CH706577B1 - A method for tamping a track and a tamping machine and a machine group for performing the method. - Google Patents

A method for tamping a track and a tamping machine and a machine group for performing the method. Download PDF

Info

Publication number
CH706577B1
CH706577B1 CH00744/12A CH7442012A CH706577B1 CH 706577 B1 CH706577 B1 CH 706577B1 CH 00744/12 A CH00744/12 A CH 00744/12A CH 7442012 A CH7442012 A CH 7442012A CH 706577 B1 CH706577 B1 CH 706577B1
Authority
CH
Switzerland
Prior art keywords
track
ballast
einschottervorrichtung
measuring device
gravel
Prior art date
Application number
CH00744/12A
Other languages
German (de)
Other versions
CH706577A2 (en
Inventor
Jörg Ganz
Original Assignee
Matisa Matériel Ind Sa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matisa Matériel Ind Sa filed Critical Matisa Matériel Ind Sa
Priority to CH00744/12A priority Critical patent/CH706577B1/en
Priority to PCT/IB2013/000856 priority patent/WO2013179112A2/en
Priority to JP2015514608A priority patent/JP6272839B2/en
Priority to EP13726270.5A priority patent/EP2855774B1/en
Priority to CN201380026176.8A priority patent/CN104350205B/en
Priority to RU2014142357A priority patent/RU2619145C2/en
Priority to ES13726270.5T priority patent/ES2666553T3/en
Publication of CH706577A2 publication Critical patent/CH706577A2/en
Publication of CH706577B1 publication Critical patent/CH706577B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • E01B27/18Sleeper-tamping machines by introducing additional fresh material under the sleepers, e.g. by the measured-shovel method, by the blowing method

Abstract

In einem Verfahren zur Unterstopfung eines Gleises werden Gleislagefehler eruiert und damit zwecks optimaler Gleiseinschotterung korrelierende Mengen an zuzuführendem neuem Schotter berechnet und von der jeweiligen Gleisstelle ortsabhängig als Schotterbedarfswert abgespeichert. Der abgespeicherte Schotterbedarfswert wird zum Abwurf der entsprechenden Menge an neuem Schotter abgerufen, sobald eine – bezüglich der Arbeitsrichtung der Messeinrichtung (13) nachfolgende – Einschottervorrichtung (9) die zugehörige Gleisstelle erreicht hat. Die Erfindung betrifft weiterhin eine Stopfmaschine und einen Maschinenverband zur Durchführung des Verfahrens.In a method for the clogging of a track track position errors are determined and thus calculated for optimal track ballast correlating amounts of zuzuführendem new ballast and stored by the respective track location depending on the location as gravel requirement value. The stored gravel requirement value is retrieved for dropping the corresponding amount of new ballast as soon as - next to the working direction of the measuring device (13) - Einschottervorrichtung (9) has reached the associated track. The invention further relates to a tamping machine and a machine dressing for carrying out the method.

Description

[0001] Die Erfindung betrifft ein Verfahren, eine Stopfmaschine sowie einen Maschinenverband zur Unterstopfung eines Gleises, wobei bezüglich einer Arbeitsrichtung vor der Gleisunterstopfung und zeitgleich mit dieser neuer Schotter auf das Gleis abgeworfen wird. The invention relates to a method, a tamping machine and a machine dressing for the clogging of a track, being dropped with respect to a working direction before the track clogging and at the same time with this new gravel on the track.

[0002] Ein derartiges Verfahren ist bereits durch AT 389 336 bekannt, wobei im Zuge einer Schwellenerneuerung aufgenommener Schotter vor der Unterstopfung auf das Gleis zurückgeführt wird. Such a method is already known from AT 389 336, which recorded in the course of a threshold renewal recorded gravel is returned to the track before the Unterstopfung.

[0003] Durch EP 0 436 757 B1 ist es auch bekannt, unmittelbar zuvor aus dem Gleis durch Bürsten aufgenommenen überschüssigen Schotter direkt im Bereich von Stopfwerkzeugen in jenen Abschnitten abzuwerfen, in denen zu wenig Schotter vorhanden ist. It is also known from EP 0 436 757 B1 to dump surplus ballast taken directly from the track by brushing directly in the area of tamping tools in those sections where too little ballast is present.

