CN101833307A - System and method for automatically integrating technological operation and management of plastic and rubber products - Google Patents

System and method for automatically integrating technological operation and management of plastic and rubber products Download PDF

Info

Publication number
CN101833307A
CN101833307A CN200910008189A CN200910008189A CN101833307A CN 101833307 A CN101833307 A CN 101833307A CN 200910008189 A CN200910008189 A CN 200910008189A CN 200910008189 A CN200910008189 A CN 200910008189A CN 101833307 A CN101833307 A CN 101833307A
Authority
CN
China
Prior art keywords
management
mould
raw materials
batch
materials ready
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910008189A
Other languages
Chinese (zh)
Other versions
CN101833307B (en
Inventor
叶能魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Automation Equipment (jiangsu) Co Ltd
Ye Jianli
Ye Nengkui
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100081898A priority Critical patent/CN101833307B/en
Publication of CN101833307A publication Critical patent/CN101833307A/en
Application granted granted Critical
Publication of CN101833307B publication Critical patent/CN101833307B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention relates to a system and a method for automatically integrating technological operation and management of plastic and rubber products. Aiming at devices participating in the production of the plastic and rubber products, running process data on important control points during the technological operation is recorded in time, fed back, analyzed and detected, and a management report is edited by using a management system to achieve a process automation management system for an entire factory. Various dynamic changes of each control point in the process of placing an order to completing the processing of the plastic and rubber products, such as material preparing, weighing according to a formula, mixing, kneading, shaping, product metering, product packaging and the like during production, main operation control action point of each unit and real-time data of temperature, load, time, rotating speed and the like are recorded in each batch of each order. Therefore, each batch of products on each order has complete history data. The existence of abnormity in a production process is judged from the history data and the cause of the abnormity is searched out. Simultaneously, detailed data analysis is provided for the improvement on the research and development of a new product and an optimal state is adjusted to in comparison to an original design.

Description

Mould, the automatically integrating system and the method for rubber product technological operation and management
Technical field
The present invention relevant for a kind ofly mould, the automatically integrating system and the method for rubber product technological operation and management, refer in particular to that a kind of whether fully consistent with former design operation parameter can understand each production link or unusual generation arranged, and find abnormal cause thus easily, simultaneously more can provide new-product development improved detailed analysis, reach research and development, producing and selling, manage and combine together.
Background technology
The traditional work method of mould at present, the rubber industry still being kept recent decades.Promptly professional after order, notify just that production line begins to mould, the getting the raw materials ready and manufacture flow process of rubber.Because the prescription that mould, rubber uses can be different because of client's demand, and the composition of prescription can not be single kind usually yet, add that the related data in each technology is (as temperature, rotating speed, time in the manufacturing process ...) also can be different, even in making the process of producing, produce unusual.Yet these relevant data and data can't go on record, thus be difficult to follow the trail of production, flaw amount, the tank farm stock of the finished product of output, and even produce the reason of unusual or faulty materials.Therefore, this traditional work pattern can't satisfy the computer automation operation of management information, though most production equipments have all had the ability of automatic control, but still be in the stage of independent development separately, and the technology integrated of the omnidistance technology of no-trump still, this can't satisfy for the high standard of upstream high-tech industry to product quality.
Therefore, for satisfying the high standard of upstream high-tech industry, design that a cover can be reviewed the process data in source and in addition the system and method for recorded and stored is real its necessity, and can promote the competitive power of dealer on described industry in view of the above product quality.
Summary of the invention
Fundamental purpose of the present invention, provide a kind of moulding, the automatically integrating system and the method for rubber product (plastic and/or rubber products) technological operation and management, it mainly is at finish whole moulding from placing an order to, the various dynamic changes that each control point produced in the rubber processing are recorded in each batch of each order, for example getting the raw materials ready in process of production, the prescription weighing, mix, mediate, be shaped and the gauging of products packing ... wait the main control action point and the temperature of each unit, load, time, rotating speed ... Deng the instant data record.The product that makes each batch of each order produce all has complete historical summary, can be for inquiry at any time, therefore, can from described these historical summaries, understand each production link whether unusual generation is arranged, and find abnormal cause thus easily, simultaneously more can provide new-product development improved detailed analysis, and adjust to optimum condition with former design comparison.
In order to achieve the above object, the invention provides a kind ofly mould, the automatically integrating system of rubber product technological operation and management, comprise the CSRC management devices, get the raw materials ready equipment and mould, rubber tooling; Wherein, described CSRC management devices be produce on the relative production order according to customer order mould, the processing of rubber product plans; The described equipment of getting the raw materials ready is to be connected with described CSRC management devices via communication network, and be divided into main formula unit and the secondary prescription unit of getting the raw materials ready of getting the raw materials ready, main formula unit and the secondary prescription unit of getting the raw materials ready of getting the raw materials ready is carried out the work of getting the raw materials ready of moulding of receiving from central monitoring management apparatus, the major and minor prescription of rubber respectively; Describedly mould, rubber tooling is connected with described CSRC management devices via communication network equally, and the equipment of getting the raw materials ready finish get the raw materials ready and notify the CSRC management devices after, carried out from central monitoring management apparatus receives mould, rubber process; And get the raw materials ready and production and processing during, get the raw materials ready equipment and mould, rubber tooling can be got the raw materials ready execution and process mould, the related data in the rubber product technology returns to the CSRC management devices and monitors and manage.
The present invention provides a kind of in addition and moulds, the automatically integrating method of rubber product technological operation and management, be to produce relevant prescription, formula ratio and make lot number according to customer order, make the preparation that lot number fills a prescription and produce corresponding bar code at each, again according to the affirmation of bar code with same lot number prescription manufacture to become to mould, rubber product, again each batch in the described order integrated at last, and stored and list relevant list.
Method of the present invention further comprises the correction flow process of researching and developing process conditions, is formula for a product ratio and process condition with research and development configuration in the laboratory, via comparison, the adjustment of curve table, to obtain the optimum value of technological parameter.
Obtain and described technology is optimized, be that the parameters that each operating point that the production run according to every batch products in the technology obtains is collected is made curve table, the curve table that the timing collection is obtained overlaps and contrasts again, find out and make the optimum good curve table of finished product, start combination, and find out the optimum operation condition parameter of respectively operating control point thus, as the foundation of quality improvement.
Description of drawings
Fig. 1 is a system Organization Chart of the present invention;
Fig. 2 is a system process flow diagram of the present invention;
Fig. 3 is the system of the present invention process flow diagram of getting the raw materials ready;
Fig. 4 shows each batch consumption record sheet of the present invention ();
Fig. 5 shows each batch consumption record sheet of the present invention (two);
Fig. 6 shows each order production situation record sheet of the present invention;
Fig. 7 is the related data that shows the required record of process equipment of the present invention.
Drawing reference numeral
1 CSRC management devices
11 monitoring management unit
12 order input blocks
13 systems make generation unit
2 equipment of getting the raw materials ready
The 21 main formulas unit of getting the raw materials ready
The 22 secondary unit of getting the raw materials ready of filling a prescription
3 mould, rubber tooling
4 networks
Embodiment
In order to make narration of the present invention more detailed and complete, please cooperate accompanying drawing and component symbol, and be described in detail as follows referring to figs. 1 through Fig. 6.
Please join Fig. 1, of the present inventionly mould, the automatically integrating system of rubber product technological operation and management, comprise: a CSRC management devices 1, have the equipment of getting the raw materials ready 2 at least and at least onely mould, rubber tooling 3; CSRC management devices 1 is with the equipment of getting the raw materials ready 2 and mould, 3 modes of communicating by letter with network 4 of rubber tooling link, and get the raw materials ready equipment 2 and mould, rubber tooling 3 is the production system order that produces according to CSRC management devices 1 and carry out fabrication plan.Wherein:
Described CSRC management devices 1 is to be connected to network 4, and it also comprises that monitoring management unit 11, order input block 12 and system make generation unit 13.
The management and the monitoring of every product output flow process handled in monitoring management unit 11, and produces relevant fabrication order according to the order data of order input block 12 inputs; Order input block 12 is externally to supply the related data of input about customer order, and these data also are sent to monitoring management unit 11, and the data of input comprise customer data, ordering products, lot-size, formula for a product numbering, dilivery date etc. at least; System makes 13 of generation units produce according to the fabrication order in the monitoring management unit 11, board ability to work and order data and moulds, the manufacturing fabrication plan of rubber product, the consumption that should increase as the batch quantity of producing and precompose with compile and edit the management bar code.
The described equipment 2 of getting the raw materials ready (please cooperate referring to Fig. 2) is to be connected with described CSRC management devices 1 via communication network 4.The described equipment 2 of getting the raw materials ready is divided into main formula unit 21 and the secondary prescription unit 22 of getting the raw materials ready of getting the raw materials ready.Wherein, main formula unit 21 and the secondary prescription unit 22 of getting the raw materials ready of getting the raw materials ready is carried out the work of getting the raw materials ready of moulding in the manufacturing fabrication plan that is produced according to the CSRC management devices, the major and minor prescription of rubber respectively.The main formula unit 21 of getting the raw materials ready comprises a main material platform scale, it is the main material metering of carrying out each batch according to the prescription that formula number sets, and give CSRC management devices 1 by network 4 passbacks, and produce by CSRC management devices 1 that one batch of bar code is attached gives described main formula with the weight of each batch.The described secondary prescription unit 22 of getting the raw materials ready comprises an auxiliary material platform scale, be to carry out the metering of the auxiliary material of each batch according to the prescription that formula number sets, and the weight of each auxiliary material in each batch is passed through network 4 passbacks give CSRC management devices 1, and by CSRC management devices 1 one batch of bar code of each auxiliary material generation at institute's weighing, and give described secondary prescription with described batch of bar code is attached, more described secondary prescription warehouse-in is stored for future use at last.Described main formula get the raw materials ready unit 21 and secondary prescription get the raw materials ready unit 22 finish get the raw materials ready after, by network 4 notice CSRC management devices 1, the point on opportunity that makes CSRC management devices 1 learn getting the raw materials ready and finish.
Describedly mould, rubber tooling 3, be connected with described CSRC management devices 1 via communication network 4 equally, after the equipment of getting the raw materials ready 2 is finished get the raw materials ready operation and notice CSRC management devices 1, described CSRC management devices 1 just again by network 4 notices mould, rubber tooling 3 carries out from moulding of being received of central monitoring management apparatus 1, rubber process.Wherein, describedly mould, rubber tooling 3 also can be different because of its process equipment that is used of difference of product, it comprises mixer, kneader, extruder, the machine of beginning to pratise, microtome, granulator.And mould, rubber tooling 3 in carrying out the process of every operation, the related data that it produced all can be sent in addition store recording of CSRC management devices 1 by network 4.
Below with regard to of the present inventionly mould, rubber product technological operation and management integration automated system actual operation flow process further specify.
At first, import the 11 also tabulation storages of relevant order product informations such as customer datas, ordering products, lot-size, formula for a product numbering, dilivery date by the order input block 12 of CSRC management devices 1 to the monitoring management unit, and system makes generation unit 13 again according to the ability to work of the moulding of the data of described these inputs and use, rubber tooling 3, converse consumption that the batch quantity that should produce and precompose should increase and make fabrication plan, make the fabrication plan equipment 2 of getting the raw materials ready after producing and to begin to carry out the preparation of raw material with compiling and editing management bar code etc.If when not setting up the prescription lot number of described order as yet, then import the various raw material weighing setting values and the prescription setting value of new prescription, and be stored in the monitoring management unit 11, to set up new prescription archives.
When preparing raw material (following please the cooperation again consulted Fig. 3), part about the pair prescription is according to the O/No. of making in the fabrication plan, formula number, the content of production batch is got the raw materials ready unit 22 from yarn batches production by the pair prescription, and in production, sticking described time on the packing of the secondary prescription of each bag after weighing is finished produces, weighing data bar code, after treating that all secondary prescriptions in this order are finished preparation, with pair prescriptions all in this order and every batch of production, weighing is returned the warehouse, simultaneously and with pair prescription and every batch of production, batch measurement data of weighing value data deposits monitoring management unit 11 in by network 4, finishes secondary prescription system and makes demand.Get the raw materials ready and finish system order and must ask when the confirm an order pair prescription of numbering of monitoring management unit 11, promptly show and to carry out the formal production of described order.When execution of order is formally produced, the pair prescription that described order is required is led out standby by the warehouse earlier, when production line is formally produced the order product, the main formula prescription that unit 21 begins to set according to formula number of getting the raw materials ready carries out the metering of main formula, and in monitoring management unit 11 the various major and minor formula material variable of described batch number is recorded in the form that sets in advance and (please joins Fig. 6).Promptly main, the secondary unit 21 of getting the raw materials ready of filling a prescription, the full automatic monitored instruction of 22 necessary energy, with automatic switch order numbering, formula number, the setting weighing value of production batch and various raw materials and parameter value such as drop at a slow speed soon, and start voluntarily and measure according to lot sequence, and every kind of each actual metered value and time keeping of formula material is passed back to CSRC management devices 1, so the main formula unit 21 of getting the raw materials ready must be equipped with the automatic weighing functional entity and automatically perform secondary prescription and collects the software ability, and the running-active status of major control point in the energy instant playback board, simultaneously its content displayed is back to CSRC management devices 1 immediately, and by CSRC management devices 1 from line item one cover process data in order to checking, therefore leading, the secondary unit 21 of getting the raw materials ready of filling a prescription, 22 must possess the ability and the detection components of automatic weighing and the passback of data accumulative total.
When the main formula of this signal during down to the mixer of the moulding of time technology, rubber tooling 3, utilize the brush barcode machine to confirm the batch number of described secondary prescription again, just pair prescription input can be moulded when correct, in the mixer of rubber tooling 3, and the weighing prescription value of the secondary prescription of order is automatic and main formula merges, the unit of monitoring management simultaneously 11 can deposit the related data of described these secondary prescriptions in the record of main formula in, to obtain major and minor formula material weighing values all in this lot number.In addition, all can reach this function no matter divide to drop into several times or drop into other equipment in his segment process, therefore each batch of producing all stays complete information, with the foundation as the various forms of constituent parts.As brush bar code when wrong, will send abnormality alarm automatically and can avoid miscarrying to produce, this unusually also will be recorded retain for future reference.
In addition; mould every of back segment; rubber tooling 3 is as mixer; kneader; the machine of beginning to pratise; extruder; rolling reamer machine; granulator; packaging machine ... Deng built-in unit; host-initiated is finished in charging each time; speed accelerates; slack-off speed; major ingredient involution and each set time are all noted; time at that time takes place; each temperature of load; each lot number production run such as pressure is measured from major ingredient foremost; mix; mediate; begin to pratise; extrude section; granulate; metering packings etc. are all complete stays correct instant record (please again and join Fig. 7); this technique information can be converted automatically to the form of constituent parts difference in functionality; as service order management warehouse handling of goods and materials; purchasing management; the production technology management; qualitative control; the abnormal cause analysis produces and improves according to arriving financial management; cost analysis; produce curve table ... in statistical tables and reports; and each segment process can set standard in the technology on; lower limit; to give the alarm immediately and note when exceeding; trace for reason afterwards; so will not worry having artificial unusual generation, guarantee system's normal operation.
The mixer of back segment; kneader; the machine of beginning to pratise; extruder; microtome; granulator; this section processing operation such as packaging machine; measure because of depositing fully to analyze the leading portion prescription by monitoring process data and record as checking afterwards; mould even if therefore manufacture; during rubber product; may be because of different product; different material; different platform; the different work flow process; the different operating method; different temperatures ... Deng and change the product quality characteristic; but because of native system can effectively get off the procedure parameter data logging; and can find real problem place, so mould; the rubber product quality can be kept stable.Be that native system is respectively to mould, set up detection components on rubber tooling 3 each main control points, collect the action situation and the main action launching of each control point to utilize detection components on each control point, time when stopping, temperature, pressure, load ... Deng variation, and the information of each detection components being collected by network 4, state ... be sent to CSRC management devices 1 etc. parameter, so that collected parameters is made curve table, the regularly curve table of the process condition of the formula for a product ratio of the research and development configuration contrast that overlaps in the curve table obtained of collection and the laboratory again, find out the best curve table of manufactured goods, the start combination, and recalling after finding out the control scope of the optimum operation condition parameter of respectively operating control point thus and producing unusually, foundation as quality improvement, and can be used for analyzing the variation place that produces the different product quality, and CSRC management devices 1 is again according to these data finishing analysis in addition, and produces the form that each management unit needs.
For instance, on the main process data logging of the hybrid technique of mixer, when main formula get the raw materials ready unit 21 finish get the raw materials ready after, mixer pan feeding opening of valves, the phenomenon at that time of pan feeding valve opening time and other control points under this moment instant recording, as the board temperature, motor load, leaving water temperature, the material temperature ... wait for when the pan feeding valve cuts out, also note the pan feeding valve and close the phenomenon of each control point at that time, mixer starts, mixer changes speed, each fixed test time point, as every interval 10 seconds or 5 seconds (this can set according to customer demand), the secondary pan feeding, each important control point such as discharging is record phenomenon at that time all automatically, after mixer is finished predefined working condition, and blanking can be accepted the pan feeding of a last technology again to next technology, when action produces or stops, remove and note related data, on the picture of CSRC management devices 1 with the display action phenomenon or change color, while is the temperature when fixing position display produces also, load, pressure ... Deng the phenomenon at that time of control point, operating personnel can be understood immediately produce some position and present situation.
Again, kneader, the machine of beginning to pratise, extruder, microtome, granulator ... Deng respectively mould, the control mode of rubber tooling 3 is roughly the same, only what are different for the control point of poor each equipment.
Because the CSRC management devices of native system system produces fabrication plan according to moulding of being obtained of client's ordering products, rubber processing data according to customer order; And the equipment of getting the raw materials ready by being connected with described CSRC management devices via communication network, carry out the work of getting the raw materials ready of moulding of receiving from central monitoring management apparatus, the major and minor prescription of rubber respectively, the information of work of will getting the raw materials ready simultaneously returns to the CSRC management devices, and the equipment of getting the raw materials ready finish get the raw materials ready and notify the CSRC management devices after, carried out from central monitoring management apparatus receives mould, rubber process; And get the raw materials ready and production and processing during, get the raw materials ready equipment and mould, rubber tooling can be got the raw materials ready execution and process mould, the related data in the rubber product technology returns to the CSRC management devices and monitors and manage.That is the present invention can produce relevant prescription, formula ratio and make lot number according to customer order, and make the preparation that lot number fills a prescription and produce corresponding bar code at each, again according to the affirmation of bar code with same lot number prescription manufacture to become to mould, rubber product, at last each batch in the described order integrated, and stored and listing correlation table list (ginseng Fig. 4, Fig. 5).
Therefore, by above detailed description, can learn that the present invention has following listed advantage at least:
1. because all process data can be integrated and keep to the complete process management systems of the present invention, therefore can provide the company upper strata immediately to understand the nearest working condition of all departments.
2. the order production process can be compiled into relevant control form owing to the present invention, and can immediately grasp production information, can make best technological quality to the client and guarantee.
3. in system used in the present invention, number when every order all has raw material consumption, actual production and production, thus can obtain true, the fastest cost analysis report, and can instant production control cost benefit.
4. the keyholed back plate by CSRC management devices of the present invention, warehouse, buying can the fastest understanding consumption of raw material and production quantity, drop to the raw materials inventory cost minimum.
By system of the present invention can to the actual weighing of composition of raw materials recorded and the process such as back segment mixing, refining, extrusion in each main control put instant phenomenon record, and can adjust easily best creation data.
6. all departments' forms are all instant in system of the present invention produces automatically, so can save a large amount of managing humans.
7. whole production run data are all forever kept in system of the present invention, and become historical archives, can be for inquiry or reference in the future.
8. the operator can understand the plant produced situation anywhere by world-wide web at any time immediately.
9. system of the present invention is quite simple and easy in the operational applications aspect, and input cost is low, and high efficiency is so can increase the competitive power of industry.
In sum, the invention process really can reach desired use effect, its disclosed concrete structure again, not only be not seen in like product, before also not being disclosed in application, really meet the regulation and the requirement of Patent Law fully, the application that therefore in accordance with the law proposes patent of invention is earnestly asked and is given examination, and the gift quasi patent, then the true feeling moral is just.

