CN110094206A - A kind of vertical shaft tunnel concrete liner structure and method - Google Patents

A kind of vertical shaft tunnel concrete liner structure and method Download PDF

Info

Publication number
CN110094206A
CN110094206A CN201910380605.0A CN201910380605A CN110094206A CN 110094206 A CN110094206 A CN 110094206A CN 201910380605 A CN201910380605 A CN 201910380605A CN 110094206 A CN110094206 A CN 110094206A
Authority
CN
China
Prior art keywords
vertical shaft
prefabricated
tube coupling
liner structure
shaft tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910380605.0A
Other languages
Chinese (zh)
Inventor
章鹏
郑晶星
向正林
张晨敏
潘定才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd
Original Assignee
Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd filed Critical Peak and Frequency Regulation Power Generation Co of China Southern Power Grid Co Ltd
Priority to CN201910380605.0A priority Critical patent/CN110094206A/en
Publication of CN110094206A publication Critical patent/CN110094206A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of vertical shaft tunnel concrete liner structure and method, including prefabricated tube coupling, prefabricated tube coupling are assembled into tubular structure section by section, and concrete layer is equipped between tubular structure and country rock face, and prefabricated tube coupling and country rock face are linked to be entirety by concrete layer.Concrete-lined working efficiency can be improved in a kind of vertical shaft tunnel concrete liner structure and method provided by the invention, reduces construction safety risk, eliminates lining concrete aggregate separated quality problems.