[0004] Die Aufgabe der vorliegenden Erfindung liegt nun in der Schaffung eines Verfahrens einer Stopfmaschine sowie eines Maschinenverbandes der gattungsgemässen Art, mit dem bzw. der unter Reduktion von Arbeitsaufwand eine gleichmässige Gleislagekorrektur optimierbar ist. The object of the present invention is now in the creation of a method of a tamping machine and a machine dressing of the generic type with which or the reduction of workload a uniform track position correction can be optimized.

[0005] Diese Aufgabe wird erfindungsgemäss mit den im jeweiligen Kennzeichen von Anspruch 1 bzw. 4 od. 5 angeführten Merkmalen gelöst. This object is achieved according to the invention in the respective characteristics of claim 1 or 4 od. 5 listed features.

[0006] Mit den erfindungsgemässen Merkmalen wird eine optimierte Verfüllung der Schwellenfächer mit Schotter sichergestellt. Damit ist auch eine den gesamten Unterstopfungsabschnitt betreffende Erhöhung des Seitenverschiebewiderstandes erzielbar. Infolge der gleichmässigeren Einschotterung mit nachfolgender Stopfung und Verdichtung ist auch eine verbesserte Dauerhaftigkeit der Gleislagekorrektur erreichbar. Ausserdem wird sichergestellt, dass nur die benötigte Schottermenge im Gleis liegt, um somit zusätzliche Arbeiten zum Abtransport oder Ausschottern von überflüssigem Schotter zu vermeiden. With the inventive features an optimized backfilling of the threshold compartments with gravel is ensured. Thus, an increase of the lateral displacement resistance concerning the entire undercutting portion can be achieved. As a result of the more uniform ballasting with subsequent stuffing and compaction, an improved durability of the track position correction can be achieved. In addition, it ensures that only the required amount of ballast is in the track so as to avoid additional work for the removal or dabbing of superfluous ballast.

[0007] Weitere Vorteile der Erfindung ergeben sich aus den weiteren Ansprüchen und der Zeichnungsbeschreibung. Further advantages of the invention will become apparent from the other claims and the description of the drawings.

[0008] Im Folgenden wird die Erfindung anhand von in der Zeichnung dargestellten Ausführungsbeispielen näher beschrieben. In the following the invention will be described with reference to embodiments illustrated in the drawings.

[0009] Es zeigen <tb>Fig. 1 , 2 und 3<SEP>je eine Variante einer Stopfmaschine in Seitenansicht.It show <Tb> FIG. 1, 2 and 3 <SEP> depending on a variant of a tamping machine in side view.

[0010] Eine in Fig. 1 dargestellte Stopfmaschine 1 ist mit Hilfe von Schienenfahrwerken 2 auf einem Gleis 3 in einer Arbeitsrichtung 4 verfahrbar. Zur Unterstopfung des Gleises 3 sind ein höhenverstellbares Stopfaggregat 5 sowie ein diesem vorgeordnetes Gleishebeaggregat 6 vorgesehen. Unmittelbar hinter dem Stopfaggregat 5 ist eine Schwellenreinigungsbürste, ein Schwellenfachverdichter 7 sowie ein Vorkopfverdichter 8 positioniert. A tamping machine 1 shown in Fig. 1 is movable by means of rail bogies 2 on a track 3 in a working direction 4. To Unterstopfung of the track 3, a height-adjustable tamping unit 5 and this upstream track lifting unit 6 are provided. Immediately behind the Stopfaggregat 5 is a threshold cleaning brush, a sleeper compartment compressor 7 and a Vorkopfverdichter 8 is positioned.