Claims (15)

  1. One kind mould, the automatically integrating system of rubber product technological operation and management, it is characterized in that described automatically integrating system comprises: a CSRC management devices, at least one get the raw materials ready equipment and at least onely mould, rubber tooling; The CSRC management devices is with the equipment of getting the raw materials ready and mould, be to link between rubber tooling in the mode of communicating by letter, and get the raw materials ready equipment and mould, rubber tooling carries out fabrication plan according to production system order that the CSRC management devices produced.
  2. 2. as claimed in claim 1ly mould, the automatically integrating system of rubber product technological operation and management, it is characterized in that described CSRC management devices comprises that monitoring management unit, order input block and system make generation unit; Handle the management and the monitoring of every product output flow process by the monitoring management unit, and produce relevant fabrication order according to the order data of order input block input, again by system make generation unit produce moulding according to the fabrication order in the monitoring management unit, board ability to work and order data, the manufacturing fabrication plan of rubber product.
  3. 3. as claimed in claim 2ly mould, the automatically integrating system of rubber product technological operation and management, it is characterized in that, the consumption that describedly mould, the manufacturing processing plan of rubber product is meant the batch quantity of production and precompose should increase with compile and edit the management bar code.
  4. 4. as claimed in claim 2ly mould, the automatically integrating system of rubber product technological operation and management, it is characterized in that the order data of described order input block input comprises customer data, ordering products, lot-size, formula for a product numbering, dilivery date etc. at least.
  5. 5. as claimed in claim 1ly mould, the automatically integrating system of rubber product technological operation and management, it is characterized in that the described equipment of getting the raw materials ready is divided into main formula unit and the secondary prescription unit of getting the raw materials ready of getting the raw materials ready.
  6. 6. as claimed in claim 5ly mould, the automatically integrating system of rubber product technological operation and management, it is characterized in that, the described main formula unit of getting the raw materials ready comprises a main material platform scale, it is the main material metering of carrying out each batch according to the system order of production, and the related data of each batch returned to the CSRC management devices by network, and produce by the CSRC management devices that one batch of bar code is attached gives described main formula.
  7. 7. as claimed in claim 5ly mould, the automatically integrating system of rubber product technological operation and management, it is characterized in that, the described secondary prescription unit of getting the raw materials ready comprises an auxiliary material platform scale, it is the auxiliary material metering of carrying out each batch according to the system order of production, and the related data of each auxiliary material in each batch returned to the CSRC management devices by network, and give each batch auxiliary material one batch of bar code by the CSRC management devices.
  8. 8. as claimed in claim 1ly mould, the automatically integrating system of rubber product technological operation and management; it is characterized in that, describedly mould, rubber tooling selects one at least in facility such as mixer, kneader, the machine of beginning to pratise, extruder, microtome, granulator, packaging machine.
  9. 9. as claimed in claim 1ly mould, the automatically integrating system of rubber product technological operation and management, it is characterized in that, describedly mould, rubber tooling in the process of carrying out every operation, the related data that it produced all can be sent in addition store recording of CSRC management devices by network.
  10. 10. as claimed in claim 1ly mould, the automatically integrating system of rubber product technological operation and management, it is characterized in that, the time the when related data that describedly mould, rubber tooling is produced in the process of carrying out every operation comprises that at least pan feeding and pan feeding are finished, board temperature, motor load, leaving water temperature, material temperature one of them.
  11. 11. one kind mould, the automatically integrating method of rubber product technological operation and management, it is characterized in that, produce relevant prescription, formula ratio and make lot number according to customer order, and make the preparation that lot number fills a prescription and produce corresponding bar code at each, again according to the affirmation of bar code with same lot number prescription manufacture to become to mould, rubber product, at last again the related data in each batch manufacturing process in the described order is integrated, and stored and list relevant list.
  12. 12. as claimed in claim 11ly mould, the automatically integrating method of rubber product technological operation and management, it is characterized in that, described method further comprises the correction flow process of researching and developing process conditions, it is formula for a product ratio and process condition with research and development configuration in the laboratory, via comparison, the adjustment of curve table, to obtain the optimum value of technological parameter.
  13. 13. as claimed in claim 12ly mould, the automatically integrating method of rubber product technological operation and management, it is characterized in that, described technology is optimized to be obtained, be that the parameters that each operating point that the production run according to every batch products in the technology obtains is collected is made curve table, the curve table that the timing collection is obtained overlaps and contrasts again, find out the best curve table of manufactured goods, start combination, and find out the optimum operation condition parameter of respectively operating control point thus, as the foundation of quality improvement.
  14. 14. as claimed in claim 11ly mould, the automatically integrating method of rubber product technological operation and management, it is characterized in that, in the preparation flow process of prescription, comprise that main formula is got the raw materials ready and secondary prescription is got the raw materials ready; In the process that main formula is got the raw materials ready and secondary prescription is got the raw materials ready, the metering related data of each batch main material and auxiliary material will be recorded respectively, and attached respectively described main formula and one batch of bar code of secondary prescription of giving.
  15. 15. as claimed in claim 11ly mould, the automatically integrating method of rubber product technological operation and management, it is characterized in that in each batch manufacturing process, the related data that it produced all can be stored record.
CN2009100081898A 2009-03-13 2009-03-13 System and method for automatically integrating technological operation and management of plastic and rubber products Active CN101833307B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100081898A CN101833307B (en) 2009-03-13 2009-03-13 System and method for automatically integrating technological operation and management of plastic and rubber products

