CN101862917B - 双管板换热器设备的焊制工艺 - Google Patents
双管板换热器设备的焊制工艺 Download PDFInfo
- Publication number
- CN101862917B CN101862917B CN2010101972178A CN201010197217A CN101862917B CN 101862917 B CN101862917 B CN 101862917B CN 2010101972178 A CN2010101972178 A CN 2010101972178A CN 201010197217 A CN201010197217 A CN 201010197217A CN 101862917 B CN101862917 B CN 101862917B
- Authority
- CN
- China
- Prior art keywords
- tube
- heat exchanger
- tube plate
- plate
- qualified
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
本发明公开了一种双管板换热器设备的焊制工艺,先组对左、右端的内管板与外管板,再立置装折流板、定距管和换热管,装配壳程筒体、聚液程壳体,经过焊接焊缝、强度胀接、气密试验等步骤得合格产品。本发明有效地提高了工作效率,避免了因无法发现哪一根换热管漏胀,而重复对内管板胀接,造成换热管因重复碾压出现裂纹或出现过胀的现象,一次合格率达到98%以上。
Description
技术领域
本发明涉及双管板换热器设备制作的技术领域。
背景技术
有机硅项目中的换热器设备大部分为双管板换热器,双管板换热器在结构上与固定管板换热器的区别是增加了内管板和聚液程,双管板换热器主要用于绝对禁止管、壳程间介质混串的场合,因内管板和换热管是管壳式换热器的主要受压元件,二者之间的强度胀接是双管板换热器制造的关键工序。胀接质量的好坏对换热器的使用起着重要的作用。因内管板和换热管是通过外管板,用加长的胀管器对其胀接。目前市场加工双管板设备没有统一的装配顺序,但装配顺序不合理,会增加一倍甚至几倍的工作量,还可能因胀管器的重复碾压造成换热管出现裂纹的现象。甚至到最后经耐压试验不合格,但又找不到某根换热管泄漏,重复胀接引起过胀,最终导致设备报废,造成巨大的经济损失。
发明内容
本发明的目的是提供一种双管板换热器设备的焊制工艺,保证设备的焊制质量,提高了产品的合格率。
一种双管板换热器设备的焊制工艺,包括如下步骤:
(1)对管板进行清理,清除油污、毛刺及铁锈至见金属光泽,先将双管板换热器的左端的外管板与左端的内管板组对,用定位销和定位板固定,再立置装折流板、定距管和换热管,然后装配壳程筒体;
(2)将步骤(1)装配的设备水平放置,组对右端的内管板与外管板,并将换热管全部装入右端的内、外管板内;
(3)焊接壳程筒体与内管板形成的焊缝;
(4)对左端的内管板与换热管进行强度胀接,然后对右端的换热管进行平头,且使换热管露出右端的外管板3mm,再对右端的内管板与换热管进行强度胀接(胀接方式采用机械胀接);
(5)对壳程进行气密试验,若有漏胀或泄露的换热管重新对其补胀,直至合格;
(6)将左右两端的聚液程的壳体分别与上述设备组装,分别焊接聚液程与内、外管板组对的四条焊缝,分别焊接左右两端的换热管与内、外管板组对的焊缝;
(7)对以上所有焊缝进行外观检验及无损检测,合格后对壳程进行气压试验,无泄露、
无异声,无变形为合格,然后进行氦检漏,漏率≤1.0×10-8Pa.m3/S为合格;
(8)对聚液程和换热管管程分别按照图纸要求进行耐压试验,无泄露、无异声、无变形为合格。
上述步骤(1)、(2)的组对要求内、外管板之间的高度尺寸偏差为±1mm,平行度 ≤0.5mm,两种管板的换热管孔同心度≤0.1mm。
本发明有效地提高了工作效率,避免了因无法发现哪一根换热管漏胀,而重复对内管板胀接,造成换热管因重复碾压出现裂纹或出现过胀的现象。一次合格率达到98%以上。最突出的优点有以下几条:
1.双管板换热器设备共四件管板,要求管板端面相对聚液层筒体轴线垂直度≤1mm,两管板平行度 ≤0.5mm, 立置装配有效的避免了因换热管下垂难装配的现象。
2.强度胀接会引起换热管加长,合理的焊接顺序提高了胀接合格率,并能减小换热管与管板连接处的应力。
3.纵向分两半组对聚液程壳体,对壳程进行气密试验,内管板外表面处刷肥皂水,尽早的发现某根换热管漏胀或欠胀引起的泄露,针对此根换热管进行补胀,避免了因无法发现某一根换热管漏胀,而重复对所有换热管胀接的现象,有效的提高了工作效率,保证了产品质量。
4.先对壳程做气密试验进行初检,而不做液压试验,因为氦检漏必须要求壳程洁净,无杂质,严格避免壳程内的水份。提高氦检漏的精确度。
附图说明
图1为本发明的工艺流程图。
图2为双管板换热器结构图;
其中: 1. 壳程筒体 2. 内管板 3. 聚液程筒体 4. 外管板 5. 换热管,C1、C2、C3、C4、C5、C6为焊缝。
具体实施方式
一种双管板换热器设备的焊制工艺,包括如下步骤:
(1)对管板进行清理,清除油污、毛刺及铁锈至见金属光泽,先将双管板换热器的左端的外管板与左端的内管板组对,用定位销和定位板固定,要求内、外管板之间的高度尺寸偏差为±1mm,平行度 ≤0.5mm,两种管板的换热管孔同心度≤0.1mm;再立置装折流板、定距管和换热管,然后装配壳程筒体;
(2)将步骤(1)装配的设备水平放置,组对右端的内管板与外管板,要求内、外管
板之间的高度尺寸偏差为±1mm,平行度 ≤0.5mm,两种管板的换热管孔同心度≤0.1mm,并将换热管全部装入右端的内、外管板内;
(3)焊接壳程筒体与内管板形成的焊缝;
(4)对左端的内管板与换热管进行强度胀接,然后对右端的换热管进行平头,且使换热管露出右端的外管板3mm,再对右端的内管板与换热管进行强度胀接(胀接方式采用机械胀接);
(5)对壳程进行气密试验,若有漏胀或泄露的换热管重新对其补胀,直至合格;
(6)将左右两端的聚液程的壳体分别与上述设备组装,分别焊接聚液程与内、外管板组对的四条焊缝,分别焊接左右两端的换热管与内、外管板组对的焊缝;
(7)对以上所有焊缝进行外观检验及无损检测,合格后对壳程进行气压试验,无泄露、无异声,无变形为合格,然后进行氦检漏,漏率≤1.0×10-8Pa·m3/S为合格;
(8)对聚液程和换热管管程分别按照图纸要求进行耐压试验,无泄露、无异声、无变形为合格。
Claims (1)
1.一种双管板换热器设备的焊制工艺,其特征是,包括如下步骤:
(1)对管板进行清理,清除油污、毛刺及铁锈至见金属光泽,先将双管板换热器的左端的外管板与左端的内管板组对,用定位销和定位板固定,再立置装折流板、定距管和换热管,然后装配壳程筒体;
(2)将步骤(1)装配的设备水平放置,组对右端的内管板与外管板,并将换热管全部装入右端的内、外管板内;
(3)焊接壳程筒体与内管板形成的焊缝;
(4)对左端的内管板与换热管进行强度胀接,然后对右端的换热管进行平头,且使换热管露出右端的外管板3mm,再对右端的内管板与换热管进行强度胀接;
(5)对壳程进行气密试验,若有漏胀或泄露的换热管重新对其补胀,直至合格;
(6)将左右两端的聚液程的壳体分别与上述设备组装,分别焊接聚液程与内、外管板组对的四条焊缝,分别焊接左右两端的换热管与内、外管板组对的焊缝;
(7)对以上所有焊缝进行外观检验及无损检测,合格后对壳程进行气压试验,无泄露、无异声,无变形为合格,然后进行氦检漏,漏率≤1.0×10-8Pa.m3/S为合格;
(8)对聚液程和换热管管程分别按照图纸要求进行耐压试验,无泄露、无异声、无变形为合格;
步骤(1)、(2)的组对要求内、外管板之间的高度尺寸偏差为±1mm,平行度≤0.5mm,两种管板的换热管孔同心度≤0.1mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101972178A CN101862917B (zh) | 2010-06-11 | 2010-06-11 | 双管板换热器设备的焊制工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101972178A CN101862917B (zh) | 2010-06-11 | 2010-06-11 | 双管板换热器设备的焊制工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101862917A CN101862917A (zh) | 2010-10-20 |
CN101862917B true CN101862917B (zh) | 2012-07-18 |
Family
ID=42954944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101972178A Active CN101862917B (zh) | 2010-06-11 | 2010-06-11 | 双管板换热器设备的焊制工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101862917B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104197770A (zh) * | 2014-08-01 | 2014-12-10 | 张家港化工机械股份有限公司 | 双管板换热器中换热管与双管板的安装制作工艺 |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106002129B (zh) * | 2016-05-27 | 2018-01-05 | 鲁西工业装备有限公司 | 一种大规格镍合金双管板换热器的制作工艺 |
CN108225093A (zh) * | 2017-12-18 | 2018-06-29 | 江苏绿叶锅炉有限公司 | 一种双管板汽化器加强密封的改进方法 |
CN108188676A (zh) * | 2018-01-17 | 2018-06-22 | 兰州兰石重型装备股份有限公司 | 一种换热器大厚度双管板制造工艺 |
CN108515322B (zh) * | 2018-03-28 | 2020-04-10 | 肇庆市庆林电热电器有限公司 | 一种双向换热加热器制造方法 |
