CN101463589A - 一种用于顶推复杂竖曲线梁的可调式滑块及其制作方法 - Google Patents

一种用于顶推复杂竖曲线梁的可调式滑块及其制作方法 Download PDF

Info

Publication number
CN101463589A
CN101463589A CNA2008101883463A CN200810188346A CN101463589A CN 101463589 A CN101463589 A CN 101463589A CN A2008101883463 A CNA2008101883463 A CN A2008101883463A CN 200810188346 A CN200810188346 A CN 200810188346A CN 101463589 A CN101463589 A CN 101463589A
Authority
CN
China
Prior art keywords
block
shift unit
jacking
absolute altitude
vertical curve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101883463A
Other languages
English (en)
Other versions
CN101463589B (zh
Inventor
李德钦
鲜正洪
杨卫平
肖向荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge South China Engineering Co Ltd
Original Assignee
ROAD AND BRIDGE SOUTHERN ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ROAD AND BRIDGE SOUTHERN ENGINEERING Co Ltd filed Critical ROAD AND BRIDGE SOUTHERN ENGINEERING Co Ltd
Priority to CN2008101883463A priority Critical patent/CN101463589B/zh
Publication of CN101463589A publication Critical patent/CN101463589A/zh
Application granted granted Critical
Publication of CN101463589B publication Critical patent/CN101463589B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种用于顶推复杂竖曲线梁的可调式滑块及其制作方法,本发明的可调式滑块包括行走机构、标高调节块、均荷板。为制得该滑块,首先制作行走机构,再安装标高调节块,最后安装均荷板,安装完毕后可根据需要调整标高调节块的高度。本发明的装置结构简单、组合材料及设备均常见易得、操作方便、方向可以调控、且稳定性好,本发明的制作方法简单易行,便于操作。

Description

一种用于顶推复杂竖曲线梁的可调式滑块及其制作方法
技术领域
本发明涉及一种在桥梁施工过程中用于移动钢箱梁的装置及其制作方法,特别是涉及一种用于顶推钢箱梁的滑动系统及其制作方法,尤其是涉及滑动系统中的滑块及其制作方法。
背景技术
现代桥梁的结构通常是采用一块一块的钢箱梁拼接而成的。在对钢箱梁的拼接过程中,一般采用顶推法将钢箱梁移动到位,然后再对其进行安装。在移动的过程中,需要使用拼装平台,它是关键的大型临时结构之一。拼装平台在顶推阶段是钢箱梁的滑动平台,在对钢箱梁的拼接安装阶段又是钢箱梁和桥梁主体进行拼装的操作平台。前者要求拼装平台上有钢梁滑移系统,后者要求拼装平台具备足够的强度和刚度,且备有用于对拼的标高调节措施。
钢箱梁在拼装平台上的滑动系统通常有两种形式,即,一种是固定式滑动系统,另一种是可调式滑动系统。所谓的固定式滑动系统指的是采用标高不可调的滑板和轨道相接合的方法来移动钢箱梁,例如专利申请号为200710168975.5且发明名称为《大跨度钢箱梁顶推法施工用半柔性支承装置》的中国发明专利申请文件中所提到的那种滑动装置,这种形式只适用于单一坡度或单一半径的桥梁。对于多坡度或多种曲线半径变化的复杂竖曲线桥梁,由于滑道标高固定,在对钢箱梁进行落梁操作后,还需要对钢箱梁的高度重新进行调整,因此,造成施工效率降低。
所谓的可调式滑动系统指的是在固定式滑道和钢箱梁之间增加一个可调高滑块,该可调高滑块用于调整钢箱梁的俯仰角度,以适应不同坡度的桥梁结构。这种形式既可适用于单一坡度或单一半径的桥梁,还可适用于多坡度或多种曲线半径变化的桥梁。调高滑块可采用底面贴有四氟滑板的对口钢楔。但是,在施工过程中,其横向位置不易控制,需要借助于横向千斤顶进行重新调整,由此降低了施工效率。同时,如果采用多点顶推或牵引,容易造成钢箱梁受力不均匀,在前行过程中易于发生横向位置偏移。另外,还需要采用侧顶推方式对钢箱梁的前行方向进行校正,从而增大了施工难度。
发明内容
本发明要解决的技术问题是提供一种结构简单、操作方便、方向可以调控、稳定性好且制作方便的顶推复杂竖曲线梁的可调式滑块及其制作方法。
为解决上述技术问题,根据本发明的一个方面,本发明提供了一种用于顶推复杂竖曲线梁的可调式滑块,其包括行走机构,该行走机构以滚动的方式在滑轨上行走,用于带动钢箱梁发生移动,并控制其移动的方向;位于行走机构之上设有用于调节滑块高度的标高调节块,以及与复杂竖曲线梁直接接触的用于平均分配滑块载荷的均荷板,其位于标高调节块之上。
按照本发明的一种优选实施方式,行走机构包括用以带动所述复杂曲线梁前行的移位器和用以限制行走机构行走方向的侧向限位轮,其较好的控制了滑块前移的方向;标高调节块包括竖向标高调节螺栓和配合标高调节螺栓同时使用的用以对钢箱梁起支撑作用的楔形钢垫块;均荷板为均荷橡胶板。其包括高弹高强橡胶板和四氟滑板,在顶推阶段,钢梁支点发生变化时,本发明中的均荷橡胶板可有效重新分布各滑块之间的竖向荷载,使得滑块受力更加均匀,同时具有改善滑块受力和实现梁体横向坐标微调的功能,而且可按荷载要求进行加工。
按照本发明的又一种优选实施方式,移位器包括履带支撑轴、圈套于所述履带支撑轴上的轮式履带、以及设置于移位器上方的承重板,轮式履带与滑槽相接触。
按照本发明的又一种优选实施方式,轮式履带为单履带式或双履带式,双履带式可承受较大的荷载,且横向稳定性好,单履带式所需要的滑槽较窄,所需滑槽材料较少。
按照本发明的又一种优选实施方式,侧向限位轮包括固定型钢、销轴和滚轮;固定型钢位于移位器侧壁;销轴固定于固定型钢上;滚轮套在销轴上。
按照本发明的又一种优选实施方式,限位轮数量为四个,分布于在移位器前、后、左、右位置上的侧板上。
按照本发明的另一种优选实施方式,竖向标高调节螺栓包括固定在移位器顶面的承重板上的固定螺母,穿过固定螺母的调节螺杆及套装于调节螺杆上的限位圈。
按照本发明的又一种优选实施方式,每个滑块包括四个竖向标高调节螺栓。调节螺栓和楔形垫块相结合使得标高调节精度高、滑块承载力高。
按照本发明的另一个方面,本发明提供了一种的用于顶推复杂竖曲线梁的可调式滑块的制作方法,包括如下步骤:①制作侧向限位轮、楔形垫块;②根据滑槽宽度,确定所述侧向限位轮横向间距,并将侧向限位轮焊在移位器上;③在移位器顶面开孔,焊接固定螺母,并将调节螺杆穿过所述固定螺母;④将所述移位器置于滑槽上,准确调整移位器的平面位置(里程、纵向轴线),并临时固定;⑤将带有四氟滑板的承重钢板安装在所述移位器的调节螺杆上,再在上面安装高弹高强橡胶板;⑥准确调整高弹高强橡胶板顶面标高后,固定竖向标高调节螺栓;⑦在带有四氟滑板的承重钢板与移位器之间塞入楔形垫块,楔紧垫实;⑧起吊钢箱梁节段,放置于滑块(通常每片箱梁用四个滑块)顶面;⑨钢梁落实后,解除对滑块的临时约束。
本发明的顶推复杂竖曲线梁的可调式滑块承载能力大、滑块高度调节方便、精度高、滑块行走横向偏位小、可控、滑块摩阻力小、滑块竖向受力可自动调整,各滑块之间受力较均匀;采用本发明的方法制作滑块的制作工艺简单,操作性强。
附图说明
图1是本发明的一个实施例的顶推复杂竖曲线梁的可调式滑块的整体结构示意图。
图2是图1所示可调式滑块的移位器的结构示意图。
图3是图1所示可调式滑块的侧向限位轮的示意图。
图4是图1所示可调式滑块的竖向标高调节螺栓的结构示意图。
具体实施方式
下面将结合附图和具体实施方式对本发明作进一步详细说明。
如图1至图4所示用于顶推复杂竖曲线梁的可调式滑块,包括:以滚动的方式在滑轨上行走的行走机构,该机构包括带动钢箱梁移动的移位器1和用于控制钢箱梁移动方向的侧向限位轮2。
另外,上述的可调式滑块还包括位于所述行走机构上并且用以调节滑块高度的标高调节块以及均荷橡胶板,其中,所述标高调节块包括用于调节滑块高度的竖向标高调节螺栓3和配合竖向标高调节螺栓3使用的楔形钢垫块4,均荷橡胶板位于所述标高调节块上,以用于平均分配滑块的载荷。
另外,所述均荷橡胶板包括高弹高强橡胶板5和四氟滑板6。高弹高强橡胶板5可优选采用弹性模量25~35MPa、抗压强度大于30MPa的特制板式橡胶支座。四氟滑板6为一个层压板,上层为钢板,下层为一种用高分子材料制成的滑板,优选地选用3mm厚聚四氟乙烯滑板和相同面积的30mm厚承重钢板。
如图2所示,移位器1包括轮式履带1a、履带支撑轴1b和承重板1c,轮式履带1a套置在履带支撑轴1b上并与滑槽接触,承重板1c承受来自上面的竖向荷载。移位器1从轮式履带1a的数量上可被划分为单履带式和双履带式,双履带式可承受较大的荷载,且横向稳定性好,但所需要的滑槽较宽。
如图3所示,侧向限位轮2包括固定型钢2a、销轴2b和套于销轴2b上的滚轮2c。固定型钢2a优选地采用尺寸为100×3.0的方型钢,其位于移位器侧壁上。销轴2b优选地采用φ30~40mm的钢棒,焊于固定型钢2a上。滚轮2c的内径较销轴2b的外径大0.5mm,其外径有比自身的内径大20mm,而且滚轮2c套装在销轴2b上。侧向限位轮2的数量为四个,分布于移位器1的前、后、左、右侧板上。该侧向限位轮2的横向与滑槽之间的间距为5mm,用来控制移位器1的横向偏位。
如图4所示,竖向标高调节螺栓3包括调节螺杆3a、固定螺母3b、限位圈3c,其中,固定螺母3b固定在移位器1顶面的承重板1c上,调节螺杆3a穿过固定螺母3b上下旋动。
本发明的用于顶推复杂竖曲线梁的可调式滑块的竖向标高调节螺栓3的调节精度从理论上讲是无限高的。
本发明的用于顶推复杂竖曲线梁的可调式滑块可采用如下方法进行制作:
首先,制作侧向限位轮2、楔形垫块4,再根据滑槽的宽度,确定侧向限位轮2的横向间距,并将侧向限位轮2焊在移位器1上。随后,在移位器1的顶面上开孔,焊接固定螺母3b,并将调节螺杆3a穿过固定螺母3b。接着,将移位器1置于滑槽上,并准确调整移位器1的平面位置(里程、纵向轴线),然后临时固定。将带有四氟滑板的承重钢板安装在移位器1的调节螺杆3a上,再在上面安装高弹高强橡胶板5。在准确调整高弹高强橡胶板5的顶面标高后,固定调节螺栓3。此后,在带有四氟滑板的承重钢板与移位器1之间塞入楔形垫块4,并将楔形垫块4楔紧垫实。然后,起吊钢箱梁节段,并放置于滑块(通常每片箱梁用4个滑块)的顶面上。最后,待钢梁落实后,解除对滑块的临时约束。
以上所披露的仅为本发明的优选实施例,当然不能以此来限定本发明的权利保护范围。可以理解,依据本发明所附权利要求中限定的实质和范围所作的等同变化,仍属于本发明所涵盖的范围。

Claims (10)

1.一种用于顶推复杂竖曲线梁的可调式滑块,其中,所述可调式滑块包括:
行走机构,该行走机构用于带动复杂竖曲线梁移动并控制其行进方向,它以滚动的方式在滑轨上行走;
标高调节块,其位于行走机构之上,用于调节所述滑块的高度;以及
均荷板,该均荷板位于标高调节块之上,它与复杂竖曲线梁直接接触并且用于平均分配安置在其上的滑块载荷。
2.根据权利要求1所述的可调式滑块,其特征在于:所述行走机构包括用以带动所述复杂曲线梁前行的移位器(1)和用以限制行走机构行走方向的侧向限位轮(2);所述标高调节块包括竖向标高调节螺栓(3)和配合标高调节螺栓(3)同时使用的、用以对钢箱梁起支撑作用的楔形钢垫块(4);所述均荷板为均荷橡胶板,其包括高弹高强橡胶板(5)和四氟滑板(6)。
3.根据权利要求2所述的用于顶推复杂竖曲线梁的可调式滑块,其特征在于:所述移位器(1)包括履带支撑轴(1b)、圈套于所述履带支撑轴(1b)上的轮式履带(1a)、以及设置于移位器上方的承重板(1c),所述轮式履带(1a)与滑槽相接触。
4.根据权利要求3所述的用于顶推复杂竖曲线梁的可调式滑块,其特征在于:所述轮式履带(1a)为单履带式。
5.根据权利要求3所述的用于顶推复杂竖曲线梁的可调式滑块,其特征在于:所述轮式履带(1a)为双履带式。
6.根据权利要求2所述用于顶推复杂竖曲线梁的可调式滑块,其特征在于:所述的侧向限位轮(2)包括固定型钢(2a)、销轴(2b)和滚轮(2c),其中,所述固定型钢(2a)位于移位器侧壁,所述销轴(2b)焊接于固定型钢(2a)上,所述滚轮(2c)套装在所述销轴(2b)上。
7.根据权利要求2或6所述用于顶推复杂竖曲线梁的可调式滑块,其特征在于,所述限位轮(2)的数量为4个,分布于移位器(1)的前、后、左、右四个方向的侧板上。
8.根据权利要求2所述用于顶推复杂竖曲线梁的可调式滑块,其特征在于:所述竖向标高调节螺栓(3)包括固定在移位器(1)顶面的承重板(1c)上的固定螺母(3b),穿过所述固定螺母(3b)的调节螺杆(3a)及套装于所述调节螺杆(3a)上的限位圈(3c)。
9.根据权利要求8所述用于顶推复杂竖曲线梁的可调式滑块,其特征在于:所述每个滑块包括四个所述竖向标高调节螺栓(3)。
10.一种用于制造根据权利要求1所述的用于顶推复杂竖曲线梁的可调式滑块的方法,该方法包括如下步骤:
①制作所述侧向限位轮(2)、楔形垫块(4);
②根据滑槽的宽度,确定所述侧向限位轮(2)的横向间距,并将所述侧向限位轮(2)焊接在所述移位器(1)上;
③在所述移位器(1)的顶面开孔,焊接所述固定螺母(3b),并将所述调节螺杆(3a)穿过所述固定螺母(3b);
④将所述移位器(1)置于滑槽上,准确调整所述移位器(1)的平面位置(里程、纵向轴线),并临时固定;
⑤将承重钢板安装在所述移位器(1)的调节螺杆(3a)上,再在上面安装所述高弹高强橡胶板(5);
⑥准确调整所述高弹高强橡胶板(5)顶面标高后,固定所述竖向标高调节螺栓(3);
⑦在承重钢板与所述移位器(1)之间塞入所述楔形垫块(4),并使之楔紧垫实;
⑧起吊钢箱梁节段,放置于所述滑块(通常每片箱梁用4个滑块)顶面;以及
⑨待钢梁落实后,解除对滑块的临时约束。
CN2008101883463A 2008-12-25 2008-12-25 一种用于顶推复杂竖曲线梁的可调式滑块及其制作方法 Active CN101463589B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101883463A CN101463589B (zh) 2008-12-25 2008-12-25 一种用于顶推复杂竖曲线梁的可调式滑块及其制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101883463A CN101463589B (zh) 2008-12-25 2008-12-25 一种用于顶推复杂竖曲线梁的可调式滑块及其制作方法

Publications (2)

Publication Number Publication Date
CN101463589A true CN101463589A (zh) 2009-06-24
CN101463589B CN101463589B (zh) 2010-12-08

Family

ID=40804363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101883463A Active CN101463589B (zh) 2008-12-25 2008-12-25 一种用于顶推复杂竖曲线梁的可调式滑块及其制作方法

Country Status (1)

