CN105155846A - Construction method for arc-shaped reinforced concrete stand - Google Patents

Construction method for arc-shaped reinforced concrete stand Download PDF

Info

Publication number
CN105155846A
CN105155846A CN201510589364.2A CN201510589364A CN105155846A CN 105155846 A CN105155846 A CN 105155846A CN 201510589364 A CN201510589364 A CN 201510589364A CN 105155846 A CN105155846 A CN 105155846A
Authority
CN
China
Prior art keywords
grandstand
ladder
mould
circular arc
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510589364.2A
Other languages
Chinese (zh)
Other versions
CN105155846B (en
Inventor
谢惠庆
欧定文
雷峰雪
李熊飞
周良兵
雷俊
余刚
李劲松
贾鹏坤
王红委
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU FOURTH CONSTRUCTION ENGINEERING Co.,Ltd. OF CDCEG
Original Assignee
Chengdu No4 Construction Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu No4 Construction Engineering Co filed Critical Chengdu No4 Construction Engineering Co
Priority to CN201510589364.2A priority Critical patent/CN105155846B/en
Publication of CN105155846A publication Critical patent/CN105155846A/en
Application granted granted Critical
Publication of CN105155846B publication Critical patent/CN105155846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to the field of stand construction, particularly to a construction method for an arc-shaped reinforced concrete stand. The method comprises the steps as follows: a supporting frame body is arranged; a stand bottom die is arranged on the supporting frame body; except the beam of the bottom die, other parts of the bottom die are all arranged obliquely; slab bars of a cast-in-place slab are obliquely arranged along the upper surface of the bottom die; a plurality of triangular structures are arranged above a plate surface bar through reinforcing steel bars, face towards the center of a circular arc of the stand and are arranged along the radian of the stand; a plurality of triangular structures are connected to form a ladder-shaped frame on the plate surface bar obliquely and upwards; outside hanger dies of the ladder of the stand are arranged on the ladder-shaped frame, and side dies of the stand are arranged; and casting is carried out. The invention aims to provide the construction method for the arc-shaped reinforced concrete stand. The bottom surface of the stand is an inclined surface built directly; space is saved; and the stand is beautiful.

Description

Circular arc steel concrete grandstand construction method
Technical field
The present invention relates to grandstand construction field, particularly a kind of circular arc steel concrete grandstand construction method.
Background technology
Nowadays, popular scene is seen concert, sees modern drama, is seen sports tournament, and no matter for indoor or outdoor viewing place, often there will be the situation that on-the-spot seat can not meet effective strength, at this moment, need to set up grandstand, be arranged on the top of stall, also cry in indoor " balcony " or " balcony cantilever platform ";
And grandstand is generally the table top of fan-shaped notch cuttype, when building grandstand, in prior art, be generally following situation:
Grandstand soffit is also notch cuttype, this better build, by being horizontally disposed with some moulds, combine formation notch cuttype, then carry out concreting, this method is the most common, be horizontally disposed with because mould is, below it, erection supports and is also very easy to, and difficulty of construction is low, after this grandstand has been constructed, carry out follow-up finishing as required again, as at soffit furred ceiling, forming section inclined-plane or all inclined-plane to reach effect more attractive in appearance, or for other purposes.
Summary of the invention
The object of the invention is to overcome above-mentioned deficiency existing in prior art, provide a kind of direct build bottom surface to be grandstand, the more conserve space on inclined-plane, circular arc steel concrete grandstand construction method more attractive in appearance.
In order to realize foregoing invention object, the invention provides following technical scheme:
A kind of circular arc steel concrete grandstand construction method, the steps include:
A, arrange supporting frame, supporting frame arranges grandstand bed die, and bed die is except the position of beam, and all oblique setting in other positions, along the oblique plate muscle arranging Bars In Poured Concrete Slab of bed die upper surface;
B, above plate gluten by the some triangular structures of steel-bar arrangement, it is towards the center of circle of grandstand circular arc, and arrange (all oblique setting of described bed die along the radian of grandstand, the plate muscle of Bars In Poured Concrete Slab is set along bed die upper surface, described bed die soffit interval is furnished with some crossbeams for supporting described bed die), at plate gluten obliquely, some triangular structures connect to form notch cuttype framework;
C, described notch cuttype framework is arranged and sees and hang mould outside stepladders, grandstand side form is set;
D, to build.
The application has used traditional supporting frame, but, supporting frame is the flitch supporting oblique setting, flitch arranges bed die again, then by described triangular structure, realize the setting of hanging mould, complete the construction to grandstand stairstepping, the grandstand that this mode directly builds out, its ground is except beam, other faces are inclined-planes, more conserve space, more attractive in appearance, or for other specific uses, this construction method compared to existing technology, be exactly different from the off, wherein solve construction difficult problem, in prior art as described in the background art, its bed die is all horizontally disposed, convenient support, also easily build the structure of stairstepping simultaneously, and the application's problems faced needs directly construction bottom surface to be the grandstand on inclined-plane, the mode of Bars In Poured Concrete Slab+hierarchic structure is adopted to realize, Bars In Poured Concrete Slab arranges bed die by oblique, plate muscle completes the component of skeleton, the theory of hanging mould is used to set out hierarchic structure by described triangular structure again, the grandstand of required form is completed together with Bars In Poured Concrete Slab.
As preferred version of the present invention, in described step B, plate muscle arranges some short muscle, short muscle stretches out plate gluten, the tie point of the adjacent described triangular structure of described notch cuttype framework is installed on the part that described short muscle stretches out plate gluten, be arranged in short muscle expenditure part, the thickness of Bars In Poured Concrete Slab itself can be ensured, the intensity of grandstand entirety is guaranteed.
As preferred version of the present invention, in step B, described triangular structure is direct triangular structure, the hypotenuse of right-angled triangle is plate gluten, or be arranged at limit parallel with plate gluten above plate gluten, be installed on again on plate muscle after directly need not becoming complete triangle by steel-bar arrangement, but directly and plate muscle secure bond be integrated, form Article 3 limit by the tie point of two minor faces, form complete triangular structure.
As preferred version of the present invention, described triangular structure is direct triangular structure, the hypotenuse of right-angled triangle is the connecting line on grandstand adjacent two described short muscle tops obliquely, and triangular structure of right angle makes to hang mould outside ladder and can locate better and be arranged in triangular structure.
As preferred version of the present invention, in step C, hang mould and be made up of flitch and wooden form outside described ladder, flitch forms skeleton, and wooden form is arranged on flitch both sides or surrounding, and structure is more firm.
As preferred version of the present invention, in step C, install when hanging mould outside described ladder, the both sides that adjacent two triangular structures are connected, as hanging the lower support point of mould installation outside ladder and hanging mould side gulde edge, install more accurate, it is more accurate to locate, more adapt to cross section be rectangle ladder outside hang mould, the reinforcing bar at triangular structure of right angle top is also provided with spacing three-legged structure by bar connecting, for with ladder outside hang mould another side be connected, to carry out clamping spacing to hanging mould outside ladder to coordinate described gulde edge, ensure that it hangs the positioning precision of mould, simultaneously can when building, play supporting role better, whole casting process is made to hang mould more stable, avoid producing displacement and causing the affected situation of grandstand precision.
