CN108487930B - A kind of method that rotary churning pile administers deep Soft rock tunnel pucking - Google Patents

A kind of method that rotary churning pile administers deep Soft rock tunnel pucking Download PDF

Info

Publication number
CN108487930B
CN108487930B CN201810163970.1A CN201810163970A CN108487930B CN 108487930 B CN108487930 B CN 108487930B CN 201810163970 A CN201810163970 A CN 201810163970A CN 108487930 B CN108487930 B CN 108487930B
Authority
CN
China
Prior art keywords
rotary churning
bottom plate
churning pile
tunnel
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810163970.1A
Other languages
Chinese (zh)
Other versions
CN108487930A (en
Inventor
李桂臣
郝文军
张农
孙长伦
贾斌义
何锦涛
张苏辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201810163970.1A priority Critical patent/CN108487930B/en
Publication of CN108487930A publication Critical patent/CN108487930A/en
Application granted granted Critical
Publication of CN108487930B publication Critical patent/CN108487930B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/002Survey of boreholes or wells by visual inspection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

The invention discloses a kind of methods that rotary churning pile administers deep Soft rock tunnel pucking, first detect to the lithology of floor strata the position of determining bottom plate key stratum, rotary churning pile group is set according to fixed intervals on each cross section that pucking section easily occurs along the roadway floor of deep-well soft broken rock stratum, all claim to help 3~5 rotary churning piles of interval construction to two as bound pair using tunnel cross-section center on each cross section, lays 45 ° of base angle rotary churning piles and 0 ° of vertical rotary churning pile in same cross section.The present invention can cut off roadway's sides to the pressure transmission path of bottom plate, reduce the extruding formed to bottom plate, it is suppressed that deformation;Floor strata is detected in advance, rotary churning pile is enabled to reinforce bottom plate competent bed;Solve the problems, such as can the anchor property infused difference loose crushing roadway floor reinforce, strong reinforcement measure is carried out to original ravelly ground in the case where not destroying tunnel original structure, difficulty of construction will not increase with mining depth and increase, the General Promotion stability in tunnel.

Description

A kind of method that rotary churning pile administers deep Soft rock tunnel pucking
Technical field
The present invention relates to a kind of method for administering roadway pucking, specifically a kind of rotary churning pile administers deep Soft rock tunnel The method of pucking.
Background technique
Aiming at the problem that loose coal petrography inter-road road pucking causes, such as: being that the cross-sectional area in tunnel becomes smaller first, be unfavorable for leading to Wind;Secondly roadway floor becomes out-of-flatness after pucking, is unfavorable for transporting, pedestrian is also dangerous, makes it possible under serious conditions Lane height is not able to satisfy worker and normally walks requirement;In addition pucking also will affect top plate and two stress states and stability helped, So that entire bearing structure and the force way of support unit etc. can also generate a series of variation, and then make the steady of tunnel entirety It is qualitative to change.The problem of Floor Heave in Roadway by be likely to production technique be constantly progressive and the increase of mining depth and become It obtains more prominent.Studies have shown that especially in high stress and soft rock mine roadway, pucking amount has occupied tunnel into after deep mining The major part of deflection.Therefore, very urgent to the prevention of Floor Heave in Roadway and improvement.
Currently, the administering method of Floor Heave in Roadway is broadly divided into destressing method and method for strengthening two major classes.Destressing method, which mainly passes through, to be cut The measures such as slot, drilling make two to help or the stress of bottom plate are shifted to deep, floor strata stress reduced, to reach floor lift control Purpose.Destressing method mainly includes bottom plate release and two help release, and insole board release includes bottom plate grooving, bottom plate drilling, bottom Plate standing;Two help release to include roadway's sides drilling, two help standing;In addition there are dig near by protection tunnel Relieving way.Method for strengthening is mainly the intensity by reinforcing soleplate raising roadway floor country rock come floor lift control, mainly there is bottom plate The technical measures such as anchor pole, floor grouting, closed support and concrete anti-arch.But for the weak broken rock stratum of deep, Using pressure release method effect and bad, and use bolt anchorage, slip casting that can not reach ideal effect, using closed support, The combined supportings such as anti-bottom arch, although there is certain effect, cost is too high, operational sequence is complicated.
Chinese patent application 201220518121.1 discloses a kind of counter-arch shaped sleeper for administering Floor Heave in Roadway, this method Although the drawbacks of overcoming reinforcing of the tradition to bottom plate, if applied it in Deep Soft Rock tunnel, loose bottom plate Still it cannot effectively control;When using reinforced concrete wall, such as Chinese invention patent 201210307001.1, due to construction Difficulty, wall height are very restricted, and can not be deep into roadway floor and be stablized rock stratum, finally be difficult to obtain satisfied effect Fruit.In addition, Chinese patent application 201520403496.7 also discloses a kind of beam anchor composite structure for preventing soft-rock tunnel pucking, Regulation effect of the beam anchor structure in deep-well Loose floor that this method uses be bad and complex procedures, the recycling of girder steel It does not reach requirement.
Summary of the invention
In view of the above-mentioned problems of the prior art, the object of the present invention is to provide it is a kind of construction be easy, it is easy to operate at This is low, and is capable of the pucking phenomenon of specific aim control deep weak stratum, in the case where not destroying tunnel original structure rock stratum The rotary churning pile improvement deep weak stratum that the generation of entire Floor Heave in Roadway can be taken precautions against, effectively improve tunnel overall space stability The method of Floor Heave in Roadway.
To achieve the above object, the technical solution adopted by the present invention is that: a kind of rotary churning pile administers deep Soft rock tunnel The method of pucking, includes the following steps:
Step 1: it pries through floor strata situation: on the bottom plate in the tunnel of deep-well soft broken, being peeped using inspection instrument for borehole Depending on the floor strata situation of tunnel cross-section center position, design drilling depth is 10-15m, and bore diameter 28mm uses drilling machine It plays the drilling of 12-17m downwards from bottom plate, opens endoscope, endoscope probe is put in drilling, video recording, note during putting in Record the rock stratum information of the following different depth of bottom plate;
Step 2: drilling depth needed for determining whirl spraying: according to prying through as a result, determining hard in floor strata for step 1 The specific location of layer position, further determines that the drilling depth during whirl spraying process implementing need to be deep into solid bed position;
Step 3: design rotary churning pile drilling: claim to help direction interval construction 3 to two as bound pair using tunnel cross section bottom plate center The angle of~5 rotary churning piles, two base angle rotary churning piles and vertical direction is 45 °, the vertical rotary churning pile between two base angle rotary churning piles with The angle of vertical direction is 0 °, and each rotary churning pile exposes the drilling disposed at equal distance of backplate surface, and the drilling of each rotary churning pile is straight Diameter is 50~100mm, and rotary churning pile drilling depth extends to hard backplane level position, with intermediate vertical rotary churning pile of first constructing, is again applied The sequence of the base angle rotary churning pile on work both sides carries out jet grouting pile construction;
Step 4: prepare cement grout: according to ratio of mud 1:1 prepare cement grout, and be added cement consumption 3~ The rapid hardening chemical agent of 5wt%;According to first water, raw material is put into agitator by grey sequence again, is eventually adding rapid hardening chemical agent Slurries are made in stirring 15-20 minutes, spare;
Step 5: rotary churning pile drilling: first in the middle part setting position of bottom plate, using drill hole of drilling machine until what is set is hard Backplane level position, is then lifted out drilling machine, and promotion speed is 0.2~0.25m/min, the whirl spraying of the side Bian Tisheng, design parameter are as follows: whirl spraying note Starch 20~25MPa of pressure, it is ensured that high-pressure jet cutting rock stratum, flow 20L/min, 10~15r/min of rotation speed, nozzle are straight 2~3mm of diameter;
Step 6: after whirl spraying, the anchor pole with " fork " shape is inserted into from whirl spraying pile center up to rotary churning pile drills most Depths, the bolt diameter are 25-30mm, process " fork " shape every 500mm on anchor pole;
Step 7: repeating the above steps five to remaining each rotary churning pile of the same cross section of step 6 construction tunnel, each Rotary churning pile is according to equidistant construction;
Step 8: step 1 is repeated to step 7, the distance construction for being 0.9-1.2m according to array pitch along floor length direction Rotary churning pile group on each cross section, until completing that pucking section bottom plate easily occurs in the tunnel in deep-well soft broken rock stratum Construction.
As the preferred embodiment of above scheme, according to the loosening degree of floor strata in the step 3, determine that whirl spraying is bored The array pitch in hole is between 0.7-1.4m.
Preferably, the rapid hardening chemical agent in the step 4 is aluminum oxide clinker.
As another preferred embodiment of above scheme, when rotation lance lift is to soon close to bottom plate table in the step 5 When the horizontal position in face, Ying Congxuan lance lift reaches backplate surface or less 1.0m and starts, with the speed of 0.1~0.15m/min Degree promotes whirl spraying, until backplate surface.It is so promoted, more stable, the biggish pile crown of range can be formed at backplate surface.
Preferably, in order to avoid that contingency occurs as far as possible, in the step 3 when constructing base angle rotary churning pile, angle is inclined Difference is no more than 1%~1.5%.
Compared with the existing technology, the present invention has the advantage that
1) present invention is formed by each rotary churning pile and is relatively large in diameter, and 45 ° of base angle whirl sprayings that the cooperation of same cross section is laid Stake and 0 ° of vertical rotary churning pile can effectively cut off roadway's sides to the pressure transmission path of bottom plate, thus weaken back, Two extruding for helping pressure to form bottom plate, effectively inhibit the deformation of bottom plate;By high-pressure jet whirl spraying construction technology, solve Can the loose crushing roadway floor of the anchor property infused difference the problem of efficiently reinforcing, do not have the wind for destroying tunnel original structure rock stratum Danger, suitable for the rock stratum tunnel of loose weak, and the diameter for reinforcing rotary churning pile increases nearly 20 times compared to common bolt, reinforcing It can be more preferable;
2) present invention on each cross section that pucking section easily occurs along the roadway floor of deep-well soft broken rock stratum according to The rotary churning pile group of fixed intervals setting enhances entire bottom plate, and carries out on each individual cross section due to constructing, and constructs Difficulty will not increase with the increase of mining depth, and the solution of pucking situation avoids the hair of deformation condition in deep-well tunnel It is raw, solve the deep-well pucking problem on deformation that can not be overcome in currently available technology;
3) pucking phenomenon obviously weakens due to the above reasons, avoids associated with bottom plate two and helps and roof Stress The deterioration of state improves the stability of tunnel solid space;Lane space is stablized while being met to break needed for dash Face area, tunnel bottom is more smooth, facilitates transport and pedestrian's walking, improves the safety of tunnel entirety, alleviate and apply The psychological burden of worker person;
4) present invention has carried out specific aim detection to the lithology of floor strata in advance before rotary churning pile of constructing, so that rotation Spray stake can reinforce the key stratum solid bed position under bottom plate, play apparent consolidation effect;The slurry of each jet grouting pile construction Liquid uses cement slurry, can achieve the effective use to resource, and intensity height, consolidation effect are good after cement slurry sets, also avoids When simple supporting to the consumption of metal resource, reduce costs;
5) present invention is at low cost, and constructing operation is simple, labor intensity is low, falls below most in work progress to the pollution of environment Low, the economic results in society of generation are more significant.
Detailed description of the invention
Fig. 1 is the tunnel cross-sectional view that present invention construction is completed;
In figure, 1. tunnels, 2. base angle rotary churning piles, 3. bottom plates, 4. vertical rotary churning piles, 5. anchor poles, 5-1. " fork " shape.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, the method that rotary churning pile administers deep Soft rock tunnel pucking includes the following steps:
Step 1: floor strata situation is pried through: on the bottom plate 3 in the tunnel of deep-well soft broken 1, using inspection instrument for borehole The 3 rock stratum situation of bottom plate of 1 cross-section center position of tunnel is pried through, design drilling depth is 10-15m, bore diameter 28mm, is considered It is not easy to be discharged to downward drilling drillings, actual borehole depth is 2m longer than design drilling depth, beats downwards using drilling machine from bottom plate 3 Endoscope is opened in the drilling of 12-17m, and endoscope probe is put in drilling, is recorded a video during putting in, is recorded 3 or less bottom plate no With the rock stratum information of depth;
Step 2: drilling depth needed for determining whirl spraying: according to prying through as a result, determining 3 rock stratum backbone of bottom plate for step 1 The specific location of hard formation position further determines that the drilling depth during whirl spraying process implementing need to be deep into solid bed position;
Step 3: design rotary churning pile drilling: claim to help direction interval to apply to two as bound pair using 1 cross section bottom plate of tunnel, 3 center The angle of 3~5 rotary churning piles of work, two base angle rotary churning piles 2 and vertical direction is 45 °, the vertical whirl spraying between two base angle rotary churning piles 2 The angle of stake 4 and vertical direction is 0 °, and each rotary churning pile exposes the drilling disposed at equal distance on 3 surface of bottom plate, and each rotary churning pile bores The diameter in hole is 50~100mm, and rotary churning pile drilling depth extends to hard backplane level position, and two base angle rotary churning piles (2) reach hard 10-15cm is re-extended behind hard backplane level position, through testing, base angle rotary churning pile (2) to reinforce more after going deep into hard bottom plate 10-15cm It is firm, while two help that the stress of bottom plate 3 can be quickly dispersed the hard backplane level position of bottom, to further obviate depth The phenomenon that portion's Soft rock tunnel pucking.With intermediate vertical rotary churning pile 4 of first constructing, the base angle rotary churning pile 2 on both sides of constructing again Sequence carries out jet grouting pile construction;
Step 4: it prepares cement grout: preparing cement grout according to ratio of mud 1:1, and prevent in the construction process The destruction of bottom plate 3 is caused, the rapid hardening chemical agent of 3~5wt% of cement consumption is added;According to first water, grey sequence puts raw material again Enter in agitator, be eventually adding rapid hardening chemical agent and stir 15-20 minutes, slurries are made, it is spare;
Step 5: rotary churning pile drilling: first in the middle part setting position of bottom plate 3, using drill hole of drilling machine until the heavily fortified point of setting Hard backplane level position, is then lifted out drilling machine, and promotion speed is 0.2~0.25m/min, the whirl spraying of the side Bian Tisheng, design parameter are as follows: whirl spraying 20~25MPa of grouting pressure, it is ensured that can high-pressure jet cut rock stratum, flow 20L/min, 10~15r/min of rotation speed, 2~3mm of nozzle diameter;
Step 6: after whirl spraying, the anchor pole 5 with " fork " shape 5-1 is inserted into from whirl spraying pile center up to rotary churning pile bores Hole bosom, 5 diameter of anchor pole are 25-30mm, process " fork " shape 5-1 every 500mm on anchor pole 5;
Step 7: repeating the above steps five to remaining each rotary churning pile of the same cross section of step 6 construction tunnel 1, each Rotary churning pile is according to equidistant construction;
Step 8: step 1 is repeated to step 7, the distance construction for being 0.9-1.2m according to array pitch along 3 length direction of bottom plate Rotary churning pile group on each cross section, until completing that pucking section bottom plate 3 easily occurs in the tunnel 1 in deep-well soft broken rock stratum Construction.
Preferably, the array pitch of same section whirl spraying drilling is determined according to the loosening degree of 3 rock stratum of bottom plate in the step 3 For 0.7-1.4m.
Preferably, the rapid hardening chemical agent in the step 4 is aluminum oxide clinker, and aluminum oxide clinker is by bauxite, soda ash, life Lime mixed sintering at.
Preferably, when encountering special geologic condition, in order to guarantee the pile-forming effect of each rotary churning pile, in the step 5 when Revolve lance lift to soon close to the horizontal position on 3 surface of bottom plate when, below Ying Congxuan lance lift arrival 3 surface of bottom plate 1.0m starts, and promotes whirl spraying, whirl spraying several seconds at a slow speed, then promote 0.5m at a slow speed upwards, until 3 surface of bottom plate.So promoted, it can be with More stable, the biggish pile crown of range is formed at 3 surface of bottom plate.
Preferably, bigger in view of inclination angle, in the construction process, staff must carry out safety measure, in order to avoid Contingency occurs, in the step 3 when construct base angle rotary churning pile 2, angular deviation no more than 1%~1.5%.

