CN101328811B - TGRM subsection moving-on type advanced deep hole grouting construction process - Google Patents

TGRM subsection moving-on type advanced deep hole grouting construction process Download PDF

Info

Publication number
CN101328811B
CN101328811B CN2008101172175A CN200810117217A CN101328811B CN 101328811 B CN101328811 B CN 101328811B CN 2008101172175 A CN2008101172175 A CN 2008101172175A CN 200810117217 A CN200810117217 A CN 200810117217A CN 101328811 B CN101328811 B CN 101328811B
Authority
CN
China
Prior art keywords
tgrm
grouting
hole
drilling
stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101172175A
Other languages
Chinese (zh)
Other versions
CN101328811A (en
Inventor
孔恒
彭峰
张继明
王卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CHINA RAILWAY RUIWEI FOUNDATION ENGINEERING CO LTD
Beijing Municipal Construction Co Ltd
Original Assignee
BEIJING CHINA RAILWAY RUIWEI FOUNDATION ENGINEERING CO LTD
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CHINA RAILWAY RUIWEI FOUNDATION ENGINEERING CO LTD, Beijing Municipal Construction Co Ltd filed Critical BEIJING CHINA RAILWAY RUIWEI FOUNDATION ENGINEERING CO LTD
Priority to CN2008101172175A priority Critical patent/CN101328811B/en
Publication of CN101328811A publication Critical patent/CN101328811A/en
Application granted granted Critical
Publication of CN101328811B publication Critical patent/CN101328811B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a TGRM segmental advancing-type leading deep-hole grouting construction process. The construction process comprises the following steps that: a slurry stop wall is made first; a hole is drilled on the set hole position; an orifice pipe is arranged in the drilled hole; a drill bit is replaced; first-segment drilling is carried out through the orifice pipe; after a depth is reached, the drilling is stopped and a drilling tool is withdrawn; grouting corollary equipment is arranged on the orifice pipe, so as to inject TGRM cement-based special grouting material into stratum; after a grout soil body reaches certain strength, the grouting equipment is removed, and second-segment drilling is carried out through the orifice pipe; the two segments of drilling are repeated till the set hole depth is reached; and then the steps are carried out to another hole position till all grouting holes are completed. The construction process has the advantages that: aiming at subsurface tunnels, in particular to tunnels of which an arch part is positioned in an unbonded and in low self-stability sand layer and other stratum and passes through the bottom of a building, segmental advancing-type leading deep-hole grouting is carried out to the stratum, which can comprehensively reinforce the stratum, so as to further slow down or avoid the settlement after the stratum is destroyed and the damage to buildings (constructed objects).

