CN109026012A - Vertical shaft surrounding rock supporting structure and its excavation supporting method - Google Patents
Vertical shaft surrounding rock supporting structure and its excavation supporting method Download PDFInfo
- Publication number
- CN109026012A CN109026012A CN201810824165.9A CN201810824165A CN109026012A CN 109026012 A CN109026012 A CN 109026012A CN 201810824165 A CN201810824165 A CN 201810824165A CN 109026012 A CN109026012 A CN 109026012A
- Authority
- CN
- China
- Prior art keywords
- vertical shaft
- layer
- anchor bolt
- borehole wall
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011435 rock Substances 0.000 title claims abstract description 28
- 230000008093 supporting effect Effects 0.000 title claims abstract description 28
- 238000009412 basement excavation Methods 0.000 title claims abstract description 14
- 238000000034 method Methods 0.000 title claims abstract description 12
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 16
- 239000004567 concrete Substances 0.000 claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 14
- 150000001875 compounds Chemical class 0.000 claims abstract description 12
- 239000011378 shotcrete Substances 0.000 claims abstract description 8
- 239000002689 soil Substances 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 6
- 239000010410 layer Substances 0.000 description 19
- 229910000831 Steel Inorganic materials 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 239000011229 interlayer Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/11—Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
Abstract
The present invention relates to a kind of vertical shaft surrounding rock supporting structure and its excavation supporting methods.The object of the present invention is to provide a kind of structures, and vertical shaft surrounding rock supporting structure and its excavation supporting method simple, easy for construction guarantees the safe and stable operation of vertical shaft to guarantee that vertical shaft internal environment is dry.The technical scheme is that a kind of vertical shaft surrounding rock supporting structure, it is characterised in that: be provided with a circle groove at spacing intervals on the borehole wall of vertical shaft, construction has system anchor bolt in the country rock around vertical shaft, and system anchor bolt is integrally located in country rock;Ecto-entad is successively arranged concrete layer, compound water-proof and reinforced concrete lining layer in the vertical shaft, wherein concrete layer is close to shaft wall setting and is formed by shotcrete with mesh, and reinforced concrete lining layer outer wall is formed with and the one-to-one support ring of the groove.The present invention is suitable for using combined bolting and shotcrete and reinforced concrete lining layer supporting, and borehole wall large area seeps water and water is larger, the excavation supporting of the vertical shaft more demanding to running environment.
Description
Technical field
The present invention relates to a kind of vertical shaft surrounding rock supporting structure and its excavation supporting methods.Suitable for using combined bolting and shotcrete and steel
Reinforced concrete liner supporting, borehole wall large area seeps water and water is larger, the excavation supporting of the vertical shaft more demanding to running environment.
Background technique
With the rapid development of underground engineering construction in recent years, such as underground workshop, buried mining, underground
Laboratory etc. generally requires and meets the functions such as communications and transportation, transmission of electricity ventilation by excavating shaft, according to the difference of vertical shaft function,
Some vertical shafts must keep drying, and the borehole wall must not have infiltration.
Outlet vertical shaft often passes through ground mulching layer, highly weathered rock mass and interlayer weakness band, and rock mass is relatively broken, needs to tie
It closes some supports means such as pneumatically placed concrete, system anchor bolt and reinforced concrete lining layer and guarantees vertical shaft adjoining rock stability, generally adopt at present
It is exposed with system anchor bolt, the way enhancing supporting construction globality of reinforced concrete lining layer is poured into, guarantees supporting effect.But one
As rock crushing, develop containing interlayer weakness band area underground water, underground water easily oozes out along the borehole wall, due to system anchor bolt outside
Dew can not be laid with compound water-proof along borehole wall large area, and borehole wall anti-seepage effect is poor, influences the safe and stable operation of vertical shaft.
Summary of the invention
The technical problem to be solved by the present invention is in view of the above problems, it is simple, easy for construction to provide a kind of structure
Vertical shaft surrounding rock supporting structure and its excavation supporting method to guarantee that vertical shaft internal environment is dry guarantee the safety and stability of vertical shaft
Operation.