Description

A kind of vertical shaft tunnel concrete liner structure and method
Technical field
The present invention relates to vertical shaft tunnel concrete liner engineering, especially a kind of vertical shaft tunnel concrete liner structure and side Method.
Background technique
In water power hydraulic engineering field, there is its power plant building of a large amount of engineering to be arranged on underground, needs to be arranged and lead to ground The cable shaft and air shaft in face, it is highest up to more than 300 m.
During shaft excavation, combined bolting and shotcrete need to be carried out to country rock, be true after the completion of excavation to ensure the stabilization of country rock Protect the long-term safe operation of building, it is necessary to carry out reinforced concrete lining layer, the general 30-50cm of lining thickness, lining cutting it is main Effect is to prevent the local failure of country rock or convenient for the structure arrangement in well.
Vertical shaft liner structure is all made of monolithic reinforced concrete structure at present, and template is sliding formwork, and personnel, material pass through lifting Equipment calls in working face, and concrete is put in storage by elephant trunk.Construction time security risk is high;Sliding formwork plays the sliding time and leans on micro-judgment, It grasps bad, it may appear that the quality accident of sliding failure;Concrete is put in storage by elephant trunk, the quality thing of aggregate separated easily occurs Therefore;Construction period is longer, and construction cost is high.
To some special power stations, such as island hydroenergy storage station, sand, stone, fresh water needed for lacking cast-in-place concrete are cast-in-place Concrete scheme also will receive restriction.
" water power hydraulic engineering inclined shaft Construction of Silo specification " DL/T 5407-2009, it is mixed to current water power hydraulic engineering vertical shaft The construction method of solidifying soil lining cutting has carried out concrete regulation.
The cast-in-place concrete theory of abandoning tradition of the present invention, breaches specification, is solved using precast concrete related Problem.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of vertical shaft tunnel concrete liner structure and methods, both meet Structure stress requires safely and fast construct again, guarantee construction quality, save the cost.
In order to solve the above technical problems, the technical scheme adopted by the invention is that:
A kind of vertical shaft tunnel concrete liner structure, including prefabricated tube coupling, prefabricated tube coupling are assembled into tubular structure, tubulose knot section by section Concrete layer is equipped between structure and country rock face, prefabricated tube coupling and country rock face are linked to be entirety by concrete layer.
The prefabricated tube coupling includes tube body, tube body upper end is equipped with hanging ring, and bottom of the pipe corresponding position is equipped with to be put into for hanging ring Aperture.
The tube wall is equipped with keyway.
Gap between the tube body and country rock face is 5cm-7cm.
The tube body upper end is equipped with watertight rubber item.
A kind of vertical shaft tunnel concrete liner method, comprising the following steps:
Step 1), during shaft excavation, with the decline of excavation face in palisades pre-embedment grouting pipe;At the same time, comprehensive analysis is true The height of fixed prefabricated tube coupling and internal-and external diameter etc. and carry out prefabricated pipe section it is prefabricated, transport to scene;
Step 2 measures control lifting by hanging apparatus to well head, hangs in well and keeps and country rock face preset clearance;
Step 3), suspension hook are automatically-unhooked;Continue next section lifting;Cement grout is carried out with the rising segmentation of tube coupling;
After step 4), packer grouting reach 3 day age, start next section of lifting;It moves in circles until terminating.
A kind of vertical shaft tunnel concrete liner structure of the present invention and method, have following technical effect that
1), by taking 300m grades of high vertical shafts as an example, using current sliding formwork cast-in-place concrete method, sliding formwork installation+sliding formwork is sliding+and sliding formwork tears open Except about needing 5 months, using this method, prefabricated tube coupling is not accounted for the straight line duration, considers that gap is in the milk when solidifying between tube wall and country rock Between, achievable installation in 2 months;Using this method, sliding formwork manufacture, installation can be saved and remove cost, prefabricated tube coupling concrete The flowing concrete cast-in-place compared with sliding formwork about reduces 50 yuan/m of cost3, accumulative to reduce about 800,000 yuan of cost.
2) it, completes to splice in vertical shaft by the way that prefabricated tube coupling to be put into, it is complete using the gap between prefabricated tube coupling and country rock face It is simple and convenient at the perfusion of concrete, and guarantee safety.The quality and efficiency for effectively meeting engineering, reduce cost of labor, With good application value.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples:
Fig. 1 is construction main view of the invention.
Fig. 2 is the main sectional view of prefabricated tube coupling in the present invention.
Fig. 3 is the partial enlargement diagram in Fig. 1 at A.
Fig. 4 be the present invention in prefabricated tube coupling be put into after sectional view.
Fig. 5 is the schematic diagram in the present invention after multiple prefabricated tube couplings assembly.
Fig. 6 is integral construction schematic diagram of the invention.
In figure: prefabricated tube coupling 1, country rock face 2, concrete layer 3, tube body 4, hanging ring 5, aperture 6, keyway 7, watertight rubber item 8, Grout pipe 9, hanging apparatus 10.
Specific embodiment
As shown in Figs 1-4, a kind of vertical shaft tunnel concrete liner structure, including prefabricated tube coupling 1, prefabricated tube coupling 1 include pre- Concrete tube body 4 processed, 4 upper end of precast concrete tube body are equipped with hanging ring 5, can be used for connecting with hanging apparatus 10 and transfer to vertical shaft In, and 4 lower end corresponding position of tube body is equipped with the aperture 6 being put into for hanging ring, can keep multiple tube bodies 4 are assembled section by section to form vertical shaft in this way Liner structure.Prefabricated pipe outer wall and country rock face 2(are specially country rock pneumatically placed concrete face) between reserve the gap 5cm, which can Lifting demand is solved, and after the cement slurry sets that can be perfused in gap, tube coupling and country rock is made to be linked to be entirety, guarantees that country rock is whole Stablize, and prefabricated pipe gravity load can largely be transmitted to country rock, guarantees construction time structure safety.Precast concrete tube body 4 High visibility lifting appliance ability, prefabricated field condition, traffic condition flexibly determine, precast concrete tube body 4 in the present embodiment Height is 3m.
In addition, being equipped with keyway 7 on 4 outer wall of tube body, the bonding that can reinforce prefabricated pipe and grout injection by keyway 7 is strong Degree.
It is equipped with watertight rubber item 8 in 4 upper end of tube body, watertight rubber item 8 can effectively prevent cement slurry from prefabricated pipe bonding crack Face leaks out.
A kind of vertical shaft tunnel concrete liner method, comprising the following steps:
Step 1), during shaft excavation, with the decline of excavation face in palisades pre-embedment grouting pipe 9;At the same time, comprehensive analysis is true The height of fixed prefabricated tube coupling 1 and internal-and external diameter etc. and carry out prefabricated pipe section 1 it is prefabricated, transport to scene;
Step 2 passes through hanging apparatus 10(tower crane) control lifting is measured to well head, swash in the transmitting of silo bottom the center point Light, centering control are hung in well, keep reserving the gap 5mm with country rock face 2;
Step 3), suspension hook are automatically-unhooked;Continue next section lifting;Cement grout is carried out with the rising segmentation of tube coupling, position of being in the milk In interval between country rock face 2 and prefabricated tube coupling 1;
After step 4), packer grouting reach 3 day age, start next section of lifting;It moves in circles until terminating.

Claims (6)

1. a kind of vertical shaft tunnel concrete liner structure, it is characterised in that: including prefabricated tube coupling (1), prefabricated tube coupling (1) is spelled section by section Dress up tubular structure, between tubular structure and country rock face (2) be equipped with concrete layer (3), concrete layer (3) by prefabricated tube coupling (1) with Country rock face (2) is linked to be entirety.
2. a kind of vertical shaft tunnel concrete liner structure according to claim 1, it is characterised in that: the prefabricated tube coupling It (1) include tube body (4), tube body (4) upper end is equipped with hanging ring (5), and tube body (4) lower end corresponding position is equipped with the aperture being put into for hanging ring (6).
3. a kind of vertical shaft tunnel concrete liner structure according to claim 2, it is characterised in that: the tube body (4) is outside Wall is equipped with keyway (7).
4. a kind of vertical shaft tunnel concrete liner structure according to claim 1, it is characterised in that: the tube body (4) with Gap between country rock face (2) is 5cm-7cm.
5. a kind of vertical shaft tunnel concrete liner structure according to claim 1, it is characterised in that: on the tube body (4) End is equipped with watertight rubber item (8).
6. a kind of vertical shaft tunnel concrete liner structure progress concrete lining described in any one of -5 according to claim 1 Method, it is characterised in that: the following steps are included:
Step 1), during shaft excavation, with the decline of excavation face in palisades pre-embedment grouting pipe (9);At the same time, comprehensive analysis Determine height and internal-and external diameter of prefabricated tube coupling (1) etc. and carry out prefabricated pipe section (1) it is prefabricated, transport to scene;
Step 2 measures control lifting by hanging apparatus (10) to well head, hangs in well and keeps pre- with country rock face (2) Stay gap;
Step 3), suspension hook are automatically-unhooked;Continue next section lifting;Cement grout is carried out with the rising segmentation of tube coupling;
After step 4), packer grouting reach 3 day age, start next section of lifting;It moves in circles until terminating.
CN201910380605.0A 2019-05-08 2019-05-08 A kind of vertical shaft tunnel concrete liner structure and method Pending CN110094206A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910380605.0A CN110094206A (en) 2019-05-08 2019-05-08 A kind of vertical shaft tunnel concrete liner structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910380605.0A CN110094206A (en) 2019-05-08 2019-05-08 A kind of vertical shaft tunnel concrete liner structure and method

Publications (1)

Publication Number Publication Date
CN110094206A true CN110094206A (en) 2019-08-06

Family

ID=67447369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910380605.0A Pending CN110094206A (en) 2019-05-08 2019-05-08 A kind of vertical shaft tunnel concrete liner structure and method

Country Status (1)