Claims (5)

1. a kind of method that rotary churning pile administers deep Soft rock tunnel pucking, which comprises the steps of:
Step 1: floor strata situation is pried through: on the bottom plate (3) in the tunnel (1) of deep-well soft broken, using inspection instrument for borehole Pry through bottom plate (3) rock stratum situation of tunnel (1) cross-section center position, design drilling depth is 10-15m, bore diameter 28mm, It plays the drilling of 12-17m downwards from bottom plate (3) using drilling machine, opens endoscope, endoscope probe is put in drilling, was put in It records a video in journey, the rock stratum information of record bottom plate (3) following different depth;
Step 2: drilling depth needed for determining whirl spraying: according to prying through as a result, determining hard in bottom plate (3) rock stratum for step 1 The specific location of layer position, further determines that the drilling depth during whirl spraying process implementing need to be deep into solid bed position;
Step 3: design rotary churning pile drilling: claim to help direction interval to apply to two as bound pair using tunnel (1) cross section bottom plate (3) center The angle of 3~5 rotary churning piles of work, two base angle rotary churning piles (2) and vertical direction is 45 °, vertical between two base angle rotary churning piles (2) The angle of rotary churning pile (4) and vertical direction is 0 °, and each rotary churning pile exposes the drilling disposed at equal distance on bottom plate (3) surface, and each The diameter of rotary churning pile drilling is 50~100mm, and rotary churning pile drilling depth extends to hard backplane level position, with intermediate hang down of first constructing Straight rotary churning pile (4), both sides of constructing again the sequence of base angle rotary churning pile (2) carry out jet grouting pile construction;
Step 4: it prepares cement grout: preparing cement grout according to ratio of mud 1:1, and be added 3~5wt%'s of cement consumption Rapid hardening chemical agent;According to first water, raw material is put into agitator by grey sequence again, is eventually adding rapid hardening chemical agent stirring 15- 20 minutes, slurries are made, it is spare;
Step 5: rotary churning pile drilling: first in the middle part setting position of bottom plate (3), using drill hole of drilling machine until what is set is hard Backplane level position, is then lifted out drilling machine, and promotion speed is 0.2~0.25m/min, the whirl spraying of the side Bian Tisheng, design parameter are as follows: whirl spraying note Starch 20~25MPa of pressure, it is ensured that high-pressure jet cutting rock stratum, flow 20L/min, 10~15r/min of rotation speed, nozzle are straight 2~3mm of diameter;
Step 6: after whirl spraying, the anchor pole (5) with " fork " shape (5-1) is inserted into from whirl spraying pile center up to rotary churning pile bores Hole bosom, anchor pole (5) diameter are 25-30mm, process " fork " shape (5-1) every 500mm on anchor pole (5);
Step 7: five are repeated the above steps to remaining each rotary churning pile of step 6 construction tunnel (1) same cross section, Ge Gexuan Stake is sprayed according to equidistant construction;
Step 8: repeating step 1 to step 7, each according to the distance construction that array pitch is 0.9-1.2m along bottom plate (3) length direction Rotary churning pile group on a cross section, until completing that pucking section bottom plate easily occurs in the tunnel (1) in deep-well soft broken rock stratum (3) construction.
2. the method that a kind of rotary churning pile according to claim 1 administers deep Soft rock tunnel pucking, which is characterized in that According to the loosening degree of bottom plate (3) rock stratum in the step 3, determine the array pitch of whirl spraying drilling between 0.7-1.4m.
3. the method that a kind of rotary churning pile according to claim 1 administers deep Soft rock tunnel pucking, which is characterized in that Rapid hardening chemical agent in the step 4 is aluminum oxide clinker.
4. the method that a kind of rotary churning pile according to claim 1 administers deep Soft rock tunnel pucking, which is characterized in that In the step 5 when revolve lance lift to soon close to the horizontal position on bottom plate (3) surface when, Ying Congxuan lance lift arrives 1.0m starts below up to bottom plate (3) surface, whirl spraying is promoted with the speed of 0.1~0.15m/min, until bottom plate (3) surface.
5. the method that a kind of rotary churning pile according to claim 1 administers deep Soft rock tunnel pucking, which is characterized in that In the step 3 when constructing base angle rotary churning pile (2), angular deviation is no more than 1%~1.5%.
CN201810163970.1A 2018-02-27 2018-02-27 A kind of method that rotary churning pile administers deep Soft rock tunnel pucking Active CN108487930B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810163970.1A CN108487930B (en) 2018-02-27 2018-02-27 A kind of method that rotary churning pile administers deep Soft rock tunnel pucking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810163970.1A CN108487930B (en) 2018-02-27 2018-02-27 A kind of method that rotary churning pile administers deep Soft rock tunnel pucking

