BE457743A - - Google Patents

Info

Publication number
BE457743A
BE457743A BE457743DA BE457743A BE 457743 A BE457743 A BE 457743A BE 457743D A BE457743D A BE 457743DA BE 457743 A BE457743 A BE 457743A
Authority
BE
Belgium
Prior art keywords
reinforced concrete
beams
slab
ribs
section
Prior art date
Application number
Other languages
French (fr)
Publication of BE457743A publication Critical patent/BE457743A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/04Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
    • E04B5/046Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement with beams placed with distance from another

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



   Louis M A R L I E R E Nouveau dispositif de hourdis en béton armé creux. 



   La présente invention se rapporte à l'industrie de la cons- truction du bâtiment et a plus spécialement pour objet un dispo- sitif nouveau et perfectionné de hourdis en béton armé, lequel est simple tant au point de vue fabrication que montage et présente sur les systèmes actuellement connus de hourdis de ce genre de sérieux avantages. 



   Conformément à cette invention, le hourdis est constitué de poutres en béton armé de profil variable, moulées d'avance ; ces poutres sont placées sur les arases des murs ou sur les coffrages des maitresses poutres de façon à laisser entre-elles un espace vide, lequel est ensuite comblé par des dalles en béton vibré et armé réunies les unes aux autres par une bande de béton coulée sur place. Le hourdis forme de ce fait un bloc monolithe, grâce   *au   béton coulé sur place et aux armatures des dalles,qui se superposent (fig.2). 



   Si les nervures ne peuvent pas rester apparentes, ou si l'on veut établir un hourdis creux, le faux plafond sera constitué de plaques en fibro-plâtre ou en treillis steengaz ou en toute autre matière appropriée fixées à une pièce de bois ou à des crochets prévus dans la nervure. 



   Les dessins annexés représentent, à titre d'exemple, une forme d'exécution de cette invention. Dans ces dessins :
Fig.l montre en coupe une poutre telle qu'elle sort du chantier de fabrication en série. 



   Fig.2 montre plusieurs nervures et dalles mises en place. 

 <Desc/Clms Page number 2> 

 



   Fig.3 représente le travail fini, complété par un faux plafond. 



   Se référant à ces dessins, le hourdis se compose essentiellement de poutres ou nervures en béton armé moulées d'avance. 



  Aux extrémités,la section a la forme rectangulaire de façon à présenter une assise stable sur les murs d'appui. Cette section rectangulaire s'étend plus ou moins loin suivant qu'il s'agit    de poutres sur deux appuis ou de poutres continues ; ce dernier   cas, les abouts de section rectangulaire forment la table de compression des maîtresses poutres. Au centre, la poutre a la forme d'un T et intermédiairement la section passe progressivement du T à la section rectangulaire, ainsi que le montre la fig.4 (vue en plan du dessous). Les poutres ainsi moulées d'avance comportent une armature telle qu'elles peuvent supporter pendant le montage, outre leur poids propre et les matériaux qui complètent le hourdis, le poids de trois hommes circulant sur la nervure. L'armature permet également une manipulation dans tous les sens sans danger de rupture. 



   Les nervures comportent dans le milieu et vers les extrémités des trous transversaux qui ont une double fonction: pendant le montage, ces trous servent au passage de câbles de suspension pour la manutention par grues, une fois le travail terminé, ils sont utilisés pour le passage des canalisations de gaz et d'électrioité. 



   De ce qui précède, on comprendra que le hourdis ainsi constitué formera un bloc monolithe armé, de résistance prédéterminée; l'établissement d'un tel plancher n'exige aucune main d'oeuvre spécialisée et supprime tout travail de coffrage, de ferraillage et d'étançonnage. Les dimensions absolues et relatives des poutres, leurs armatures, l'interespace sont autant de détails qui peuvent varier suivant chaque cas particulier. Ces facteurs seront déterminés par les calculs de résistance et le système de plafond adopté. 



   La fig.5 montre, à titre de variante, que par l'adjonction d'une pièce de bois à la partie supérieure, la dalle en béton 

 <Desc/Clms Page number 3> 

 armé peut être remplacée par un plancher en bois, les nervures tenant alors lieu de gite en bois. 



    REVENDICATIONS.   



   -----------------
1.- Hourdis en béton armé creux caractérisé en ce qu'il comporte des nervures robustes permettant un montage complet sans l'intervention d'aucun étançonnage.



   <Desc / Clms Page number 1>
 



   Louis M A R L I E R E New hollow reinforced concrete slab system.



   The present invention relates to the building construction industry and more specifically relates to a new and improved device for reinforced concrete slabs, which is simple both from the point of view of manufacture and assembly and present on the structures. currently known slab systems of this kind have serious advantages.



