ZA202302570B - Combined mining method for underground mines - Google Patents
Combined mining method for underground minesInfo
- Publication number
- ZA202302570B ZA202302570B ZA2023/02570A ZA202302570A ZA202302570B ZA 202302570 B ZA202302570 B ZA 202302570B ZA 2023/02570 A ZA2023/02570 A ZA 2023/02570A ZA 202302570 A ZA202302570 A ZA 202302570A ZA 202302570 B ZA202302570 B ZA 202302570B
- Authority
- ZA
- South Africa
- Prior art keywords
- mining method
- underground mines
- combined mining
- combined
- mines
- Prior art date
Links
- 238000000034 method Methods 0.000 title 1
- 238000005065 mining Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Remote Sensing (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210100024.9A CN114396281B (en) | 2022-01-27 | 2022-01-27 | Underground mine combined mining method |
PCT/CN2022/092444 WO2023142303A1 (en) | 2022-01-27 | 2022-05-12 | Combined mining method for underground mine |
Publications (1)
Publication Number | Publication Date |
---|---|
ZA202302570B true ZA202302570B (en) | 2023-05-31 |
Family
ID=81232242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ZA2023/02570A ZA202302570B (en) | 2022-01-27 | 2023-02-24 | Combined mining method for underground mines |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN114396281B (en) |
WO (1) | WO2023142303A1 (en) |
ZA (1) | ZA202302570B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114396281B (en) * | 2022-01-27 | 2022-10-28 | 中钢集团马鞍山矿山研究总院股份有限公司 | Underground mine combined mining method |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3712677A (en) * | 1971-03-10 | 1973-01-23 | Atlantic Richfield Co | Mining method |
SU922282A1 (en) * | 1979-05-16 | 1982-04-23 | Восточный научно-исследовательский горнорудный институт | Ore supply method |
CN103032070A (en) * | 2011-10-09 | 2013-04-10 | 彭康 | Boundary-controlled room column type sublevel open stoping subsequent stage filling mining method |
CN106121648B (en) * | 2016-08-04 | 2018-05-15 | 西北矿冶研究院 | Sublevel open stoping chassis route ore drawing subsequent filling mining method |
CN106677780B (en) * | 2017-02-21 | 2018-09-14 | 中冶北方(大连)工程技术有限公司 | Bottom ore removal afterwards filling mining method is cut in a kind of upward and downward stage rock drilling segmentation |
BG67116B1 (en) * | 2017-09-12 | 2020-07-31 | Николаи Георгиев Вълканов | Method of underground mining of mineral resources |
CN107989614B (en) * | 2017-12-06 | 2019-04-26 | 昆明冶金高等专科学校 | The mining methods of the inclined thick ore body of disk rock crusher in a kind of back production |
CN107939402B (en) * | 2017-12-28 | 2018-12-25 | 昆明冶金高等专科学校 | A kind of mining methods of the medium above firm inclined thick ore body of back production ore-rock |
CN108894785B (en) * | 2018-06-12 | 2019-11-15 | 北京矿冶科技集团有限公司 | A kind of layer and section combination recovery method of breaking ore body interlayer |
BR112022023583A2 (en) * | 2020-05-20 | 2022-12-20 | Luossavaara Kiirunavaara Ab | MINING METHOD FOR MINING ORE FROM AN ORE BODY |
CN111852478B (en) * | 2020-08-20 | 2022-04-01 | 安徽铜冠(庐江)矿业有限公司 | Thick, large and stable ore body filling mining method with H-shaped stud structure |
CN111927452B (en) * | 2020-09-25 | 2021-01-08 | 矿冶科技集团有限公司 | Ore body upper and lower tray cooperative downward continuous mining method |
CN114396280B (en) * | 2022-01-27 | 2022-10-28 | 中钢集团马鞍山矿山研究总院股份有限公司 | Underground structure arrangement mode for mining by adopting segmented open stope method and staged open stope method in sequence |
CN114396281B (en) * | 2022-01-27 | 2022-10-28 | 中钢集团马鞍山矿山研究总院股份有限公司 | Underground mine combined mining method |
-
2022
- 2022-01-27 CN CN202210100024.9A patent/CN114396281B/en active Active
- 2022-05-12 WO PCT/CN2022/092444 patent/WO2023142303A1/en unknown
-
2023
- 2023-02-24 ZA ZA2023/02570A patent/ZA202302570B/en unknown
Also Published As
Publication number | Publication date |
---|---|
CN114396281B (en) | 2022-10-28 |
WO2023142303A1 (en) | 2023-08-03 |
CN114396281A (en) | 2022-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SG11202111608VA (en) | Method for reconstructing shield tunnel for mining construction | |
ZA202102741B (en) | Frozen aquifer-based method for underground longwall face coal mining under water-containing condition | |
ZA202007716B (en) | Comprehensive supporting method for a fully mechanized mining face of a coal mine | |
ZA201906164B (en) | Grading method for water-preserving coal mining mine/mine area | |
ZA202302570B (en) | Combined mining method for underground mines | |
GB201902094D0 (en) | Improvements relating to underground mining | |
ZA202209148B (en) | Grouting method for reinforcing surrounding rock of three-soft mining roadway | |
GB201812808D0 (en) | Shearing system for longwall mining | |
EP3998395A4 (en) | Design method for mine without leaving coal pillar and without roadway tunneling | |
GB201911968D0 (en) | A geological rock mining equipment based on carbon dioxide blasting | |
GB2591022B (en) | Method for deep-sea mining | |
ZA202208979B (en) | Quantitative calculation method and system for ecological impact generated by open-pit coal mining | |
ZA202109624B (en) | Method for mining shallow coal seam with minimized impact | |
GB202008460D0 (en) | An equipment for automatically mining coal | |
ZA202105993B (en) | Intelligent design system and method for underground gas prevention drilling in coal mine | |
ZA202204342B (en) | Method for mining coal seam group | |
GB202306637D0 (en) | Mining method | |
ZA202105618B (en) | Blasting apparatus for rock under mine | |
GB2607938B (en) | Cable handling system for longwall mining machines | |
ZA202110936B (en) | Blasting technology for hard rock multi-arch tunnels | |
ZA202208304B (en) | Mining limit determining method and system for open-pit coal mine | |
ZA202213114B (en) | Mine underground filling mortar | |
AU2022903079A0 (en) | Method of Mining in Underground Mines Including Disposal of Tailings | |
CA222181S (en) | Drill rig for mining | |
AU2023903057A0 (en) | Underground mining |