CN101109356A - 大型轴流式水轮发电机组安装方法 - Google Patents

大型轴流式水轮发电机组安装方法 Download PDF

Info

Publication number
CN101109356A
CN101109356A CNA2007100591891A CN200710059189A CN101109356A CN 101109356 A CN101109356 A CN 101109356A CN A2007100591891 A CNA2007100591891 A CN A2007100591891A CN 200710059189 A CN200710059189 A CN 200710059189A CN 101109356 A CN101109356 A CN 101109356A
Authority
CN
China
Prior art keywords
main shaft
support
web
support cover
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100591891A
Other languages
English (en)
Other versions
CN100451330C (zh
Inventor
王军
单庆臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Tianfa Heavy Hydropower Equipment Manufacturing Co Ltd
Original Assignee
Tianjin Tianfa Heavy Hydropower Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Tianfa Heavy Hydropower Equipment Manufacturing Co Ltd filed Critical Tianjin Tianfa Heavy Hydropower Equipment Manufacturing Co Ltd
Priority to CNB2007100591891A priority Critical patent/CN100451330C/zh
Publication of CN101109356A publication Critical patent/CN101109356A/zh
Application granted granted Critical
Publication of CN100451330C publication Critical patent/CN100451330C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

本发明涉及一种大型轴流式水轮发电机组安装方法。其特点是包括以下步骤:(1)立主轴;(2)将转轮与运输底座把合;(3)吊起主轴,把主轴与转轮的操作油管连接;(4)将主轴降落至转轮体,连接法兰及联轴螺栓;(5)在基础上安装支柱;(6)吊装支持盖到位;与支柱把合;(7)吊装支架;(8)拆下支撑支持盖的支柱,将主轴、支持盖、支架、转轮等部件整体吊入机坑,并将转轮体与机坑内的部件固定连接;(9)在机坑内,将支持盖与顶盖把合,将电机轴与水机轴连接完成后,最后拆下支架。本发明适合大型轴流式水轮发电机组的安装,设计简单,安装操作方便,安全可靠,通用性比较强,符合技术要求。

Description

大型轴流式水轮发电机组安装方法
技术领域
本发明涉及水电站的水轮发电机组主要部套的安装方法,特别涉及一种大型轴流式水轮发电机组安装方法。
背景技术
一般的小型轴流式水轮发电机组的各部件主要是使用安装车间内或机坑内的吊钩来完成机组的安装,起吊重量大约在20吨左右,其安装主要在机坑内完成,通常是用吊具的一端固定在座环的固定导叶上,另一端固定在转轮体叶片上,以此将转轮悬挂在机坑内,再连接水轮机主轴与发电机主轴,再安装支持盖等。当进行大型机组安装时,如果继续使用原来的安装方法,起吊重量大约在100吨左右;对部件的安装、调整及定位操作非常不便;并且需要在叶片上打孔固定吊具,现根据有关技术要求,机组的安装不允许在叶片上打孔,因此现有的安装方法已经不适合大型机组的安装。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种适合大型轴流式水轮发电机组的安装方法。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:一种大型轴流式水轮发电机组安装方法,包括以下步骤:
(1)立主轴;在立主轴之前,将主轴中的操作油管安装完毕,吊装工具与主轴的电机端固定连接,起吊主轴,将主轴的水机端立在地面的基础上;
(2)把转轮体运输底座固定在基础上,将转轮体与运输底座固定连接,并在每个导叶下面做支撑;
(3)吊起主轴,并将主轴下落至适当位置,把主轴与转轮体的操作油管连接;
(4)将主轴降落至转轮体,并与其固定连接;
(5)在基础上安装支柱;围绕转轮体至少有三根支柱;
(6)吊装支持盖到位,与支柱固定连接;
(7)吊装支架,使支架的下环与支持盖的锥筒固定连接,支架的上环与主轴上的轴肩顶接,并用压环来调整顶紧量,支架、压环分别为分体式;
(8)拆下支撑支持盖的支柱,将主轴、支持盖、支架、转轮体整体吊起至机坑,并将转轮体与机坑内的部件固定连接;
(9)在机坑内,依次固定连接支持盖与顶盖、拆下压环、调整支持盖与转轮体的位置、固定连接电机轴与水机轴,最后拆下支架。
所述的步骤(5)中的支柱分布位置按圆周等分。
本发明具有的优点和积极效果是:本发明适合大型轴流式水轮发电机组的安装,设计简单,安装操作方便,安全可靠,通用性比较强,符合技术要求。
附图说明
图1是实施本发明的示意图;
图2是实施本发明时采用的支架和压环的结构示意剖示图。
其中:1是支柱,3是支持盖,5是支架,6是压环,7是吊装工具,8是主轴,9是顶盖,10是转轮体,11是转轮体运输底座,12是支撑件,5-1是下环,5-2是锥筒,5-3吊耳,5-4是上环。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参见图1、图2,图1是实施本发明的示意图,现分步骤说明:
(1)立主轴8,主轴8中的操作油管和吊装主轴用的吊装工具7提前安装,吊装工具7与主轴的上法兰面固定连接,主轴的下法兰面立在地面的基础上。
(2)把转轮体运输底座11固定在基础上,将转轮体10与运输底座11固定连接,并在每个导叶下面用支撑件12做支撑。
(3)吊起主轴8,并将主轴8下落至适当位置,把主轴8与转轮体10的操作油管连接。
(4)将主轴8降落至转轮体10,连接法兰及联轴螺栓。
(5)在基础上安装支柱1;围绕转轮体10至少有三根支柱1,支柱1按圆周三等分布置。因为支柱1的上端与支持盖3固定连接,所以这三根支柱的分布圆要与支持盖3的最大分布圆一致。
(6)保证厂房及吊装高度,吊装支持盖3到位,与支柱1固定连接。
(7)吊装支架5,使支架5的下环5-1与支持盖3固定连接,支架5的上环5-4与主轴8上轴肩顶接,并用压环6来调整顶紧量。锥筒5-2固结于上环与下环之间;所述支架及压环分别为分半固接结构。锥筒5-2的外表面上固接吊耳5-3,便于起吊。
(8)拆下支柱1,将主轴8、支持盖3、支架5、转轮体10整体吊起至机坑,并将转轮体10与机坑内的部件固定连接。
(9)在机坑内,将支持盖3与顶盖9固定连接,拆下压环6,调整支持盖3与转轮体10的位置,将电机轴与水机轴连接完成后,最后拆下支架5。
本发明适合大型轴流式水轮发电机组的安装,设计简单,安装操作方便,安全可靠,通用性比较强,符合技术要求。

Claims (2)

1.一种大型轴流式水轮发电机组安装方法,其特征是包括以下步骤:
(1)立主轴;在立主轴之前,将主轴中的操作油管安装完毕,吊装工具与主轴的电机端固定连接,起吊主轴,将主轴的水机端立在地面的基础上;
(2)把转轮体运输底座固定在基础上,将转轮体与运输底座固定连接,并在每个导叶下面做支撑;
(3)吊起主轴,并将主轴下落至适当位置,把主轴与转轮体的操作油管连接;
(4)将主轴降落至转轮体,并与其固定连接;
(5)在基础上安装支柱;围绕转轮体至少有三根支柱;
(6)吊装支持盖到位,与支柱固定连接;
(7)吊装支架,使支架的下环与支持盖的锥筒固定连接,支架的上环与主轴上的轴肩顶接,并用压环来调整顶紧量,支架、压环分别为分体式;
(8)拆下支撑支持盖的支柱,将主轴、支持盖、支架、转轮体整体吊起至机坑,并将转轮体与机坑内的部件固定连接;
(9)在机坑内,依次固定连接支持盖与顶盖、拆下压环、调整支持盖与转轮体的位置、固定连接电机轴与水机轴,最后拆下支架。
2.根据权利要求1所述的大型轴流式水轮发电机组安装方法,其特征是所述步骤(5)中的支柱分布位置按圆周等分。
CNB2007100591891A 2007-08-22 2007-08-22 大型轴流式水轮发电机组安装方法 Expired - Fee Related CN100451330C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100591891A CN100451330C (zh) 2007-08-22 2007-08-22 大型轴流式水轮发电机组安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100591891A CN100451330C (zh) 2007-08-22 2007-08-22 大型轴流式水轮发电机组安装方法

Publications (2)

Publication Number Publication Date
CN101109356A true CN101109356A (zh) 2008-01-23
CN100451330C CN100451330C (zh) 2009-01-14

Family

ID=39041565

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100591891A Expired - Fee Related CN100451330C (zh) 2007-08-22 2007-08-22 大型轴流式水轮发电机组安装方法

Country Status (1)

Country Link
CN (1) CN100451330C (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102423847A (zh) * 2011-11-17 2012-04-25 东方电气集团东方电机有限公司 轴流转桨式水轮机装配方法及所采用的支撑装置
CN105129687A (zh) * 2015-08-07 2015-12-09 国电大渡河检修安装有限公司 水轮发电机组受油器翻身方法
CN107701352A (zh) * 2017-11-06 2018-02-16 国网四川省电力公司遂宁供电公司 一种用于立式水轮机转动部分的荷重转移装置及方法
CN108087181A (zh) * 2017-12-13 2018-05-29 重庆水轮机厂有限责任公司 一种水轮机转动部分整体安装方法
CN108547721A (zh) * 2018-03-20 2018-09-18 哈尔滨电机厂有限责任公司 一种提高轴流式水轮机转轮间隙均匀度的方法
CN109185008A (zh) * 2018-08-21 2019-01-11 中国水利水电第五工程局有限公司 一种大型轴流转浆式四体联吊组装平衡施工方法
CN109484974A (zh) * 2018-11-20 2019-03-19 国电大渡河检修安装有限公司 轴流转桨式水轮机安装方法
CN114483660A (zh) * 2022-01-05 2022-05-13 东方电气集团东方电机有限公司 一种大型立式水泵芯包整体拆装方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832705B (zh) * 2010-05-25 2011-09-21 中国一冶集团有限公司 烘干筒设备快速拼装方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2509342Y (zh) * 2001-12-28 2002-09-04 许文华 涡壳轴流水轮发电机

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102423847A (zh) * 2011-11-17 2012-04-25 东方电气集团东方电机有限公司 轴流转桨式水轮机装配方法及所采用的支撑装置
CN105129687A (zh) * 2015-08-07 2015-12-09 国电大渡河检修安装有限公司 水轮发电机组受油器翻身方法
CN107701352A (zh) * 2017-11-06 2018-02-16 国网四川省电力公司遂宁供电公司 一种用于立式水轮机转动部分的荷重转移装置及方法
CN108087181A (zh) * 2017-12-13 2018-05-29 重庆水轮机厂有限责任公司 一种水轮机转动部分整体安装方法
CN108547721A (zh) * 2018-03-20 2018-09-18 哈尔滨电机厂有限责任公司 一种提高轴流式水轮机转轮间隙均匀度的方法
CN109185008A (zh) * 2018-08-21 2019-01-11 中国水利水电第五工程局有限公司 一种大型轴流转浆式四体联吊组装平衡施工方法
CN109484974A (zh) * 2018-11-20 2019-03-19 国电大渡河检修安装有限公司 轴流转桨式水轮机安装方法
CN109484974B (zh) * 2018-11-20 2020-01-10 国电大渡河检修安装有限公司 轴流转桨式水轮机安装方法
CN114483660A (zh) * 2022-01-05 2022-05-13 东方电气集团东方电机有限公司 一种大型立式水泵芯包整体拆装方法
CN114483660B (zh) * 2022-01-05 2023-04-07 东方电气集团东方电机有限公司 一种大型立式水泵芯包整体拆装方法

Also Published As

Publication number Publication date
CN100451330C (zh) 2009-01-14

Similar Documents

Publication Publication Date Title
CN100451330C (zh) 大型轴流式水轮发电机组安装方法
EP1677006A2 (en) Wind turbine with detachable crane
CN108700024B (zh) 安装或者拆卸多转子风轮机的风轮机部件的方法
CN108700022B (zh) 安装或者拆卸多转子风轮机的风轮机部件的方法
CN104477788B (zh) 风力发电塔跨越自爬式平移吊机
CN203128000U (zh) 用于直驱式风力发电机组的吊装设备
CN202645875U (zh) 风力发电机叶片的移动式支撑保护装置
CN103663063B (zh) 无齿轮曳引机的安装维修装置
CN104963638A (zh) 一种气体钻井排砂管线的新型支撑装置
CN103539020B (zh) 一种新型吊装施工方法及专用吊运器
CN204754826U (zh) 一种气体钻井排砂管线的新型支撑装置
CN102060252A (zh) 立轴轴流式水轮机转轮吊装工艺
CN201199661Y (zh) 转子平行抽芯架
CN204752010U (zh) 风力发电塔自顶升平移吊吊装系统
CN203529795U (zh) 一种专用吊运器
CN203529784U (zh) 一种风电维护机
CN205709666U (zh) 一种臂架安装支撑装置
CN203112394U (zh) 塔式起重机下支座导向装置
CN201077709Y (zh) 大型轴流式水轮发电机组支架式安装设备
CN202556057U (zh) 轮式风力发电机叶轮变桨操作平台
CN209483538U (zh) 用于风力发电塔筒法兰连接限位装置
CN205132926U (zh) 水轮发电机组尾水肘管的专用井字吊具
CN209507455U (zh) 具有自伸缩塔身的塔式起重机
CN208496910U (zh) 大型灯泡贯流式机组水轮发电机灯泡头安装小车
CN201530696U (zh) 自升式吊装

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090114

Termination date: 20130822