CN109986321B (zh) * | 2019-03-01 | 2020-11-17 | 东方电气集团东方锅炉股份有限公司 | 一种双管板π形换热管管束穿管方法 |
CN113001101B (zh) * | 2021-04-09 | 2023-08-01 | 鲁西工业装备有限公司 | 一种工业换热器立式组装工艺及其安装装置与应用 |
CN113804043A (zh) * | 2021-09-30 | 2021-12-17 | 抚顺化工机械设备制造有限公司 | 一种固定管板式热交换器中段的焊接方法 |
CN113953632B (zh) * | 2021-12-22 | 2022-02-25 | 江苏利柏特股份有限公司 | 一种大管径厚管壁弯头折流板焊接工艺方法 |
CN115026380B (zh) * | 2022-08-10 | 2022-11-15 | 山西阳煤化工机械(集团)有限公司 | 管板与壳程筒体合拢缝焊接方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3662718A (en) * | 1971-03-02 | 1972-05-16 | Atomic Energy Commission | Sodium heated steam generator |
US3958630A (en) * | 1975-01-24 | 1976-05-25 | Exxon Research And Engineering Company | Heat exchanger baffle arrangement |
US4154464A (en) * | 1971-06-16 | 1979-05-15 | Stary Walter E | Tube holding means in a heat exchanger |
US4650110A (en) * | 1985-10-22 | 1987-03-17 | Westinghouse Electric Corp. | Continuous movement brazing process |
DE3614237A1 (de) * | 1986-04-26 | 1987-10-29 | Balcke Duerr Ag | Verfahren zum befestigen von rohren zwischen rohrplatten |
EP0727275A1 (de) * | 1995-02-18 | 1996-08-21 | BDAG Balcke-Dürr Aktiengesellschaft | Verfahren zum restspaltfreien Verschweissen der Enden dünnwandiger Wärmetauscherrohre |
CN201007624Y (zh) * | 2007-02-14 | 2008-01-16 | 辽宁石油化工大学 | 双壳程u形管椭圆折流板换热器 |
CN101458043A (zh) * | 2008-11-03 | 2009-06-17 | 江苏双良空调设备股份有限公司 | 横向穿孔单管板结构的换热器 |
CN101695807A (zh) * | 2009-11-06 | 2010-04-21 | 倪加明 | 双管板式换热器的制造方法 |
-
2010
- 2010-06-11 CN CN2010101972178A patent/CN101862917B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3662718A (en) * | 1971-03-02 | 1972-05-16 | Atomic Energy Commission | Sodium heated steam generator |
US4154464A (en) * | 1971-06-16 | 1979-05-15 | Stary Walter E | Tube holding means in a heat exchanger |
US3958630A (en) * | 1975-01-24 | 1976-05-25 | Exxon Research And Engineering Company | Heat exchanger baffle arrangement |
US4650110A (en) * | 1985-10-22 | 1987-03-17 | Westinghouse Electric Corp. | Continuous movement brazing process |
DE3614237A1 (de) * | 1986-04-26 | 1987-10-29 | Balcke Duerr Ag | Verfahren zum befestigen von rohren zwischen rohrplatten |
