CN100339543C - 复合保温隔热混凝土建筑钢筋精确定位系统及其施工方法 - Google Patents
复合保温隔热混凝土建筑钢筋精确定位系统及其施工方法 Download PDFInfo
- Publication number
- CN100339543C CN100339543C CNB2006102002100A CN200610200210A CN100339543C CN 100339543 C CN100339543 C CN 100339543C CN B2006102002100 A CNB2006102002100 A CN B2006102002100A CN 200610200210 A CN200610200210 A CN 200610200210A CN 100339543 C CN100339543 C CN 100339543C
- Authority
- CN
- China
- Prior art keywords
- vertical
- reinforcement
- horizontal
- steel bars
- location
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
一种复合保温隔热混凝土建筑钢筋精确定位系统及其施工方法,在复合保温隔热装配式墙体模板和复合保温隔热混凝土楼板造型模板的围合空间内布设竖向钢筋、水平钢筋和箍筋,由竖向定位器、水平定位器、竖向钢筋定位卡件、水平钢筋定位卡件和预埋钢件五大部分连接成格架形钢筋定位系统;竖向定位器由内板、外板、横档固定连接成梯架,该梯架与竖向钢筋平行、与水平钢筋垂直,梯架空腔宽度与墙体厚度相同;水平定位器由内板、外板、横撑固定连接成梯架,该梯架与水平钢筋平行、与竖向钢筋垂直,梯架空腔宽度与墙体厚度相同。本发明能够方便钢筋定位及现场绑扎,大大提高施工速度和施工精度及钢筋系统整体刚度,在混凝土浇铸过程中钢筋不会发生位移。
Description
(一)技术领域
本发明涉及一种建筑钢筋连接装置及其施工方法。
(二)背景技术
现有的建筑钢筋连接系统包括固定连接的竖向钢筋、水平钢筋和箍筋,存在的问题是:施工速度慢、施工精度及整体刚度较差,在混凝土浇筑过程中容易发生钢筋位移。
(三)发明内容
本发明的目的是提供一种复合保温隔热混凝土建筑钢筋精确定位系统及其施工方法,解决现有钢筋工程施工速度慢、施工精度及整体刚度较差的问题,并解决避免在混凝土浇筑过程中发生钢筋位移的技术问题。
本发明复合保温隔热混凝土建筑钢筋精确定位系统的技术方案:在复合保温隔热装配式墙体模板和复合保温隔热混凝土楼板造型模板的围合空间内布设竖向钢筋、水平钢筋和箍筋,其特征在于:由竖向定位器、水平定位器、竖向钢筋定位卡件、水平钢筋定位卡件和预埋钢件五大部分连接成格架形钢筋定位系统;其中:
竖向定位器由内板、外板、横档固定连接成梯架,该梯架与竖向钢筋平行、与水平钢筋垂直,梯架空腔宽度与墙体厚度相同;
水平定位器由内板、外板、横撑固定连接成梯架,该梯架与水平钢筋平行、与竖向钢筋垂直,梯架空腔宽度与墙体厚度相同;
水平钢筋定位卡件为一个带垂直卡槽的矩形垫块,其垂直卡槽插接在竖向定位器的外板与横档、内板与横档的交接处,水平钢筋穿在竖向定位器的内板与外板之间,抵靠在水平钢筋定位卡件内侧,矩形垫块的厚度与混凝土保护层厚度相适应。
竖向钢筋定位卡件为一个双向带卡槽的直角形垫块,竖向钢筋插接在横向部分的水平卡槽中,水平卡槽底边至对边实体的厚度与混凝土保护层厚度相适应;竖向卡槽插接在水平定位器的外板或内板上,竖向钢筋定位卡件由紧固螺丝与水平定位器固定,竖向钢筋穿在水平定位器的内板与外板之间,抵靠在竖向钢筋定位卡件内侧,竖向钢筋定位卡件竖向部分的厚度与混凝土保护层厚度相适应。
上述水平定位器与竖向定位器的连接为螺栓连接、铆接、插接或焊接。
上述水平定位器的横撑和竖向定位器的横档上有开孔和穿孔。
本发明复合保温隔热混凝土建筑钢筋精确定位系统的施工步骤为:
a、在基础施工时,根据钢筋定位系统整体刚度设计和钢筋分布确定预埋钢件位置;
b、将竖向定位器与预埋钢件连接固定好;
c、将水平定位器通过铆接或焊接固定在两根竖向定位器之间;
d、将水平钢筋定位卡件安装在竖向定位器的横档上,并靠近横档内侧;
e、安装箍筋,将箍筋按设计要求预先套在竖向钢筋、水平钢筋上,或者在水平钢筋和竖向钢筋绑扎完成后将U型钢筋弯折形成箍筋;
安装水平钢筋,并初步固定;
g、根据竖向钢筋的位置,移动竖向钢筋定位卡件,拧紧紧固螺丝将其固定在水平定位器上;
h、安装竖向钢筋;
i、绑扎横向钢筋和竖向钢筋;
j、窗洞和门洞钢筋施工时,箍筋预先套在水平钢筋和竖向钢筋上。移动水平钢筋留出洞口距离,竖向钢筋通过竖向钢筋定位卡件确定钢筋位置,并将竖向钢筋绑扎在水平钢筋上;
k、拆除竖向钢筋定位卡件;
l、安装复合保温隔热装配式墙体模板;
m、安装复合保温隔热混凝土楼板造型模板,并支撑;
n、安装梁钢筋或楼板钢筋。
本发明与现有传统技术相比具有的有益效果:能够方便地将水平钢筋、竖向钢筋进行横向、纵向定位及现场绑扎,提高施工速度。钢筋定位系统与钢筋连接成整体,提高钢筋工程的施工精度及整体刚度,在混凝土浇筑过程中钢筋不会发生位移,确保混凝土保护层的厚度,避免钢筋腐蚀,使钢筋混凝土工程质量大大提高。
(四)附图说明
图1是本发明钢筋精确定位系统的结构示意图;
图2是竖向钢筋定位卡件的结构示意图;
图3是水平钢筋定位卡件的结构示意图;
图4是水平定位器的结构示意图;
图5是竖向定位器的结构示意图;
图6是水平钢筋和竖向钢筋安装定位示意图;
图7是钢筋系统绑扎定位示意图;
图8是复合保温隔热混凝土建筑钢筋精确定位系统的实施例示意图。
1-竖向定位器、2-水平定位器、3-水平钢筋定位卡件、4-竖向钢筋定位卡件、5-竖向钢筋、6-水平钢筋、7-窗洞、8-门洞、9-楼板钢筋、10-梁钢筋、11-预埋钢件12-箍筋、13-复合保温隔热装配式墙体模板、14-复合保温隔热混凝土楼板造型模板、15-空调风管。
101-竖向定位器内板、102-竖向定位器外板、103-横档、104-穿孔。
201-水平定位器内板、202-水平定位器外板、203-横撑、204-开孔。
301-水平钢筋定位卡件的垂直卡槽。
401-水平卡槽、402-竖向卡槽、403-紧固螺丝。
(五)具体实施方式
这种复合保温隔热混凝土建筑钢筋精确定位系统的具体实施例参见图1-8,在复合保温隔热装配式墙体模板13和复合保温隔热混凝土楼板造型模板14的围合空间内布设竖向钢筋5、水平钢筋6和箍筋12。由竖向定位器1、水平定位器2、竖向钢筋定位卡件3、水平钢筋定位卡件4和预埋钢件11五大部分连接成格架形钢筋定位系统,水平定位器与竖向定位器的连接可以为螺栓连接、铆接、插接或焊接。
参见图2,竖向定位器1由竖向定位器内板101、竖向定位器外板102、横档103固定连接成梯架,该梯架与竖向钢筋平行、与水平钢筋垂直,梯架空腔宽度与墙体厚度相同。为节省材料,横档上有穿孔104。
参见图3,水平定位器2由水平定位器内板201、水平定位器外板202、横撑203固定连接成梯架,该梯架与水平钢筋平行、与竖向钢筋垂直,梯架空腔宽度与墙体厚度相同。为节省材料,横撑上有开孔204。
参见图4、6,水平钢筋定位卡件3为一个带垂直卡槽301的矩形垫块,其垂直卡槽插接在竖向定位器的外板与横档、内板与横档的交接处,水平钢筋穿在竖向定位器的内板与外板之间,抵靠在水平钢筋定位卡件内侧,矩形垫块的厚度与混凝土保护层厚度相适应。
参见图5、6,竖向钢筋定位卡件4为一个双向带卡槽的直角形垫块,竖向钢筋插接在横向部分的水平卡槽401中,水平卡槽底边至对边实体的厚度与混凝土保护层厚度相适应;竖
向卡槽402插接在水平定位器的外板或内板上,竖向钢筋定位卡件由紧固螺丝403与水平定位2
器固定,竖向钢筋穿在水平定位器的内板与外板之间,抵靠在竖向钢筋定位卡件内侧,竖向钢筋定位卡件竖向部分的厚度与混凝土保护层厚度相适应。
本发明的施工步骤:
a、在基础施工时,根据钢筋定位系统整体刚度设计和钢筋分布确定预埋钢件11的位置;
b、参见图1,将竖向定位器1与预埋钢件11连接固定好;
c、参见图1,将水平定位器2通过铆接或焊接固定在两根竖向定位器1之间;
d、参见图6,将水平钢筋定位卡件3安装在竖向定位器1的横档103上,并靠近横档内侧;
e、参见图6,安装箍筋12,将箍筋按设计要求预先套在竖向钢筋5、水平钢筋6上,或者在水平钢筋和竖向钢筋绑扎完成后将U型钢筋弯折形成箍筋;
f、参见图6,安装水平钢筋6,并初步固定;
g、参见图6,根据竖向钢筋5的位置,移动竖向钢筋定位卡件4,拧紧紧固螺丝403将其固定在水平定位器2上;
h、参见图6,安装竖向钢筋5;
i、参见图7,绑扎横向钢筋6和竖向钢筋5;
j、参见图7,窗洞7和门洞8钢筋施工时,箍筋12预先套在水平钢筋和竖向钢筋上。移动水平钢筋留出洞口距离,竖向钢筋通过竖向钢筋定位卡件确定钢筋位置,并将竖向钢筋绑扎在水平钢筋上;
k、参见图7,拆除竖向钢筋定位卡件4;
l、参见图8,安装复合保温隔热装配式墙体模板13;
m、参见图8,安装复合保温隔热混凝土楼板造型模板14、空调风管15,并支撑;
n、参见图8,安装梁钢筋10或楼板钢筋9。
Claims (4)
1.一种复合保温隔热混凝土建筑钢筋精确定位系统,在复合保温隔热装配式墙体模板和复合保温隔热混凝土楼板造型模板的围合空间内布设竖向钢筋、水平钢筋和箍筋,其特征在于:由竖向定位器、水平定位器、竖向钢筋定位卡件、水平钢筋定位卡件和预埋钢件五大部分连接成格架形钢筋定位系统;其中:
竖向定位器由内板、外板、横档固定连接成梯架,该梯架与竖向钢筋平行、与水平钢筋垂直,梯架空腔宽度与墙体厚度相同;
水平定位器由内板、外板、横撑固定连接成梯架,该梯架与水平钢筋平行、与竖向钢筋垂直,梯架空腔宽度与墙体厚度相同;
水平钢筋定位卡件为一个带垂直卡槽的矩形垫块,其垂直卡槽插接在竖向定位器的外板与横档、内板与横档的交接处,水平钢筋穿在竖向定位器的内板与外板之间,抵靠在水平钢筋定位卡件内侧,矩形垫块的厚度与混凝土保护层厚度相适应。
竖向钢筋定位卡件为一个双向带卡槽的直角形垫块,竖向钢筋插接在横向部分的水平卡槽中,水平卡槽底边至对边实体的厚度与混凝土保护层厚度相适应;竖向卡槽插接在水平定位器的外板或内板上,竖向钢筋定位卡件由紧固螺丝与水平定位器固定,竖向钢筋穿在水平定位器的内板与外板之间,抵靠在竖向钢筋定位卡件内侧,竖向钢筋定位卡件竖向部分的厚度与混凝土保护层厚度相适应。
2.根据权利要求1所述的复合保温隔热混凝土建筑钢筋精确定位系统,其特征在于:上述水平定位器与竖向定位器的连接为螺栓连接、铆接、插接或焊接。
3.根据权利要求1所述的复合保温隔热混凝土建筑钢筋精确定位系统,其特征在于:上述水平定位器的横撑和竖向定位器的横档上有开孔和穿孔。
4.根据权利要求1所述的复合保温隔热混凝土建筑钢筋精确定位系统的施工方法,其特征在于施工步骤为:
a、在基础施工时,根据钢筋定位系统整体刚度设计和钢筋分布确定预埋钢件位置;
b、将竖向定位器与预埋钢件连接固定好;
c、将水平定位器通过铆接或焊接固定在两根竖向定位器之间;
d、将水平钢筋定位卡件安装在竖向定位器的横档上,并靠近横档内侧;
e、安装箍筋,将箍筋按设计要求预先套在竖向钢筋、水平钢筋上,或者在水平钢筋和竖向钢筋绑扎完成后将U型钢筋弯折形成箍筋;
安装水平钢筋,并初步固定;
g、根据竖向钢筋的位置,移动竖向钢筋定位卡件,拧紧紧固螺丝将其固定在水平定位器上;
h、安装竖向钢筋;
i、绑扎横向钢筋和竖向钢筋;
j、窗洞和门洞钢筋施工时,箍筋预先套在水平钢筋和竖向钢筋上。移动水平钢筋留出洞口距离,竖向钢筋通过竖向钢筋定位卡件确定钢筋位置,并将竖向钢筋绑扎在水平钢筋上;
k、拆除竖向钢筋定位卡件;
l、安装复合保温隔热装配式墙体模板;
m、安装复合保温隔热混凝土楼板造型模板,并支撑;
n、安装梁或楼板钢筋。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102002100A CN100339543C (zh) | 2006-03-07 | 2006-03-07 | 复合保温隔热混凝土建筑钢筋精确定位系统及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102002100A CN100339543C (zh) | 2006-03-07 | 2006-03-07 | 复合保温隔热混凝土建筑钢筋精确定位系统及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1844605A CN1844605A (zh) | 2006-10-11 |
CN100339543C true CN100339543C (zh) | 2007-09-26 |
Family
ID=37063566
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006102002100A Expired - Fee Related CN100339543C (zh) | 2006-03-07 | 2006-03-07 | 复合保温隔热混凝土建筑钢筋精确定位系统及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100339543C (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112411886A (zh) * | 2020-11-26 | 2021-02-26 | 华中科技大学 | 一种钢筋精确定位指纹装置及方法 |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102352690B (zh) * | 2011-07-29 | 2013-05-22 | 中国二十二冶集团有限公司 | 现浇混凝土空心楼板的钢管抗浮定位系统的施工方法 |
CN104831868A (zh) * | 2015-03-10 | 2015-08-12 | 成都科创佳思科技有限公司 | 剪力墙定位装置 |
CN105499447A (zh) * | 2015-12-25 | 2016-04-20 | 上海建工四建集团有限公司 | 钢筋网片弯折及拼装的定位夹具及其施工方法 |
CN107338912A (zh) * | 2016-04-08 | 2017-11-10 | 陈键 | 一种建筑钢筋保护层夹装设备 |
CN106002052A (zh) * | 2016-07-08 | 2016-10-12 | 杨晓斌 | 一种用于钢筋网焊接的支撑架 |
CN108868153A (zh) * | 2017-05-12 | 2018-11-23 | 五冶集团上海有限公司 | 腐蚀环境下地下室环氧树脂涂层钢筋绑扎方法 |
CN108868154A (zh) * | 2017-05-12 | 2018-11-23 | 五冶集团上海有限公司 | 腐蚀环境下混凝土梁模板的环氧树脂涂层钢筋绑扎方法 |
CN107587628B (zh) * | 2017-09-23 | 2019-07-05 | 天津市盛泰建筑工程有限公司 | 一种剪力墙结构及其浇注方法 |
CN107587419A (zh) * | 2017-09-28 | 2018-01-16 | 中国十七冶集团有限公司 | 斜截面桥梁钢筋保护层和钢筋的排距控制装置及使用方法 |
CN108505687A (zh) * | 2018-06-05 | 2018-09-07 | 江苏凤腾塑料有限公司 | 一种pvc挤出成型的混凝土加固装置 |
CN109853856A (zh) * | 2018-12-27 | 2019-06-07 | 天津新宇建筑工程有限公司 | 一种剪力墙钢筋间距控制施工工艺 |
CN110748091A (zh) * | 2019-11-01 | 2020-02-04 | 中铁十六局集团第四工程有限公司 | 保护层厚度控制装置 |
CN111255124A (zh) * | 2020-03-12 | 2020-06-09 | 四川省建筑设计研究院有限公司 | 一种叠合剪力墙及其插筋方法 |
CN111749232B (zh) * | 2020-07-14 | 2021-12-03 | 邳州华创新能源电池研究院有限公司 | 一种钢筋模板一体化构件用预埋式防偏棒 |
CN116607708B (zh) * | 2023-07-19 | 2023-09-22 | 中宇拓疆环保科技(新沂)有限公司 | 一种装配式建筑墙体钢筋预埋定位装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87201293U (zh) * | 1987-04-27 | 1988-01-20 | 王枥枥 | 一套定位固定柱主筋及柱的组合夹具 |
CN2087648U (zh) * | 1991-05-03 | 1991-10-30 | 胡晓 | 钢筋定位支架 |
CN2362937Y (zh) * | 1998-07-16 | 2000-02-09 | 同济大学 | 钢筋混凝土结构中钢筋的定位夹具 |
CN2695508Y (zh) * | 2004-05-09 | 2005-04-27 | 润弘精密工程事业股份有限公司 | 建筑物基础钢筋装置 |
-
2006
- 2006-03-07 CN CNB2006102002100A patent/CN100339543C/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87201293U (zh) * | 1987-04-27 | 1988-01-20 | 王枥枥 | 一套定位固定柱主筋及柱的组合夹具 |
CN2087648U (zh) * | 1991-05-03 | 1991-10-30 | 胡晓 | 钢筋定位支架 |
CN2362937Y (zh) * | 1998-07-16 | 2000-02-09 | 同济大学 | 钢筋混凝土结构中钢筋的定位夹具 |
CN2695508Y (zh) * | 2004-05-09 | 2005-04-27 | 润弘精密工程事业股份有限公司 | 建筑物基础钢筋装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112411886A (zh) * | 2020-11-26 | 2021-02-26 | 华中科技大学 | 一种钢筋精确定位指纹装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN1844605A (zh) | 2006-10-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100339543C (zh) | 复合保温隔热混凝土建筑钢筋精确定位系统及其施工方法 | |
CN100356016C (zh) | 混凝土建筑钢筋精确定位系统及其施工方法 | |
CN2856237Y (zh) | 轻钢装配式建筑用h型轻钢构件 | |
CN106013787B (zh) | 现浇混凝土梁模板工具式加固体系及其施工工艺 | |
CN1786364A (zh) | 复合保温隔热混凝土逐层整体浇筑体系及其施工方法 | |
CN102704672A (zh) | 一种剪力墙全钢大模板阴角处安装施工方法 | |
CN110409811B (zh) | 含钢筋笼免拆成型柱模板、模板结构及建筑工艺 | |
CN1182821A (zh) | 框架构件和使用框架构件的建筑方法 | |
CN205840322U (zh) | 现浇混凝土梁模板工具式加固体系 | |
CN1968887A (zh) | 电梯的门套 | |
CN105386538A (zh) | 一种cl复合混凝土剪力墙施工工艺 | |
CN2603827Y (zh) | 自承式模板构件 | |
CN115324341B (zh) | 钢混组合梁的施工方法 | |
CN104775613A (zh) | 一种用于建筑施工中混凝土浇注的外角加固系统 | |
CN214459711U (zh) | 一种跨座式单轨钢混结合梁桥面混凝土模板加固装置 | |
CN214531508U (zh) | 构造柱安装结构及建筑 | |
CN211775787U (zh) | 一种非标准层铝模与木模组合节点结构 | |
CN211369523U (zh) | 一种伸缩缝剪力墙的模板体系 | |
CN213774463U (zh) | 一种墙体浇筑用组装式铝模板 | |
CN206655474U (zh) | 定型组合拼装式楼梯模板 | |
CN220840824U (zh) | 一种预应力混凝土雁形屋盖板模具体系 | |
CN220183845U (zh) | 一种雨水箱涵倒角处吊模安装结构 | |
CN212509834U (zh) | 一种竖向混凝土泵管固定结构 | |
CN217949749U (zh) | 一种用于圈梁模板的加固装置 | |
CN209760802U (zh) | 一种工程外侧梁木板加固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070926 Termination date: 20150307 |
|
EXPY | Termination of patent right or utility model |