BRPI0920989A2 - sistema de criação de plano de combinação e dotação de navio, método e programa para o mesmo - Google Patents
sistema de criação de plano de combinação e dotação de navio, método e programa para o mesmoInfo
- Publication number
- BRPI0920989A2 BRPI0920989A2 BRPI0920989A BRPI0920989A BRPI0920989A2 BR PI0920989 A2 BRPI0920989 A2 BR PI0920989A2 BR PI0920989 A BRPI0920989 A BR PI0920989A BR PI0920989 A BRPI0920989 A BR PI0920989A BR PI0920989 A2 BRPI0920989 A2 BR PI0920989A2
- Authority
- BR
- Brazil
- Prior art keywords
- endowment
- ship
- program
- setting
- same
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G61/00—Use of pick-up or transfer devices or of manipulators for stacking or de-stacking articles not otherwise provided for
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008298596 | 2008-11-21 | ||
PCT/JP2009/006236 WO2010058584A1 (ja) | 2008-11-21 | 2009-11-19 | 配合及び配船計画作成システム、方法及びプログラム |
Publications (1)
Publication Number | Publication Date |
---|---|
BRPI0920989A2 true BRPI0920989A2 (pt) | 2016-01-05 |
Family
ID=42198027
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI0920989A BRPI0920989A2 (pt) | 2008-11-21 | 2009-11-19 | sistema de criação de plano de combinação e dotação de navio, método e programa para o mesmo |
Country Status (5)
Country | Link |
---|---|
JP (1) | JP4669582B2 (pt) |
KR (1) | KR101296933B1 (pt) |
CN (1) | CN102137803B (pt) |
BR (1) | BRPI0920989A2 (pt) |
WO (1) | WO2010058584A1 (pt) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101156821B1 (ko) * | 2008-01-18 | 2012-06-18 | 신닛뽄세이테쯔 카부시키카이샤 | 배합 계획 작성 장치, 방법 및 기록 매체 |
JP5598498B2 (ja) * | 2012-06-06 | 2014-10-01 | 新日鐵住金株式会社 | 原材料の購買及び使用計画作成装置、方法並びにプログラム |
CN103208059B (zh) * | 2013-04-17 | 2016-03-09 | 中华人民共和国张家港出入境检验检疫局 | 多港分卸的信息管理系统及方法 |
JP5598587B1 (ja) * | 2013-10-01 | 2014-10-01 | 新日鐵住金株式会社 | 原材料の購買及び使用計画作成装置、方法並びにプログラム |
JP6736258B2 (ja) * | 2015-04-27 | 2020-08-05 | 日本製鉄株式会社 | 計画立案装置、方法及びプログラム |
CN106097234A (zh) * | 2016-06-14 | 2016-11-09 | 北京交通大学 | 基于电子合同的港口散杂货作业自动计费方法和装置 |
CN109561412B (zh) * | 2018-12-21 | 2022-07-05 | 广州文冲船厂有限责任公司 | 一种无人船多点停靠通信方法及装置 |
JP7367771B2 (ja) * | 2019-11-18 | 2023-10-24 | 日本電気株式会社 | 取引管理装置、取引管理方法、およびプログラム |
KR20230024406A (ko) * | 2020-07-31 | 2023-02-20 | 제이에프이 스틸 가부시키가이샤 | 배선 계획 작성 방법, 그 방법에 의한 조업 방법 및 배선 계획 작성 장치 |
CN112446094B (zh) * | 2020-11-25 | 2023-06-16 | 江南造船(集团)有限责任公司 | 用于船舶管件族制造的自动成组方法及系统 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5859129A (ja) * | 1981-09-30 | 1983-04-08 | Kawasaki Steel Corp | ベツテイングパイルの積付方法 |
JPH11217619A (ja) * | 1998-01-30 | 1999-08-10 | Topy Ind Ltd | スクラップの使用量比率決定システム |
JP2001243301A (ja) * | 2000-03-01 | 2001-09-07 | Nkk Corp | 石炭配合計画作成装置および石炭配合計画作成方法 |
JP2002304447A (ja) * | 2001-04-03 | 2002-10-18 | Nippon Steel Corp | 輸送管理装置、輸送管理システム、輸送管理方法及び記憶媒体 |
CN1661609A (zh) * | 2004-02-26 | 2005-08-31 | 何浩然 | 钢铁生产计划中合同与库存联合优化管理方法 |
JP2005343630A (ja) * | 2004-06-03 | 2005-12-15 | Chugoku Electric Power Co Inc:The | 海送物流管理システム及び海送物流管理方法 |
JP5011954B2 (ja) * | 2006-10-27 | 2012-08-29 | Jfeスチール株式会社 | 原料輸送配船計画システム及び原料輸送配船計画立案方法 |
CN101276439A (zh) * | 2007-03-30 | 2008-10-01 | 上海宝信软件股份有限公司 | 大宗物料资源集中统筹平衡优化仿真方法及系统 |
JP4465011B2 (ja) * | 2008-01-21 | 2010-05-19 | 新日本製鐵株式会社 | 配合計画作成装置、方法及びプログラム |
-
2009
- 2009-11-19 JP JP2010510606A patent/JP4669582B2/ja active Active