As preferred version of the present invention, in step C, after hanging mould installation outside ladder, some split bolts are set to drawing reinforcing, split bolt lower end passes described grandstand bed die and fixes, and above described notch cuttype framework, arrange steel pipe, described split bolt upper end is fixed on described steel pipe, make the template of whole grandstand more stable, when reducing to build, displacement waits the probability that the situation reducing precision occurs.
As preferred version of the present invention, described grandstand bed die arranges two steel pipe, and described split bolt lower end is from passing between two steel pipe and fix, and the steel pipe arranged above described notch cuttype framework is also two steel pipe, and structure simply, is more easily arranged.
As preferred version of the present invention, hang in mould outside single described ladder, flitch is two, setting up and down in parallel to each other, wooden form is fitted in the both sides of two flitches, scientific structure, make outside ladder, to hang mould more stable, not yielding, bear better and come from concrete pressure, flitch is vertically arranged, with circular arc arrayed, described wooden form is arranged on flitch surrounding, form the surface of hanging mould surrounding outside ladder hermetically, flitch setting direction is vertical with the wooden form of both sides, wooden form can straight line or camber line be arranged, the shearing resistance that this mode hangs mould is stronger, more firm, can when building, play supporting role better, whole casting process is made to hang mould more stable, avoid producing displacement and causing the affected situation of grandstand precision.
As preferred version of the present invention, hang after mould installs in step C outside ladder, outside grandstand obliquely adjacent described stepladders, hang intermode gusseted plate is set, the side of mould is hung outside the connected unit ladder of gusseted plate side, opposite side connects the end face hanging mould outside adjacent stations ladder, make the template of whole grandstand more stable, particularly grandstand hangs the mutual support of intermode obliquely outside adjacent steps, and when reducing to build, displacement waits the probability that the situation reducing precision occurs.
compared with prior art, beneficial effect of the present invention:
Direct build bottom surface is grandstand, the more conserve space, more attractive in appearance on inclined-plane.
accompanying drawing illustrates:
Fig. 1 is grandstand constructing structure sectional view in the embodiment of the present application 1;
Fig. 2 is A place partial enlarged drawing in Fig. 1;
Fig. 3 is the method schematic diagram of the embodiment of the present application 1;
Fig. 4 is the grandstand constructing structure sectional view of the embodiment of the present application 2;
Fig. 5 is the structural representation that the application hangs mould;
Mark in figure: 1-plate gluten, muscle at the bottom of 2-plate, 3-Bars In Poured Concrete Slab, 4-split bolt, 5-bed die, the two steel pipe of 6-, hangs mould outside 7-ladder, 8-gusseted plate, 9-triangular structure, the spacing triangular structure of 10-, 11-wooden form, 12-flitch.
Detailed description of the invention
Below in conjunction with embodiment and detailed description of the invention, the present invention is described in further detail.But this should be interpreted as that the scope of the above-mentioned theme of the present invention is only limitted to following embodiment, all technology realized based on content of the present invention all belong to scope of the present invention.
embodiment 1
As Fig. 1, the present embodiment is that Ya'an cultural center engineering (second phase) project is positioned at the blue or green Jiang Gandao in YAAN RAIN CITY DISTRICT Yao Qiao town, Sichuan Province and section intersection, the physical culture south of road.Ya'an cultural center the second stage of the project is (two-layer on the ground by a cultural art center, 4 layers, local), (ground is two-layer for the supporting podium of north side business (on the ground two-layer) and the supporting podium of southern side business, 3 layers, local) composition, overall floorage 13954 ㎡, superstructure area 12681 ㎡, mainly performing art centre and supporting business, underground area 1273 ㎡, for one deck basement, basement floor height is 4.65m.This engineered refractory hierarchically top is divided into secondary, and under ground portion is one-level; The service life of structure design is 50 years; The safe class of building structure is secondary; Base foundation design grade is second class; Structural element seismic behavior three grades, local large span (span 18m) reinforced concrete frame, theater stage overhead height are secondary more than the framework seismic behavior of 24m.
Auditorium's grandstand is one deck altogether, sees that platen distributes from 5.174 meters ~ 7.166 meters absolute altitudes, and amount to 15 rank, seem the step of stair viewed from vertical cross section, upright projection sees similarly to be fan-shaped concentric circles.See that platen bottom is the swash plate tilted, angle of inclination is 27 degree, top is L-type waist slab, bench width has 1000mm, and rise of flight has multiple, and 127mm ~ 224mm is not etc., grandstand thickness of slab 140mm, grandstand master is (folding) beam maximum cross-section 400 × 700, grandstand secondary beam maximum cross-section 250 × 600mm tiltedly, and grandstand arc girder maximum cross-section is 350 × 700.The concrete grade C30 of post, cant beam, Vierendeel girder and secondary beam, grandstand board concrete strength grade are C30.
As 2,3, concrete grandstand construction method step is:
A, surveying setting-out, arrange supporting frame, and supporting frame arranges grandstand bed die 5, and bed die 5 is except the position of beam, and all oblique setting in other positions, along the oblique plate muscle (being made up of muscle 2 at the bottom of plate gluten and plate) arranging Bars In Poured Concrete Slab 3 of bed die 5 upper surface;
Stand Beams, bed die 5 and see that hanging mould 7 panel outside stepladders all adopts 16mm high-quality black wooden form to make panel; Secondary joist selects the two-sided lumps of wood of scraping of 50 × 100mm; Main joist adopts and selects 48.3 × 3.6mm steel pipe;
See that platen often walks wide 1000mm, often walk highly not etc., grandstand time deck-siding is 250mm.For improving speed of application, save circulation material, vertical pole ' s span meets grandstand modulus, and during grandstand construction, support system selects 900mm × 900 all round victory fastener type steel pipe support system.The specific practice of support system refers to template special scheme;
