CN109826654A - Tunnel ventilation well supporting construction and its construction method - Google Patents

Tunnel ventilation well supporting construction and its construction method Download PDF

Info

Publication number
CN109826654A
CN109826654A CN201910184746.5A CN201910184746A CN109826654A CN 109826654 A CN109826654 A CN 109826654A CN 201910184746 A CN201910184746 A CN 201910184746A CN 109826654 A CN109826654 A CN 109826654A
Authority
CN
China
Prior art keywords
section
well bore
well
wall
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910184746.5A
Other languages
Chinese (zh)
Inventor
唐协
林国进
王联
何佳
田尚志
安俊吉
郑金龙
唐锐
丁尧
聂亮
向龙
王俊
蔚艳庆
郑建国
李泳伸
田志宇
张兆杰
李世琦
朱长安
周仁强
滕振楠
韦远飞
葛正辉
廖炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Original Assignee
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute filed Critical Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority to CN201910184746.5A priority Critical patent/CN109826654A/en
Publication of CN109826654A publication Critical patent/CN109826654A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Tunnel ventilation well supporting construction and its construction method of the present invention, belong to Tunnel Engineering field, it is therefore an objective to save ventilation shaft supporting process, accelerate speed of shaft sinking, improve safety.Ventilation shaft supporting construction includes ventilation shaft well head section, shaft bottom section and well bore section;It is close to be provided with circumferential closed well bore lining cutting layer on the inner wall of well bore section, well bore lining cutting layer builds concrete structure using mould, and is made of the single shell lining structure of well bore section well bore lining cutting layer.The present invention, using single shell lining structure, structure is simplified, and has saved working procedure, and the construction period is greatly saved;It is carried out simultaneously using mould building structure at well, mechanization degree is high, and working security is high;Single shell lining structure plays the time advance of supporting to country rock, improves the safety of ventilation shaft itself and construction.Its construction method, Completed advance rate is fast, working face safety.

Description

Tunnel ventilation well supporting construction and its construction method
Technical field
The invention belongs to tunnel ventilation field, particularly tunnel ventilation well supporting construction and its construction method.
Background technique
Ventilation shaft is one of tunnel ventilation facility.It is super super long tunnel " nostril ", by ventilation shaft, by tunnel Ground is discharged in interior foul atmosphere, while ground fresh air is sent into tunnel, and air is pure and fresh in guarantee tunnel.As China is handed over Logical net constantly extends to mountain area, large quantities of long tunnels and Super Long Tunnel occurs, this kind of tunnel usually require setting ventilation shaft with Solve the problems, such as operation ventilation.Vertical shaft has many advantages, such as that length is short, windage is small relative to other well type.But Construction of Silo is multiple It is miscellaneous, the main composite lining formed using combined bolting and shotcrete after driving or Cheng Jinghou artesian well bottom form concrete or armored concrete Structure, construction are bored with positive well based on quick-fried driving and pick block uniline operation.Which has the following drawbacks:
Firstly, composite lining supporting process is more, speed of shaft sinking is slow;
Secondly, uniline operation mode, mechanization degree is low, and safety is poor.
Summary of the invention
The object of the present invention is to provide a kind of tunnel ventilation well supporting construction and its construction methods, solve conventional composite formula lining It is complicated to build construction, the slow problem of speed of shaft sinking accelerates speed of shaft sinking to save ventilation shaft supporting process, improves safety.
The technical solution adopted by the present invention is that: tunnel ventilation well supporting construction, ventilation shaft are connected to corresponding tunnel main shaft One end is shaft bottom end, the other end is uphole end;Along ventilation shaft longitudinal direction, ventilation shaft includes the well head section and well adjacent with uphole end The adjacent shaft bottom section in bottom end and the well bore section between well head section and shaft bottom section;The inner wall of the well bore section is in rough Rough surface;It is close to be provided with circumferential closed well bore lining cutting layer on the inner wall of the well bore section, the well bore lining cutting layer uses mould Concrete structure is built, and is made of the single shell lining structure of the well bore section the well bore lining cutting layer.
Further, the well head section is provided with circumferential closed fore shaft circle, and the fore shaft circle is that mould builds armored concrete Structure, and it is made of the fore shaft circle single shell lining structure of the well head section.
Further, the inner wall for being close to the shaft bottom section is provided with circumferential closed shaft bottom lining cutting layer, the shaft bottom lining cutting Layer builds reinforced concrete structure using mould, and the single shell lining structure of the shaft bottom section is made of the shaft bottom lining cutting layer.
Further, the ventilation shaft is vertical shaft.
Further, it along the radial direction of ventilation shaft, is provided in the outer wall of the well bore lining cutting layer and radially outwardly protrudes Wellbore wall seat, the well bore groove being radially recessed outward, the wellbore wall seat are provided on the inner wall of the well bore section It is plugged in the well bore groove.
Further, the wellbore wall seat is reinforced concrete structure;The wellbore wall seat include bottom wall, side wall and tiltedly Wall;Perpendicular to the inner wall of well bore section, described skew wall one end is connected the bottom wall with side wall, and the other end is tilted towards well head extreme direction Extend to the outer wall of well bore lining cutting layer.
The construction method of above-mentioned tunnel ventilation well supporting construction, longitudinal along ventilation shaft are pressed from well head section to shaft bottom section direction Tunnel section and carry out section construction, the driving section includes well head section, well bore section and shaft bottom section, and the well bore section from well head section to Shaft bottom section direction is divided into several sections of well bore driving sections;When construction, wait tunnel Duan Mo build to be formed build wall 1/3 up to initial set after, The construction for starting next driving section is so repeated up to shaft bottom section construction and finishes.
Further, it suspends integral mold plate in midair, will be tunneled on the empty slag to be formed below integral mold plate in corresponding driving section, this is whole Formed between body template and the borehole wall of corresponding driving section and pour mouth and pour cavity towards uphole end, to pour poured in cavity it is mixed Solidifying soil.
Further, well bore groove at one is at least distributed on the borehole wall of each well bore driving section of the well bore section.
Further, between the construction joint of the adjacent well bore lining cutting layer of well bore section, between well bore lining cutting layer and fore shaft circle And circumferential closed sealing rod is set between well bore lining cutting layer and the construction joint of shaft bottom lining cutting layer.
The beneficial effects of the present invention are: tunnel ventilation well supporting construction of the invention, firstly, using single shell lining structure, Structure is simplified, and has saved working procedure, and the construction period is greatly saved;It is carried out simultaneously using mould building structure at well, machine Tool degree is high, and working security is high.Second, single shell lining structure plays the time advance of supporting to country rock, ventilation is improved The safety of well itself and construction.Third, whole supporting uses mould building structure, avoid raising ash, small pollution of the environment.Its Four, play the role of support to liner structure by the rough rough surface of the inner wall of well bore section and it is avoided to slide, it is especially sharp In the safety for guaranteeing Construction of Silo, and structure is simple, cheap, and can be by tunneling process self-assembling formation, construction is simple It is convenient.Its construction method, working face safety, Completed advance rate are fast, and moon Cheng Jingneng reaches 65-85 meters.
Detailed description of the invention
Fig. 1 is sectional view of the present invention;
Fig. 2 is partial enlarged view at the A of Fig. 1;
Fig. 3 is present invention construction schematic diagram.
In figure, well head section 1, fore shaft circle 11, well bore section 2, well bore lining cutting layer 21, wellbore wall seat 22, bottom wall 221, side wall 222, skew wall 223, well bore groove 23, shaft bottom section 3, shaft bottom lining cutting layer 31, integral mold plate 4, pour cavity 5, empty quarrel 6.
Specific embodiment
It is as follows that the present invention is described further with reference to the accompanying drawings and examples:
Tunnel ventilation well supporting construction, as shown in Figure 1, one end that ventilation shaft and corresponding tunnel main shaft are connected to be shaft bottom end, The other end is uphole end;Along ventilation shaft longitudinal direction, ventilation shaft includes the well head section 1 adjacent with uphole end, the well adjacent with shaft bottom end Bottom section 3 and the well bore section 2 between well head section 1 and shaft bottom section 3;The inner wall of the well bore section 2 is in rough rough surface; It is close to be provided with circumferential closed well bore lining cutting layer 21 on the inner wall of the well bore section 2, the well bore lining cutting layer 21 is built using mould Concrete structure, and it is made of the well bore lining cutting layer 21 the single shell lining structure of the well bore section 2.
Tunnel ventilation well supporting construction of the invention, the inner wall by well bore section 2 are in rough rough surface, well bore lining Course 21 is to be close to the mould of the inner wall of well bore section 2 to build concrete structure, and is single shell lining structure.Firstly, make with it is traditional compound Formula liner structure is compared, and without operations such as combined bolting and shotcretes, has saved working procedure, the construction period is greatly saved.Second, with biography The composite lining structure of system is compared, and structure is simplified, and cost is reduced.Third, the time for playing supporting to country rock is big It is big to shift to an earlier date, improve the safety of ventilation shaft itself and construction.Four, the inner wall of well bore section 2 is in rough rough surface, The concrete of liner structure is mutually embedded in rough inner wall when mould is built, when segmentation mould is built, to the upper section lining that mould is built Block structure can play the role of support and its is avoided to slide, and be especially beneficial the safety for guaranteeing Construction of Silo.Fifth, well bore section 2 The uneven structure of inner wall, structure is simple, cheap, and can be by tunneling process self-assembling formation, and construction is simple is convenient.
Preferably, the well head section 1 is provided with circumferential closed fore shaft circle 11, and the fore shaft circle 11 is that mould builds reinforced concrete Soil structure, and it is made of the fore shaft circle 11 the single shell lining structure of the well head section 1.
Preferably, the inner wall for being close to the shaft bottom section 3 is provided with circumferential closed shaft bottom lining cutting layer 31, the shaft bottom lining cutting Layer 31 builds reinforced concrete structure using mould, and the single shell lining structure of the shaft bottom section 3 is made of the shaft bottom lining cutting layer 31.
The structure is readily applicable to inclined shaft, parallel pilot tunnel and vertical shaft etc., and advantage in the shaft is the most obvious.
In order to further increase stability of the well bore lining cutting layer 21 in conjunction with the inner wall of well bore section 2, it is preferred that such as Fig. 2 institute Show, along the radial direction of ventilation shaft, the outer wall of the well bore lining cutting layer 21 be provided with the wellbore wall seat 22 radially outwardly protruded, The well bore groove 23 being radially recessed outward is provided on the inner wall of the well bore section 2, the wellbore wall seat 22 is plugged in In the well bore groove 23.
It is embedded in well bore groove 23 by wellbore wall seat 22, so that well bore lining cutting layer 21, which is firmly grabbed, invests well bore lining cutting layer 21 Outer wall, further improve the stability of well bore lining cutting layer 21, avoid well bore lining cutting layer 21 and vertically slide.
For the ease of pouring, it is preferred that the wellbore wall seat 22 is reinforced concrete structure;The wellbore wall seat 22 includes Bottom wall 221, side wall 222 and skew wall 223;Inner wall of the bottom wall 221 perpendicular to well bore section 2, described 223 one end of skew wall and side wall 222 are connected, and the other end is tilted towards the outer wall that well head extreme direction extends to well bore lining cutting layer 21.
The setting of the skew wall 223 enables concrete to be flowed into well bore groove 23 very well, in conjunction with setting for bottom wall 221 Set, to flow into groove 23 in concrete play position-limiting action, wellbore wall seat 22 is formed well, and with well bore groove 23 are fused together.
The construction method of above-mentioned tunnel ventilation well supporting construction, along the longitudinal from well head section 1 to shaft bottom 3 directions of section of ventilation shaft Section construction is carried out by driving section, the driving section includes well head section 1, well bore section 2 and shaft bottom section 3, and the well bore section 2 is by well Mouth section 1 is divided into several sections of well bores driving sections to shaft bottom 3 directions of section;When construction, top driving section is tunneled first, section to be tunneled Mould build to be formed build wall 1/3 up to initial set after, start it is next driving section driving, be so repeated up to shaft bottom section 3 construct It finishes.Specifically, as shown in figure 3, suspention integral mold plate 4, tunnels the void to be formed in corresponding driving section for 4 lower section of integral mold plate and is cut It on 6, is formed between the integral mold plate 4 and the borehole wall of corresponding driving section and pours mouth and pour cavity 5 towards uphole end, to pouring chamber Casting concrete in body 5.
When Specific construction, firstly, open cut well head section 1, suspends integral mold plate 4 in midair and by 4 lower section of integral mold plate in well head section 1 In useless quarrel, pouring reinforcement concrete forms and latches circle 11, after the 1/3 of lock 11 height of circle reach initial set, starts to go out in parallel Quarrel, and continues next driving section, that is, 2 topmost of well bore section well bore driving section driving, the well bore to topmost tunnels Section driving in place, by the useless quarrel of 4 lower section of integral mold plate to well bore driving section, is tunneling the borehole wall and integral mold plate 4 formed Between formed and pour cavity 5, well bore lining cutting layer 21 is formed to concrete perfusion is poured in cavity 5, equally to well bore lining cutting layer 21 After the 1/3 of height reaches initial set, start muck removal, and continue the construction of next driving section, until section 3 construction in shaft bottom finishes.For Well head section 1, the above-mentioned lock circle 11 built wall and refer to reinforced concrete structure;For well bore section 2, above-mentioned wall of building refers to concrete structure Well bore lining cutting layer 21;For shaft bottom section 3, the above-mentioned shaft bottom lining cutting layer 31 built wall and refer to concrete structure.For example, the height of integral mold plate 4 Degree is 4 meters, then corresponding build after wall reaches 1 meter high initial set, can continue postorder construction.
The construction method of ventilation shaft supporting construction disclosed by the invention, using from well head section 1 to shaft bottom section 3 directions, that is, supreme Form of construction work under and can guarantee the safety of construction.And by section construction, i.e., every one section of driving just pours one section, makes Just ventilation shaft supporting is finished after the completion of must tunneling, has saved working procedure, shortened construction period, and in time to driving section into Row supporting ensure that the safety of construction and ventilation shaft self structure.Due to tunneling the inner wall bumps of the ventilation shaft formed not It is flat, mould can be made to build the concrete to be formed and be firmly attached to its surface, after build wall 1/3 up to arrives initial set, building wall just can jail Jail is supported in the inner wall of ventilation shaft without sliding.Therefore when build wall 1/3 up to initial set after, can muck removal, carry out next driving The construction of section.Due to build wall 1/3 up to initial set after, just start it is next driving section driving so that build wall process part with It is parallel to tunnel process, more conducively raising Completed advance rate.Due to the useless quarrel not muck removal for the driving section just constructed, i.e. the driving section Driving process is not yet completed, and is just started lower section integral mold plate 4 and is poured, and is included in driving process so that building wall process.Just It is to be included in driving process due to building wall process, and there have part to build wall process to be parallel with driving, so that ventilation shaft supporting construction Immediately following development end, working face safety, Completed advance rate are fast, and moon Cheng Jingneng reaches 65-85 meters.And entire work progress is only by uphole end One of subjob completion is carried out to shaft bottom end, without being acted on again from shaft bottom end to uphole end, avoids overhead pendant object etc. Risk also as save process and construction period, meanwhile, the spray anchor process of composite lining is avoided, whole process uses cast-in-place coagulation Soil structure, no rebound, work progress not will cause air pollution.And the thickness of branch sheath is reduced, and is not only conducive to save Material also reduces the influence to ventilation shaft diameter.
Stability of the wall in conjunction with the borehole wall is built in order to further increase each driving section, it is preferred that the well bore section 2 Well bore groove 23 at one is at least distributed on the borehole wall of each well bore driving section.
In order to play waterproof action, it is preferred that between the construction joint of the adjacent well bore lining cutting layer 21 of well bore section 2, well bore Circumferential closing is set between lining cutting layer 21 and fore shaft circle 11 and between well bore lining cutting layer 21 and the construction joint of shaft bottom lining cutting layer 31 Sealing rod.

