- Prior art keywords
- gangboard
- bottom panel
- panel
- strip type
- type stair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a drawable slat type stair template. Between the construction slit positions of two connected step bottom plates is arrange a gap having the width of 80-100mm, in which is inserted a drawable slat. By using the gap between the step bottom plates in the utility model, the garbage can be fully cleaned by flushing during the second time pour and tamp of the construction slit. The concrete can be poured into the construction slit after the inserting of the drawable plates to guarantee the slag inclusion-free phenomenon on the construction slit after the disassembling of the mold. The utility model can be widely used in the template arrangement of the stair concrete pouring.
Description
Technical field
The utility model relates to a kind of stair template, but particularly a kind of pull lath stair template of removing gangboard panel constuction joint place rubbish.
Background technology
At present, stair mould plate technique in the building engineering construction, in textbook, construction handbook, tecnical regulations, stair constuction joint place is mingled with and do not have certain preventive action, oneself builds the concrete residue of part and traditional stair template tends to have gathered some in the constuction joint position, if before the concrete of pouring construction seam position, do not dispose, can form the common quality defect of slag inclusion behind the stripping in stair gangboard bottom surface.
The utility model content
But the purpose of this utility model provides a kind of pull strip type stair template, solve the rubbish cleaning waste slag difficulty that exists in the present stair mould plate technique, causes the technical problem of concrete surface slag inclusion common fault.
For achieving the above object, the utility model adopts following technical scheme:
But a kind of pull strip type stair template, comprise gangboard template and support system, the gangboard template is supported on the support system top, the gangboard template comprises the gangboard bottom panel, the top panel of marking time, the mark time side panel and the outer group side panel of marking time, the described two gangboard bottom panels that join are reserved the space of wide a 80~100mm of being of seam in gangboard constuction joint position, but are inserted with the pull lath wide with the space in the space.
The bottom surface of described gangboard bottom panel helps the position to be provided with grid outside stair, and mark time outer group side panel, gangboard bottom panel and the grid of same vertical facade connect as one by split bolt.
Described grid is flitch or steel side.
Described stair template also comprises landing slab bottom panel and platform beam forms.
Described support system is made up of secondary joist, main joist and supporting row frame, and supporting row frame is formed by vertical rod and horizon bar square crossing, and secondary joist is supported on the main joist, and main joist is connected with the vertical rod colligation of supporting row frame.
Be provided with bridging between the described vertical rod.
Described landing beam template comprises landing beam bottom panel and platform beam sides plate, and landing slab bottom panel, landing beam bottom panel and platform beam sides plate are supported on the secondary joist.
But described gangboard bottom panel, the side panel of marking time, the top panel of marking time, mark time outer group side panel, landing slab bottom panel, landing beam bottom panel, landing beam side panel and pull lath are veneer, bamboo clappers, plank or steel plate.
Compared with prior art the utlity model has following characteristics and beneficial effect:
At first, but the utility model passes through the setting of pull lath, has solved the quality problems such as slag inclusion of job site stair constuction joint, efficiently solves job site common quality defect problem.
Secondly, the utility model is simple in structure, is skillfully constructed, and material source is convenient.
The utility model has overcome the rubbish cleaning waste slag difficulty that exists in traditional stair mould plate technique, causes the shortcoming of concrete surface slag inclusion common fault, has solved by simple structure to guarantee that stair soffit builds the technical problem of the common quality defect of no slag inclusion.
The utility model can be widely used in the formwork erection in the stair concreting.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is a structural representation of the present utility model.
Reference numeral: mark time top panel, 8-mark time outer group side panel, 9-vertical rod, 10-horizon bar, 11-landing slab bottom panel, 12-landing beam bottom panel, 13-landing beam side panel, 14-gangboard constuction joint, 15-split bolt of side panel, 7-but 1-gangboard bottom panel, 2-pull lath, 3-secondary joist, 4-main joist, 5-bridging, 6-are marked time.
