CN110528663A - A kind of construction method for protecting municipal pipeline - Google Patents

A kind of construction method for protecting municipal pipeline Download PDF

Info

Publication number
CN110528663A
CN110528663A CN201910823857.6A CN201910823857A CN110528663A CN 110528663 A CN110528663 A CN 110528663A CN 201910823857 A CN201910823857 A CN 201910823857A CN 110528663 A CN110528663 A CN 110528663A
Authority
CN
China
Prior art keywords
municipal pipeline
soil
pipeline
municipal
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910823857.6A
Other languages
Chinese (zh)
Inventor
黄秋筠
黄芷敏
冯亦文
廖伟东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201910823857.6A priority Critical patent/CN110528663A/en
Publication of CN110528663A publication Critical patent/CN110528663A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground

Abstract

The invention discloses a kind of construction methods for protecting municipal pipeline, comprising the following steps: step 1, determines the position of municipal pipeline;Step 2, surface layer soil thickness is controlled: when after both sides of the road are excavated to same root municipal pipeline, utilizing the soil thickness at the top of tape measure correlation municipal pipeline in step 1 step;Step 3, soil is infiltrated;Step 4, it excavates rhone: excavating gutter respectively at the 30cm-50cm of municipal pipeline two sides using mini-excavator;Step 5, soil rinses;River water is filled respectively using at least two sprinkling trucks simultaneously, and connects rinse water pipe in sprinkling truck water outlet.By being positioned to municipal pipeline in the present invention, on municipal pipeline top, watering infiltrates soil, gutter is opened up respectively in municipal pipeline two sides again, finally the soil around municipal pipeline is rinsed using giant, relative to traditional mode by mechanically or manually excavating, this method excavation efficiency is higher, will not influence work.

Description

A kind of construction method for protecting municipal pipeline
Technical field
The present invention relates to pipe construction technique field more particularly to a kind of construction methods for protecting municipal pipeline.
Background technique
Municipal Infrastructure is the important guarantee for building city material progress and cultural and ideological progress.Municipal basis is set Apply be urban development basis, be constantly ensure urban sustainable development a critical facility.It mainly by traffic, Water supply, draining, combustion gas, environmental sanitation, power supply, communicate, take precautions against natural calamities, every engineering system such as afforestation is constituted;As urban pipe network is got over It is more taken seriously, has increasing need for the talent for having systematic Urban Buried Pipeline Network knowledge, can have to city water, row The urban pipelines system such as water, combustion gas, heat supply, power supply, communication, to the composition of each pipeline system, arrangement, main units, tubing The equal ability understood in detail.
But town road is when being constructed in the prior art, first has to carry out the municipal pipeline inside boundary lines of roads Positioning exploration, for influence construction municipal pipeline also excavate, it is exposed, it is most likely that construction when by In digging machine, accidentally touching damages municipal pipeline, seriously affects construction speed.
Summary of the invention
1. technical problems to be solved
The purpose of the present invention is to solve first have to carry out positioning to the municipal pipeline inside boundary lines of roads in the prior art to survey It visits, the municipal pipeline for influencing construction also excavates, it is exposed, it is most likely that in construction due to digging machine Accidentally touching damage municipal pipeline the problem of, and propose a kind of protection municipal pipeline construction method.
2. technical solution
To achieve the goals above, present invention employs following technical solutions:
A kind of construction method for protecting municipal pipeline, comprising the following steps:
Step 1, it determines the position of municipal pipeline: being docked by being laid with department from different municipal pipelines, directly obtain phase Paving location and the direction of municipal pipeline, and the Position Approximate of municipal pipeline historically are closed, in the boundary lines of roads two of planning Side carries out hand digging to municipal pipeline respectively, when the boundary lines of roads two sides in planning pass through hand digging to same root phase After closing municipal pipeline, draws the connecting line of boundary lines of roads two sides municipal pipeline on the ground using pulverized limestone, drawn on ground The connecting line is the specific trend of related municipal pipeline;
Step 2, surface layer soil thickness is controlled: when after both sides of the road are excavated to same root municipal pipeline, utilizing volume in step 1 step Ruler measures the soil thickness at the top of related municipal pipeline, if the soil thickness at the top of the municipal pipeline of boundary lines of roads two sides is more than 50cm, and when walking upwards without at significant depressions, select road-mixed machine along municipal pipeline in municipal pipeline inside boundary lines of roads Move towards carry out pavement breaking, due to road-mixed machine grinding depth in 30cm hereinafter, therefore municipal administration will not be damaged using road-mixed machine Pipeline selects bull-dozer to clear up the soil block that surface layer is crushed after road-mixed machine road pavement be crushed, after the completion of cleaning again It is secondary to draw connecting line along municipal pipeline trend on the ground using pulverized limestone;If the soil at the top of the municipal pipeline of boundary lines of roads two sides When thickness degree has side lower than 50cm, then crushing and clearing is not carried out to ground;
Step 3, infiltrate soil: soil thickness is lower than 50cm or the municipal pipeline top after crushing and clearing at the top of municipal pipeline When portion's soil thickness is lower than 50cm, watered using sprinkling truck along municipal pipeline, so that the soil around municipal pipeline Layer is fully wet out;
Step 4, it excavates rhone: excavating gutter respectively at the 30cm-50cm of municipal pipeline two sides using mini-excavator, institute Stating gutter excavation width is 50cm-80cm, and the gutter cutting depth is greater than the municipal pipeline depth of burying, and in the row The catch basin of 50cm × 50cm is excavated out in ditch close to rainwater drainage pipe one end, and the catch basin elevation of bottom is than gutter bottom The low 50cm of absolute altitude;
Step 5, soil rinses;River water is filled respectively using at least two sprinkling trucks simultaneously, and connects punching in sprinkling truck water outlet Scouring water pipe, so that can uninterruptedly carry out to washing away for soil, has using the water alternate scour municipal pipeline inside sprinkling truck Conducive to working efficiency is improved, since municipal pipeline top soil thickness is smaller, and the soil around municipal pipeline is after infiltration More loose, under the washing away on sprinkling truck, the soil around municipal pipeline can be detached from from pipeline easily, in order to not The soil around municipal pipeline is cleared up in the case where injuring municipal pipeline.
Preferably, sharp first after excavating municipal pipeline in the boundary lines of roads two sides of planning in the step 1 Connect the same root municipal pipeline excavated of two sides with construction with tape measure, and tape measure be straightened, then using pulverized limestone along Tape measure draws lines.
Preferably, in the step 1, the walking upwards there are recess in municipal pipeline inside the boundary lines of roads of planning, The innermost absolute altitude of recess then is detected using level, and by calculating to obtain distance at surface indentation apart from municipal pipeline, It is less than 50cm apart from the height of municipal pipeline at surface indentation, then road-mixed machine road pavement can not be used to be crushed, work as table Height of the face recess apart from municipal pipeline is greater than 50cm, then road-mixed machine road pavement can be used and be crushed.
Preferably, when soil layer carries out pouring water infiltration at the top of to municipal pipeline in the step 3, divide 3 times -5 times and poured Water, and watering is required to concentrate the connecting line at the top of road piping to be poured every time.
Preferably, in the step 4, the catch basin draws water to gutter inside for placing immersible pump, due to The catch basin of 50cm × 50cm can just place immersible pump, and after rinse water flows to the catch basin, internal soil Earth is deposited to gutter bottom completely.
Preferably, in the step 4, when the distance between municipal pipeline and sewage pipe inspection-pit are significantly less than municipal pipeline The distance between rain pipe water inlet then selects to excavate catch basin close to sewage pipe inspection-pit side.
Preferably, in the step 4, the setting of gutter inclined bottom surface, the gutter bottom surface is carried out according to the gradient 10 ‰ Setting, and the catch basin is in lowest part.
Preferably, in the step 5, the sprinkling truck water outlet is equipped with high-pressure hydraulic pump, and the rinse water pipe It is mounted on high-pressure hydraulic pump water outlet, the hydraulic pressure that the rinse water pipe sprays is between -3 megapascal of 1 megapascal.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
(1) in the present invention, by positioning to municipal pipeline, on municipal pipeline top, watering infiltrates soil, then Municipal pipeline two sides open up gutter respectively, are finally rinsed using giant to the soil around municipal pipeline, relatively In traditional mode by mechanically or manually excavating, this method will not injure municipal pipeline, can fill to municipal pipeline Code insurance shield, and this method excavation efficiency is higher, will not influence the duration.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of construction method for protecting municipal pipeline proposed by the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Embodiment 1:
Referring to Fig.1, a kind of construction method for protecting municipal pipeline, comprising the following steps:
Step 1, it determines the position of municipal pipeline: being docked by being laid with department from different municipal pipelines, directly obtain phase Paving location and the direction of municipal pipeline, and the Position Approximate of municipal pipeline historically are closed, in the boundary lines of roads two of planning Side carries out hand digging to municipal pipeline respectively, when the boundary lines of roads two sides in planning pass through hand digging to same root phase After closing municipal pipeline, draws the connecting line of boundary lines of roads two sides municipal pipeline on the ground using pulverized limestone, drawn on ground Connecting line is the specific trend of related municipal pipeline;
Step 2, surface layer soil thickness is controlled: when after both sides of the road are excavated to same root municipal pipeline, utilizing volume in step 1 step Ruler measures the soil thickness at the top of related municipal pipeline, if the soil thickness at the top of the municipal pipeline of boundary lines of roads two sides is more than 50cm, and when walking upwards without at significant depressions, select road-mixed machine along municipal pipeline in municipal pipeline inside boundary lines of roads Move towards carry out pavement breaking, due to road-mixed machine grinding depth in 30cm hereinafter, therefore municipal administration will not be damaged using road-mixed machine Pipeline selects bull-dozer to clear up the soil block that surface layer is crushed after road-mixed machine road pavement be crushed, after the completion of cleaning again It is secondary to draw connecting line along municipal pipeline trend on the ground using pulverized limestone;If the soil at the top of the municipal pipeline of boundary lines of roads two sides When thickness degree has side lower than 50cm, then crushing and clearing is not carried out to ground;
Step 3, infiltrate soil: soil thickness is lower than 50cm or the municipal pipeline top after crushing and clearing at the top of municipal pipeline When portion's soil thickness is lower than 50cm, watered using sprinkling truck along municipal pipeline, so that the soil around municipal pipeline Layer is fully wet out;
Step 4, it excavates rhone: excavating gutter respectively at the 30cm-50cm of municipal pipeline two sides using mini-excavator, arrange Ditch excavation width is 50cm-80cm, and gutter cutting depth is greater than the municipal pipeline depth of burying, and in gutter close to rainwater The catch basin of 50cm × 50cm is excavated out in drainpipe one end, and catch basin elevation of bottom is 50cm lower than gutter elevation of bottom;
Step 5, soil rinses;River water is filled respectively using at least two sprinkling trucks simultaneously, and connects punching in sprinkling truck water outlet Scouring water pipe, so that can uninterruptedly carry out to washing away for soil, has using the water alternate scour municipal pipeline inside sprinkling truck Conducive to working efficiency is improved, since municipal pipeline top soil thickness is smaller, and the soil around municipal pipeline is after infiltration More loose, under the washing away on sprinkling truck, the soil around municipal pipeline can be detached from from pipeline easily, in order to not The soil around municipal pipeline is cleared up in the case where injuring municipal pipeline.
In the present invention, in step 1, after excavating municipal pipeline in the boundary lines of roads two sides of planning, first with Construction connects the same root municipal pipeline that two sides are excavated with tape measure, and tape measure is straightened, then using pulverized limestone along skin Ruler draws lines, in step 1, inside the boundary lines of roads of planning municipal pipeline walk upwards there are recess, then utilize water Quasi- instrument detects the innermost absolute altitude of recess, and by calculating to obtain distance at surface indentation apart from municipal pipeline, when surface is recessed It falls into height of the place apart from municipal pipeline and is less than 50cm, then road-mixed machine road pavement can not be used to be crushed, at surface indentation Height apart from municipal pipeline is greater than 50cm, then road-mixed machine road pavement can be used and be crushed.
Embodiment 2:
Referring to Fig.1, a kind of construction method for protecting municipal pipeline, comprising the following steps:
Step 1, it determines the position of municipal pipeline: being docked by being laid with department from different municipal pipelines, directly obtain phase Paving location and the direction of municipal pipeline, and the Position Approximate of municipal pipeline historically are closed, in the boundary lines of roads two of planning Side carries out hand digging to municipal pipeline respectively, when the boundary lines of roads two sides in planning pass through hand digging to same root phase After closing municipal pipeline, draws the connecting line of boundary lines of roads two sides municipal pipeline on the ground using pulverized limestone, drawn on ground Connecting line is the specific trend of related municipal pipeline;
Step 2, surface layer soil thickness is controlled: when after both sides of the road are excavated to same root municipal pipeline, utilizing volume in step 1 step Ruler measures the soil thickness at the top of related municipal pipeline, if the soil thickness at the top of the municipal pipeline of boundary lines of roads two sides is more than 50cm, and when walking upwards without at significant depressions, select road-mixed machine along municipal pipeline in municipal pipeline inside boundary lines of roads Move towards carry out pavement breaking, due to road-mixed machine grinding depth in 30cm hereinafter, therefore municipal administration will not be damaged using road-mixed machine Pipeline selects bull-dozer to clear up the soil block that surface layer is crushed after road-mixed machine road pavement be crushed, after the completion of cleaning again It is secondary to draw connecting line along municipal pipeline trend on the ground using pulverized limestone;If the soil at the top of the municipal pipeline of boundary lines of roads two sides When thickness degree has side lower than 50cm, then crushing and clearing is not carried out to ground;
Step 3, infiltrate soil: soil thickness is lower than 50cm or the municipal pipeline top after crushing and clearing at the top of municipal pipeline When portion's soil thickness is lower than 50cm, watered using sprinkling truck along municipal pipeline, so that the soil around municipal pipeline Layer is fully wet out;
Step 4, it excavates rhone: excavating gutter respectively at the 30cm-50cm of municipal pipeline two sides using mini-excavator, arrange Ditch excavation width is 50cm-80cm, and gutter cutting depth is greater than the municipal pipeline depth of burying, and in gutter close to rainwater The catch basin of 50cm × 50cm is excavated out in drainpipe one end, and catch basin elevation of bottom is 50cm lower than gutter elevation of bottom;
Step 5, soil rinses;River water is filled respectively using at least two sprinkling trucks simultaneously, and connects punching in sprinkling truck water outlet Scouring water pipe, so that can uninterruptedly carry out to washing away for soil, has using the water alternate scour municipal pipeline inside sprinkling truck Conducive to working efficiency is improved, since municipal pipeline top soil thickness is smaller, and the soil around municipal pipeline is after infiltration More loose, under the washing away on sprinkling truck, the soil around municipal pipeline can be detached from from pipeline easily, in order to not The soil around municipal pipeline is cleared up in the case where injuring municipal pipeline.
In the present invention, in step 1, after excavating municipal pipeline in the boundary lines of roads two sides of planning, first with Construction connects the same root municipal pipeline that two sides are excavated with tape measure, and tape measure is straightened, then using pulverized limestone along skin Ruler draws lines, in step 1, inside the boundary lines of roads of planning municipal pipeline walk upwards there are recess, then utilize water Quasi- instrument detects the innermost absolute altitude of recess, and by calculating to obtain distance at surface indentation apart from municipal pipeline, when surface is recessed It falls into height of the place apart from municipal pipeline and is less than 50cm, then road-mixed machine road pavement can not be used to be crushed, at surface indentation Height apart from municipal pipeline is greater than 50cm, then road-mixed machine road pavement can be used and be crushed.
In the present invention, when soil layer carries out pouring water infiltration at the top of to municipal pipeline in step 3, divides 3 times -5 times and waters, And watering is required to concentrate the connecting line at the top of road piping to be poured every time, in step 4, catch basin is for placing immersible pump It draws water to gutter inside, since the catch basin of 50cm × 50cm can just place immersible pump, and works as rinse water stream To after catch basin, internal soil is deposited to gutter bottom completely, in step 4, when municipal pipeline and sewage pipe are examined The distance between well workover is significantly less than the distance between municipal pipeline and rain pipe water inlet, then selects close to sewage pipe inspection-pit Excavate catch basin in side.
Embodiment 3:
Referring to Fig.1, a kind of construction method for protecting municipal pipeline, comprising the following steps:
Step 1, it determines the position of municipal pipeline: being docked by being laid with department from different municipal pipelines, directly obtain phase Paving location and the direction of municipal pipeline, and the Position Approximate of municipal pipeline historically are closed, in the boundary lines of roads two of planning Side carries out hand digging to municipal pipeline respectively, when the boundary lines of roads two sides in planning pass through hand digging to same root phase After closing municipal pipeline, draws the connecting line of boundary lines of roads two sides municipal pipeline on the ground using pulverized limestone, drawn on ground Connecting line is the specific trend of related municipal pipeline;