Claims (10)

1. tunnel ventilation well supporting construction, ventilation shaft with one end that corresponding tunnel main shaft is connected to is shaft bottom end, the other end is well head End;Along ventilation shaft longitudinal direction, ventilation shaft includes the well head section (1) adjacent with uphole end, the shaft bottom section (3) adjacent with shaft bottom end and position Well bore section (2) between well head section (1) and shaft bottom section (3);It is characterized by: the inner wall of the well bore section (2) in it is concave-convex not Flat rough surface;It is close to be provided with circumferential closed well bore lining cutting layer (21) on the inner wall of the well bore section (2), the well bore lining Course (21) builds concrete structure using mould, and the single shell lining structure of the well bore section (2) is made of the well bore lining cutting layer (21).
2. tunnel ventilation well supporting construction as described in claim 1, it is characterised in that: the well head section (1) is provided with circumferential direction Closed fore shaft circle (11), the fore shaft circle (11) are that mould builds reinforced concrete structure, and constitutes institute by the fore shaft circle (11) State the single shell lining structure of well head section (1).
3. tunnel ventilation well supporting construction as claimed in claim 1 or 2, it is characterised in that: be close to the interior of the shaft bottom section (3) Wall is provided with circumferential closed shaft bottom lining cutting layer (31), and the shaft bottom lining cutting layer (31) builds reinforced concrete structure using mould, and The single shell lining structure of the shaft bottom section (3) is made of the shaft bottom lining cutting layer (31).
4. the tunnel ventilation well supporting construction as described in claim 1-3 any one claim, it is characterised in that: described logical Ventilating shaft is vertical shaft.
5. tunnel ventilation well supporting construction as claimed in claim 4, it is characterised in that: along the radial direction of ventilation shaft, in the well The outer wall of body lining cutting layer (21) is provided with the wellbore wall seat (22) radially outwardly protruded, in the inner wall of the well bore section (2) On be provided with the well bore groove (23) being radially recessed outward, the wellbore wall seat (22) is plugged in the well bore groove (23) It is interior.
6. tunnel ventilation well supporting construction as claimed in claim 5, it is characterised in that: the wellbore wall seat (22) is mixed for reinforcing bar Xtah Crude Clay structure;The wellbore wall seat (22) includes bottom wall (221), side wall (222) and skew wall (223);The bottom wall (221) is vertical Inner wall in well bore section (2), described skew wall (223) one end are connected with side wall (222), and the other end is tilted towards well head extreme direction and prolongs Extend to the outer wall of well bore lining cutting layer (21).
7. the construction method of the tunnel ventilation well supporting construction as described in claim 1-6 any one claim, feature Be: longitudinal along ventilation shaft carries out section construction, the driving section by driving section from well head section (1) to shaft bottom section (3) direction Including well head section (1), well bore section (2) and shaft bottom section (3), and the well bore section (2) from well head section (1) to shaft bottom section (3) direction It is divided into several sections of well bore driving sections;When construction, wait tunnel Duan Mo build to be formed build wall 1/3 up to initial set after, start next pick Into the construction of section, so it is repeated up to shaft bottom section (3) construction and finishes.
8. the construction method of tunnel ventilation well supporting construction as claimed in claim 7, it is characterised in that: suspention integral mold plate (4), it will be excavated on the empty quarrel (6) to be formed below integral mold plate (4) in corresponding excavation section, which excavates with corresponding It is formed between the borehole wall of section and pours mouth and pour cavity (5) towards uphole end, to pouring casting concrete in cavity.
9. the construction method of tunnel ventilation well supporting construction as claimed in claim 7 or 8, it is characterised in that: the well bore section (2) well bore groove (23) at one are at least distributed on the borehole wall of each well bore driving section.
10. the construction method of tunnel ventilation well supporting construction as claimed in claim 9, it is characterised in that: in well bore section (2) Between the construction joint of adjacent well bore lining cutting layer (21), between well bore lining cutting layer (21) and fore shaft circle (11) and well bore lining cutting layer (21) circumferential closed sealing rod is set between the construction joint of shaft bottom lining cutting layer (31).
CN201910184746.5A 2019-03-12 2019-03-12 Tunnel ventilation well supporting construction and its construction method Pending CN109826654A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910184746.5A CN109826654A (en) 2019-03-12 2019-03-12 Tunnel ventilation well supporting construction and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910184746.5A CN109826654A (en) 2019-03-12 2019-03-12 Tunnel ventilation well supporting construction and its construction method

Publications (1)

Publication Number Publication Date
CN109826654A true CN109826654A (en) 2019-05-31

Family

ID=66869136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910184746.5A Pending CN109826654A (en) 2019-03-12 2019-03-12 Tunnel ventilation well supporting construction and its construction method

Country Status (1)