The technical scheme adopted by the invention is that: a kind of vertical shaft surrounding rock supporting structure, it is characterised in that: in the borehole wall of vertical shaft
On be provided with a circle groove at spacing intervals, construction has system anchor bolt in the country rock around vertical shaft, and system anchor bolt is integrally located at
In country rock;Ecto-entad is successively arranged concrete layer, compound water-proof and reinforced concrete lining layer in the vertical shaft, wherein coagulation
Soil layer is close to shaft wall setting and is formed by shotcrete with mesh, and reinforced concrete lining layer outer wall is formed with and the groove one
One corresponding support ring.
A kind of excavation supporting method of vertical shaft surrounding rock supporting structure, it is characterised in that steps are as follows:
A, at spacing intervals in the one circle groove of shaft wall setting during shaft excavation;
B, it constructs after the completion of shaft excavation the system anchor bolt, system anchor bolt is integrally located in the country rock around vertical shaft;
C, shotcrete with mesh forms the concrete layer on shaft wall;
D, it is close to concrete layer and one layer of compound water-proof is set;
E, the construction reinforced concrete lining layer.
The beneficial effects of the present invention are: the present invention is directed to the contradiction between shaft support and antiseepage, by certain along the borehole wall
One circle groove of spacing setting, groove is interior to be poured together according to Structure Calculation result arrangement of reinforcement and with borehole wall reinforced concrete lining layer, is increased
The strong supporting effect of the borehole wall, the exposed effect of alternative system anchor bolt, therefore this excavation supporting method is used, system anchor bolt can
It is not exposed, so as to be laid with compound water-proof along borehole wall large area, stop wall leakage, both meets the requirement of vertical shaft adjoining rock stability,
Guarantee borehole wall anti-seepage effect again.
Detailed description of the invention
Fig. 1 is the sectional side elevation of embodiment.
Fig. 2 is the cross sectional view of embodiment.
Specific embodiment
As shown in Figure 1 and Figure 2, the present embodiment is a kind of vertical shaft surrounding rock supporting structure, every certain on the borehole wall of vertical shaft 6
Spacing excavation is formed with a circle groove 5, and construction has system anchor bolt 1 in the country rock around vertical shaft 6, and system anchor bolt 1 is integrally located at
In country rock, which is not exposed in vertical shaft 6.Ecto-entad is successively arranged concrete layer 2, compound water-proof 3 and steel in vertical shaft 6
Reinforced concrete lining cutting 4, wherein concrete layer 2 and compound water-proof 3 are close to 6 borehole wall of vertical shaft arrangement, and recessed on the corresponding borehole wall 6
5 position of slot is formed with corresponding slot, and 4 outer wall of reinforced concrete lining layer is formed with and the one-to-one support ring 401 of groove 5.
Compound water-proof 3 constitutes borehole wall waterproof construction in this example, stops wall leakage.The general Ying Yugu of compound water-proof 3
Knot grouting, grout curtain, System drainage hole, plastic blind-ditch, draining steel pipe etc. are applied in combination.
The construction method of the present embodiment is as follows:
A, at spacing intervals in 6 borehole wall of vertical shaft setting, one circle groove 5 in 6 digging process of vertical shaft;
B, construction system anchor pole 1 after the completion of vertical shaft 6 excavates, system anchor bolt 1 are integrally located in the country rock around vertical shaft 6, anchor
Bar is not exposed in vertical shaft 6;
C, shotcrete with mesh forms concrete layer 2 on 6 borehole wall of vertical shaft, guarantees that hole wall is smooth;
D, it is close to concrete layer 2 and one layer of compound water-proof 3 is set;
E, construction reinforced bar concrete lining 4, should be according to Structure Calculation result arrangement of reinforcement when the groove 5 of the borehole wall 6 backfills, and and well
Wall reinforced concrete lining layer 4 pours together becomes whole.
Certainly, above description is not limitation of the present invention, and the present invention is also not limited to the example above, the art
Those of ordinary skill, within the scope of the invention, variation, addition or the replacement made all should belong to protection scope of the present invention.
