ZA202212169B - Combined mining method for transition sublevels and barrier pillars from caving to filling - Google Patents
Combined mining method for transition sublevels and barrier pillars from caving to fillingInfo
- Publication number
- ZA202212169B ZA202212169B ZA2022/12169A ZA202212169A ZA202212169B ZA 202212169 B ZA202212169 B ZA 202212169B ZA 2022/12169 A ZA2022/12169 A ZA 2022/12169A ZA 202212169 A ZA202212169 A ZA 202212169A ZA 202212169 B ZA202212169 B ZA 202212169B
- Authority
- ZA
- South Africa
- Prior art keywords
- sublevels
- caving
- filling
- transition
- mining method
- Prior art date
Links
- 230000004888 barrier function Effects 0.000 title 1
- 238000000034 method Methods 0.000 title 1
- 238000005065 mining Methods 0.000 title 1
- 230000007704 transition Effects 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/22—Methods of underground mining; Layouts therefor for ores, e.g. mining placers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Remote Sensing (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210120191.XA CN114412468B (en) | 2022-02-07 | 2022-02-07 | Caving-to-filling transition subsection and isolated ore pillar combined mining method |
Publications (1)
Publication Number | Publication Date |
---|---|
ZA202212169B true ZA202212169B (en) | 2022-11-30 |
Family
ID=81280187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ZA2022/12169A ZA202212169B (en) | 2022-02-07 | 2022-11-08 | Combined mining method for transition sublevels and barrier pillars from caving to filling |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN114412468B (en) |
ZA (1) | ZA202212169B (en) |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE469726B (en) * | 1990-04-30 | 1993-08-30 | Outokumpu Oy | VERTICAL PILLAR BREAKING PROVIDING UPPER DOWN |
CN101725348A (en) * | 2008-10-21 | 2010-06-09 | 招金矿业股份有限公司大尹格庄金矿 | Pre-control roof open stoping spallation subsequent filling mining method |
CN102305073B (en) * | 2011-08-15 | 2013-03-20 | 鞍钢集团矿业公司 | Sill pillar staged caving stoping method with single route projecting eaves structure |
CN102587916B (en) * | 2012-02-01 | 2015-11-25 | 金建工程设计有限公司 | A kind of ore caving afterwards filling mining methods |
CN102644464B (en) * | 2012-04-12 | 2014-01-01 | 东北大学 | Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine |
CN102635357A (en) * | 2012-04-26 | 2012-08-15 | 辽宁科技大学 | Pillarless phased caving method with top tailing crushed stone filling and sectional water injection binding |
CN103615250B (en) * | 2013-12-09 | 2015-09-23 | 中南大学 | The full Open stope mining afterwards filling of itemize studding works in coordination with mining codes |
CN205400734U (en) * | 2016-03-14 | 2016-07-27 | 林立荣 | Metal mine chuan mai adopts four and stays one to retreat mining structure |
CN107339104B (en) * | 2017-08-03 | 2019-11-19 | 长沙矿山研究院有限责任公司 | Security personnel's curtain wall recovery method |
CN109322670B (en) * | 2018-11-13 | 2024-03-19 | 中国恩菲工程技术有限公司 | Double-roadway upward fan-shaped blast hole blasting bottom-pulling mining system |
CN110644997B (en) * | 2019-10-10 | 2021-06-11 | 安徽金安矿业有限公司 | Sublevel rock drilling and sublevel mining subsequent filling mining method |
CN111364997A (en) * | 2019-12-31 | 2020-07-03 | 武钢资源集团有限公司 | Upward drift-caving combined mining method |
CN113047836B (en) * | 2021-03-15 | 2024-05-14 | 福建兴万祥建设集团有限公司 | Goaf isolated ore pillar safe stoping method |
-
2022
- 2022-02-07 CN CN202210120191.XA patent/CN114412468B/en active Active
- 2022-11-08 ZA ZA2022/12169A patent/ZA202212169B/en unknown
Also Published As
Publication number | Publication date |
---|---|
CN114412468A (en) | 2022-04-29 |
CN114412468B (en) | 2022-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2015345830B2 (en) | Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence | |
US9494037B2 (en) | Inclined layered solid-filling mining method in ultrathick coal layer | |
CN103104287A (en) | Stripe gob filling repeated-mining method | |
US10012080B2 (en) | Skip-mining type wangeviry stope branch roadway filling and coal mining method | |
AU2013354613B2 (en) | Method of local filling to control surface subsidence in worked-out area | |
ZA202007716B (en) | Comprehensive supporting method for a fully mechanized mining face of a coal mine | |
CN102518438A (en) | Roof regeneration medium-length hole ore blast backfill mining method | |
AU2021101511A4 (en) | Flat bottom mining preparation system for large diameter deep hole stope of inclined thick and large ore body | |
CN103244123A (en) | High-dipping medium thick ore body mining method | |
ZA202212169B (en) | Combined mining method for transition sublevels and barrier pillars from caving to filling | |
CN104358573A (en) | Block open-stope and block caving combined mining method of thick orebody | |
CN109209490A (en) | It adopts bank face and withdraws method in a kind of waste filling auxiliary end | |
ZA201604147B (en) | Dynamic state monitor of roof for filling coal mining goaf in a comprehensive and mechanized way | |
ZA202204720B (en) | Method for recovering stocked ore during conversion from caving process to filling process | |
ZA202209148B (en) | Grouting method for reinforcing surrounding rock of three-soft mining roadway | |
ZA202302412B (en) | Method for improving roof-contacted filling rate of end sand discharging stope in underground mines | |
ZA202302570B (en) | Combined mining method for underground mines | |
Townend et al. | Mitigation strategies for mining in high stress sill pillars at Coleman Mine–a case study | |
ZA202213461B (en) | Low-temperature sealed coal core drilling device of underground coal mine and method thereof | |
ZA201808355B (en) | Coal mine underground bag-shaped filling structure and method of using same | |
CN111894668B (en) | Top and bottom column one-time recycling method for constructing temporary supporting structure by cemented filling | |
ZA202302410B (en) | Charging method for horizontal holes in underground mine fractured rock masses | |
DUPONT et al. | Speleogenesis by alterite erosion within ghost-rock features in the Ardenne Allochton (Sprimont syncline, East Belgium) | |
CN102828753A (en) | Double-beveling arranging method for long-wall comprehensive releasing operation surface of heavy-pitch coal seam tendency | |
ZA202201594B (en) | Mining filling method for advanced replacement section coal pillar |