steel skeleton 21 and end template 7 it Between, the inner side back cord lumps of wood 10, the outside back cord lumps of wood 9 are to utilize the colligation of iron wire 20 skeleton outside double steel pipe inner frame 12 and double steel pipe On 11, PVC sleeve pipes 13 are preset in outer side rail plywood form 3 and inner side wood plywood template 4, screw rod 14 through walls is passed through PVC sleeve pipes 13 are carried out to drawing self-locking temperature pier, double steel pipe dermoskeleton outside double steel pipe on skeleton 11 and double steel pipe inner frame 12 Frame 11, double steel pipe inner frame 12, at the node of end both sides' steel skeleton 21 using steel pipe cruciform fastening for falsework 23 connect together, The diverse location of the outer skeleton 11 of double steel pipe and double steel pipe inner frame 12 is welded with multiple additional fasteners 16, in additional fastener 16 and position Wall screw rod drawknot 19 is provided between end both sides' steel skeleton 21 of the end of L-shaped short-limb wall wall 1, at wall external corner 5 Double steel pipe it is outer external corner screw rod drawknot 15 is provided between skeleton 11 and additional fastener 16, skeleton 11 and double steel outside double steel pipe End split bolt 25 is provided between pipe inner frame 12.
For the shorter shear wall of top plate, preferred embodiment is:Metal sleeve is preset with L-shaped manomelia wall top plate 2 17, skeleton 11, end both sides' steel skeleton 21 are provided with top plate Screw arbor with nut at both-ends 18 outside double steel pipe, and top plate Screw arbor with nut at both-ends 18 passes through gold Belong to sleeve pipe 17 to pass through to drawing self-locking manner that end template 7 is temporarily fixed.
For the longer shear wall of top plate, preferred embodiment is:End both sides positioned at the end of L-shaped manomelia wall top plate 2 Top plate screw rod drawknot 22 is provided between steel skeleton 21 and additional fastener 16.
The L-type shear wall with short piers formwork reinforcement system that the present invention is provided, can construct to wall column and top plate one-piece casting simultaneously, So that L-type shear wall with short piers formwork reinforcement mode simplifies, speed of application is fast, it is easy to operational control, and the service life of template increases It is long, effectively overcome the common quality defects, the molding effect of concrete such as formwork edge joint, negative and positive angle etc. concrete spillage, faulting of slab ends Also effective control has been obtained.
Brief description of the drawings
Fig. 1 is the L-shaped short-limb wall length≤1 meter formwork reinforcement structural representation of the present invention;
Fig. 2 is L-shaped short-limb wall length 1 meter of formwork reinforcement structural representation of > of the present invention;
Fig. 3 is the A-A wall external angle formwork enlarged diagrams in Fig. 1;
Fig. 4 is the B-B wall inside corner formworks enlarged diagrams in Fig. 1;
Fig. 5 is the C-C wall end template enlarged diagrams in Fig. 1.
Embodiment
The present invention is described in detail below in conjunction with the accompanying drawings:
The formwork reinforcement system of the L-type shear wall with short piers one-piece casting construction of the present invention, including L-shaped short-limb wall wall 1 and L Shape manomelia wall top plate 2, outside wood plywood template 3 is provided with the outside of L-shaped short-limb wall wall 1 and L-shaped manomelia wall top plate 2, Inner side wood plywood template 4 is provided with the inner side of L-shaped short-limb wall wall 1 and L-shaped manomelia wall top plate 2, in outer side rail glued board The upper end corner of template 3 is provided with wall external corner 5, and the upper end corner of interior side rail plywood form 4 is provided with wall internal corner 6, end template 7, end template 7 and outside wood plywood template 3, inner side wood glue are provided with L-shaped short-limb wall wall end Piece between plywood template 4, wall external corner 5, wall internal corner 6 is engaging one another together by sticky sponge strip 8, in outside Be provided with the outside back cord lumps of wood 9 between the outer skeleton 11 of wood plywood template 3 and double steel pipe, interior side rail plywood form 4 with it is double The inner side back cord lumps of wood 10 is provided between steel pipe inner frame 12, the outside of end template 7 is provided with end lumps of wood back cord 24, end Lumps of wood back cord 24 is lain on end both sides' steel skeleton 21, and the inner side back cord lumps of wood 10, the outside back cord lumps of wood 9 are to utilize iron wire 20 Colligation is outside double steel pipe inner frame 12 and double steel pipe on skeleton 11, in outer side rail plywood form 3 and inner side wood plywood mould PVC sleeve pipes 13 are preset in plate 4, screw rod 14 through walls passes through PVC sleeve pipes 13 outside double steel pipe on skeleton 11 and double steel pipe inner frame 12 Carry out to drawing self-locking temperature pier, the outer skeleton 11 of double steel pipe, double steel pipe inner frame 12, use steel at the node of both sides' steel skeleton 21 Pipe cruciform fastening for falsework 23 is connected together, and additional fastener 16 is welded with skeleton 11 and double steel pipe inner frame 12 outside steel pipe, Wall screw rod drawknot 19 is provided with additional fastener 16 and both sides' steel skeleton 21, the skeleton 11 outside the steel pipe at wall external corner 5 External corner screw rod drawknot 15 is provided between additional fastener 16, between the both sides' steel skeleton 21 and additional fastener 16 of wall end Top plate screw rod drawknot 22 is provided with, end is provided between skeleton 11 and double steel pipe inner frame 12 outside the steel pipe of wall end 23 Split bolt 25, metal sleeve 17 is preset with L-shaped manomelia top plate 2, and skeleton 11, both sides' steel skeleton 21 are provided with top outside steel pipe Plate Screw arbor with nut at both-ends 18, top plate Screw arbor with nut at both-ends 18 passes through to drawing self-locking manner that end template 7 is temporarily fixed through metal sleeve 17.
