CN101769157A - Construction method for tunnel working face counterpressure treatment during tunnel excavation - Google Patents

Construction method for tunnel working face counterpressure treatment during tunnel excavation Download PDF

Info

Publication number
CN101769157A
CN101769157A CN201010019551A CN201010019551A CN101769157A CN 101769157 A CN101769157 A CN 101769157A CN 201010019551 A CN201010019551 A CN 201010019551A CN 201010019551 A CN201010019551 A CN 201010019551A CN 101769157 A CN101769157 A CN 101769157A
Authority
CN
China
Prior art keywords
tunnel
face
working face
wall
tunnel excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010019551A
Other languages
Chinese (zh)
Other versions
CN101769157B (en
Inventor
杨红军
李刚
雷鸣
徐一鸣
曾志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Changda Highway Engineering Co Ltd
Original Assignee
Guangdong Changda Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Changda Highway Engineering Co Ltd filed Critical Guangdong Changda Highway Engineering Co Ltd
Priority to CN2010100195514A priority Critical patent/CN101769157B/en
Publication of CN101769157A publication Critical patent/CN101769157A/en
Application granted granted Critical
Publication of CN101769157B publication Critical patent/CN101769157B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a construction method for tunnel working face counterpressure treatment during tunnel excavation, which is used when a working face is unstable with geology of fully weathered or severely weathered wall rocks and intense water gushing or mud gushing. The construction method is characterized in that the method comprises the following steps: A, building a wall with selected tunnel slag at a position close to a tunnel working face and adding flaky rubbles into the piled up tunnel slag when the tunnel working face undergoes intense mud gushing; B, spraying concrete on the surface of the built wall to form a curtain; C, arranging a plurality of aqueducts and grout pipes on the surface of the built wall; and D, adopting mixed slurry of cement and water glass to grout the built wall body through the grout pipes. Because the construction method can effectively prevent a tunnel working face from being hollowed out by water during carrying out reinforcement treatment of an excavated tunnel, the formation of a greater cavity inside the tunnel working face can be avoided; and the method also improves construction quality and accelerates construction during tunnel excavation.

Description

The job practices that the face back-pressure is disposed in the tunnel excavation
Technical field
The present invention relates to the method for disposal of face in a kind of tunnel excavation, especially a kind of geology that is applicable to is completely decomposed or severely-weathered country rock, and face water burst occurs or gushes mud bigger, makes face be difficult to the job practices that the face back-pressure is disposed in the tunnel excavation that is adopted under the steady situation.
Background technology
In the tunnel excavation process, face is with entirely, it is main reaching severely-weathered country rock, and big water burst appears in face, and under the souring of water, face is difficult to from steady, and its slag body is emptied by water and formed the cavity, when situation is serious, appearance is caved in, and perhaps, face is based on the sandstone of completely decomposed, washing away under the drive of water, form mud-rock flow, mud occurs gushing, these two kinds of situations all are under the effect of water, unfavorable condition appears in face, if stable the going again of face handled by the time, certainly will under the effect of water, force face to be emptied, take away most of slag body, formation increases the postorder intractability, thereby has influenced construction quality and construction speed than macroscopic-void.
Summary of the invention
In order to overcome above-mentioned deficiency, the object of the present invention is to provide and a kind ofly can effectively avoid face to be emptied by water, formation is than the phenomenon of macroscopic-void, thus the job practices that the face back-pressure is disposed in the tunnel excavation of the construction quality of raising tunnel excavation and operating efficiency.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: the job practices that the face back-pressure is disposed in the tunnel excavation, it is characterized in that: this method may further comprise the steps: A, select for use the hole slag to be piled into a wall in the position near face, when face gush mud when big, in the hole slag of piling up, add sheet piece stone; B, at the metope sprayed mortar of piling up, form curtain; C, on the metope of piling up, establish a plurality of aqueducts and Grouting Pipe; The mixed serum of D, employing cement and water glass carries out slip casting by Grouting Pipe to the body of wall of piling up.
In the described steps A, the hole slag is the rock of severely-weathered or completely decomposed.
In the described steps A, the height of the wall that is piled into is apart from vault 50cm or still less, the length of wall must be greater than the zone length of face water burst.
Among the described step B, the thickness of described curtain is at 15cm.
Among the described step D, in the mixed serum of cement and water glass, the quality proportioning of cement and water glass is 1: 0.5; Grouting pressure adopts 0.5~1.0Mpa.
Construction principle: carry out owing to the excavation to whole tunnel is one section one section, after excavating one section, need carry out consolidation process to the tunnel that digs, during reinforcing, face is bigger as water burst occurring or gushing mud, emptied the formation cavity by water, when situation is serious, can occur easily caving in, real probatio inspectionem pecuoarem is bright, when landslide appearred in face, the body that caves in collapsed to a certain degree will stopping, and reason is, cave in body oneself itself the slag body be stacked into to a certain degree after make its formation " barricade effect ", limited the degree of freedom of the direction of caving in, so landslide stops.And the back-pressure soil body that this paper proposed, can impel it to form barricade effect (or core soil effect) in advance, after the back-pressure, can seal face fast, limit slump body degree of freedom in advance, prevent to greatest extent to wash away or fluid removal slag body, minimizing is emptied, impel face to reach stable state fast, reduce the postorder intractability.
Beneficial effect of the present invention is: since the tunnel that digs carry out consolidation process during, can effectively prevent to be emptied by water because of face, thereby avoid face to form bigger cavity, this method has not only improved the construction quality of tunnel excavation, but also has improved construction speed.
Description of drawings
Below in conjunction with the drawings and specific embodiments the present invention is described in further detail:
Fig. 1 is a construction schematic diagram of the present invention.
Among the figure: 1, tunnel; 2, face; 3, wall; 4, curtain; 5, aqueduct; 6, Grouting Pipe; 7, vault.
The specific embodiment
As shown in Figure 1, the application of job practices in the mountain tunnel excavation process that gurgles greatly that the face back-pressure is disposed in the tunnel excavation, this method may further comprise the steps: A, select for use hole slag position near face 2 in tunnel 1 of severely-weathered or completely decomposed to be piled into a wall 3, gush mud when big when face 2, in the hole slag of piling up, add sheet piece stone, the height of the wall that is piled into is 50cm or still less apart from the spacing of vault 7, the length of wall is looked face water burst scope and is determined, the length of wall must be greater than the zone length of face water burst, in the present embodiment, because whole face all has the water burst phenomenon, the length of Gu Qiang is the width of tunnel; B, at the metope sprayed mortar of piling up, form curtain 4, the thickness of described curtain 4 is at 15cm; C, on the metope of piling up, establish a plurality of aqueducts 5 and Grouting Pipe 6; The mixed serum of D, employing cement and water glass carries out slip casting by Grouting Pipe to the body of wall of piling up, and in the mixed serum of cement and water glass, the quality proportioning of cement and water glass is 1: 0.5; Grouting pressure adopts 0.5~1.0Mpa.
Owing to used the job practices that face back-pressure of the present invention is disposed in the mountain tunnel excavation process that gurgles greatly, after the completion, by inspection, its construction quality has exceeded the basic standard of regulation, and finishes construction in advance in two months.