Country Link
CN (1) CN101463589B (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818481A (zh) * 2010-06-04 2010-09-01 北京城建道桥建设集团有限公司 应用滚排滑道进行桥梁顶推施工的装置及其施工方法
CN103754547A (zh) * 2013-12-31 2014-04-30 中交第四航务工程局有限公司 一种滑动台车及其出运超重构件的方法
CN106592439A (zh) * 2016-12-28 2017-04-26 中交路桥华南工程有限公司 钢箱梁滑移牵引系统及其施工方法
CN106948268A (zh) * 2017-04-24 2017-07-14 中铁七局集团武汉工程有限公司 变截面钢箱梁顶推组合装置及使用方法
CN107268450A (zh) * 2017-08-09 2017-10-20 重庆交通大学 用于顶推建造组合桥梁的减阻导向卸载装置及顶推方法
CN107587431A (zh) * 2017-09-17 2018-01-16 湖南金海集团有限公司 一种大型工件顶推装置
CN108385843A (zh) * 2018-02-01 2018-08-10 中建三局集团有限公司 一种基于顶推滑移的构件可调节支撑结构及安装方法
CN108941906A (zh) * 2018-08-14 2018-12-07 武汉松盛光电科技有限公司 一种多功能激光锡焊机
CN109736212A (zh) * 2019-01-21 2019-05-10 郭正兴 一种桥梁节段安装的滚动摩擦型步履顶推装置
CN112095474A (zh) * 2020-09-15 2020-12-18 中国五冶集团有限公司 钢箱梁加工用通用型工装平台
CN112900281A (zh) * 2021-02-03 2021-06-04 中交武汉港湾工程设计研究院有限公司 复杂曲线梁上顶推施工装置及方法
CN113293681A (zh) * 2021-06-30 2021-08-24 广西梧州市赢鑫船舶制造有限公司 一种马路自动刻纹机
CN113931082A (zh) * 2021-10-29 2022-01-14 中国水利水电第五工程局有限公司 一种悬臂现浇挂篮轨道调平装置及其调平方法
CN114232503A (zh) * 2022-01-21 2022-03-25 河南华海建设工程有限公司 一种土木工程桥梁底承板装配总成
CN114892540A (zh) * 2022-06-13 2022-08-12 中交第二公路工程局有限公司 一种用于钢桁梁主动调节的步履式顶推装置及方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6851149B2 (en) * 2002-05-30 2005-02-08 Rex Joseph King, Jr. Lift-slide drawbridge
CN201121294Y (zh) * 2007-10-17 2008-09-24 上海市机械施工有限公司 一种液压平推装置
CN101210416B (zh) * 2007-12-20 2011-05-25 中铁大桥局股份有限公司 大跨度钢箱梁顶推法施工用半柔性支承装置

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818481B (zh) * 2010-06-04 2011-05-18 北京城建道桥建设集团有限公司 应用滚排滑道进行桥梁顶推施工的装置及其施工方法
CN101818481A (zh) * 2010-06-04 2010-09-01 北京城建道桥建设集团有限公司 应用滚排滑道进行桥梁顶推施工的装置及其施工方法
CN103754547A (zh) * 2013-12-31 2014-04-30 中交第四航务工程局有限公司 一种滑动台车及其出运超重构件的方法
CN103754547B (zh) * 2013-12-31 2016-06-08 中交第四航务工程局有限公司 一种滑动台车及其出运超重构件的方法
CN106592439A (zh) * 2016-12-28 2017-04-26 中交路桥华南工程有限公司 钢箱梁滑移牵引系统及其施工方法
CN106948268B (zh) * 2017-04-24 2023-07-21 中铁七局集团武汉工程有限公司 变截面钢箱梁顶推组合装置及使用方法
CN106948268A (zh) * 2017-04-24 2017-07-14 中铁七局集团武汉工程有限公司 变截面钢箱梁顶推组合装置及使用方法
CN107268450A (zh) * 2017-08-09 2017-10-20 重庆交通大学 用于顶推建造组合桥梁的减阻导向卸载装置及顶推方法
CN107268450B (zh) * 2017-08-09 2019-06-07 重庆交通大学 用于顶推建造组合桥梁的减阻导向卸载装置及顶推方法
CN107587431A (zh) * 2017-09-17 2018-01-16 湖南金海集团有限公司 一种大型工件顶推装置
CN108385843A (zh) * 2018-02-01 2018-08-10 中建三局集团有限公司 一种基于顶推滑移的构件可调节支撑结构及安装方法
CN108941906A (zh) * 2018-08-14 2018-12-07 武汉松盛光电科技有限公司 一种多功能激光锡焊机
CN109736212A (zh) * 2019-01-21 2019-05-10 郭正兴 一种桥梁节段安装的滚动摩擦型步履顶推装置
CN109736212B (zh) * 2019-01-21 2023-09-19 郭正兴 一种桥梁节段安装的滚动摩擦型步履顶推装置
CN112095474A (zh) * 2020-09-15 2020-12-18 中国五冶集团有限公司 钢箱梁加工用通用型工装平台
CN112900281A (zh) * 2021-02-03 2021-06-04 中交武汉港湾工程设计研究院有限公司 复杂曲线梁上顶推施工装置及方法
CN113293681A (zh) * 2021-06-30 2021-08-24 广西梧州市赢鑫船舶制造有限公司 一种马路自动刻纹机
CN113931082A (zh) * 2021-10-29 2022-01-14 中国水利水电第五工程局有限公司 一种悬臂现浇挂篮轨道调平装置及其调平方法
CN114232503A (zh) * 2022-01-21 2022-03-25 河南华海建设工程有限公司 一种土木工程桥梁底承板装配总成
CN114232503B (zh) * 2022-01-21 2024-04-05 河南华海建设工程有限公司 一种土木工程桥梁底承板装配总成
CN114892540A (zh) * 2022-06-13 2022-08-12 中交第二公路工程局有限公司 一种用于钢桁梁主动调节的步履式顶推装置及方法