[0011] Bezüglich der Arbeitsrichtung 4 vor dem Stopfaggregat 5 befindet sich eine Einschottervorrichtung 9 und eine vorgeordnete Schotteraufnahmevorrichtung 10 mit einem Schotterspeicher 11. With respect to the working direction 4 in front of the Stopfaggregat 5 is a ballast device 9 and an upstream gravel picking device 10 with a ballast storage 11th

[0012] An einem vorderen Ende 12 der Stopfmaschine 1 ist eine das Gleis 3 abtastende Messeinrichtung 13 mit einer Wegmesseinheit sowie einer Speicher- und Recheneinheit angeordnet. Diese Messeinrichtung 13 ist in eine die Gleislagefehler ermittelnde Maschinenmessbasis 14 integriert. At a front end 12 of the tamping machine 1, a track 3 scanning measuring device 13 is arranged with a path measuring unit and a memory and arithmetic unit. This measuring device 13 is integrated in a track position error determining machine measuring base 14.

[0013] Im Arbeitseinsatz der Maschine 1 erfolgt eine Unterstopfung des Gleises in Arbeitsrichtung 4, während zeitgleich dazu durch die vorgeordnete Messeinrichtung 13 eventuelle Gleislagefehler eruiert werden. In der Speicher- und Recheneinheit werden zu den jeweils ermittelten Gleislagefehlern für eine optimale Gleiseinschotterung korrelierende Mengen an zuzuführendem Neuschotter berechnet und von der jeweiligen Gleisstelle ortsabhängig als Schotterbedarfswert abgespeichert. In labor use of the machine 1 is a clogging of the track in the working direction 4, while at the same time be determined by the upstream measuring device 13 any track position error. In the storage and arithmetic unit, correlated amounts of new ballot to be supplied are calculated for the respectively determined track position errors for optimum track ballast and are stored as ballast requirement value from the respective track spot in a location-dependent manner.

[0014] Dabei können im Falle von Überhöhungsfehlern die auf den einen oder anderen Schienenstrang abzulassenden Schottermengen unterschiedlich geregelt werden. Die korrekte Dosierung geschieht durch eine in Funktion der Gleishebung mittels geeigneter Einrichtungen bewirkte Höhenverstellung von die Einschottervorrichtung 9 bildenden Schotterschurren. Alternativ kann die Einschottervorrichtung 9 auch durch andere bekannte Vorrichtungen gebildet werden. In the case of Überhöhungsfehlern to be deducted on the one or other rail track gravel quantities can be controlled differently. The correct dosage is done by a function of the track elevation by means of suitable facilities effected height adjustment of the ballast device 9 forming ballast chutes. Alternatively, the ballast device 9 may also be formed by other known devices.

[0015] Der abgespeicherte Schotterbedarfswert wird zum Abwurf der entsprechenden Schottermenge abgerufen, sobald die – bezüglich der Arbeitsrichtung 4 der Messeinrichtung 13 nachfolgende – Einschottervorrichtung 9 die zugehörige Gleisstelle erreicht hat. The stored gravel requirement value is retrieved to drop the corresponding amount of gravel as soon as the - with respect to the working direction 4 of the measuring device 13 subsequent - Einschottervorrichtung 9 has reached the associated track.

[0016] Zeitgleich dazu wird bezüglich der Arbeitsrichtung 4 nach der Messeinrichtung 13 und vor der Einschottervorrichtung 9 über ein vorschriftsmässiges Schotterbettprofil im Bereich der Gleisschulter hinausragender Schotter automatisch durch die Schotteraufnahmevorrichtung 10 erfasst und im Schotterspeicher 11 für einen bedarfsweisen Abwurf durch die Einschottervorrichtung 9 zwischengespeichert. At the same time with respect to the working direction 4 after the measuring device 13 and before Einschottervorrichtung 9 on a proper ballast bed profile in the track shoulder protruding gravel automatically detected by the gravel receiving device 10 and cached in the ballast storage 11 for a demand drop by the Einschottervorrichtung 9.

[0017] Der Schotterspeicher 11 kann bedarfsweise auch vorab mit neuem Schotter gefüllt oder beispielsweise von einer parallel zur Stopfmaschine arbeitenden Reinigungsmaschine mit gereinigtem Schotter beschickt werden. The ballast storage 11 may, if necessary, also pre-filled with new ballast or be loaded for example by a working parallel to the tamping machine cleaning machine with purified ballast.

[0018] Die hinter den Stopfwerkzeugen angebrachten Schwellenreinigungsbürsten stossen die auf der Schwellenoberfläche liegenden Schottersteine in die Schwellenfächer. Unmittelbar nachfolgend wird der Schotter mit Hilfe der Schwellenfach- und Vorkopfverdichter 7, 8 sowohl zwischen benachbarten Schwellen als auch in einem an Schwellenenden anschliessenden Vorkopfbereich verdichtet. Zweckmässigerweise sind die Schwellenfachverdichter in dem Schwellenfach unmittelbar hinter den gestopften Schwellen wirksam, um die von den Stopfwerkzeugen in das Schotterbett eingebrachte Energie, welche sich bis in die der gestopften Schwelle benachbarten Schwellenfächer auswirkt, beim Verdichtvorgang mitzubenutzen und so die Verdichtung zu verbessern. Auch dieser Effekt dient der Rückgewinnung des Seitenverschiebewiderstandes des Gleises nach der Stopfung. Hinzu kommt der Einsatz von Vorkopfverdichtern, die zweckmässigerweise ebenfalls in dem der Stopfung benachbarten Bereich zum Einsatz kommen und einen zusätzlichen Beitrag zur Konsolidierung des Gleises bewirken. The threshold cleaning brushes placed behind the stuffing tools push the ballast stones lying on the sleeper surface into the sleeper compartments. Immediately below, the ballast is compacted by means of the sleeper compartment and precutting compressors 7, 8 both between adjacent sleepers and in a precutting area adjoining the ends of the sleepers. Conveniently, the sleeper compartments are operative in the sleeper compartment immediately behind the stuffed sills to share in the compaction process the energy introduced into the ballast bed by the stuffing tools, which impacts the threshold compartments adjacent to the stuffed sill, thus improving compaction. This effect also serves to recover the lateral displacement resistance of the track after tamping. In addition, there is the use of Vorkopfverdichtern that expediently also come in the area adjacent to the stuffing used and make an additional contribution to the consolidation of the track.

[0019] Durch diese – verschiedene Arbeitsvorgänge auf eine einzige Maschinendurchfahrt konzentrierenden – Verfahrensschritte kann die Gleislage unter bestmöglicher Ausnützung von eventuellem Schotterüberschuss und optimaler Schotterverdichtung nachhaltig korrigiert und der Querverschiebewiderstand bestmöglich zurückgewonnen werden. By this - different operations on a single machine passage concentrating - process steps, the track position can be sustainably corrected under the best possible utilization of any excess ballast and optimum ballast compaction and the transverse displacement resistance can be recovered as best as possible.

[0020] Eine in Fig. 2 und 3 ersichtliche Stopfmaschine 1 ist in einer weiteren Erfindung durch einen vorgeordneten Speicherwagen 15 zu einem Maschinenverband erweitert. Bei diesem sind der Schotterspeicher 11, die Einschottervorrichtung 9 und die Messeinrichtung 13 auf dem Speicherwagen 15 angeordnet. Am Speicherwagen 15 gemäss Fig. 3 ist zusätzlich noch die Schotteraufnahmevorrichtung 10 positioniert. Mit dieser kann überschüssiger Schotter – wie bereits zuvor beschrieben – im Schotterspeicher 11 für einen bedarfsweisen Abwurf zwischengespeichert werden. An apparent in Fig. 2 and 3 stuffing machine 1 is extended in a further invention by an upstream storage vehicle 15 to a machine group. In this, the ballast storage 11, the Einschottervorrichtung 9 and the measuring device 13 are arranged on the storage carriage 15. On the storage trolley 15 according to FIG. 3, the ballast receiving device 10 is additionally positioned. With this excess gravel - as already described above - be cached in the ballast storage 11 for a demand drop.

