WO2024047878A1 - アンカーボルト設置治具、および、アンカーボルト設置方法 - Google Patents
アンカーボルト設置治具、および、アンカーボルト設置方法 Download PDFInfo
- Publication number
- WO2024047878A1 WO2024047878A1 PCT/JP2022/033181 JP2022033181W WO2024047878A1 WO 2024047878 A1 WO2024047878 A1 WO 2024047878A1 JP 2022033181 W JP2022033181 W JP 2022033181W WO 2024047878 A1 WO2024047878 A1 WO 2024047878A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- support
- anchor bolt
- positioning tool
- foundation
- formwork
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
Definitions
- the present disclosure relates to an anchor bolt installation jig and an anchor bolt installation method for anchor bolts installed on the foundation of a building.
- Anchor bolts may be installed in the foundation of a building. Anchor bolts are provided on the foundation to connect the building body and the foundation. Anchor bolts are placed in place in the foundation.
- an extension member is attached to the head of each of a plurality of anchor bolts. Then, the anchor bolt is positioned by a positioning tool (template in the document).
- a builder may be involved in multiple construction properties.
- positioning tools will need to be set at each site.
- the builder needs to prepare a plurality of sets of positioning tools in advance. Maintaining an inventory of a large number of positioning fixture sets poses an administrative burden to the builder.
- An anchor bolt installation jig that solves the above problem is an anchor bolt installation jig that installs an anchor bolt on a foundation, and includes a support for supporting the anchor bolt, and a positioning of the support with respect to the foundation. and a positioning tool, the positioning tool being configured such that the plurality of supports are temporarily assembled to the positioning tool.
- the positioning tool after temporarily assembling the plurality of supports to the positioning tool at predetermined positions, the positioning tool can be placed in the formwork with the plurality of supports temporarily assembled. Therefore, the plurality of supports can be fixed to the formwork in a state where the positional relationship between the plurality of supports is defined. Then, the positioning tool can be removed from the plurality of supports fixed to the formwork. Therefore, the removed positioning tool can be reused. For this reason, the inventory of anchor bolt installation jigs can be reduced.
- the support includes a fixing part fixed to the formwork of the foundation to be constructed, and extending from the fixing part to support the anchor bolt.
- a support part the support part has an anchor hole through which the anchor bolt is inserted, and a first engagement part in which a temporary assembly member for temporarily assembling the support tool and the positioning tool engages.
- the positioning tool has a second engaging part with which the temporary assembly member engages, and a reference part that determines the position of the positioning tool with respect to the foundation. According to this configuration, the supporting tool can be positioned with respect to the positioning tool using the temporary assembly member.
- the anchor hole of the support is configured to also serve as the first engaging portion.
- the support can be configured to have a simple structure.
- the fixing part includes a fixing body part fixed to the formwork and an edge of the fixing body part. and a connecting portion extending upward from the fixing body portion and connecting the fixed main body portion and the supporting portion. According to this configuration, a gap can be left between the upper surface of the concrete and the support part in a state where the concrete is placed in the formwork. Therefore, the upper surface of the concrete under the support part can be easily leveled with a trowel.
- the fixing part has a temporary fixing part that is temporarily fixed to the formwork.
- the positioning tool in which the supporting tool is temporarily assembled, is placed at a predetermined position with respect to the foundation, the supporting tool can be temporarily fixed to the formwork. Therefore, after arranging the positioning tool with the support temporarily assembled at a predetermined position, the operator can adjust the position of the support without supporting the positioning tool.
- An anchor bolt installation method that solves the above problems is an anchor bolt installation method in which the anchor bolt is installed in the formwork of the foundation, and the method includes temporarily assembling a plurality of supports supporting the anchor bolts to a positioning tool. a second step of arranging the positioning tool in which the supports are temporarily assembled so that the plurality of supports are arranged at predetermined positions with respect to the foundation; and a second step of placing the plurality of supports on the foundation. and a fourth step of removing the positioning tool from the support tool.
- the positioning tool can be reused after the support tool is fixed to the formwork.
- the positioner can be taken to other sites.
- multiple positioning tools were required to install multiple anchor bolts on the foundation, but with this technology, the positioning tools can be removed from the support immediately after the support is installed. Therefore, the number of positioning tools used at one site can be reduced.
- the support includes a fixing part fixed to the formwork and a support part extending from the fixing part and supporting the anchor bolt.
- the support part has an anchor hole through which the anchor bolt is inserted, and a first engagement part in which a temporary assembly member for temporarily assembling the support and the positioning tool engages, has a second engaging portion with which the temporary assembly member engages, and a reference portion that determines the position of the positioning tool with respect to the foundation.
- the support tool can be positioned at a predetermined position with respect to the positioning tool using the temporary assembly member.
- the inventory of anchor bolt installation jigs can be reduced.
- FIG. 3 is a plan view of a positioning tool for an anchor bolt installation jig.
- FIG. 3 is a plan view of a temporarily assembled positioning tool.
- FIG. 3 is a layout diagram of a temporary assembly positioning tool with respect to a foundation.
- FIG. 3 is a perspective view of a support with anchor bolts attached.
- FIG. 2 is a cross-sectional view of the ground immediately before anchor bolts are placed during foundation construction.
- FIG. 2 is a sectional view of the ground and formwork in the first step of the anchor bolt installation method.
- FIG. 2 is a sectional view of the ground and formwork in the second step of the anchor bolt installation method.
- FIG. 7 is a sectional view of the ground and formwork in the third step of the anchor bolt installation method. It is a sectional view of the ground and formwork when the anchor bolt is attached to the support after the fourth step of the anchor bolt installation method.
- FIG. 2 is a cross-sectional view of the ground and formwork when concrete is poured into the formwork.
- FIG. 7 is a perspective view of a modification of the support.
- anchor bolt installation jig The anchor bolt installation jig 10 will be explained with reference to FIGS. 1 to 11.
- the anchor bolt 1 is provided to the foundation 3 of the building to be constructed.
- “with respect to the foundation 3 to be constructed” will simply be written as “with respect to the foundation 3.” Therefore, the description "with respect to the foundation 3” shown below means “with respect to the foundation 3 to be constructed.” Specifically, “with respect to the foundation 3 to be constructed” means “with respect to the reference line L of the foundation 3 to be constructed.”
- the anchor bolt installation jig 10 is a jig for installing the anchor bolt 1 on the foundation 3 of a building.
- the foundation 3 is composed of concrete 4 and reinforcing bars 5. Furthermore, the foundation 3 is provided with an anchor bolt 1.
- the foundation 3 is formed by pouring concrete 4 into the formwork 2.
- the formwork 2 is composed of frame plates 2A.
- the frame board 2A is installed so as to surround the outer periphery of the foundation 3 to be constructed.
- the frame board 2A is supported on the ground 7 by support rods 2C (see FIG. 6).
- the example of the foundation 3 to which the anchor bolt installation jig 10 is applied is not limited.
- Examples of the foundation 3 include a solid foundation and a cloth foundation.
- the anchor bolt installation jig 10 shown in this embodiment can be suitably used for a solid foundation.
- the formwork 2 corresponding to the rising part of the cloth foundation includes two frame plates 2A installed parallel to each other. Therefore, the anchor bolt 1 placed between the two frame plates 2A can be supported by a support member supported by the two frame plates 2A.
- the frame board 2A is installed so as to surround the foundation 3. Therefore, the support 20 that supports the anchor bolt 1 is fixed to the frame plate 2A in a cantilevered state (see FIGS. 5 and 9).
- the anchor bolt installation jig 10 according to this embodiment can be suitably used to arrange the support 20 supported by the frame plate 2A in a cantilevered manner at a predetermined position.
- the anchor bolt 1 is provided so that a part of the anchor bolt 1 is exposed from the upper surface 3A of the foundation 3 (see FIG. 11). A portion 1B of the anchor bolt 1 other than the exposed portion 1A is buried in concrete 4 constituting the foundation 3. The exposed portion 1A of the anchor bolt 1 is coupled to a pillar of the building body erected on the foundation 3.
- the anchor bolt 1 is installed along the outer periphery of the foundation 3.
- the anchor bolts 1 are installed so as to be located inside the formwork 2 in a step after the formwork 2 of the foundation 3 is installed and before concrete 4 is poured into the formwork 2.
- Anchor bolt installation jig 10 is used to install anchor bolt 1 at this stage. The configuration of the anchor bolt installation jig 10 will be described below.
- the anchor bolt installation jig 10 includes a support 20 that supports the anchor bolt 1 and a positioning tool 30 (see FIG. 3).
- a first direction D1 the direction along the formwork 2
- a second direction D2 the direction orthogonal to the first direction D1
- the support 20 will be explained with reference to FIG.
- the support 20 has a fixing part 21 fixed to the formwork 2 and a support part 25.
- the fixed part 21 has a fixed main body part 22.
- the fixed main body part 22 is fixed to the formwork 2.
- the fixed main body portion 22 is arranged on the upper surface 2B of the formwork 2.
- the width of the fixed body portion 22 is equal to or shorter than the width of the formwork 2.
- the fixed main body portion 22 has a plurality of screw holes 24.
- the screw hole 24 is formed into a long hole.
- the screw hole 24 extends in the second direction D2 when the fixed main body portion 22 is placed on the upper surface 2B of the formwork 2. Since the screw hole 24 is a long hole, the position of the support 20 with respect to the formwork 2 can be adjusted in the second direction D2.
- the fixing part 21 may further include a connecting part 23.
- the connecting portion 23 connects the fixed main body portion 22 and the support portion 25.
- the connecting portion 23 may be omitted.
- the support part 25 is directly connected to the fixed body part 22.
- the fixed main body portion 22, the support portion 25, and the connecting portion 23 are integrally configured.
- the fixed main body portion 22, the support portion 25, and the connecting portion 23 are integrally formed by sheet metal press working.
- the connecting portion 23 extends upward from the end of the fixed main body portion 22 in the second direction D2.
- the connecting portion 23 is provided for the following purpose.
- the concrete 4 may be poured to the same height as the upper surface 2B of the formwork 2.
- a connecting part 23 is provided on the support 20 so that a gap S is left between the upper surface 4A of the concrete 4 and the support part 25.
- the height of the connecting portion 23 is set so that a trowel for leveling the concrete 4 can fit into the gap S.
- the height H of the connecting portion 23 is also a factor that determines the height of the exposed portion 1A of the anchor bolt 1 exposed from the concrete 4.
- the support portion 25 supports the anchor bolt 1.
- the support portion 25 extends from the fixed portion 21 .
- the support portion 25 extends from the upper end of the connecting portion 23 in parallel to the fixed main body portion 22.
- the support portion 25 extends on the side opposite to the fixed main body portion 22 with respect to the connecting portion 23.
- the support portion 25 has an anchor hole 26 through which the anchor bolt 1 is inserted.
- the support portion 25 is provided with four anchor holes 26 and an anchor reference portion 27.
- the four anchor holes 26 are arranged at positions equidistant from the anchor reference portion 27. Further, the four anchor holes 26 are arranged so that the shape formed by the four anchor holes 26 is a square.
- the anchor reference portion 27 is also used as a mark indicating the reference position of the support 20.
- the anchor reference portion 27 is used to adjust the position of the support 20 after the support 20 is fixed to the formwork 2.
- the anchor reference portion 27 is used as a reference position for the support 20 when checking the positional deviation between the reference line L (for example, a water line) stretched over the foundation 3 and the support 20.
- the anchor reference portion 27 is configured as a hole, a depression, or an engraved mark passing through the support portion 25 .
- the anchor reference portion 27 is configured to have a size that can be visually observed.
- the support portion 25 further includes a first engagement portion 28.
- the first engaging portion 28 is a portion with which the temporary assembly member 29 engages.
- the temporary assembly member 29 is a member for temporarily assembling the support tool 20 and the positioning tool 30.
- the temporary assembly member 29 is, for example, a bolt 29A (see FIG. 7).
- Another example of the temporary assembly member 29 is a wedge-shaped pin.
- the wedge-shaped pin is also called ⁇ Shino''.
- the first engaging portion 28 is configured as a through hole into which the bolt 29A is inserted, for example.
- the anchor hole 26 is configured to also serve as the first engaging portion 28.
- the positioning tool 30 will be explained with reference to FIGS. 2 and 3.
- the positioning tool 30 is a tool for positioning the support tool 20 with respect to the foundation 3. Specifically, the positioning tool 30 positions the plurality of supports 20 with respect to a reference line L (for example, a water line) stretched during construction of the foundation 3.
- a reference line L for example, a water line
- the positioning tool 30 is composed of a long plate. When using the positioning tool 30, the positioning tool 30 is placed along the formwork 2.
- the positioning tool 30 has a first end 30A extending in the longitudinal direction of the positioning tool 30.
- the first end 30A extends in a straight line.
- the positioning tool 30 has a first end 30A and a second end 30B opposite to the first end 30A.
- the second end 30B extends parallel to the first end 30A.
- the positioning tool 30 is configured such that a plurality of supports 20 are temporarily assembled at predetermined positions of the positioning tool 30.
- the positioning tool 30 has a plurality of temporary assembly parts 31.
- the temporary assembly portion 31 is a portion where the support 20 is temporarily assembled.
- the plurality of temporary assembly parts 31 are provided at predetermined intervals in the longitudinal direction of the positioning tool 30. In one example, the plurality of temporary assembly parts 31 are provided at equal intervals.
- the temporary assembly portion 31 is configured to have a size that allows the entire support portion 25 of the support tool 20 to come into contact with it.
- the positioning tool 30 has a second engaging part 32 with which the temporary assembly member 29 engages, and a reference part 33 that determines the position of the positioning tool 30 with respect to the foundation 3.
- the temporary assembly member 29 is the bolt 29A or a wedge-shaped pin as described above.
- the second engaging portion 32 is configured as a through hole into which the bolt 29A is inserted.
- the second engaging portion 32 and the reference portion 33 are provided in the temporary assembly portion 31.
- the plurality of second engaging portions 32 are configured in the same manner as the plurality of first engaging portions 28.
- the anchor hole 26 also serves as the first engaging portion 28.
- the temporary assembly portion 31 is similarly provided with four second engaging portions 32.
- the arrangement of the four second engaging portions 32 is the same as the arrangement of the four anchor holes 26 of the support 20.
- the four second engaging parts 32 are arranged so that the shape formed by the four second engaging parts 32 is a square.
- the support tool 20 is placed under the positioning tool 30. Specifically, the support 20 is arranged so that the support part 25 of the support 20 contacts the temporary assembly part 31 on the lower surface of the positioning tool 30. At this time, the support 20 is arranged on the positioning tool 30 so that the four first engaging parts 28 and the four second engaging parts 32 overlap each other. Then, the bolt 29A is inserted into the communication hole between the first engaging part 28 and the second engaging part 32. The support 20 is temporarily assembled to the positioning tool 30 by attaching the nut 29B to the bolt 29A and tightening the nut 29B.
- the reference portion 33 of the positioning tool 30 is used as a reference position of the positioning tool 30.
- the reference part 33 is used when positioning the positioning tool 30 with respect to a reference line L (for example, a water line) stretched against the foundation 3 after the positioning tool 30 is placed on the formwork 2. , is used as a reference position for the positioning tool 30.
- a reference line L for example, a water line
- the reference part 33 is arranged at a position equidistant from the four second engaging parts 32.
- the reference portion 33 is configured as a through hole passing through the positioning tool 30.
- the reference portion 33 is configured to have a size that allows the anchor reference portion 27 of the support tool 20 to be visually recognized through the through hole serving as the reference portion 33 in a state where the positioning tool 30 and the support tool 20 are temporarily assembled.
- the positioning tool 30 may be provided with a hole 34 for weight reduction.
- the hole 34 is provided between the two temporary assembly parts 31.
- the positioning tool 30 may have a notch configured to cut out the second end 30B instead of the hole 34.
- the support 20 is first temporarily assembled to the positioning tool 30.
- the operator attaches the support 20 to a predetermined position on the formwork 2 using the positioning tool 30 on which the support 20 is temporarily assembled.
- a reference line L (for example, a water line) is stretched to indicate the position where the anchor bolt 1 is installed.
- the reference line L includes a first reference line L1 and a second reference line L2.
- the second reference line L2 is drawn perpendicular to the first reference line L1.
- the intersection P is located near the outgoing corner of the foundation 3 or near the incoming corner of the foundation 3.
- the positioning tool 30 with the support 20 temporarily assembled is such that the reference part 33 of the positioning tool 30 overlaps the intersection P of the first reference line L1 and the second reference line L2, and The plurality of reference parts 33 on the tool 30 are arranged so as to be located on the first reference line L1. Then, the plurality of supports 20 temporarily fixed to the positioning tool 30 are arranged at predetermined positions with respect to the foundation 3.
- the support 20 placed at a predetermined position is fixed to the frame plate 2A with screws 6. Further, the positioning tool 30 is removed from the support tool 20 fixed by the screws 6.
- the anchor bolt 1 is attached to the support 20 fixed in this way. Since the support 20 is arranged at a predetermined position with respect to the foundation 3, the anchor bolt 1 can be placed at a predetermined position with respect to the foundation 3 simply by inserting the anchor bolt 1 into the support 20.
- the anchor bolt installation method shows a method of installing the anchor bolt 1 in the formwork 2 of the foundation 3.
- the anchor bolt installation method is used in the construction of foundation 3.
- FIG. 6 shows the formwork 2 installed on the ground 7.
- a groove 8 is provided in the ground 7.
- the formwork 2 is installed so as to surround the foundation 3 to be constructed.
- the formwork 2 is arranged outside the groove 8 and along the groove 8.
- the reinforcing bars 5 are provided along the grooves 8. Further, the reinforcing bars 5 are arranged over the entire surface of the ground 7 where the foundation 3 is provided.
- the anchor bolt installation method includes at least first to fourth steps.
- a plurality of supports 20 are temporarily assembled into a positioning tool 30.
- the plurality of supports 20 are arranged under the positioning tool 30 (see FIGS. 3 and 7).
- the support 20 is arranged so that the support part 25 of the support 20 contacts the temporary assembly part 31 on the lower surface of the positioning tool 30.
- the four first engaging parts 28 and the four second engaging parts 32 are arranged so as to overlap each other (see FIG. 3). Then, as described above, the positioning tool 30 and the support tool 20 are temporarily assembled.
- a positioning tool 30 (hereinafter referred to as a temporarily assembled positioning tool 30X) in which the supports 20 are temporarily assembled is arranged so that the plurality of supports 20 are arranged at predetermined positions with respect to the foundation 3.
- the temporary assembly positioning tool 30X is positioned with respect to a reference line L stretched on the ground 7 on which the foundation 3 is provided (see FIG. 4).
- a reference line L (for example, a water line) is stretched on the ground 7 on which the foundation 3 is provided.
- the first reference line L1 is stretched along the formwork 2 and apart from the formwork 2 by a predetermined distance in the second direction D2.
- the second reference line L2 is perpendicular to the first reference line L1 and is stretched so as to pass through the installation reference point PX of the anchor bolt 1 located on the first reference line L1.
- An intersection P between the first reference line L1 and the second reference line L2 overlaps with the installation reference point PX of the anchor bolt 1. If the second reference line L2 is provided at all the installation reference points PX of the anchor bolts 1, the number of reference lines L stretched on the ground 7 will be excessive, which will hinder the leveling work of the concrete 4.
- the second reference line L2 is omitted.
- the temporarily assembled positioning tool 30X has a reference section 33 at the end of the positioning tool 30 that overlaps the intersection P of the first reference line L1 and the second reference line L2, and a plurality of reference sections 33 on the positioning tool 30. is positioned on the first reference line L1.
- the plurality of supports 20 temporarily assembled to the positioning tool 30 are arranged at predetermined positions with respect to the reference line L. At this time, both ends of the temporarily assembled positioning tool 30X are supported by the operator.
- a plurality of supports 20 are fixed to the formwork 2 of the foundation 3. Specifically, in a state where the temporarily assembled positioning tool 30X is placed at a predetermined position with respect to the foundation 3, the fixing part 21 of the support 20 temporarily assembled to the positioning tool 30 is fixed to the formwork with screws 6. Fixed at 2.
- the positioning tool 30 is removed from the support tool 20.
- the positioning tool 30 from which the support 20 has been removed can be used for temporary assembly of other supports 20.
- anchor bolts 1 are attached to supports 20 fixed to formwork 2. Specifically, the anchor bolt 1 is inserted into the anchor hole 26 (see FIG. 5). The anchor bolt 1 is then fixed to the support 20 by a nut 39.
- concrete 4 is poured into the formwork 2. After this, the surface of the concrete 4 is leveled with a dragonfly or a trowel. On the surface of the concrete 4, the portion below the support 20 is leveled using a trowel.
- the anchor bolt 1 is supported by an anchor support fixed to the formwork 2. These anchor supports are fixed where the anchor bolt 1 is installed. For this reason, when a large number of anchor bolts 1 are provided along the outer periphery of the foundation 3, it takes a lot of time to position the anchor supports.
- the plurality of supports 20 are temporarily assembled into a temporary assembly section 31 located at a predetermined position of the positioning tool 30.
- the positional relationship between the plurality of supports 20 is accurately defined by temporarily assembling the supports 20 to the temporary assembly section 31 of the positioning tool 30. Therefore, by arranging any one of the supports 20 temporarily assembled to the positioning tool 30 at a predetermined position on the foundation 3 and arranging the positioning tool 30 in a predetermined direction with respect to the foundation 3, other The support 20 is also placed in a predetermined position relative to the foundation 3.
- the reference portion 33 at the end of the positioning tool 30 overlaps the intersection P of the first reference line L1 and the second reference line L2, and
- the temporary assembly positioning tool 30X is arranged so that the portion 33 is located on the first reference line L1.
- the plurality of supports 20 temporarily assembled to the positioning tool 30 are arranged at predetermined positions with respect to the reference line L. In this way, a plurality of supports 20 can be placed in position with respect to the foundation 3 substantially simultaneously. Thereby, the working time for positioning the support 20 can be shortened.
- the positioning tool 30 is removed from the support tool 20 after the support tool 20 is fixed to the formwork 2. Therefore, it is possible to reuse the positioning tool 30.
- a large number of anchor bolts 1 can be installed on the foundation 3 at one construction site by reusing one to several positioning tools 30.
- the positioning tool 30 that has been used for one building can be taken to another site.
- the anchor bolt installation jig 10 includes a support 20 that supports the anchor bolt 1 and a positioning tool 30 that positions the support 20 with respect to the foundation 3.
- the positioning tool 30 is configured such that the plurality of supports 20 are temporarily assembled to the positioning tool 30.
- the positioning tool 30 can be placed in the formwork 2 in a state where the plurality of supports 20 are temporarily assembled. Therefore, the plurality of supports 20 can be fixed to the formwork 2 in a state where the positional relationship between the plurality of supports 20 is defined. After that, the positioning tool 30 can be removed from the plurality of supports 20 fixed to the formwork 2. Therefore, the removed positioning tool 30 can be taken to another site. Since the conventional positioning tool is used as a jig to support the anchor bolt 1 until the concrete 4 of the foundation 3 hardens, the rotation rate of the positioning tool 30 cannot be increased. In this regard, according to the above configuration, the positioning tool 30 can be reused after the support tool 20 is fixed to the formwork 2. For example, the positioner 30 can be taken to another site.
- the positioning tool 30 can be removed from the support 20 immediately. Furthermore, the positioning tool 30 can be reused even at one site. Therefore, the number of positioning tools 30 used at one site can be reduced.
- the builder can reduce the inventory of anchor bolt installation jigs 10. In particular, the inventory of positioning tools 30 can be reduced.
- the support part 25 of the support tool 20 has a first engagement part 28 with which the temporary assembly member 29 engages.
- the positioning tool 30 has a second engaging portion 32 with which the temporary assembly member 29 engages. According to this configuration, the support tool 20 can be positioned with respect to the positioning tool 30 by the temporary assembly member 29.
- the anchor hole 26 of the support 20 is configured to also serve as the first engagement portion 28. According to this configuration, the support 20 can be configured to have a simple structure.
- the fixing part 21 of the support 20 includes a fixing main body part 22 fixed to the formwork 2 and a connecting part 23.
- the connecting portion 23 extends upward from the edge of the fixed main body portion 22 and connects the fixed main body portion 22 and the support portion 25 .
- a gap S can be left between the upper surface 4A of the concrete 4 and the support part 25 in a state where the concrete 4 is placed in the formwork 2 (see FIG. 11). Therefore, the upper surface 4A of the concrete 4 under the support portion 25 can be easily leveled with a trowel.
- Anchor bolt installation method includes first to fourth steps.
- a plurality of supports 20 that support the anchor bolt 1 are temporarily assembled into a positioning tool 30.
- the positioning tool 30 in which the supports 20 are temporarily assembled is arranged so that the plurality of supports 20 are arranged at predetermined positions with respect to the foundation 3.
- the plurality of supports 20 are fixed to the formwork 2 of the foundation 3.
- the positioning tool 30 is removed from the support tool 20.
- the positioning tool 30 can be reused.
- the positioner 30 can be taken to another site.
- a plurality of positioning tools 30 were required.
- the positioning tool 30 can be removed from the supporting tool 20 immediately after the supporting tool 20 is installed, so the number of positioning tools 30 used at one site can be reduced.
- the support part 25 of the support tool 20 has a first engagement part 28 with which the temporary assembly member 29 engages.
- the positioning tool 30 has a second engaging portion 32 with which the temporary assembly member 29 engages. According to this configuration, the support tool 20 can be positioned at a predetermined position with respect to the positioning tool 30 by the temporary assembly member 29.
- the embodiment described above is an example of the form that the anchor bolt installation jig 10 and the anchor bolt installation method can take, and is not intended to limit the form.
- the anchor bolt installation jig 10 and the anchor bolt installation method may take a form different from the form illustrated in the above embodiment.
- An example of this is a configuration in which a part of the configuration of the embodiment is replaced, changed, or omitted, or a configuration in which a new configuration is added to the embodiment. Modifications of the embodiment are shown below.
- the fixing part 21 of the support 20 may have a temporary fixing part 50.
- the temporary fixing part 50 is configured to be temporarily fixed to the formwork 2.
- the temporary fixing part 50 has a temporary fixing main body part 51 and two hanging parts 52.
- the temporary fixing body part 51 is connected to the lower surface of the fixing body part 22.
- the two hanging portions 52 are configured such that the frame plate 2A is inserted between the two hanging portions 52.
- the two hanging parts 52 are provided at both ends of the temporarily fixed body part 51 in the second direction D2, and extend downward. The distance between the two hanging portions 52 is shorter than the width of the frame plate 2A of the formwork 2.
- the frame plate 2A is inserted between the two hanging parts 52 of the temporary fixing part 50.
- the support 20 can be temporarily fixed to the formwork 2.
- the positioning tool 30 is supported by the plurality of supports 20 temporarily fixed to the frame board 2A. Therefore, after arranging the temporarily assembled positioning tool 30X at a predetermined position, the operator can adjust the position of the support tool 20 without supporting the positioning tool 30.
- the fixed main body portion 22, the support portion 25, and the connecting portion 23 of the support device 20 are integrally configured.
- the support 20 may be composed of a plurality of members.
- the fixed main body portion 22 and the connecting portion 23 are configured as one member
- the support portion 25 is configured as a separate member from the member including the fixed main body portion 22 and the connecting portion 23.
- the support tool 20 may be made of resin. By constructing the support 20 from resin, the weight of the support 20 can be reduced.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Electromagnetism (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Foundations (AREA)
- Joining Of Building Structures In Genera (AREA)
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB2318811.3A GB2635239A (en) | 2022-09-02 | 2022-09-02 | Anchor bolt installing jig and anchor bolt installing method |
PCT/JP2022/033181 WO2024047878A1 (ja) | 2022-09-02 | 2022-09-02 | アンカーボルト設置治具、および、アンカーボルト設置方法 |
AU2022459562A AU2022459562B2 (en) | 2022-09-02 | 2022-09-02 | Anchor bolt installing jig and anchor bolt installing method |
JP2023571648A JP7704224B2 (ja) | 2022-09-02 | 2022-09-02 | アンカーボルト設置治具、および、アンカーボルト設置方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2022/033181 WO2024047878A1 (ja) | 2022-09-02 | 2022-09-02 | アンカーボルト設置治具、および、アンカーボルト設置方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2024047878A1 true WO2024047878A1 (ja) | 2024-03-07 |
Family
ID=89575888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2022/033181 WO2024047878A1 (ja) | 2022-09-02 | 2022-09-02 | アンカーボルト設置治具、および、アンカーボルト設置方法 |
Country Status (4)
Country | Link |
---|---|
JP (1) | JP7704224B2 (enrdf_load_stackoverflow) |
AU (1) | AU2022459562B2 (enrdf_load_stackoverflow) |
GB (1) | GB2635239A (enrdf_load_stackoverflow) |
WO (1) | WO2024047878A1 (enrdf_load_stackoverflow) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS639620Y2 (enrdf_load_stackoverflow) * | 1983-03-08 | 1988-03-22 | ||
JPH08189189A (ja) * | 1995-01-09 | 1996-07-23 | Asahi Chem Ind Co Ltd | 型枠上部矯正治具 |
JPH116160A (ja) * | 1997-06-19 | 1999-01-12 | Sekisui House Ltd | 間仕切り基礎用アンカーボルトの位置決め装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS639620A (ja) * | 1986-06-27 | 1988-01-16 | Mazda Motor Corp | 過給機付デイ−ゼルエンジンのピストン冷却装置 |
-
2022
- 2022-09-02 WO PCT/JP2022/033181 patent/WO2024047878A1/ja active Application Filing
- 2022-09-02 JP JP2023571648A patent/JP7704224B2/ja active Active
- 2022-09-02 AU AU2022459562A patent/AU2022459562B2/en active Active
- 2022-09-02 GB GB2318811.3A patent/GB2635239A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS639620Y2 (enrdf_load_stackoverflow) * | 1983-03-08 | 1988-03-22 | ||
JPH08189189A (ja) * | 1995-01-09 | 1996-07-23 | Asahi Chem Ind Co Ltd | 型枠上部矯正治具 |
JPH116160A (ja) * | 1997-06-19 | 1999-01-12 | Sekisui House Ltd | 間仕切り基礎用アンカーボルトの位置決め装置 |
Also Published As
Publication number | Publication date |
---|---|
GB2635239A (en) | 2025-05-07 |
GB202318811D0 (en) | 2024-01-24 |
AU2022459562A1 (en) | 2024-04-04 |
AU2022459562B2 (en) | 2025-07-24 |
JP7704224B2 (ja) | 2025-07-08 |
JPWO2024047878A1 (enrdf_load_stackoverflow) | 2024-03-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4732915B2 (ja) | 基礎の構築方法と装置及び構築用アンカーボルト支持装置 | |
JP7059618B2 (ja) | 主脚材据付方法およびアンカーフレーム据付治具 | |
KR102089758B1 (ko) | 기둥단위 지지구조를 가진 역타공법용 거푸집 지지구조 및 이를 이용한 지하구조물의 시공방법 | |
JP4078367B2 (ja) | 斜張ケーブルの定着構造 | |
WO2024047878A1 (ja) | アンカーボルト設置治具、および、アンカーボルト設置方法 | |
CN210737947U (zh) | 一种装配式楼梯 | |
JP4459080B2 (ja) | 斜材定着部の施工方法および斜材定着部用の型枠構造 | |
JP2015055079A (ja) | アンカーフレーム及びこれを用いたアンカー構造体の構築方法 | |
CN116219897A (zh) | 一种预制梁快速定位及垂直度控制的装置及其施工方法 | |
JP2020002657A (ja) | 建物の基礎の施工方法 | |
JP4563879B2 (ja) | アンカーボルトの支持装置 | |
JP2670427B2 (ja) | 鉄筋コンクリート柱の構築方法及びその実施に用いる鉄筋位置決め治具 | |
JP2021038614A (ja) | 機器設置用架台の施工方法および機器設置用架台並びに基礎ボルト設置用テンプレート | |
JP2021195834A (ja) | 柱脚アンカー構造体、架台、および柱脚アンカー構造体の設計方法 | |
JP3329690B2 (ja) | セグメント用鉄筋籠の組立て装置 | |
JP7663433B2 (ja) | 基礎施工治具及び基礎施工方法 | |
CN219710756U (zh) | 具有螺纹套的横梁 | |
JPH01278620A (ja) | アンカーボルトの設置工法とそれに使用するアンカーボルト支持装置 | |
JP7538022B2 (ja) | 掘削工法 | |
JPH0649982A (ja) | 型枠ユニットとその施工方法 | |
JP2021071011A (ja) | 基礎の施工方法及び基礎 | |
JP7181069B2 (ja) | 逆打支柱位置決め冶具 | |
WO2025041241A1 (ja) | アンカー支持具およびアンカー設置方法 | |
JP2022063587A (ja) | 柱脚アンカー構造体、架台、および柱脚アンカー構造体の設計方法 | |
CN117211400A (zh) | 一种模块化建筑用定位连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ENP | Entry into the national phase |
Ref document number: 2023571648 Country of ref document: JP Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 18570928 Country of ref document: US |
|
ENP | Entry into the national phase |
Ref document number: 202318811 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20220902 |
|
ENP | Entry into the national phase |
Ref document number: 2022459562 Country of ref document: AU Date of ref document: 20220902 Kind code of ref document: A |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22957472 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 22957472 Country of ref document: EP Kind code of ref document: A1 |