CN100548568C - 大包回转台回转轴承快速更换方法 - Google Patents

大包回转台回转轴承快速更换方法 Download PDF

Info

Publication number
CN100548568C
CN100548568C CNB2008100994312A CN200810099431A CN100548568C CN 100548568 C CN100548568 C CN 100548568C CN B2008100994312 A CNB2008100994312 A CN B2008100994312A CN 200810099431 A CN200810099431 A CN 200810099431A CN 100548568 C CN100548568 C CN 100548568C
Authority
CN
China
Prior art keywords
floating bearing
base
jack
panoramic tables
bale panoramic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2008100994312A
Other languages
English (en)
Other versions
CN101269462A (zh
Inventor
范清厚
高文华
史爱军
王丽茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China No2 Metallurgical Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China No2 Metallurgical Construction Co Ltd filed Critical China No2 Metallurgical Construction Co Ltd
Priority to CNB2008100994312A priority Critical patent/CN100548568C/zh
Publication of CN101269462A publication Critical patent/CN101269462A/zh
Application granted granted Critical
Publication of CN100548568C publication Critical patent/CN100548568C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种大包回转台回转轴承快速更换方法,其特征是:采用四根钢管做立柱,四个立柱垂直分布于大包回转台基础的圆周上,然后采用千斤顶换位摆放补偿顶升点的施工方法,利用四台不小于200t的千斤顶整体顶升回转轴承上部的旋转平台,使回转轴承完全暴露在大包回转台底座的凹槽之上,将回转轴承平移出来进行更换。其优点是:更换回转轴承速度快、安全性高、施工成本低、更换质量高。