Country Link
CN (1) CN110094206A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627885A (en) * 2020-12-30 2021-04-09 兰州铁道设计院有限公司 Backfill load reduction structure for top shaft of large buried depth tunnel and construction method thereof
CN112814684A (en) * 2021-02-18 2021-05-18 中交第二公路工程局有限公司 Cast-in-place and prefabricated assembly combined tunnel shaft inner wall structure and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB270041A (en) * 1926-03-02 1927-05-05 Thomas Blandford Improvements in and relating to concrete linings for shafts, wells and other shaft-like structures
SU708058A1 (en) * 1977-12-13 1980-01-05 Среднеазиатское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им. С.Я.Жука Made-up mine roof support
SU836359A1 (en) * 1979-07-25 1981-06-07 Ордена Трудового Красного Знаменинаучно-Исследовательский Институтоснований И Подземных Сооруженийим. H.M.Герсеванова Государственногокомитета Cobeta Министров Cccp Поделам Строительства Mine shaft lining
CN109026012A (en) * 2018-07-25 2018-12-18 中国电建集团华东勘测设计研究院有限公司 Vertical shaft surrounding rock supporting structure and its excavation supporting method
CN109630128A (en) * 2019-02-19 2019-04-16 广东华方工程设计有限公司 A kind of prefabricated reinforced concrete assembled self weight sinking vertical shaft
CN109723075A (en) * 2018-12-06 2019-05-07 中建地下空间有限公司 A kind of prefabrication and assembly construction controllable type open caisson construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB270041A (en) * 1926-03-02 1927-05-05 Thomas Blandford Improvements in and relating to concrete linings for shafts, wells and other shaft-like structures
SU708058A1 (en) * 1977-12-13 1980-01-05 Среднеазиатское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им. С.Я.Жука Made-up mine roof support
SU836359A1 (en) * 1979-07-25 1981-06-07 Ордена Трудового Красного Знаменинаучно-Исследовательский Институтоснований И Подземных Сооруженийим. H.M.Герсеванова Государственногокомитета Cobeta Министров Cccp Поделам Строительства Mine shaft lining
CN109026012A (en) * 2018-07-25 2018-12-18 中国电建集团华东勘测设计研究院有限公司 Vertical shaft surrounding rock supporting structure and its excavation supporting method
CN109723075A (en) * 2018-12-06 2019-05-07 中建地下空间有限公司 A kind of prefabrication and assembly construction controllable type open caisson construction method
CN109630128A (en) * 2019-02-19 2019-04-16 广东华方工程设计有限公司 A kind of prefabricated reinforced concrete assembled self weight sinking vertical shaft

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
顾志刚: "《水工工艺基础》", 31 March 2002, 中国电力出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627885A (en) * 2020-12-30 2021-04-09 兰州铁道设计院有限公司 Backfill load reduction structure for top shaft of large buried depth tunnel and construction method thereof
CN112814684A (en) * 2021-02-18 2021-05-18 中交第二公路工程局有限公司 Cast-in-place and prefabricated assembly combined tunnel shaft inner wall structure and construction method

Similar Documents

Publication Publication Date Title
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN102305075A (en) Vertical shaft construction method under unfavorable geological condition
CN105804089B (en) Locally increase deep support system and its construction method after a kind of former deep foundation pit construction
CN112554177A (en) Construction method of ultra-long small-diameter cast-in-situ bored pile
CN210509175U (en) Reinforced structure of building is worn to shield closely side
CN111648376A (en) Construction method adopting deep foundation pit supporting and anchoring structure for supporting
CN110984999A (en) Tunnel shaft construction method
CN112323823A (en) Filling device and method for waste air-raid shelter of pile foundation construction site
CN112727466A (en) Construction method for support-free prefabricated assembled type shield tunnel air shaft structure
CN110094206A (en) A kind of vertical shaft tunnel concrete liner structure and method
CN110158656A (en) A kind of integrated template piping lane and its method of construction
CN106193051A (en) Upper-soft lower-hard ground Metro station excavation support system and construction method thereof
CN105862897B (en) Sandy Silt ground shallow foundation original groove pouring construction engineering method
CN106968252B (en) Pile pulling recharging method and pile pulling recharging system
CN108952728B (en) A kind of headframe main body construction and self well digging freeze parallel construction system and method
CN111928014A (en) Pipe jacking engineering construction method
CN109184783A (en) A kind of main chute reinforced construction method
CN105970992A (en) Construction process for superlarge-section and large-dip-angle tunnel type pile foundation
CN109989428A (en) Prefabricated concrete inspection well
CN206070541U (en) Upper-soft lower-hard ground Metro station excavation support system
CN115596453A (en) Micro-brush slope tunnel entering method for tunnel long-distance side to pass through accumulation body
CN210152660U (en) Hole reinforcing and supporting structure entering underground excavation pipe gallery tunnel from slope
CN211498929U (en) Street lamp basis prefabricated construction
CN111706351A (en) Newly-increased undercut passageway and existing station room layer intercommunication construction structures of plugging into

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190806