Step 2, surface layer soil thickness is controlled: when after both sides of the road are excavated to same root municipal pipeline, utilizing volume in step 1 step Ruler measures the soil thickness at the top of related municipal pipeline, if the soil thickness at the top of the municipal pipeline of boundary lines of roads two sides is more than 50cm, and when walking upwards without at significant depressions, select road-mixed machine along municipal pipeline in municipal pipeline inside boundary lines of roads Move towards carry out pavement breaking, due to road-mixed machine grinding depth in 30cm hereinafter, therefore municipal administration will not be damaged using road-mixed machine Pipeline selects bull-dozer to clear up the soil block that surface layer is crushed after road-mixed machine road pavement be crushed, after the completion of cleaning again It is secondary to draw connecting line along municipal pipeline trend on the ground using pulverized limestone;If the soil at the top of the municipal pipeline of boundary lines of roads two sides When thickness degree has side lower than 50cm, then crushing and clearing is not carried out to ground;
Step 3, infiltrate soil: soil thickness is lower than 50cm or the municipal pipeline top after crushing and clearing at the top of municipal pipeline When portion's soil thickness is lower than 50cm, watered using sprinkling truck along municipal pipeline, so that the soil around municipal pipeline Layer is fully wet out;
Step 4, it excavates rhone: excavating gutter respectively at the 30cm-50cm of municipal pipeline two sides using mini-excavator, arrange Ditch excavation width is 50cm-80cm, and gutter cutting depth is greater than the municipal pipeline depth of burying, and in gutter close to rainwater The catch basin of 50cm × 50cm is excavated out in drainpipe one end, and catch basin elevation of bottom is 50cm lower than gutter elevation of bottom;
Step 5, soil rinses;River water is filled respectively using at least two sprinkling trucks simultaneously, and connects punching in sprinkling truck water outlet Scouring water pipe, so that can uninterruptedly carry out to washing away for soil, has using the water alternate scour municipal pipeline inside sprinkling truck Conducive to working efficiency is improved, since municipal pipeline top soil thickness is smaller, and the soil around municipal pipeline is after infiltration More loose, under the washing away on sprinkling truck, the soil around municipal pipeline can be detached from from pipeline easily, in order to not The soil around municipal pipeline is cleared up in the case where injuring municipal pipeline.
In the present invention, in step 1, after excavating municipal pipeline in the boundary lines of roads two sides of planning, first with Construction connects the same root municipal pipeline that two sides are excavated with tape measure, and tape measure is straightened, then using pulverized limestone along skin Ruler draws lines, in step 1, inside the boundary lines of roads of planning municipal pipeline walk upwards there are recess, then utilize water Quasi- instrument detects the innermost absolute altitude of recess, and by calculating to obtain distance at surface indentation apart from municipal pipeline, when surface is recessed It falls into height of the place apart from municipal pipeline and is less than 50cm, then road-mixed machine road pavement can not be used to be crushed, at surface indentation Height apart from municipal pipeline is greater than 50cm, then road-mixed machine road pavement can be used and be crushed.
In the present invention, when soil layer carries out pouring water infiltration at the top of to municipal pipeline in step 3, divides 3 times -5 times and waters, And watering is required to concentrate the connecting line at the top of road piping to be poured every time, in step 4, catch basin is for placing immersible pump It draws water to gutter inside, since the catch basin of 50cm × 50cm can just place immersible pump, and works as rinse water stream To after catch basin, internal soil is deposited to gutter bottom completely, in step 4, when municipal pipeline and sewage pipe are examined The distance between well workover is significantly less than the distance between municipal pipeline and rain pipe water inlet, then selects close to sewage pipe inspection-pit Catch basin is excavated in side, and in step 4, gutter inclined bottom surface setting, gutter bottom surface is configured according to the gradient 10 ‰, and is collected Sink is in lowest part, and in step 5, sprinkling truck water outlet is equipped with high-pressure hydraulic pump, and rinse water pipe is mounted on high pressure water Water end (W.E.) is pumped out, the hydraulic pressure that rinse water pipe sprays is between -3 megapascal of 1 megapascal.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (8)

1. a kind of construction method for protecting municipal pipeline, which comprises the following steps:
Step 1, it determines the position of municipal pipeline: being docked by being laid with department from different municipal pipelines, directly obtain phase Paving location and the direction of municipal pipeline, and the Position Approximate of municipal pipeline historically are closed, in the boundary lines of roads two of planning Side carries out hand digging to municipal pipeline respectively, when the boundary lines of roads two sides in planning pass through hand digging to same root phase After closing municipal pipeline, draws the connecting line of boundary lines of roads two sides municipal pipeline on the ground using pulverized limestone, drawn on ground The connecting line is the specific trend of related municipal pipeline;
Step 2, surface layer soil thickness is controlled: when after both sides of the road are excavated to same root municipal pipeline, utilizing volume in step 1 step Ruler measures the soil thickness at the top of related municipal pipeline, if the soil thickness at the top of the municipal pipeline of boundary lines of roads two sides is more than 50cm, and when walking upwards without at significant depressions, select road-mixed machine along municipal pipeline in municipal pipeline inside boundary lines of roads Move towards carry out pavement breaking, due to road-mixed machine grinding depth in 30cm hereinafter, therefore municipal administration will not be damaged using road-mixed machine Pipeline selects bull-dozer to clear up the soil block that surface layer is crushed after road-mixed machine road pavement be crushed, after the completion of cleaning again It is secondary to draw connecting line along municipal pipeline trend on the ground using pulverized limestone;If the soil at the top of the municipal pipeline of boundary lines of roads two sides When thickness degree has side lower than 50cm, then crushing and clearing is not carried out to ground;
Step 3, infiltrate soil: soil thickness is lower than 50cm or the municipal pipeline top after crushing and clearing at the top of municipal pipeline When portion's soil thickness is lower than 50cm, watered using sprinkling truck along municipal pipeline, so that the soil around municipal pipeline Layer is fully wet out;
Step 4, it excavates rhone: excavating gutter respectively at the 30cm-50cm of municipal pipeline two sides using mini-excavator, institute Stating gutter excavation width is 50cm-80cm, and the gutter cutting depth is greater than the municipal pipeline depth of burying, and in the row The catch basin of 50cm × 50cm is excavated out in ditch close to rainwater drainage pipe one end, and the catch basin elevation of bottom is than gutter bottom The low 50cm of absolute altitude;
Step 5, soil rinses;River water is filled respectively using at least two sprinkling trucks simultaneously, and connects punching in sprinkling truck water outlet Scouring water pipe, so that can uninterruptedly carry out to washing away for soil, has using the water alternate scour municipal pipeline inside sprinkling truck Conducive to working efficiency is improved, since municipal pipeline top soil thickness is smaller, and the soil around municipal pipeline is after infiltration More loose, under the washing away on sprinkling truck, the soil around municipal pipeline can be detached from from pipeline easily, in order to not The soil around municipal pipeline is cleared up in the case where injuring municipal pipeline.
2. a kind of construction method for protecting municipal pipeline according to claim 1, which is characterized in that in the step 1, when After municipal pipeline is excavated in the boundary lines of roads two sides of planning, connect what two sides were excavated with tape measure first with construction Same root municipal pipeline, and tape measure is straightened, then drawn lines using pulverized limestone along tape measure.
3. a kind of construction method for protecting municipal pipeline according to claim 1, which is characterized in that in the step 1, when Inside the boundary lines of roads of planning municipal pipeline walk upwards there are recess, then using level detection recess it is innermost Absolute altitude, and by calculating to obtain distance at surface indentation apart from municipal pipeline, apart from the height of municipal pipeline at surface indentation Less than 50cm, then road-mixed machine road pavement can not be used to be crushed, the height at surface indentation apart from municipal pipeline is greater than 50cm then can be used road-mixed machine road pavement and is crushed.
4. it is according to claim 1 it is a kind of protect municipal pipeline construction method, which is characterized in that in the step 3 When carrying out pouring water infiltration to soil layer at the top of municipal pipeline, divide 3 times -5 times and water, and watering is required to concentrate to road every time Connecting line at the top of pipeline is poured.
5. a kind of construction method for protecting municipal pipeline according to claim 1, which is characterized in that in the step 4, institute It states catch basin to draw water to gutter inside for placing immersible pump, since the catch basin of 50cm × 50cm can just be placed Immersible pump, and after rinse water flows to the catch basin, internal soil is deposited to gutter bottom completely.
6. a kind of construction method for protecting municipal pipeline according to claim 1, which is characterized in that in the step 4, when The distance between municipal pipeline and sewage pipe inspection-pit are significantly less than the distance between municipal pipeline and rain pipe water inlet, then select It selects and excavates catch basin close to sewage pipe inspection-pit side.
7. a kind of construction method for protecting municipal pipeline according to claim 1, which is characterized in that in the step 4, row The setting of ditch inclined bottom surface, the gutter bottom surface is configured according to the gradient 10 ‰, and the catch basin is in lowest part.
8. a kind of construction method for protecting municipal pipeline according to claim 1, which is characterized in that in the step 5, institute It states sprinkling truck water outlet and high-pressure hydraulic pump is installed, and the rinse water pipe is mounted on high-pressure hydraulic pump water outlet, the flushing The hydraulic pressure sprayed with water pipe is between -3 megapascal of 1 megapascal.
CN201910823857.6A 2019-09-02 2019-09-02 A kind of construction method for protecting municipal pipeline Withdrawn CN110528663A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910823857.6A CN110528663A (en) 2019-09-02 2019-09-02 A kind of construction method for protecting municipal pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910823857.6A CN110528663A (en) 2019-09-02 2019-09-02 A kind of construction method for protecting municipal pipeline

