China
Prior art keywords
sand
slurry
sand layer
layer
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102824258A
Other languages
Chinese (zh)
Inventor
周赣
王福恩
程贤红
孙爱军
舒雪松
黄龙光
付国才
简靖桃
鲍俊捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN2010102824258A priority Critical patent/CN101967987A/en
Publication of CN101967987A publication Critical patent/CN101967987A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a construction process for temporarily strengthening a tunnel face of an underground excavation sand layer, which comprises the following steps: stirring and preparing slurry: taking a liquid sand strengthening agent and cement slurry of which the mixing ratio is 1:0.5, stirring under the condition that the volume ratio of the sand strengthening agent to the cement slurry is 1:0.7 to form cement and sand strengthening agent dual-liquid slurry, and initially setting for 7min; generating high-pressure air by directly utilizing a spraying and mixing air compressor, and controlling the air pressure at 0.5MPa; spraying the slurry: connecting an air pipe to a sealed slurry injecting tank, enabling a slurry spraying pipe which is led out of the bottom of the slurry injecting tank to face the surface of the sand layer, inputting the high-pressure air to spray the slurry in the slurry injecting tank onto the surface of the sand layer through the high-pressure air to further permeate into the sand layer, enabling the slurry spraying pipe to be perpendicular to the surface of the sand layer, keeping the distance between the slurry spraying pipe and the surface of the sand layer at 20cm-40cm, and moving the slurry spraying pipe at uniform speed to connect the sprayed surfaces together; and installing grids. Thus, the invention solves the problems of safety and stability of the tunnel face in the construction of the underground excavation sand layer. The invention has the characteristic of convenient and quick construction, can not affect the excavation construction, and is economical and practical. The invention is suitable for strengthening and stabilizing the tunnel face excavated in the sand layer geology.

