CN201400997Y - 步进式交替支撑平台装置 - Google Patents

步进式交替支撑平台装置 Download PDF

Info

Publication number
CN201400997Y
CN201400997Y CN2009200362030U CN200920036203U CN201400997Y CN 201400997 Y CN201400997 Y CN 201400997Y CN 2009200362030 U CN2009200362030 U CN 2009200362030U CN 200920036203 U CN200920036203 U CN 200920036203U CN 201400997 Y CN201400997 Y CN 201400997Y
Authority
CN
China
Prior art keywords
platform
frame
hollow tubes
hollow section
lower frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200362030U
Other languages
English (en)
Inventor
戴宏康
张志明
刘文赞
王福华
李加存
谢庆华
王国华
谈静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGDU LANYUE MACHINERY CO Ltd
Original Assignee
JIANGDU LANYUE MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGDU LANYUE MACHINERY CO Ltd filed Critical JIANGDU LANYUE MACHINERY CO Ltd
Priority to CN2009200362030U priority Critical patent/CN201400997Y/zh
Application granted granted Critical
Publication of CN201400997Y publication Critical patent/CN201400997Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

步进式交替支撑平台装置,涉及到载荷提升领域和建筑施工中使用的载荷提升装置平台。在平台的下端分别固定连接至少四根立向空心管,各空心管的下端分别连接在同一组框架上,该框架的四角分别设置可与墙体连接的支撑件;在各空心管内分别套置内套管,各内套管的下端分别与同一组下框架连接,所述下框架的四角分别设置可与墙体连接的支撑件。将下框架四角分别支撑在墙体上,在下框架与框架之间设置顶升部件,使空心管在内套管外向上举升,加大下框架与框架之间的间距,即实现了将框架连同空心管和平台向上举升的目的,可实现又快又省,而且可靠。

Description

步进式交替支撑平台装置
技术领域
本实用新型涉及到载荷提升领域和建筑施工中使用的载荷提升装置平台。
背景技术
在建筑领域的立面墙进行混凝土浇注时,需要预先立模,即将模板预先固定在钢筋笼外周,固定后进行浇注,待水泥凝固后拆模,再进行下一位置立模,拆模和立模需要花费大量时间,立模时还需要大量的支承件对模板由底部至工作位置进行支撑固定。在载荷需要提升领域或建筑施工中需要将载荷提升到需要提升到的位置时,需要有足够支撑载荷的作业平台,而这种作业平台还要从一个操作位置提升或移动到另一个操作位置。因此,按现有的施工技术耗材多,施工进度慢。
实用新型内容
本实用新型的目的是提供无须频繁拆模、立模即可实现快速施工的步进式交替支撑平台装置。
本实用新型包括平台,所述平台的下端分别固定连接至少四根立向空心管,各空心管的下端分别连接在同一组框架上,该框架的四角分别设置可与墙体连接的支撑件;在各空心管内分别套置内套管,各内套管的下端分别与同一组下框架连接,所述下框架的四角分别设置可与墙体连接的支撑件。
使用时,将下框架四角分别支撑在墙体上,使下框架与框架之间留有适当间距,在下框架与框架之间设置顶升部件,使空心管在内套管外向上举升,加大下框架与框架之间的间距,即实现了将框架连同空心管和平台向上举升的目的。之后,通过框架四周与墙体形成固定支撑,再将下框架抬高并支撑在墙体上。本实用新型可沿着筑好的立面墙向上交替地抬高框架和下框架,使用于操作用的工作平台逐渐向上,而无需在地面搭建与建成的建筑物相应高度的支撑台。可实现又快又省,而且可靠使用载荷平台的目的。
为了更快地建筑立面墙体,本实用新型还在所述空心管外侧的平台下端悬挂有可在平台下端移动的成对的立模板。
当平台被举升至一定高度时,将一对立模板移动至与已浇注好混凝土并形成墙体的立面墙的上方,使两个立模板的下端分别紧贴在新制成的立面墙的两个外侧,然后向两个立模板之间浇注混凝土,待混凝土成型后,分别向两侧移开两个立模板,两个立模板可与平台同步向上举升。依此向上成段地快速建筑立面墙。
附图说明
图1为本实用新型的一种结构示意图。
具体实施方式
如图1所示,平台1的下端分别固定连接四根(也可六根或八根)立向空心管2,各空心管2的下端分别连接在同一组框架3上,框架3的四角分别设置可与立面墙体5连接的支撑件6,也可在立面墙体5的相应位置连接可拆装的支撑块。
在各空心管2内分别套置内套管7,各内套管7的下端分别与同一组下框架8连接,下框架8的四角分别设置可与立面墙体5连接的支撑件9,也可在立面墙体5的相应位置连接可拆装的支撑块或预留有可穿置下框架8的四角的孔。
于平台1下端、在空心管2外侧分别通过滚轮10悬挂有可在平台1下端移动的四组成对的立模板4。