- 2009-11-19 WO PCT/JP2009/006236 patent/WO2010058584A1/ja active Application Filing
- 2009-11-19 BR BRPI0920989A patent/BRPI0920989A2/pt not_active Application Discontinuation
- 2009-11-19 KR KR1020117004465A patent/KR101296933B1/ko active IP Right Grant
- 2009-11-19 CN CN2009801337236A patent/CN102137803B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
WO2010058584A1 (ja) | 2010-05-27 |
JPWO2010058584A1 (ja) | 2012-04-19 |
KR20110050475A (ko) | 2011-05-13 |
CN102137803A (zh) | 2011-07-27 |
CN102137803B (zh) | 2013-10-23 |
JP4669582B2 (ja) | 2011-04-13 |
KR101296933B1 (ko) | 2013-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BRPI0920989A2 (pt) | sistema de criação de plano de combinação e dotação de navio, método e programa para o mesmo | |
BRPI0819842A2 (pt) | Sistema de carga e método para operar o mesmo. | |
BRPI0814085A2 (pt) | Sistema, e, método | |
BRPI0815101A2 (pt) | Método, e, sistema | |
BRPI0813914A2 (pt) | Sistema, e, método. | |
BRPI0822078A2 (pt) | Método, e, sistema. | |
BRPI0907279A2 (pt) | sistema de monitoramento fetal e método para o monitoramento fetal. | |
BRPI0906327A2 (pt) | Folha de registro e método para fabricar folha de registro. | |
BRPI0819918A2 (pt) | sistema e método para furo abaixo. | |
BRPI0819085A2 (pt) | Sistema para uso com produção de hidrocarbonetos, e, método associado com produção de hidrocarbonetos | |
BRPI0811722A2 (pt) | Método, e sistema | |
BRPI0718971A2 (pt) | Sistema para medir parâmetros, e, método para montar um sistema para medir parâmetros | |
BRPI0822705A2 (pt) | Painel de ligações impresso e método para fabricar o mesmo | |
BRPI0811113A2 (pt) | Processo, aparelho e sistema para estabelecer conexão. | |
BRPI0820148A2 (pt) | Sistema de aberturas, sistema de computador e método para usinar aberturas | |
BRPI0811883A2 (pt) | Método e sistema para planejamento dentário. | |
BRPI0819876A2 (pt) | Sistema de enumeração e método para exibição de led. | |
BRPI0821208A2 (pt) | sistema de ablação. | |
BRPI0907909A2 (pt) | Sistema, e, processo para a produção e uso do mesmo | |
BRPI0813569A2 (pt) | Método de inspeção. | |
BRPI0810963A2 (pt) | sistema, e, método | |
BRPI0820898A2 (pt) | Método, produto de programa de computador, e, sistema | |
BRPI0807579A2 (pt) | Sistema pneumático para condimentação. | |
BRPI0812652A2 (pt) | "método para avaliar automaticamente um diálogo, produto de programa de computador e sistema para avaliar automaticamente um diálogo" | |
BRPI0810190A2 (pt) | Sistema, e, método. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B25D | Requested change of name of applicant approved |
Owner name: NIPPON STEEL AND SUMITOMO METAL CORPORATION (JP) |
|
B06T | Formal requirements before examination [chapter 6.20 patent gazette] | ||
B06I | Publication of requirement cancelled [chapter 6.9 patent gazette] |
Free format text: ANULADA A PUBLICACAO CODIGO 6.20 NA RPI NO 2485 DE 21/08/2018 POR TER SIDO INDEVIDA. |
|
B06T | Formal requirements before examination [chapter 6.20 patent gazette] | ||
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B25D | Requested change of name of applicant approved |
Owner name: NIPPON STEEL CORPORATION (JP) |
|
B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
B09B | Patent application refused [chapter 9.2 patent gazette] | ||
B12B | Appeal against refusal [chapter 12.2 patent gazette] |