CH353390A - Method of repairing a railway track and installation for its implementation - Google Patents

Method of repairing a railway track and installation for its implementation

Info

Publication number
CH353390A
CH353390A CH353390DA CH353390A CH 353390 A CH353390 A CH 353390A CH 353390D A CH353390D A CH 353390DA CH 353390 A CH353390 A CH 353390A
Authority
CH
Switzerland
Prior art keywords
ballast
track
elements
frame
railway track
Prior art date
Application number
Other languages
French (fr)
Inventor
Scheuchzer Alfred
Original Assignee
Scheuchzer Alfred
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scheuchzer Alfred filed Critical Scheuchzer Alfred
Publication of CH353390A publication Critical patent/CH353390A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/10Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track

Description

  

  Procédé de réfection d'une voie de     chemin    de fer  et     installation    pour sa mise en     aeuvre       Il existe     actuellement    divers types     d'installations     permettant tout d'abord d'extraire le ballast de des  sous une voie de chemin de fer, puis d'épurer les  éléments de ce ballast.

   Ces installations connues ont  ceci de commun, qu'après extraction des éléments de  ballast de la voie, elles procèdent à l'épuration de  ces éléments au moyen de cribles de type classique,  qui exigent tous l'élévation du matériau jusqu'à un  niveau sensiblement supérieur à celui de la voie.     Il     s'ensuit que ces installations sont d'un encombrement  et d'un poids tels qu'elles doivent être disposées sur  un chariot roulant sur la voie afin d'assurer leur  progression le long de la voie ferrée au     fur    et à  mesure de l'avancement des travaux de réfection.  



  Certains constructeurs ont toutefois tenté de ré  soudre le problème de la non-occupation de la voie  ferrée pendant les travaux de réfection afin de lais  ser celle-ci libre au trafic ferroviaire. Ces instal  lations     comportent    des dispositifs d'épuration du  ballast ancien qui, comme les installations décrites  précédemment, présentent des cribles de type clas  sique qui nécessitent une élévation de tous les élé  ments du ballast jusqu'à un niveau nettement supé  rieur à celui de la voie. Toutefois, tous     ces    dispositifs  transporteur, élévateur et cribleur, sont situés en de  hors du gabarit des véhicules roulant sur la voie, de  sorte que la réfection de la voie peut être effectuée  sans trop de     perturbation    dans le trafic ferroviaire.  



  Néanmoins, ces installations occupent un espace       important    sur et au-dessus de la contre-banquette à  côté de la voie ferrée et de son ballast. Or, il est en  fait très rare que ces contre-banquettes soient entière  ment libres. Bien au contraire, sur ces     contre-ban-          quettes    sont généralement aménagés les signaux  d'aiguillage, les dispositifs de commande de ces  signaux, les caniveaux d'alimentation électriques, les    socles des pylônes, etc. En réalité, ces installations  ne peuvent que rarement être     utilisées.     



  Le présent brevet a pour objet un procédé de  réfection d'une voie ferrée selon lequel on retire le  ballast à l'aide d'une chaîne sans fin de creusage       portant    des outils, disposée transversalement sous la  voie et     entrainée    dans un mouvement de translation  de long de la voie ferrée et qui tend à remédier aux  inconvénients des procédés connus par le fait qu'au       fur    et à mesure de la progression, on crible le ballast  accumulé sur le côté de la voie ferrée en projetant  ses éléments horizontalement contre un crible dis  posé au niveau du ballast,     accumule    les éléments  encore     utilisables        sur    l'une des banquettes le long de  la voie ferrée,

   en arrière de l'appareil de criblage  progressant à la même vitesse que la     chaîne    sans fin  de creusage.  



       Ainsi,    l'opération de criblage est     effectuée    dans  la banquette même de la voie ferrée et sans élévation  du matériau, de sorte que la contre-banquette reste  entièrement     libre.     



  Ce brevet a également pour objet une     installation     pour la mise en     ceuvre    du procédé, qui est carac  térisée par le fait qu'elle comporte un bâti     formé    de  deux parties disposées de part et d'autre de la voie  ferrée et qui porte un dispositif de creusage disposé  transversalement sous la voie ferrée, et constitué par  un châssis reliant rigidement les deux parties du bâti  et protégeant une     chaîne    sans fin munie d'outils, et  par le fait que l'une des     parties    de ce bâti porte, en  outre,

   un dispositif de criblage des éléments du bal  last retirés par le dispositif de creusage et qui com  porte des organes batteurs projetant     horizontalement     les éléments du ballast contre     un    crible disposé au  niveau du ballast et qui accumule les éléments du  ballast encore     utilisables    sur l'une des banquettes laté-           rales    le long de la voie ferrée en arrière du disposi  tif de criblage.  



  Cette installation ne comporte donc aucun dis  positif transporteur ou élévateur du matériau ce qui  permet de réduire dans une très grande mesure ses       dimensions    et donc son poids, de sorte     qu'il    est, dès  lors, possible de libérer entièrement la voie en réfec  tion et de conserver celle-ci, pendant toute 1a durée  des travaux, pour le trafic ferroviaire.  



  Le dessin annexé illustre schématiquement et à  titre d'exemple, une forme d'exécution d'une instal  lation pour la mise en     oeuvre    du procédé faisant  l'objet du brevet.  



  La     fig.    1 en est une     vue    en plan, certaines parties  étant arrachées pour plus de     clarté.     



  La     fig.    2 en est une vue par derrière.  



  La     fig.    3 est une vue de profil suivant la flèche A.  Les     fig.    4 et 5 sont des vues de     détails    à plus  grande échelle.  



  L'installation représentée comporte un bâti formé  de longerons 1 parallèles aux rails 2 et de supports 3  qui portent des patins 4 prenant appui sur les parties  des traverses 5 situées de     part    et d'autre à l'extérieur  des rails. Ce bâti comprend donc deux     parties    dis  posées de part et d'autre de la voie ferrée et qui sont  reliées par deux châssis 6 et 7 situés en dessous des  traverses 5.  



  Le châssis 6 comprend deux plaques 8, 9 paral  lèles protégeant une chaîne sans fin 10 munie d'outils  11. Ce châssis et cette chaîne sans fin constituent un  dispositif de creusage de type connu et décrit par  exemple dans les brevets suisses     Nos    126750 et  154984. La chaîne sans fin passe sur deux engre  nages à chaîne 12 (dont un seul est représenté) soli  daires chacun d'un axe 14 tournant librement dans  des     paliers    aménagés dans le châssis 6. L'un de ces  axes est relié à l'arbre 15 d'un moteur d'entraînement  16 porté par le bâti 1, 3.  



  Le châssis 7, qui comprend également deux  plaques parallèles, protège une chaîne sans fin munie       d'outils    19. Ce châssis et cette chaîne sans fin cons  tituent un dispositif de -remise en place sous la voie  ferrée des éléments de ballast encore utilisables.  



  La conception de ce dispositif est très semblable  à celle du dispositif de creusage, de sorte qu'il n'y a  pas lieu de la décrire plus en détail ici. La chaîne  sans fin portant les outils 19 est entraînée par un  moteur 20 porté par le bâti 1, 3. Les plaques supé  rieures de chaque châssis 6, 7 sont encore munies de  dispositifs d'appui constitués par des jeux de rou  leaux 17 roulant sur les faces inférieures des tra  verses 5. Les rouleaux 17 d'un même jeu de rouleaux  sont disposés les uns derrière les autres à une dis  tance<I>a</I> inférieure à la distance<I>b</I> séparant deux tra  verses 5 voisines.  



  L'installation est encore munie d'un dispositif de  criblage disposé entre le dispositif de creusage et le  dispositif de remise en place des éléments de ballast.  Ce dispositif de criblage est disposé sur l'un des  côtés de la voie ferrée et porté par le bâti. Ce dis-    positif de criblage comporte, d'une     part,    un crible  constitué par des barres 21 disposées parallèlement  les unes aux autres et maintenues en position les  unes par rapport aux autres par des montants 22  fixés rigidement au bâti et d'autre part, par un axe  vertical 24 entraîné par un moteur 23 fixé au bâti.  Des chaînes 25 sont attachées à cet axe 24 et dis  posées en trois rangs parallèles. Chaque chaîne 25  porte à son extrémité libre une masselotte 26.

   Le  crible est situé au niveau du ballast et chaque barre  21 est disposée dans un plan perpendiculaire à  l'axe 24.    Le fonctionnement de l'installation décrite est le  suivant  Les chaînes de creusage et de remise en place  des éléments de ballast étant entraînées dans le sens  des     flèches        f1    et     f2    par leur moteur respectif et l'axe  d'entraînement 24 des chaînes 25 du dispositif de  criblage étant entraîné dans le sens de la flèche     f3     par le moteur 23, l'ensemble de l'installation est tiré  le long de la voie ferrée au moyen de câbles 28 s'en  roulant sur des treuils (non représentés) placés de       part    et d'autre de la voie ferrée.

   Au fur et à mesure  de la progression de l'installation, le dispositif de  creusage creuse le ballast de cette voie, et dépose les  éléments du ballast sur le côté de la voie ferrée. Ces  éléments s'accumulent en un tas 29 qui progresse le  long de la voie ferrée.  



  Les masselottes 26 du dispositif de criblage,  frappent les éléments de ballast ainsi déposés le long  de la voie, et projettent ceux-ci horizontalement  contre le crible, dont la largeur e de l'espace libre  entre les barres 21 voisines correspond à la dimen  sion des éléments les plus gros à éliminer. Ainsi, tous  les éléments fins et petits traversent le crible et se  dispersent au-delà du crible, tandis que les gros élé  ments de ballast qui sont encore utilisables s'accu  mulent dans l'espace libre entre le crible et la voie  ferrée et forme un tas 31 qui progresse le long de  la voie au fur et à mesure de la progression de l'ins  tallation.  



  Ces gros éléments sont poussés en direction de la  voie ferrée par un râteau rotatif qui comprend un  axe 32 parallèle au crible, muni de dents radiales 33  et entraîné en rotation par un moteur 34 porté par le  bâti. Ces gros éléments de ballast repoussés en direc  tion de la voie ferrée sont alors entraînés par les  outils 19 et déposés par ceux-ci sous les traverses 5.  Grâce à la progression continue de l'installation, ces  gros éléments de ballast sont déposés par les outils  19 de manière répartie sur toute la largeur du bal  last 52.  



  Il est à remarquer que dans l'installation décrite,  l'opération de criblage s'effectue sur place,     c'est-à-          dire    sur la banquette latérale de la voie ferrée et que  les dispositifs élévateur ou transporteur des éléments  de ballast à trier, ainsi que les récipients d'accumu  lation et tambour trieur des installations en usage  sont entièrement éliminés.      Ainsi, dans l'installation décrite, les éléments de  ballast reposant en un tas le long de la voie ferrée  sont projetés horizontalement contre le     crible    et les  gros éléments encore utilisables s'accumulent en  arrière du dispositif de criblage sur la banquette laté  rale le long de la voie ferrée.  



  Comme représenté au dessin, tous les organes et  éléments de l'installation décrits sont situés entière  ment en dehors du gabarit défini par le trait mixte i  et nécessaire au passage des trains. Ainsi, la voie  ferrée reste entièrement libre, de sorte que le trafic  ferroviaire peut être maintenu sur la voie ferrée pen  dant toute la durée de sa réfection, ce qui constitue  un très grand avantage de l'installation décrite par  rapport à toutes les installations connues à ce jour.  



  En outre, ainsi qu'on peut aisément s'en rendre  compte, les trois opérations principales qui sont  a)     élèvement    du ballast ancien ;  b) élimination des éléments fins et petits ;  c) remise en place des éléments de ballast encore  utilisables, s'effectuent simultanément, sur une très  courte longueur de voie, par exemple inférieure  à 10 mètres, de sorte que seuls quelques plots ou  cales doivent être posés sous les traverses 5 afin  de caler celles-ci et de permettre le passage d'un  train sur la voie en réfection.  



  Toutes les opérations d'enlèvement du ballast, de  triage de ces éléments et de remise en place des élé  ments utilisables, étant effectuées au cours de la pro  gression de l'installation le long de la voie ferrée à  l'aide de dispositifs disposés les uns derrière les  autres et au niveau du ballast et spécialement grâce  au fait que le dispositif de criblage est entièrement  exempt de récipient de triage. toujours très lourd et  encombrant, tous transport et élévation inutiles des  éléments de ballast sont éliminés, ce qui permet, non  seulement de réduire l'encombrement de l'installation  et de simplifier sa conception par rapport aux instal  lations connues, mais encore d'effectuer tout le tra  vail de triage sur la banquette latérale de la voie  ferrée en laissant la voie ferrée elle-même entièrement  libre pour la circulation ferroviaire.  



  Comme représenté au dessin, le bâti 1, 3 qui       porte    tous les organes et éléments de l'installation  est porté par les patins 4 qui glissent sur les traverses  5 à l'extérieur des rails 2. Au cours du travail de  creusage du ballast et de remise en place des élé  ments de ballast, des forces sont engendrées qui  tendent à soulever le bâti. Les jeux de rouleaux 17  qui prennent appui sur les faces inférieures des tra  verses 5, s'opposent à un tel soulèvement du bâti et  maintiennent celui-ci en position par rapport à la  voie ferrée.  



  Le travail de creusage du ballast et de remise en  place des éléments de ballast engendre nécessaire  ment des forces latérales, qui tendent à déplacer le  bâti latéralement par rapport à la voie ferrée. Pour  éviter de tels déplacements latéraux intempestifs, le  bâti est encore muni d'organes de guidage 35 cons  titués par des patins ou des galets portés par des    supports 36 et qui prennent appui sur les faces laté  rales des rails 2, soit comme représenté sur la face  latérale du boudin 37 de chaque     rail    2, soit dans une  variante sur la partie supérieure de la face latérale  externe de l'âme 38 de chaque rail, et de manière à  passer au-dessus des boulons ou autres organes de  fixation des rails 2 sur les traverses.  