The specific embodiment
Embodiment is referring to shown in Figure 1, but a kind of pull strip type stair template, comprise gangboard template and support system, the gangboard template is supported on the support system top, the gangboard template comprises the gangboard bottom panel, the top panel 7 of marking time, the mark time side panel 6 and the outer group side panel 8 of marking time, the described two gangboard bottom panels 1 that join are reserved the space of wide a 80~100mm of being of seam in gangboard constuction joint 14 positions, but are inserted with the pull lath 2 wide with the space in the space.The bottom surface of described gangboard bottom panel 1 helps the position to be provided with grid outside stair, and mark time outer group side panel 8, gangboard bottom panel 1 and the grid of same vertical facade connect as one by split bolt 15.Described grid is flitch or steel side.Described stair template also comprises landing slab bottom panel 11 and platform beam forms.Described support system is made up of secondary joist 3, main joist 4 and supporting row frame, and supporting row frame is formed by vertical rod 9 and horizon bar 10 square crossings, and secondary joist 3 is supported on the main joist 4, and main joist 4 is connected with vertical rod 9 colligations of supporting row frame.Be provided with bridging 5 between the described vertical rod 9.Described landing beam template comprises landing beam bottom panel 12 and platform beam sides plate 13, and landing slab bottom panel, landing beam bottom panel 12 and platform beam sides plate 13 are supported on the secondary joist 3.But described gangboard bottom panel 1, the side panel 6 of marking time, the top panel 7 of marking time, mark time outer group side panel 8, landing slab bottom panel 11, landing beam bottom panel 12, landing beam side panel 13 and pull lath 2 are veneer, bamboo clappers, plank or steel plate.
All slab joints place adopt wide adhesive sticker to paste, and prevent spillage.Panel upper surface should be brushed release agent on request.
Add the support of putting more energy between the grid, to eliminate the distortion of step plate.
The course of work of the present utility model:
At first in template construction, the two gangboard bottom panels that join are reserved the space of wide a 80~100mm of being of seam in gangboard constuction joint 14 positions, but be inserted with pull lath 2 in the space, and after the situation of checking on the quality, enter next process after qualified; Then after concreting, but take out out pull lath 2, carry out the conventional treatment of constuction joint, carry out work such as garbage-cleaning, guarantee the constuction joint secondary water smash concrete interface place rubbish all wash (cleaning) clean, carry out constuction joint second pouring concrete but plug pull lath 2 again.
Claims (8)
1. but pull strip type stair template, comprise gangboard template and support system, the gangboard template is supported on the support system top, the gangboard template comprises the gangboard bottom panel, the top panel of marking time (7), the side panel of marking time (6) and the outer group side panel (8) of marking time, it is characterized in that: the described two gangboard bottom panels (1) that join are reserved the space of wide a 80~100mm of being of seam in gangboard constuction joint (14) position, but are inserted with the pull lath (2) wide with the space in the space.
2. but pull strip type stair template according to claim 1, it is characterized in that: the bottom surface of described gangboard bottom panel (1) helps the position to be provided with grid outside stair, and mark time outer group side panel (8), gangboard bottom panel (1) and the grid of same vertical facade connect as one by split bolt (15).
3. but pull strip type stair template according to claim 2, it is characterized in that: described grid is flitch or steel side.
4. but pull strip type stair template according to claim 1, it is characterized in that: described stair template also comprises landing slab bottom panel (11) and platform beam forms.
5. but pull strip type stair template according to claim 4, it is characterized in that: described support system is made up of secondary joist (3), main joist (4) and supporting row frame, supporting row frame is formed by vertical rod (9) and horizon bar (10) square crossing, secondary joist (3) is supported on the main joist (4), and main joist (4) is connected with vertical rod (9) colligation of supporting row frame.
6. but pull strip type stair template according to claim 4 is characterized in that: be provided with bridging (5) between the described vertical rod (9).
7. but pull strip type stair template according to claim 4, it is characterized in that: described landing beam template comprises landing beam bottom panel (12) and platform beam sides plate (13), and landing slab bottom panel, landing beam bottom panel (12) and platform beam sides plate (13) are supported on the secondary joist (3).
8. but pull strip type stair template according to claim 4 is characterized in that: described gangboard bottom panel (1), the side panel of marking time (6), the top panel of marking time (7), the outer group side panel (8) of marking time, landing slab bottom panel (11), landing beam bottom panel (12), landing beam side panel (13) but and pull lath (2) be veneer, bamboo clappers, plank or steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202685994U CN201722927U (en) | 2010-07-23 | 2010-07-23 | Drawable slat type stair template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202685994U CN201722927U (en) | 2010-07-23 | 2010-07-23 | Drawable slat type stair template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201722927U true CN201722927U (en) | 2011-01-26 |
Family
ID=43491245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202685994U Expired - Fee Related CN201722927U (en) | 2010-07-23 | 2010-07-23 | Drawable slat type stair template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201722927U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747837A (en) * | 2012-07-06 | 2012-10-24 | 中国十七冶集团有限公司 | Cleaning method for cast-in-place reinforced concrete stair segment timber template |
CN103321409A (en) * | 2012-03-23 | 2013-09-25 | 中国二十冶集团有限公司 | Supporting method of cast-in-place concrete slab type stair framework free from cleaning construction joints |
CN103321423A (en) * | 2013-07-10 | 2013-09-25 | 南通华新建工集团有限公司 | Cast-in-place concrete stair construction method |
CN103669865A (en) * | 2013-12-20 | 2014-03-26 | 广东省第四建筑工程公司 | Stair construction method through shaped supports |
CN103696565A (en) * | 2013-12-31 | 2014-04-02 | 青建集团股份公司 | Integral stair tread formwork installation method |
CN104074353A (en) * | 2013-03-26 | 2014-10-01 | 中国二十冶集团有限公司 | Stair construction joint blocking template and application method thereof |
CN105332506A (en) * | 2015-11-18 | 2016-02-17 | 上海建工五建集团有限公司 | Formwork support system for parallel multi-section stair and method for constructing same |
CN106088588A (en) * | 2016-08-05 | 2016-11-09 | 中国建筑第七工程局有限公司 | A kind of cast-in-situ stair is closed formwork erecting structure and pours in down a chimney the construction of concrete |
-
2010
- 2010-07-23 CN CN2010202685994U patent/CN201722927U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321409A (en) * | 2012-03-23 | 2013-09-25 | 中国二十冶集团有限公司 | Supporting method of cast-in-place concrete slab type stair framework free from cleaning construction joints |
CN102747837A (en) * | 2012-07-06 | 2012-10-24 | 中国十七冶集团有限公司 | Cleaning method for cast-in-place reinforced concrete stair segment timber template |
CN104074353A (en) * | 2013-03-26 | 2014-10-01 | 中国二十冶集团有限公司 | Stair construction joint blocking template and application method thereof |
CN104074353B (en) * | 2013-03-26 | 2016-09-28 | 中国二十冶集团有限公司 | Stair construction joint stopend and using method thereof |
CN103321423A (en) * | 2013-07-10 | 2013-09-25 | 南通华新建工集团有限公司 | Cast-in-place concrete stair construction method |
CN103669865A (en) * | 2013-12-20 | 2014-03-26 | 广东省第四建筑工程公司 | Stair construction method through shaped supports |
CN103696565A (en) * | 2013-12-31 | 2014-04-02 | 青建集团股份公司 | Integral stair tread formwork installation method |
CN105332506A (en) * | 2015-11-18 | 2016-02-17 | 上海建工五建集团有限公司 | Formwork support system for parallel multi-section stair and method for constructing same |
CN106088588A (en) * | 2016-08-05 | 2016-11-09 | 中国建筑第七工程局有限公司 | A kind of cast-in-situ stair is closed formwork erecting structure and pours in down a chimney the construction of concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201722927U (en) | Drawable slat type stair template | |
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN101144328A (en) | Construction method for after-pouring band beam-slab template | |
CN104153508A (en) | Floor construction structure and method | |
CN104947719A (en) | Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof | |
CN106368245A (en) | Construction method for post-cast strip supporting formwork easy to clean | |
CN104060760B (en) | High Rise Building Transfer Floor Structure concrete super large beam construction in layer method | |
CN108979132A (en) | Floor post-cast strip template support system | |
CN105952154B (en) | A kind of concrete-pouring template stent | |
CN202850485U (en) | A simple and practical building surface post-cast strip framework support system | |
CN114704112A (en) | Disassembly-free anti-seepage plugging method for cantilever type scaffold steel beam through-wall opening | |
CN107227843A (en) | A kind of alter-pouring strips mould plate support system and construction method | |
CN207048310U (en) | A kind of alter-pouring strips mould plate support system | |
CN106337530B (en) | A kind of construction of frame beam seams stifled construction method | |
CN204609293U (en) | Portablely locate buttress casting mold | |
CN205857707U (en) | Stair step constructing device | |
CN104295089A (en) | Support system of cast-in-place concrete GBF honeycomb core dense-rib floor system | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN203603462U (en) | Post-cast strip beam plate formwork supporting structure | |
CN105780975B (en) | The control technique of partition wall plank split | |
CN201972395U (en) | Steel-frame double-layer-net building template | |
CN204531405U (en) | A kind of traveling formwork device being convenient to the cleaning of stair construction joint position | |
CN207194032U (en) | A kind of post-cast strip cleans aperture apparatus | |
CN204252084U (en) | The plate device at position, slope is played for arch dam bracket | |
CN109629696B (en) | Connection node and bamboo building structure of former bamboo combination wallboard of assembled and floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110126 Termination date: 20130723 |