CN208982058U CN201821180939.0U CN201821180939U CN208982058U CN 208982058 U CN208982058 U CN 208982058U CN 201821180939 U CN201821180939 U CN 201821180939U CN 208982058 U CN208982058 U CN 208982058U
Authority
CN
China
Prior art keywords
vertical shaft
utility
model
reinforced concrete
surrounding rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821180939.0U
Other languages
Chinese (zh)
Inventor
陈登义
方丹
邵兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201821180939.0U priority Critical patent/CN208982058U/en
Application granted granted Critical
Publication of CN208982058U publication Critical patent/CN208982058U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a kind of vertical shaft surrounding rock supporting structures.The purpose of the utility model is to provide a kind of structures, and vertical shaft surrounding rock supporting structure simple, easy for construction guarantees the safe and stable operation of vertical shaft to guarantee that vertical shaft internal environment is dry.The technical solution of the utility model is: a kind of vertical shaft surrounding rock supporting structure, it is characterised in that: is provided with a circle groove at spacing intervals on the borehole wall of vertical shaft, construction has system anchor bolt in the country rock around vertical shaft, and system anchor bolt is integrally located in country rock;Ecto-entad is successively arranged concrete layer, compound water-proof and reinforced concrete lining layer in the vertical shaft, wherein concrete layer is close to shaft wall setting and is formed by shotcrete with mesh, and reinforced concrete lining layer outer wall is formed with and the one-to-one support ring of the groove.The utility model is suitable for using combined bolting and shotcrete and reinforced concrete lining layer supporting, and borehole wall large area seeps water and water is larger, the excavation supporting of the vertical shaft more demanding to running environment.

Description

Vertical shaft surrounding rock supporting structure
Technical field
The utility model relates to a kind of vertical shaft surrounding rock supporting structures.Suitable for using combined bolting and shotcrete and reinforced concrete lining layer Supporting, borehole wall large area seeps water and water is larger, the excavation supporting of the vertical shaft more demanding to running environment.
Background technique
With the rapid development of underground engineering construction in recent years, such as underground workshop, buried mining, underground Laboratory etc. generally requires and meets the functions such as communications and transportation, transmission of electricity ventilation by excavating shaft, according to the difference of vertical shaft function, Some vertical shafts must keep drying, and the borehole wall must not have infiltration.
Outlet vertical shaft often passes through ground mulching layer, highly weathered rock mass and interlayer weakness band, and rock mass is relatively broken, needs to tie It closes some supports means such as pneumatically placed concrete, system anchor bolt and reinforced concrete lining layer and guarantees vertical shaft adjoining rock stability, generally adopt at present It is exposed with system anchor bolt, the way enhancing supporting construction globality of reinforced concrete lining layer is poured into, guarantees supporting effect.But one As rock crushing, develop containing interlayer weakness band area underground water, underground water easily oozes out along the borehole wall, due to system anchor bolt outside Dew can not be laid with compound water-proof along borehole wall large area, and borehole wall anti-seepage effect is poor, influences the safe and stable operation of vertical shaft.
Summary of the invention
Technical problem to be solved by the utility model is: in view of the above problems, provide that a kind of structure is simple, construction Convenient vertical shaft surrounding rock supporting structure guarantees the safe and stable operation of vertical shaft to guarantee that vertical shaft internal environment is dry.
The technical scheme adopted by the utility model is a kind of vertical shaft surrounding rock supporting structure, it is characterised in that: in vertical shaft A circle groove is provided on the borehole wall at spacing intervals, construction has system anchor bolt in the country rock around vertical shaft, and system anchor bolt is whole In country rock;Ecto-entad is successively arranged concrete layer, compound water-proof and reinforced concrete lining layer in the vertical shaft, wherein Concrete layer be close to shaft wall setting and formed by shotcrete with mesh, reinforced concrete lining layer outer wall be formed with it is described recessed The one-to-one support ring of slot.
A kind of excavation supporting method of vertical shaft surrounding rock supporting structure, it is characterised in that steps are as follows:
A, at spacing intervals in the one circle groove of shaft wall setting during shaft excavation;
B, it constructs after the completion of shaft excavation the system anchor bolt, system anchor bolt is integrally located in the country rock around vertical shaft;
C, shotcrete with mesh forms the concrete layer on shaft wall;
D, it is close to concrete layer and one layer of compound water-proof is set;
E, the construction reinforced concrete lining layer.
The beneficial effects of the utility model are: the utility model passes through edge for the contradiction between shaft support and antiseepage One fixed spacing of borehole wall setting, one circle groove, in groove according to Structure Calculation result arrangement of reinforcement and and borehole wall reinforced concrete lining layer together It pours, enhances the supporting effect of the borehole wall, the exposed effect of alternative system anchor bolt, therefore use this excavation supporting method, be Uniting anchor pole can not be exposed, so as to be laid with compound water-proof along borehole wall large area, stops wall leakage, it is steady both to have met vertical shaft country rock Provisioning request, and guarantee borehole wall anti-seepage effect.
Detailed description of the invention
Fig. 1 is the sectional side elevation of embodiment.
Fig. 2 is the cross sectional view of embodiment.
Specific embodiment
As shown in Figure 1 and Figure 2, the present embodiment is a kind of vertical shaft surrounding rock supporting structure, every certain on the borehole wall of vertical shaft 6 Spacing excavation is formed with a circle groove 5, and construction has system anchor bolt 1 in the country rock around vertical shaft 6, and system anchor bolt 1 is integrally located at In country rock, which is not exposed in vertical shaft 6.Ecto-entad is successively arranged concrete layer 2, compound water-proof 3 and steel in vertical shaft 6 Reinforced concrete lining cutting 4, wherein concrete layer 2 and compound water-proof 3 are close to 6 borehole wall of vertical shaft arrangement, and recessed on the corresponding borehole wall 6 5 position of slot is formed with corresponding slot, and 4 outer wall of reinforced concrete lining layer is formed with and the one-to-one support ring 401 of groove 5.
Compound water-proof 3 constitutes borehole wall waterproof construction in this example, stops wall leakage.The general Ying Yugu of compound water-proof 3 Knot grouting, grout curtain, System drainage hole, plastic blind-ditch, draining steel pipe etc. are applied in combination.
The construction method of the present embodiment is as follows:
A, at spacing intervals in 6 borehole wall of vertical shaft setting, one circle groove 5 in 6 digging process of vertical shaft;
B, construction system anchor pole 1 after the completion of vertical shaft 6 excavates, system anchor bolt 1 are integrally located in the country rock around vertical shaft 6, anchor Bar is not exposed in vertical shaft 6;
C, shotcrete with mesh forms concrete layer 2 on 6 borehole wall of vertical shaft, guarantees that hole wall is smooth;
D, it is close to concrete layer 2 and one layer of compound water-proof 3 is set;
E, construction reinforced bar concrete lining 4, should be according to Structure Calculation result arrangement of reinforcement when the groove 5 of the borehole wall 6 backfills, and and well Wall reinforced concrete lining layer 4 pours together becomes whole.
Certainly, above description is not limitation of the utility model, and the utility model is also not limited to the example above, this skill The those of ordinary skill in art field, in the scope of the utility model, variation, addition or the replacement made all should belong to this reality With novel protection scope.

Claims (1)

1. a kind of vertical shaft surrounding rock supporting structure, it is characterised in that: be provided with a circle at spacing intervals on the borehole wall of vertical shaft (6) Groove (5), the interior construction of the country rock of vertical shaft (6) surrounding have system anchor bolt (1), and system anchor bolt (1) is integrally located in country rock;
It is successively arranged concrete layer (2), compound water-proof (3) and reinforced concrete lining layer (4) in the vertical shaft (6), wherein mixing Solidifying soil layer (2) are close to the setting of vertical shaft (6) borehole wall and are formed by shotcrete with mesh, and reinforced concrete lining layer (4) outer wall is formed with With the one-to-one support ring (401) of the groove (5).
CN201821180939.0U 2018-07-25 2018-07-25 Vertical shaft surrounding rock supporting structure Active CN208982058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821180939.0U CN208982058U (en) 2018-07-25 2018-07-25 Vertical shaft surrounding rock supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821180939.0U CN208982058U (en) 2018-07-25 2018-07-25 Vertical shaft surrounding rock supporting structure

Publications (1)

Publication Number Publication Date
CN208982058U true CN208982058U (en) 2019-06-14

Family

ID=66780366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821180939.0U Active CN208982058U (en) 2018-07-25 2018-07-25 Vertical shaft surrounding rock supporting structure

Country Status (1)

Country Link
CN (1) CN208982058U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110286032A (en) * 2019-06-17 2019-09-27 林同棪国际工程咨询(中国)有限公司 A kind of vertical shaft country rock simulator and system
CN114673504A (en) * 2022-03-30 2022-06-28 中铁第一勘察设计院集团有限公司 Shaft opening section supporting structure under rock stratum hoisting load effect and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110286032A (en) * 2019-06-17 2019-09-27 林同棪国际工程咨询(中国)有限公司 A kind of vertical shaft country rock simulator and system
CN110286032B (en) * 2019-06-17 2022-05-03 林同棪国际工程咨询(中国)有限公司 Shaft surrounding rock simulation device and system
CN114673504A (en) * 2022-03-30 2022-06-28 中铁第一勘察设计院集团有限公司 Shaft opening section supporting structure under rock stratum hoisting load effect and construction method

Similar Documents

Publication Publication Date Title
CN109026012A (en) Vertical shaft surrounding rock supporting structure and its excavation supporting method
CN103758123B (en) The construction method of manually digging hole filling pile retaining wall lining
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN103967504B (en) A kind of supporting construction and construction method of electric power plant circulating water system tunnel mouth
CN110107310A (en) A kind of construction method at tunnel slope hole
KR100656194B1 (en) Open cut and cover method applying tunnel cut method
CN102444143B (en) Construction method for cancelling operation channel for facades of basement
CN106930775A (en) The firm structure building enclosure of shallow embedding mountain highway tunnel gate-type campshed and its construction method
CN108797618A (en) One kind being used for Urban Underground pipe gallery drainage of foundation pit structure and its construction method
KR101859612B1 (en) Reinforcement and waterproof structure of vertical shafts-utility tunnels interface
CN105464685A (en) Cave-pile method bored tunnel waterproof curtain and construction method thereof
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN208982058U (en) Vertical shaft surrounding rock supporting structure
CN203939509U (en) The waterproof construction of bolt-spary supports traffic tunnel
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN103147444A (en) Foundation pit enclosure structure capable of realizing supporting while excavating and foundation pit excavating method
CN107059904A (en) A kind of underground pipe gallery ponding well excavation method
CN110306989A (en) A kind of non-open cut assembled pipe canal digging support reinforcement method
CN107165640B (en) Tunnels and underground engineering surely builds method certainly
KR100924794B1 (en) Inflow reduction method for transition zone btween cut and coer bored tunnel
CN108978709B (en) Urban comprehensive pipe gallery branch construction method in space-limited environment
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
CN108625384A (en) A kind of construction method of deep strong permeable layer base pit dewatering structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant