CN110284885A CN201910550294.8A CN201910550294A CN110284885A CN 110284885 A CN110284885 A CN 110284885A CN 201910550294 A CN201910550294 A CN 201910550294A CN 110284885 A CN110284885 A CN 110284885A
Authority
CN
China
Prior art keywords
inspection
pit
shield
excavated
shield machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910550294.8A
Other languages
Chinese (zh)
Inventor
徐铁强
王林
李自力
陈乾
郝伟
冀兴俊
李杨
谢超
邵海超
温涛
檀方华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201910550294.8A priority Critical patent/CN110284885A/en
Publication of CN110284885A publication Critical patent/CN110284885A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/11Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Wood Science & Technology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention provides a kind of shield inspection-pit construction methods, comprising the following steps: S1) before overhauling well construction, in the cast-in-place formation concrete collar tie beam of the pithead position of inspection-pit to be excavated;S2) grouting and reinforcing is carried out in earth's surface inspection-pit surrounding setting grouting sleeve valve pipe to be excavated;S3 it) excavates to form multiple dewatering wells in inspection-pit surrounding to be excavated tunnel two sides;S4 it) is taken from earth's surface and mechanical excavates inspection-pit elevation location on cutter head of shield machine into tunnel;S5) since on cutter head of shield machine elevation location, forming inspection-pit using hand digging to projected depth in tunnel;S6) after carrying out maintenance or cutter head of shield machine replacement to shield machine, inspection-pit is backfilled using sandstone.Shield inspection-pit construction method can find out situations such as cobble, erratic boulder are distributed, and provide geologic basis for next step solution formulation;Maintenance or cutterhead replacement can be carried out to shield machine simultaneously, and is capable of providing safe operating environment.

Description

Shield inspection-pit construction method
Technical field
The present invention relates to technical field of tunnel construction, and in particular to a kind of shield inspection-pit construction method.
Background technique
Tunnelling during, it usually needs excavated using shield machine, due to excavate soil layer in there are ovum Stone, erratic boulder distribution, damage the cutterhead of shield machine, or the screw machine of blocking shield machine, cause cutterhead repeatedly to occur stuck Stop jumping, there are abnormal sounds, dregs to be discharged for cutterhead in driving, and thrust, soil pressure increase, and situations such as can not normally promoting, needs pair Cutterhead replace or overhaul to screw machine.
Summary of the invention
Situations such as present invention provides a kind of shield inspection-pit construction method, can find out cobble, erratic boulder distribution, and be next It walks solution formulation and geologic basis is provided;Maintenance or cutterhead replacement can be carried out to the shield machine simultaneously, and is capable of providing safety Operating environment.
Shield inspection-pit construction method provided by the invention is the following steps are included: S1) before overhauling well construction, wait dig Dig the cast-in-place formation concrete collar tie beam of pithead position of inspection-pit;S2 it) is carried out in earth's surface inspection-pit surrounding setting grouting sleeve valve pipe to be excavated Grouting and reinforcing;S3 it) excavates to form multiple dewatering wells in the inspection-pit surrounding to be excavated tunnel two sides;S4) machine is taken from earth's surface Tool formula excavates the inspection-pit elevation location on cutter head of shield machine into tunnel;S5) cutter head of shield machine subscript is high-order from tunnel Beginning is set, the inspection-pit is formed using hand digging to projected depth;S6 maintenance or cutter head of shield machine) are being carried out to shield machine After replacement, the inspection-pit is backfilled using sandstone.
Preferably, in the step S1) in, the cast-in-place concrete collar tie beam that formed includes: the walling crib model in inspection-pit to be excavated In enclosing, surface dust is removed;It constructs and buries well head casing;It pours collar tie beam close to casing inner wall production and is poured in collar tie beam described Arrange built-in fitting;It pours collar tie beam to described after removing casing and pour forming the concrete collar tie beam.