The thick black wooden form of 16mm selected by Stand Inclined Beams, secondary beam, swash plate bed die 5, beam inner side template panel, beam side secondary joist selects the 50mm*100mm lumps of wood, and flitch requires two-sided scraping, and makes it be close to template, main joist selects φ 48.3 × 3.6 short steel pipes, horizontal arrangement folder through-wall bolt; Beam bottom board 5 carries out field lofting processing template by figure paper size, is transported to the scope of operation carries out composite assembly by tower crane, after add horizontal stupefied, and utilize support system to be clamped beam both sides.Bottom swash plate, main joist selects φ 48.3 × 3.6 steel pipe, and secondary joist selects the 50mm*100mm lumps of wood;
Beam, Column border node adopt pre-splicing sizing wooden form, and paste dual face seals bar to avoid spillage, and termination keeps concordant, arrange twice and strengthen tie within the scope of bean column node, for the location of node template and fixing;
B, plate muscle arranges some 10 short muscle (set-up mode is spot welding in the present embodiment), short muscle props up ejecting plate gluten 1, be installed on by the tie point of the adjacent described triangular structure 9 of notch cuttype framework described in the some triangular structure 9(of 10 steel-bar arrangement the part that described short muscle props up ejecting plate gluten 1 above plate gluten 1, in the present embodiment, described triangular structure 9 is direct triangular structure 9, the hypotenuse of right-angled triangle is the connecting line on grandstand adjacent two described short muscle tops obliquely, same adjacent short muscle spacing is obliquely by 1 meter of setting, coupling bench width), it is towards the center of circle of grandstand circular arc, and arrange along the radian of grandstand, at plate gluten 1 obliquely, some triangular structures 9 connect to form notch cuttype framework,
C, on described notch cuttype framework, setting is seen and is hung mould 7 outside stepladders, install when hanging mould 7 outside described ladder, the both sides that adjacent two triangular structures 9 are connected, as hanging lower support point that mould 7 installs outside ladder and hanging mould side gulde edge and (hang mould 7 outside described ladder to be made up of flitch and wooden form, flitch forms skeleton, wooden form is arranged on flitch both sides, hang outside single described ladder in mould 7, flitch is two, setting up and down in parallel to each other, wooden form is fitted in the both sides of two flitches, according to arc radius, release the full-page proof that circular arc hangs mould, and make circular arc according to full-page proof and hang mould.According to the every single order height of grandstand, circular arc hangs die face plate and adopts the wooden form that two pieces of 16mm are thick, the flitch of liner two 50 × 50mm between panel, panel and flitch adopt iron nail stickfast, seam crossing must be smooth, and seam is tight, hangs after mould completes, put according to the grandstand sideline of having discharged and plane absolute altitude be fixed on the long right-angle side of triangular structure of right angle 9 by hanging mould, side form is close to short right-angle side and is installed.), grandstand side form is set;
Some split bolts 4 are set to drawing reinforcing, described grandstand bed die 5 arranges two steel pipe 6, described split bolt 4 lower end is from passing between two steel pipe 6 and fixing, two steel pipe 6 is set above described notch cuttype framework, described split bolt 4 upper end is fixed on described steel pipe, grandstand hangs between mould 7 outside adjacent described stepladders obliquely and arranges gusseted plate 8, hang the side of mould 7 outside the connected unit ladder of gusseted plate 8 side, opposite side connect hang mould 7 outside adjacent stations ladder end face (adopt the thick wooden form of 16mm be made into grandstand hang mould reinforce required for scale triangle.Hang after mould installs, be close to the triangle wooden form made in advance and hang mould and carry out installations reinforcing, and use iron nail stickfast).
D, build, when building, the steps part of Bars In Poured Concrete Slab 3 and grandstand from the bottom to top together with build first jolt ramming underplate concrete, reach when marking time position and build from bottom to top with mixed stair concrete of marking time again, first jolt ramming underplate concrete, reach to water together with concrete of marking time again when marking time position and smash, constantly boost continuously, and it is floating with wood float upper surface of marking time at any time, because see that platen structure is Stand Beams and sees the staircase structural model that platen forms, concreting easily returns slurry, just look at platen outboard template for hanging mould, template system easily destroys, comprehensive many factors Stand Beams, plate adopts, adopt low slump concrete.
embodiment 2
The present embodiment is except the structure described in embodiment 1, as Fig. 4, the reinforcing bar at triangular structure of right angle 9 top is also provided with spacing three-legged structure 10 by bar connecting, it is also right-angled triangle, for with ladder outside hang mould 7 another side be connected, to carry out clamping spacing to hanging mould 7 outside ladder to coordinate described gulde edge, ensure that it hangs the positioning precision of mould, simultaneously can when building, play supporting role better, make whole casting process hang mould more stable, avoid producing displacement and causing the affected situation of grandstand precision;
Simultaneously, the concrete structure hanging mould 7 outside ladder is also different, as Fig. 5, flitch 12 is vertically arranged, with circular arc arrayed, described wooden form 11 is arranged on flitch 12 surrounding, form the surface of hanging mould 7 surrounding outside ladder hermetically, flitch 12 setting direction is vertical with the wooden form 11 of both sides, and wooden form 11 can straight line or camber line layout, the shearing resistance that this mode hangs mould is stronger, more firm, when building, supporting role better can be played, make whole casting process hang mould more stable, avoid producing displacement and causing the affected situation of grandstand precision.

Claims (10)

1. a circular arc steel concrete grandstand construction method, is characterized in that, step is:
Arrange supporting frame, supporting frame arranges grandstand bed die, all oblique setting of described bed die, arranges the plate muscle of Bars In Poured Concrete Slab along bed die upper surface, and described bed die soffit interval is furnished with some crossbeams for supporting described bed die;
By the some triangular structures of steel-bar arrangement above plate gluten, it is towards the center of circle of grandstand circular arc, and arranges along the radian of grandstand, and at plate gluten obliquely, some triangular structures connect to form notch cuttype framework;
On described notch cuttype framework, setting is seen and is hung mould outside stepladders, arranges grandstand side form;
Build.
2. circular arc steel concrete grandstand construction method according to claim 1, it is characterized in that, in described step B, plate muscle arranges some short muscle, short muscle stretches out the plate gluten of described plate muscle, stretches out the part of an ejecting plate gluten described in the tie point of the adjacent described triangular structure of described notch cuttype framework is installed on.
3. circular arc steel concrete grandstand construction method according to claim 1, it is characterized in that, in step B, described triangular structure is direct triangular structure, the hypotenuse of right-angled triangle is plate gluten, or is arranged at limit parallel with plate gluten above plate gluten.
4. circular arc steel concrete grandstand construction method according to claim 2, it is characterized in that, described triangular structure is direct triangular structure, and the hypotenuse of right-angled triangle is the connecting line on grandstand adjacent two described short muscle tops obliquely.
5. circular arc steel concrete grandstand construction method according to claim 4, is characterized in that, in step C, hangs mould and be made up of flitch and wooden form outside described ladder, and flitch forms skeleton, and wooden form is arranged on flitch both sides or surrounding.
6. circular arc steel concrete grandstand construction method according to claim 5, it is characterized in that, in step C, install when hanging mould outside described ladder, the both sides that adjacent two triangular structures are connected, as hanging the lower support point of mould installation outside ladder and hanging mould side gulde edge, the reinforcing bar at triangular structure of right angle top is also provided with spacing three-legged structure by bar connecting, for with ladder outside hang mould another side be connected, to carry out clamping spacing to hanging mould outside ladder to coordinate described gulde edge.
7. circular arc steel concrete grandstand construction method according to claim 6, it is characterized in that, in step C, after hanging mould installation outside ladder, some split bolts are set to drawing reinforcing, split bolt lower end passes described grandstand bed die and fixes, and above described notch cuttype framework, arrange steel pipe, described split bolt upper end is fixed on described steel pipe.
8. circular arc steel concrete grandstand construction method according to claim 7, it is characterized in that, described grandstand bed die arranges two steel pipe, and described split bolt lower end is from passing between two steel pipe and fix, and the steel pipe arranged above described notch cuttype framework is also pair steel pipe.
9. circular arc steel concrete grandstand construction method according to claim 5, it is characterized in that, hang in mould outside single described ladder, flitch is vertically arranged, with circular arc arrayed, described wooden form is arranged on flitch surrounding, forms the surface of hanging mould surrounding outside ladder, flitch setting direction is vertical with the wooden form of both sides, and wooden form can straight line or camber line layout.
10. circular arc steel concrete grandstand construction method according to claim 1, it is characterized in that, hang after mould installs in step C outside ladder, outside grandstand obliquely adjacent described stepladders, hang intermode gusseted plate is set, hang the side of mould outside the connected unit ladder of gusseted plate side, opposite side connects the end face hanging mould outside adjacent stations ladder.
CN201510589364.2A 2015-09-15 2015-09-15 Arc-shaped armored concrete grandstand construction method Active CN105155846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510589364.2A CN105155846B (en) 2015-09-15 2015-09-15 Arc-shaped armored concrete grandstand construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510589364.2A CN105155846B (en) 2015-09-15 2015-09-15 Arc-shaped armored concrete grandstand construction method

Publications (2)

Publication Number Publication Date
CN105155846A true CN105155846A (en) 2015-12-16
CN105155846B CN105155846B (en) 2018-07-31

Family

ID=54796855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510589364.2A Active CN105155846B (en) 2015-09-15 2015-09-15 Arc-shaped armored concrete grandstand construction method

Country Status (1)

Country Link
CN (1) CN105155846B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396986A (en) * 2018-05-10 2018-08-14 上海建工二建集团有限公司 The ruggedized construction and construction method of superposed type Prefabricated L-shaped prestressing force girt strip plate
CN110259118A (en) * 2019-06-13 2019-09-20 中国建筑第八工程局有限公司 Stair ramp type Stadium formwork reinforcement system and its construction method
CN110778162A (en) * 2019-10-25 2020-02-11 杭州宝力体育设施工程有限公司 Construction method of stadium stand
CN112372808A (en) * 2020-11-25 2021-02-19 中建一局集团建设发展有限公司 Three-fold-line double-step prefabricated stand board die and stand board construction method
CN114250972A (en) * 2021-12-21 2022-03-29 晟通科技集团有限公司 Pull tab and template system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998057010A1 (en) * 1997-06-11 1998-12-17 Stairform Designs Pty. Ltd. Staircase form
US20110240831A1 (en) * 2010-04-05 2011-10-06 D'amato Construction Corporation, Inc. Adjustable form for a concrete stairway
CN202787974U (en) * 2012-09-24 2013-03-13 中国建筑第八工程局有限公司 Closed framework structure used for stair construction
CN103362300A (en) * 2013-06-28 2013-10-23 中建七局第二建筑有限公司 Template structure and method for template support of cast-in-place concrete arc-shaped terrace
CN203475828U (en) * 2013-09-18 2014-03-12 五矿二十三冶建设集团有限公司 Totally closed stair formwork for cast-in-situ stair construction
CN103669865A (en) * 2013-12-20 2014-03-26 广东省第四建筑工程公司 Stair construction method through shaped supports
CN204492179U (en) * 2015-01-13 2015-07-22 中建三局第三建设工程有限责任公司 A kind of detachable staircase shaping template