The formwork reinforcement system for the L-type shear wall with short piers one-piece casting construction that the present invention is used, comprises the following steps:
The first step, on the ground surveying and locating go out L-type shear wall with short piers body position, according to L-type shear wall with short piers body position Baseline makes the outer skeleton 11 of double steel pipe with the position of double steel pipe inner frame 12, the skeleton outside outer side rail plywood form 3 and double steel pipe The outside back cord lumps of wood 9 is provided between 11,
The inner side back cord lumps of wood 10 is provided between interior side rail plywood form 4 and double steel pipe inner frame 12, in advance will be interior The side back cord lumps of wood 10, the outside back cord lumps of wood 9 be using the colligation of iron wire 20 outside double steel pipe inner frame 12 and double steel pipe skeleton 11 it On, while carrying out skeleton 11 and double steel pipe in-seam outside the steel pipe of L-shaped short-limb wall wall 1 section by section using the method for hand fit's hoist engine The assembly of frame 12.After treating that the outer skeleton 11 of double steel pipe and the assembly of double steel pipe inner frame 12 are completed at L-shaped short-limb wall wall 1, L is installed Used at steel pipe outer skeleton 11, double steel pipe inner frame 12 and end both sides' steel skeleton 21 at shape manomelia wall top plate 2, its interior joint Steel pipe cruciform fastening for falsework 23 is connected together, while skeleton 11 and double steel pipe in-seam outside the double steel pipe of L-shaped manomelia wall top plate 2 Mounting end Screw arbor with nut at both-ends 25 carries out the temperature pier of skeleton in the wall end of frame 12, it is ensured that in L-shaped manomelia wall steel pipe Outer framework location Huaihe River really, has reached the effect of formwork support structure safety and stability.
Second step, the outside back cord lumps of wood 9 along skeleton outside double steel pipe 11 and the inner side back cord side of double steel pipe inner frame 12 The outside wood plywood template 3 and inner side wood plywood template 4 of L-shaped short-limb wall wall 1 are installed in the outer surface of wood 10, in assembled mistake Cheng Zhong, carry out when overstory plywood form is installed need in lower template upper end, down 20 centimeters are provided with PVC sleeve pipes 13, Screw rod 14 through walls is installed in PVC sleeve pipes 13, every layer of template faced drawing on skeleton 11 and double steel pipe inner frame 12 outside double steel pipe Shi Jiagu and template correction, to ensure that every layer of formwork structure is precise and stable.After the model sheetinstallat of L-shaped short-limb wall wall 1 is completed Carry out the installation of the outside wood plywood template 3, inner side wood plywood template 4 and screw rod through walls 14 of L-shaped manomelia wall top plate 2; The mounting end lumps of wood back cord 24 on end both sides' steel skeleton 21, the top mounting end template 7 of lumps of wood back cord 24 in end, end Piece between portion's template 7, inner side wood plywood template 4, outside wood plywood template 3 is engaged on by sticky sponge strip 8 Together, it is prevented effectively from spillage.
3rd step, after end template 7, inner side wood plywood template 4, outside wood plywood template 3 are installed using wearing Wall screw rod 14 and end Screw arbor with nut at both-ends 25 carry out the Integral correction of template, it is ensured that tight at mold plate verticality and formwork edge joint Property, template tightens screw rod 14 through walls and end Screw arbor with nut at both-ends 25 after checking, outside the steel pipe of L-shaped manomelia wall top plate skeleton 11 with it is double Top plate Screw arbor with nut at both-ends 18 is installed through metal sleeve 17 between square steel skeleton 21, using to drawing self-locking manner to carry out end template 7 It is accurate fixed.
4th step, outside steel pipe weld additional fastener 16 on skeleton 11 and double steel pipe inner frame 12, additional fastener 16 with Wall screw rod drawknot 19 is installed, outside the steel pipe at wall external corner 5 between skeleton 11 and additional fastener 16 on both sides' steel skeleton 21 External corner screw rod drawknot 15 is installed, top plate screw rod drawknot is installed between the both sides' steel skeleton 21 and additional fastener 16 of wall end 22, the outer skeleton 11 of wall double steel pipe, double steel pipe inner frame 12 and end both sides' steel skeleton one entirety of formation is effectively ensured, effectively Improve template bearing capacity.