Preferably, in the step S1) later and before step S2), further includes: it is attached in the well head of inspection-pit to be excavated Guardrail and water fender is arranged near position.
Preferably, in the step S2) in, it is infused in earth's surface two circle grouting sleeve valve pipe of inspection-pit surrounding setting to be excavated Slurry is reinforced, and the depth of the grouting sleeve valve pipe is 0.6~1m of the well head of inspection-pit to be excavated or less.
Preferably, in the step S3) in, the excavation step of the dewatering well includes: that drilling forms depth as 45m, aperture For the hoistway of 600mm;The well casing that installation wall is more than or equal to 3mm in the hoistway, caliber is 280mm;The well casing with Between the hoistway inner wall ring rockfill English circle gravel and ring fill out clay ball, to form the dewatering well.
Preferably, the tube top of well casing 0.2m above ground level.
Preferably, in the step S4) in, taking from earth's surface and mechanically excavating the inspection-pit includes: using total station Construction lofting is carried out, determines the inspection-pit coordinate position;Well head steel pile casting is buried according to the inspection-pit coordinate position;It uses Drilling machinery excavates the inspection-pit elevation location on cutter head of shield machine into tunnel;Segmental installation inspection-pit steel pile casting.
Preferably, the internal diameter of the well head steel pile casting is greater than the diameter of the inspection-pit, the top surface of the well head steel pile casting Absolute altitude is higher than construction ground.
Preferably, in the step S5) in, the hand digging to projected depth forms the inspection-pit, comprising: in machine The bottom that tool formula excavates the well section to be formed continues a cubic metre of earth hand digging, wherein the every excavation predetermined depth of hand digging, in institute The borehole wall merogenesis for stating inspection-pit sets up grid steel frame and is laid with mesh sheet, and sprays the grid steel frame and laying mesh sheet Concrete, up to hand digging to projected depth;It is laid with single layer steel mesh in shaft bottom, forms the inspection-pit.
Preferably, in the cutterhead elevation range corresponding position of hand digging to shield machine, in the borehole wall frame of the inspection-pit If glass fiber-reinforced polymer structure grid, for guaranteeing that the without hindrance broken wall of shield machine reaches specified maintenance and tool change position.
Shield inspection-pit construction method provided by the invention, by the way that inspection-pit, Neng Goutong are arranged in front of shield machine tunnels Situations such as maintenance well construction finds out cobble, erratic boulder distribution is crossed, plays the role of exploration hole and provides geology for next step solution formulation Foundation;Maintenance or cutterhead replacement can be carried out to the shield machine simultaneously, and is capable of providing safe operating environment;It is waited in earth's surface It excavates inspection-pit surrounding setting grouting sleeve valve pipe and carries out grouting and reinforcing, firm stratum is formed by slip casting, during avoiding excavation It settles, and the mini pile effect of mini-valve tube is combined to avoid stratum loose, control the inspection-pit and excavate coverage, guarantee The safety of construction period;It is taken first from earth's surface and mechanically excavates inspection-pit cutter head of shield machine subscript high position into tunnel It sets, then since on cutter head of shield machine elevation location, forming the inspection-pit using hand digging to projected depth, really in tunnel It has protected the safety of maintenance well construction and has shortened and built the period;After carrying out maintenance or cutterhead replacement to shield machine, sand is used Stone backfills the inspection-pit, to guarantee ground safety.
The other feature and advantage of the embodiment of the present invention will the following detailed description will be given in the detailed implementation section.
Detailed description of the invention
Attached drawing is to further understand for providing to the embodiment of the present invention, and constitute part of specification, under The specific embodiment in face is used to explain the present invention embodiment together, but does not constitute the limitation to the embodiment of the present invention.Attached In figure:
Fig. 1 is the step flow chart of the shield inspection-pit construction method of embodiment according to the present invention;
Fig. 2 is the top view of the shield machine and inspection-pit of embodiment according to the present invention;
Fig. 3 is the front section view of the shield machine and inspection-pit of embodiment according to the present invention.
