- CN204252084U CN204252084U CN201420723340.2U CN201420723340U CN204252084U CN 204252084 U CN204252084 U CN 204252084U CN 201420723340 U CN201420723340 U CN 201420723340U CN 204252084 U CN204252084 U CN 204252084U
- Authority
- CN
- China
- Prior art keywords
- truss
- slope
- operating desk
- sub
- locating cone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 239000002023 wood Substances 0.000 claims description 6
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 5
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 5
- 241001330002 Bambuseae Species 0.000 claims description 5
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 5
- 239000011425 bamboo Substances 0.000 claims description 5
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 18
- 238000009434 installation Methods 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of plate device playing position, slope for arch dam bracket, comprise slope panel, sub-truss, triangle operating desk, first pre-buried locating cone and the second pre-buried locating cone, first pre-buried locating cone is embedded on the sidewall of Arch Dam Concrete, triangle operating desk is fastenedly connected by the first tight fixed bolt and the first pre-buried locating cone, sub-truss has been connected to the dorsal part of slope panel by the second tight fixed bolt, second pre-buried locating cone has been arranged at the front side of slope panel and has been fastenedly connected with the second tight fixed bolt, the bottom of sub-truss and the top of triangle operating desk are intermittently welded to connect.This plate device has the high advantage of simple to operate, short construction period, safety.
Description
Technical field
The utility model relates generally to building engineering construction field, particularly relates to a kind of plate device playing position, slope for arch dam bracket.
Background technology
In the Arch Dam Structure of hydraulic engineering, need to arrange a large amount of bracket structures, in bracket structure work progress, the construction of cantilever position is particularly crucial, and the difficult point of cantilever position concrete construction is work high above the ground.In prior art, what bracket played that the construction at position, slope adopts is the mode of on-the-spot formwork erection, namely the bracket template of supporting the reinforcement of concrete is that on-the-spot in bulk faling apart tears formula structure open, due to the complexity at bracket position, adopt the on-the-spot loose mode of tearing open in bulk in this high-altitude to there is great potential safety hazard, meanwhile, its difficulty of construction is also very large, substantially prolongs construction period, raise construction cost.
Utility model content
The technical problems to be solved in the utility model overcomes the deficiencies in the prior art, provides the plate device playing position, slope for arch dam bracket that a kind of simple to operate, short construction period, safety are high.
For solving the problems of the technologies described above, the utility model by the following technical solutions:
A kind of plate device playing position, slope for arch dam bracket, comprise slope panel, sub-truss, triangle operating desk, first pre-buried locating cone and the second pre-buried locating cone, described first pre-buried locating cone is embedded on the sidewall of Arch Dam Concrete, described triangle operating desk is fastenedly connected by the first tight fixed bolt and the first pre-buried locating cone, described sub-truss has been connected to the dorsal part of slope panel by the second tight fixed bolt, described second pre-buried locating cone has been arranged at the front side of slope panel and has been fastenedly connected with the second tight fixed bolt, the bottom of described sub-truss and the top of triangle operating desk are intermittently welded to connect.
Further improvement as technique scheme:
Described slope panel dorsal part interval uniform welding has steel pipe, and between described steel pipe and support truss, wedge copied by the wood be provided with for levelling slope panel.
The top of described triangle operating desk is equipped with the bamboo splint of convenient operation.
Described triangle operating desk and sub-truss outer peripheral are provided with the close net of safety.
Described sub-truss is all welded with for being connected next horizontal Pin sub-truss and the angle steel of triangle operating desk respectively with triangle operating desk inside.
