WO2022168166A1 - 実装システム - Google Patents

実装システム Download PDF

Info

Publication number
WO2022168166A1
WO2022168166A1 PCT/JP2021/003739 JP2021003739W WO2022168166A1 WO 2022168166 A1 WO2022168166 A1 WO 2022168166A1 JP 2021003739 W JP2021003739 W JP 2021003739W WO 2022168166 A1 WO2022168166 A1 WO 2022168166A1
Authority
WO
WIPO (PCT)
Prior art keywords
mounting
agv
automatic guided
guided vehicle
production
Prior art date
Application number
PCT/JP2021/003739
Other languages
English (en)
French (fr)
Inventor
茂人 大山
Original Assignee
株式会社Fuji
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Fuji filed Critical 株式会社Fuji
Priority to US18/261,608 priority Critical patent/US20240074132A1/en
Priority to CN202180083770.5A priority patent/CN116671271A/zh
Priority to JP2022579186A priority patent/JPWO2022168166A1/ja
Priority to EP21924563.6A priority patent/EP4290996A4/en
Priority to PCT/JP2021/003739 priority patent/WO2022168166A1/ja
Publication of WO2022168166A1 publication Critical patent/WO2022168166A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/02Feeding of components
    • H05K13/021Loading or unloading of containers
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/085Production planning, e.g. of allocation of products to machines, of mounting sequences at machine or facility level
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/086Supply management, e.g. supply of components or of substrates

Definitions

  • the transportation plan creation unit calculates the remaining number of parts based on the production planning data and the actual production data, and creates a transportation plan for the component housing members based on the remaining number.
  • the transport plan for the component housing members is created based on the remaining number of components, the production plan for the mounting line to be transported is considered, but the production plans for the other mounting lines are not considered. For this reason, for example, when work such as setup change is being performed on a mounting line adjacent to the destination mounting line, when the automatic guided vehicle starts running, the automatic guided vehicle is turned off to prevent interference with the work. It becomes necessary to wait on the way, and the efficiency of conveying the member by the automatic guided vehicle is lowered.
  • the main purpose of the present disclosure is to appropriately control the traveling of an automatic guided vehicle that automatically conveys members so that it can travel efficiently.
  • the present disclosure has taken the following means to achieve the above main objectives.
  • the implementation system of the present disclosure includes: A plurality of mounting lines are provided in which a plurality of mounting-related devices that perform mounting-related processing related to component mounting are arranged side by side, and members used for the mounting-related processing are transported to predetermined locations on the mounting line by automatic guided vehicles.
  • An implementation system a creation unit that creates a travel plan for the automatic guided vehicle based on the production plans for the plurality of mounting lines; a control unit that controls travel of the automatic guided vehicle to the predetermined location based on the travel plan; The gist is to provide
  • a travel plan for an automatic guided vehicle is created based on production plans for multiple mounting lines, and the travel of the automatic guided vehicle to a predetermined location is controlled based on the travel plan.
  • the automatic guided vehicle can be run in an appropriate situation according to the production plan of multiple mounting lines, so the automatic guided vehicle may not interfere with various work and mounting-related processing performed on each mounting line. It is possible to suppress the automatic guided vehicle from waiting for a long time while traveling to prevent interference. Therefore, the traveling control of the automatic guided vehicle that automatically conveys the members can be performed appropriately to allow the automatic guided vehicle to travel efficiently.
  • FIG. 1 is an explanatory diagram showing an example of a mounting system 1;
  • FIG. FIG. 2 is an explanatory diagram showing an outline of the configuration of the mounting line 10;
  • FIG. 2 is an explanatory diagram showing an outline of the configuration of the mounting apparatus 20;
  • 2 is a block diagram showing a configuration related to control of the mounting system 1;
  • FIG. 4 is a flowchart showing an example of travel plan creation processing;
  • FIG. 4 is an explanatory diagram showing an example of a travel plan TP created from a production plan PP;
  • 4 is a flowchart showing an example of AGV running control;
  • FIG. 5 is an explanatory diagram showing an example of how the AGV 55 travels to the storage shed 16;
  • FIG. 11 is a flowchart showing AGV travel control of a modified example;
  • FIG. 1 is an explanatory diagram showing an example of a mounting system 1.
  • FIG. 2 is an explanatory diagram showing the outline of the configuration of the mounting line 10.
  • FIG. 3 is an explanatory diagram showing the outline of the configuration of the mounting apparatus 20.
  • FIG. 4 is a block diagram showing a control configuration of the mounting system 1.
  • the left-right direction (X-axis), the front-rear direction (Y-axis), and the up-down direction (Z-axis) are as shown in FIGS.
  • the mounting system 1 includes a plurality of mounting lines 10 (10A and 10B) on which mounting-related processing related to mounting of components on the board S is performed (two are illustrated in FIG. 1), and various members used for the mounting-related processing are arranged.
  • a transport process is performed by the transport system 50 .
  • the mounting system 1 also includes a management device 5 that manages the processing of the entire system.
  • Each mounting line 10 includes a plurality of mounting-related devices that perform mounting-related processing, and a mounting control device 38 that controls the plurality of mounting-related devices.
  • the transport system 50 also includes a plurality of automatic transport vehicles 55 (hereinafter referred to as AGVs 55 ), a charging station 57 , and a transport control device 58 .
  • the plurality of mounting-related devices in the mounting line 10 include, for example, one or more of the printing device 12, the print inspection device 14, the storage box 16, the mounting device 20, the mounting inspection device 28, the reflow device 30, the reflow inspection device 32, and the like. include. These are arranged side by side along the transport direction of the substrate S (X-axis direction). Moreover, in this embodiment, a loader 18 that can move along the mounting line 10 is provided.
  • Each mounting line 10 (10A, 10B) has the same configuration, but may have a different configuration, and only one mounting line 10 (10A) is shown in FIGS.
  • the printing device 12 prints on the substrate S (see FIG. 3) by pushing solder into the pattern holes formed in the screen mask.
  • the print inspection device 14 inspects the state of solder printed by the printer 12 .