Claims (5)

1. the job practices that the face back-pressure is disposed in the tunnel excavation, it is characterized in that: this method may further comprise the steps: A, select for use the hole slag to be piled into a wall in the position near face, when face gush mud when big, in the hole slag of piling up, add sheet piece stone; B, at the metope sprayed mortar of piling up, form curtain; C, on the metope of piling up, establish a plurality of aqueducts and Grouting Pipe; The mixed serum of D, employing cement and water glass carries out slip casting by Grouting Pipe to the body of wall of piling up.
2. the job practices that the face back-pressure is disposed in the tunnel excavation according to claim 1, it is characterized in that: in the described steps A, the hole slag is the rock of severely-weathered or completely decomposed.
3. the job practices that the face back-pressure is disposed in the tunnel excavation according to claim 1, it is characterized in that: in the described steps A, the height of the wall that is piled into is apart from vault 50cm or still less, the length of wall must be greater than the zone length of face water burst.
4. the job practices that the face back-pressure is disposed in the tunnel excavation according to claim 1, it is characterized in that: among the described step B, the thickness of described curtain is at 15cm.
5. the job practices that the face back-pressure is disposed in the tunnel excavation according to claim 1, it is characterized in that: among the described step D, in the mixed serum of cement and water glass, the quality proportioning of cement and water glass is 1: 0.5; Grouting pressure adopts 0.5~1.0Mpa.
CN2010100195514A 2010-01-21 2010-01-21 Construction method for tunnel working face counterpressure treatment during tunnel excavation Expired - Fee Related CN101769157B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010100195514A CN101769157B (en) 2010-01-21 2010-01-21 Construction method for tunnel working face counterpressure treatment during tunnel excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010100195514A CN101769157B (en) 2010-01-21 2010-01-21 Construction method for tunnel working face counterpressure treatment during tunnel excavation

Publications (2)

Publication Number Publication Date
CN101769157A true CN101769157A (en) 2010-07-07
CN101769157B CN101769157B (en) 2012-01-04

Family

ID=42502240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010100195514A Expired - Fee Related CN101769157B (en) 2010-01-21 2010-01-21 Construction method for tunnel working face counterpressure treatment during tunnel excavation

Country Status (1)