Compared with prior art, the utility model has the advantage of:
The plate device playing position, slope for arch dam bracket of the present utility model, comprise slope panel, sub-truss, triangle operating desk, first pre-buried locating cone and the second pre-buried locating cone, first pre-buried locating cone is embedded on the sidewall of Arch Dam Concrete, triangle operating desk is fastenedly connected by the first tight fixed bolt and the first pre-buried locating cone, sub-truss has been connected to the dorsal part of slope panel by the second tight fixed bolt, second pre-buried locating cone has been arranged at the front side of slope panel and has been fastenedly connected with the second tight fixed bolt, the bottom of sub-truss and the top of triangle operating desk are intermittently welded to connect, in this structure, play slope panel, sub-truss, triangle operating desk, first pre-buried locating cone and the second pre-buried locating cone all can make in factory in advance in batch, during installation, first the first pre-buried locating cone is embedded on the sidewall of Arch Dam Concrete, with the first tight fixed bolt, triangle operating desk and the first pre-buried locating cone are fastenedly connected, to realize the installation of triangle operating desk, then with the second tight fixed bolt, sub-truss has been connected to the dorsal part of slope panel, again by the second pre-buried locating cone from the front side of slope panel and the second tight fixed bolt be fastenedly connected, when ensureing that lower one deck sub-truss is installed, can already installed this layer of sub-truss be braced structures, finally, the top of the bottom of this layer of sub-truss and triangle operating desk is intermittently welded to connect, the installation work that bracket plays slope position template device can be completed, comparatively traditional structure, this plate device can reduce the storehouse face die plate set-up time, shorten the standby storehouse time of this cantilever-face, substantially reduce construction period, reduce difficulty of construction and construction cost, simultaneously, the installation of sub-truss can be carried out on triangle operating desk, without facing idle job face when namely constructing, substantially increase the safety of construction.
Accompanying drawing explanation
Fig. 1 is the utility model plays the plate device at position, slope structural representation for arch dam bracket.
Fig. 2 is the A place structure for amplifying schematic diagram of Fig. 1.
In figure, each label represents:
1, slope panel is played; 2, truss is supportted; 3, triangle operating desk; 4, the first pre-buried locating cone; 5, the second pre-buried locating cone; 6, the first tight fixed bolt; 7, the second tight fixed bolt; 8, steel pipe; 9, wedge copied by wood; 10, bamboo splint; 11, the close net of safety; 12, angle steel.
Detailed description of the invention
Below with reference to Figure of description and specific embodiment, the utility model is described in further details.
Fig. 1 and Fig. 2 shows the utility model plays the plate device at position, slope embodiment for arch dam bracket, this plate device has comprised slope panel 1, sub-truss 2, triangle operating desk 3, first pre-buried locating cone 4 and the second pre-buried locating cone 5, first pre-buried locating cone 4 is embedded on the sidewall of Arch Dam Concrete, triangle operating desk 3 is fastenedly connected by the first tight fixed bolt 6 and the first pre-buried locating cone 4, sub-truss 2 has been connected to the dorsal part of slope panel 1 by the second tight fixed bolt 7, second pre-buried locating cone 5 has been arranged at the front side of slope panel 1 and has been fastenedly connected with the second tight fixed bolt 7, the bottom of sub-truss 2 and the top of triangle operating desk 3 are intermittently welded to connect, in this structure, play slope panel 1, sub-truss 2, triangle operating desk 3, first pre-buried locating cone 4 and the second pre-buried locating cone 5 all can make in factory in advance in batch, during installation, first the first pre-buried locating cone 4 is embedded on the sidewall of Arch Dam Concrete, with the first tight fixed bolt 6, triangle operating desk 3 and the first pre-buried locating cone 4 are fastenedly connected, to realize the installation of triangle operating desk 3, then with the second tight fixed bolt 7, sub-truss 2 has been connected to the dorsal part of slope panel 1, again by the second pre-buried locating cone 5 from the front side of slope panel 1 and the second tight fixed bolt 7 be fastenedly connected, when ensureing that lower one deck sub-truss 2 is installed, can already installed this layer of sub-truss 2 be braced structures, finally, the top of the bottom of this layer of sub-truss 2 and triangle operating desk 3 is intermittently welded to connect, the installation work that bracket plays slope position template device can be completed, comparatively traditional structure, this plate device can reduce the storehouse face die plate set-up time, shorten the standby storehouse time of this cantilever-face, substantially reduce construction period, reduce difficulty of construction and construction cost, simultaneously, the installation of sub-truss 2 can be carried out on triangle operating desk 3, without facing idle job face when namely constructing, substantially increase the safety of construction.
