CN104314082A - Deep function pit supporting structure in karst geology condition and construction method thereof - Google Patents
Deep function pit supporting structure in karst geology condition and construction method thereof Download PDFInfo
- Publication number
- CN104314082A CN104314082A CN201410634154.6A CN201410634154A CN104314082A CN 104314082 A CN104314082 A CN 104314082A CN 201410634154 A CN201410634154 A CN 201410634154A CN 104314082 A CN104314082 A CN 104314082A
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- supporting structure
- water
- reinforcing body
- grouting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410634154.6A CN104314082A (en) | 2014-11-12 | 2014-11-12 | Deep function pit supporting structure in karst geology condition and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410634154.6A CN104314082A (en) | 2014-11-12 | 2014-11-12 | Deep function pit supporting structure in karst geology condition and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104314082A true CN104314082A (en) | 2015-01-28 |
Family
ID=52369383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410634154.6A Pending CN104314082A (en) | 2014-11-12 | 2014-11-12 | Deep function pit supporting structure in karst geology condition and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104314082A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862722A (en) * | 2016-04-07 | 2016-08-17 | 中建交通建设集团有限公司 | Three-dimensional treatment method of subway deep foundation pit in karst intense development region |
CN108824449A (en) * | 2018-07-26 | 2018-11-16 | 中国建筑第八工程局有限公司 | Support system and its construction method with underground horizontal support |
CN110409457A (en) * | 2019-06-26 | 2019-11-05 | 贵州建工集团第一建筑工程有限责任公司 | Deep foundation pit supporting structure and its construction method under the conditions of a kind of karst area |
CN110528523A (en) * | 2019-09-02 | 2019-12-03 | 湖南宏禹工程集团有限公司 | A kind of highly permeable stratum building foundation pit horizontal grouting back cover construction method |
CN111042146A (en) * | 2019-11-11 | 2020-04-21 | 中铁七局集团第二工程有限公司 | Construction method of deep foundation pit supporting anti-seepage system of coastal karst stratum |
CN111436204A (en) * | 2018-11-12 | 2020-07-21 | 包尔特殊基础工程有限公司 | Method for producing a sealing base in the ground |
CN111691442A (en) * | 2019-03-15 | 2020-09-22 | 包尔特殊基础工程有限公司 | Foundation pit surrounding structure in foundation and manufacturing method thereof |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1376836A (en) * | 2001-03-27 | 2002-10-30 | 同济大学 | Method for controlling deformation of foundation pit's retaining wall by grouting in passive area of earth body |
CN101328713A (en) * | 2008-07-18 | 2008-12-24 | 华丰建设股份有限公司 | Construction method of circular deep foundation pit support |
KR20090007826A (en) * | 2007-07-16 | 2009-01-21 | 김창근 | Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut |
CN101418572A (en) * | 2008-10-17 | 2009-04-29 | 上海隧道工程股份有限公司 | Pit construction method employing precast support |
KR101109520B1 (en) * | 2010-09-03 | 2012-01-31 | 삼정건설 주식회사 | Method for constructing earth retaining wall using steel pipe |
CN103437339A (en) * | 2013-07-29 | 2013-12-11 | 中铁十六局集团北京轨道交通工程建设有限公司 | Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum |
CN103590425A (en) * | 2013-11-28 | 2014-02-19 | 中铁二十局集团第五工程有限公司 | Peaty soft soil stratum subway station construction technology |
CN103967015A (en) * | 2014-05-21 | 2014-08-06 | 刘绍国 | Water-stopping deep foundation pit excavation method and structure thereof |
CN204174626U (en) * | 2014-11-12 | 2015-02-25 | 云南建工集团有限公司 | Deep foundation pit supporting structure under a kind of Karst Geology |
-
2014
- 2014-11-12 CN CN201410634154.6A patent/CN104314082A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1376836A (en) * | 2001-03-27 | 2002-10-30 | 同济大学 | Method for controlling deformation of foundation pit's retaining wall by grouting in passive area of earth body |
KR20090007826A (en) * | 2007-07-16 | 2009-01-21 | 김창근 | Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut |
CN101328713A (en) * | 2008-07-18 | 2008-12-24 | 华丰建设股份有限公司 | Construction method of circular deep foundation pit support |
CN101418572A (en) * | 2008-10-17 | 2009-04-29 | 上海隧道工程股份有限公司 | Pit construction method employing precast support |
KR101109520B1 (en) * | 2010-09-03 | 2012-01-31 | 삼정건설 주식회사 | Method for constructing earth retaining wall using steel pipe |
CN103437339A (en) * | 2013-07-29 | 2013-12-11 | 中铁十六局集团北京轨道交通工程建设有限公司 | Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum |
CN103590425A (en) * | 2013-11-28 | 2014-02-19 | 中铁二十局集团第五工程有限公司 | Peaty soft soil stratum subway station construction technology |
CN103967015A (en) * | 2014-05-21 | 2014-08-06 | 刘绍国 | Water-stopping deep foundation pit excavation method and structure thereof |