Claims (2)

1、步进式交替支撑平台装置,其特征在于包括平台,所述平台的下端分别固定连接至少四根立向空心管,各空心管的下端分别连接在同一组框架上,该框架的四角分别设置可与墙体连接的支撑件;在各空心管内分别套置内套管,各内套管的下端分别与同一组下框架连接,所述下框架的四角分别设置可与墙体连接的支撑件。
2、根据权利要求1所述步进式交替支撑平台装置,其特征在于在所述空心管外侧的平台下端悬挂有可在平台下端移动的成对的立模板。
CN2009200362030U 2009-03-06 2009-03-06 步进式交替支撑平台装置 Expired - Fee Related CN201400997Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200362030U CN201400997Y (zh) 2009-03-06 2009-03-06 步进式交替支撑平台装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200362030U CN201400997Y (zh) 2009-03-06 2009-03-06 步进式交替支撑平台装置

Publications (1)

Publication Number Publication Date
CN201400997Y true CN201400997Y (zh) 2010-02-10

Family

ID=41660796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200362030U Expired - Fee Related CN201400997Y (zh) 2009-03-06 2009-03-06 步进式交替支撑平台装置

Country Status (1)

Country Link
CN (1) CN201400997Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284079A (zh) * 2016-08-08 2017-01-04 中交三公局桥梁隧道工程有限公司 一种桥梁断柱交替分级同步整体顶升的施工方法
CN108979112A (zh) * 2018-08-23 2018-12-11 中国建筑第二工程局有限公司 电梯井多功能操作平台系统及其施工方法
CN108979131A (zh) * 2017-06-01 2018-12-11 惠玉清 一种高层建筑施工钢模板及操作架整体提升平台装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284079A (zh) * 2016-08-08 2017-01-04 中交三公局桥梁隧道工程有限公司 一种桥梁断柱交替分级同步整体顶升的施工方法
CN108979131A (zh) * 2017-06-01 2018-12-11 惠玉清 一种高层建筑施工钢模板及操作架整体提升平台装置
CN108979112A (zh) * 2018-08-23 2018-12-11 中国建筑第二工程局有限公司 电梯井多功能操作平台系统及其施工方法
CN108979112B (zh) * 2018-08-23 2023-04-14 中国建筑第二工程局有限公司 电梯井多功能操作平台系统及其施工方法

Similar Documents

Publication Publication Date Title
CN103806644A (zh) 用于电梯井筒模液压伸缩装置及其运行方法
CN203701581U (zh) 移动模块化建筑模板
CN105926929A (zh) 一种直墙混凝土的浇筑施工方法
CN103485574B (zh) 一种造粒塔塔顶钢筋混凝土结构施工方法
CN202627493U (zh) 用于电梯井施工的组合模板
CN101492962A (zh) 大载荷整体式液压自动提模成套装置
CN205778918U (zh) 黄土隧道开挖及初支模筑混凝土施工复合式台车
CN201400997Y (zh) 步进式交替支撑平台装置
CN107675725A (zh) 大型构件支撑体系转换装置及其转换方法
CN202430994U (zh) 模板限位卡
CN204280974U (zh) 一种模板提升装置
CN203200664U (zh) 变截面空心高墩滑模施工装置
JP3074765U (ja) 柱状建築物施工システム装置
CN202946193U (zh) 一种隧道中心水沟模板
CN205152807U (zh) 下行式移动模架造桥机拆除用主梁吊装施工结构
CN109944164B (zh) 自升式空心薄壁墩辊模系统及其施工方法
CN101492960A (zh) 步进式交替支撑平台装置
CN203755173U (zh) 用于桥梁高墩液压爬升的模板装置
CN206800968U (zh) 电梯井电动液压施工平台装置
CN201400998Y (zh) 大载荷整体式液压自动提模成套装置
CN108842799A (zh) 一种大型杯口基础内模板设置方法
CN104131635A (zh) 一种预制楼梯间周边剪力墙施工方法及施工平台
CN212507548U (zh) 牛腿支撑机器人
CN111677359A (zh) 一种钢筋混凝土筒仓仓顶环梁的施工方法
CN209907898U (zh) 搭设电梯井剪力墙浇筑模板的内架式工作台

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100210

Termination date: 20110306