CN100356016C - 混凝土建筑钢筋精确定位系统及其施工方法 - Google Patents
混凝土建筑钢筋精确定位系统及其施工方法 Download PDFInfo
- Publication number
- CN100356016C CN100356016C CNB2006102002115A CN200610200211A CN100356016C CN 100356016 C CN100356016 C CN 100356016C CN B2006102002115 A CNB2006102002115 A CN B2006102002115A CN 200610200211 A CN200610200211 A CN 200610200211A CN 100356016 C CN100356016 C CN 100356016C
- Authority
- CN
- China
- Prior art keywords
- vertical
- reinforcement
- horizontal
- location
- fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
一种混凝土建筑钢筋精确定位系统及其施工方法,由竖向定位器、水平定位器、竖向钢筋定位卡件、水平钢筋定位卡件和预埋钢件五大部分连接成格架形定位系统。竖向定位器由内板、外板、横档固定连接成梯架,该梯架与竖向钢筋平行、与水平钢筋垂直,梯架空腔宽度与墙体厚度相同;水平定位器由内板、外板、横撑固定连接成梯架,该梯架与水平钢筋平行、与竖向钢筋垂直,梯架空腔宽度与墙体厚度相同。本发明能够方便地将水平钢筋、竖向钢筋进行横向、纵向定位及现场绑扎,提高施工速度。钢筋定位系统与钢筋连接成整体,提高了钢筋工程的施工精度及整体刚度,避免钢筋在混凝土浇筑过程中发生位移。
Description
(一)技术领域
本发明涉及一种建筑钢筋连接装置及其施工方法。
(二)背景技术
现有的建筑钢筋连接系统包括固定连接的竖向钢筋、水平钢筋和箍筋,存在的问题是:施工速度慢、施工精度及整体刚度较差,在混凝土浇筑过程中容易发生钢筋位移。
(三)发明内容
本发明的目的是提供一种混凝土建筑钢筋精确定位系统及其施工方法,解决现有钢筋工程施工速度慢、施工精度及整体刚度较差的问题,并解决避免在混凝土浇筑过程中发生钢筋位移的技术问题。
本发明的技术方案:这种混凝土建筑钢筋精确定位系统,包括固定连接的竖向钢筋、水平钢筋和箍筋,其特征在于:由竖向定位器、水平定位器、竖向钢筋定位卡件、水平钢筋定位卡件和预埋钢件五大部分连接成格架形定位系统;其中:
竖向定位器由内板、外板、横档固定连接成梯架,该梯架与竖向钢筋平行、与水平钢筋垂直,梯架空腔宽度与墙体厚度相同;
水平定位器由内板、外板、横撑固定连接成梯架,该梯架与水平钢筋平行、与竖向钢筋垂直,梯架空腔宽度与墙体厚度相同;
水平钢筋定位卡件为一个带垂直卡槽的矩形垫块,其垂直卡槽插接在竖向定位器的外板与横档、内板与横档的交接处,水平钢筋穿在竖向定位器的内板与外板之间,抵靠在水平钢筋定位卡件内侧,矩形垫块的厚度与混凝土保护层厚度相适应。
竖向钢筋定位卡件为一个双向带卡槽的直角形垫块,竖向钢筋插接在横向部分的水平卡槽中,水平卡槽底边至对边实体的厚度与混凝土保护层厚度相适应;竖向卡槽插接在水平定位器的外板或内板上,竖向钢筋定位卡件由紧固螺丝与水平定位器固定,竖向钢筋穿在水平定位器的内板与外板之间,抵靠在竖向钢筋定位卡件内侧,竖向钢筋定位卡件竖向部分的厚度与混凝土保护层厚度相适应。
上述水平定位器与竖向定位器的连接为螺栓连接、铆接、插接或焊接。
上述水平定位器的横撑和竖向定位器的横档上有开孔和穿孔。
本发明混凝土建筑钢筋精确定位系统的施工步骤为:
a、在基础施工时,根据钢筋定位系统整体刚度设计和钢筋分布确定预埋钢件位置;
b、将竖向定位器与预埋钢件连接固定好;
c、将水平定位器通过铆接或焊接固定在两根竖向定位器之间;
d、将水平钢筋定位卡件安装在竖向定位器的横档上,并靠近横档内侧;
e、安装箍筋,将箍筋按设计要求预先套在竖向钢筋、水平钢筋上,或者在水平钢筋和竖向钢筋绑扎完成后将U型钢筋弯折形成箍筋;
安装水平钢筋,并初步固定;
g、根据竖向钢筋的位置,移动竖向钢筋定位卡件,拧紧紧固螺丝将其固定在水平定位器上;
h、安装竖向钢筋;
i、绑扎横向钢筋和竖向钢筋;
j、窗洞和门洞钢筋施工时,箍筋预先套在水平钢筋和竖向钢筋上。移动水平钢筋留出洞口距离,竖向钢筋通过竖向钢筋定位卡件确定钢筋位置,并将竖向钢筋绑扎在水平钢筋上;
k、拆除竖向钢筋定位卡件;
l、安装楼板钢筋或梁钢筋。
本发明与现有传统技术相比具有的有益效果:能够方便地将水平钢筋、竖向钢筋进行横向、纵向定位及现场绑扎,提高施工速度。钢筋定位系统与钢筋连接成整体,提高钢筋工程的施工精度及整体刚度,在混凝土浇筑过程中钢筋不会发生位移, 确保混凝土保护层的厚度,避免钢筋腐蚀,使钢筋混凝土工程质量大大提高。
(四)附图说明
图1是本发明钢筋精确定位系统的结构示意图;
图2是竖向定位器的结构示意图;
图3是水平定位器的结构示意图;
图4是水平钢筋定位卡件的结构示意图;
图5是竖向钢筋定位卡件的结构示意图;
图6是水平钢筋和竖向钢筋安装定位示意图;
图7是钢筋系统绑扎定位实施例的示意图。
1-竖向定位器、2-水平定位器、3-水平钢筋定位卡件、4-竖向钢筋定位卡件、5-竖向钢筋、6-水平钢筋、7-窗洞、8-门洞、9-楼板钢筋、10-梁钢筋、11-预埋钢件12-箍筋。
101-竖向定位器内板、102-竖向定位器外板、103-横档、104-穿孔。
201-水平定位器内板、202-水平定位器外板、203-横撑、204-开孔。
301-水平钢筋定位卡件的垂直卡槽。
401-水平卡槽、402-竖向卡槽、403-紧固螺丝。
(五)具体实施方式
这种混凝土建筑钢筋精确定位系统的具体实施例参见图1-7,将竖向钢筋5、水平钢筋6、箍筋12固定连接,其特征在于:由竖向定位器1、水平定位器2、竖向钢筋定位卡件3、水平钢筋定位卡件4和预埋钢件11五大部分连接成格架形定位系统,水平定位器与竖向定位器的连接可以为螺栓连接、铆接、插接或焊接。
参见图2,竖向定位器1由竖向定位器内板101、竖向定位器外板102、横档103固定连接成梯架,该梯架与竖向钢筋平行、与水平钢筋垂直,梯架空腔宽度与墙体厚度相同。为节省材料,横档上有穿孔104。
参见图3,水平定位器2由水平定位器内板201、水平定位器外板202、横撑203固定连接成梯架,该梯架与水平钢筋平行、与竖向钢筋垂直,梯架空腔宽度与墙体厚度相同。为节省材料,横撑上有开孔204。
参见图4、6,水平钢筋定位卡件3为一个带垂直卡槽301的矩形垫块,其垂直卡槽插接在竖向定位器的外板与横档、内板与横档的交接处,水平钢筋穿在竖向定位器的内板与外板之间,抵靠在水平钢筋定位卡件内侧,矩形垫块的厚度与混凝土保护层厚度相适应。
参见图5、6,竖向钢筋定位卡件4为一个双向带卡槽的直角形垫块,竖向钢筋插接在横向部分的水平卡槽401中,水平卡槽底边至对边实体的厚度与混凝土保护层厚度相适应;竖向卡槽402插接在水平定位器的外板或内板上,竖向钢筋定位卡件由紧固螺丝403与水平定位器固定,竖向钢筋穿在水平定位器的内板与外板之间,抵靠在竖向钢筋定位卡件内侧,竖向钢筋定位卡件竖向部分的厚度与混凝土保护层厚度相适应。
本发明的施工步骤:
a、在基础施工时,根据钢筋定位系统整体刚度设计和钢筋分布确定预埋钢件11的位置;
b、参见图1,将竖向定位器1与预埋钢件11连接固定好;
c、参见图1,将水平定位器2通过铆接或焊接固定在两根竖向定位器1之间;
d、参见图6,将水平钢筋定位卡件3安装在竖向定位器1的横档103上,并靠近横档内侧;
e、参见图6、7,安装箍筋12,将箍筋按设计要求预先套在竖向钢筋5、水平钢筋6上,或者在水平钢筋和竖向钢筋绑扎完成后将U型钢筋弯折形成箍筋;
f、参见图6,安装水平钢筋6,并初步固定;
g、参见图6,根据竖向钢筋5的位置,移动竖向钢筋定位卡件4,拧紧紧固螺丝403将其固定在水平定位器2上;
h、参见图6,安装竖向钢筋5;
i、参见图7,绑扎横向钢筋6和竖向钢筋5;
j、参见图7,窗洞7和门洞8钢筋施工时,箍筋12预先套在水平钢筋和竖向钢筋上。移动水平钢筋留出洞口距离,竖向钢筋通过竖向钢筋定位卡件确定钢筋位置,并将竖向钢筋绑扎在水平钢筋上;
k、参见图7,拆除竖向钢筋定位卡件4;
l、参见图7,安装楼板钢筋9或梁钢筋10。
Claims (4)
1.一种混凝土建筑钢筋精确定位系统,包括固定连接的竖向钢筋、水平钢筋和箍筋,其特征在于:由竖向定位器、水平定位器、竖向钢筋定位卡件、水平钢筋定位卡件和预埋钢件五大部分连接成格架形定位系统;其中:
竖向定位器由内板、外板、横档固定连接成梯架,该梯架与竖向钢筋平行、与水平钢筋垂直,梯架空腔宽度与墙体厚度相同;
水平定位器由内板、外板、横撑固定连接成梯架,该梯架与水平钢筋平行、与竖向钢筋垂直,梯架空腔宽度与墙体厚度相同;
水平钢筋定位卡件为一个带垂直卡槽的矩形垫块,其垂直卡槽插接在竖向定位器的外板与横档、内板与横档的交接处,水平钢筋穿在竖向定位器的内板与外板之间,抵靠在水平钢筋定位卡件内侧,矩形垫块的厚度与混凝土保护层厚度相适应。
竖向钢筋定位卡件为一个双向带卡槽的直角形垫块,竖向钢筋插接在横向部分的水平卡槽中,水平卡槽底边至对边实体的厚度与混凝土保护层厚度相适应;竖向卡槽插接在水平定位器的外板或内板上,竖向钢筋定位卡件由紧固螺丝与水平定位器固定,竖向钢筋穿在水平定位器的内板与外板之间,抵靠在竖向钢筋定位卡件内侧,竖向钢筋定位卡件竖向部分的厚度与混凝土保护层厚度相适应。
2.根据权利要求1所述的混凝土建筑钢筋精确定位系统,其特征在于:上述水平定位器与竖向定位器的连接为螺栓连接、铆接、插接或焊接。
3.根据权利要求1所述的混凝土建筑钢筋精确定位系统,其特征在于:上述水平定位器的横撑和竖向定位器的横档上有开孔和穿孔。
4.根据权利要求1所述的混凝土建筑钢筋精确定位系统的施工方法,其特征在于施工步骤为:
a、在基础施工时,根据钢筋定位系统整体刚度设计和钢筋分布确定预埋钢件位置;
b、将竖向定位器与预埋钢件连接固定好;
c、将水平定位器通过铆接或焊接固定在两根竖向定位器之间;
d、将水平钢筋定位卡件安装在竖向定位器的横档上,并靠近横档内侧;
e、安装箍筋,将箍筋按设计要求预先套在竖向钢筋、水平钢筋上,或者在水平钢筋和竖向钢筋绑扎完成后将U型钢筋弯折形成箍筋;
安装水平钢筋,并初步固定;
g、根据竖向钢筋的位置,移动竖向钢筋定位卡件,拧紧紧固螺丝将其固定在水平定位器上;
h、安装竖向钢筋;
i、绑扎横向钢筋和竖向钢筋;
j、窗洞和门洞钢筋施工时,箍筋预先套在水平钢筋和竖向钢筋上。移动水平钢筋留出洞口距离,竖向钢筋通过竖向钢筋定位卡件确定钢筋位置,并将竖向钢筋绑扎在水平钢筋上;
k、拆除竖向钢筋定位卡件;
l、安装楼板钢筋或梁钢筋。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102002115A CN100356016C (zh) | 2006-03-07 | 2006-03-07 | 混凝土建筑钢筋精确定位系统及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102002115A CN100356016C (zh) | 2006-03-07 | 2006-03-07 | 混凝土建筑钢筋精确定位系统及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1936228A CN1936228A (zh) | 2007-03-28 |
CN100356016C true CN100356016C (zh) | 2007-12-19 |
Family
ID=37953926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006102002115A Expired - Fee Related CN100356016C (zh) | 2006-03-07 | 2006-03-07 | 混凝土建筑钢筋精确定位系统及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100356016C (zh) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT1403798B1 (it) * | 2011-01-13 | 2013-10-31 | Caboni | Sistema costruttivo modulare per l armatura di fondamenta, pilastri, setti antisismici per cassaforma a geometria variabile. |
CN104100093B (zh) * | 2013-09-06 | 2016-04-06 | 青岛林川工程技术咨询有限公司 | 一种保证水平钢筋间距的装置及其使用方法 |
CN105298140B (zh) * | 2015-09-25 | 2018-03-02 | 长沙远大住宅工业集团有限公司 | 外剪力墙施工用钢筋定位框及其定位方法 |
CN107338762B (zh) * | 2017-08-24 | 2022-11-01 | 上海市水利工程集团有限公司 | 防汛墙钢筋精确定型ω式全锁扣定位方法及定位器 |
CN107587628B (zh) * | 2017-09-23 | 2019-07-05 | 天津市盛泰建筑工程有限公司 | 一种剪力墙结构及其浇注方法 |
CN107587419A (zh) * | 2017-09-28 | 2018-01-16 | 中国十七冶集团有限公司 | 斜截面桥梁钢筋保护层和钢筋的排距控制装置及使用方法 |
CN108104380A (zh) * | 2017-12-15 | 2018-06-01 | 中天建设集团有限公司 | 一种装配式转换层钢筋定位施工方法 |
CN109056539B (zh) * | 2018-08-22 | 2020-07-03 | 中交第二航务工程局有限公司 | 一种装配式钢筋安装结构 |
CN108868159A (zh) * | 2018-09-03 | 2018-11-23 | 江苏金贸科技发展有限公司 | 一种装配式建筑用钢筋定位装置 |
CN109853856A (zh) * | 2018-12-27 | 2019-06-07 | 天津新宇建筑工程有限公司 | 一种剪力墙钢筋间距控制施工工艺 |
CN110145054B (zh) * | 2019-06-06 | 2021-03-02 | 内蒙古工业大学 | 一种装配式的建筑复合外墙板结构 |
CN111456421B (zh) * | 2020-04-15 | 2021-10-29 | 中国电建市政建设集团有限公司 | 一种多连体薄壁筒仓滑模的快速锁紧机构 |
CN111531306A (zh) * | 2020-05-12 | 2020-08-14 | 周建平 | 一种建筑浇筑框架的定位焊接一体化机构 |
CN112502442B (zh) * | 2020-11-30 | 2022-05-13 | 中国十七冶集团有限公司 | 一种剪力墙外墙钢筋绑扎定位装置 |
CN112832512B (zh) * | 2021-01-07 | 2022-05-27 | 中铁三局集团建筑安装工程有限公司 | 大跨度缓粘结预应力钢筋混凝土梁及施工方法 |
CN113863578B (zh) * | 2021-09-07 | 2023-07-25 | 中国建筑第八工程局有限公司 | 地下室外墙竖向钢筋固定装置及利用装置安装钢筋的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87201293U (zh) * | 1987-04-27 | 1988-01-20 | 王枥枥 | 一套定位固定柱主筋及柱的组合夹具 |
CN2087648U (zh) * | 1991-05-03 | 1991-10-30 | 胡晓 | 钢筋定位支架 |
CN2362937Y (zh) * | 1998-07-16 | 2000-02-09 | 同济大学 | 钢筋混凝土结构中钢筋的定位夹具 |
CN2695508Y (zh) * | 2004-05-09 | 2005-04-27 | 润弘精密工程事业股份有限公司 | 建筑物基础钢筋装置 |
-
2006
- 2006-03-07 CN CNB2006102002115A patent/CN100356016C/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87201293U (zh) * | 1987-04-27 | 1988-01-20 | 王枥枥 | 一套定位固定柱主筋及柱的组合夹具 |
CN2087648U (zh) * | 1991-05-03 | 1991-10-30 | 胡晓 | 钢筋定位支架 |
CN2362937Y (zh) * | 1998-07-16 | 2000-02-09 | 同济大学 | 钢筋混凝土结构中钢筋的定位夹具 |
CN2695508Y (zh) * | 2004-05-09 | 2005-04-27 | 润弘精密工程事业股份有限公司 | 建筑物基础钢筋装置 |
Also Published As
Publication number | Publication date |
---|---|
CN1936228A (zh) | 2007-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100356016C (zh) | 混凝土建筑钢筋精确定位系统及其施工方法 | |
CN100339543C (zh) | 复合保温隔热混凝土建筑钢筋精确定位系统及其施工方法 | |
CN108086355B (zh) | 现浇管廊传统工艺下的预埋槽道安装固定方法 | |
CN211774638U (zh) | 型钢混凝土梁柱快装节点 | |
CN113216768A (zh) | 一种汽车隐藏式门把手安装结构以及安装方法 | |
CN208733666U (zh) | 一种固定螺栓预留孔模板工具 | |
CN214868365U (zh) | 高层住宅楼剪力墙竖钢筋定位工具 | |
CN115370048A (zh) | 一种用于曲面幕墙的可调节精准定位装置 | |
CN203486004U (zh) | 底架及具有该底架的专用车或半挂车 | |
CN209760457U (zh) | 一种钢筋模板一体化墙体与连梁拼接连接构造 | |
JP4190390B2 (ja) | 建物躯体へのパネル部材の取付構造 | |
CN100417774C (zh) | 复合保温隔热混凝土建筑模板安装限位系统及其施工方法 | |
CN210530332U (zh) | 一种k板加固背楞的使用安装结构 | |
CN209799020U (zh) | 一种钢筋模板一体化墙体与连梁机械连接构造 | |
CN210597766U (zh) | 一种装配式混凝土剪力墙叠合结构 | |
CN206655474U (zh) | 定型组合拼装式楼梯模板 | |
CN215630700U (zh) | 混凝土现浇结构侧壁预埋钢件固定器 | |
CN217710878U (zh) | 用于橡胶止水带的组合式安装工具 | |
CN110593554A (zh) | 一种应用于超厚竖向混凝土结构模板体系内角加固结构 | |
CN215518375U (zh) | 预制梁翼板悬臂定位调节模架 | |
CN217481312U (zh) | 一种用于隧道纵向止水带定位的装置 | |
CN215282581U (zh) | 一种固定限位磁盒的夹具装置 | |
CN204781462U (zh) | 一种抗裂墙体固定组合件 | |
CN220183845U (zh) | 一种雨水箱涵倒角处吊模安装结构 | |
CN216239738U (zh) | 现浇混凝土梁模板支撑夹具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20071219 Termination date: 20150307 |
|
EXPY | Termination of patent right or utility model |