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100081898A CN101833307B (en) 2009-03-13 2009-03-13 System and method for automatically integrating technological operation and management of plastic and rubber products

Publications (2)

Publication Number Publication Date
CN101833307A true CN101833307A (en) 2010-09-15
CN101833307B CN101833307B (en) 2012-05-30

Family

ID=42717403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100081898A Active CN101833307B (en) 2009-03-13 2009-03-13 System and method for automatically integrating technological operation and management of plastic and rubber products

Country Status (1)

Country Link
CN (1) CN101833307B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103632408A (en) * 2013-12-20 2014-03-12 双钱集团(江苏)轮胎有限公司 Inspection system for rubber mixing process
CN104364724A (en) * 2012-03-12 2015-02-18 株式会社日立制作所 Processing step planning device
CN105607664A (en) * 2016-03-25 2016-05-25 正将自动化设备(江苏)有限公司 Bin raw material stock device and adjusting method thereof
CN108375409A (en) * 2018-02-24 2018-08-07 浙江中控技术股份有限公司 A kind of flow control method, server and system of feeding intake of weighing of material
CN108399519A (en) * 2018-02-11 2018-08-14 成都兴联宜科技有限公司 A kind of concrete mixing plant Information Management System
CN110910060A (en) * 2019-11-06 2020-03-24 青岛大学 Automatic control management system of dye consumption model
CN111665803A (en) * 2020-06-02 2020-09-15 海南中橡科技有限公司 Integrated control equipment for intelligent natural rubber production line
CN112540581A (en) * 2020-11-12 2021-03-23 惠州市麒麟环保材料有限公司 Automatic production system of concrete release agent and operation method thereof
CN116945544A (en) * 2023-09-20 2023-10-27 张家港禾福新材料科技有限公司 Plastic master batch production process regulation control method and system based on application

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1403976A (en) * 2001-08-29 2003-03-19 英业达股份有限公司 Method for examinating production of ordered shortage fittings without production instruction
CN1991876A (en) * 2005-12-30 2007-07-04 英业达股份有限公司 Material management method and system
CN101279525A (en) * 2008-04-11 2008-10-08 东莞市鑫艺来塑胶制品有限公司 Processing technique of multiple colour rubber products