Description of symbols
1 inspection-pit, 2 cutter head of shield machine
3 concrete collar tie beams
Specific embodiment
It is described in detail below in conjunction with specific embodiment of the attached drawing to the embodiment of the present invention.It should be understood that this Locate described specific embodiment and be merely to illustrate and explain the present invention embodiment, is not intended to restrict the invention embodiment.
With reference to the accompanying drawing, technical solution in the embodiment of the present invention is described in detail.
Due to excavating, there are cobble, erratic boulders to be distributed in soil layer, damages to the cutterhead of shield machine, or blocking shield machine Screw machine causes cutterhead stuck stop jumping repeatedly occur, and there are abnormal sounds, dregs to be discharged for cutterhead in driving, and thrust, soil pressure increase Greatly, situations such as can not normally promoting, needs to carry out cutterhead to replace or overhaul screw machine.
As shown in Figure 1-Figure 3, the present invention provides a kind of shield inspection-pit construction method, and the construction method includes following step It is rapid: S1) before the construction of inspection-pit 1, in the cast-in-place formation concrete collar tie beam 3 of the pithead position of inspection-pit 1 to be excavated;S2 it) is waited in earth's surface It excavates 1 surrounding of inspection-pit setting grouting sleeve valve pipe and carries out grouting and reinforcing;S3) in the 1 surrounding tunnel two sides of inspection-pit to be excavated Excavation forms multiple dewatering wells;S4 it) is taken from earth's surface and mechanically excavates the inspection-pit 12 subscript of cutter head of shield machine into tunnel High position;S5) since on cutter head of shield machine 2 elevation location, forming the inspection using hand digging to projected depth in tunnel Well workover 1;S6) after carrying out maintenance or the replacement of cutter head of shield machine 2 to shield machine, the inspection-pit 1 is backfilled using sandstone.
According to the technique and scheme of the present invention, inspection-pit 1 is set in front of shield machine driving, can be constructed by inspection-pit 1 Situations such as finding out cobble, erratic boulder distribution, plays the role of exploration hole and provides geologic basis for next step solution formulation;It simultaneously can Safety work environment is provided for cutter maintenance, replacement.
Specifically, step S1): before the construction of inspection-pit 1, in the cast-in-place formation concrete of the pithead position of inspection-pit 1 to be excavated Collar tie beam 3 (as shown in Figure 3);To ensure that during construction, well head does not collapse, guarantee the safety of construction.
A kind of embodiment according to the present invention, in the step S1) in, the cast-in-place formation concrete collar tie beam 3 include: to Within the scope of the walling crib for excavating inspection-pit 1, surface dust is removed;It constructs and buries well head casing;Circle is poured close to casing inner wall production Beam simultaneously arranges built-in fitting in described pour in collar tie beam;It pours collar tie beam to described after removing casing and pour forming the concrete collar tie beam 3.3 sound construction of concrete collar tie beam of overall time pouring molding, is hardly damaged, it can be ensured that the safety of well head construction.
A kind of embodiment according to the present invention, in the step S1) after and before step S2), further includes: to The well head neighbouring position setting guardrail and water fender of inspection-pit 1 are excavated, to prevent sundries, surface dust and water from falling into the inspection from well head In well workover 1, the safety of construction personnel and being normally carried out for construction are further ensured.
Due to 1 present position complex geologic conditions of inspection-pit, in order to avoid the security risk of construction period, according to the present invention Technical solution, step S2): carry out grouting and reinforcing in earth's surface 1 surrounding of inspection-pit to be excavated setting grouting sleeve valve pipe, pass through slip casting Firm stratum is formed, avoids settling during excavating, and the mini pile effect of mini-valve tube is combined to avoid stratum loose, control The inspection-pit 1 excavates coverage, guarantees the safety of construction period.