Description

TGRM segmentation protrusive advanced deep hole grouting construction process
Technical field
The present invention is meant a kind of TGRM segmentation protrusive advanced deep hole grouting construction process.It is as the anti-heavy necessary effective means of subsiding of construction, and being applicable to that bored tunnel begins to construct needs engineering that the soil body is reinforced in advance.Especially to passing through building bottom, pass through the structure (as railway, track traffic, bridge, highway etc.) of settlement request strictness, tunnel structure is in does not have bonding, from layer of sand and gravel (ovum) stone layer, aquifer sand layer and the loose geology soil layer of steady power difference.
Background technology
Common grouting process has dual pipe grouting process at present, and dual pipe slurry injection technique is to adopt dual pipe bit machine drill hole to carry out retrusive slip casting in the drilling rod of hollow to desired depth, and injecting paste material adopts cement-sodium silicate double liquid.Its shortcoming is that this worker's method adopts drilling rod slip casting, will inevitably there be the gap between drilling rod and the injected hole, very easily cause slurry reflux during slip casting, both waste material can not guarantee slip casting effect, therefore the injecting paste material that dual pipe grouting process adopts is that the cement-sodium silicate double liquid (time of setting is in 1 minute) of rapid hardening is to prevent slurry reflux, but the active strength of biliquid slurry induration can only maintain the time about a week, so dual pipe slip casting only is suitable for grouting consolidation effect is wanted the not long provisional grouting and reinforcing of seeking time, is not suitable for the grouting and reinforcing project is passed through in the higher structure bottom of settlement request.
Summary of the invention
The objective of the invention is at the unfavorable present situation of present pre-grouting consolidation effect, the theory analysis of the science of carrying out, grope, and the concrete practice by engineering, provide a kind of being in not have bonding at the tunnel excavation structure, layer of sand and gravel (ovum) stone from steady power difference, aquifer sand layer and loose geology soil layer, especially tunnel passing through building bottom or railroad crossing, track traffic, bridge, during the higher structure of settlement requests such as road surface bottom, the TGRM segmentation protrusive advanced deep hole grouting construction process of using as leading pre-soil mass consolidation, soil mass consolidation prevents to cave in thereby reach effectively, the control sedimentation, guarantee the purpose of construction safety.
The present invention is realized by following technical scheme.
A kind of TGRM segmentation protrusive advanced deep hole grouting construction process may further comprise the steps:
Stop excavation when 1. tunnel excavation extremely need carry out reinforcing scope, the sealing face performs wall for grouting;
2. configure bore angle, length, position and quantity according to the pre-reinforcing scope of need, wherein: angle is 4 °-10 °, total length is that 12-14m, injected hole spacing are 0.6-1m, quantity and position are determined according to the tunnel size and the scope that needs reinforcement, and are carried out the bore position unwrapping wire by setting requirement on wall for grouting;
3. be divided into plurality of sections according to the on-the-spot stratum condition slip casting length of will always holing, every section is controlled at 1.0-2.0m; Use split type horizontal geological drilling rig to hole at bore position according to the angle that configures, drill bit adopts drill hammer, drilling depth 0.5-1m;
4. after reaching drilling depth, withdraw from drilling tool, pre-processed orifice tube is installed in boring, the orifice tube outer end is welded with flange, with the fast setting cement packing orifice tube and the space on stratum on every side;
5. after the fast setting cement for the treatment of packing reaches certain intensity, change the drill bit less than the orifice tube diameter, undertaken first section by orifice tube and creep into, drilling depth is 1.0-2.0m, stops to creep into after reaching drilling depth, withdraws from drilling tool;
6. the slip casting corollary equipment is installed on orifice tube; Mix the extraordinary injecting paste material of system TGRM cement based, the injecting paste material that stirs is injected the stratum by grouting pump;
7. after treating that the slip casting soil body reaches certain intensity, remove slip casting flange corollary equipment, carry out second section again by orifice tube and creep into, drilling depth is 1.0-2.0m, reach drilling depth after, stop to creep into, withdraw from drilling tool;
8. again according to step 6., 7. step repeat; So circulation up to reaching the setting hole depth, is finished final stage slip casting, and then this injected hole construction is finished;
9. change position, another one hole, all 3.-8. carry out, set all injected holes that require up to finishing according to step;
10. after all injected hole slip castings are finished, promptly finish the stratum consolidation in the area requirement, carry out wall for grouting then and abolish, excavate, excavate structure in advance, until excavating the stratum consolidation excavation length of setting with digging along with the tunnel is installed according to code requirement.
Be the flange by separately between orifice tube and the slip casting corollary equipment, connect, can remove at any time or install with bolt.
The orifice tube diameter of installing in the position, aperture during every hole mortar depositing construction is 90-150mm, and the inlet well diameter is 70-130mm.
The mode that TGRM segmentation protrusive advanced deep hole grouting construction process combines by rig subsection hole-drilling and slip casting, stratum consolidation all will be constructed and reaches whole grouting consolidation effect by performing a plurality of segmentation protrusive advanced deep hole groutings each time.
According to stratum condition, the pre-reinforced hole length of each boring slip casting is divided into plurality of sections, every segment length is 1.0-2.0m.
Orifice tube is installed in the position, aperture during every hole mortar depositing construction, and is connected with orifice tube by the supporting grouting device of flange and carries out slip casting.
TGRM segmentation protrusive advanced deep hole grouting construction process injecting paste material uses serial TGRM cement based special material, comprises TGRM reinforcement type, TGRM superfine type, TGRM water proof type etc., can use corresponding injecting paste material according to Different Strata.
Water, the gray scale of TGRM cement based special material are: 0.6-1.2: 1.
Grouting pressure is controlled at 0.3-1.5Mpa, and slip casting diffusion radius is 0.6-1m.
The drilling rod extensible of split type horizontal geological drilling rig reaches the gun drilling needs to 12-14m.
Advantage of the present invention: at bored tunnel, particularly the arch, tunnel is in abominable stratum (comprising the layer of sand that do not have bonding, self-stable ability difference and sandy gravel etc.), when especially passing through building (constructing) thing bottom, segmentation protrusive advanced deep hole grouting is carried out on the stratum, can reinforce the stratum effectively comprehensively, thereby further slow down or avoid the ground sedimentation of damage layer and the damage of building (constructing) thing, guarantee construction safety.
Description of drawings
Fig. 1 is a TGRM segmentation protrusive advanced deep hole grouting cross-sectional configuration schematic diagram.
Fig. 2 is a TGRM segmentation protrusive advanced deep hole grouting longitudinal plane structure schematic diagram.
Among the figure: 1.TGRM segmentation protrusive pre-grouting hole, 2. pre-leading soil mass consolidation, 3. the tunnel excavates structure in advance, 4. wall for grouting, 5. orifice tube.
Horizontal arrow among Fig. 2 is the drill bit direct of travel, curved arrow be injecting paste material to around permeate direction.
The specific embodiment
Embodiment: No. four line Xizhimen of Beijing Metro~zoological park interval double-hole tunnel mileage K14+0.0 eastwards totally 105 meters sections just locating to be positioned at Chinese sorghum bridge below, about 14 meters of bored tunnel buried depth, need pass through the high beam bridge bridge pier in Xizhimen during construction, arch, tunnel structure stratum of living in is to be the sandy ground layer below sandy gravel, the haunch, for guaranteeing the safety of Chinese sorghum bridge in the running tunnel digging process, adopted the present invention's " TGRM segmentation protrusive advanced deep hole grouting construction process ".
The described TGRM segmentation of present embodiment protrusive advanced deep hole grouting construction process is used for the bored tunnel construction, and it may further comprise the steps:
Stop excavation when 1. tunnel excavation extremely need carry out reinforcing scope, the sealing face performs wall for grouting;
2. configure bore angle, length, position and quantity according to the pre-reinforcing scope of need, wherein: angle is 4 °-10 °, total length is that 12m, injected hole spacing are 1m, quantity and position are determined according to the tunnel size and the scope that needs reinforcement, and are carried out the bore position unwrapping wire by setting requirement on wall for grouting;
3. be divided into six sections according to the on-the-spot stratum condition slip casting length of will always holing, every section is controlled at 2.0m; Use split type horizontal geological drilling rig to hole at bore position according to the angle that configures, drill bit adopts φ 130mm drill hammer, drilling depth 0.5-1m;
4. after reaching drilling depth, withdraw from drilling tool, pre-processed φ 108mm orifice tube (outer end is welded with φ 127mm flange) is installed in boring, and with the fast setting cement packing orifice tube and the space on stratum on every side;
5. after the fast setting cement for the treatment of packing reaches certain intensity, change the φ 90mm drill bit less than the orifice tube diameter, undertaken first section by orifice tube and creep into, drilling depth is 2.0m, stops to creep into after reaching drilling depth, withdraws from drilling tool;
6. the slip casting corollary equipment is installed on orifice tube; Mix the extraordinary injecting paste material of system TGRM cement based, the injecting paste material that stirs is injected the stratum by grouting pump;
7. after treating that the slip casting soil body reaches certain intensity, remove slip casting flange corollary equipment, carry out second section again by orifice tube and creep into, drilling depth is 2.0m, reach drilling depth after, stop to creep into, withdraw from drilling tool;
8. again according to step 6., 7. step repeat; So circulation up to reaching the setting hole depth, is finished final stage slip casting, and then this injected hole construction is finished;
9. change position, another one hole, all 3.-8. carry out, set all injected holes that require up to finishing according to step;
10. after all injected hole slip castings are finished, promptly finish the stratum consolidation in the area requirement, carry out wall for grouting then and abolish, excavate, excavate structure in advance, until excavating the stratum consolidation excavation length of setting with digging along with the tunnel is installed according to code requirement.
Be the flange by separately between orifice tube and the slip casting corollary equipment, connect, can remove at any time or install with bolt.
TGRM segmentation protrusive advanced deep hole grouting construction process combines by subsection hole-drilling and slip casting, and stratum consolidation all will be constructed and reaches whole grouting consolidation effect by performing a plurality of TGRM segmentation protrusive advanced deep hole groutings each time.
The selection of TGRM segmentation protrusive advanced deep hole grouting technology injecting paste material is mainly selected suitable injecting paste material according to the residing stratum condition of bored tunnel structure, is generally: TGRM reinforcement type and TGRM superfine type.Adopt TGRM reinforcement type special material at position, arch injecting paste material in the present embodiment, adopt TGRM superfine type special material at the following position of haunch injecting paste material.
As shown in Figure 1 and Figure 2, lay two row's segmentation protrusive pre-grouting holes above pre-tunneling, spacing is 1.0m, is blossom type and lays.Each construction reinforcement arch soil body length is 12 meters in the present embodiment, excavates 10 meters.
Present embodiment adopts split type horizontal geological drilling rig pore-forming, and drilling diameter is φ 90mm, and section length is 2.0m, be divided into six sections and carry out, drilling rod can divide six sections spreadings to 12m, promptly whenever creeps into 2.0m, just stop to creep into capable slip casting, injecting paste material adopts TGRM cement based special material.
It is 1: 1 that present embodiment uses water, the gray scale of TGRM cement based special material, and grouting pressure is controlled at 0.3-0.5Mpa.
Each leading soil mass consolidation needs 4 days durations, guarantees that running tunnel normally excavates.After the running tunnel excavation construction finishes, measure and show the bridge pier only 0.8mm that sinks, satisfied the requirement that sedimentation that bridge property right unit and design propose is no more than 2mm.
Carry out leading soil stabilization by employing TGRM segmentation protrusive advanced deep hole grouting construction process, thereby guaranteed the safe excavation in tunnel, and the normal current of the high beam bridge in Xizhimen do not caused any harmful effect, obtained good society and economic benefit.