In the present embodiment, play slope panel 1 dorsal part interval uniform welding and have steel pipe 8, between steel pipe 8 and support truss 2, wedge 9 copied by the wood be provided with for levelling slope panel 1, in this structure, by steel pipe 8 and wood copy wedge 9 with the use of, be convenient to levelling slope panel 1 on the one hand, improve the pouring quality that bracket plays position, slope, on the other hand, slope panel 1 has been made not form direct contact with support truss 2, exit wood and copy wedge 9 as long as beat and just can realize slope panel 1 and support being separated of truss 2, substantially increase the convenience of dismounting.
In the present embodiment, the top of triangle operating desk 3 is equipped with the bamboo splint 10 of convenient operation, and this bamboo splint 10 makes constructor can construct at the top of triangle operating desk 3, does not need to face idle job, ensure that the safety of construction.
In the present embodiment, triangle operating desk 3 and sub-truss 2 outer peripheral are provided with the close net 11 of safety, fall, play a protective role when the close net 11 of this safety can prevent constructor from constructing.
In the present embodiment, sub-truss 2 and triangle operating desk 3 inside are all welded with for being connected next horizontal Pin sub-truss 2 and the angle steel 12 of triangle operating desk 3 respectively, when setting up next Pin sub-truss 2 and triangle operating desk 3, only need to be welded to connect with the angle steel 12 of the sub-truss 2 set up and triangle operating desk 3 accordingly, it is simple and practical.
Although the utility model discloses as above with preferred embodiment, but and be not used to limit the utility model.Any those of ordinary skill in the art, when not departing from technical solutions of the utility model scope, the technology contents of above-mentioned announcement all can be utilized to make many possible variations and modification to technical solutions of the utility model, or be revised as the Equivalent embodiments of equivalent variations.Therefore, every content not departing from technical solutions of the utility model, according to the utility model technical spirit to any simple modification made for any of the above embodiments, equivalent variations and modification, all should drop in the scope of technical solutions of the utility model protection.
Claims (6)
1. one kind is played the plate device at position, slope for arch dam bracket, it is characterized in that: comprised slope panel (1), sub-truss (2), triangle operating desk (3), first pre-buried locating cone (4) and the second pre-buried locating cone (5), described first pre-buried locating cone (4) is embedded on the sidewall of Arch Dam Concrete, described triangle operating desk (3) is fastenedly connected by the first tight fixed bolt (6) and the first pre-buried locating cone (4), described sub-truss (2) has been connected to the dorsal part of slope panel (1) by the second tight fixed bolt (7), described second pre-buried locating cone (5) has been arranged at the front side of slope panel (1) and has been fastenedly connected with the second tight fixed bolt (7), the bottom of described sub-truss (2) and the top of triangle operating desk (3) are intermittently welded to connect.
2. the plate device playing position, slope for arch dam bracket according to claim 1, it is characterized in that: described slope panel (1) dorsal part interval uniform welding has steel pipe (8), between described steel pipe (8) and support truss (2), wedge (9) copied by the wood be provided with for levelling slope panel (1).
3. the plate device playing position, slope for arch dam bracket according to claim 2, is characterized in that: the top of described triangle operating desk (3) is equipped with the bamboo splint (10) of convenient operation.
4. the plate device playing position, slope for arch dam bracket according to any one of claim 1 to 3, is characterized in that: described triangle operating desk (3) and sub-truss (2) outer peripheral are provided with the close net of safety (11).
