CN103775102B - Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method - Google Patents
Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method Download PDFInfo
- Publication number
- CN103775102B CN103775102B CN201410047139.1A CN201410047139A CN103775102B CN 103775102 B CN103775102 B CN 103775102B CN 201410047139 A CN201410047139 A CN 201410047139A CN 103775102 B CN103775102 B CN 103775102B
- Authority
- CN
- China
- Prior art keywords
- concrete
- chamber
- collapsing
- hole
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410047139.1A CN103775102B (en) | 2014-02-11 | 2014-02-11 | Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410047139.1A CN103775102B (en) | 2014-02-11 | 2014-02-11 | Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103775102A CN103775102A (en) | 2014-05-07 |
CN103775102B true CN103775102B (en) | 2016-06-08 |
Family
ID=50567796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410047139.1A Active CN103775102B (en) | 2014-02-11 | 2014-02-11 | Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103775102B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107701194A (en) * | 2017-09-14 | 2018-02-16 | 中铁十九局集团第二工程有限公司 | A kind of construction method repaired to tunnel after landslide |
CN108843344B (en) * | 2018-06-05 | 2019-11-26 | 中铁二局集团有限公司 | One kind is collapsed the closely knit dam filling construction of chamber |
CN110067573A (en) * | 2019-04-26 | 2019-07-30 | 西和县中宝矿业有限公司 | A kind of quick improvement and the construction method for passing through the crushed zone that caved in |
CN113482657A (en) * | 2021-06-21 | 2021-10-08 | 中铁十六局集团第三工程有限公司 | Tunnel fault closed-door collapse processing and reinforcing method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07158389A (en) * | 1993-12-06 | 1995-06-20 | Kajima Corp | Working face independence method in collapse bedrock tunnel |
JPH08218780A (en) * | 1995-02-08 | 1996-08-27 | Tokyo Gas Co Ltd | Construction of back-filling material injection port in shield machine |
CN102174894A (en) * | 2011-03-15 | 2011-09-07 | 中铁十二局集团第一工程有限公司 | Follow-up pipe shed construction method |
CN102182472A (en) * | 2011-04-02 | 2011-09-14 | 中国建筑第五工程局有限公司 | Backfill repairing method for tunnel collapse cavity |
CN103089275A (en) * | 2013-01-16 | 2013-05-08 | 山东大学 | Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections |
CN103174438A (en) * | 2013-03-25 | 2013-06-26 | 中交路桥建设有限公司 | Tunnel vault cavity pumping backfill construction method |
-
2014
- 2014-02-11 CN CN201410047139.1A patent/CN103775102B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07158389A (en) * | 1993-12-06 | 1995-06-20 | Kajima Corp | Working face independence method in collapse bedrock tunnel |
JPH08218780A (en) * | 1995-02-08 | 1996-08-27 | Tokyo Gas Co Ltd | Construction of back-filling material injection port in shield machine |
CN102174894A (en) * | 2011-03-15 | 2011-09-07 | 中铁十二局集团第一工程有限公司 | Follow-up pipe shed construction method |
CN102182472A (en) * | 2011-04-02 | 2011-09-14 | 中国建筑第五工程局有限公司 | Backfill repairing method for tunnel collapse cavity |
CN103089275A (en) * | 2013-01-16 | 2013-05-08 | 山东大学 | Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections |
CN103174438A (en) * | 2013-03-25 | 2013-06-26 | 中交路桥建设有限公司 | Tunnel vault cavity pumping backfill construction method |
Non-Patent Citations (1)
Title |
---|
铁岭某地下工程大塌方处理技术;刘则启;《探矿工程(岩土钻掘工程)》;20060930(第9期);62-63 * |
Also Published As
Publication number | Publication date |
---|---|
CN103775102A (en) | 2014-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103089275B (en) | Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections | |
CN103993892B (en) | A kind of supporting method for weak broken uneven strata constructing tunnel | |
CN103334770B (en) | One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method | |
CN103510957B (en) | A kind of combined type coal uncovering method | |
CN104389618B (en) | A kind of multiple-arch tunnel barrel is without room steel tube shed construction method for supporting | |
CN105041333A (en) | Method for treating tunnel collapse through dugand covered method | |
CN103775102B (en) | Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method | |
CN103835648A (en) | Raise-boring technology for improving rock stratum performance through ground grouting | |
CN107605498A (en) | Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method | |
CN109404005A (en) | Bored tunnel duck eye is into big hole pre-add solid system and construction method | |
CN104533425B (en) | Vertical shaft overall pouring section walling crib and vertical shaft overall pouring section walling crib construction method | |
CN103089276A (en) | Deep-shallow hole and high-low pressure coupling grouting technology | |
CN107905817A (en) | The ground handling well Shed-pipe Advanced Support pre-add solid system of existing thing is worn under shield section | |
CN107905796A (en) | A kind of tunnels in soil Guan Peng operating rooms construction method | |
CN110905536A (en) | Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel | |
CN109209443A (en) | A kind of construction method of breaking surrounding rock tunnel structure | |
CN104863183B (en) | Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction | |
CN109209287A (en) | Sectional curtain grouting construction method for fault working face with overlarge inclination angle of vertical shaft | |
CN207609428U (en) | The ground handling well Shed-pipe Advanced Support pre-add solid system of existing object is worn under shield section | |
CN105909262B (en) | A kind of bored tunnel driving method | |
CN101748742B (en) | Dual-plugging construction method of concrete and flange for depressurization well | |
CN207406345U (en) | Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction | |
CN102635359B (en) | Energy-saving rapid construction method for ventilating shafts of tunnels | |
CN114562289A (en) | Rapid treatment method for large-scale cavity collapse of soft broken surrounding rock tunnel vault | |
CN108661652B (en) | Reinforcing device and method for shield starting and receiving ends in mine tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Jiang Lingyu Inventor after: Yuan Xingchao Inventor after: He Pengcheng Inventor after: Wu Gaojian Inventor after: Guo Wenjie Inventor after: Zhang Weilin Inventor after: Yang Wanhua Inventor after: Zhang Li Inventor after: Sun Linzhi Inventor after: Liang Tao Inventor before: Jiang Lingyu Inventor before: Zhang Weilin Inventor before: Yang Wanhua |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160413 Address after: 610065 Jinjiang District City, Chengdu Province, the Fourth Ring Road, east section of No. 8, No. Applicant after: Sinohydro Bureau 5 Co., Ltd. Address before: 610066, hydropower Bureau, No. five, building, 8 East Fourth Ring Road, ring road, Sichuan, Chengdu Applicant before: Jiang Lingyu |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |