CN101225708A - 一种烟囱的上滑下砌无井架液压滑动模板安装方法 - Google Patents

一种烟囱的上滑下砌无井架液压滑动模板安装方法 Download PDF

Info

Publication number
CN101225708A
CN101225708A CNA200710001199XA CN200710001199A CN101225708A CN 101225708 A CN101225708 A CN 101225708A CN A200710001199X A CNA200710001199X A CN A200710001199XA CN 200710001199 A CN200710001199 A CN 200710001199A CN 101225708 A CN101225708 A CN 101225708A
Authority
CN
China
Prior art keywords
sliding
chimney
platform
construction
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200710001199XA
Other languages
English (en)
Inventor
何烨
杨廷文
邢福胜
吴振宝
吉民勇
揣立文
吴志刚
蒋学宁
席彭彭
邱启华
娄林成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No68 Engineering Division
Yanzhou Coal Yulin Nenghua Co ltd
Yanzhou Coal Mining Co Ltd
Original Assignee
China Coal No68 Engineering Division
Yanzhou Coal Yulin Nenghua Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No68 Engineering Division, Yanzhou Coal Yulin Nenghua Co ltd filed Critical China Coal No68 Engineering Division
Priority to CNA200710001199XA priority Critical patent/CN101225708A/zh
Publication of CN101225708A publication Critical patent/CN101225708A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种烟囱的双层平台,上滑下砌无井架液压滑动模板安装方法,在模板操作平台底部悬挂一层砌筑操作平台(兼操作通道),利用一套液压提升系统将模板不断提升,一次性完成整个烟囱筒身及防腐、隔热层和内衬的施工,所述方法包括下列步骤:滑模装置安装、筒身滑模施工及内衬砌筑、附属设施安装和滑模装置拆除。本发明施工方法采用双层操作平台,“筒身滑模与内衬砌筑”同步施工工艺,具有同步施工、安全可靠、保证质量、节约费用,特别是工期减半等优点,传统施工方法比较,提前了工期,确保了工程质量。

Description

一种烟囱的上滑下砌无井架液压滑动模板安装方法
技术领域
本发明涉及一种烟囱的上滑下砌无井架液压滑动模板安装方法。
背景技术
烟囱的种类大致分为砖烟囱、钢筋混凝土烟囱、双筒式或多筒式烟囱。
其中钢筋混凝土烟囱,一直采用传统的单层操作平台进行滑模施工,因其牛腿在滑模完毕后进行浇筑施工,螺纹钢筋需经过两次弯曲,而且混凝土施工缝很难避免等原因,因此,其施工方法难以保证牛腿钢筋、混凝土和内衬施工的质量,这种施工方法150m烟囱通常需要4-5个月的施工周期,并且成本费用比较难以控制。
发明内容
本发明的目的就在于克服现有高、大烟囱砌筑施工难度大、工期长、费用大的缺陷,提供一种烟囱双层平台、上滑下砌无井架液压滑动模板施工方法,保证了砌筑施工质量、工期以及成本费用等问题。
为解决上述技术问题,本发明采用如下技术方案:
本发明一种烟囱的上滑下砌无井架液压滑动模板安装方法,所述方法采取上滑下砌、双层操作平台分层作业,筒壁滑升与内衬同时进行、筒身和内衬同时作业,全套滑模装置采用一次组模。
本发明所述上滑下砌、双层操作平台,组装顺序为:在烟囱的底部组装滑模操作平台,绑扎钢筋、浇筑混凝土进行模板滑身,当滑模操作平台滑身到距地面2.5m左右后,悬挂下层内衬操作平台,经全面检查合格后转入正常滑身,采用一套滑模装置完成整个烟囱筒壁及内衬施工。
本发明所述施工方法包括下列步骤:滑模装置组装,筒身滑模施工(滑至距地面2.5m左右后悬挂下层砌筑平台)、滑过烟道口牛腿后筒身滑模与内衬同时进行施工、附属设施安装和滑模装置拆除、积灰平台结构施工。本着先土建后安装、筒身和内衬同时作业的方案施工,采用双层平台,滑模和内衬砌筑工程一气呵成。
内衬砌筑、防腐及保温材料与筒身滑模同步施工,在滑升操作平台下悬挂一层操作平台(操作通道),用于砌筑、防腐、隔热层施工以及内衬材料的堆放等工作。
本发明所述滑模装置由滑升模板系统、操作平台系统、液压提升系统、施工精度控制系统和供水供电及通讯系统组成.
本发明所述滑模装置的组装顺序为:采用传统方法组装操作平台及模板、利用液压滑升系统滑升、滑升至距地面2.5m左右后悬挂下层砌筑平台、转入正常滑升。
本发明的有益效果为:
本发明烟囱的上滑下砌无井架液压滑动模板安装方法的优点是:
1、施工只使用一套提升系统,两层操作平台,采用液压千斤顶和支撑干,同时完成筒身浇筑成型和内衬施工的完成。
2、比常规滑模施工方法工期可缩短一半,降低了施工成本费用,保证了工程质量。
3、牛腿和筒身混凝土同时浇筑,可避免施工缝,保证建筑物的整体性。
附图说明
图1为本发明所述滑模及砌筑装置结构示意图。
图中:1、模板;2、围圈;3、支顶螺杆;4、提升架;5、调径装置;6、鼓圈;7、拉杆;8、环梁;9、辐射梁;10、操作平台;11、架板吊筋;12、下层操作平台(操作通道);13、液压控制台;14、千斤顶;15、支撑杆;16、随升井架;17、起重把杆;18、斜支撑;19、操纵台;20、爬梯;21、吊笼;22、安全抱刹;23、吊笼钢丝绳;24、灰斗;25、存灰斗;26‘栏杆;27、安全网;28、避雷针;29、起重钢丝绳;30、筒壁;31、吊脚手架;32、卷扬机。
具体实施方式
该烟囱是一种火力发电厂废气处理烟囱工程,烟囱筒身为钢筋砼体结构,高度150米,底口直径13.4米,上口直径5.54米。
该工程采用双层平台、上滑下砌无井架液压滑模施工,其程序为:场地整平、定位放线、滑模装置组装、筒身滑模和内衬施工、附属设施安装、滑模装置拆除、土建收尾、竣工验收。
1、平台的组成
上层操作平台其结构布置采用内、外环梁、辐射梁和拉杆组成。内环梁有上、下两层,用24块[14槽钢焊接而成。平台铺板用50mm木板,与模板上口齐平。在操作平台周围设安全保护栏杆。平台整个结构支承在提升架上,供堆放材料、工具、设备、悬挂内外吊脚手架和内砌筑平台、供工人绑扎钢筋、浇筑混凝土、提升模板之用。(图二附后)
下层平台(通道)其结构布置采用48*3.5的钢管和扣件锁成网状,作为平台骨架,骨架上面满铺脚手板,利用圆16的钢筋悬挂在上层滑模操作平台的辐射梁上。供施工人员进行防腐、隔热层和耐火砖砌筑施工。
2、外吊架的设置:
外吊架分上、下两层,用钢管扣件锁制并固定在提升架上,供绑扎钢筋、调整和修理外模板使用,上铺宽500-800mm脚手板,双侧设安全防护栏杆,并满挂安全网。
3、滑升施工顺序:
初次浇灌混凝土的高度一般为60-70cm,以避免因混凝土自重小、模板上升的摩阻力大而使混凝土产生裂缝。通常分2-3层进行,待最下层混凝土贯入阻力值达到0.30-1.05kN/cm2(相当与立方体抗压强度0.2-0.4Mpa)时,一般养护3-5h,即可初次提升3-5个千斤顶行程。并对模板结构和液压系统进行检查,一切正常后即继续浇筑,每浇筑20-30cm的均匀高度,再提升3-5个行程,直到混凝土距模板上口100mm时,即转入正常提升。继续绑扎钢筋,浇筑混凝土,滑过烟道口后,在模板滑升的同时进行内衬施工。如此不断的绑扎钢筋、浇筑混凝土、同时进行内衬施工,循环往复逐步完成整个烟囱筒身的成型和内衬施工的完成。

Claims (2)

1.一种烟囱的上滑下砌无井架液压滑动模板安装方法,其特征在于:所述方法采取上滑下砌、双层操作平台分层作业,筒壁滑升与内衬同时进行、筒身和内衬同时作业,全套滑模装置采用一次组模。
2.如权利要求1所述烟囱的上滑下砌无井架液压滑动模板安装方法,其特征在于:所述上滑下砌、双层操作平台,组装顺序为:在烟囱的底部组装滑模操作平台,绑扎钢筋、浇筑混凝土进行模板滑身,当滑模操作平台滑身到距地面2.5m左右后,悬挂下层内衬操作平台,经全面检查合格后转入正常滑身,采用一套滑模装置完成整个烟囱筒壁及内衬施工。
CNA200710001199XA 2007-01-19 2007-01-19 一种烟囱的上滑下砌无井架液压滑动模板安装方法 Pending CN101225708A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200710001199XA CN101225708A (zh) 2007-01-19 2007-01-19 一种烟囱的上滑下砌无井架液压滑动模板安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200710001199XA CN101225708A (zh) 2007-01-19 2007-01-19 一种烟囱的上滑下砌无井架液压滑动模板安装方法

