CN101492960A - 步进式交替支撑平台装置 - Google Patents
步进式交替支撑平台装置 Download PDFInfo
- Publication number
- CN101492960A CN101492960A CNA2009100257132A CN200910025713A CN101492960A CN 101492960 A CN101492960 A CN 101492960A CN A2009100257132 A CNA2009100257132 A CN A2009100257132A CN 200910025713 A CN200910025713 A CN 200910025713A CN 101492960 A CN101492960 A CN 101492960A
- Authority
- CN
- China
- Prior art keywords
- platform
- frame
- inner sleeve
- wall
- hollow section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009416 shuttering Methods 0.000 claims description 8
- 238000009432 framing Methods 0.000 claims description 3
- 238000009435 building construction Methods 0.000 abstract 1
- 238000009415 formwork Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000035807 sensation Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
步进式交替支撑平台装置,涉及到载荷提升领域和建筑施工中使用的载荷提升装置平台。在平台的下端分别固定连接至少四根立向空心管,各空心管的下端分别连接在同一组框架上,该框架的四角分别设置可与墙体连接的支撑件;在各空心管内分别套置内套管,各内套管的下端分别与同一组下框架连接,所述下框架的四角分别设置可与墙体连接的支撑件。将下框架四角分别支撑在墙体上,在下框架与框架之间设置顶升部件,使空心管在内套管外向上举升,加大下框架与框架之间的间距,即实现了将框架连同空心管和平台向上举升的目的,可实现又快又省,而且可靠。
Description
技术领域
本发明涉及到载荷提升领域和建筑施工中使用的载荷提升装置平台。
背景技术
在建筑领域的立面墙进行混凝土浇注时,需要预先立模,即将模板预先固定在钢筋笼外周,固定后进行浇注,待水泥凝固后拆模,再进行下一位置立模,拆模和立模需要花费大量时间,立模时还需要大量的支承件对模板由底部至工作位置进行支撑固定。在载荷需要提升领域或建筑施工中需要将载荷提升到需要提升到的位置时,需要有足够支撑载荷的作业平台,而这种作业平台还要从一个操作位置提升或移动到另一个操作位置。因此,按现有的施工技术耗材多,施工进度慢。
发明内容
本发明的目的是提供无须频繁拆模、立模即可实现快速施工的步进式交替支撑平台装置。
本发明包括平台,所述平台的下端分别固定连接至少四根立向空心管,各空心管的下端分别连接在同一组框架上,该框架的四角分别设置可与墙体连接的支撑件;在各空心管内分别套置内套管,各内套管的下端分别与同一组下框架连接,所述下框架的四角分别设置可与墙体连接的支撑件。
使用时,将下框架四角分别支撑在墙体上,使下框架与框架之间留有适当间距,在下框架与框架之间设置顶升部件,使空心管在内套管外向上举升,加大下框架与框架之间的间距,即实现了将框架连同空心管和平台向上举升的目的。之后,通过框架四周与墙体形成固定支撑,再将下框架抬高并支撑在墙体上。本发明可沿着筑好的立面墙向上交替地抬高框架和下框架,使用于操作用的工作平台逐渐向上,而无需在地面搭建与建成的建筑物相应高度的支撑台。可实现又快又省,而且可靠使用载荷平台的目的。
为了更快地建筑立面墙体,本发明还在所述空心管外侧的平台下端悬挂有可在平台下端移动的成对的立模板。
当平台被举升至一定高度时,将一对立模板移动至与已浇注好混凝土并形成墙体的立面墙的上方,使两个立模板的下端分别紧贴在新制成的立面墙的两个外侧,然后向两个立模板之间浇注混凝土,待混凝土成型后,分别向两侧移开两个立模板,两个立模板可与平台同步向上举升。依此向上成段地快速建筑立面墙。
附图说明
图1为本发明的一种结构示意图。
具体实施方式
如图1所示,平台1的下端分别固定连接四根(也可六根或八根)立向空心管2,各空心管2的下端分别连接在同一组框架3上,框架3的四角分别设置可与立面墙体5连接的支撑件6,也可在立面墙体5的相应位置连接可拆装的支撑块。
在各空心管2内分别套置内套管7,各内套管7的下端分别与同一组下框架8连接,下框架8的四角分别设置可与立面墙体5连接的支撑件9,也可在立面墙体5的相应位置连接可拆装的支撑块或预留有可穿置下框架8的四角的孔。
于平台1下端、在空心管2外侧分别通过滚轮10悬挂有可在平台1下端移动的四组成对的立模板4。