Publications (1)

Publication Number Publication Date
CN110528663A true CN110528663A (en) 2019-12-03

Family

ID=68666208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910823857.6A Withdrawn CN110528663A (en) 2019-09-02 2019-09-02 A kind of construction method for protecting municipal pipeline

Country Status (1)

Country Link
CN (1) CN110528663A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177006A (en) * 2020-09-27 2021-01-05 类维波 Construction method for protecting municipal pipeline

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587557A (en) * 2017-09-27 2018-01-16 广东景源建设工程有限公司 Outdoor water engineering construction method
CN109082965A (en) * 2018-08-16 2018-12-25 正坚建设有限公司 A kind of environment-friendly type town road and its construction method
CN109183802A (en) * 2018-10-10 2019-01-11 中建八局第三建设有限公司 A kind of construction method for protecting municipal pipeline
CN110284885A (en) * 2019-06-24 2019-09-27 中铁十二局集团有限公司 Shield inspection-pit construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587557A (en) * 2017-09-27 2018-01-16 广东景源建设工程有限公司 Outdoor water engineering construction method
CN109082965A (en) * 2018-08-16 2018-12-25 正坚建设有限公司 A kind of environment-friendly type town road and its construction method
CN109183802A (en) * 2018-10-10 2019-01-11 中建八局第三建设有限公司 A kind of construction method for protecting municipal pipeline
CN110284885A (en) * 2019-06-24 2019-09-27 中铁十二局集团有限公司 Shield inspection-pit construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177006A (en) * 2020-09-27 2021-01-05 类维波 Construction method for protecting municipal pipeline
CN112177006B (en) * 2020-09-27 2021-08-27 类维波 Construction method for protecting municipal pipeline

Similar Documents

Publication Publication Date Title
CN106759781A (en) A kind of intelligent city rainwater regulating pondage system and its construction method
CN103615010A (en) Construction method of digging and conveying earth of deep foundation pit through current scour
CN106087953B (en) A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow
CN108316354A (en) With waterproof, the underground pipe gallery structure of drain function and its construction method
CN105821889A (en) Loess platform landslip comprehensive treatment method based on underground water level control
CN107700511A (en) Open caisson and its construction method under the conditions of a kind of phreatic high
CN109183802A (en) A kind of construction method for protecting municipal pipeline
CN208088344U (en) With waterproof, the underground pipe gallery structure of drain function
CN102605791A (en) Method for excavating soil from soft soil foundation
CN110528663A (en) A kind of construction method for protecting municipal pipeline
CN109577337A (en) The construction method of deep foundation ditch of flowing line
CN205876390U (en) A dirt absorbing device for no -dig tunnel machine
CN205502034U (en) Slope protective structure of step gobi desert cobble plants in arch skeleton
CN105971666A (en) Sewage suction device for channel tunneling machine
CN104234027A (en) Embedded blow-filled vibroflotation soft foundation processing method
Keppie et al. Some rescue excavation on the line of the Antonine Wall, 1973-6
CN104404932B (en) A kind of hidden pipe dredging method based on heavily salted farmland drip irrigation system
CN102733403B (en) Method for preventing permafrost layer from feeding water to inflow in excavation pit by using waterproof film
CN108533270A (en) A kind of method that underground deep layer flexible pipe line is removed in rich water soft soil layer
CN215165816U (en) Compact rainwater goes into comprehensive trench system of ditch suitable for pier store yard
RU2299328C2 (en) Method for extracting gravel deposits under reaches of rivers, located in permafrost zones
KR100961512B1 (en) The composition method for site
Sharvit et al. ‘En Zippori
KR20090010296U (en) Bungae Sooro
Lehner Capital zone walk-about 2006: spot heights on the third millennium landscape

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20191203