Description

大包回转台回转轴承快速更换方法
一、技术领域:
本发明涉及一种大包回转台回转轴承快速更换方法,属于冶金机械设备安装施工领域。
二、技术背景:
薄板坯连铸连轧大包回转台主要由底座、回转轴承、上部旋转结构、提升臂、提升液压缸、滑环、称重装置等组成,它是钢水包的支承及运载设备。其作用是将位于受包位的满载钢包回转至浇钢位置,准备进行浇注,同时将浇注完的空包转回至收包位置。回转轴承位于旋转齿轮座和旋转平台之间,它承受着回转臂传递来的载荷,是大包回转台的重要设备。
包钢薄板坯连铸连轧生产线上的大包回转台的回转轴承滚柱及保持架在运行中发现损坏,已严重影响其运行和生产,因此决定予以更换。但由于世界各地正在运行的大包回转台的轴承的损坏包钢是第一家,即世界范围仅此一例,德国专家也是第一次遇到这类问题,因此没有一套成熟的更换方法。一般可以想到的常规的更换方法有:
方法一:按普通的先拆除再回装的方法施工。将大包回转台轴承上部所有设备逐一拆卸,更换回转轴承,更换完后再一件一件回装,工期需25天,拆卸周期较长,难以实施。
方法二:采用设备整体吊装。由于其位于两厂房之间天车梁下,天车用不上,只能在天车梁上设吊点,通过卷扬起升,但由于大包回转台距大梁底板仅150mm,起升高度小,滑轮设置困难,设备捆绑困难。另外梁不在大包回转台中心,升降时易偏心,使回转轴承难以提升出槽,回装困难,同时由于大包回转台上大底小,利用卷扬吊装保持其水平度非常难,安全性不好,实施较难。
三、发明内容:
本发明的目的是提供一种可以快速更换回转轴承,安全性较高,施工成本较低的大包回转台回转轴承快速更换方法。
本发明的方法是:先拆除回转轴承周围的部件、拆除大包回转台旋转平台上保温砖、拆除大包回转台底座外围保温板、拆除事故流槽、拆除滑环各部件、拆除所有管道,然后采用四根钢管做立柱,四个立柱垂直分布于大包回转台基础的圆周上,设置在大包回转台基础底座上的四个测量支腿旁边,并分别与四个测量支腿焊接;在每个立柱顶部水平固定一钢板,在每个钢板上部放置一台不小于200t的千斤顶,将回转轴承与底座之间螺栓松开,卸下所有螺母,螺栓不抽出,然后四台千斤顶顶住旋转平台同步起升,使回转轴承完全暴露在大包回转台底座的凹槽之上,在底座内和底座外、回转轴承移出方向搭设平台,平台上部安放轨道,使底座内、外轨道在同一平面内;回转轴承与底座间螺栓抽出,再将回转轴承与上部旋转平台螺栓松开,将回转轴承落至钢轨上,拆下所有螺栓,然后利用倒链将回转轴承平抽,当回转轴承移出至接近移出方向的立柱位置时,在移出方向的中轴线上、底座与旋转平台之间安放1台不小于200t的千斤顶,并使其顶住旋转平台,然后松开此方向立柱上的千斤顶,并将此立柱拆掉,然后继续向外平移轴承,直到回转轴承尾部内圈接近其移出方向的底座与旋转平台之间安放千斤顶时,在底座上回转轴承尾部外圈两旁以移出方向的中轴线为对称各放1个不小于200t的千斤顶,并使它们顶住旋转平台,然后撤掉移出方向的中轴线上的千斤顶,向外继续牵引回转轴承至外部平台的轨道上,完成回转轴承的拆除;回转轴承回装是将新的回转轴承按抽出回转轴承方向放至在底座外侧轨道上,然后按回转轴承抽出的步骤反向回装即可。
本发明的优点是:更换回转轴承速度快、安全性高、施工成本低、更换质量高。
四、附图说明:
图1是回转轴承更换时千斤顶顶升旋转平台示意图;
图2是图1的A-A向剖视示意图;
图3是图1的B-B向剖视示意图;
图4是回转轴承移出时的平台支架示意图。
图中:1、旋转平台,2、千斤顶,3、立柱,4、测量支腿,5、回转轴承,6、回转轴承移出方向的中轴线,7、8、9、千斤顶,10、底座,11、钢轨,12、底座外侧平台,13、底座内侧平台。
五、具体实施方式:
实施例:参照附图,用本发明的方法对包钢薄板坯连铸连轧生产线上的大包回转台的回转轴承进行快速更换,仅用7天时间完成了回转轴承快速更换任务。大包回转台提前一天生产,就可多生产薄板4000吨,价值约2000万元,具有较好的经济、社会效益。在回转轴承快速更换过程中,千斤顶2、7、8、9均采用200t的千斤顶,四个立柱3采用无缝钢管,要保证立柱垂直度在0.5/1000以内,立柱顶面钢板水平度在0.05mm以内;回转轴承5完全暴露在大包回转台底座10的凹槽之上时,回转轴承5与底座10的间隙不小于30mm;所述当回转轴承5移出至接近移出方向的立柱位置时,一般是回转轴承接近移出方向的立柱位置在30mm以内;所述回转轴承5尾部内圈接近其移出方向的底座10与旋转平台1之间安放千斤顶7时,一般是回转轴承5尾部内圈接近千斤顶7在30mm以内,然后在底座上回转轴承尾部外圈两旁以移出方向的中轴线6为对称各放1个200t的千斤顶8、9。

Claims (1)

1、一种大包回转台回转轴承快速更换方法,其特征是:先拆除回转轴承周围的部件、拆除大包回转台旋转平台上保温砖、拆除大包回转台底座外围保温板、拆除事故流槽、拆除滑环各部件、拆除所有管道,然后采用四根钢管做立柱,四个立柱垂直分布于大包回转台基础的圆周上,设置在大包回转台底座上的四个测量支腿旁边,并分别与四个测量支腿焊接;在每个立柱顶部水平固定一钢板,在每个钢板上部放置一台不小于200t的千斤顶,将回转轴承与底座之间螺栓松开,卸下所有螺母,螺栓不抽出,然后四台千斤顶顶住旋转平台同步起升,使回转轴承完全暴露在大包回转台底座的凹槽之上,在底座内和底座外、回转轴承移出方向搭设平台,平台上部安放轨道,使底座内、外轨道在同一平面内;回转轴承与底座间螺栓抽出,再将回转轴承与上部旋转平台螺栓松开,将回转轴承落至底座内侧轨道上,拆下所有螺栓,然后利用倒链将回转轴承平抽,当回转轴承移出至接近移出方向的立柱位置时,在移出方向的中轴线上、底座与旋转平台之间安放一台不小于200t的千斤顶,并使其顶住旋转平台,然后松开此方向立柱上的千斤顶,并将此立柱拆掉,然后继续向外平移轴承,直到回转轴承尾部内圈接近其移出方向的底座与旋转平台之间安放千斤顶时,在底座上回转轴承尾部外圈两旁以移出方向的中轴线为对称各放1个不小于200t的千斤顶,并使它们顶住旋转平台,然后撤掉移出方向的中轴线上的千斤顶,向外继续牵引回转轴承至外部平台的轨道上,完成回转轴承的拆除;回转轴承回装是将新的回转轴承按抽出回转轴承方向放至在底座外侧轨道上,然后按回转轴承抽出的步骤反向回装即可。
CNB2008100994312A 2008-05-09 2008-05-09 大包回转台回转轴承快速更换方法 Active CN100548568C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2008100994312A CN100548568C (zh) 2008-05-09 2008-05-09 大包回转台回转轴承快速更换方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2008100994312A CN100548568C (zh) 2008-05-09 2008-05-09 大包回转台回转轴承快速更换方法

Publications (2)

Publication Number Publication Date
CN101269462A CN101269462A (zh) 2008-09-24
CN100548568C true CN100548568C (zh) 2009-10-14

Family

ID=40003824

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2008100994312A Active CN100548568C (zh) 2008-05-09 2008-05-09 大包回转台回转轴承快速更换方法

Country Status (1)

Country Link
CN (1) CN100548568C (zh)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102502230A (zh) * 2011-10-24 2012-06-20 北方重工集团有限公司 一种自移式转载机
CN103447750B (zh) * 2012-06-05 2015-09-02 上海宝冶集团有限公司 高线精轧机辊箱轴承的更换方法
CN103057973B (zh) * 2012-06-27 2014-12-24 南京梅山冶金发展有限公司 一种适用于取料机回转轴承更换的多点顶升的方法
CN103264256B (zh) * 2013-05-31 2015-09-30 上海宝冶集团有限公司 立式磨机选粉机下轴承的更换方法
CN103341722B (zh) * 2013-06-28 2016-12-28 中国一冶集团有限公司 大包回转台轴承更换的方法
CN103551796A (zh) * 2013-10-14 2014-02-05 鞍钢股份有限公司 一种辊道轴承快速更换方法
CN105236320A (zh) * 2015-10-28 2016-01-13 上海十三冶建设有限公司 连铸回转台回转轴承更换鞍臂顶升装置及其施工方法
CN106347194B (zh) * 2016-09-12 2018-11-09 鞍钢集团矿业有限公司 车载电机存储装置及其使用方法
CN106276642A (zh) * 2016-10-11 2017-01-04 中国神华能源股份有限公司 起重机回转轴承的更换方法
CN107322254A (zh) * 2017-06-30 2017-11-07 上海二十冶建设有限公司 一种连铸机大包回转台回转轴承的快速更换方法
CN107354322A (zh) * 2017-09-06 2017-11-17 洛阳新远大冶金成套设备有限公司 铝液过滤箱及铝液净化系统
CN107661977A (zh) * 2017-09-22 2018-02-06 九江萍钢钢铁有限公司 一种依据起重设备整体提升更换连铸机钢包回转支承的方法
CN108500251B (zh) * 2018-06-28 2020-04-24 五冶集团上海有限公司 更换连铸机大包回转台称重臂支撑轴上滑动轴承的方法
CN108941421A (zh) * 2018-09-29 2018-12-07 德清县鑫宏锻造有限公司 锻造手动回转平台
CN108941420A (zh) * 2018-09-29 2018-12-07 德清县鑫宏锻造有限公司 锻造自动回转平台
CN109622933B (zh) * 2019-01-30 2021-01-19 上海二十冶建设有限公司 连铸机大包回转台上部设备整体抬吊更换回转轴承的方法
CN113458750A (zh) * 2020-03-30 2021-10-01 上海梅山钢铁股份有限公司 一种大包回转台回转轴承的更换方法
CN113894526B (zh) * 2021-10-30 2023-07-21 江阴怡源设备安装有限公司 一种料场堆取料机回转轴承快速更换方法及设备
CN114535557B (zh) * 2022-01-10 2023-11-03 新余钢铁股份有限公司 连铸钢包回转台摆臂关节轴承拆卸方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4951386A (en) * 1988-09-08 1990-08-28 Mazda Motor Corporation Apparatus for disassembling bearing caps and assembling metals

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4951386A (en) * 1988-09-08 1990-08-28 Mazda Motor Corporation Apparatus for disassembling bearing caps and assembling metals

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
引进VAI大型板坯连铸机安装技术总结. 贺继文,黄强.安装,第4期. 2006
引进VAI大型板坯连铸机安装技术总结. 贺继文,黄强.安装,第4期. 2006 *

Also Published As

Publication number Publication date
CN101269462A (zh) 2008-09-24

Similar Documents

Publication Publication Date Title
CN100548568C (zh) 大包回转台回转轴承快速更换方法
CN100526000C (zh) 超大型炼钢转炉的组合安装方法
CN103341722B (zh) 大包回转台轴承更换的方法
CN102816891B (zh) 一种转炉首段固定汽化烟道检修拆除的吊装方法
CN101880006B (zh) 固定式回转起重机用滚装装置及滚装方法
CN105755205A (zh) 一种超大型转炉组合法的安装方法
CN101486091A (zh) 上方吊装空间有限的大包回转台整体更换方法
CN101976913A (zh) 一种粗轧机主传动电机吊装方法
CN101367116B (zh) 铜冶炼垂直连铸机安装方法
CN100590206C (zh) 转炉整体平移液压回降施工方法
US3820769A (en) Ladle swing tower for a continuous casting installation
CN102049335A (zh) 大型球磨机安装施工方法
CN109055637B (zh) 一种高炉大修中炉壳安装的液压提升工艺
CN204747073U (zh) 一种板带轧机agc液压缸更换运送装置
CN204958963U (zh) 一种转炉托圈更换的顶升装置
CN104550243B (zh) 大型轧机机架牛腿旋转吊装方法
CN103898270A (zh) 一种炼钢转炉的倒装式安装方法
CN110252823B (zh) 受限空间下重型轧机牌坊的转向滑移方法
CN201793312U (zh) 用于端部带法兰的大型物件的翻转的辅助装置
CN103602769A (zh) 一种平移更换高炉炉顶气密箱设备的施工方法
CN205099290U (zh) 连铸回转台回转轴承更换鞍臂顶升装置
CN105252255B (zh) 一种用顶升装置更换浮式起重机回转轴承的方法
CN209206877U (zh) 一种碳钢板坯连铸机大包回转台轴承更换装置
CN204645809U (zh) 烟囱钢内筒分片滑动拼装就位装置
CN105236320A (zh) 连铸回转台回转轴承更换鞍臂顶升装置及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA SECOND METALLURGY GROUP CORPORATION LIMITED

Free format text: FORMER NAME: CHINA NO.2 METALLURGICAL CONSTRUCTION CO., LTD.

CP03 Change of name, title or address

Address after: 014010 the Inner Mongolia Autonomous Region Baotou City Queensland Steel Street No. 122

Patentee after: China Second Metallurgy Group Co., Ltd.

Address before: 014010 the Inner Mongolia Autonomous Region Baotou City Queensland Steel Street No. 124

Patentee before: China No.2 Metallurgical Construction Co., Ltd.