A kind of embodiment according to the present invention, in the step S2) in, in earth's surface 1 surrounding of inspection-pit setting to be excavated Two circle grouting sleeve valve pipes carry out grouting and reinforcing, and specifically, can select the specification of sleeve valve is Φ 76mm;The grouting sleeve valve pipe Depth is 0.6~1m of the well head of inspection-pit 1 to be excavated or less, and the depth of mini-valve tube can be selected according to geological condition;Slip casting side Formula is that rigid mini-valve tube is segmented retrusive slip casting;Injection speed is 10~110L/min;Final grouting pressure is 3~4MPa;Slip casting material Material uses based on ordinary portland cement single slurry, supplemented by ordinary cement-waterglass dual slurry, single slurry proportion: W:C=(0.8 ~1): 1, dual slurry proportion: W:C=(0.8~1): 1, C:S=1:1.
Since the inspection-pit 1 is in sandy gravel composite soil water rich strata, to ensure construction safety, skill according to the present invention Art scheme, step S3): it excavates to form multiple dewatering wells in the 1 surrounding tunnel two sides of inspection-pit to be excavated, excavates soil to reduce Water content in layer, prevents the generation of water burst accident.
A kind of embodiment according to the present invention, in the step S3) in, the excavation step of the dewatering well includes: to bore Hole forms the hoistway that depth is 45m, aperture is 600mm;Installation wall is more than or equal to 3mm in the hoistway, caliber is 280mm's Well casing;Between the well casing and the hoistway inner wall ring rockfill English circle gravel and ring fill out clay ball, to form the dewatering well.
Specifically, from shaft bottom to 10m pressure-bearing water-bearing section ring rockfill English circle gravel, to form good artificial loaded filter;In 10m Range inner ring fills out clay ball to carry out sealing of hole outside pipe, upper layer diving is insulated with lower part artesian water, to avoid diving by after drainage Discharging consolidation causes the excessive sedimentation in ground.
A kind of embodiment according to the present invention, it is preferable that the tube top of well casing 0.2m above ground level, to prevent ground Water flows into the dewatering well.
To ensure that 1 construction safety of inspection-pit and shortening are built the period, according to the technique and scheme of the present invention, step S4): from ground Table, which is taken, mechanically excavates the inspection-pit 1 elevation location on cutter head of shield machine 2 into tunnel.
A kind of embodiment according to the present invention, in the step S4) in, it is taken from earth's surface and mechanically excavates the maintenance Well 1 includes: to carry out construction lofting using total station, determines 1 coordinate position of inspection-pit;According to 1 coordinate bit of inspection-pit Set embedded well head steel pile casting;The inspection-pit 1 elevation location on cutter head of shield machine 2 into tunnel is excavated using drilling machinery;Point The embedded inspection-pit steel pile casting of section.
A kind of embodiment according to the present invention carries out construction lofting using total station, determines 1 coordinate bit of inspection-pit It postpones, a site is made on 1 coordinate position of inspection-pit using the lumps of wood stake of long 30cm, then follow closely iron nail on timber and accurately determine Position;Stake position is buried fender pile after determining and is protected to stake position, 2~3 meters from stake position of fender pile, is followed closely using right-angled intersection, lumps of wood dowel pin The method of hanging wire is determined, and uses concreting fender pile in the fender pile bottom margin, so that the fender pile stablizes jail Gu in order to avoid the fender pile is lost or is loosened.
A kind of embodiment according to the present invention, the internal diameter of the well head steel pile casting are greater than the diameter of the inspection-pit 1, institute The top surface absolute altitude for stating well head steel pile casting is higher than construction ground.Specifically, the internal diameter of the well head steel pile casting is than the inspection-pit 1 The big 20cm of diameter, casing top surface are higher by construction ground 0.5m.The cylinder s buried depth is met the following requirements: cohesive soil is not less than 1m, sandy soil are not less than 2m;Casing is embedded into harder closely knit soil layer when topsoil is soft and is no less than 0.3m, and Casing surrounding backfill clay is simultaneously tamped;Casing end face center and design pile position deviation are not more than 5cm, and gradient is not more than 1%, with Guarantee the quality of shield-tube embedment.
According to the technique and scheme of the present invention, step S5): since in tunnel on cutter head of shield machine 2 elevation location, using people Work is excavated to projected depth and forms the inspection-pit 1, ensure that the safety of construction.
A kind of embodiment according to the present invention, it is preferable that in the step S5) in, the hand digging is to designing depth Degree forms the inspection-pit 1, comprising: continue a cubic metre of earth hand digging in the bottom of the mechanical well section excavated and formed, wherein The every excavation predetermined depth of hand digging sets up grid steel frame in the borehole wall merogenesis of the inspection-pit 1 and is laid with mesh sheet, and to described Grid steel frame and laying mesh sheet carry out jetting cement, up to hand digging to projected depth;It is laid with single layer steel mesh in shaft bottom, is formed The inspection-pit 1;It is laid with single layer steel mesh in shaft bottom, for guaranteeing the firm of 1 structure of inspection-pit, guarantees the peace of construction Entirely.
A kind of embodiment according to the present invention, the predetermined depth is 500mm, to set up grid steel frame and laying in time Mesh sheet, and to the grid steel frame and it is laid with mesh sheet progress jetting cement, guarantee the safety of construction.
A kind of embodiment according to the present invention, the safety of 1 structure of inspection-pit when to ensure that cutterhead 2 abolishes the borehole wall, In the 2 elevation range above and below preset distance of cutter head of shield machine, twice concrete ring beam structure, concrete described in twice is respectively set Sleeper is set between ring beam and is attached the stabilization to ensure 1 structure of the inspection-pit entirety.
A kind of embodiment according to the present invention, it is preferable that corresponding in 2 elevation range of cutterhead of hand digging to shield machine Position sets up glass fiber-reinforced polymer structure grid in the borehole wall of the inspection-pit 1, for guaranteeing that the without hindrance broken wall arrival of shield machine refers to Fixed maintenance and tool change position.
The measure for increasing glass fiber-reinforced polymer grid rigidity should be taken in the fiberglass grid manufacturing process, to prevent Occurring biggish deformation in lifting and transportational process influences the installation of glass fiber-reinforced polymer grid.For example, in stress main reinforcement glass fibers The connection between muscle and reinforcing bar, between glass fiber-reinforced polymer and glass fiber-reinforced polymer is tieed up to connect using steel U-shaped buckle;Between remaining position Glass fiber-reinforced polymer muscle and reinforcing bar, glass fiber-reinforced polymer and glass fiber-reinforced polymer between connection can using iron wire bind, binding jail Gu.
A kind of embodiment according to the present invention excavates position periphery in the inspection-pit 1 and mud pit is arranged, and is the inspection The construction of well workover 1 provides mud, selects and prepares enough clay for preparing mud or bentonite, move up and down carry out pulping using block stamp.
When needing to carry out the shield machine maintenance or cutterhead 2 is replaced, construction first forms the inspection-pit 1, later The shield machine is tunneled to the side side wall for abolishing the inspection-pit 1, and construction personnel can be in the inspection-pit 1 to the shield Structure machine carries out maintenance or cutterhead 2 is replaced, and the inspection-pit 1 provides enough maintenance and replacement space, and construction personnel does not mention The operating environment of safety is supplied.According to the technique and scheme of the present invention, step S6): maintenance or the replacement of cutterhead 2 are being carried out to shield machine Afterwards, the inspection-pit 1 is backfilled using sandstone.
One section retaining wall of bottommost need to be removed when backfill, in order to avoid influence the subsequent tunneling construction of shield machine;30cm is used when backfill One layer, hand compaction, last 2m is using clay backfilling and tamps;It simultaneously will to establish soil pressure flat to carrying out filling out sand in shield machine soil cabin Weighing apparatus, to guarantee ground safety.
The object of the present invention is to provide a kind of shield inspection-pit construction methods, are overhauled by being arranged in front of shield machine tunnels Well 1 can be constructed by inspection-pit 1 and find out situations such as cobble, erratic boulder are distributed, and played the role of exploration hole and be next step scheme system Geologic basis is provided surely;Maintenance can be carried out to the shield machine simultaneously or cutterhead 2 is replaced, and is capable of providing safe operation ring Border;Grouting and reinforcing is carried out in earth's surface 1 surrounding of inspection-pit setting grouting sleeve valve pipe to be excavated, forms firm stratum by slip casting, It avoids settling during excavating, and the mini pile effect of mini-valve tube is combined to avoid stratum loose, control the inspection-pit 1 and excavate Coverage guarantees the safety of construction period;It is taken first from earth's surface and mechanically excavates the shield machine into tunnel of inspection-pit 1 Elevation location on cutterhead 2, then since in tunnel on cutter head of shield machine 2 elevation location, using hand digging to projected depth shape At the inspection-pit 1, it is ensured that the safety and shorten and build the period that inspection-pit 1 is constructed;To shield machine carry out maintenance or After cutterhead 2 is replaced, the inspection-pit 1 is backfilled using sandstone, to guarantee ground safety.
The optional embodiment of the embodiment of the present invention is described in detail in conjunction with attached drawing above, still, the embodiment of the present invention is simultaneously The detail being not limited in above embodiment can be to of the invention real in the range of the technology design of the embodiment of the present invention The technical solution for applying example carries out a variety of simple variants, these simple variants belong to the protection scope of the embodiment of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance In the case where shield, it can be combined in any appropriate way.In order to avoid unnecessary repetition, the embodiment of the present invention pair No further explanation will be given for various combinations of possible ways.
In addition, any combination can also be carried out between a variety of different embodiments of the embodiment of the present invention, as long as it is not The thought of the embodiment of the present invention is violated, equally should be considered as disclosure of that of the embodiment of the present invention.

Claims (10)

1. a kind of shield inspection-pit construction method, which is characterized in that the construction method the following steps are included:
S1) before inspection-pit (1) construction, in the cast-in-place formation concrete collar tie beam (3) of the pithead position of inspection-pit to be excavated (1);
S2) grouting and reinforcing is carried out in earth's surface inspection-pit to be excavated (1) surrounding setting grouting sleeve valve pipe;
S3 it) excavates to form multiple dewatering wells in inspection-pit (1) the surrounding tunnel two sides to be excavated;
S4 it) is taken from earth's surface and mechanically excavates the inspection-pit (1) elevation location on cutter head of shield machine (2) into tunnel;
S5) since elevation location on cutter head of shield machine in tunnel (2), the maintenance is formed using hand digging to projected depth Well (1);
S6) after carrying out maintenance or cutter head of shield machine (2) replacement to shield machine, the inspection-pit (1) is returned using sandstone It fills out.
2. shield inspection-pit construction method according to claim 1, which is characterized in that in the step S1) in, it is described existing It pours and to form concrete collar tie beam (3) and include:
Within the scope of the walling crib of inspection-pit to be excavated (1), surface dust is removed;
It constructs and buries well head casing;
It pours collar tie beam close to casing inner wall production and arranges built-in fitting in collar tie beam in described pour;
It pours collar tie beam to described after removing casing and pour forming the concrete collar tie beam (3).
3. shield inspection-pit construction method according to claim 1, which is characterized in that in the step S1) after and Step S2) before, further includes:
In the well head neighbouring position of inspection-pit to be excavated (1), guardrail and water fender are set.
4. shield inspection-pit construction method according to claim 1, which is characterized in that in the step S2) in, in earth's surface Two circle grouting sleeve valve pipe of inspection-pit (1) surrounding setting to be excavated carries out grouting and reinforcing, and the depth of the grouting sleeve valve pipe is wait dig Dig 0.6~1m of the well head of inspection-pit (1) or less.