Claims (6)

1. Verfahren zur Unterstopfung eines Gleises, wobei bezüglich einer Arbeitsrichtung (4) vor der Gleisunterstopfung und zeitgleich mit dieser neuer Schotter auf das Gleis abgeworfen wird, gekennzeichnet durch folgende Merkmale: a) durch eine Messeinrichtung (13) mit einer Wegmesseinheit sowie einer Speicher- und Recheneinheit werden Gleislagefehler eruiert und damit zwecks optimaler Gleiseinschotterung korrelierende Mengen an zuzuführendem neuem Schotter berechnet und von der jeweiligen Gleisstelle ortsabhängig als Schotterbedarfswert abgespeichert, b) der abgespeicherte Schotterbedarfswert wird zum Abwurf der entsprechenden Menge an neuem Schotter abgerufen, sobald eine – bezüglich der Arbeitsrichtung (4) der Messeinrichtung (13) nachfolgende – Einschottervorrichtung (9) die zugehörige Gleisstelle erreicht hat, c) Einschotterung mit nachfolgender Stopfung und Verdichtung.1. A method for the clogging of a track, wherein with respect to a working direction (4) before the track clogging and at the same time with this new ballast on the track is dropped, characterized by the following features: a) by a measuring device (13) with a path measuring unit and a memory and arithmetic unit track position errors are determined and thus calculated for optimal track ballast correlating amounts of zuzuführendem new gravel and stored by the respective track location depending on location as gravel requirement value, b) the stored gravel requirement value is retrieved for dropping the corresponding amount of new ballast as soon as - following the working direction (4) of the measuring device (13) following - Einschottervorrichtung (9) has reached the associated track, c) Ballast with subsequent tamping and compaction. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass – bezüglich der Arbeitsrichtung (4) nach der Messeinrichtung (13) und vor der Einschottervorrichtung (9) – über ein vorgegebenes Schotterbettprofil hinausragender Schotter aufgenommen und für einen bedarfsweisen Abwurf durch die Einschottervorrichtung (9) zwischengespeichert wird.2. The method according to claim 1, characterized in that - with respect to the working direction (4) after the measuring device (13) and before the Einschottervorrichtung (9) - taken over a given ballast bed profile projecting gravel and for a demand drop by the Einschottervorrichtung (9) is cached. 3. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der Schotter unmittelbar hinter der Unterstopfung des Gleises (3) sowohl zwischen benachbarten Schwellen als auch in einem an Schwellenenden anschliessenden Vorkopfbereich verdichtet wird.3. The method according to claim 1, characterized in that the ballast is compacted immediately behind the Unterstopfung of the track (3), both between adjacent sleepers as well as in a subsequent end of the tail ends Vorkopfbereich. 4. Stopfmaschine zur Unterstopfung eines Gleises zur Durchführung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, dass zwischen der an einem vorderen Ende (12) der Stopfmaschine (1) positionierten Messeinrichtung (13) mit einer Speicher- und Recheneinheit und einem Stopfaggregat (5) eine Schotteraufnahmevorrichtung (10), ein Schotterspeicher (11) sowie die nachfolgende Einschottervorrichtung (9) angeordnet sind.4. tamping machine for clogging a track for performing the method according to claim 1, characterized in that between the at a front end (12) of the tamping machine (1) positioned measuring device (13) with a storage and processing unit and a Stopfaggregat (5) a gravel receiving device (10), a ballast storage (11) and the following Einschottervorrichtung (9) are arranged. 5. Maschinenverband zur Unterstopfung eines Gleises zur Durchführung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, dass eine Stopfmaschine (1) mit einem bezüglich der Arbeitsrichtung (4) vorgeordneten, mit der Messeinrichtung (13) mit einer Speicher- und Recheneinheit und der dieser nachfolgenden Einschottervorrichtung (9) ausgestatteten Speicherwagen (15) verbunden ist.5. machine group for the clogging of a track for carrying out the method according to claim 1, characterized in that a stuffing machine (1) with respect to the working direction (4) upstream, with the measuring device (13) with a memory and arithmetic unit and the following Einschottervorrichtung (9) equipped storage trolley (15) is connected. 6. Maschinenverband nach Anspruch 5, dadurch gekennzeichnet, dass der Speicherwagen (15) zwischen Messeinrichtung (13) und Einschottervorrichtung (9) eine Schotteraufnahmevorrichtung (10) aufweist.6. machine group according to claim 5, characterized in that the storage carriage (15) between the measuring device (13) and Einschottervorrichtung (9) comprises a ballast pick-up device (10).
CH00744/12A 2012-05-30 2012-05-30 A method for tamping a track and a tamping machine and a machine group for performing the method. CH706577B1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CH00744/12A CH706577B1 (en) 2012-05-30 2012-05-30 A method for tamping a track and a tamping machine and a machine group for performing the method.
PCT/IB2013/000856 WO2013179112A2 (en) 2012-05-30 2013-05-06 Method, tamping machine, and machine group for tamping a track
JP2015514608A JP6272839B2 (en) 2012-05-30 2013-05-06 Method of tamping under track, tamping machine and machine group
EP13726270.5A EP2855774B1 (en) 2012-05-30 2013-05-06 Method, tamping machine, and machine group for tamping a track
CN201380026176.8A CN104350205B (en) 2012-05-30 2013-05-06 For the method for tamping railway, tamping machine and machinery group
RU2014142357A RU2619145C2 (en) 2012-05-30 2013-05-06 Method, tamping machine, as well as composition of machines for tamping railway track
ES13726270.5T ES2666553T3 (en) 2012-05-30 2013-05-06 Procedure, a batting machine as well as a set of machines for leveling a track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH00744/12A CH706577B1 (en) 2012-05-30 2012-05-30 A method for tamping a track and a tamping machine and a machine group for performing the method.

Publications (2)

Publication Number Publication Date
CH706577A2 CH706577A2 (en) 2013-12-13
CH706577B1 true CH706577B1 (en) 2015-12-31

Family

ID=48539305

Family Applications (1)

Application Number Title Priority Date Filing Date
CH00744/12A CH706577B1 (en) 2012-05-30 2012-05-30 A method for tamping a track and a tamping machine and a machine group for performing the method.

Country Status (7)

Country Link
EP (1) EP2855774B1 (en)
JP (1) JP6272839B2 (en)
CN (1) CN104350205B (en)
CH (1) CH706577B1 (en)
ES (1) ES2666553T3 (en)
RU (1) RU2619145C2 (en)
WO (1) WO2013179112A2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106283981A (en) * 2016-08-30 2017-01-04 中国铁建大桥工程局集团有限公司 One has the railway maintenance small-sized machine of tamping flat quarrel device
CN106638177B (en) * 2017-01-13 2020-05-05 中铁四局集团有限公司 Method for controlling continuous ballast unloading process of ballast line
AT521850A1 (en) * 2018-10-24 2020-05-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Track construction machine and method for stuffing sleepers of a track
CN109778609A (en) * 2019-01-25 2019-05-21 中国铁建高新装备股份有限公司 A kind of multi-functional tamping car and its operational method
CN110670430B (en) * 2019-10-15 2021-05-14 株洲时代电子技术有限公司 Sleeper position protection method
CN111501435A (en) * 2020-05-09 2020-08-07 中国铁建高新装备股份有限公司 Screen scarifier suitable for slope screen scarfing operation and slope operation method