CN204174626U (en) * | 2014-11-12 | 2015-02-25 | 云南建工集团有限公司 | Deep foundation pit supporting structure under a kind of Karst Geology |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862722A (en) * | 2016-04-07 | 2016-08-17 | 中建交通建设集团有限公司 | Three-dimensional treatment method of subway deep foundation pit in karst intense development region |
CN108824449A (en) * | 2018-07-26 | 2018-11-16 | 中国建筑第八工程局有限公司 | Support system and its construction method with underground horizontal support |
CN111436204A (en) * | 2018-11-12 | 2020-07-21 | 包尔特殊基础工程有限公司 | Method for producing a sealing base in the ground |
CN111691442A (en) * | 2019-03-15 | 2020-09-22 | 包尔特殊基础工程有限公司 | Foundation pit surrounding structure in foundation and manufacturing method thereof |
CN110409457A (en) * | 2019-06-26 | 2019-11-05 | 贵州建工集团第一建筑工程有限责任公司 | Deep foundation pit supporting structure and its construction method under the conditions of a kind of karst area |
CN110528523A (en) * | 2019-09-02 | 2019-12-03 | 湖南宏禹工程集团有限公司 | A kind of highly permeable stratum building foundation pit horizontal grouting back cover construction method |
CN111042146A (en) * | 2019-11-11 | 2020-04-21 | 中铁七局集团第二工程有限公司 | Construction method of deep foundation pit supporting anti-seepage system of coastal karst stratum |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104314082A (en) | Deep function pit supporting structure in karst geology condition and construction method thereof | |
CN102493822B (en) | Method for performing curtain grouting construction on tunnel by water rich fault influence zone | |
CN101806059B (en) | Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway | |
CN108547639B (en) | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings | |
CN204371354U (en) | The compound supporting and protection structure of a kind of Karst Tunnel | |
CN103696416B (en) | A kind of method for processing foundation | |
CN107503362A (en) | A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability | |
CN102877470B (en) | Combined soil nailing construction method for supporting | |
CN103603379A (en) | Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system | |
CN110630293A (en) | Double-liquid and method for grouting wall | |
CN107059900B (en) | A kind of construction method that Double-wall sin-gle-image radiography quickly sinks in sand-pebble layer | |
CN208605186U (en) | Shield launching and reception end bracing means in Tunneling by mining method | |
CN107237332A (en) | A kind of foundation pit stope support containing drifting sand layer method of use composite soil-nailed retaining wall | |
CN104532855A (en) | Combined pile supporting structure in deep and thick peat soil layer | |
CN104153381A (en) | Waterproof curtain pile, waterproof curtain and construction method of waterproof curtain pile | |
CN103343534A (en) | Closed precipitation method for foundation pit construction | |
CN104150820A (en) | Synchronous grouting slurry for shield driving construction of water-enriched sandy gravel stratum | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN206971247U (en) | A kind of concrete plinth foundation ruggedized construction being placed on Unloading Rock | |
CN101769157B (en) | Construction method for tunnel working face counterpressure treatment during tunnel excavation | |
CN103195063B (en) | Fresh water splitting post grouting construction method | |
CN204174626U (en) | Deep foundation pit supporting structure under a kind of Karst Geology | |
CN208982058U (en) | Vertical shaft surrounding rock supporting structure | |
CN209457055U (en) | A kind of deep basal pit mechanical anchor anti-float anchor rod | |
CN110409457A (en) | Deep foundation pit supporting structure and its construction method under the conditions of a kind of karst area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Jianfei Inventor after: Wang Xiaoyan Inventor after: Wang Xiaofang Inventor after: Yin Huafu Inventor after: Yang Shaozhen Inventor after: Li Zhiping Inventor after: Zhou Chengming Inventor after: Wang Xiaoshu Inventor after: Yang Shixiang Inventor before: Wang Jianfei Inventor before: Zheng Yungang Inventor before: Meng Yinglei Inventor before: Zhou Lin Inventor before: Yang Cheng Inventor before: Su Lanzhong Inventor before: Wang Xiaoyan Inventor before: Yin Huafu Inventor before: Yang Shaozhen Inventor before: Li Zhiping Inventor before: Zhou Chengming Inventor before: Wang Xiaoshu Inventor before: Yang Shixiang Inventor before: Wang Zizhong |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WANG JIANFEI WANG XIAOYAN YIN HUAFU YANG SHAOZHEN LI ZHIPING ZHOU CHENGMING WANG XIAOSHU YANG SHIXIANG WANG ZIZHONG ZHENG YUNGANG MENG YINGLEI ZHOU LIN YANG CHENG SU LANZHONG TO: WANG JIANFEI WANG XIAOYAN WANG XIAOFANG YIN HUAFU YANG SHAOZHEN LI ZHIPING ZHOU CHENGMING WANG XIAOSHU YANG SHIXIANG |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150128 |