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998057010A1 (en) * 1997-06-11 1998-12-17 Stairform Designs Pty. Ltd. Staircase form
US20110240831A1 (en) * 2010-04-05 2011-10-06 D'amato Construction Corporation, Inc. Adjustable form for a concrete stairway
CN202787974U (en) * 2012-09-24 2013-03-13 中国建筑第八工程局有限公司 Closed framework structure used for stair construction
CN103362300A (en) * 2013-06-28 2013-10-23 中建七局第二建筑有限公司 Template structure and method for template support of cast-in-place concrete arc-shaped terrace
CN203475828U (en) * 2013-09-18 2014-03-12 五矿二十三冶建设集团有限公司 Totally closed stair formwork for cast-in-situ stair construction
CN103669865A (en) * 2013-12-20 2014-03-26 广东省第四建筑工程公司 Stair construction method through shaped supports
CN204492179U (en) * 2015-01-13 2015-07-22 中建三局第三建设工程有限责任公司 A kind of detachable staircase shaping template

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396986A (en) * 2018-05-10 2018-08-14 上海建工二建集团有限公司 The ruggedized construction and construction method of superposed type Prefabricated L-shaped prestressing force girt strip plate
CN110259118A (en) * 2019-06-13 2019-09-20 中国建筑第八工程局有限公司 Stair ramp type Stadium formwork reinforcement system and its construction method
CN110778162A (en) * 2019-10-25 2020-02-11 杭州宝力体育设施工程有限公司 Construction method of stadium stand
CN112372808A (en) * 2020-11-25 2021-02-19 中建一局集团建设发展有限公司 Three-fold-line double-step prefabricated stand board die and stand board construction method
CN112372808B (en) * 2020-11-25 2022-05-17 中建一局集团建设发展有限公司 Three-fold-line double-step prefabricated stand board die and stand board construction method
CN114250972A (en) * 2021-12-21 2022-03-29 晟通科技集团有限公司 Pull tab and template system

Also Published As

Publication number Publication date
CN105155846B (en) 2018-07-31

Similar Documents

Publication Publication Date Title
CN105155846A (en) Construction method for arc-shaped reinforced concrete stand
CN206503230U (en) A kind of fabricated steel building
CN103741604B (en) Totally-prefabricated assembling type reinforced concrete bridge splicing structure and attaching method thereof
CN105926765B (en) The regular polygon of falling umbrella steel structure module and its installation method
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN106013781A (en) Slab supporting construction method and construction device by reversely suspending template
CN106193589B (en) Concrete superelevation heavy type beam and overlapping board combining structure method for supporting
CN105568854A (en) Construction method of overwater curved fish-bellied cast-in-place reinforced concrete box girder
CN105587097A (en) Ground aerial structure capable of being leveled
CN203684108U (en) Fully-precast assembly type reinforced concrete bridge assembling structure
CN203213591U (en) Beam-free turbinate column cap structure template system
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN114134820A (en) Formwork support and construction method for I-shaped composite beam cast-in-place bridge deck
CN204080843U (en) Movable plank house foundation structure
CN205894272U (en) Fall umbelliform regular polygon steel structure module
CN104895108A (en) Bailey piece assembled movable-type truss unilateral framework system construction method
CN109505225B (en) Safe and stable suspension bridge and construction process thereof
CN206646817U (en) The form bracing system of the cast-in-place decorative panel of staged Arc Stand
CN106988520B (en) Construction method and support system for high-rise suspension structure
CN102787717B (en) Self-supporting combined steel template construction method
CN205857697U (en) The anti-form bracing constructing device hanging template
CN113565346A (en) Assembled floor landing-free adjustable supporting structure and construction method
CN111719578B (en) Archaized building and construction process
CN206143914U (en) SC fabricated frame bearing structure system
CN105971117A (en) Pseudo-classic architecture steel-frame structure with box type cross-section girders

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 14 / F and 15 / F, building B, friendship, 55 zouma street, Chengdu, Sichuan 610000

Patentee after: CHENGDU FOURTH CONSTRUCTION ENGINEERING Co.,Ltd. OF CDCEG

Address before: 14 / F and 15 / F, block B, Friendship Plaza, 55 zouma street, Jinjiang District, Chengdu, Sichuan 610021

Patentee before: CHENGDU NO.4 CONSTRUCTION ENGINEERING Co.