Also Published As

Publication number Publication date
CN101463589B (zh) 2010-12-08

Similar Documents

Publication Publication Date Title
CN101463589B (zh) 一种用于顶推复杂竖曲线梁的可调式滑块及其制作方法
CN108677720B (zh) 吊装构件顶升架设施工工艺
CN101818481B (zh) 应用滚排滑道进行桥梁顶推施工的装置及其施工方法
CN101429820B (zh) 建筑物整体移位方法
CN111038940A (zh) 一种轨道式用于吊装运输的牵引系统
CN212771969U (zh) 一种桥梁支架体系用装配式卸落块
CN109281254B (zh) 钢梁滑移装置及系统
CN107268450A (zh) 用于顶推建造组合桥梁的减阻导向卸载装置及顶推方法
CN204325945U (zh) 一种用于变截面箱梁的顶推装置
CN201671064U (zh) 滚排滑道
CN201443042U (zh) 一种用于顶推复杂竖曲线梁的可调式滑块
CN106400693A (zh) 一种斜坡道钢箱梁运梁车及运梁方法
CN108691277A (zh) 用于节段预制拼装梁在架设过程中定位的三维调整工装
CN215210599U (zh) 一种用于建筑物顶推平移的多功能步履式顶推装置
CN113529588A (zh) 一种用于桥梁或钢结构屋盖顶推施工的顶推机构
CN104627189B (zh) 一种多功能换流变压器用就位车
CN210031352U (zh) 一种支撑装置
CN105064219B (zh) 一种移动模架移动小车
CN204662409U (zh) 一种静载试验设备
CN202156518U (zh) 船舶分段在搁置及运输时使用的门架
CN102677597A (zh) 用于滑移施工的可分离式滑块
CN108749831A (zh) 重载运输车超重载运输系统
CN102493361A (zh) 顶推法施工中主梁在顶推拼装平台上的滑移方式
CN211711873U (zh) 一种轨道式用于吊装运输的牵引系统
CN210368464U (zh) 一种具有内嵌式抬升装置的无砟轨道结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ROAD + BRIDGE SOUTH CHINA ENGINEERING CO., LTD.

Free format text: FORMER NAME: ROAD AND BRIDGE SOUTH CHINA ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 528400, Bank of China Tower, No. three, 18, 28, Zhongshan, Guangdong, Zhongshan

Patentee after: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd.

Address before: 528400, Bank of China Tower, No. three, 18, 28, Zhongshan, Guangdong, Zhongshan

Patentee before: ROAD AND BRIDGE SOUTHERN ENGINEERING Co.,Ltd.

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 528400 Guangdong city of Zhongshan Province East Xing Zheng Road No. 1 Central Plaza 3 floor 19

Patentee after: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd.

Address before: 528400, Bank of China Tower, No. three, 18, 28, Zhongshan, Guangdong, Zhongshan

Patentee before: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An adjustable slider and its manufacturing method for pushing complex vertical curved beams

Effective date of registration: 20231214

Granted publication date: 20101208

Pledgee: Zhongshan Branch of Bank of Communications Co.,Ltd.

Pledgor: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd.

Registration number: Y2023980071581