Claims (2)
1. a kind of vertical shaft surrounding rock supporting structure, it is characterised in that: be provided with a circle at spacing intervals on the borehole wall of vertical shaft (6)
Groove (5), the interior construction of the country rock of vertical shaft (6) surrounding have system anchor bolt (1), and system anchor bolt (1) is integrally located in country rock;
It is successively arranged concrete layer (2), compound water-proof (3) and reinforced concrete lining layer (4) in the vertical shaft (6), wherein mixing
Solidifying soil layer (2) are close to the setting of vertical shaft (6) borehole wall and are formed by shotcrete with mesh, and reinforced concrete lining layer (4) outer wall is formed with
With the one-to-one support ring (401) of the groove (5).
2. a kind of excavation supporting method of vertical shaft surrounding rock supporting structure according to claim 1, it is characterised in that steps are as follows:
A, at spacing intervals in the one circle groove (5) of vertical shaft (6) borehole wall setting in vertical shaft (6) digging process;
B, vertical shaft (6) is constructed the system anchor bolt (1) after the completion of excavating, and system anchor bolt (1) is integrally located at enclosing around vertical shaft (6)
In rock;
C, shotcrete with mesh forms the concrete layer (2) on vertical shaft (6) borehole wall;
D, it is close to concrete layer (2) and one layer of compound water-proof (3) is set;
E, the construction reinforced concrete lining layer (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810824165.9A CN109026012A (en) | 2018-07-25 | 2018-07-25 | Vertical shaft surrounding rock supporting structure and its excavation supporting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810824165.9A CN109026012A (en) | 2018-07-25 | 2018-07-25 | Vertical shaft surrounding rock supporting structure and its excavation supporting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109026012A true CN109026012A (en) | 2018-12-18 |
Family
ID=64645935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810824165.9A Pending CN109026012A (en) | 2018-07-25 | 2018-07-25 | Vertical shaft surrounding rock supporting structure and its excavation supporting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109026012A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109519174A (en) * | 2019-01-09 | 2019-03-26 | 东北大学 | A kind of shaft wall supporting construction |
CN109826654A (en) * | 2019-03-12 | 2019-05-31 | 四川省交通运输厅公路规划勘察设计研究院 | Tunnel ventilation well supporting construction and its construction method |
CN110094206A (en) * | 2019-05-08 | 2019-08-06 | 南方电网调峰调频发电有限公司 | A kind of vertical shaft tunnel concrete liner structure and method |
CN110206550A (en) * | 2019-05-27 | 2019-09-06 | 中铁十八局集团第四工程有限公司 | A kind of complicated geological excavates the construction of shield received well |
AU2020273364B2 (en) * | 2019-06-26 | 2021-04-22 | Beijing China Coal Mine Engineering Co., Ltd. | A new type of mining rooting-anchoring double-layer shaft lining |
CN112746849A (en) * | 2020-12-11 | 2021-05-04 | 中国矿业大学 | Shaft water-carrying digging and building method |
CN110671114B (en) * | 2019-11-01 | 2024-05-03 | 中国地质大学(北京) | Recovery type round vertical shaft supporting device and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1995006185A1 (en) * | 1993-08-25 | 1995-03-02 | Horst Guggemos | Prefabricated shaft element |
CN201857971U (en) * | 2010-10-27 | 2011-06-08 | 中蓝连海设计研究院 | Vertical shaft of ore bed of salt rocks |
CN105545342A (en) * | 2016-03-02 | 2016-05-04 | 中铁第一勘察设计院集团有限公司 | Smoke shaft of existing lining tunnel inner arch and constructing method of smoke shaft |
CN106677787A (en) * | 2016-12-27 | 2017-05-17 | 中冶集团武汉勘察研究院有限公司 | Vertical shaft restoration and reinforcement structure and restoration and reinforcement construction method |
-
2018
- 2018-07-25 CN CN201810824165.9A patent/CN109026012A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1995006185A1 (en) * | 1993-08-25 | 1995-03-02 | Horst Guggemos | Prefabricated shaft element |
CN201857971U (en) * | 2010-10-27 | 2011-06-08 | 中蓝连海设计研究院 | Vertical shaft of ore bed of salt rocks |