Claims (7)

1. TGRM segmentation protrusive advanced deep hole grouting construction process, it is characterized in that: it may further comprise the steps:
Stop excavation when 1. tunnel excavation extremely need carry out reinforcing scope, the sealing face performs wall for grouting;
2. configure bore angle, length, position and quantity according to the pre-reinforcing scope of need: angle is 4 °-10 °, total length is that 12-14m, injected hole spacing are 0.6-1m, quantity and position are determined according to the tunnel size and the scope that needs reinforcement, and are carried out the bore position unwrapping wire by setting requirement on wall for grouting;
3. be divided into plurality of sections according to the on-the-spot stratum condition slip casting length of will always holing, every section is controlled at 1.0-2.0m; Use split type horizontal geological drilling rig to hole at bore position according to the angle that configures, drill bit adopts drill hammer, drilling depth 0.5-1m;
4. after reaching drilling depth, withdraw from drilling tool, the pre-processed orifice tube that flange is housed is installed in boring, and with the fast setting cement packing orifice tube and the space on stratum on every side;
5. after the fast setting cement for the treatment of packing reaches certain intensity, change the drill bit less than the orifice tube diameter, undertaken first section by orifice tube and creep into, drilling depth is 1.0-2.0m, stops to creep into after reaching drilling depth, withdraws from drilling tool;
6. the slip casting corollary equipment is installed on orifice tube; Mix the extraordinary injecting paste material of system TGRM cement based, the injecting paste material that stirs is injected the stratum by grouting pump;
7. after treating that the slip casting soil body reaches certain intensity, remove slip casting flange corollary equipment, carry out second section again by orifice tube and creep into, drilling depth is 1.0-2.0m, reach drilling depth after, stop to creep into, withdraw from drilling tool;
8. again according to step 6., 7. step repeat; So circulation up to reaching the setting hole depth, is finished final stage slip casting, and then this injected hole construction is finished;
9. change position, another one hole, all 3.-8. carry out, set all injected holes that require up to finishing according to step;
10. after all injected hole slip castings are finished, promptly finish the stratum consolidation in the area requirement, carry out wall for grouting then and abolish, excavate, hole on one side and the tunnel is installed is excavated structure in advance, excavate length until the stratum consolidation that excavates setting according to code requirement.
2. TGRM segmentation protrusive advanced deep hole grouting construction process as claimed in claim 1 is characterized in that: be the flange by separately between orifice tube and the slip casting corollary equipment, connect with bolt.
3. TGRM segmentation protrusive advanced deep hole grouting construction process as claimed in claim 1 is characterized in that: the orifice tube diameter of installing in the position, aperture during the mortar depositing construction of every hole is 90-150mm, and the inlet well diameter is 70-130mm.
4. TGRM segmentation protrusive advanced deep hole grouting construction process as claimed in claim 1 is characterized in that: the mode of taking rig subsection hole-drilling and slip casting to combine.
5. TGRM segmentation protrusive advanced deep hole grouting construction process as claimed in claim 1 is characterized in that: injecting paste material uses serial TGRM cement based special material, comprises TGRM reinforcement type, TGRM superfine type, TGRM water proof type.
6. TGRM segmentation protrusive advanced deep hole grouting construction process as claimed in claim 1 is characterized in that: water, the gray scale of TGRM cement based special material are: 0.6-1.2: 1.
7. TGRM segmentation protrusive advanced deep hole grouting construction process as claimed in claim 1, it is characterized in that: grouting pressure is controlled at 0.3-1.5Mpa, and slip casting diffusion radius is 0.6-1m.
CN2008101172175A 2008-07-25 2008-07-25 TGRM subsection moving-on type advanced deep hole grouting construction process Expired - Fee Related CN101328811B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101172175A CN101328811B (en) 2008-07-25 2008-07-25 TGRM subsection moving-on type advanced deep hole grouting construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101172175A CN101328811B (en) 2008-07-25 2008-07-25 TGRM subsection moving-on type advanced deep hole grouting construction process