Country Link
CN (1) CN101769157B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967987A (en) * 2010-09-15 2011-02-09 中铁四局集团第五工程有限公司 Construction process for temporarily strengthening tunnel face of underground excavation sand layer
CN102425425A (en) * 2011-12-26 2012-04-25 中铁四局集团有限公司 Working face reinforcing structure in shield machine cabin as well as construction method and equipment thereof
CN103334772A (en) * 2013-07-08 2013-10-02 中铁十四局集团有限公司 Slurry capable of stabilizing tunnel face of underground excavation sand layer, slurry preparation method, grouting equipment and grouting process
CN110985041A (en) * 2019-12-31 2020-04-10 中铁隧道局集团有限公司 Construction method for processing sudden surge of separated double-hole tunnel
CN113756850A (en) * 2021-09-18 2021-12-07 同济大学 Assembled type water filling inclined support locking port pipe coupling air bag type tunnel face water retaining wall

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19612743C1 (en) * 1996-03-29 1997-03-27 Klaus Dipl Ing Esters Sealing working surface during formation of hollow space in tunnel and pipeline construction
JP2000110488A (en) * 1998-10-02 2000-04-18 Toda Constr Co Ltd Working face marking device and excavating method
CN101196117A (en) * 2008-01-04 2008-06-11 中铁二院工程集团有限责任公司 Non-blasting digging method for tunnel and underground project
CN101328811B (en) * 2008-07-25 2010-10-27 北京市政建设集团有限责任公司 TGRM subsection moving-on type advanced deep hole grouting construction process
CN101363321A (en) * 2008-09-24 2009-02-11 中国水利水电第五工程局有限公司 Application method for horizontal V-shaped tunnel face for digging tunnel
CN101487393B (en) * 2009-02-20 2011-09-21 中铁西南科学研究院有限公司 Full-section pre-reinforcing construction method for tunnel free-machining anchor bar

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967987A (en) * 2010-09-15 2011-02-09 中铁四局集团第五工程有限公司 Construction process for temporarily strengthening tunnel face of underground excavation sand layer
CN102425425A (en) * 2011-12-26 2012-04-25 中铁四局集团有限公司 Working face reinforcing structure in shield machine cabin as well as construction method and equipment thereof
CN102425425B (en) * 2011-12-26 2014-07-23 中铁四局集团有限公司 Working face reinforcing structure in shield machine cabin as well as construction method and equipment thereof
CN103334772A (en) * 2013-07-08 2013-10-02 中铁十四局集团有限公司 Slurry capable of stabilizing tunnel face of underground excavation sand layer, slurry preparation method, grouting equipment and grouting process
CN110985041A (en) * 2019-12-31 2020-04-10 中铁隧道局集团有限公司 Construction method for processing sudden surge of separated double-hole tunnel
CN110985041B (en) * 2019-12-31 2021-04-20 中铁隧道局集团有限公司 Construction method for processing sudden surge of separated double-hole tunnel
CN113756850A (en) * 2021-09-18 2021-12-07 同济大学 Assembled type water filling inclined support locking port pipe coupling air bag type tunnel face water retaining wall

Also Published As

Publication number Publication date
CN101769157B (en) 2012-01-04

Similar Documents

Publication Publication Date Title
CN105041333B (en) It is a kind of first to fill out the method for digging method processing Tunnel Landslide afterwards
CN101761237B (en) Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN103669346B (en) A kind of tuck inside the sleeve raft pipe and the application in landslide control
CN103321246B (en) Underground diaphragm wall based foundation pit construction method
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN109026020B (en) Water-rich tunnel karst cave treatment and excavation method
CN101769157B (en) Construction method for tunnel working face counterpressure treatment during tunnel excavation
CN108086296B (en) Dynamic and static combined grouting foundation reinforcing construction method
CN107503362A (en) A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability
CN103362117A (en) Full-section grouting method for grouting section
CN104314082A (en) Deep function pit supporting structure in karst geology condition and construction method thereof
CN202194149U (en) Water-proof curtain
CN107268688A (en) I-shaped steel joint of diaphragm wall reinforces the construction method of sealing
CN103485347A (en) Batter pile used for building foundation pit support and construction method thereof
CN102235008B (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN103775102B (en) Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN105545315A (en) Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction
CN113216215A (en) Deep groove support reverse construction method in complex environment
CN208778010U (en) A kind of advance reinforcement structure of push pipe inlet and outlet cave
CN203701112U (en) Composite foundation grouting steel tube type reinforced slope
CN110344394A (en) A kind of surrounding deep foundation pit shallow embedding structure base ruggedized construction and construction method
CN101793024B (en) Construction method for multi-head small-diameter deep mixing and high-pressure jet combined anti-seepage wall of foundation pit
CN116104530A (en) Poor geological disaster construction method for diversion tunnel
CN104389609A (en) No-blasting mechanical digging method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20140121