5. shield inspection-pit construction method according to claim 1, which is characterized in that in the step S3) in, the drop The excavation step of well includes:
Drilling forms the hoistway that depth is 45m, aperture is 600mm;
The well casing that installation wall is more than or equal to 3mm in the hoistway, caliber is 280mm;
Between the well casing and the hoistway inner wall ring rockfill English circle gravel and ring fill out clay ball, to form the dewatering well.
6. shield inspection-pit construction method according to claim 5, which is characterized in that the tube top of the well casing is above ground level 0.2m。
7. shield inspection-pit construction method according to claim 1, which is characterized in that in the step S4) in, from earth's surface It takes and mechanically excavates the inspection-pit (1) and include:
Construction lofting is carried out using total station, determines the inspection-pit (1) coordinate position;
Well head steel pile casting is buried according to the inspection-pit (1) coordinate position;
The inspection-pit (1) elevation location on cutter head of shield machine (2) into tunnel is excavated using drilling machinery;
Segmental installation inspection-pit steel pile casting.
8. shield inspection-pit construction method according to claim 7, which is characterized in that the internal diameter of the well head steel pile casting is big The top surface absolute altitude of diameter in the inspection-pit (1), the well head steel pile casting is higher than construction ground.
9. shield inspection-pit construction method according to claim 1, which is characterized in that in the step S5) in, the people Work is excavated to projected depth and forms the inspection-pit (1), comprising:
Continue a cubic metre of earth hand digging in the bottom of the mechanical well section excavated and formed, wherein hand digging is every excavates pre- depthkeeping Degree sets up grid steel frame in the borehole wall merogenesis of the inspection-pit (1) and is laid with mesh sheet, and to the grid steel frame and is laid with mesh sheet Jetting cement is carried out, up to hand digging to projected depth;
It is laid with single layer steel mesh in shaft bottom, forms the inspection-pit (1).
10. shield inspection-pit construction method according to claim 9, which is characterized in that in hand digging to shield machine Cutterhead (2) elevation range corresponding position sets up glass fiber-reinforced polymer structure grid in the borehole wall, for guaranteeing the without hindrance broken wall of shield machine Reach specified maintenance and tool change position.
CN201910550294.8A 2019-06-24 2019-06-24 Shield inspection-pit construction method Pending CN110284885A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910550294.8A CN110284885A (en) 2019-06-24 2019-06-24 Shield inspection-pit construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910550294.8A CN110284885A (en) 2019-06-24 2019-06-24 Shield inspection-pit construction method

Publications (1)

Publication Number Publication Date
CN110284885A true CN110284885A (en) 2019-09-27

Family

ID=68005381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910550294.8A Pending CN110284885A (en) 2019-06-24 2019-06-24 Shield inspection-pit construction method

Country Status (1)

Country Link
CN (1) CN110284885A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528663A (en) * 2019-09-02 2019-12-03 广东省建筑工程机械施工有限公司 A kind of construction method for protecting municipal pipeline
CN110630273A (en) * 2019-10-17 2019-12-31 中铁二局集团有限公司 Construction method of totally weathered granite ground layer bias shallow tunnel
CN111058851A (en) * 2019-12-06 2020-04-24 中交第三航务工程局有限公司南京分公司 Safe construction method for shield cutter head repair space
CN112031797A (en) * 2020-08-03 2020-12-04 王沛喆 Shield construction maintenance device
CN113982599A (en) * 2021-10-09 2022-01-28 中铁七局集团有限公司 Shield tunneling construction method for underwater cultural relic protection area of water-bearing sand pebble bed

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061493A (en) * 2000-08-24 2002-02-28 Nkk Corp Roller bit attaching structure for shield machine