  Les ballasts des voies ferrées pouvant présenter  des épaisseurs différentes,     l'installation    est encore  munie de     dispositifs    de réglage 39 de la profondeur  de creusage constitués chacun par un cylindre 40       (fig.    4) fixé aux longerons 1 et dans lequel coulisse  un piston 42 fixé respectivement sur le bâti 6 ou le  bâti 7. Le cylindre est muni d'une part d'un conduit  d'échappement 44 pourvu d'une vanne 45 et, d'autre  part d'une conduite de remplissage 46 comportant  un clapet     anti-retour    47.  



  Ainsi, en reliant la conduite 46 à une pompe  d'alimentation en     fluide    (non représentée), l'usager  a la possibilité d'augmenter la distance entre les lon  gerons 1 et les châssis 6 et 7 et donc d'augmenter la  profondeur de creusage.  



  Par contre, en ouvrant la     vanne    45,     il    a la possi  bilité de laisser échapper du liquide par la conduite  d'échappement 44 et donc de réduire la distance  entre les longerons 1 et les châssis 6 et 7 et donc  de réduire la profondeur de creusage.  



  Chaque rouleau 17 porte deux tourillons 48       (fig.    5) tournant chacun dans un     palier    49     relié    à un  cadre 50 par l'intermédiaire de dispositifs élastiques  51. Ainsi, les rouleaux 17 peuvent s'adapter aux dif  férentes épaisseurs des traverses 5 et restent en con  tact avec la face inférieure de ces traverses quelle  que soit la profondeur de creusage dans les     limites     du réglage (6 à 10 cm) que permettent des dispositifs  de réglage.  



  Les patins 4 pourraient être remplacés par des  jeux de rouleaux semblables aux rouleaux 17. De  même, les jeux de rouleaux 17 pourraient être rem  placés par des patins semblables aux patins 4.  



  Dans une variante, l'installation pourrait com  porter un bâti en deux parties comme décrit en réfé  rence au dessin annexé, qui ne porterait qu'un dis  positif de creusage et un dispositif de criblage tels  que décrits. Dans ce cas, les éléments de     ballast     encore utilisables accumulés par le dispositif de cri  blage en un tas continu sur la banquette     latérale    de  la voie ferrée, peuvent être remis en place à la pelle  ou par tout autre dispositif connu. Une telle instal  lation     pourrait    être avantageuse par exemple lors  qu'il s'agit d'un ballast ancien dans lequel la pro  portion des éléments encore     utilisables    est faible  (20      /o    à 30      /o).     



  Les dispositifs de réglage hydraulique de la pro  fondeur de creusage peuvent bien entendu être rem  placés par des dispositifs pneumatiques ou méca  niques connus.  



  Dans une autre variante, le bâti pourrait être  porté par des organes roulant sur les rails 2. Dans  ce cas, la voie ferrée n'est plus disponible au trafic      ferroviaire, toutefois lorsqu'il s'agit de la réfection  d'une voie ferrée secondaire sur laquelle le trafic est  peu intense, une telle installation peut être avan  tageuse.



  Method of repairing a railway track and installation for its implementation There are currently various types of installations allowing first of all to extract the ballast from under a railway track, then to purify it. the elements of this ballast.

   These known installations have this in common, that after extraction of the ballast elements from the track, they proceed to the purification of these elements by means of screens of conventional type, which all require the raising of the material to a level. significantly higher than that of the track. It follows that these installations are of a size and a weight such that they must be placed on a trolley rolling on the track in order to ensure their progress along the railway track as it goes. progress of repair work.



  However, some manufacturers have tried to solve the problem of the non-occupation of the railway line during the repair work in order to leave it free to rail traffic. These installations include devices for purifying the old ballast which, like the installations described above, have conventional type screens which require raising all the elements of the ballast to a level markedly higher than that of the way. However, all these conveyor, elevator and screen devices are located outside the gauge of vehicles traveling on the track, so that the repair of the track can be carried out without too much disturbance in rail traffic.



  Nevertheless, these installations occupy a significant space on and above the counter-bench next to the railway and its ballast. However, it is in fact very rare that these counter-benches are entirely free. On the contrary, on these counter benches are generally fitted out the switch signals, the control devices for these signals, the electrical supply channels, the pylon bases, etc. In reality, these facilities can only rarely be used.



  The present patent relates to a process for repairing a railway track according to which the ballast is removed using an endless digging chain carrying tools, arranged transversely under the track and driven in a translational movement of along the railway line and which tends to remedy the drawbacks of the known methods by the fact that as the progress progresses, the ballast accumulated on the side of the railway is screened by projecting its elements horizontally against a sieve dis placed at the level of the ballast, accumulates the elements still usable on one of the benches along the railway track,

   behind the screening machine advancing at the same speed as the endless digging chain.



       Thus, the screening operation is carried out in the same bench seat of the railroad track and without raising the material, so that the back bench remains completely free.