Description

A kind of construction technology of interim reinforcing tunneling layer of sand face
Technical field
The present invention relates to a kind of construction technology of interim reinforcing tunneling layer of sand face.
Background technology
In the construction of project dug underground, the excavation face is to construct foremost, also is the weak part of engineering, and most landslide, unstability all occur in the construction face, is the primary problem that solves of tunneling construction so keep the safety and stability of face.The concreteness of sand is poor, particularly the layer of sand water content hour, the core soil bank protection that the excavation face is reserved is also stable inadequately, grid is installed, spray mixes natural layer of sand is produced disturbance, causes that sand constantly is scattered, leaks, and usually causes blank unstability.
The method of reinforcing face commonly used has net pneumatically placed concrete or conduit slip casting at present, be subjected to the restriction of engineering time, these two kinds of methods only adopt when stopping to construct, and generally can not implement to handle to the layer of sand of face in the normal construction process, have stayed potential safety hazard.
Summary of the invention
Its purpose of the present invention just is to provide a kind of construction technology of interim reinforcing tunneling layer of sand face, has easy construction, characteristics efficiently, does not influence excavation construction, and economic, practical.
The technical scheme that realizes above-mentioned purpose and take comprises that slurries mix system, adopts liquid sand-fixating agent and cement paste, and the match ratio of cement paste is 1: 0.5, stirs, and the volume ratio of sand-fixating agent and cement paste is 1: 0.7, forms cement sand-fixating agent biliquid slurry, initial setting time 7min; High-pressure blast, directly the air compressor machine that utilizes spray to mix gets final product, and blast is controlled at 0.5MPa; Spray slurries, airduct is switched to airtight slip casting jar, the shotcrete pipe of drawing from the slip casting pot bottom is towards the layer of sand surface, the input high-pressure blast can be ejected into the layer of sand surface by high-pressure blast with the slurries in the slip casting jar, and to internal penetration, shotcrete pipe keeps the distance of 20cm~40cm perpendicular to the layer of sand surface, at the uniform velocity mobile shotcrete pipe joins together jet face; Grid is installed, grid is installed subsequently, set slip casting ductule, a spray just is mixed and can be effectively protected.
Compared with prior art, beneficial effect of the present invention is,
Facts have proved, adopt the two slurries of cement sand-fixating agent to spray and reinforce the face layer of sand:
(1) overcome the difficult problem that the face in the excavation construction is reinforced, the good penetrability of slurries, form the duricrust of one deck 2cm~4cm on the layer of sand surface, effectively prevent loose sand fall certainly and general construction disturbance under slump, reinforce layer of sand excavation face and vault by ring, eliminate the influence of construction disturbance, stablize surface layer, prevent to leak;
(2) easy construction, quick, disturbance is little, easily causes collapsing of sand bed as setting grouting pipe on the face that tilts, installation and spray to excavation and bow member mix not influence, substantially do not take the normal engineering time, implement the reinforcing on surface by high-pressure injection, simple, effective;
(3) to be melted into the duricrust intensity that sand forms low, manually promptly dismountable for cement sand-fixating agent slurries, do not influence excavation construction, forms the continuous duricrust of one deck at the sand surface layer, on layer of sand, combines together with layer of sand, need not to carry out anchoring by other member;
(4) than net spray and conduit slip casting economy, easily and fast, practicality.
The specific embodiment
Comprise
1) slurries are mixed system
Adopt liquid sand-fixating agent and cement paste, the match ratio of cement paste is 1: 0.5, stirs, and the volume ratio of sand-fixating agent and cement paste is 1: 0.7, forms cement sand-fixating agent biliquid slurry, initial setting time 7min;
2) high-pressure blast
Directly the air compressor machine that utilizes spray to mix gets final product, and blast is controlled at 0.5MPa;
3) spray slurries
Airduct is switched to airtight slip casting jar, the shotcrete pipe of drawing from the slip casting pot bottom is towards the layer of sand surface, the input high-pressure blast can be ejected into the layer of sand surface by high-pressure blast with the slurries in the slip casting jar, and to internal penetration, shotcrete pipe is perpendicular to the layer of sand surface, keep the distance of 20cm~40cm, at the uniform velocity mobile shotcrete pipe joins together jet face;
4) grid is installed
Grid is installed subsequently, is set slip casting ductule, a spray just is mixed and can be effectively protected.
The present invention adopts fixed slurries, exposed sand face enforcement is sprayed to excavation face and arch, can form one deck duricrust on the layer of sand surface fast, has eliminated the layer of sand leakage that the construction disturbance causes, keep the stable of chiltern face, had very high practical value.
Technology is described in detail
1, slurries are mixed system
Adopt liquid sand-fixating agent and cement paste (match ratio of cement paste is 1: 0.5) to stir, the volume ratio of sand-fixating agent and cement paste is 1: 0.7, forms cement sand-fixating agent biliquid slurry, because slurries have the characteristic of rapid solidification, so will be with mixing with notes.Initial setting time 7min.
2, high-pressure blast
Directly the air compressor machine that utilizes spray to mix gets final product, and blast is controlled at 0.5MPa.
3, spray slurries
Airduct is switched to airtight slip casting jar, and the shotcrete pipe of drawing from the slip casting pot bottom is towards the layer of sand surface, and the input high-pressure blast can be ejected into the layer of sand surface by high-pressure blast with the slurries in the slip casting jar, and to internal penetration.Shotcrete pipe keeps the distance of 20cm~40cm perpendicular to the layer of sand surface, and at the uniform velocity mobile shotcrete pipe joins together jet face.
4, effect detection
The setting time of the two slurries of cement sand-fixating agent is 7min, can form a back-up coat on the layer of sand surface after injection is finished.
Spray one-shot forming, can not spray again, fill spray and cause disturbance.
Embodiment
No. two line station owners of certain subway body tunneling section is positioned at railway below, vault buried depth 6.4m, two-way 8 tracks, stop, heavy traffic, underground 12 of the pipelines such as plumbing, electric power, coal gas, communication that are embedded with.The following 4m in road surface~6m scope is a backfill, is downwards fine sand, medium coarse sand, and vault and face are positioned at the fine sand scope substantially.Because layer of sand is positioned at more than the waterline, water content is low, is loose shape, and being subjected to extraneous slight disturbance all can slump.
During mixing, keep stablizing of face layer of sand in installation bow member and spray, decision is to exposed layer of sand jet surface cement sand-fixating agent slurry, the sand that the surface is loose is consolidated into one deck duricrust, prevents that loose sand is scattered under the disturbance of construction and ground driving and continuous expansion forms landslide.
Construction process and technology are as follows:
(1) airduct, grout mixer and slip casting jar and cement, sand-fixating agent leave the job site in, implement immediately to spray after each circulation excavation finishes and reinforce face and vault;
(2) pour the cement sand-fixating agent mixed pulp that stirs into the slip casting jar;
(3) high-pressure blast is inserted the slip casting jar, open shotcrete pipe, whitewash towards the sand face;
(4) grid is installed subsequently, is set slip casting ductule, a spray just mixes to wait and all can effectively be protected.

Claims (1)

1. an interim construction technology of reinforcing tunneling layer of sand face is characterized in that, comprises
1) slurries are mixed system
Adopt liquid sand-fixating agent and cement paste, the match ratio of cement paste is 1: 0.5, stirs, and the volume ratio of sand-fixating agent and cement paste is 1: 0.7, forms cement sand-fixating agent biliquid slurry, initial setting time 7min;
2) high-pressure blast
Directly the air compressor machine that utilizes spray to mix gets final product, and blast is controlled at 0.5MPa;
3) spray slurries
Airduct is switched to airtight slip casting jar, the shotcrete pipe of drawing from the slip casting pot bottom is towards the layer of sand surface, the input high-pressure blast can be ejected into the layer of sand surface by high-pressure blast with the slurries in the slip casting jar, and to internal penetration, shotcrete pipe is perpendicular to the layer of sand surface, keep the distance of 20cm~40cm, at the uniform velocity mobile shotcrete pipe joins together jet face;
4) grid is installed
Grid is installed subsequently, is set slip casting ductule, a spray just is mixed and can be effectively protected.
CN2010102824258A 2010-09-15 2010-09-15 Construction process for temporarily strengthening tunnel face of underground excavation sand layer Pending CN101967987A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102824258A CN101967987A (en) 2010-09-15 2010-09-15 Construction process for temporarily strengthening tunnel face of underground excavation sand layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102824258A CN101967987A (en) 2010-09-15 2010-09-15 Construction process for temporarily strengthening tunnel face of underground excavation sand layer