JP3838853B2 (en) * 2000-08-29 2006-10-25 株式会社奥村組 Widening excavator for tunnel excavator
CN101182772A (en) * 2007-11-20 2008-05-21 中铁二局股份有限公司 Two lines intersection small radius, shallow earth covering and large longitudinal slope complicated linetype shield construction method
CN101413234A (en) * 2008-09-27 2009-04-22 中铁一局集团有限公司 Arranging construction method of subway narrow shield well inclined hoisting rail
CN108708736A (en) * 2018-05-16 2018-10-26 北京中地盾构工程技术研究院有限公司 Shield cutter inspection-pit assembly construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061493A (en) * 2000-08-24 2002-02-28 Nkk Corp Roller bit attaching structure for shield machine
JP3838853B2 (en) * 2000-08-29 2006-10-25 株式会社奥村組 Widening excavator for tunnel excavator
CN101182772A (en) * 2007-11-20 2008-05-21 中铁二局股份有限公司 Two lines intersection small radius, shallow earth covering and large longitudinal slope complicated linetype shield construction method
CN101413234A (en) * 2008-09-27 2009-04-22 中铁一局集团有限公司 Arranging construction method of subway narrow shield well inclined hoisting rail
CN108708736A (en) * 2018-05-16 2018-10-26 北京中地盾构工程技术研究院有限公司 Shield cutter inspection-pit assembly construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中国平安财产保险股份有限公司等: "《中国地铁风险管理与保险蓝皮书》", 31 January 2018 *
李丰果等: "《深圳地铁暗挖区间隧道施工技术》", 28 February 2015 *
邹建洲: "富水砂卵石地层盾构刀具两幅检修技术", 《国防交通工程与技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528663A (en) * 2019-09-02 2019-12-03 广东省建筑工程机械施工有限公司 A kind of construction method for protecting municipal pipeline
CN110630273A (en) * 2019-10-17 2019-12-31 中铁二局集团有限公司 Construction method of totally weathered granite ground layer bias shallow tunnel
CN111058851A (en) * 2019-12-06 2020-04-24 中交第三航务工程局有限公司南京分公司 Safe construction method for shield cutter head repair space
CN112031797A (en) * 2020-08-03 2020-12-04 王沛喆 Shield construction maintenance device
CN113982599A (en) * 2021-10-09 2022-01-28 中铁七局集团有限公司 Shield tunneling construction method for underwater cultural relic protection area of water-bearing sand pebble bed

Similar Documents

Publication Publication Date Title
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN105257301B (en) A kind of shallow-depth-excavation tunnel weak surrounding rock landslide reinforcing and processing method
CN110374633B (en) Tunnel opening section construction method for tunnel to pass through loose body
CN110284885A (en) Shield inspection-pit construction method
CN104790978B (en) The tunnel ring-shaped base tunnel construction method of small interval crossings on different level
CN110685714B (en) Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology
CN109098733B (en) Rapid grouting reinforcement method for large-section tunnel in fracture zone rock stratum
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN105525619B (en) A kind of water rich strata bored tunnel occlusion pipe curtain
CN102660955B (en) Quick construction method for foundation pit slope support
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN107965325B (en) A kind of small interval shallow tunnel just branch arch replacement construction method
CN109778869A (en) Foundation ditch construction method
CN106049195A (en) Method for strengthening subgrade basement of existing high speed railway line
CN111119128B (en) Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake
CN112145203A (en) Full-face advancing type sectional grouting construction method and overlapped tunnel construction method
CN105714748A (en) Excavating construction method for surge shaft in gravel and sandy soil layer
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN110735432A (en) Method for clearing pile foundation and controlling parameters in shield tunneling machine over-invasion limit tunnel range
CN112942399A (en) Open caisson mechanical construction device and method for penetrating rock stratum
CN110847929B (en) Tunnel portal section pre-reinforcing and excavating construction method based on partition blasting
CN115539048A (en) Construction method for shallow-buried bias tunnel portal
CN110700860B (en) Construction method of soil-stone boundary tunnel crossing loess valley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190927