ZA202204720B - Method for recovering stocked ore during conversion from caving process to filling process - Google Patents
Method for recovering stocked ore during conversion from caving process to filling processInfo
- Publication number
- ZA202204720B ZA202204720B ZA2022/04720A ZA202204720A ZA202204720B ZA 202204720 B ZA202204720 B ZA 202204720B ZA 2022/04720 A ZA2022/04720 A ZA 2022/04720A ZA 202204720 A ZA202204720 A ZA 202204720A ZA 202204720 B ZA202204720 B ZA 202204720B
- Authority
- ZA
- South Africa
- Prior art keywords
- stocked
- recovering
- during conversion
- caving
- ore during
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110538486.4A CN113216964B (en) | 2021-05-18 | 2021-05-18 | Recovery method of deposit ore in process of transferring caving method to filling method |
Publications (1)
Publication Number | Publication Date |
---|---|
ZA202204720B true ZA202204720B (en) | 2022-06-29 |
Family
ID=77093068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ZA2022/04720A ZA202204720B (en) | 2021-05-18 | 2022-04-28 | Method for recovering stocked ore during conversion from caving process to filling process |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN113216964B (en) |
WO (1) | WO2022241972A1 (en) |
ZA (1) | ZA202204720B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113216964B (en) * | 2021-05-18 | 2022-05-27 | 中钢集团马鞍山矿山研究总院股份有限公司 | Recovery method of deposit ore in process of transferring caving method to filling method |
CN114000882A (en) * | 2021-11-03 | 2022-02-01 | 金川集团股份有限公司 | Caving method and filling method collaborative mining method for same mining area |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1157236A1 (en) * | 1983-03-09 | 1985-05-23 | Читинский Филиал Всесоюзного Научно-Исследовательского,Проектного И Конструкторского Института Горного Дела Цветной Металлургии | Method and apparatus for mining ore bodies |
RU2123597C1 (en) * | 1997-06-06 | 1998-12-20 | Институт горного дела СО РАН | Method for mining steep seams |
CA2409848A1 (en) * | 2000-05-19 | 2001-11-22 | Eskom | Underground mining method |
DE102005040272A1 (en) * | 2005-08-24 | 2007-03-01 | Dbt Gmbh | Pillar retreating method for use during digging e.g. coal, in underground layer-like deposits, involves supporting inclination end with construction units before retreating face of extraction unit |
CN1963147A (en) * | 2005-11-07 | 2007-05-16 | 王培福 | Mining method |
CN101105129B (en) * | 2007-07-16 | 2010-05-19 | 中南大学 | Mining environment reconstructed continuous mining afterwards filling mining method |
CN102635357A (en) * | 2012-04-26 | 2012-08-15 | 辽宁科技大学 | Pillarless phased caving method with top tailing crushed stone filling and sectional water injection binding |
CN102704934B (en) * | 2012-06-28 | 2014-07-09 | 中钢集团马鞍山矿山研究院有限公司 | High-yield and low-cost subsequent filling mining method for underground mine |
CN104405395B (en) * | 2014-11-24 | 2016-11-30 | 西北矿冶研究院 | Mining method for transition of underground ore body from open stope mining method to caving mining method |
CN104847355B (en) * | 2015-05-15 | 2017-05-17 | 西北矿冶研究院 | Continuous mining method for hollow ground of medium-thickness steeply inclined ore body |
CN106677780B (en) * | 2017-02-21 | 2018-09-14 | 中冶北方(大连)工程技术有限公司 | Bottom ore removal afterwards filling mining method is cut in a kind of upward and downward stage rock drilling segmentation |
CN107339104B (en) * | 2017-08-03 | 2019-11-19 | 长沙矿山研究院有限责任公司 | Security personnel's curtain wall recovery method |
CN108547618A (en) * | 2018-04-04 | 2018-09-18 | 长沙有色冶金设计研究院有限公司 | A kind of two steps mining methods leave the recovery process of studding |
CN108561136B (en) * | 2018-04-18 | 2019-07-30 | 西安建筑科技大学 | From kerve Block caving system |
CN111894591B (en) * | 2020-07-16 | 2022-05-17 | 南华大学 | Collaborative mining method for inclined thick and large ore body panel and panel interval column |
CN112031770B (en) * | 2020-09-11 | 2022-08-16 | 中钢集团马鞍山矿山研究总院股份有限公司 | Novel mining method suitable for multi-stope synchronous mining of thick and large ore body |
CN113216964B (en) * | 2021-05-18 | 2022-05-27 | 中钢集团马鞍山矿山研究总院股份有限公司 | Recovery method of deposit ore in process of transferring caving method to filling method |
CN113216963B (en) * | 2021-05-18 | 2022-05-27 | 中钢集团马鞍山矿山研究总院股份有限公司 | Stoping method for gallery ore in transition mining by caving method to filling method |
-
2021
- 2021-05-18 CN CN202110538486.4A patent/CN113216964B/en active Active
- 2021-09-01 WO PCT/CN2021/116006 patent/WO2022241972A1/en unknown
-
2022
- 2022-04-28 ZA ZA2022/04720A patent/ZA202204720B/en unknown
Also Published As
Publication number | Publication date |
---|---|
CN113216964A (en) | 2021-08-06 |
CN113216964B (en) | 2022-05-27 |
WO2022241972A1 (en) | 2022-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ZA202204720B (en) | Method for recovering stocked ore during conversion from caving process to filling process | |
EP4119244A4 (en) | Method for recovering valuable substance | |
EP3904546C0 (en) | Process for recovering components from alkaline batteries | |
ZA202007716B (en) | Comprehensive supporting method for a fully mechanized mining face of a coal mine | |
PL3749735T3 (en) | A method for producing metallurgical coke from non-coking coal | |
HU231497B1 (en) | Method for purifying nickel-cobalt-manganese leaching solution | |
IL284038A (en) | Method for transferring a batch production process to a continuous production process | |
PL4225697T3 (en) | Method for recovering metals from black mass | |
EP4134180A4 (en) | Method for recovering valuable metal | |
HUE062801T2 (en) | Improved method for producing high purity lead | |
KR102376746B9 (en) | A method for manufacuring tantalum powder using metallothermic reduction | |
KR102565372B9 (en) | System for Recovering Valuable Metals from Wasted Batteries | |
GB2561018B (en) | Process for recovering organics from material recovery facility fines | |
EP4212258A4 (en) | Valuable matter recovery method | |
ZA202108028B (en) | Method for producing a pgm collector alloy | |
EP4107298A4 (en) | Process of rare earth recovery from ores containing bastnaesite | |
KR102451803B9 (en) | Method for recovering metal | |
ZA202212169B (en) | Combined mining method for transition sublevels and barrier pillars from caving to filling | |
GB202314849D0 (en) | A process for vertical well re-entry | |
GB202302553D0 (en) | A method for the recovery of metals from mined mineral materials | |
GB202210875D0 (en) | Process for recovery of lithium from brine | |
ZA202204342B (en) | Method for mining coal seam group | |
GB2589452B (en) | Process for hydraulic mining | |
EP4153558C0 (en) | A method for synthesizing xanthohumol | |
ZA202201594B (en) | Mining filling method for advanced replacement section coal pillar |