  This patent also relates to an installation for carrying out the process, which is charac terized by the fact that it comprises a frame formed of two parts arranged on either side of the railway track and which carries a digging arranged transversely under the railway track, and consisting of a frame rigidly connecting the two parts of the frame and protecting an endless chain provided with tools, and by the fact that one of the parts of this frame carries, in addition,

   a device for screening the elements of the ball last withdrawn by the digging device and which comprises threshing devices horizontally projecting the elements of the ballast against a screen arranged at the level of the ballast and which accumulates the elements of the ballast which can still be used on one of the side benches along the track behind the screening device.



  This installation therefore does not include any conveyor or elevator device for the material, which makes it possible to reduce its dimensions and therefore its weight to a very great extent, so that it is therefore possible to completely free the track under repair and to keep it for the duration of the works for rail traffic.



  The appended drawing illustrates schematically and by way of example, an embodiment of an installation for carrying out the process which is the subject of the patent.



  Fig. 1 is a plan view, with some parts broken away for clarity.



  Fig. 2 is a view from behind.



  Fig. 3 is a side view along arrow A. FIGS. 4 and 5 are detail views on a larger scale.



  The installation shown comprises a frame formed of side members 1 parallel to the rails 2 and of supports 3 which carry pads 4 bearing on the parts of the sleepers 5 located on either side outside the rails. This frame therefore comprises two parts placed on either side of the railway track and which are connected by two frames 6 and 7 located below the sleepers 5.



  The frame 6 comprises two plates 8, 9 parallel protecting an endless chain 10 provided with tools 11. This frame and this endless chain constitute a digging device of known type and described for example in Swiss patents Nos 126750 and 154984 The endless chain passes over two chain gears 12 (only one of which is shown) each secured to an axis 14 rotating freely in bearings arranged in the frame 6. One of these axes is connected to the. shaft 15 of a drive motor 16 carried by the frame 1, 3.



  The frame 7, which also comprises two parallel plates, protects an endless chain provided with tools 19. This frame and this endless chain constitute a device for -remise in place under the railway track of the ballast elements which can still be used.



  The design of this device is very similar to that of the digging device, so there is no need to describe it in more detail here. The endless chain carrying the tools 19 is driven by a motor 20 carried by the frame 1, 3. The upper plates of each frame 6, 7 are further provided with support devices constituted by sets of rollers 17 rolling on the lower faces of the crosspieces 5. The rollers 17 of the same set of rollers are arranged one behind the other at a distance <I> a </I> less than the distance <I> b </I> between two crossings 5 neighbors.



  The installation is also provided with a screening device arranged between the digging device and the device for replacing the ballast elements. This screening device is arranged on one of the sides of the railway track and carried by the frame. This screening device comprises, on the one hand, a screen consisting of bars 21 arranged parallel to one another and held in position with respect to each other by uprights 22 rigidly fixed to the frame and, on the other hand, by a vertical axis 24 driven by a motor 23 fixed to the frame. Chains 25 are attached to this axis 24 and arranged in three parallel rows. Each chain 25 carries at its free end a weight 26.

   The screen is located at the level of the ballast and each bar 21 is arranged in a plane perpendicular to the axis 24. The operation of the installation described is as follows The chains for digging and replacing the ballast elements being driven in the direction of the arrows f1 and f2 by their respective motor and the drive shaft 24 of the chains 25 of the screening device being driven in the direction of the arrow f3 by the motor 23, the entire installation is pulled on along the railway line by means of cables 28 rolling on winches (not shown) placed on either side of the railway line.

   As the installation progresses, the digging device digs the ballast of this track, and deposits the ballast elements on the side of the railway track. These elements accumulate in a pile 29 which progresses along the railway line.



  The weights 26 of the screening device strike the ballast elements thus deposited along the track, and project them horizontally against the screen, the width e of the free space between the neighboring bars 21 of which corresponds to the dimension of the largest elements to eliminate. Thus, all fine and small elements pass through the screen and disperse beyond the screen, while the large ballast elements which are still usable accumulate in the free space between the screen and the railroad track and form a pile 31 which progresses along the track as the installation progresses.



  These large elements are pushed in the direction of the railway track by a rotary rake which includes an axis 32 parallel to the screen, provided with radial teeth 33 and driven in rotation by a motor 34 carried by the frame. These large ballast elements pushed back in the direction of the railway track are then driven by the tools 19 and deposited by them under the sleepers 5. Thanks to the continuous progress of the installation, these large ballast elements are deposited by the tools 19 distributed over the entire width of the ball last 52.



  It should be noted that in the installation described, the screening operation is carried out on site, that is to say on the side bench of the railway track and that the lifting devices or conveyor of the ballast elements to be sorted , as well as the storage containers and sorting drum of the installations in use are entirely eliminated. Thus, in the installation described, the ballast elements resting in a heap along the railroad tracks are projected horizontally against the screen and the large elements which can still be used accumulate behind the screening device on the side bench along from the railroad tracks.



  As shown in the drawing, all the components and elements of the installation described are situated entirely outside the template defined by the dashed line i and necessary for the passage of trains. Thus, the railway line remains completely free, so that rail traffic can be maintained on the railway line throughout its repair, which constitutes a very great advantage of the installation described over all known installations. nowadays.



  In addition, as can easily be seen, the three main operations which are a) removal of old ballast; b) elimination of fine and small elements; c) re-installation of the ballast elements which can still be used, are carried out simultaneously, over a very short length of track, for example less than 10 meters, so that only a few blocks or wedges need to be placed under the sleepers 5 in order to wedge these and allow the passage of a train on the track under repair.



  All the operations of removing the ballast, sorting these elements and putting back in place the usable elements, being carried out during the progress of the installation along the railway track using devices placed as close as possible. one behind the other and at the level of the ballast and especially thanks to the fact that the screening device is completely free of sorting container. still very heavy and bulky, all unnecessary transport and elevation of the ballast elements are eliminated, which makes it possible not only to reduce the size of the installation and to simplify its design compared to known installations, but also to perform all the yard work on the side bench of the railroad track, leaving the railroad itself entirely free for rail traffic.



  As shown in the drawing, the frame 1, 3 which carries all the components and elements of the installation is carried by the pads 4 which slide on the sleepers 5 outside the rails 2. During the work of digging the ballast and When replacing the ballast elements, forces are generated which tend to lift the frame. The sets of rollers 17 which bear on the lower faces of the sleepers 5, oppose such a lifting of the frame and keep the latter in position relative to the railway track.



  The work of digging out the ballast and replacing the ballast elements necessarily generates lateral forces, which tend to move the frame laterally with respect to the railway track. To avoid such untimely lateral movements, the frame is also provided with guide members 35 constituted by runners or rollers carried by supports 36 and which bear on the lateral faces of the rails 2, either as shown in FIG. lateral face of the flange 37 of each rail 2, or in a variant on the upper part of the external lateral face of the web 38 of each rail, and so as to pass above the bolts or other fasteners of the rails 2 on the sleepers.



  Since the ballasts of the railway tracks may have different thicknesses, the installation is also provided with devices 39 for adjusting the digging depth, each consisting of a cylinder 40 (fig. 4) fixed to the side members 1 and in which a piston 42 fixed slides. respectively on the frame 6 or the frame 7. The cylinder is provided on the one hand with an exhaust duct 44 provided with a valve 45 and, on the other hand with a filling duct 46 comprising an anti-valve. back 47.



  Thus, by connecting line 46 to a fluid supply pump (not shown), the user has the possibility of increasing the distance between the rails 1 and the frames 6 and 7 and therefore of increasing the depth of digging.



  On the other hand, by opening the valve 45, it has the possibility of letting liquid escape through the exhaust pipe 44 and therefore of reducing the distance between the side members 1 and the frames 6 and 7 and therefore of reducing the digging depth. .



  Each roller 17 carries two journals 48 (FIG. 5) each rotating in a bearing 49 connected to a frame 50 by means of elastic devices 51. Thus, the rollers 17 can adapt to the different thicknesses of the sleepers 5 and remain in contact with the underside of these cross members whatever the digging depth within the limits of the adjustment (6 to 10 cm) permitted by the adjustment devices.



  The pads 4 could be replaced by sets of rollers similar to the rollers 17. Likewise, the sets of rollers 17 could be replaced by pads similar to the pads 4.



  In a variant, the installation could comprise a frame in two parts as described with reference to the appended drawing, which would only carry a digging device and a screening device as described. In this case, the still usable ballast elements accumulated by the screening device in a continuous heap on the side bench of the railroad, can be replaced with a shovel or by any other known device. Such an installation could be advantageous, for example, when it is an old ballast in which the proportion of the elements that can still be used is low (20 / o to 30 / o).



  The hydraulic adjustment devices for the digging depth can of course be replaced by known pneumatic or mechanical devices.



  In another variant, the frame could be carried by components rolling on the rails 2. In this case, the railway line is no longer available to rail traffic, however when it comes to repairing a railway line. secondary on which traffic is not intense, such an installation can be advantageous.

 

Claims (1)

REVENDICATIONS 1. Procédé de réfection d'une voie ferrée selon lequel on retire le ballast à l'aide d'une chaîne sans fin de creusage portant des outils, disposée trans versalement sous la voie ferrée et entraînée dans un mouvement de translation le long de cette voie, caractérisé par le fait qu'au fur et à mesure de la progression, on crible le ballast accumulé sur le côté de la voie ferrée en projetant ses éléments contre un crible disposé au niveau de ce ballast, accumule les éléments encore utilisables sur l'une des banquettes latérales le long de la voie ferrée en arrière de l'appa reil de criblage progressant à la même vitesse que la chaîne sans fin de creusage. II. CLAIMS 1. A method of repairing a railway track according to which the ballast is removed using an endless digging chain carrying tools, disposed transversely under the railway track and driven in a translational movement along it. this track, characterized by the fact that as it progresses, the ballast accumulated on the side of the railway track is screened by projecting its elements against a screen disposed at the level of this ballast, accumulates the elements still usable on one of the side benches along the rail track behind the screening machine moving at the same speed as the endless digging chain. II. Installation pour la mise en oeuvre du procédé selon la revendication 1, caractérisée par le fait qu'elle comporte un bâti formé de deux parties dis posées de part et d'autre de la voie ferrée et qui porte un dispositif de creusage disposé transversale ment sous la voie ferrée, et constitué par un châssis reliant rigidement les deux parties du bâti et proté geant une chaîne sans fin munie d'outils, et par le fait que l'une des parties de ce bâti porte, en outre, Installation for carrying out the method according to Claim 1, characterized in that it comprises a frame formed of two parts placed on either side of the railway track and which carries a digging device disposed transversely under the railway track, and constituted by a frame rigidly connecting the two parts of the frame and protecting an endless chain provided with tools, and by the fact that one of the parts of this frame carries, in addition, un dispositif de criblage des éléments du ballast retirés par le dispositif de creusage et qui comporte des organes batteurs projetant horizontalement les éléments du ballast contre un crible disposé au niveau du ballast et qui accumule les éléments encore utilisables sur l'une des banquettes latérales le long de la voie ferrée en arrière du dispositif de criblage. SOUS-REVENDICATIONS 1. a device for screening the elements of the ballast withdrawn by the digging device and which comprises threshing members projecting the ballast elements horizontally against a screen arranged at the level of the ballast and which accumulates the elements still usable on one of the side benches along of the railway track behind the screening device. SUB-CLAIMS 1. Procédé selon la revendication 1, caractérisé par le fait qu'on reprend au moins une partie des éléments de ballast encore utilisables et les entraîne sous la voie pour les poser de manière répartie sous celle-ci à l'aide d'une chaîne sans fin munie d'outils, disposée transversalement sous la voie ferrée et en traînée le long de cette voie à la même vitesse que la chaîne de creusage. 2. Installation selon la revendication 11, carac térisée par le fait que tous ses organes et éléments sont portés par ledit bâti et sont situés en dehors du gabarit nécessaire au passage d'un train sur la voie en réfection. 3. Method according to Claim 1, characterized in that at least some of the ballast elements which can still be used are taken up and driven under the track in order to lay them distributed under the latter using an endless chain fitted with tools, arranged transversely under the railway track and dragged along this track at the same speed as the digging chain. 2. Installation according to claim 11, charac terized in that all its members and elements are carried by said frame and are located outside the template necessary for the passage of a train on the track under repair. 3. Installation selon la revendication Il et la sous-revendication 2, caractérisée par le fait que le crible est porté par l'une des parties du bâti paral lèlement à la voie ferrée. 4. Installation selon la revendication II et les sous-revendications 2 et 3, caractérisée par le fait qu'elle est portée par des organes porteurs, en con tact avec la face supérieure des parties des traverses dépassant les rails. 5. Installation selon la revendication II et les sous-revendications 2 à 4, caractérisée par le fait qu'elle comporte des dispositifs d'appui s'opposant à un soulèvement de son bâti et qui prennent appui sur les faces inférieures des traverses. 6. Installation according to Claim II and sub-Claim 2, characterized in that the screen is carried by one of the parts of the frame parallel to the railway track. 4. Installation according to claim II and sub-claims 2 and 3, characterized in that it is carried by supporting members, in contact with the upper face of the parts of the sleepers projecting from the rails. 5. Installation according to claim II and sub-claims 2 to 4, characterized in that it comprises support devices opposing a lifting of its frame and which bear on the lower faces of the sleepers. 6. Installation selon la revendication II et les sous-revendications 2 à 5, caractérisée par le fait qu'elle comporte des dispositifs de réglage de la pro fondeur de creusage. 7. Installation selon la revendication II et les sous-revendications 2 à 6, caractérisée par le fait qu'elle comporte des organes de guidage prenant appui sur une partie de la face latérale externe de chaque rail de la voie ferrée et s'opposant à un déplacement latéral intempestif de l'installation. 8. Installation according to Claim II and sub-claims 2 to 5, characterized in that it comprises devices for adjusting the digging depth. 7. Installation according to claim II and sub-claims 2 to 6, characterized in that it comprises guide members bearing on a part of the outer lateral face of each rail of the railway track and opposing untimely lateral displacement of the installation. 8. Installation selon la revendication II et les sous-revendications 2 à 7, caractérisée par le fait qu'elle comporte, en outre, un dispositif de remise en place sous la voie ferrée des éléments de ballast encore utilisables, ce dispositif étant porté par les deux parties du bâti et présentant une chaîne sans fin munie d'outils et disposée transversalement sous la voie. 9. Installation selon la revendication II et les sous-revendications 3 à 8, caractérisée par le fait qu'elle comporte un dispositif d'alimentation en élé ments de ballast du dispositif de remise en place du ballast. Installation according to Claim II and sub-claims 2 to 7, characterized in that it furthermore comprises a device for replacing ballast elements which can still be used under the railway track, this device being carried by the two parts of the frame and having an endless chain equipped with tools and arranged transversely under the track. 9. Installation according to claim II and sub-claims 3 to 8, characterized in that it comprises a device for supplying ballast elements to the device for replacing the ballast.
CH353390D 1959-03-31 1959-03-31 Method of repairing a railway track and installation for its implementation CH353390A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH353390T 1959-03-31