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58135201A (en) * 1982-02-05 1983-08-11 日本車輌製造株式会社 Automatic ballast scattering car
AT389336B (en) * 1986-02-12 1989-11-27 Plasser Bahnbaumasch Franz TRACKING MACHINE WITH LIFTING, STOPPING AND, IF NECESSARY, DIRECTIONAL UNIT
EP0436757B1 (en) 1990-01-10 1992-12-30 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Railway track tamping machine
US5172637A (en) * 1991-02-01 1992-12-22 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track surfacing machine for the controlled lowering of the track
EP0499018B1 (en) * 1991-02-12 1994-09-07 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Cleaning machine
ATE121151T1 (en) * 1991-06-12 1995-04-15 Plasser Bahnbaumasch Franz METHOD AND tamping machine for compacting the ballast of a track.
AT403387B (en) * 1992-06-19 1998-01-26 Plasser Bahnbaumasch Franz MACHINE FOR TREATING THE GRAVEL BED
ES2120158T3 (en) * 1994-11-15 1998-10-16 Plasser Bahnbaumasch Franz PROCEDURE AND DEVICE FOR THE SUBSOIL SANITATION OF THE GRAVILLA BED OF A VIA.
ES2143746T3 (en) * 1995-03-07 2000-05-16 Plasser Bahnbaumasch Franz BATCHING MACHINE, MACHINERY CONFIGURATION AND PROCEDURE FOR BOTTOM BATTING OF A TRACK.
DE59808965D1 (en) * 1997-11-05 2003-08-14 Plasser Bahnbaumasch Franz Ballast grader and method for ballasting a track
RU2196860C1 (en) * 2001-11-19 2003-01-20 Общество с ограниченной ответственностью "Вагонпутьмашпроект" Track machine
RU2378441C1 (en) * 2008-06-24 2010-01-10 ЗАО "Центральное конструкторское бюро тяжелых путевых машин" Machine to straighten rail track

Also Published As

Publication number Publication date
CN104350205B (en) 2016-11-02
WO2013179112A2 (en) 2013-12-05
WO2013179112A3 (en) 2014-04-17
EP2855774B1 (en) 2018-01-31
RU2619145C2 (en) 2017-05-12
ES2666553T3 (en) 2018-05-07
RU2014142357A (en) 2016-07-20
JP6272839B2 (en) 2018-01-31
JP2015521242A (en) 2015-07-27
CN104350205A (en) 2015-02-11
EP2855774A2 (en) 2015-04-08
CH706577A2 (en) 2013-12-13

Similar Documents

Publication Publication Date Title
EP2855774B1 (en) Method, tamping machine, and machine group for tamping a track
AT505403A4 (en) MACHINE FOR RECEIVING AND STORING SMALL IRONS OF A TRACK AND PROCESS
AT398097B (en) SYSTEM FOR PRODUCING A PLANUM PROTECTIVE LAYER
AT513034B1 (en) Method for submerging a track
AT3917U2 (en) MACHINE FOR RENEWING A TRACK
EP2398965A1 (en) Machine and method for renovating a track
EP1607523A1 (en) A method and machine for exchanging damaged ties of a railroad track
AT3918U2 (en) MACHINE FOR RENEWING A TRACK
EP2791418B1 (en) Method for repairing a subgrade
EP2931973B1 (en) Method and machine for cleaning ballast of a track
EP1771625B1 (en) Method for replacing old sleepers of a railway track by new sleepers
AT510158A4 (en) METHOD AND MACHINE FOR CLEANING A SCHOTTERBETTUNG OF A TRAIL
EP2295638B1 (en) Method for creating a track body
AT517075B1 (en) Method of stabilizing a soil
EP3371369B1 (en) Method and track-building machine for renewing sleepers of a track formed from rails and the sleepers
EP1607522B1 (en) A method and a machine for exchanging railway sleepers
DE1116257B (en) Method and device for receiving ballast under tracks
EP1994226B1 (en) Method for cleaning a ballast bed
DE102006059639A1 (en) Laying and renovating a railway permanent way lays the rail on a protective layer, to be lifted for the ballast to be spread under it before the rail is crammed into place
AT14304U1 (en) Method of renewing a ballast bed of a track
CH708506B1 (en) Vehicle association and method of renewing a track.
AT287769B (en) Mobile machine for treating the ballast bedding of tracks
AT13243U1 (en) Method for rehabilitating a ballast bed
CH707680A2 (en) Device for track laying machine for treatment of ballast of track, has broaching organ transporting ballast in track transverse direction, and rotatable clearing chain and plow that are included in device
CH709230A2 (en) Machine and method for renewing a track.

Legal Events

Date Code Title Description
PL Patent ceased