Claims (2)
1、步进式交替支撑平台装置,其特征在于包括平台,所述平台的下端分别固定连接至少四根立向空心管,各空心管的下端分别连接在同一组框架上,该框架的四角分别设置可与墙体连接的支撑件;在各空心管内分别套置内套管,各内套管的下端分别与同一组下框架连接,所述下框架的四角分别设置可与墙体连接的支撑件。
2、根据权利要求1所述步进式交替支撑平台装置,其特征在于在所述空心管外侧的平台下端悬挂有可在平台下端移动的成对的立模板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100257132A CN101492960A (zh) | 2009-03-06 | 2009-03-06 | 步进式交替支撑平台装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100257132A CN101492960A (zh) | 2009-03-06 | 2009-03-06 | 步进式交替支撑平台装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101492960A true CN101492960A (zh) | 2009-07-29 |
Family
ID=40923741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2009100257132A Pending CN101492960A (zh) | 2009-03-06 | 2009-03-06 | 步进式交替支撑平台装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101492960A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114753612A (zh) * | 2022-05-26 | 2022-07-15 | 联旺工程建设有限公司 | 一种建筑物外部爬升式建筑施工操作平台及安装方法 |
-
2009
- 2009-03-06 CN CNA2009100257132A patent/CN101492960A/zh active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114753612A (zh) * | 2022-05-26 | 2022-07-15 | 联旺工程建设有限公司 | 一种建筑物外部爬升式建筑施工操作平台及安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104314305B (zh) | 直墙混凝土浇筑整体移动模架及其应用 | |
US4076778A (en) | Climbing formwork | |
CN103806644A (zh) | 用于电梯井筒模液压伸缩装置及其运行方法 | |
CN202055516U (zh) | 竖井整体提升模板系统 | |
CN103485574B (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN106854941B (zh) | 一种大截面看台斜梁及斜柱的施工方法 | |
CN101492962A (zh) | 大载荷整体式液压自动提模成套装置 | |
CN201400997Y (zh) | 步进式交替支撑平台装置 | |
CN202430994U (zh) | 模板限位卡 | |
CN111663659A (zh) | 错层同步施工方法 | |
CN103758343A (zh) | 钢筋混凝土楼板吊挂式施工方法及其吊挂装置 | |
CN107675725A (zh) | 大型构件支撑体系转换装置及其转换方法 | |
CN204280974U (zh) | 一种模板提升装置 | |
CN206681359U (zh) | 一种坑中坑新型支模体系 | |
CN203200664U (zh) | 变截面空心高墩滑模施工装置 | |
CN101492960A (zh) | 步进式交替支撑平台装置 | |
CN115110765B (zh) | 一种变形缝处剪力墙施工方法及装置 | |
CN206957232U (zh) | 一种二次结构混凝土浇筑辅助装置 | |
CN216515141U (zh) | 一种新悬挑施工爬模装置 | |
CN104131635A (zh) | 一种预制楼梯间周边剪力墙施工方法及施工平台 | |
CN108842799A (zh) | 一种大型杯口基础内模板设置方法 | |
CN212507548U (zh) | 牛腿支撑机器人 | |
CN110883920B (zh) | 一种预制t梁自行式液压模板装置及模板系统 | |
CN201400998Y (zh) | 大载荷整体式液压自动提模成套装置 | |
CN111677359A (zh) | 一种钢筋混凝土筒仓仓顶环梁的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20090729 |