WO2022201577A1 - 拠点配置シミュレーションシステム及び拠点配置シミュレーション方法 - Google Patents

拠点配置シミュレーションシステム及び拠点配置シミュレーション方法 Download PDF

Info

Publication number
WO2022201577A1
WO2022201577A1 PCT/JP2021/029024 JP2021029024W WO2022201577A1 WO 2022201577 A1 WO2022201577 A1 WO 2022201577A1 JP 2021029024 W JP2021029024 W JP 2021029024W WO 2022201577 A1 WO2022201577 A1 WO 2022201577A1
Authority
WO
WIPO (PCT)
Prior art keywords
base
cost
simulation system
department
rent
Prior art date
Application number
PCT/JP2021/029024
Other languages
English (en)
French (fr)
Inventor
芽衣 高田
健一郎 山田
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Publication of WO2022201577A1 publication Critical patent/WO2022201577A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"

Definitions

  • the present invention relates to a base location simulation system.
  • Patent Document 1 Japanese Patent Application Laid-Open No. 2008-287372 discloses a distance cost calculation means for calculating the distance cost between business bases and the distance cost between each base and each employee, and a business Business continuation condition determination means for determining whether or not the continuation condition is satisfied; Candidate selection means for selecting candidate employees to be dispatched based on the distance cost for bases that do not satisfy the business continuation condition. and dispatcher determination means for determining whether or not to dispatch based on the priority of the candidate employee's current location and dispatch destination location. ing.
  • the location simulation system comprises a computer having an arithmetic unit that executes predetermined arithmetic processing and a storage device connected to the arithmetic unit, and a movement cost calculation unit that calculates the movement cost of the department. Then, the rent cost of the department is calculated from the required area required by the department, and based on the calculated movement cost and the rent cost, the movement cost of all the departments to be the base location calculation target and a location calculation unit that calculates the location of the department at the location so as to reduce the sum of the rent cost.
  • FIG. 3 is a block diagram showing the physical configuration of the CRE management server of this embodiment;
  • FIG. 3 is a block diagram showing the logical configuration of the CRE management server of this embodiment;
  • FIG. It is a figure which shows the structural example of the movement-cost relevant information of a present Example.
  • 4 is a diagram showing a configuration example of department information according to the embodiment;
  • FIG. It is a figure which shows the structural example of the required area reduction rate setting file of a present Example.
  • FIG. 4 is a sequence diagram of processing by the base location simulation system of the embodiment; 9 is a flow chart of movement cost information synchronization processing according to the present embodiment. It is a flowchart of rent cost information synchronization processing of the present embodiment. 4 is a flow chart of location calculation processing according to the present embodiment. 4 is a flowchart of visualization/analysis processing of the embodiment.
  • FIG. 11 is a diagram showing an example of a department-by-department analysis screen according to the embodiment; It is a figure which shows the example of the arrangement
  • Fig. 1 is a diagram showing the solution concept of the base location simulation system of this embodiment.
  • the base location simulation system of this embodiment executes processing in the following procedure.
  • Transportation costs include commuting expenses for personnel to the mother office (for example, commuter fare), business trip transportation expenses from the base to other offices, customers, partner companies, etc., and commuting and transportation expenses for personnel at the base.
  • Personnel expenses related to business trips are included, and movement costs are calculated by summing these.
  • Personnel costs for commuting and business trips are calculated by multiplying the time required for commuting and business trips by the cost per unit time of the relevant personnel.
  • the mother office is an office designated as the base of the department.
  • the management department sets constraints in line with the relocation/consolidation policy. For example, it is possible to set conditions for whether or not a transfer is necessary for each department (for example, the head office cannot be transferred) and the conditions for the transfer destination.
  • plan A the total cost is the lowest, but there is concern about the impact on productivity due to increased transportation costs
  • plan B the effect of cost reduction is low, but the benefits of increasing the number of departments close to customers can be enjoyed. It is possible to proceed with the study while comparing multiple proposals in a similar manner.
  • the base placement simulation system of this embodiment can compare solutions with a small total cost under multiple conditions and provide a convincing relocation/consolidation policy.
  • FIG. 2 is a diagram showing the overall configuration of the base location simulation system of this embodiment.
  • the site location simulation system of this embodiment includes a CRE management server 100 and a terminal 500 used by the client company's management, CRE management department, and site operation manager. These CRE management server 100 and terminal 500 are connected to network 300 .
  • the CRE management server 100 executes arithmetic processing for base location simulation, which will be described later.
  • the terminal 500 is a computer used by the client company's management, CRE management department, and site operation manager.
  • the network 300 is connected to a terminal 400 used by the worker of the client company and an application server 200 that provides applications (e.g., attendance management application, business trip transportation expense settlement application) used by the worker of the client company.
  • applications e.g., attendance management application, business trip transportation expense settlement application
  • a worker of the client company uses the terminal 400 to carry out the work.
  • the data collected by the application server 200 is used for base location simulation.
  • the CRE management server 100 and application server 200 may be configured on the cloud, but may be configured on-premises on a specific computer (hardware).
  • FIG. 3 is a block diagram showing the physical configuration of the CRE management server of this embodiment. Although FIG. 3 shows the physical configuration of the CRE management server 100, the application server 200 and the terminals 400 and 500 may have the same configuration.
  • the CRE management server 100 of this embodiment is composed of a computer having a processor (CPU) 1, a memory 2, an auxiliary storage device 3, and a communication interface 4.
  • the CRE management server 100 may have an input interface 5 and an output interface 6 .
  • the processor 1 is an arithmetic device that executes programs stored in the memory 2, and constitutes an arithmetic unit 10 and an input/output display unit 30.
  • each functional unit of the CRE management server 100 for example, the movement cost calculation unit 11, the area calculation unit 12, the rent setting unit 13, the constraint condition setting unit 14, the location calculation unit 15 etc.
  • the processor 1 by executing the program may be performed by another arithmetic device (for example, hardware such as ASIC and FPGA).
  • the memory 2 includes ROM, which is a non-volatile storage element, and RAM, which is a volatile storage element.
  • ROM stores immutable programs (eg, BIOS) and the like.
  • RAM is a high-speed and volatile storage device such as DRAM (Dynamic Random Access Memory), and temporarily stores programs executed by processor 1 and data used during program execution.
  • the auxiliary storage device 3 is, for example, a large-capacity, non-volatile storage device such as a magnetic storage device (HDD) or flash memory (SSD), and constitutes the storage section 20 .
  • the auxiliary storage device 3 stores data used by the processor 1 when executing programs (for example, moving cost related information 21, rent cost related information 22, department information 23, required area reduction rate setting file 24, constraint condition setting file 25, etc.). , arrangement result information 26, etc.) and programs executed by the processor 1 are stored. That is, the program is read from the auxiliary storage device 3, loaded into the memory 2, and executed by the processor 1, thereby realizing each function of the CRE management server 100.
  • the communication interface 4 is a network interface device that controls communication with another device (eg, terminal 500) according to a predetermined protocol.
  • the input interface 5 is an interface to which an input device such as a keyboard 7 and a mouse 8 is connected and which receives input from an operator.
  • the output interface 6 is an interface to which output devices such as a display device 9 and a printer (not shown) are connected, and which outputs results of program execution in a format that can be visually recognized by the operator.
  • a user terminal connected to the CRE management server 100 via a network may provide the input device and the output device.
  • the CRE management server 100 may have a web server function, and the user terminal may access the CRE management server 100 using a predetermined protocol (eg, http).
  • Programs executed by the processor 1 are provided to the CRE management server 100 via removable media (CD-ROM, flash memory, etc.) or a network, and stored in the non-volatile auxiliary storage device 3, which is a non-temporary storage medium. . Therefore, the CRE management server 100 preferably has an interface for reading data from removable media.
  • the CRE management server 100 is a computer system configured on one physical computer or on a plurality of computers configured logically or physically, and is built on a plurality of physical computer resources. It may operate on a virtual machine.
  • the movement cost calculation unit 11, the area calculation unit 12, the rent setting unit 13, the constraint condition setting unit 14, and the base location calculation unit 15 may operate on separate physical or logical computers, or may be combined. and run on one physical or logical computer.
  • FIG. 4 is a block diagram showing the logical configuration of the CRE management server 100 of this embodiment.
  • the CRE management server 100 has a calculation unit 10, a storage unit 20, and an input/output display unit 30.
  • the calculation unit 10 has a movement cost calculation unit 11 , an area calculation unit 12 , a rent setting unit 13 , a constraint condition setting unit 14 and a location calculation unit 15 .
  • the moving cost calculation unit 11 executes the moving cost calculation process (FIG. 10) to calculate the transportation costs and personnel costs incurred when the department of the client company is moved to a different base.
  • the area calculation unit 12 uses the required area reduction rate setting file 24 to calculate the required area of each department.
  • the rent setting unit 13 receives an input of the rent of the base from the base operation manager of the customer company, executes the rent cost information synchronization process 360 (FIG. 11), and sets it in the rent cost related information 22 .
  • the constraint setting unit 14 receives constraint conditions for site location simulation from the management of the customer company and the CRE management department through the constraint input unit 34 , and sets them in the constraint setting file 25 .
  • the base location calculation unit 15 executes the base location calculation process 370 (FIG. 12) and records the simulation result in the location result information 26.
  • FIG. 12 The base location calculation process 370 (FIG. 12) and records the simulation result in the location result information 26.
  • the storage unit 20 stores movement cost-related information 21, rent cost-related information 22, department information 23, required area reduction ratio setting file 24, constraint condition setting file 25, and arrangement result information 26.
  • the travel cost related information 21 is information on travel costs calculated for each combination of department and site, and the details thereof will be described with reference to FIG.
  • the rent cost related information 22 is information on the rent cost for each base of the customer company, and the details thereof will be described with reference to FIG.
  • the department information 23 is information on the department of the customer company, and details thereof will be described with reference to FIG.
  • the required area reduction rate setting file 24 is information on the reduction rate of the office area for each job type, and the details thereof will be described with reference to FIG.
  • the restrictive condition setting file 25 is a file in which restrictive conditions are set in the base location simulation.
  • the placement result information 26 records the result of the site placement simulation.
  • the input/output display section 30 has a data input section 31 , a data output section 32 , a movement data display section 33 , a constraint input section 34 and an arrangement result display section 35 .
  • the data input unit 31 is an interface that receives input of data used for simulation in the form of text, binary, CSV, or the like.
  • the data output unit 32 is an interface that outputs simulation result data in a format such as text, binary, or CSV.
  • the movement data display unit 33 executes visualization/analysis processing 380 (FIG. 13), and displays display data for displaying the movement data of the departments recorded in the movement cost related information 21 on the basis of the result of the base location simulation. is generated (see FIG. 15).
  • the constraint input unit 34 is activated by the constraint setting unit 14, and receives input of constraint conditions for site location simulation from the terminal 500 of the management of the customer company or the CRE management department.
  • the placement result display unit 35 executes the visualization/analysis processing 380 (FIG. 13), and generates display data for screen display of the site placement simulation results recorded in the placement result information 26 (see FIG. 14).
  • FIG. 5 is a diagram showing a configuration example of the travel cost related information 21 of this embodiment.
  • the travel cost-related information 21 records travel costs calculated for each combination of department and base, and is provided for each customer company.
  • a combination of a department and a base is specified by a department ID, which is identification information that uniquely identifies the department of the customer company, and a base ID, which is identification information that uniquely identifies the business base of the customer company.
  • the cost associated with the movement of people, such as business trips and commuting, is the movement cost.
  • FIG. 6 is a diagram showing a configuration example of the rent cost related information 22 of this embodiment.
  • the rent cost related information 22 records the rent cost information for each base, and is provided for each client company.
  • the rent cost related information 22 includes base ID, usable area, and base rent data.
  • the base ID is identification information that uniquely identifies the business base of the customer company.
  • the usable area is the usable area for each site.
  • Base rent is the rent for the base.
  • the rent cost related information 22 is input from the terminal 500 of the site operation manager of the customer company in the rent cost information synchronization process 360 .
  • FIG. 7 is a diagram showing a configuration example of the department information 23 of this embodiment.
  • the department information 23 records department information and is provided for each customer company.
  • the department information 23 includes department ID, number of employees, and required area data.
  • the department ID is identification information that uniquely identifies the department of the customer company.
  • the number of employees is the number of employees belonging to the department.
  • the required area is the floor area required for the work of the department, and is the total of the area required for the staff to perform the work and the installation area of the equipment required for the work of the department.
  • FIG. 8 is a diagram showing a configuration example of the required area reduction rate setting file 24 of this embodiment.
  • the required area reduction rate setting file 24 records the office area reduction rate for each job type, and includes job ID, job type, and correction coefficient data. If the office area is to be reduced due to relocation, the correction coefficient should be less than 1. If the area is the same as the current one, set the correction factor to 1.
  • the correction coefficient is set for each job type, taking into account, for example, the average attendance rate for each job type, availability of other work locations (eg, satellite offices), and the like. A different correction coefficient may be set for each department.
  • a method of directly calculating the reduction rate from the latest attendance rate calculated by the movement cost calculation unit 11 instead of the format of setting by reading the values from the setting file is also conceivable.
  • FIG. 9 is a sequence diagram of processing by the base location simulation system of this embodiment.
  • the customer company's management/CRE management department operates the terminal 500 to set the constraint conditions for the base location simulation and input the department information.
  • the constraint conditions set the range of parameters that can be changed in the simulation, such as sites and personnel that cannot be moved (specifically, the headquarters cannot be moved, and the minimum number of personnel for each site).
  • the input department information is recorded in the department information 23 .
  • the worker of the client company operates the terminal 400 to input attendance and attendance into the attendance management application on the application server 200 (330). Also, the worker of the customer company operates the terminal 400 to input the commuting transportation expenses and business trip transportation expenses into the business trip transportation expense adjustment application on the application server 200 (330).
  • attendance data and business trip transportation expense reimbursement data (affiliation, movement route, transportation expense) are transferred to the CRE management server 100.
  • the travel cost calculator 11 executes travel cost information synchronization processing using the received attendance management data and transportation expense data, and records the processing result in the travel cost related information 21 (340 ). Details of the movement cost information synchronization process 340 will be described later with reference to FIG.
  • the site operation manager of the customer company operates the terminal 500 to access the CRE management server 100, the available area of each site, the rent of each site, and department information (required area per employee, each Enter the number of people belonging to the department and occupational information).
  • the CRE management server 100 executes rent cost information synchronization processing using the input rent, and records the processing result in the rent cost related information 22 (360). Details of the rent cost information synchronization process 360 will be described later with reference to FIG.
  • the CRE management server 100 executes site location calculation processing (370).
  • the details of the location calculation process 370 will be described later with reference to FIG.
  • the CRE management server 100 executes visualization/analysis processing (380). Details of the visualization/analysis processing 380 will be described later with reference to FIG.
  • the results of the visualization/analysis processing 380 can be viewed by the client company's management/CRE management department via the terminal 500.
  • the management and CRE management departments of the customer company view the results of the site placement simulation and review conditions such as personnel placement at the sites.
  • FIG. 10 is a detailed flowchart of the movement cost information synchronization process 340 executed by the movement cost calculation unit 11 of this embodiment.
  • the travel cost calculation unit 11 calculates business trip travel expenses for each department from the collected business trip travel expense reimbursement data (341). Further, the travel cost calculation unit 11 calculates the travel time (business trip) from the travel route information of the collected business trip travel expense reimbursement data (342). In addition, the travel cost calculation unit 11 identifies days on which there is no business trip from the collected business trip transportation expense settlement data, identifies working days from the attendance and leaving data, and assumes that days on which the mother does not work from home are working days. The attendance rate in the office is calculated (343). Further, the travel cost calculator 11 calculates the commute time to the mother office from the commuter pass route information (344). Further, the travel cost calculation unit 11 calculates commuting expenses for each department from the commuter pass route information (345).
  • the travel cost calculator 11 multiplies the commuting time of each employee by the number of working days to calculate the travel time (commuting portion) (346). and the total travel time for commuting is multiplied by the hourly wage and totaled for each department to calculate the labor cost required for travel for each department (347).
  • the travel cost calculation unit 11 calculates the current travel cost for each department by totaling the business trip travel expenses, personnel expenses, and commuting travel expenses (348).
  • an option may be provided to select the items to be added according to the customer company's policy. For example, reduced commuting time contributes to increased employee satisfaction, but commuting time is often not included in working hours and often has no direct impact on a company's costs. Therefore, in step 347, an option may be provided in which the travel time (commuting time) is not added to the labor cost.
  • the travel cost may be calculated using only the commuter pass route information or the station information closest to each home (that is, without considering business trips). In this way, the smaller the number of data items provided by the client company, the less time and effort the client company will have to put in, and the lower the hurdles for introducing this system.
  • the movement cost calculation unit 11 sums the business trip transportation expenses, personnel expenses, and commuting transportation expenses when the base is relocated to another base candidate, and calculates the current movement cost for each department located at the base. is calculated (348).
  • the movement cost calculation unit 11 calculates the movement cost for each department by totaling the business trip transportation expenses, personnel expenses, and commuting transportation expenses when the base is changed to another base candidate, and calculates the movement cost related information 21 (349).
  • FIG. 11 is a detailed flowchart of the rent cost information synchronization process 360 of this embodiment.
  • the rent setting unit 13 multiplies the number of people in each department, the required area per person in each department, and the correction coefficient according to the job type of each department to calculate the required area for the department after reduction. do.
  • the number of people in each department and the required area per person in each department can be obtained from the department information 23 .
  • a value recorded in the required area reduction ratio setting file 24 may be used as the correction coefficient according to the occupation.
  • the area calculation unit 12 may use an appropriate area reduction rate for each department calculated from the attendance rate of the mother office. Then, the rent setting unit 13 records the calculated required area in the department information 23 .
  • FIG. 12 is a detailed flowchart of the location calculation process 370 of this embodiment.
  • the base location calculation unit 15 uses mathematical programming to find a combination that reduces the sum of the rent cost and the travel cost. Specifically, the constraint conditions set in step 310, the moving cost for each department calculated in the moving cost information synchronization process 340, the required area of the department after reduction calculated in the rent cost information synchronization process 360, step 360 The available area and rent for each base entered in , are entered, and the combination of department and base that minimizes the total cost is sought. Then, the arrangement of the departments and the cost trial calculation results at each base where the total cost value is small are output. At this time, the layout of the departments at the site with the lowest cost may be output, or a predetermined number of layouts may be output in descending order of cost.
  • mathematical programming algorithms that perform calculations that minimize the cost under constraints include, for example, mixed integer programming and genetic algorithms. Other algorithms may be used.
  • the rent cost of each base is calculated by considering the leased area of the base, the rent, the management fee, and other information related to the contract. Calculate.
  • the current data is input to calculate the effects of base placement, but it is also possible to enter movement cost prediction data to determine the locations of newly established bases.
  • FIG. 13 is a detailed flowchart of the visualization/analysis processing 380 of this embodiment.
  • the movement data display unit 33 refers to the business trip transportation expense settlement data (department, movement route) and the route information of the commuter pass, totals the movement route of each person, and uses the top N stations with the largest number of users. It is extracted as a station (381).
  • the movement data display unit 33 refers to the information of the mother office of each department, compares the nearest station to the base and the high-use station, and extracts the high-use base (382).
  • the placement result display unit 35 refers to the information on the nearest station to each base, and determines that the high-use stations other than the company's base are business partners (customers, cooperating companies, etc.) (383).
  • the movement data display unit 33 displays, for each department, the display data of the analysis screen for each department, in which the current mother office, high-use bases of the company and others, customer destinations, cooperating companies, and movement routes are superimposed on the map. Generate (384).
  • the movement data display unit 33 compares the current movement cost calculated in step 348 with the movement cost when the movement cost is changed to the base where the movement cost is the lowest for each department, and the effect of changing the base is large. (The cost difference is N times or more) and the department with a large difference is displayed (385). For example, the departments may be arranged and displayed in descending order of cost reduction effect, or the department with the greatest cost reduction effect may be displayed as a high transfer priority department.
  • the department-by-department analysis display and placement result display display the mother office, high-usage bases A and B, residential areas, and business partners superimposed on the railroad route map. At this time, the thickness of the line of the route is changed and displayed according to the frequency of use.
  • the screen shown in FIG. 14 also includes an operation area (tab) for switching departments, and an operation area (buttons) for switching between the current display (department-by-department analysis display) and the display after placement (placement result display). should be provided.
  • the placement result display unit 35 generates display data for a placement result information screen (FIG. 15) that graphically displays the number of staff assigned to each base before and after the change due to placement, the movement cost, and the rent cost (386). .
  • a placement result information screen (FIG. 15) that graphically displays the number of staff assigned to each base before and after the change due to placement, the movement cost, and the rent cost (386).
  • it is preferable to display the setting conditions of each proposal it is preferable to display the setting conditions of each proposal.
  • the site location simulation system includes the moving cost calculation unit 11 that calculates the moving cost for each department, and the rent cost of the department from the required area required by the department, Based on the calculated travel cost and rent cost, base placement calculation that calculates the placement of the department to the base so as to reduce the sum of the travel cost and the rent cost of all departments subject to the base placement calculation. Since the unit 15 is provided, it is possible to realize a comfortable working environment for employees while reducing asset costs. In other words, in response to changes in employee work styles, it is possible to propose relocation/consolidation plans for sites whose utilization efficiency has declined, and realize department allocation while keeping costs down.
  • the present invention is not limited to the above-described embodiments, and includes various modifications and equivalent configurations within the spirit of the attached claims.
  • the above-described embodiments have been described in detail for easy understanding of the present invention, and the present invention is not necessarily limited to those having all the described configurations.
  • part of the configuration of one embodiment may be replaced with the configuration of another embodiment.
  • the configuration of another embodiment may be added to the configuration of one embodiment.
  • additions, deletions, and replacements of other configurations may be made for a part of the configuration of each embodiment.
  • each configuration, function, processing unit, processing means, etc. described above may be realized by hardware, for example, by designing a part or all of them with an integrated circuit, and the processor realizes each function. It may be realized by software by interpreting and executing a program to execute.
  • Information such as programs, tables, and files that implement each function can be stored in storage devices such as memory, hard disks, SSDs (Solid State Drives), or recording media such as IC cards, SD cards, and DVDs.
  • storage devices such as memory, hard disks, SSDs (Solid State Drives), or recording media such as IC cards, SD cards, and DVDs.
  • control lines and information lines indicate those that are considered necessary for explanation, and do not necessarily indicate all the control lines and information lines necessary for implementation. In practice, it can be considered that almost all configurations are interconnected.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

拠点配置シミュレーションシステムであって、所定の演算処理を実行する演算装置と、前記演算装置に接続された記憶デバイスとを有する計算機によって構成され、前記部署の移動コストを算出する移動コスト算出部と、前記部署が必要とする所要面積から前記部署の賃料コストを算出し、前記算出された移動コストと前記賃料コストとに基づいて、拠点配置計算対象とする全ての前記部署の前記移動コストと前記賃料コストとの和を小さくするように、前記拠点への前記部署の配置を計算する拠点配置計算部とを備えることを特徴とする。

Description

拠点配置シミュレーションシステム及び拠点配置シミュレーション方法 参照による取り込み
 本出願は、令和3年(2021年)3月24日に出願された日本出願である特願2021-49529の優先権を主張し、その内容を参照することにより、本出願に取り込む。
 本発明は、拠点配置シミュレーションシステムに関する。
 大企業の多くは従来から、自社資産や賃貸による複数の事業拠点を有してきたが、テレワークの進展により従業員の働き方が変わりつつある。さらに柔軟かつ活き活きとした働き方を実現する環境として、サテライトオフィスやフリーアドレスの導入も進んでいる。
 このように、従業員がマザーオフィス(所属部署の拠点として定められたオフィス)以外にも様々な就業場所の選択肢を持った結果、マザーオフィスの利用効率(例えば、在席率)が低下している。一方で企業は近年、事業環境の変化により柔軟に対応できるよう、自社所有のオフィスを順次売却し賃貸契約のオフィスに切り替えていく傾向にある。賃貸契約のオフィスであっても複数年の契約で、更新時期以外のタイミングで解約すると違約金などが必要となるケースも多い。
 企業はこうしたケースにおいてもコストアップ(ROA悪化)を防ぐために、契約更新までの間、既存オフィスを有効活用しながら、従業員の移動コストを抑制する必要がある。
 本技術分野の背景技術として、以下の先行技術がある。特許文献1(特開2008-287372号公報)には、事業の拠点間の距離コスト及び各拠点と従業員個々との間の距離コストを算出する距離コスト算出手段と、前記各拠点毎に事業継続条件を満たしているか否かを判定する事業継続条件判定手段と、前記事業継続条件を満たしていない拠点について、前記距離コストに基づいて派遣すべき従業員の候補を選定する候補者選定手段と、前記候補となった従業員の現所属拠点と派遣先拠点との優先度に基づいて派遣の可否を決定する派遣者決定手段と、を備えることを特徴とする事業継続計画支援装置が記載されている。
 従業員の就業場所の選択肢が増えても、マザーオフィスが旧来のままでは様々な問題がある。例えば、従業員の観点では、通勤ラッシュが辛い、マザーオフィスが不便な場所にある場合、客先や協力会社からの立ち寄りに時間がかかる。また、経営者の観点では、在宅勤務が増加して従業員によるマザーオフィスの利用頻度が低下し、アセット投資が十分に活用されなくなる。かといってオフィス面積を急激に縮減すると、従業員の生産性が低下し、退職者が増加する怖れがある。さらに、感染症の拡大によって通勤時やオフィスでの感染リスク低減も必要となり、マザーオフィスの見直しは喫緊の課題となっている。
 このため、従業員の働き方の変化に既存拠点が対応できていない企業では、利用効率が低下した拠点の移転や集約が望まれている。その際、従業員の働き方の変化に対応し、移動後のコストを抑制できる部署の配置とすることが望まれている。
 本願において開示される発明の代表的な一例を示せば以下の通りである。すなわち、拠点配置シミュレーションシステムであって、所定の演算処理を実行する演算装置と、前記演算装置に接続された記憶デバイスとを有する計算機によって構成され、前記部署の移動コストを算出する移動コスト算出部と、前記部署が必要とする所要面積から前記部署の賃料コストを算出し、前記算出された移動コストと前記賃料コストとに基づいて、拠点配置計算対象とする全ての前記部署の前記移動コストと前記賃料コストとの和を小さくするように、前記拠点への前記部署の配置を計算する拠点配置計算部とを備えることを特徴とする。
 本発明の一態様によれば、アセットコストを低減し、従業員の働きやすさを実現できる。前述した以外の課題、構成及び効果は、以下の実施例の説明によって明らかにされる。
本実施例の拠点配置シミュレーションシステムによるソリューションコンセプトを示す図である。 本実施例の拠点配置シミュレーションシステムの全体構成を示す図である。 本実施例のCRE管理サーバの物理的な構成を示すブロック図である。 本実施例のCRE管理サーバの論理的な構成を示すブロック図である。 本実施例の移動コスト関連情報の構成例を示す図である。 本実施例の賃料コスト関連情報の構成例を示す図である。 本実施例の部署情報の構成例を示す図である。 本実施例の所要面積縮減率設定ファイルの構成例を示す図である。 本実施例の拠点配置シミュレーションシステムによる処理のシーケンス図である。 本実施例の移動コスト情報同期処理のフローチャートである。 本実施例の賃料コスト情報同期処理のフローチャートである。 本実施例の拠点配置計算処理のフローチャートである。 本実施例の可視化・分析処理のフローチャートである。 本実施例の部署毎分析画面の例を示す図である。 本実施例の配置結果情報画面の例を示す図である。
 図1は、本実施例の拠点配置シミュレーションシステムによるソリューションコンセプトを示す図である。
 本実施例の拠点配置シミュレーションシステムは、前述した課題を解決するために、以下の手順で処理を実行する。
 (1)部署毎の移動コストを算出する。移動コストには、マザーオフィスへの人員の通勤交通費(例えば、通勤定期代)と、当該拠点から他事業所、客先、協力会社などへの出張交通費と、当該拠点の人員の通勤及び出張に関する人件費とが含まれ、これらの和によって移動コストを算出する。通勤及び出張に関する人件費は、通勤及び出張の移動に必要な時間と当該人員の単位時間あたりのコストとの積によって算出する。マザーオフィスは、当該部署の拠点として定められたオフィスである。
 (2)経営部門が移転・集約方針に沿った制約条件を設定する。例えば、部署毎の移転要否(本社は移転不可など)と移転先の条件を設定可能とする。
 (3)拠点・部署毎の面積を算出する。例えば、テレワークやフリーアドレスの導入によって、現状より面積を縮減した試算結果を得てもよい。
 (4)拠点配置計算を実行する。拠点配置計算では、賃料コストと移動コストの合計を小さくする組み合わせを求める。
 (5)経営部門へのコンサルテーションを行う。例えば、A案ではトータルコストは最小だが移動コストが増加し生産性への影響が懸念されるが、B案ではコスト縮減効果は低いが顧客先に近い部署が増加するメリットを享受できる、といったような形で複数案を比較しながら検討を進めることが可能である。
 このように、本実施例の拠点配置シミュレーションシステムでは、複数条件下でのトータルコストが小さい解を比較し、納得感のある移転・集約方針を提供できる。
 図2は、本実施例の拠点配置シミュレーションシステムの全体構成を示す図である。
 本実施例の拠点配置シミュレーションシステムは、CRE管理サーバ100及び顧客企業の経営層・CRE管理部門や拠点運営管理者が使用する端末500を含む。これらのCRE管理サーバ100及び端末500はネットワーク300に接続されている。
 CRE管理サーバ100は、後述する拠点配置シミュレーションのための演算処理を実行する。端末500は、顧客企業の経営層・CRE管理部門や拠点運営管理者が使用する計算機であり、拠点配置シミュレーションの条件が入力され、CRE管理サーバ100による拠点配置シミュレーション結果を表示する。
 また、ネットワーク300には、顧客企業のワーカーが使用する端末400及び顧客企業のワーカーが使用するアプリケーション(例えば、出退勤管理アプリケーション、出張交通費精算アプリケーション)を提供するアプリサーバ200が接続されている。顧客企業のワーカーは端末400を使用して業務を遂行する。アプリサーバ200が収集したデータは、拠点配置シミュレーションのために使用される。
 CRE管理サーバ100及びアプリサーバ200は、クラウド上に構成されるとよいが、特定の計算機(ハードウェア)上に構成されるオンプレミスでもよい。
 図3は、本実施例のCRE管理サーバの物理的な構成を示すブロック図である。図3には、CRE管理サーバ100の物理的な構成を示すが、アプリサーバ200や端末400、500も同じ構成でよい。
 本実施例のCRE管理サーバ100は、プロセッサ(CPU)1、メモリ2、補助記憶装置3及び通信インターフェース4を有する計算機によって構成される。CRE管理サーバ100は、入力インターフェース5及び出力インターフェース6を有してもよい。
 プロセッサ1は、メモリ2に格納されたプログラムを実行する演算装置であり、演算部10及び入出力表示部30を構成する。プロセッサ1が、各種プログラムを実行することによって、CRE管理サーバ100の各機能部(例えば、移動コスト算出部11、面積算出部12、賃料設定部13、制約条件設定部14、拠点配置計算部15など)による機能が実現される。なお、プロセッサ1がプログラムを実行して行う処理の一部を、他の演算装置(例えば、ASIC、FPGA等のハードウェア)で実行してもよい。
 メモリ2は、不揮発性の記憶素子であるROM及び揮発性の記憶素子であるRAMを含む。ROMは、不変のプログラム(例えば、BIOS)などを格納する。RAMは、DRAM(Dynamic Random Access Memory)のような高速かつ揮発性の記憶素子であり、プロセッサ1が実行するプログラム及びプログラムの実行時に使用されるデータを一時的に格納する。
 補助記憶装置3は、例えば、磁気記憶装置(HDD)、フラッシュメモリ(SSD)等の大容量かつ不揮発性の記憶装置であり、記憶部20を構成する。また、補助記憶装置3は、プロセッサ1がプログラムの実行時に使用するデータ(例えば、移動コスト関連情報21、賃料コスト関連情報22、部署情報23、所要面積縮減率設定ファイル24、制約条件設定ファイル25、配置結果情報26など)、及びプロセッサ1が実行するプログラムを格納する。すなわち、プログラムは、補助記憶装置3から読み出されて、メモリ2にロードされて、プロセッサ1によって実行されることによって、CRE管理サーバ100の各機能を実現する。
 通信インターフェース4は、所定のプロトコルに従って、他の装置(例えば、端末500)との通信を制御するネットワークインターフェース装置である。
 入力インターフェース5は、キーボード7やマウス8などの入力装置が接続され、オペレータからの入力を受けるインターフェースである。出力インターフェース6は、ディスプレイ装置9やプリンタ(図示省略)などの出力装置が接続され、プログラムの実行結果をオペレータが視認可能な形式で出力するインターフェースである。なお、CRE管理サーバ100にネットワークを介して接続されたユーザ端末が入力装置及び出力装置を提供してもよい。この場合、CRE管理サーバ100がウェブサーバの機能を有し、ユーザ端末がCRE管理サーバ100に所定のプロトコル(例えばhttp)でアクセスしてもよい。
 プロセッサ1が実行するプログラムは、リムーバブルメディア(CD-ROM、フラッシュメモリなど)又はネットワークを介してCRE管理サーバ100に提供され、非一時的記憶媒体である不揮発性の補助記憶装置3に格納される。このため、CRE管理サーバ100は、リムーバブルメディアからデータを読み込むインターフェースを有するとよい。
 CRE管理サーバ100は、物理的に一つの計算機上で、又は、論理的又は物理的に構成された複数の計算機上で構成される計算機システムであり、複数の物理的計算機資源上に構築された仮想計算機上で動作してもよい。例えば、移動コスト算出部11、面積算出部12、賃料設定部13、制約条件設定部14及び拠点配置計算部15は、各々別個の物理的又は論理的計算機上で動作するものでも、複数が組み合わされて一つの物理的又は論理的計算機上で動作するものでもよい。
 図4は、本実施例のCRE管理サーバ100の論理的な構成を示すブロック図である。
 CRE管理サーバ100は、演算部10、記憶部20及び入出力表示部30を有する。
 演算部10は、移動コスト算出部11、面積算出部12、賃料設定部13、制約条件設定部14及び拠点配置計算部15を有する。移動コスト算出部11は、移動コスト算出処理(図10)を実行し、顧客企業の部署を異なる拠点へ移した場合にかかる交通費及び人件費を算出する。面積算出部12は、所要面積縮減率設定ファイル24を用いて各部署の所要面積を算出する。賃料設定部13は、顧客企業の拠点運営管理者から拠点の賃料の入力を受け、賃料コスト情報同期処理360(図11)を実行して、賃料コスト関連情報22に設定する。制約条件設定部14は、制約条件入力部34によって顧客企業の経営層やCRE管理部門から拠点配置シミュレーションの制約条件の入力を受け、制約条件設定ファイル25に設定する。拠点配置計算部15は、拠点配置計算処理370(図12)を実行し、シミュレーション結果を配置結果情報26に記録する。
 記憶部20は、移動コスト関連情報21、賃料コスト関連情報22、部署情報23、所要面積縮減率設定ファイル24、制約条件設定ファイル25及び配置結果情報26を格納する。移動コスト関連情報21は、部署及び拠点の組み合わせ毎に計算された移動コストの情報であり、その詳細は図5を参照して説明する。賃料コスト関連情報22は、顧客企業の拠点毎の賃料コストの情報であり、その詳細は図6を参照して説明する。部署情報23は、顧客企業の部署の情報であり、その詳細は図7を参照して説明する。所要面積縮減率設定ファイル24は、職種毎のオフィス面積の縮減率の情報であり、その詳細は図8を参照して説明する。制約条件設定ファイル25は、拠点配置シミュレーションにおける制約条件が設定されるファイルである。配置結果情報26には、拠点配置シミュレーションの結果が記録される。
 入出力表示部30は、データ入力部31、データ出力部32、移動データ表示部33、制約条件入力部34及び配置結果表示部35を有する。データ入力部31は、テキスト、バイナリ、CSV等の形式でシミュレーションに用いるデータの入力を受け付けるインターフェースである。データ出力部32は、テキスト、バイナリ、CSV等の形式でシミュレーション結果のデータを出力するインターフェースである。移動データ表示部33は、可視化・分析処理380(図13)を実行し、拠点配置シミュレーションの結果に基づいて、移動コスト関連情報21に記録された部署の移動データを画面表示するための表示データを生成する(図15参照)。制約条件入力部34は、制約条件設定部14によって起動され、顧客企業の経営層やCRE管理部門の端末500から拠点配置シミュレーションの制約条件の入力を受ける。配置結果表示部35は、可視化・分析処理380(図13)を実行し、配置結果情報26に記録された拠点配置シミュレーションの結果を画面表示するための表示データを生成する(図14参照)。
 図5は、本実施例の移動コスト関連情報21の構成例を示す図である。
 移動コスト関連情報21は、部署及び拠点の組み合わせ毎に計算された移動コストが記録され、顧客企業ごとに設けられる。部署及び拠点の組み合わせは、顧客企業の部署を一意に識別する識別情報である部署IDと、顧客企業の事業拠点を一意に識別する識別情報である拠点IDとで特定され、当該部署を当該拠点に配置した場合の、出張、通勤などの人の移動に伴うコストが移動コストとなる。
 図6は、本実施例の賃料コスト関連情報22の構成例を示す図である。
 賃料コスト関連情報22は、拠点毎の賃料コストの情報を記録しており、顧客企業ごとに設けられる。賃料コスト関連情報22は、拠点ID、利用可能面積、及び拠点賃料のデータを含む。拠点IDは、顧客企業の事業拠点を一意に識別する識別情報である。利用可能面積は、当該拠点毎の利用可能面積である。拠点賃料は、当該拠点の賃料である。賃料コスト関連情報22は、賃料コスト情報同期処理360において顧客企業の拠点運営管理者の端末500から入力される。
 図7は、本実施例の部署情報23の構成例を示す図である。
 部署情報23は、部署の情報を記録しており、顧客企業ごとに設けられる。部署情報23は、部署ID、所属人数、及び所要面積のデータを含む。部署IDは、顧客企業の部署を一意に識別する識別情報である。所属人数は、当該部署に所属する人員数である。所要面積は、当該部署の業務に必要な床面積であり、所属人員が業務遂行に必要な面積の他、当該部署の業務に必要な設備の設置面積の合計値である。
 図8は、本実施例の所要面積縮減率設定ファイル24の構成例を示す図である。
 所要面積縮減率設定ファイル24は、職種毎のオフィス面積の縮減率を記録しており、職種ID、職種、及び補正係数のデータを含む。移転に伴いオフィス面積を縮減する場合は補正係数を1より小さくする。現行と同様の面積とする場合は補正係数を1とする。補正係数は、例えば、職種による平均的な出勤率や、他の就業場所(例えば、サテライトオフィス)の利用可否等を考慮して職種毎に設定される。部署毎に異なる補正係数を設定してもよい。このように設定ファイルから値を読み込んで設定する形式ではなく、移動コスト算出部11で算出された直近の出勤率等から縮減率を直接計算する方法も考えられる。
 図9は、本実施例の拠点配置シミュレーションシステムによる処理のシーケンス図である。
 まず、顧客企業の経営層・CRE管理部門は、端末500を操作して、拠点配置シミュレーションの制約条件を設定し、部署の情報を入力する。例えば、制約条件は、シミュレーションにおいて変更できるパラメータの範囲等を設定するもので、動かせない拠点や人員(具体的には、本社は移動できない、拠点毎の最低人員)などである。入力された部署の情報は、部署情報23に記録される。
 日常の業務において、顧客企業のワーカーは、端末400を操作して、出勤及び退勤をアプリサーバ200上の出退勤管理アプリケーションに入力する(330)。また、顧客企業のワーカーは、端末400を操作して、通勤交通費や出張交通費をアプリサーバ200上の出張交通費精算アプリケーションに入力する(330)。
 これらの、出退勤データ及び出張交通費精算データ(所属、移動経路、交通費)はCRE管理サーバ100に転送される。CRE管理サーバ100では、移動コスト算出部11が、受信した出退勤管理データ及び交通費データを用いて、移動コスト情報同期処理を実行して、処理の結果を移動コスト関連情報21に記録する(340)。移動コスト情報同期処理340の詳細は図10を参照して後述する。
 また、顧客企業の拠点運営管理者は、端末500を操作して、CRE管理サーバ100にアクセスし、各拠点の利用可能面積、各拠点の賃料、及び部署情報(従業員一人当たり所要面積、各部署の所属人数と職種情報)を入力する。CRE管理サーバ100は、入力された賃料を用いて、賃料コスト情報同期処理を実行して、処理の結果を賃料コスト関連情報22に記録する(360)。賃料コスト情報同期処理360の詳細は図11を参照して後述する。
 次に、CRE管理サーバ100は、拠点配置計算処理を実行する(370)。拠点配置計算処理370の詳細は図12を参照して後述する。
 その後、CRE管理サーバ100は、可視化・分析処理を実行する(380)。可視化・分析処理380の詳細は図13を参照して後述する。
 可視化・分析処理380の結果は、端末500を介して顧客企業の経営層・CRE管理部門にて閲覧可能である。顧客企業の経営層・CRE管理部門は、拠点配置シミュレーションの結果を閲覧して、拠点への人員配置などの条件を見直す。
 図10は、本実施例の移動コスト算出部11が実行する移動コスト情報同期処理340の詳細のフローチャートである。
 まず、移動コスト算出部11が、収集した出張交通費精算データから部署毎の出張交通費を算出する(341)。また、移動コスト算出部11が、収集した出張交通費精算データの移動経路の情報から移動時間(出張分)を算出する(342)。また、移動コスト算出部11が、収集した出張交通費精算データから出張が無い日を特定し、出退勤データから勤務日を特定し、勤務日のうち在宅勤務しない日を出勤と仮定して、マザーオフィスにおける出勤率を算出する(343)。また、移動コスト算出部11が、定期券経路情報からマザーオフィスへの通勤時間を算出する(344)。また、移動コスト算出部11が、定期券経路情報から部署毎の通勤交通費を算出する(345)。
 次に、移動コスト算出部11が、各従業員の通勤時間に在勤日数を乗じて、移動時間(通勤分)を算出する(346)その後、移動コスト算出部11が、各従業員の出張分と通勤分の移動時間の合計値に時間給を乗じて、これを部署毎に合計して、部署毎の移動に要する人件費を算出する(347)。
 次に、移動コスト算出部11が、出張交通費と人件費と通勤交通費とを合計して、部署毎の現状の移動コストを算出する(348)。ステップ348において、顧客企業のポリシーに従って、加算する項目を選択可能なオプションを設けるとよい。例えば、通勤時間の短縮は従業員満足度の向上に寄与するが、通勤時間は一般的に勤務時間には含まれないことが多く、企業のコストに直接的な影響がないことも多い。このため、ステップ347において、移動時間(通勤分)を人件費に加算しないオプションを設けてもよい。また、定期券経路情報又は各自宅最寄駅情報のみを用いて(すなわち、出張を考慮しないで)移動コストを算出してもよい。このように、顧客企業から提供されるデータ項目が少ない方が顧客企業の手間が少なく本システム導入のハードルが下がる一方、拠点配置シミュレーションの精度は低くなるという関係がある。
 その後、移動コスト算出部11が、当該拠点が他の拠点候補に移転した場合の出張交通費と人件費と通勤交通費とを合計して、当該拠点に配置される部署毎の現状の移動コストを算出する(348)。
 その後、移動コスト算出部11が、当該拠点が他の拠点候補に変わった場合の出張交通費と人件費と通勤交通費とを合計して、部署毎の移動コストを算出し、移動コスト関連情報21に記録する(349)。
 図11は、本実施例の賃料コスト情報同期処理360の詳細のフローチャートである。
 賃料コスト情報同期処理360では、賃料設定部13が、各部署の人数と、各部署の一人当たり所要面積と、各部署の職種に応じた補正係数を乗じて、縮減後の部署所要面積を算出する。このとき、各部署の人数、及び各部署の一人当たり所要面積は部署情報23から取得できる。職種に応じた補正係数は、所要面積縮減率設定ファイル24に記録された値を用いてもよい。また、面積算出部12が、マザーオフィスの出勤率から算出した各部署の適正な面積縮減率を用いてもよい。そして、賃料設定部13は、算出された所要面積を部署情報23に記録する。
 図12は、本実施例の拠点配置計算処理370の詳細のフローチャートである。
 拠点配置計算処理370では、拠点配置計算部15が、数理計画法を用いて、賃料コストと移動コストの合計を小さくする組み合わせを求める。具体的には、ステップ310で設定された制約条件設定、移動コスト情報同期処理340で算出された部署毎の移動コスト、賃料コスト情報同期処理360で算出された縮減後の部署所要面積、ステップ360で入力された各拠点の利用可能面積及び賃料が入力され、合計コストが小さくなる部署と拠点の組み合わせを求める。そして、コストの合計値が小さくなる各拠点における部署の配置とコスト試算結果を出力する。このとき、コストが最小の拠点における部署の配置を出力してもよいし、コストが小さい方から所定数の配置を出力してもよい。本実施例において、制約条件のもとでコストが最小となる計算をする数理計画法のアルゴリズムについては、例えば混合整数計画法、遺伝的アルゴリズムなどがあり、本発明では特に方法を限定せず、その他のアルゴリズムを用いてもよい。
 拠点配置計算部15が、賃料コストを計算する場合、各部署の所要面積に加えて、拠点の賃借面積、賃借料、管理費、及びその他の契約に関する情報を考慮して拠点毎の賃料コストを算出するとよい。
 前述した拠点配置計算処理では、現在のデータを入力して拠点の配置による効果を計算するが、移動コストの予測データを入力して新規に設置される拠点の配置先を決定してもよい。
 図13は、本実施例の可視化・分析処理380の詳細のフローチャートである。
 まず、移動データ表示部33が、出張交通費精算データ(所属、移動経路)及び定期券の経路情報を参照して、各人の移動経路を集計し、利用人数が多い上位N駅を高利用駅として抽出する(381)。また、移動データ表示部33が、各部署のマザーオフィスの情報を参照して、拠点の最寄り駅と高利用駅とを照合して、高利用拠点を抽出する(382)。さらに、配置結果表示部35が、各拠点の最寄り駅の情報を参照して、高利用駅のうち自社拠点以外は取引先(顧客、協力会社など)と判定する(383)。
 次に、移動データ表示部33が、部署毎に、現状のマザーオフィス、高利用の自社他拠点、顧客先、協力会社、及び移動経路が地図上に重畳された部署毎分析画面の表示データを生成する(384)。
 その後、移動データ表示部33が、部署毎に、ステップ348で算出された現状の移動コストと、移動コストが最小となる拠点に変わった場合の移動コストとを比較し、拠点を変更する効果大(コスト差がN倍以上)の部署を差が大きい部署を表示する(385)。例えば、コスト低減効果が大きい順に部署を並べて表示したり、コスト低減効果が最も大きい部署を高移転優先度部署として表示してもよい。
 部署毎分析表示及び配置結果表示は、図14に示すように、マザーオフィス、高利用拠点A、B、居住地、取引先を鉄道路線地図上に重畳して表示する。このとき、利用頻度によって路線の線の太さを変えて表示する。また、図14に示す画面には、部署を切り替えるための操作領域(タブ)、及び現状の表示(部署毎分析表示)と配置後の表示(配置結果表示)を切り替えるための操作領域(ボタン)を設けるとよい。
 また、配置結果表示部35が、配置による変更前後の各拠点への配置人員数、及び移動コストと賃料コストをグラフで表示する配置結果情報画面(図15)の表示データを生成する(386)。このとき、複数案のコスト情報を並べて比較可能に表示するとよい。さらに、各案の設定条件も表示するとよい。
 以上に説明したように、本発明の実施例の拠点配置シミュレーションシステムは、部署ごとの移動コストを算出する移動コスト算出部11と、部署が必要とする所要面積から部署の賃料コストを算出し、算出された移動コストと賃料コストとに基づいて、拠点配置計算対象とする全ての部署の移動コストと賃料コストとの和を小さくするように、当該部署の拠点への配置を計算する拠点配置計算部15とを備えるので、アセットコストを低減しながら、従業員の働きやすさも実現できる。すなわち、従業員の働き方の変化に対応して利用効率が低下している拠点の移転・集約案を提案でき、コストを抑制した形で部署配置を実現できる。
 なお、本発明は前述した実施例に限定されるものではなく、添付した特許請求の範囲の趣旨内における様々な変形例及び同等の構成が含まれる。例えば、前述した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに本発明は限定されない。また、ある実施例の構成の一部を他の実施例の構成に置き換えてもよい。また、ある実施例の構成に他の実施例の構成を加えてもよい。また、各実施例の構成の一部について、他の構成の追加・削除・置換をしてもよい。
 また、前述した各構成、機能、処理部、処理手段等は、それらの一部又は全部を、例えば集積回路で設計する等により、ハードウェアで実現してもよく、プロセッサがそれぞれの機能を実現するプログラムを解釈し実行することにより、ソフトウェアで実現してもよい。
 各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリ、ハードディスク、SSD(Solid State Drive)等の記憶装置、又は、ICカード、SDカード、DVD等の記録媒体に格納することができる。
 また、制御線や情報線は説明上必要と考えられるものを示しており、実装上必要な全ての制御線や情報線を示しているとは限らない。実際には、ほとんど全ての構成が相互に接続されていると考えてよい。

Claims (13)

  1.  拠点配置シミュレーションシステムであって、
     所定の演算処理を実行する演算装置と、前記演算装置に接続された記憶デバイスとを有する計算機によって構成され、
     部署の移動コストを算出する移動コスト算出部と、
     前記部署が必要とする所要面積から前記部署の賃料コストを算出し、前記算出された移動コストと前記賃料コストとに基づいて、拠点配置計算対象とする全ての前記部署の前記移動コストと前記賃料コストとの和を小さくするように、拠点への前記部署の配置を計算する拠点配置計算部とを備えることを特徴とする拠点配置シミュレーションシステム。
  2.  請求項1に記載の拠点配置シミュレーションシステムであって、
     職種に対応して予め設定された面積縮減率及び現実の出勤率に基づく面積縮減率の少なくとも一方に基づいて前記所要面積を算出する面積算出部と、
     前記部署の前記拠点への配置を算出する際の制約条件の設定を受け付ける制約条件設定部とを備え、
     前記拠点配置計算部は、前記制約条件を考慮して、前記部署の前記拠点への配置を計算することを特徴とする拠点配置シミュレーションシステム。
  3.  請求項1に記載の拠点配置シミュレーションシステムであって、
     前記移動コスト算出部は、当該部署の人員の通勤交通費と、当該部署の人員の出張交通費を用いて移動コストを算出することを特徴とする拠点配置シミュレーションシステム。
  4.  請求項3に記載の拠点配置シミュレーションシステムであって、
     前記移動コスト算出部は、前記通勤交通費と前記出張交通費に加え、通勤及び出張の移動に必要な時間と当該部署の人員の単位時間あたりのコストとの積の当該部署の人員分の合計によって、前記通勤及び出張にかかる人件費も加えて移動コストを算出することを特徴とする拠点配置シミュレーションシステム。
  5.  請求項1に記載の拠点配置シミュレーションシステムであって、
     前記拠点配置計算部は、賃借面積、賃借料、管理費、及びその他の契約に関する情報に基づいて拠点毎に賃料コストを算出することを特徴とする拠点配置シミュレーションシステム。
  6.  請求項1に記載の拠点配置シミュレーションシステムであって、
     前記拠点配置計算部は、数理計画法を用いて、前記移動コストと前記賃料コストとの和を小さくするように、前記部署の前記拠点への配置を計算することを特徴とする拠点配置シミュレーションシステム。
  7.  請求項1に記載の拠点配置シミュレーションシステムであって、
     前記移動コスト算出部による計算結果を地図に重畳して表示するためのデータを生成する移動データ表示部を備えることを特徴とする拠点配置シミュレーションシステム。
  8.  請求項1に記載の拠点配置シミュレーションシステムであって、
     前記拠点配置計算部により算出された変更前後の各拠点への配置人員数、移動コスト及び賃料コストをグラフ形式で表示するためのデータを生成する配置結果表示部を備えることを特徴とする拠点配置シミュレーションシステム。
  9.  請求項8に記載の拠点配置シミュレーションシステムであって、
     前記配置結果表示部は、複数案の設定条件と結果を並べて比較可能な形式で前記部署の配置を表示するためのデータを生成することを特徴とする拠点配置シミュレーションシステム。
  10.  請求項9に記載の拠点配置シミュレーションシステムであって、
     前記配置結果表示部は、前記複数案の設定条件を表示することを特徴とする拠点配置シミュレーションシステム。
  11.  請求項2に記載の拠点配置シミュレーションシステムであって、
     前記制約条件は、特定の拠点に一定以上の人数を配置することと定義することを特徴とする拠点配置シミュレーションシステム。
  12.  拠点配置シミュレーションシステムによって実行される拠点配置シミュレーション方法であって、
     前記拠点配置シミュレーションシステムは、所定の演算処理を実行する演算装置と、前記演算装置に接続された記憶デバイスとを有する計算機によって構成され、
     前記拠点配置シミュレーション方法は、
     前記演算装置が、部署の移動コストを算出する移動コスト算出手順と、
     前記演算装置が、前記部署が必要とする所要面積から前記部署の賃料コストを算出し、前記算出された移動コストと前記算出された賃料コストとに基づいて、拠点配置計算対象とする全ての前記部署の前記移動コストと前記賃料コストとの和を小さくするように、拠点への前記部署の配置を計算する拠点配置計算手順とを備えることを特徴とする拠点配置シミュレーション方法。
  13.  請求項12に記載の拠点配置シミュレーション方法であって、
     前記演算装置が、職種に対応して予め設定された面積縮減率及び現実の出勤率に基づく面積縮減率の少なくとも一方に基づいて前記所要面積を算出する面積算出手順と、
     前記演算装置が、前記部署の前記拠点への配置を算出する際の制約条件を設定可能な制約条件設定手順とを備え、
     前記拠点配置計算手順では、前記演算装置が、前記制約条件を考慮して、前記部署の前記拠点への配置を計算することを特徴とする拠点配置シミュレーション方法。
PCT/JP2021/029024 2021-03-24 2021-08-04 拠点配置シミュレーションシステム及び拠点配置シミュレーション方法 WO2022201577A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-049529 2021-03-24
JP2021049529A JP7430150B2 (ja) 2021-03-24 2021-03-24 拠点配置シミュレーションシステム及び拠点配置シミュレーション方法

Publications (1)

Publication Number Publication Date
WO2022201577A1 true WO2022201577A1 (ja) 2022-09-29

Family

ID=83396652

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/029024 WO2022201577A1 (ja) 2021-03-24 2021-08-04 拠点配置シミュレーションシステム及び拠点配置シミュレーション方法

Country Status (2)

Country Link
JP (1) JP7430150B2 (ja)
WO (1) WO2022201577A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06332559A (ja) * 1993-05-20 1994-12-02 Kokuyo Co Ltd オフィス改善用の支援用具
US20150248630A1 (en) * 2014-03-03 2015-09-03 Tata Consultancy Services Limited Space planning and optimization
US20180308029A1 (en) * 2017-04-20 2018-10-25 Siemens Schweiz Ag Method And Arrangement For Allocating A Workspace To Employees In An Office Building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06332559A (ja) * 1993-05-20 1994-12-02 Kokuyo Co Ltd オフィス改善用の支援用具
US20150248630A1 (en) * 2014-03-03 2015-09-03 Tata Consultancy Services Limited Space planning and optimization
US20180308029A1 (en) * 2017-04-20 2018-10-25 Siemens Schweiz Ag Method And Arrangement For Allocating A Workspace To Employees In An Office Building

Also Published As

Publication number Publication date
JP2022148018A (ja) 2022-10-06
JP7430150B2 (ja) 2024-02-09

Similar Documents

Publication Publication Date Title
US20050080696A1 (en) Method and system for generating a business case for a server infrastructure
JP2001222424A (ja) ソフトウェアライセンス管理装置,ソフトウェアライセンス管理方法およびソフトウェアライセンス管理用プログラム記録媒体
JP7029929B2 (ja) 原価計上装置、原価計上方法、および、原価計上プログラム
Ham et al. Optimal BIM staffing in construction projects using a queueing model
Matsatsinis Towards a decision support system for the ready concrete distribution system: A case of a Greek company
JP2002230196A (ja) エレベーターの保守契約支援システム
Liu et al. Data-driven order assignment for last mile delivery
JP7487147B2 (ja) プロジェクト計画策定システム
JP6265871B2 (ja) 営業業務支援システム、及び営業業務支援方法
Yu et al. Time window optimization for attended home service delivery under multiple sources of uncertainties
WO2022201577A1 (ja) 拠点配置シミュレーションシステム及び拠点配置シミュレーション方法
JP2000039904A (ja) プロジェクト管理システム
Cavada et al. Accounting for cost heterogeneity on the demand in the context of a technician dispatching problem
JP5765529B2 (ja) 業務システム変更支援システム、業務システム変更支援プログラム、および業務システム変更支援方法
Hoseinpour et al. Designing a service system with price-and distance-sensitive demand: A case study in mining industry
JP2023021403A (ja) 収益予測管理装置、収益予測管理方法、および、収益予測管理プログラム
JP4245388B2 (ja) 会計処理システム、会計処理プログラム及び会計処理の方法
Ramshe et al. A portfolio optimization approach to design of congested multi‐service networks with application in community healthcare: fractional 0‐1 programming
JP6000408B1 (ja) 経営支援システム、経営支援方法、および、経営支援プログラム
JP2004118832A (ja) 保険の挙績又は販売手数料配分のための情報処理方法及び装置
JP7492399B2 (ja) 成績管理装置、成績管理方法、及び成績管理プログラム
JP7112294B2 (ja) 入金予定管理装置、入金予定管理方法および入金予定管理プログラム
JP7456567B2 (ja) 情報提供装置および情報提供方法
JP4795455B2 (ja) 介護サービスにおける収支算出システム
Silva et al. Analysis of Operational Efficiency in Picking Activity on a Pipes and Fittings Company

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21933178

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21933178

Country of ref document: EP

Kind code of ref document: A1