Publications (2)

Publication Number Publication Date
CN108487930A CN108487930A (en) 2018-09-04
CN108487930B true CN108487930B (en) 2019-06-04

Family

ID=63340744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810163970.1A Active CN108487930B (en) 2018-02-27 2018-02-27 A kind of method that rotary churning pile administers deep Soft rock tunnel pucking

Country Status (1)

Country Link
CN (1) CN108487930B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109139057B (en) * 2018-10-29 2020-02-07 六盘水师范学院 Coal mining roadway floor water absorption bottom heave treatment method
CN111042844B (en) * 2019-09-24 2021-05-25 西安科技大学 Roadway floor anchor pile reinforcing method
CN116882012B (en) * 2023-07-11 2024-03-29 安徽建筑大学 Deep roadway floor heave influence factor and feature analysis method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101812992B (en) * 2010-04-07 2011-11-16 北京科技大学 Jet-grouting pipe-shed pre-support method for tunnel and longitudinal opening perforated pipe
CN103306687B (en) * 2012-10-31 2015-09-16 北京中铁瑞威基础工程有限公司 Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN103615265B (en) * 2013-12-10 2016-01-20 北京中铁瑞威基础工程有限公司 Soft rock tunnel horizontal jet grouting construction method
CN206034454U (en) * 2016-09-09 2017-03-22 武汉理工大学 Supporting construction
CN206173974U (en) * 2016-11-15 2017-05-17 河南省水利勘测设计研究有限公司 Push pipe construction is with dark underground structure of small -size

Also Published As

Publication number Publication date
CN108487930A (en) 2018-09-04

Similar Documents

Publication Publication Date Title
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN108678769A (en) Deep Gateway anchor note cuts top master control and stays lane method
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN202969392U (en) Complex geology deep excavation pit combined support
CN108487930B (en) A kind of method that rotary churning pile administers deep Soft rock tunnel pucking
CN102996149B (en) Support method for bolt-grouting composite crushing dynamic-pressure roadway soft rock roof by high-pre-stressed anchor cable
CN110318770A (en) A kind of hazy start tunneling method of vcehicular tunnel
CN102518135A (en) Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles
CN212296427U (en) Double-lane arrangement working face outer lane narrow coal pillar stable supporting structure
CN102226403A (en) Construction method of large-span subway station main body by using arched cover method and station main body structure
CN108087008B (en) A kind of three-soft seam gob side entry method for protecting support
CN106049505A (en) Construction method for deep foundation pit supporting and protecting system
CN1657711A (en) Rotary spray anchoring pile construction process
CN108487911A (en) The compound crossing method construction method of longspan tunnel bilateral wall under complex geological condition
CN109487804A (en) The low disturbance reinforcement protection system of red soft rock cut slope and construction method
CN201991017U (en) Subway large-span station body structure based on arch cover method construction forming
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN101509383A (en) Tunnel footing anchor pouring reinforcement anti bottom expanding method and construction technique
CN115182729B (en) Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method
CN108374672B (en) A method of reinforcing Deep Mine soft coal level roadway surrounding rock
CN108487924B (en) A kind of reinforcement means of soft coal level gob side entry driving thin coal pillar
CN107503362A (en) A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability
CN109268027A (en) A kind of tunnel apex angle curved surface country rock intensive control method
CN107339122A (en) A kind of steel pipe column handles goaf engineering method
CN108150175A (en) Shaft of vertical well passes through the supporting construction of the old dead zone in coal seam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant