ZA202302412B - Method for improving roof-contacted filling rate of end sand discharging stope in underground mines - Google Patents
Method for improving roof-contacted filling rate of end sand discharging stope in underground minesInfo
- Publication number
- ZA202302412B ZA202302412B ZA2023/02412A ZA202302412A ZA202302412B ZA 202302412 B ZA202302412 B ZA 202302412B ZA 2023/02412 A ZA2023/02412 A ZA 2023/02412A ZA 202302412 A ZA202302412 A ZA 202302412A ZA 202302412 B ZA202302412 B ZA 202302412B
- Authority
- ZA
- South Africa
- Prior art keywords
- stope
- filling rate
- sand discharging
- underground mines
- end sand
- Prior art date
Links
- 238000007599 discharging Methods 0.000 title 1
- 238000000034 method Methods 0.000 title 1
- 239000004576 sand Substances 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210393029.5A CN114753843B (en) | 2022-04-14 | 2022-04-14 | Method for improving filling and roof-contacting rate of sand-discharging stope at end part of underground mine |
PCT/CN2022/092439 WO2023197392A1 (en) | 2022-04-14 | 2022-05-12 | Method for increasing roof-contacted filling rate of underground mine end sand discharging stope |
Publications (1)
Publication Number | Publication Date |
---|---|
ZA202302412B true ZA202302412B (en) | 2023-05-31 |
Family
ID=82330855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ZA2023/02412A ZA202302412B (en) | 2022-04-14 | 2023-02-23 | Method for improving roof-contacted filling rate of end sand discharging stope in underground mines |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN114753843B (en) |
WO (1) | WO2023197392A1 (en) |
ZA (1) | ZA202302412B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117451976B (en) * | 2023-12-25 | 2024-03-08 | 山东黄金矿业科技有限公司充填工程实验室分公司 | Indoor experimental device for simulating filling of underground metal mine stope |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4265570A (en) * | 1979-06-01 | 1981-05-05 | Conoco, Inc. | Mine roof control |
CN100441831C (en) * | 2003-12-11 | 2008-12-10 | 云南驰宏锌锗股份有限公司 | Ladder type mining method using united pillars to support roof and partition stope |
AU2013207575B2 (en) * | 2012-07-20 | 2016-10-20 | Jollan Kingsley | Stope fill barrier |
CN103615285B (en) * | 2013-12-04 | 2015-11-04 | 南京银茂铅锌矿业有限公司 | A kind of stope route arrangement and method being beneficial to Tight filling |
CN109083644B (en) * | 2018-08-16 | 2019-08-02 | 中南大学 | A kind of safe and efficient mining methods of gently inclined medium thick orebody |
CN109339783B (en) * | 2018-11-15 | 2020-04-07 | 中国恩菲工程技术有限公司 | Approach open stope subsequent filling mining method for gently inclined medium-thickness ore body |
CN110359914B (en) * | 2019-08-19 | 2021-01-15 | 中钢集团马鞍山矿山研究总院股份有限公司 | Safe and low-cost combined sublevel mining method for gently inclined medium-thickness ore body |
CN110886612A (en) * | 2019-11-13 | 2020-03-17 | 铜陵有色金属集团股份有限公司 | Mining method suitable for continuous mining of gently inclined medium-thickness ore body |
CN110778316B (en) * | 2019-11-19 | 2020-12-25 | 深圳市中金岭南有色金属股份有限公司 | Sublevel rock drilling stage open stope subsequent filling mining method adopting arched-arch-shaped top pillar structure |
CN113565508B (en) * | 2021-08-03 | 2022-08-02 | 长沙矿山研究院有限责任公司 | Open stope subsequent filling mining method for V-shaped top column subsection rock drilling stage of medium-thickness ore body |
CN114087016B (en) * | 2021-12-03 | 2023-09-26 | 武钢资源集团金山店矿业有限公司 | Caving-to-filling mining isolation top column pre-control supporting method |
CN114810072A (en) * | 2022-04-14 | 2022-07-29 | 中钢集团马鞍山矿山研究总院股份有限公司 | Structural arrangement mode for improving filling and roof-contacting rate of end sand-discharging stope |
-
2022
- 2022-04-14 CN CN202210393029.5A patent/CN114753843B/en active Active
- 2022-05-12 WO PCT/CN2022/092439 patent/WO2023197392A1/en unknown
-
2023
- 2023-02-23 ZA ZA2023/02412A patent/ZA202302412B/en unknown
Also Published As
Publication number | Publication date |
---|---|
CN114753843A (en) | 2022-07-15 |
WO2023197392A1 (en) | 2023-10-19 |
CN114753843B (en) | 2023-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ZA202302412B (en) | Method for improving roof-contacted filling rate of end sand discharging stope in underground mines | |
CN104481540A (en) | Method for controlling multiple coal mining hazards by high level borehole grouting | |
CN103758567B (en) | A kind of breaking roof Collapsed zone grouting filling method | |
CN103742148B (en) | The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam | |
CN101942999A (en) | Coal mining method for high-dipping low seam | |
ZA202007716B (en) | Comprehensive supporting method for a fully mechanized mining face of a coal mine | |
CN104500070B (en) | Continuous coal mining machine paste filling mining method | |
CN105909287B (en) | A kind of coal mine fully-mechanized mining working lead abutment pressure area deep hole grouting technique and method | |
MX2012009756A (en) | Underground mining. | |
CN104481539A (en) | Extruding blasting caving mining method for self-pulling slot | |
CN109869152B (en) | Mining method for reserved roadway of coal and gas outburst coal seam | |
CN105422102B (en) | A kind of vertical medium-length hole ore blast subsection access back-filling method | |
ZA202209148B (en) | Grouting method for reinforcing surrounding rock of three-soft mining roadway | |
RU2352780C1 (en) | Method of ore bodies development | |
CN106223955A (en) | Rhombic bench cemented filling mining method | |
ZA202302570B (en) | Combined mining method for underground mines | |
RU2439323C1 (en) | Method to mine inclined ore deposits | |
CN113756868A (en) | Geotechnical engineering underground side wall construction method | |
CN117449856A (en) | Method for filling, roof protecting and displacement mining of bauxite under coal by lane | |
ZA202208485B (en) | Method for diverting water from anchor-cable grouting hole for construction in rock brust mine | |
ZA202102300B (en) | Grouting quality testing method for weak floor of coal mine rock roadway | |
RU2400625C1 (en) | Method for combined development of mineral deposits | |
ZA202213114B (en) | Mine underground filling mortar | |
CN111594183A (en) | Coal seam deep hole blasting pressure relief method for improving blasting effect by using original pressure relief holes | |
ZA202302410B (en) | Charging method for horizontal holes in underground mine fractured rock masses |