CN105545342A (en) * | 2016-03-02 | 2016-05-04 | 中铁第一勘察设计院集团有限公司 | Smoke shaft of existing lining tunnel inner arch and constructing method of smoke shaft |
CN106677787A (en) * | 2016-12-27 | 2017-05-17 | 中冶集团武汉勘察研究院有限公司 | Vertical shaft restoration and reinforcement structure and restoration and reinforcement construction method |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109519174A (en) * | 2019-01-09 | 2019-03-26 | 东北大学 | A kind of shaft wall supporting construction |
CN109826654A (en) * | 2019-03-12 | 2019-05-31 | 四川省交通运输厅公路规划勘察设计研究院 | Tunnel ventilation well supporting construction and its construction method |
CN110094206A (en) * | 2019-05-08 | 2019-08-06 | 南方电网调峰调频发电有限公司 | A kind of vertical shaft tunnel concrete liner structure and method |
CN110206550A (en) * | 2019-05-27 | 2019-09-06 | 中铁十八局集团第四工程有限公司 | A kind of complicated geological excavates the construction of shield received well |
AU2020273364B2 (en) * | 2019-06-26 | 2021-04-22 | Beijing China Coal Mine Engineering Co., Ltd. | A new type of mining rooting-anchoring double-layer shaft lining |
CN110671114B (en) * | 2019-11-01 | 2024-05-03 | 中国地质大学(北京) | Recovery type round vertical shaft supporting device and method |
CN112746849A (en) * | 2020-12-11 | 2021-05-04 | 中国矿业大学 | Shaft water-carrying digging and building method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109026012A (en) | Vertical shaft surrounding rock supporting structure and its excavation supporting method | |
CN103758123B (en) | The construction method of manually digging hole filling pile retaining wall lining | |
CN107060803B (en) | Tunnel construction method by utilizing pipe curtain grouting | |
CN103967504B (en) | A kind of supporting construction and construction method of electric power plant circulating water system tunnel mouth | |
CN108547639B (en) | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings | |
CN109736827B (en) | Method for excavating urban subway hard rock stratum communication channel by high-pressure gas expansion fracturing | |
CN202117686U (en) | Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums | |
CN110107310A (en) | A kind of construction method at tunnel slope hole | |
KR100656194B1 (en) | Open cut and cover method applying tunnel cut method | |
KR101859612B1 (en) | Reinforcement and waterproof structure of vertical shafts-utility tunnels interface | |
KR100760293B1 (en) | Tunnel construction method for shallow overburden tunnel | |
CN105822311A (en) | In-situ extension construction structure and method for extra-large-section tunnel with opening formed inside to enlarge working face | |
CN105464685A (en) | Cave-pile method bored tunnel waterproof curtain and construction method thereof | |
CN104612696A (en) | Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method | |
CN105525619A (en) | Occlusive pipe curtain for bored tunnel in water-rich stratum and construction method of occlusive pipe curtain | |
RU2485318C1 (en) | Method to construct station tunnels with low subsidence of earth surface | |
CN107059904A (en) | A kind of underground pipe gallery ponding well excavation method | |
CN208982058U (en) | Vertical shaft surrounding rock supporting structure | |
KR100924794B1 (en) | Inflow reduction method for transition zone btween cut and coer bored tunnel | |
CN109630157A (en) | A kind of regulator control system of Tunnel Engineering and ground water regime | |
CN110512594A (en) | The simple and easy method of churning driven opportunity cavity pore-forming | |
CN110500112A (en) | Earth pressure balanced shield, EPBS is parallel with shallow burial hidden digging tunnel to overlap construction method | |
KR100476839B1 (en) | Construction method for installing concrete underground structures | |
CN108625384A (en) | A kind of construction method of deep strong permeable layer base pit dewatering structure | |
CN205296194U (en) | Rich irrigated land layer undercut tunnel interlock pipe curtain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181218 |
|
WD01 | Invention patent application deemed withdrawn after publication |