Claims (3)

1. a kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction, including L-shaped short-limb wall wall (1) and L-shaped it is short Limb wall top plate (2), it is characterised in that be provided with outer side rail on the outside of L-shaped short-limb wall wall (1) and L-shaped manomelia wall top plate (2) Plywood form (3), is provided with inner side wood plywood mould on the inside of L-shaped short-limb wall wall (1) and L-shaped manomelia wall top plate (2) Plate (4), is provided with wall external corner (5), in interior side rail plywood form (4) in outer side rail plywood form (3) upper end corner Upper end corner be provided with wall internal corner (6), in the end of L-shaped short-limb wall wall (1) and the end of L-shaped manomelia wall top plate (2) Portion is provided with end template (7), end template (7) and outside wood plywood template (3), inner side wood plywood template (4), wall Piece between body external corner (5), wall internal corner (6) is engaging one another together by sticky sponge strip (8), in outer side rail gluing Be provided with the outside back cord lumps of wood (9) between the outer skeleton (11) of template die plate (3) and double steel pipe, interior side rail plywood form (4) with The inner side back cord lumps of wood (10) is provided between double steel pipe inner frame (12), the end lumps of wood back of the body is provided with the outside of end template (7) Stupefied (24), end lumps of wood back cord (24) is placed between end both sides' steel skeleton (21) and end template (7), the inner side back cord lumps of wood (10), the outside back cord lumps of wood (9) be using iron wire (20) colligation double steel pipe inner frame (12) and double steel pipe outside skeleton (11) it On, PVC sleeve pipes (13) are preset in outer side rail plywood form (3) and inner side wood plywood template (4), screw rod (14) through walls is worn PVC sleeve pipes (13) are crossed to carry out to drawing self-locking temperature pier on skeleton (11) and double steel pipe inner frame (12) outside double steel pipe, it is double The outer skeleton (11) of steel pipe, double steel pipe inner frame (12), use steel pipe cruciform fastening for falsework (23) at end both sides' steel skeleton (21) node Connect together, the diverse location of skeleton (11) and double steel pipe inner frame (12) is welded with multiple additional buttons outside double steel pipe Part (16), is provided with additional fastener (16) and between end both sides' steel skeleton (21) of L-shaped short-limb wall wall (1) end Wall screw rod drawknot (19), sun is provided with outside the double steel pipe at wall external corner (5) place between skeleton (11) and additional fastener (16) Angle screw rod drawknot (15), it is provided with end split bolt between skeleton (11) and double steel pipe inner frame (12) outside double steel pipe (25)。
2. formwork reinforcement system according to claim 1, it is characterised in that for pre- in L-shaped manomelia wall top plate (2) Provided with metal sleeve (17), skeleton (11), end both sides' steel skeleton (21) are provided with top plate Screw arbor with nut at both-ends (18) outside double steel pipe, Top plate Screw arbor with nut at both-ends (18) passes through to drawing self-locking manner that end template (7) is temporarily fixed through metal sleeve (17).
3. formwork reinforcement system according to claim 1, it is characterised in that the end positioned at L-shaped manomelia wall top plate (2) end Top plate screw rod drawknot (22) is provided between portion's both sides' steel skeleton (21) and additional fastener (16).
CN201710167190.XA 2017-03-20 2017-03-20 A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction Pending CN106968435A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710167190.XA CN106968435A (en) 2017-03-20 2017-03-20 A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710167190.XA CN106968435A (en) 2017-03-20 2017-03-20 A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction

Publications (1)

Publication Number Publication Date
CN106968435A true CN106968435A (en) 2017-07-21

Family

ID=59329044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710167190.XA Pending CN106968435A (en) 2017-03-20 2017-03-20 A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction

Country Status (1)

Country Link
CN (1) CN106968435A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700836A (en) * 2017-09-26 2018-02-16 福建建工集团有限责任公司 A kind of reinforcement system and construction method of L-shaped filling wall construction column template
CN107700828A (en) * 2017-09-26 2018-02-16 福建建工集团有限责任公司 A kind of shear wall corner formwork reinforcement system and preparation method thereof
CN110042957A (en) * 2019-05-10 2019-07-23 中铁建设集团有限公司 A kind of steel bar template integration L shape wall member and production method
CN110145116A (en) * 2018-02-12 2019-08-20 泰博混凝土模板与支撑(陕西)有限公司 A kind of lightgage steel joist type corner wall mould reinforcement system
CN110857588A (en) * 2018-08-23 2020-03-03 五冶集团上海有限公司 Method for reinforcing concrete shear wall internal and external corner template
CN114278084A (en) * 2022-02-21 2022-04-05 中铁十六局集团城市建设发展有限公司 Shear force wall negative and positive corner template fixing device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020100247A1 (en) * 2001-01-31 2002-08-01 Nieh-Hung Lai Method for quickly building a building and moldboard employed in the method
CN101654925A (en) * 2009-09-15 2010-02-24 清华大学建筑设计研究院 Space fixing truss concrete construction and construction method thereof
CN103206088A (en) * 2013-04-18 2013-07-17 成军 Shear wall structural wall and slab integral pouring construction method
CN103967271A (en) * 2014-05-27 2014-08-06 安徽华力建设集团有限公司 Formwork combination reinforcing and supporting structure used in short-leg shear wall construction and construction method thereof
CN106121227A (en) * 2016-06-29 2016-11-16 山东三箭建设工程管理有限公司 A kind of moldboard reinforcing tool and utilize its method carrying out pier formwork reinforcement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020100247A1 (en) * 2001-01-31 2002-08-01 Nieh-Hung Lai Method for quickly building a building and moldboard employed in the method
CN101654925A (en) * 2009-09-15 2010-02-24 清华大学建筑设计研究院 Space fixing truss concrete construction and construction method thereof
CN103206088A (en) * 2013-04-18 2013-07-17 成军 Shear wall structural wall and slab integral pouring construction method
CN103967271A (en) * 2014-05-27 2014-08-06 安徽华力建设集团有限公司 Formwork combination reinforcing and supporting structure used in short-leg shear wall construction and construction method thereof
CN106121227A (en) * 2016-06-29 2016-11-16 山东三箭建设工程管理有限公司 A kind of moldboard reinforcing tool and utilize its method carrying out pier formwork reinforcement

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700836A (en) * 2017-09-26 2018-02-16 福建建工集团有限责任公司 A kind of reinforcement system and construction method of L-shaped filling wall construction column template
CN107700828A (en) * 2017-09-26 2018-02-16 福建建工集团有限责任公司 A kind of shear wall corner formwork reinforcement system and preparation method thereof
CN110145116A (en) * 2018-02-12 2019-08-20 泰博混凝土模板与支撑(陕西)有限公司 A kind of lightgage steel joist type corner wall mould reinforcement system
CN110145116B (en) * 2018-02-12 2023-08-15 陕西泰博智能化建筑工程系统有限公司 Light steel joist type corner wall mould reinforcing system
CN110857588A (en) * 2018-08-23 2020-03-03 五冶集团上海有限公司 Method for reinforcing concrete shear wall internal and external corner template
CN110042957A (en) * 2019-05-10 2019-07-23 中铁建设集团有限公司 A kind of steel bar template integration L shape wall member and production method
CN114278084A (en) * 2022-02-21 2022-04-05 中铁十六局集团城市建设发展有限公司 Shear force wall negative and positive corner template fixing device

Similar Documents

Publication Publication Date Title
CN106968435A (en) A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction
CN106926359A (en) A kind of vertical manufacture method of slag concrete sandwich insulation exterior wall plate
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN107130791A (en) Combining aluminum alloy mould plate is used for the construction method of assembly concrete precast construction
CN202706536U (en) Lateral support formwork applied to post-cast strip or construction joint
CN105143570A (en) Building structure and construction method for same
CN206512581U (en) Transverse prestress overall with reinforced concrete bridge deck slab plate combination beam
CN108301545A (en) A kind of big module overlapping contignation of the assembled with space truss temporary support
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN206396966U (en) A kind of assembled laminated floor slab plate seam node component
CN103452350A (en) Fabricated electronic workshop and construction method thereof
CN111218983A (en) Lattice formula structure concrete frame house
CN208981528U (en) Assembled overlaps board wall grouting behind shaft or drift lining connecting joint structure
CN210767266U (en) Prefabricated assembled type stiffening concrete column member node connecting structure
CN210713517U (en) Assembled superposed beam structure
CN204173804U (en) A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure
CN207140033U (en) Assembly concrete exterior wall board mold
CN207244961U (en) A kind of Prefabricated stacking floor with side flanging for being used to drop plate region
CN206753043U (en) A kind of Structure Beam-column node Hou Jiao areas mould plate supporting device
CN203603542U (en) Fabricated electronic workshop
CN201321720Y (en) Ring-beam no-putlog-hole template erecting device in brick and concrete structure construction
CN209397938U (en) One kind reinforcing tooling for Double-side laminated co-clip heart heat-preservation shear wall wall root
CN206769245U (en) A kind of combination construction component for strengthening Sloping roof construction quality
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN206360337U (en) A kind of bracing means of staircase concrete wall joint part

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170721

WD01 Invention patent application deemed withdrawn after publication