EP0727275A1 (de) * | 1995-02-18 | 1996-08-21 | BDAG Balcke-Dürr Aktiengesellschaft | Verfahren zum restspaltfreien Verschweissen der Enden dünnwandiger Wärmetauscherrohre |
CN201007624Y (zh) * | 2007-02-14 | 2008-01-16 | 辽宁石油化工大学 | 双壳程u形管椭圆折流板换热器 |
CN101458043A (zh) * | 2008-11-03 | 2009-06-17 | 江苏双良空调设备股份有限公司 | 横向穿孔单管板结构的换热器 |
CN101695807A (zh) * | 2009-11-06 | 2010-04-21 | 倪加明 | 双管板式换热器的制造方法 |
Non-Patent Citations (2)
Title |
---|
刘保富等.双管板换热器的制造要点.《压力容器》.2009,(第05期), * |
吕延茂.双管板换热器制造工艺.《石油化工设备》.2004,(第06期), * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104197770A (zh) * | 2014-08-01 | 2014-12-10 | 张家港化工机械股份有限公司 | 双管板换热器中换热管与双管板的安装制作工艺 |
CN104197770B (zh) * | 2014-08-01 | 2016-04-20 | 苏州天沃科技股份有限公司 | 双管板换热器中换热管与双管板的安装制作工艺 |
Also Published As
Publication number | Publication date |
---|---|
CN101862917A (zh) | 2010-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101862917B (zh) | 双管板换热器设备的焊制工艺 | |
CN105014336A (zh) | 双管板换热器新型的制造工艺 | |
CN104197770B (zh) | 双管板换热器中换热管与双管板的安装制作工艺 | |
CN201503332U (zh) | 浮头式换热器浮动管板端水压试验填料箱 | |
CN103673681B (zh) | 发夹式双管板换热器及其换热管与壳体的装配方法 | |
CN105486460B (zh) | 一种用于浮头式换热器的试压系统 | |
CN203011654U (zh) | 一种换热管试压卡具 | |
CN106288527B (zh) | 一种空调换热器组件及其装配方法 | |
CN205002638U (zh) | 一种换热器双管板结构 | |
CN202580461U (zh) | 一种高压流体管道的带压堵漏结构 | |
CN210441486U (zh) | 一种双管一体式拉伸储液器 | |
CN204924011U (zh) | 换热管和管板的密封结构 | |
CN207006937U (zh) | 一种u型管式换热器 | |
CN206945231U (zh) | 一种水压试验密封装置 | |
CN2454752Y (zh) | 搪玻璃列管式换热器 | |
KR101465047B1 (ko) | 배열 회수 보일러 및 그 제조 방법 | |
CN214502823U (zh) | 一种u形管换热器试压装置 | |
WO2019090282A1 (en) | Method of manufacturing a box header for heat exchanger | |
CN202630779U (zh) | 换热管与管板的焊接结构 | |
CN201925660U (zh) | 管道伸缩补偿器 | |
CN201069335Y (zh) | 抗热应力径向热管换热器 | |
CN204159779U (zh) | 一种液压胀接工装 | |
CN205156715U (zh) | 换热器的双管板结构 | |
CN207007440U (zh) | 一种换热管氦检装置 | |
CN204359176U (zh) | 一种换热器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 252211 Shandong city of Liaocheng province Dong'e County Gu Guan Tun Zhen Luxi Chemical Industrial Park Patentee after: LUXI INDUSTRY EQUIPMENT Co.,Ltd. Address before: 252211 Shandong city of Liaocheng province Dong'e County Gu Luxi Industrial Park Town Patentee before: LUXI INDUSTRY EQUIPMENT Co.,Ltd. |
|
CP02 | Change in the address of a patent holder |