5. the plate device playing position, slope for arch dam bracket according to any one of claim 1 to 3, is characterized in that: described sub-truss (2) is all welded with for being connected next horizontal Pin sub-truss (2) and the angle steel (12) of triangle operating desk (3) respectively with triangle operating desk (3) inside.
6. the plate device playing position, slope for arch dam bracket according to claim 4, is characterized in that: described sub-truss (2) is all welded with for being connected next horizontal Pin sub-truss (2) and the angle steel (12) of triangle operating desk (3) respectively with triangle operating desk (3) inside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420723340.2U CN204252084U (en) | 2014-11-27 | 2014-11-27 | The plate device at position, slope is played for arch dam bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420723340.2U CN204252084U (en) | 2014-11-27 | 2014-11-27 | The plate device at position, slope is played for arch dam bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204252084U true CN204252084U (en) | 2015-04-08 |
Family
ID=52956409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420723340.2U Expired - Fee Related CN204252084U (en) | 2014-11-27 | 2014-11-27 | The plate device at position, slope is played for arch dam bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204252084U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116950017A (en) * | 2023-07-26 | 2023-10-27 | 中国水利水电第三工程局有限公司 | Construction method for top concrete structure of guide wall of dam spillway |
CN116950016A (en) * | 2023-07-26 | 2023-10-27 | 中国水利水电第三工程局有限公司 | Dam spillway guide wall top bracket template structure |
-
2014
- 2014-11-27 CN CN201420723340.2U patent/CN204252084U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116950017A (en) * | 2023-07-26 | 2023-10-27 | 中国水利水电第三工程局有限公司 | Construction method for top concrete structure of guide wall of dam spillway |
CN116950016A (en) * | 2023-07-26 | 2023-10-27 | 中国水利水电第三工程局有限公司 | Dam spillway guide wall top bracket template structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204298825U (en) | Foundation ditch builds elephant trunk supporting and regulating device | |
CN201567532U (en) | Novel supporting structure of lid beam of bridge | |
CN203961238U (en) | Bolt anchor slab adjustable tool formula builder's jack | |
CN102926504A (en) | Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof | |
CN204252084U (en) | The plate device at position, slope is played for arch dam bracket | |
CN206581602U (en) | A kind of civil engineering bridge construction template link | |
CN204552075U (en) | A kind of wooden H-beam and square steel pipe combined type Types of Fast Dismantle System in Roof Formwork | |
CN204252083U (en) | Arch dam bracket hangs plate device by the feet entirely | |
CN103255929A (en) | Assembly technology of adjustable supporting columns and eight type modularized steel floor slab moulds | |
CN103452328A (en) | Device and method for decreasing columns and reinforcing girders of reinforced concrete members | |
CN207160018U (en) | A kind of dismountable bracing members Guan Liang Z-shaped support hanging plate | |
CN202658765U (en) | Keel framework concrete anti-crack filling wall | |
CN204662369U (en) | A kind of slope cantilever large form | |
CN205088951U (en) | Many function combination jackscrew | |
CN204531441U (en) | The support frame structure levelling for concrete pavement and tool-type leveling system | |
CN203795459U (en) | Foundation structure of tower crane for high-altitude roofs | |
CN204456809U (en) | A kind of steel supporting structure | |
CN104295089A (en) | Support system of cast-in-place concrete GBF honeycomb core dense-rib floor system | |
CN204001190U (en) | Building housing box column transformational structure | |
CN207686147U (en) | Floor and double steel bar protective layer thickness control device | |
CN202990415U (en) | Nuclear power plant four tubular post early detaching supporting device | |
CN103195079B (en) | Installing type template, installing type template group and complete installing type plate device | |
CN206467577U (en) | Cast-in-place box beam bracket | |
CN104404923A (en) | Arch dam bracket template device and construction method based on arch dam bracket template device | |
CN102767280A (en) | Quick-dismounting system and installation method for top plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150408 |
|
CF01 | Termination of patent right due to non-payment of annual fee |