Country Link
CN (1) CN109826654A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113847036A (en) * 2021-10-25 2021-12-28 安徽理工大学 Double-wall seat structure for deep drilling shaft after well wall bottom breaking and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638898A (en) * 2009-08-19 2010-02-03 郑州市市政工程总公司 Suspension type construction method of top pipe shaft
CN102635359A (en) * 2012-04-13 2012-08-15 中铁十七局集团第三工程有限公司 Energy-saving rapid construction method for ventilating shafts of tunnels
CN103982188A (en) * 2014-06-03 2014-08-13 中铁第一勘察设计院集团有限公司 Supporting structure system of rock stratum large-section deep vertical shaft and construction method of supporting structure system
CN105240018A (en) * 2015-10-30 2016-01-13 中铁上海工程局集团有限公司 Vertical shaft construction device and method
CN105545342A (en) * 2016-03-02 2016-05-04 中铁第一勘察设计院集团有限公司 Smoke shaft of existing lining tunnel inner arch and constructing method of smoke shaft
CN106677787A (en) * 2016-12-27 2017-05-17 中冶集团武汉勘察研究院有限公司 Vertical shaft restoration and reinforcement structure and restoration and reinforcement construction method
CN207003499U (en) * 2017-07-25 2018-02-13 广州大学 A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN109026012A (en) * 2018-07-25 2018-12-18 中国电建集团华东勘测设计研究院有限公司 Vertical shaft surrounding rock supporting structure and its excavation supporting method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638898A (en) * 2009-08-19 2010-02-03 郑州市市政工程总公司 Suspension type construction method of top pipe shaft
CN102635359A (en) * 2012-04-13 2012-08-15 中铁十七局集团第三工程有限公司 Energy-saving rapid construction method for ventilating shafts of tunnels
CN103982188A (en) * 2014-06-03 2014-08-13 中铁第一勘察设计院集团有限公司 Supporting structure system of rock stratum large-section deep vertical shaft and construction method of supporting structure system
CN105240018A (en) * 2015-10-30 2016-01-13 中铁上海工程局集团有限公司 Vertical shaft construction device and method
CN105545342A (en) * 2016-03-02 2016-05-04 中铁第一勘察设计院集团有限公司 Smoke shaft of existing lining tunnel inner arch and constructing method of smoke shaft
CN106677787A (en) * 2016-12-27 2017-05-17 中冶集团武汉勘察研究院有限公司 Vertical shaft restoration and reinforcement structure and restoration and reinforcement construction method
CN207003499U (en) * 2017-07-25 2018-02-13 广州大学 A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN109026012A (en) * 2018-07-25 2018-12-18 中国电建集团华东勘测设计研究院有限公司 Vertical shaft surrounding rock supporting structure and its excavation supporting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113847036A (en) * 2021-10-25 2021-12-28 安徽理工大学 Double-wall seat structure for deep drilling shaft after well wall bottom breaking and construction method

Similar Documents

Publication Publication Date Title
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN102562099B (en) Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN102979531B (en) Reinforce construction method and the structure of large-scale rock slope deep weak structural plane
CN109372517A (en) One kind is suitable for wearing water supplying pipe construction method under upper soft lower hard compound stratum tunnel
CN108266191B (en) A kind of multiple-arch tunnel optimized construction method
CN105525619B (en) A kind of water rich strata bored tunnel occlusion pipe curtain
CN105781573A (en) Railway down-traversing highway tunnel double-layer casing pipe reinforcement double-pipe shed follow-pipe drilling construction method
CN110331992A (en) A kind of hole daguanpeng construction method
CN104653188B (en) A kind of large-diameter shield that arranges in tunneling air channel receives and the method for starting well
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN104533425B (en) Vertical shaft overall pouring section walling crib and vertical shaft overall pouring section walling crib construction method
CN110700841B (en) Double-side-wall guide pit type excavation method for tunnel excavation
CN105350988B (en) Tunnel Base reinforcement means
CN106884665B (en) A kind of Double Multi-Arch start tunneling method based on arch set arch
CN107012861B (en) A kind of discrete material core expansive concrete stake and its construction method
CN110144886A (en) Deep soft stratum long spire is with pipe, churning driven pore-creating filling pile construction method
CN111119910A (en) Tunnel collapse section back-blowing sand grouting backfill structure and construction method thereof
CN110195604A (en) A kind of threaded list road main tunnel TBM driving section constructing method
CN110284885A (en) Shield inspection-pit construction method
CN109667587A (en) Using the drill+blast tunnel structure of prefabrication and assembly construction inverted arch
CN110761808A (en) Large-section loess tunnel supporting system and supporting construction method
CN110700860B (en) Construction method of soil-stone boundary tunnel crossing loess valley
CN109057802A (en) Shallow tunnel with big cross-section underpass of freeways construction method
CN109826654A (en) Tunnel ventilation well supporting construction and its construction method
CN108487930B (en) A kind of method that rotary churning pile administers deep Soft rock tunnel pucking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190531

RJ01 Rejection of invention patent application after publication