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104364724A (en) * 2012-03-12 2015-02-18 株式会社日立制作所 Processing step planning device
CN104364724B (en) * 2012-03-12 2016-08-24 株式会社日立制作所 Manufacturing procedure plan making device
CN103632408A (en) * 2013-12-20 2014-03-12 双钱集团(江苏)轮胎有限公司 Inspection system for rubber mixing process
CN103632408B (en) * 2013-12-20 2015-11-18 双钱集团(江苏)轮胎有限公司 The cruising inspection system of rubber mixing technique
CN105607664A (en) * 2016-03-25 2016-05-25 正将自动化设备(江苏)有限公司 Bin raw material stock device and adjusting method thereof
CN108399519A (en) * 2018-02-11 2018-08-14 成都兴联宜科技有限公司 A kind of concrete mixing plant Information Management System
CN108375409A (en) * 2018-02-24 2018-08-07 浙江中控技术股份有限公司 A kind of flow control method, server and system of feeding intake of weighing of material
CN110910060A (en) * 2019-11-06 2020-03-24 青岛大学 Automatic control management system of dye consumption model
CN110910060B (en) * 2019-11-06 2024-02-23 青岛大学 Automatic control management system of dyeing material consumption model
CN111665803A (en) * 2020-06-02 2020-09-15 海南中橡科技有限公司 Integrated control equipment for intelligent natural rubber production line
CN111665803B (en) * 2020-06-02 2022-02-18 海南天然橡胶产业集团股份有限公司 Integrated control equipment for intelligent natural rubber production line
CN112540581A (en) * 2020-11-12 2021-03-23 惠州市麒麟环保材料有限公司 Automatic production system of concrete release agent and operation method thereof
CN116945544A (en) * 2023-09-20 2023-10-27 张家港禾福新材料科技有限公司 Plastic master batch production process regulation control method and system based on application
CN116945544B (en) * 2023-09-20 2024-03-12 张家港禾福新材料科技有限公司 Plastic master batch production process regulation control method and system based on application

Also Published As

Publication number Publication date
CN101833307B (en) 2012-05-30

Similar Documents

Publication Publication Date Title
CN101833307B (en) System and method for automatically integrating technological operation and management of plastic and rubber products
US20090043625A1 (en) Process Management System and Method
CN112258053B (en) Method for producing formula food for special medical application by using manufacturing execution system
CN102385363A (en) ERP-based intelligent intensive control system of continuous dyeing production line
CN104376408A (en) Data acquisition and management system used in paint producing process
WO2018084180A1 (en) Production management system and production management method
CN111722603A (en) Management and control system and management and control method for production workshop
CN112130537B (en) Informationized management method and system for mixed-flow assembly line of engine
CN108829048A (en) A kind of information analysis system and method based on liquid crystal glass base production and processing
CN111768081A (en) Method and system for calculating product manufacturing energy consumption in hybrid manufacturing environment
CN112101771A (en) Automatic production control system and production method for Danshu soft capsules
CN118000435A (en) Feed processing technology based on automatic production line
JP3738569B2 (en) Manufacturing information management method
CN117314120A (en) Engineering project cost management and control method and system based on EBS and engineering quantity list
CN107272613B (en) A kind of New Process control system applied to woodworking
CN101436066B (en) Real time information management method and system of high-frequency straight welded pipe production line
CN102929238A (en) Intelligent compounding monitoring system
CN109636152B (en) Homogenization processing regulation and control method and system for chemical components of product
JP7408606B2 (en) visualization system
CN103676872B (en) A kind of method and system of production management
CN114433834B (en) Integrative intelligent control system of sand mixing molding pouring
Phruksaphanrat et al. Lean techniques and simulation-based optimization for improving wood plastic composite manufacturing
CN201689454U (en) Senior planning and scheduling system
CN107272623B (en) Intelligent workshop part operation guidance video system
CN117649211B (en) Enterprise assembly process collaborative management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YE JIANLI ZHENG-JIANG AUTOMATION (JIANGSU) CO., LT

Effective date: 20120516

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120516

Address after: Tainan City, Taiwan, China

Co-patentee after: Ye Jianli

Patentee after: Ye Nengkui

Co-patentee after: Automation equipment (Jiangsu) Co., Ltd.

Address before: Tainan County, Taiwan, China

Patentee before: Ye Nengkui