Publications (1)

Publication Number Publication Date
CH353390A true CH353390A (en) 1961-04-15

Family

ID=4510118

Family Applications (1)

Application Number Title Priority Date Filing Date
CH353390D CH353390A (en) 1959-03-31 1959-03-31 Method of repairing a railway track and installation for its implementation

Country Status (1)

Country Link
CH (1) CH353390A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1205128B (en) * 1962-04-28 1965-11-18 Gottfried Hoefels Track bed cleaning machine
DE1205127B (en) * 1962-04-14 1965-11-18 Gottfried Hoefels Profile-free track bed cleaning machine
DE1213459B (en) * 1962-07-10 1966-03-31 Alfred Scheuchzer Machine for cleaning the ballast under a track

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1205127B (en) * 1962-04-14 1965-11-18 Gottfried Hoefels Profile-free track bed cleaning machine
DE1205128B (en) * 1962-04-28 1965-11-18 Gottfried Hoefels Track bed cleaning machine
DE1213459B (en) * 1962-07-10 1966-03-31 Alfred Scheuchzer Machine for cleaning the ballast under a track

Similar Documents

Publication Publication Date Title
CH620005A5 (en)
FR2476708A1 (en) MOBILE ASSEMBLY FOR CLEANING THE RAILWAY BALLAST LAYER AND CLEANING METHOD USING SUCH AN ASSEMBLY
FR2470189A1 (en) MOBILE MACHINE FOR CLEANING A BALLAST BED, INCLUDING LEVELING AND COMPACTION DEVICES, AND METHOD FOR TREATING A BALLAST BED USING SUCH A MACHINE
FR2558859A1 (en) METHOD AND MACHINE FOR CLEANING A RAILWAY BALLAST BED
FR2618466A1 (en) EXCHANGE MACHINE OF TRAVERSES
FR2635126A1 (en) MOBILE JAM MACHINE, LIFTING AND DRESSING OF RAILWAYS FOR LIFTING AND / OR LATERAL SHIFTING OF A TRACK IN ZONES OF NEEDLE AND CROSSING
EP0446130B1 (en) Installation for straightening
CH353390A (en) Method of repairing a railway track and installation for its implementation
FR2480815A1 (en) RAILWAY CONSTRUCTION MACHINE COMPRISING A DEVICE FOR DEBLAYING AND PLACING THE BALLAST LAYER
FR2802504A1 (en) IMPROVED DEVICE FOR BALANCING A VESSEL ESPECIALLY ROLLING
EP0108168B1 (en) Track installation replacement method and train for carrying out the method
EP3368718A1 (en) System and method for transporting a railway switch
FR2541600A1 (en) UNIVERSAL CAGE WITH OPEN COLUMNS, CONVERTIBLE INTO A DUO CAGE AND VICE VERSA EXTENSIBLE IN HEIGHT AND WIDTH, FOR LAMINATION OF PROFILES SUCH AS H AND I POULTRY, RAILS, PALPLANCHES AND OTHER SIMILAR PROFILES
BE620311A (en)
FR2685307A1 (en) Device for continuous transportation of bulk (loose) materials
FR2535359A1 (en) Method for the replacement of railway lines and handling frame for implementing the same
FR2532668A1 (en) BEAM LAUNCHER DEVICE BETWEEN BRIDGE BATTERIES
US3054459A (en) Apparatus for cleaning the ballast of a railway track
FR2983877A1 (en) WAGON POUSSEUR DE RAILS.
FR2741024A1 (en) MOBILE PLATFORM FOR CROSSING DEGREE DEDUCTIONS
CH651338A5 (en) RAILWAY SITE MACHINE FOR REPLACING A SECTION OR MOUNTED TRACK APPARATUS.
FR2628456A1 (en) FERRY RAIL MOWING MACHINE
CH285414A (en) Railway train for laying and removing track elements.
FR2566018A1 (en) Method and devices for the mechanised replacement of railway gear or lengths of track
CH374095A (en) Method of dressing a railway track and installation for its implementation