Publications (1)

Publication Number Publication Date
CN101225708A true CN101225708A (zh) 2008-07-23

Family

ID=39857887

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200710001199XA Pending CN101225708A (zh) 2007-01-19 2007-01-19 一种烟囱的上滑下砌无井架液压滑动模板安装方法

Country Status (1)

Country Link
CN (1) CN101225708A (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101566005B (zh) * 2009-05-21 2011-04-06 山东丰汇设备技术有限公司 烟囱液压提模装置
CN102535843A (zh) * 2011-12-16 2012-07-04 马鞍山钢铁建设集团有限公司 一种圆形钢筋混凝土烟囱筒壁施工方法及液压滑模装置
CN102605988A (zh) * 2012-04-18 2012-07-25 永升建设集团有限公司 烟囱内衬外砼同步施工方法
CN101696604B (zh) * 2009-09-24 2013-01-09 东北电业管理局烟塔工程公司 一种烟囱筒壁施工方法及专用电动顶升平桥
CN103225389A (zh) * 2013-04-12 2013-07-31 山东电力建设第二工程公司 混凝土筒壁施工顶升平台吊模机装置
CN103590648A (zh) * 2013-11-28 2014-02-19 中国二十二冶集团有限公司 烟囱滑升平台施工方法及其施工装置
CN104355077A (zh) * 2014-10-14 2015-02-18 中国十七冶集团有限公司 一种焦炉耐材的运输装置及运输方法
CN104727545A (zh) * 2015-04-08 2015-06-24 中国十九冶集团有限公司 大型水塔筒身液压滑模垂直运输系统及方法
CN106284997A (zh) * 2015-05-28 2017-01-04 中国二十冶集团有限公司 钢筋混凝土烟囱的大钢模整体提升施工方法
CN107697818A (zh) * 2017-10-17 2018-02-16 郑州科润机电工程有限公司 一种预应力混凝土风电塔筒壁施工方法及专用施工设备
CN107795122A (zh) * 2017-11-21 2018-03-13 中国十九冶集团有限公司南京分公司 混凝土筒身施工装置及施工方法
CN108590170A (zh) * 2018-06-07 2018-09-28 中建铁路投资建设集团有限公司 一种矩形烟囱双井架移置式模板整体提升装置及其施工方法
CN111424969A (zh) * 2020-04-29 2020-07-17 五冶集团上海有限公司 双筒壁混凝土筒仓滑模施工操作平台及施工方法
CN113167072A (zh) * 2018-12-18 2021-07-23 因温特奥股份公司 具有爬升模板和升降机系统的建筑工地设备
CN114108996A (zh) * 2021-11-26 2022-03-01 中煤西安设计工程有限责任公司 一种无楼板砖砌填充墙的施工装置及方法

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101566005B (zh) * 2009-05-21 2011-04-06 山东丰汇设备技术有限公司 烟囱液压提模装置
CN101696604B (zh) * 2009-09-24 2013-01-09 东北电业管理局烟塔工程公司 一种烟囱筒壁施工方法及专用电动顶升平桥
CN102535843A (zh) * 2011-12-16 2012-07-04 马鞍山钢铁建设集团有限公司 一种圆形钢筋混凝土烟囱筒壁施工方法及液压滑模装置
CN102535843B (zh) * 2011-12-16 2014-03-12 马鞍山钢铁建设集团有限公司 一种圆形钢筋混凝土烟囱筒壁施工方法及液压滑模装置
CN102605988A (zh) * 2012-04-18 2012-07-25 永升建设集团有限公司 烟囱内衬外砼同步施工方法
CN102605988B (zh) * 2012-04-18 2014-12-24 永升建设集团有限公司 烟囱内衬外砼同步施工方法
CN103225389A (zh) * 2013-04-12 2013-07-31 山东电力建设第二工程公司 混凝土筒壁施工顶升平台吊模机装置
CN103225389B (zh) * 2013-04-12 2015-04-01 山东电力建设第二工程公司 混凝土筒壁施工顶升平台吊模机装置
CN103590648A (zh) * 2013-11-28 2014-02-19 中国二十二冶集团有限公司 烟囱滑升平台施工方法及其施工装置
CN104355077B (zh) * 2014-10-14 2017-03-15 中国十七冶集团有限公司 一种焦炉耐材的运输装置及运输方法
CN104355077A (zh) * 2014-10-14 2015-02-18 中国十七冶集团有限公司 一种焦炉耐材的运输装置及运输方法
CN104727545A (zh) * 2015-04-08 2015-06-24 中国十九冶集团有限公司 大型水塔筒身液压滑模垂直运输系统及方法
CN106284997A (zh) * 2015-05-28 2017-01-04 中国二十冶集团有限公司 钢筋混凝土烟囱的大钢模整体提升施工方法
CN106284997B (zh) * 2015-05-28 2019-06-14 中国二十冶集团有限公司 钢筋混凝土烟囱的大钢模整体提升施工方法
CN107697818A (zh) * 2017-10-17 2018-02-16 郑州科润机电工程有限公司 一种预应力混凝土风电塔筒壁施工方法及专用施工设备
CN107697818B (zh) * 2017-10-17 2023-10-17 郑州科润机电工程有限公司 一种预应力混凝土风电塔筒壁施工方法及专用施工设备
CN107795122A (zh) * 2017-11-21 2018-03-13 中国十九冶集团有限公司南京分公司 混凝土筒身施工装置及施工方法
CN108590170A (zh) * 2018-06-07 2018-09-28 中建铁路投资建设集团有限公司 一种矩形烟囱双井架移置式模板整体提升装置及其施工方法
CN113167072A (zh) * 2018-12-18 2021-07-23 因温特奥股份公司 具有爬升模板和升降机系统的建筑工地设备
CN111424969A (zh) * 2020-04-29 2020-07-17 五冶集团上海有限公司 双筒壁混凝土筒仓滑模施工操作平台及施工方法
CN111424969B (zh) * 2020-04-29 2024-01-30 五冶集团上海有限公司 双筒壁混凝土筒仓滑模施工操作平台及施工方法
CN114108996A (zh) * 2021-11-26 2022-03-01 中煤西安设计工程有限责任公司 一种无楼板砖砌填充墙的施工装置及方法

Similar Documents

Publication Publication Date Title
CN101225708A (zh) 一种烟囱的上滑下砌无井架液压滑动模板安装方法
CN108019076B (zh) 大直径钢筋混凝土筒仓施工方法及用于锥壳施工的装置
CN106894639B (zh) 一种下挂式钢结构逆向安装施工方法
CN102535843B (zh) 一种圆形钢筋混凝土烟囱筒壁施工方法及液压滑模装置
CN106150079B (zh) 空中造楼机
CN101538936B (zh) 水塔的液压滑提施工方法
CN104131703A (zh) 利用自爬模架施工核心筒墙体的方法及所用自爬模架
CN106013811A (zh) 一种装配式建筑的安装方法
CN112854745A (zh) 一种装配式建筑铝合金模板施工工艺
CN101886466A (zh) 捣固式焦炉煤塔模板支撑结构的施工方法
CN1452678A (zh) 具有大型模块化单元的高层建筑物的建造
CN103195256A (zh) 吊柱式钢结构胎架法施工工法
CN107542268A (zh) 一种大剧院室内舞台钢结构的逆向安装施工方法
CN205025086U (zh) 一种劲性骨架混凝土梁施工的悬吊模板
CN201367728Y (zh) 用于钢筋混凝土水塔支筒施工中的无井架液压滑模装置
CN101566005B (zh) 烟囱液压提模装置
CN203654702U (zh) 一种钢筋混凝土烟囱施工操作平台
CN102337782A (zh) 一种高大空间顶部施工桁架平台提升系统及其施工方法
CN206352388U (zh) 一种双操作平台电梯井专用脚手架
CN102286932B (zh) 移动模架桥台后方拼装自行上桥施工方法
CN203834928U (zh) 一种自爬模架
CN102409617A (zh) 一种高桥墩的施工方法
CN102733608A (zh) 一种造粒塔喷头层施工方法
CN103061508A (zh) 一种三角形滑模装置及施工方法
CN114109123A (zh) 一种烟囱筒身的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20080723