Publications (2)

Publication Number Publication Date
CN101328811A CN101328811A (en) 2008-12-24
CN101328811B true CN101328811B (en) 2010-10-27

Family

ID=40204794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101172175A Expired - Fee Related CN101328811B (en) 2008-07-25 2008-07-25 TGRM subsection moving-on type advanced deep hole grouting construction process

Country Status (1)

Country Link
CN (1) CN101328811B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101769157B (en) * 2010-01-21 2012-01-04 广东省长大公路工程有限公司 Construction method for tunnel working face counterpressure treatment during tunnel excavation
CN102235151B (en) * 2010-04-21 2013-05-08 成都中铁隆工程集团有限公司 Advanced hole-forming method of sand gravel boulder layer
CN102995647B (en) * 2012-12-15 2014-12-17 天津大学 Underground water control method used for grouting and seepage insulation of pile hole
CN103147778A (en) * 2013-03-23 2013-06-12 孟志强 Method for lane development and support in extremely crushed rock stratum
CN103835729B (en) * 2013-11-11 2016-06-15 北京中煤矿山工程有限公司 Deep distance roadway surrounding rock pre grouting from the surface reinforcement process
CN103982201A (en) * 2014-05-22 2014-08-13 北京中铁瑞威工程检测有限责任公司 Advanced detection, grouting reinforcement and excavation method of wide separation fracture of high-pressure water-rich tunnel
CN104453943B (en) * 2014-10-27 2015-09-02 山东科技大学 Rich water fragmented rock body comprehensive grouting control method under effective sealing batholite deletion condition
CN105781557B (en) * 2016-03-25 2018-10-02 广东水电二局股份有限公司 A kind of construction method of bored tunnel chemical grouting consolidation layer of sand
CN109083649B (en) * 2018-10-11 2019-08-13 中国石油大学(华东) It is applicable in the water-rich sand layer pre-grouting reinforcement means of complicated urban environment subway tunnel
CN109162736B (en) * 2018-10-26 2019-07-19 中国矿业大学 A kind of liquid mixed deep hole circulation Application of High pressure Split Grouting method of air-water mud
CN110004913A (en) * 2019-04-10 2019-07-12 中国水利水电第七工程局成都水电建设工程有限公司 A kind of deep settlement foundation stabilization construction method of proximity subway station
CN113216149B (en) * 2021-05-21 2022-11-15 浙江海聚科技有限公司 Grouting process for advanced drilling
CN114991817B (en) * 2022-05-17 2023-05-30 中国矿业大学(北京) Tunnel surrounding rock broken zone strength double-gradient advanced grouting compensation method

Also Published As

Publication number Publication date
CN101328811A (en) 2008-12-24

Similar Documents

Publication Publication Date Title
CN101328811B (en) TGRM subsection moving-on type advanced deep hole grouting construction process
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN103835729B (en) Deep distance roadway surrounding rock pre grouting from the surface reinforcement process
CN102606162B (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN104405399B (en) One kind passes through drift sand stratum tunnel excavation support body engineering method
CN102134967B (en) Construction method of consolidating horizontal directional drilling hole by grouting coal seam baseboard
CN102146672B (en) Method for constructing pile foundation in karst area
CN202707075U (en) Long-span subway station main structure constructed based on column and arch method
CN103147442B (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN105525619B (en) A kind of water rich strata bored tunnel occlusion pipe curtain
CN102733413A (en) Method for controlling subsidence of operating subway tunnel
CN110331992A (en) A kind of hole daguanpeng construction method
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN102748040A (en) Main structure for metro long-span station and pillar arching construction method thereof
CN105350988B (en) Tunnel Base reinforcement means
CN107725056A (en) One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN102278130A (en) Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel
CN207934910U (en) A kind of newly built tunnels closely on across existing tunnel anti-floating reinforcement system
CN103321235A (en) Composite soil nailing wall slope support method
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN105464685A (en) Cave-pile method bored tunnel waterproof curtain and construction method thereof
CN106812134A (en) Reserved long term line passes through the plain stake reinforcement system and its construction method of existing lines part
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN108331595A (en) One kind is soft to mould the body Karst Tunnel reinforcement process that caves in

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101027

Termination date: 20160725