   In accordance with this invention, the slab consists of reinforced concrete beams of variable profile, molded in advance; these beams are placed on the edges of the walls or on the formwork of the main beams so as to leave an empty space between them, which is then filled by vibrated and reinforced concrete slabs joined to each other by a cast concrete strip on the spot. The slabs therefore form a monolithic block, thanks to * the concrete poured in place and the reinforcements of the slabs, which are superimposed (fig. 2).



   If the ribs cannot remain visible, or if a hollow slab is to be established, the false ceiling will be made of plasterboard or steengaz mesh or any other suitable material fixed to a piece of wood or to hooks provided in the rib.



   The accompanying drawings show, by way of example, one embodiment of this invention. In these drawings:
Fig.l shows in section a beam as it leaves the mass production site.



   Fig. 2 shows several ribs and slabs in place.

 <Desc / Clms Page number 2>

 



   Fig. 3 represents the finished work, supplemented by a false ceiling.



   Referring to these drawings, the slab is essentially made up of reinforced concrete beams or ribs molded in advance.



  At the ends, the section has a rectangular shape so as to present a stable base on the supporting walls. This rectangular section extends more or less far depending on whether they are beams on two supports or continuous beams; the latter case, the ends of rectangular section form the compression table of the main beams. In the center, the beam has the shape of a T and intermediate the section gradually passes from the T to the rectangular section, as shown in fig. 4 (plan view from below). The beams thus molded in advance comprise a reinforcement such that they can withstand during assembly, in addition to their own weight and the materials which complete the slab, the weight of three men circulating on the rib. The frame also allows manipulation in all directions without danger of breaking.



   The ribs have transverse holes in the middle and towards the ends which have a dual function: during assembly, these holes are used for the passage of suspension cables for handling by cranes, once the work is finished, they are used for the passage gas and electricity pipelines.



   From the foregoing, it will be understood that the slab thus formed will form an armed monolith block, of predetermined resistance; the establishment of such a floor requires no specialized labor and eliminates any formwork, reinforcement and shoring work. The absolute and relative dimensions of the beams, their reinforcements, the inter-space are all details which may vary according to each particular case. These factors will be determined by the strength calculations and the ceiling system adopted.



   Fig. 5 shows, as an alternative, that by adding a piece of wood to the upper part, the concrete slab

 <Desc / Clms Page number 3>

 reinforced can be replaced by a wooden floor, the ribs then taking the place of wooden gite.



    CLAIMS.



   -----------------
1.- Hollow reinforced concrete slab characterized in that it comprises robust ribs allowing complete assembly without the intervention of any shoring.


    

Claims (1)

2. - Mode d'établissement d'un hourdis en béton armé suivant revendication 1, caractérisé par l'absence de coffrage et de ferraillage sur place. 2. - Method of establishing a reinforced concrete slab according to claim 1, characterized by the absence of formwork and reinforcement on site. 3.- Hourdis en béton armé suivant revendication 1, caractérisé par la présence d'ouvertures pratiquées d'avance pour le placement des canalisations diverses. 3.- reinforced concrete slats according to claim 1, characterized by the presence of openings made in advance for the placement of various pipes. 4.- Hourdis en béton armé suivant revendications 1 et 3, caractérisé par la variation de la section de l'appui vers le milieu. 4.- reinforced concrete slats according to claims 1 and 3, characterized by the variation of the section of the support towards the middle.
BE457743D BE457743A (en)

Publications (1)

Publication Number Publication Date
BE457743A true BE457743A (en)

Family

ID=111156

Family Applications (1)

Application Number Title Priority Date Filing Date
BE457743D BE457743A (en)

Country Status (1)

Country Link
BE (1) BE457743A (en)

Similar Documents

Publication Publication Date Title
US20180195240A1 (en) Field-assembly concret dowel basket
WO2016189476A1 (en) Construction of the prefabricated column and beam type
EP2096221B1 (en) Construction block with built-in insulation
BE457743A (en)
BE1015453A3 (en) Process for producing concrete surfaces and joint therefor.
FR2924451A1 (en) Prefabricated floor for e.g. school, has reinforcement bars for connecting slabs to spandrel on longitudinal walls to retrieve transversal horizontal efforts, where reinforcement bars pass via splits connected in protectors
FR2739643A1 (en) COLLABORATING METAL BEAM
BE560977A (en)
FR3058428B1 (en) BUILDING ELEMENT WITH INTEGRATED PLANELLE
BE343155A (en)
BE449539A (en)
EP4105403A1 (en) Modular system, method for manufacturing such a system and assembly comprising a plurality of modular systems
CH132238A (en) Cement concrete floor-ceiling, and method of carrying it out.
EP0143026A1 (en) Set of modular elements for the realisation of storage spaces, in particular of cellars and garden sheds
BE502271A (en)
CH277552A (en) Reinforced concrete floor.
BE483260A (en)
BE383690A (en)
CH315813A (en) Reinforced concrete floor and process for its manufacture
OA18497A (en) Construction type prefabricated posts and beams.