Publications (1)

Publication Number Publication Date
CN101967987A true CN101967987A (en) 2011-02-09

Family

ID=43547197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102824258A Pending CN101967987A (en) 2010-09-15 2010-09-15 Construction process for temporarily strengthening tunnel face of underground excavation sand layer

Country Status (1)

Country Link
CN (1) CN101967987A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334772A (en) * 2013-07-08 2013-10-02 中铁十四局集团有限公司 Slurry capable of stabilizing tunnel face of underground excavation sand layer, slurry preparation method, grouting equipment and grouting process
CN108875152A (en) * 2018-05-28 2018-11-23 湖南科技大学 A kind of tunnel tunnel face calculating method for stability considering penetration

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000337077A (en) * 1999-05-26 2000-12-05 Ohbayashi Corp Method for constructing tunnel
JP2008138385A (en) * 2006-11-30 2008-06-19 Shimizu Corp Tunnel construction method
CN101358529A (en) * 2008-08-19 2009-02-04 中铁四局集团第五工程有限公司 Short tube and short tube sand consolidation agent strengthening construction process
KR20100004936A (en) * 2007-03-23 2010-01-13 미쓰비시덴키 가부시키가이샤 Elevator control system
CN101769157A (en) * 2010-01-21 2010-07-07 广东省长大公路工程有限公司 Construction method for tunnel working face counterpressure treatment during tunnel excavation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000337077A (en) * 1999-05-26 2000-12-05 Ohbayashi Corp Method for constructing tunnel
JP2008138385A (en) * 2006-11-30 2008-06-19 Shimizu Corp Tunnel construction method
KR20100004936A (en) * 2007-03-23 2010-01-13 미쓰비시덴키 가부시키가이샤 Elevator control system
CN101358529A (en) * 2008-08-19 2009-02-04 中铁四局集团第五工程有限公司 Short tube and short tube sand consolidation agent strengthening construction process
CN101769157A (en) * 2010-01-21 2010-07-07 广东省长大公路工程有限公司 Construction method for tunnel working face counterpressure treatment during tunnel excavation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘庆伟,王旭光: "采取综合措施使隧道通过砂夹卵石不稳定地层", 《铁道建筑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334772A (en) * 2013-07-08 2013-10-02 中铁十四局集团有限公司 Slurry capable of stabilizing tunnel face of underground excavation sand layer, slurry preparation method, grouting equipment and grouting process
CN108875152A (en) * 2018-05-28 2018-11-23 湖南科技大学 A kind of tunnel tunnel face calculating method for stability considering penetration

Similar Documents

Publication Publication Date Title
CN102121395B (en) Method for integrated comprehensive management of gas in low-permeability single coal bed
CN102146679B (en) Construction method for complex geological section earth pressure balance shield passing middle air shaft
CN105804770B (en) The earth-filling method and its equipment in TBM method tunnel or tunnel construction
CN108166994B (en) A kind of construction method of the grouting reinforced region applied to water-rich sand layer shield tunnel
CN103806479B (en) A kind of pile foundation combined casting reinforced construction method of combination water-stop curtain
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN101806059B (en) Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway
CN103953365A (en) Single/double slurry alternated grouting reinforcement technology of tunnel and device of single/double slurry alternated grouting reinforcement technology
CN106761782A (en) A kind of tunneling construction method for wearing operation tunnel under shield in rich water powder land floor
CN103912003B (en) The method of water and hole is moved on a kind of simple and efficient shutoff stratum
CN105386435B (en) It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution
CN101603427A (en) Shield synchronization slip casting construction technology
CN103790592A (en) End soil mass reinforcement system and method
CN109736815A (en) Grouting serous fluid and grouting process for subway tunnel tunneling water sealing consolidation
CN109798128A (en) A kind of diversion tunnel pole weak surrounding rock section constructing method
CN109578013B (en) Method for treating tunnel collapse roof fall by adopting advanced small conduit pre-grouting process
CN107503770A (en) A kind of duct pieces of shield tunnel secondary grouting method
CN106948828A (en) A kind of device that secondary grouting is carried out using shield synchronization slip casting equipment
CN109437771A (en) A kind of mining flexible hole-sealing grouting material
CN103334772A (en) Slurry capable of stabilizing tunnel face of underground excavation sand layer, slurry preparation method, grouting equipment and grouting process
CN205171496U (en) Foundation stabilization high pressure jet slip casting device
CN105064335A (en) Ultrahigh pressure rotary jet grouting method suitable for sandy cobble stratum shield end well reinforcement
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN111170711A (en) Set-time-controllable grouting slurry for wall back grouting, grouting process and grouting device
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110209