  • the mounting inspection device 28 inspects the mounting state of the components mounted on the board S by the mounting device 20 .
  • the reflow device 30 melts the solder by heating the substrate S on which the components are arranged on the solder, and then electrically connects and fixes each component on the substrate S by cooling.
  • the reflow inspection device 32 inspects the state of the components on the substrate S after reflow.
  • a plurality of mounting apparatuses 20 are arranged along the transport direction of the board S, and mount components on the board S.
  • the mounting apparatus 20 includes a mounting unit 22 and a feeder 24, as shown in FIG.
  • the mounting unit 22 is a unit that picks up a component and mounts it on the substrate S using a mounting head equipped with a picking member such as a nozzle.
  • the feeder 24 is configured as a tape feeder on which a reel around which a tape for holding components at a predetermined pitch is wound is detachably attached, and the tape is fed out by rotating the reel to supply components.
  • the loader 18 is configured to be movable within a movement area (dotted line area in FIG. 1) along the transport direction of the substrate S on the front side of the plurality of mounting devices 20 and the stocker 16 .
  • the loader 18 moves within the movement area and performs an automatic replacement work of automatically replacing (recovering or replenishing) the members used in the mounting process.
  • the loader 18 automatically replaces the feeder 24 which is a replaceable working unit with respect to the mounting apparatus 20.
  • the mounting unit 22 includes a head, a collection member such as a nozzle, a solder storage member, a screen mask, and the like. It suffices if the members used in the mounting-related processing can be automatically replaced.
  • the storage 16 is an in-line storage that stores various members used in mounting-related processing within each mounting line 10, and stores the feeder 24, for example.
  • the operator M can supply (replenish) the feeder 24 and retrieve it.
  • the loader 18 is capable of automatically exchanging the feeders 24 in the storage 16.
  • the necessary feeders 24 are retrieved from the storage 16 and supplied to the mounting apparatus 20, and the used feeders 24 are replaced by the mounting apparatus 20. , and collected in the stocker 16.
  • the AGV 55 can also replenish the feeder 24 and recover it.
  • the storage 16 is partitioned into a plurality of storage sections such as a first storage section 16a and a second storage section 16b, and the feeder 24 can be stored in each storage section.
  • the mounting control device 38 is a general-purpose computer including a CPU, ROM, RAM, HDD, etc., and is connected to input devices such as a keyboard and mouse, and output devices such as a display.
  • a storage device such as an HDD of the mounting control device 38 stores a production plan for the board S (a production plan PP to be described later) and production information related to the production of the board S.
  • FIG. The production plan defines the order in which components are mounted on the board S, the number of boards S to be produced, and the like. Further, the production information includes information indicating the solder print position on the board S, information on the components to be mounted on the board S, the mounting position of each component, and the like.
  • the component information indicates the types of components to be mounted by each mounting device 20, and the arrangement status of the feeders 24 in each mounting device 20 and the stocker 16 as part inventory status.
  • the mounting control device 38 controls the printing device 12, the print inspection device 14, the loader 18, the mounting device 20, the mounting inspection device 28, the reflow device 30, the reflow inspection device 32, based on the production plan and production information.
  • Various command signals are given to Further, the mounting control device 38 is communicably connected to the transfer control device 58, and exchanges information regarding the work status of the loader 18, information regarding the running status of the AGV 55, and the like.
  • the AGV 55 includes a motor for rotating wheels and a battery for supplying power, and automatically moves members used for mounting-related processing such as the feeder 24 between the warehouse 60 and the storage warehouse 16. transport.
  • the AGV 55 takes out the necessary feeder 24 from the warehouse 60 and automatically conveys it to the stocker 16 for distribution (supply), or collects the used feeder 24 from the stocker 16 and automatically conveys it to the warehouse 60. accommodate.
  • the AGV 55 automatically conveys the feeder 24, but it also automatically conveys the members used in mounting-related processing, such as the heads, nozzles, and other sampling members provided in the mounting unit 22, solder storage members, screen masks, and the like. I wish I had.
  • the magazine 55a can be collectively and automatically exchanged.
  • the loader 18 inserts and removes the feeder 24 into and out of the other storage unit while one of the above-described first storage unit 16a and second storage unit 16b of the storage unit 16 is vacant. 24 is recovered to the other storage unit.
  • the AGV 55 distributes and collects the feeders 24, the AGV 55 first stores a plurality of feeders 24 to be served in one of the first storage section 16a and the second storage section 16b of the storage 16, and stores the plurality of feeders 24 in the magazine 55a. Pay out and serve.
  • the AGV 55 receives and collects the plurality of feeders 24 collected in the other one of the first storage section 16a and the second storage section 16b together with the magazine 55a.
  • the AGV 55 automatically conveys the collected feeder 24 to the warehouse 60 .
  • the charging station 57 is a facility for charging the batteries of one or a plurality of AGVs 55 parked at a predetermined charging position.
  • the charging station 57 may be configured such that when the AGV 55 is parked at a predetermined charging position, a connector is connected to enable power supply, or may be configured to enable power supply in a non-contact manner.
  • the transport control device 58 is a general-purpose computer including a CPU, ROM, RAM, HDD, etc., and is connected to input devices such as a keyboard and mouse, and output devices such as a display.
  • the transport control device 58 is configured to be able to communicate with the AGV 55 wirelessly, acquires the position information of the AGV 55, performs travel control such as departure and standby of the AGV 55, and checks the state of the AGV 55 such as the remaining battery level. or get The transport control device 58 also performs charging control of the AGV 55 at the charging station 57 and the like.
  • the management device 5 is a general-purpose computer including a CPU 5a, ROM 5b, RAM 5c, HDD 5d, etc., and is connected to input devices such as a keyboard and mouse, and output devices such as a display.
  • the management device 5 is configured to be able to communicate with each mounting control device 38 and the transport control device 58 of each mounting line 10 .
  • the management device 5 stores the production plan PP of the board S, the travel plan (transfer plan) TP of the AGV 55, and the like in the HDD 5d.
  • the management device 5 transmits the production plan PP and production information of the board S of each mounting line 10 to each mounting control device 38 .
  • the management device 5 receives the production status of the boards S, the usage status of the feeders 24 required for production, the arrangement status of the feeders 24 in the stocker 16, and the like from each mounting control device 38 .
  • the production status includes the status of setup changes such as replacement of the screen mask and replacement of the feeder 24 as production preparations for substrates of different types.
  • the management device 5 also transmits the travel plan TP of each AGV 55 to the transport control device 58, and receives the travel status, remaining battery capacity, charge status, and the like of each AGV 55 from the transport control device 58.
  • the management device 5 is based on the production plan PP of the board S of each mounting line 10, the production status of the board S, the information related to the feeder 24 required for production, and the like. Create a travel plan TP including
  • FIG. 5 is a flowchart showing an example of travel plan creation processing.
  • the CPU 5a of the management device 5 first acquires the production plan PP of each of the mounting lines 10A and 10B (S100). Next, the CPU 5a creates a travel plan TP for the AGV 55 and stores it in the HDD 5d based on the changeover schedule in the acquired production plan PP so that the travel of the AGV 55 does not interfere with the changeover (S110). For example, when the traveling AGV 55 interferes with the work area for changeover (see work areas A1 and A2 in FIG. 8, which will be described later), the operator needs to interrupt the changeover in order to prevent contact with the AGV 55. , the running of the AGV 55 may interfere with the setup change.
  • the transport control device 58 creates the travel plan PP so as not to cause such an interruption of setup change.
  • the travel plan TP is created so that the running of the AGV 55 is not hindered by the setup change, for example, the AGV 55 does not need to wait for the interruption or completion of the setup change. good.
  • the CPU 5a of the management device 5 transmits the travel plan TP to the transport control device 58 of the transport system 50 (S120), and ends the travel plan creation process.
  • FIG. 6 is an explanatory diagram showing an example of the travel plan TP created from the production plan PP.
  • the setup change of the printing device 12 on the mounting line 10A is performed from time t0 to time t1
  • the setup change of the printing device 12 on the mounting line 10B is performed from time t1 to time t2. It is scheduled.
  • the travel plan TP of FIG. 6 after these setup changes are completed, that is, from time t2 when the travel of the AGV 55 does not interfere with the setup change, the AGV 55 is scheduled to travel to the storage shed 16 of the mounting line 10A.
  • the AGV 55 does not have to stand by during running due to the setup change, so the run of the AGV 55 is not hindered by the setup change.
  • the AGV 55 is scheduled to start running after the setup change is completed, but the present invention is not limited to this. For example, if there are a plurality of routes that can be traveled to the storage 16 of the mounting line 10A, the CPU 5a of the management device 5 searches for a route that does not interfere with setup change, and even if it is not the shortest route, it does not interfere with setup change. If so, you may choose that route. Then, the AGV 55 may be scheduled to start traveling on the selected route before time t2 (end of setup change). Note that FIG.
  • FIG. 6 is a flow chart showing an example of AGV travel control, and FIG.
  • the transport control device 58 waits until the departure time determined in the travel plan TP (S200). In S200, the transport control device 58 waits for time t2 of the travel plan TP shown in FIG. 6, for example. In the present embodiment, it is assumed that preparations for departure are completed by, for example, loading all the feeders 24 to be served on the AGV 55 before the departure time.
  • the transport control device 58 acquires the collection status of the feeders 24 in the storage shed 16 of the destination by communication with the mounting control device 38 (S210), and the collection of the feeders 24 is completed. It is determined whether or not there is (S220). When the transport control device 58 determines that the collection of the feeders 24 has been completed, that is, the feeders 24 to be collected are all in the stocker 16, the AGV 55 starts traveling from a predetermined traveling start position P1 (see FIG. 8). Start (S230).
  • the transport control device 58 determines whether or not the delay time from the scheduled departure time exceeds a predetermined time without proceeding to the processing of S230 (S240). ). That is, if the collection of the feeder 24 has not been completed even at the departure time, the transport control device 58 does not start the travel of the AGV 55 and causes the AGV 55 to wait until the delay time from the departure time exceeds the predetermined time. It waits until collection is completed while judging whether or not. Then, when the transport control device 58 determines that the collection of the feeder 24 is completed without the delay time exceeding the predetermined time, the AGV 55 starts running in S230.
  • the transport control device 58 determines in S240 that the delay time has exceeded the predetermined time before the collection of the feeder 24 is completed, the AGV 55 starts running in S230. That is, when the delay time exceeds the predetermined time and the delay becomes large, the transport control device 58 starts running the AGV 55 even if the feeders 24 to be collected are not complete.
  • the transport control device 58 waits for the AGV 55 to arrive at the evacuation confirmation position P2 (see FIG. 8) based on the position information of the AGV 55 (S250).
  • the evacuation confirmation position P2 is a position in front of the storage shed 16, which is the destination, and is determined as a position that does not interfere with the work and movement of the loader 18 even if the AGV 55 stands by.
  • the transport control device 58 determines that the AGV 55 has arrived at the evacuation confirmation position P2, it acquires the evacuation status of the loader 18 from in front of the storage 16 through communication with the mounting control device 38 (S260).
  • the transport control device 58 determines whether or not the evacuation of the loader 18 is completed based on the evacuation status (S270).
  • S280 it waits until the evacuation of the loader 18 is completed in S260 and S270. It is assumed that the management device 5 or the transport control device 58 notifies the mounting control device 38 that the AGV 55 has started running. The mounting control device 38 that has received the notification either completes the work of the loader 18 in the storage 16 or temporarily suspends the work of the loader 18 to withdraw the loader 18 from the front of the storage 16 . Therefore, normally when the AGV 55 reaches the evacuation confirmation position P2, the loader 18 has completed evacuation or is in the process of evacuation. It's unlikely to happen.
  • the transport control device 58 moves the AGV 55 to the front of the serving storage unit (for example, the first storage unit 16a in FIG. 8) to start the feeding operation of the feeder 24. Execute it (S290) and wait for the completion of the serving work (S300). Next, when the transport control device 58 determines that the feeding operation of the feeder 24 is completed, the AGV 55 is moved to the front of the other storage unit (for example, the second storage unit 16b in FIG. 8) to recover the feeder 24. Execute the work (S310) and wait for the collection work to be completed (S320).
  • the serving storage unit for example, the first storage unit 16a in FIG. 8
  • the transport control device 58 determines that the collecting operation of the feeder 24 is completed, it starts moving the AGV 55 with the warehouse 60 as the destination (S330), and ends the AGV travel control. Note that the travel control of the AGV 55 up to the warehouse 60 does not constitute the gist of the present invention, so the description thereof will be omitted.
  • the transport control device 58 transmits a work completion notification to the mounting control device 38 .
  • the mounting control device 38 that has received the work completion notification permits the movement of the loader 18 to the storage 16 and the work.
  • the AGV 55 may collect the feeders 24 in S310 in a state where the feeders 24 are not in the collection destination storage unit.
  • the management device 5 recreates the travel plan TP to which the feeder 24 recovery schedule is added in order to cause the AGV 55 to recover the feeder 24 that could not be recovered.
  • the mounting line 10 (10A, 10B) of this embodiment corresponds to the mounting line
  • the management device 5 corresponds to the preparation section
  • the AGV 55 corresponds to the automatic guided vehicle
  • the transfer control device 58 corresponds to the control section.
  • the AGV travel plan TP is created based on the production plans PP of the multiple mounting lines 10, and the travel of the AGV 55 to the storage shed 16 is controlled based on the travel plan TP. Therefore, since the AGV 55 can be run in an appropriate condition according to the production plans PP of the plurality of mounting lines 10, the AGV 55 interferes with or interferes with various operations and mounting-related processing performed in each mounting line 10. For prevention, it is possible to suppress the waiting time of the AGV 55 from occurring. Therefore, the traveling control of the AGV 55 can be appropriately performed, and the feeder 24 (member) can be efficiently conveyed by the AGV 55 .
  • a travel plan TP is created so that the travel of the AGV 55 does not interfere with the setup change or the travel of the AGV 55 is not hindered by the setup change. For this reason, it is possible to suppress the occurrence of delays in setup change and the occurrence of standby time of the AGV 55 .
  • the AGV 55 since the AGV 55 starts running after the departure time determined in the travel plan TP, the AGV 55 can start running before the departure time so that the AGV 55 can perform various tasks and mounting-related processing performed on each mounting line 10. can be prevented from interfering with
  • the AGV 55 is started to travel. It is possible to suppress the influence on the conveyance and collection of the feeder 24 by suppressing a large deviation from occurring in the schedule of the feeder 24 .
  • the transport control device 58 determines whether or not the AGV 55 has arrived at the evacuation confirmation position P2 based on the position information of the AGV 55 in S250.
  • the arrival timing at the evacuation confirmation position P2 may be predicted from the distance to the evacuation confirmation position P2, and it may be determined in S250 whether or not the arrival timing has come. That is, the transport control device 58 may confirm evacuation of the loader 18 when arrival at the evacuation confirmation position P2 is expected to arrive.
  • the AGV 55 starts running when the delay time from the departure time exceeds the predetermined time. may not cause the AGV 55 to start running.
  • the AGV 55 starts running after it is determined whether or not the recovery of the feeder 24 in the storage shed 16 is completed and the recovery of the feeder 24 is possible. It is not limited to this. For example, it is not limited to whether or not the feeder 24 can be collected, and it may be confirmed whether the feeder 24 can be placed in the storage 16, or the feeder 24 can be collected. It may be confirmed both whether the situation is good and whether the feeder 24 can be served. That is, it may be determined whether or not a predetermined condition regarding the state of members such as the feeder 24 in the stocker 16 is satisfied. Alternatively, the AGV 55 may start running at the departure time without making such a determination regarding the state of the members.
  • FIG. 9 is a flow chart showing AGV travel control of a modified example.
  • FIG. 9 mainly shows the part where the processing is different from that in FIG. 7 and will be described.
  • the transport control device 58 acquires the production status of each mounting line 10 through communication with the mounting control device 38 (S202), and the setup change of each mounting line 10 is completed. (S204). For example, the transport control device 58 determines whether or not both the setup change of the mounting line 10A and the setup change of the mounting line 10B illustrated in FIG. 6 have been completed. If the changeover has been completed, the transport control device 58 starts running the AGV 55 in S230. If the changeover is not completed, the transfer control device 58 returns to S202 and waits for the completion of the changeover while acquiring the production status.
  • the start of running of the AGV 55 is delayed when the changeover is not completed because the production situation is behind the production plan PP even at the departure time. Therefore, it is possible to reliably prevent the running of the AGV 55 from hindering the setup change and the running of the AGV 55 from being hindered by the setup change due to the AGV 55 starting to run while the setup change is not completed. can do.
  • the transfer control device 58 acquires the production status of each mounting line 10 through communication with the mounting control device 38 (S206), and the setup change of each mounting line 10 is completed. It is determined whether or not (S208). If the setup change is not completed, the transfer control device 58 returns to S200 and waits for the departure time, and waits for the setup change to be completed while acquiring the production status. Further, the transport control device 58 starts running the AGV 55 in S230 if the changeover is completed even before the departure time. As described above, in the modified example, if the production situation is earlier than the production plan PP and the setup change is completed even before the departure time, the AGV 55 starts running earlier. Therefore, the AGV 55 can be started to run promptly when it becomes possible to run the AGV 55 based on the production status, so the AGV 55 can be efficiently run and the collection efficiency of the feeder 24 can be improved.
  • the transfer control device 58 determines whether or not the setup has been completed from the production status both after the departure time and before the departure time, but it is not limited to this. do not have. For example, after the departure time or before the departure time, the transfer control device 58 determines whether or not the changeover is completed based on the production status, and starts the AGV 55 to run. may Further, in the modified example, the transfer control device 58 determines whether or not the changeover is completed from the acquired production status, but it is not limited to the changeover. It may be determined whether In doing so, the transport control device 58 controls the start of the AGV 55 earlier when the production status is earlier than the production plan PP, and controls the AGV 55 when the production status is later than the production plan PP. At least one of control for delaying the start of running may be performed.
  • illustration of S210, S220, and S240 in FIG. 7 is omitted, and these processes are not performed.
  • the processing of S210, S220, and S240 may be performed. That is, the transport control device 58 determines the completion of the changeover in S204 after the departure time in S200, or determines the completion of the changeover in S208 before the departure time in S200. Either or both may proceed to the process of S210. For example, it can be said that the collection is more likely to be incomplete before the departure time than after the departure time. Therefore, if the completion of the setup change is determined in S208 before the departure time, the process proceeds to S210, and if the completion of the setup change is determined in S204 after the departure time, S210 ) may be skipped and the process may proceed to S230.
  • the travel plan TP for the AGV55 is created based on the changeover schedule of the production plan PP, but it is not limited to this, and the travel plan TP for the AGV55 may be created based on the production plan PP.
  • the management device 5 creates the travel plan TP
  • the transport control device 58 may create the travel plan TP.
  • the generation of the travel plan TP and the travel control of the AGV 55 are not limited to being performed by separate devices, and may be performed by the same device.
  • the transport control device 58 caused the AGV 55 to wait at the evacuation confirmation position P2 when the evacuation completion of the loader 18 could not be confirmed. may wait. That is, the AGV 55 may be made to wait at a position closer to the storage 16, which is the destination, than the evacuation confirmation position P2.
  • the AGV 55 is temporarily stopped at the evacuation confirmation position P2, and if the completion of evacuation of the loader 18 cannot be confirmed, the AGV 55 is kept on standby and the completion of evacuation of the loader 18 is made. can be confirmed, the AGV 55 may be run again.
  • the members used for mounting-related processing such as the feeder 24 are conveyed by the AGV 55 to the dedicated storage 16 in the mounting line 10, but are not limited to this, and are conveyed to a predetermined location in the mounting line 10. Anything is fine. For example, what is transported to a storage provided in each device (printing device 12, printing device 14, mounting device 20, mounting inspection device 28, etc.) such as a storage provided below mounting device 20 in FIG. It's okay.
  • the implementation system of the present disclosure may be configured as follows. Note that the following description is not limited to the production plan for a plurality of mounting lines, and may be based on the production plan for one mounting line, such as a mounting line including the destination (predetermined location) of an automatic guided vehicle.
  • the system is not limited to having multiple mounting lines.
  • the setup change does not interfere with the travel of the automatic guided vehicle, or the travel of the automatic guided vehicle
  • the travel plan may be created so as not to interfere with the setup change. By doing so, it is possible to prevent the automatic guided vehicle from interfering with the setup change work performed in each mounting line.
  • this configuration is not limited to a plurality of mounting lines, and may be a setup change of one mounting line, or a setup change of a plurality of mounting-related devices of one mounting line.
  • control unit does not start traveling to the predetermined location until the departure time determined in the travel plan, and starts traveling to the predetermined location at the departure time. It is also possible to control the automatic guided vehicle at the same time. By doing so, it is possible to prevent the automatic guided vehicle from interfering with various operations and mounting-related processes of each mounting line due to the automatic guided vehicle departing before the departure time.
  • the control unit is capable of acquiring the state of the member at the predetermined location, and if the predetermined condition regarding the state of the member at the predetermined location does not hold even at the departure time, , the automatic guided vehicle may be controlled so as to delay the start of traveling to the predetermined location. By doing so, it is possible to prevent the waiting time of the automatic guided vehicle from becoming long and increasing the possibility of interference by waiting for the establishment of the predetermined condition at or near the predetermined location.
  • the control unit controls the automatic guided vehicle to start traveling to the predetermined location when the delay from the departure time exceeds a predetermined time even if the predetermined condition is not satisfied. It can be a thing. In this way, it is possible to prevent a large delay in subsequent schedules in the travel plan due to an increase in departure delay. Therefore, it is possible to suppress the influence exerted on the automatic conveyance of the member.
  • control unit can acquire the production status of the plurality of mounting lines, and when the production status is earlier than the production plan, At least one of control to start running the automatic guided vehicle earlier than the time and control to delay the start of running the automatic guided vehicle from the departure time when the production situation is behind the production plan. may be performed. In this way, the automatic guided vehicle can be started to run at an appropriate timing according to the production situation, so that the automatic guided vehicle can be made to run more efficiently.
  • the present disclosure can be used for mounting systems in which members are transported by automatic transport vehicles.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Operations Research (AREA)
  • Automatic Assembly (AREA)
  • Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)

Abstract

部品の実装に関する実装関連処理を行う複数の実装関連装置が並んで配置された複数の実装ラインを備え、実装関連処理に用いられる部材が自動搬送車により実装ラインの所定箇所に搬送される実装システムは、複数の実装ラインの生産計画に基づいて自動搬送車の走行計画を作成する作成部と、走行計画に基づいて所定箇所への自動搬送車の走行を制御する制御部と、を備える。

Description

実装システム
 本明細書は、実装システムを開示する。
 従来、部品を基板に実装する実装装置などの実装関連設備が並んで配置された複数の実装ラインを備え、実装に用いられる部材などが自動搬送車(自動搬送装置)により実装ラインまで自動搬送される実装システムが知られている(例えば、特許文献1参照)。この実装システムでは、搬送計画作成部が、生産計画データと生産実数データとに基づいて部品の残数を算出し、その残数に基づいて部品の収容部材の搬送計画を作成する。
特開2019-091770号公報
 上述した実装システムでは、部品の残数に基づいて部品の収容部材の搬送計画を作成するから、搬送対象の実装ラインの生産計画が考慮されるものとなるが、他の実装ラインの生産計画は考慮されていない。このため、例えば搬送先の実装ラインに隣接する実装ラインにおいて段取り替えなどの作業が行われている場合に自動搬送車が走行を開始すると、作業に干渉するのを防止するために自動搬送車を途中で待機させる必要が生じ、自動搬送車による部材の搬送効率が低下してしまう。
 本開示は、部材を自動搬送する自動搬送車の走行制御を適切に行って効率よく走行させることを主目的とする。
 本開示は、上述の主目的を達成するために以下の手段を採った。
 本開示の実装システムは、
 部品の実装に関する実装関連処理を行う複数の実装関連装置が並んで配置された複数の実装ラインを備え、前記実装関連処理に用いられる部材が自動搬送車により前記実装ラインの所定箇所に搬送される実装システムであって、
 前記複数の実装ラインの生産計画に基づいて前記自動搬送車の走行計画を作成する作成部と、
 前記走行計画に基づいて前記所定箇所への前記自動搬送車の走行を制御する制御部と、
 を備えることを要旨とする。
 本開示の実装システムでは、複数の実装ラインの生産計画に基づいて自動搬送車の走行計画を作成し、その走行計画に基づいて所定箇所への自動搬送車の走行を制御する。これにより、複数の実装ラインの生産計画に応じた適切な状況で自動搬送車を走行させることができるから、各実装ラインで行われる各種作業や実装関連処理などに自動搬送車が干渉したり、干渉防止のために走行中に自動搬送車が長時間待機したりするのを抑制することができる。したがって、部材を自動搬送する自動搬送車の走行制御を適切に行って効率よく走行させることができる。
実装システム1の一例を示す説明図。 実装ライン10の構成の概略を示す説明図。 実装装置20の構成の概略を示す説明図。 実装システム1の制御に関する構成を示すブロック図。 走行計画作成処理の一例を示すフローチャート。 生産計画PPから作成される走行計画TPの一例を示す説明図。 AGV走行制御の一例を示すフローチャート。 AGV55が保管庫16へ走行する様子の一例を示す説明図。 変形例のAGV走行制御を示すフローチャート。
 次に、本開示を実施するための形態を図面を参照しながら説明する。図1は、実装システム1の一例を示す説明図である。図2は、実装ライン10の構成の概略を示す説明図である。図3は、実装装置20の構成の概略を示す説明図である。図4は、実装システム1の制御に関する構成を示すブロック図である。なお、本実施形態において、左右方向(X軸)、前後方向(Y軸)及び上下方向(Z軸)は、図2,3に示した通りとする。
 実装システム1は、基板Sへの部品の実装に関する実装関連処理が行われる複数(図1では2つを例示)の実装ライン10(10A,10B)を備え、実装関連処理に用いられる各種部材の搬送処理が搬送システム50により行われる。また、実装システム1は、システム全体の処理を管理する管理装置5を備える。各実装ライン10は、実装関連処理を行う複数の実装関連装置と、複数の実装関連装置を制御する実装制御装置38とを備える。また、搬送システム50は、複数台の自動搬送車55(以下、AGV55)と、充電ステーション57と、搬送制御装置58とを備える。
 実装ライン10の複数の実装関連装置には、例えば、印刷装置12、印刷検査装置14、保管庫16、実装装置20、実装検査装置28、リフロー装置30、リフロー検査装置32などのうち1以上が含まれている。これらは、基板Sの搬送方向(X軸方向)に沿って並んで配置されている。また、本実施形態では、実装ライン10に沿って移動可能なローダ18を備える。なお、各実装ライン10(10A,10B)は、同じ構成とするが、異なる構成でもよく、図2,図4では1の実装ライン10(10A)のみを図示する。
 印刷装置12は、スクリーンマスクに形成されたパターン孔にはんだを押し込むことで基板S(図3参照)に印刷する。印刷検査装置14は、印刷装置12で印刷されたはんだの状態を検査する。実装検査装置28は、実装装置20で基板Sに実装された部品の実装状態を検査する。リフロー装置30は、はんだ上に部品が配置された基板Sを加熱することによりはんだを溶融し、その後冷却することにより各部品を基板S上に電気的に接続、固定する。リフロー検査装置32は、リフロー後の基板S上の部品の状態を検査する。
 実装装置20は、基板Sの搬送方向に沿って複数配置されており、基板Sに部品を実装する。実装装置20は、図3に示すように、実装ユニット22と、フィーダ24とを備える。実装ユニット22は、ノズルなどの採取部材を装着した実装ヘッドにより、部品を採取して基板S上に実装するユニットである。フィーダ24は、部品を所定ピッチで保持するテープが巻回されたリールが着脱可能に取り付けられ、リールを回転させることによりテープを送り出して部品を供給するテープフィーダとして構成されている。
 ローダ18は、複数の実装装置20および保管庫16の前面側において、基板Sの搬送方向に沿った移動エリア内(図1の点線エリア)で移動可能に構成されている。ローダ18は、移動エリア内で移動して、実装処理に用いられる部材を自動で交換(回収や補給)する自動交換作業を行う。例えば、ローダ18は、実装装置20に対して交換可能な作業ユニットであるフィーダ24を自動で交換するが、実装ユニット22が備えるヘッド、ノズルなどの採取部材、はんだの収容部材、スクリーンマスクなど、実装関連処理に用いられる部材を自動で交換可能であればよい。
 保管庫16は、実装関連処理で使用される各種部材を各実装ライン10内で保管するライン内保管庫であり、例えばフィーダ24を保管する。保管庫16では、作業者Mがフィーダ24を供給(補給)したり回収したりすることができる。また、ローダ18は、保管庫16に対してフィーダ24の自動交換作業が可能であり、必要なフィーダ24を保管庫16から取り出して実装装置20に補給したり、使用したフィーダ24を実装装置20から取り出して保管庫16に回収したりする。また、保管庫16では、AGV55もフィーダ24を補給したり回収したりすることができる。また、保管庫16は、例えば第1保管部16aと第2保管部16bなどの複数の保管部に区画されており、各保管部にフィーダ24を保管可能となっている。
 実装制御装置38は、CPUやROM、RAM、HDDなどを含む汎用のコンピュータであり、キーボードやマウスなどの入力デバイスやディスプレイなどの出力デバイスが接続される。実装制御装置38のHDDなどの記憶装置には、基板Sの生産計画(後述する生産計画PP)や基板Sの生産に関連した生産情報が記憶される。生産計画は、基板Sへの部品の実装順や、基板Sの生産数等を規定する。また、生産情報は、基板Sにおけるはんだの印刷位置を示す情報や、基板Sに実装される部品の情報、各部品の実装位置などが含まれる。部品の情報には、各実装装置20で実装される部品種の他、部品の在庫状況として、各実装装置20や保管庫16へのフィーダ24の配置状況などを示す。実装制御装置38は、基板Sの生産に際し、生産計画および生産情報に基づいて、印刷装置12や印刷検査装置14、ローダ18、実装装置20、実装検査装置28、リフロー装置30、リフロー検査装置32などに各種指令信号を与える。また、実装制御装置38は、搬送制御装置58と通信可能に接続されており、ローダ18の作業状況に関する情報やAGV55の走行状況に関する情報などをやり取りする。
 AGV55は、図示は省略するが、車輪を回転駆動させるモータや電力を供給するバッテリなどを備え、フィーダ24などの実装関連処理に用いられる部材を、倉庫60と保管庫16との間などで自動搬送する。AGV55は、例えば、倉庫60から必要なフィーダ24を取り出して保管庫16に自動搬送して配膳(供給)したり、保管庫16から使用済みのフィーダ24を回収して倉庫60に自動搬送して収容したりする。なお、AGV55は、フィーダ24を自動で搬送するが、実装ユニット22が備えるヘッド、ノズルなどの採取部材、はんだの収容部材、スクリーンマスクなど、実装関連処理に用いられる部材を自動で搬送するものであればよい。
 ここで、AGV55と保管庫16との間では、例えば複数のフィーダ24を所定の搭載部材としてのマガジン55aに搭載した状態で、マガジン55aごと一括で自動交換可能となっている。ローダ18は、保管庫16の上述した第1保管部16aおよび第2保管部16bのうち一方の保管部が空いた状態で、他方の保管部に対してフィーダ24を出し入れして使用済みのフィーダ24を他方の保管部に回収する。AGV55は、フィーダ24の配膳と回収とを行う場合、まず、保管庫16の第1保管部16aおよび第2保管部16bのうち一方の保管部に対し、配膳対象の複数のフィーダ24をマガジン55aごと払い出して配膳する。次に、AGV55は、第1保管部16aおよび第2保管部16bのうち他方の保管部に回収された複数のフィーダ24をマガジン55aごと受け取って回収する。AGV55は、回収したフィーダ24を倉庫60まで自動搬送する。
 倉庫60には、作業者Mにより収容されたフィーダ24やAGV55により自動搬送されたフィーダ24などの各種部材が保管されている。なお、AGV55は、倉庫60に対して複数のフィーダ24をマガジン55aごと一括で出し入れすることができる。また、充電ステーション57は、所定の充電位置に駐車した1または複数台のAGV55のバッテリを充電する設備である。なお、充電ステーション57は、所定の充電位置にAGV55が駐車すると、コネクタが接続されて給電可能となる構成でもよいし、非接触で給電可能となる構成でもよい。
 搬送制御装置58は、CPUやROM、RAM、HDDなどを含む汎用のコンピュータであり、キーボードやマウスなどの入力デバイスやディスプレイなどの出力デバイスが接続される。搬送制御装置58は、無線によりAGV55と通信接続が可能に構成されており、AGV55の位置情報を取得したり、AGV55の発車や待機などの走行制御を行ったり、AGV55のバッテリ残量などの状態を取得したりする。また、搬送制御装置58は、充電ステーション57におけるAGV55の充電制御なども行う。
 管理装置5は、CPU5aやROM5b、RAM5c、HDD5dなどを含む汎用のコンピュータであり、キーボードやマウスなどの入力デバイスやディスプレイなどの出力デバイスが接続される。管理装置5は、各実装ライン10の各実装制御装置38や搬送制御装置58と通信可能に構成されている。この管理装置5は、HDD5dに基板Sの生産計画PPやAGV55の走行計画(搬送計画)TPなどを記憶している。管理装置5は、各実装ライン10の基板Sの生産計画PPや生産情報を各実装制御装置38に送信する。管理装置5は、各実装制御装置38から基板Sの生産状況や生産に必要なフィーダ24の使用状況、保管庫16におけるフィーダ24の配置状況などを受信する。なお、生産状況には、異なる種類の基板に対する生産準備としてスクリーンマスクの交換やフィーダ24の交換などを行う段取り替えの状況を含む。また、管理装置5は、各AGV55の走行計画TPを搬送制御装置58に送信したり、搬送制御装置58から各AGV55の走行状況やバッテリ残量、充電状況などを受信したりする。なお、管理装置5は、各実装ライン10の基板Sの生産計画PPや基板Sの生産状況、生産に必要なフィーダ24に関する情報などに基づいて、各AGV55におけるフィーダ24の搬送予定や充電予定などを含む走行計画TPを作成する。
 こうして構成された実装システム1の動作、特にAGV55の走行に関する処理について説明する。まず、AGV55の走行計画TPについて説明する。図5は、走行計画作成処理の一例を示すフローチャートである。
 図5の走行計画作成処理では、管理装置5のCPU5aは、まず各実装ライン10A,10Bの生産計画PPを取得する(S100)。次に、CPU5aは、取得した生産計画PPにおける段取り替えの予定に基づいて、AGV55の走行が段取り替えの妨げとならないように、AGV55の走行計画TPを作成してHDD5dに記憶する(S110)。例えば、走行するAGV55が段取り替えの作業エリア(後述する図8の作業エリアA1,A2参照)と干渉する場合、作業者はAGV55との接触を防止するために段取り替えを中断する必要が生じるなど、AGV55の走行が段取り替えの妨げとなることがある。このため、搬送制御装置58は、そのような段取り替えの中断が生じないように走行計画PPを作成する。なお、S110では、段取り替えによってAGV55の走行が妨げられないように、例えば段取り替えの中断または終了を待つために、AGV55の待機が必要とならないように、走行計画TPが作成されるものとしてもよい。続いて、管理装置5のCPU5aは、走行計画TPを搬送システム50の搬送制御装置58に送信して(S120)、走行計画作成処理を終了する。
 図6は、生産計画PPから作成される走行計画TPの一例を示す説明図である。図6の生産計画PPでは、一例として、実装ライン10Aの印刷装置12の段取り替えが時刻t0から時刻t1まで行われ、実装ライン10Bの印刷装置12の段取り替えが時刻t1から時刻t2まで行われる予定となっている。図6の走行計画TPでは、これらの段取り替えが終了した後、即ちAGV55の走行が段取り替えの妨げとならない時刻t2からAGV55が実装ライン10Aの保管庫16へ走行する予定となっている。このため、段取り替えによって走行中にAGV55が待機する必要がないから、段取り替えによってAGV55の走行が妨げられないものとなる。図6では、段取り替えが終了した後からAGV55が走行を開始する予定としたが、これに限られない。例えば、実装ライン10Aの保管庫16へ走行可能な経路が複数ある場合、管理装置5のCPU5aは、段取り替えの妨げとならない経路を探索し、最短経路でなくても段取り替えの妨げとならない経路があれば、その経路を選択してもよい。そして、時刻t2となる(段取り替えが終了する)前から、選択した経路でAGV55が走行を開始する予定としてもよい。なお、図6では、印刷装置12の段取り替えを例示したが、これに限られず、実装装置20の段取り替えであってもよい。また、保管庫16でのAGV55の作業や倉庫60へのAGV55の戻りは時刻t3で完了する予定となっている。搬送制御装置58は、受信した走行計画TPをHDDなどに記憶しておき、走行計画TPに基づいてAGV55の走行を制御する。図7は、AGV走行制御の一例を示すフローチャートであり、図8は、AGV55が保管庫16へ走行する様子の一例を示す説明図である。
 図7のAGV走行制御では、搬送制御装置58は、走行計画TPで定められた発車時刻になるのを待つ(S200)。S200では、搬送制御装置58は、例えば図6に示した走行計画TPの時刻t2となるのを待つ。なお、本実施形態では、発車時刻となるまでに、例えばAGV55に配膳対象のフィーダ24が全て搭載されるなど、発車準備を完了させておくものとする。
 走行計画TPの発車時刻になると、搬送制御装置58は、目的地の保管庫16におけるフィーダ24の回収状況を実装制御装置38との通信により取得し(S210)、フィーダ24の回収が完了しているか否かを判定する(S220)。搬送制御装置58は、フィーダ24の回収が完了している、即ち回収対象のフィーダ24が保管庫16に揃っていると判定すると、所定の走行開始位置P1(図8参照)からAGV55の走行を開始する(S230)。
 一方、搬送制御装置58は、フィーダ24の回収が完了していないと判定すると、S230の処理に進まずに、予定の発車時刻からの遅延時間が所定時間を超えるか否かを判定する(S240)。即ち、搬送制御装置58は、発車時刻になってもフィーダ24の回収が完了していなければ、AGV55の走行を開始させずにAGV55を待機させて、発車時刻からの遅延時間が所定時間を超えるか否かを判定しながら回収が完了するのを待つ。そして、搬送制御装置58は、遅延時間が所定時間を超えることなくフィーダ24の回収が完了したと判定すると、S230でAGV55の走行を開始する。また、搬送制御装置58は、フィーダ24の回収が完了する前にS240で遅延時間が所定時間を超えたと判定すると、S230でAGV55の走行を開始する。即ち、搬送制御装置58は、遅延時間が所定時間を超えて遅延が大きくなった場合には、回収対象のフィーダ24が揃っていなくてもAGV55の走行を開始するのである。
 こうしてAGV55の走行を開始すると、搬送制御装置58は、AGV55の位置情報に基づいてAGV55が退避確認位置P2(図8参照)に到着するのを待つ(S250)。退避確認位置P2は、目的地である保管庫16よりも手前の位置であって、AGV55が待機してもローダ18の作業や移動に干渉しない位置として定められている。搬送制御装置58は、AGV55が退避確認位置P2に到着したと判定すると、実装制御装置38との通信により保管庫16前からのローダ18の退避状況を取得する(S260)。次に、搬送制御装置58は、退避状況に基づいてローダ18の退避が完了しているか否かを判定し(S270)、退避が完了していないと判定すると、退避確認位置P2でAGV55を待機させながら(S280)、S260,S270でローダ18の退避が完了するのを待つ。なお、AGV55が走行を開始したことは、管理装置5または搬送制御装置58から実装制御装置38に通知されるものとする。その通知を受けた実装制御装置38は、保管庫16でのローダ18の作業が完了するか、またはローダ18の作業を一時中断させて、ローダ18を保管庫16前から退避させる。このため、通常はAGV55が退避確認位置P2に到着した際に、ローダ18は退避が完了しているか退避中であるため、退避確認位置P2でAGV55を待機させたとしても待機時間が長時間となることは殆どない。
 搬送制御装置58は、S270でローダ18の退避が完了していると判定すると、AGV55を配膳先の保管部(例えば図8では第1保管部16a)前に移動させてフィーダ24の配膳作業を実行させて(S290)、配膳作業が完了するのを待つ(S300)。次に、搬送制御装置58は、フィーダ24の配膳作業が完了したと判定すると、AGV55を回収先の他方の保管部(例えば図8では第2保管部16b)前に移動させてフィーダ24の回収作業を実行させて(S310)、回収作業が完了するのを待つ(S320)。そして、搬送制御装置58は、フィーダ24の回収作業が完了したと判定すると、目的地を倉庫60としてAGV55の移動を開始して(S330)、AGV走行制御を終了する。なお、倉庫60までのAGV55の走行制御は、本発明の要旨をなさないから説明を省略する。搬送制御装置58は、AGV55が移動を開始すると、作業完了通知を実装制御装置38に送信する。作業完了通知を受けた実装制御装置38は、ローダ18の保管庫16への移動および作業を許可する。なお、S240で遅延時間が所定時間を超えたためにS230でAGV55が走行を開始した場合、S310では回収先の保管部にフィーダ24が揃っていない状態でAGV55がフィーダ24を回収する場合がある。その場合、管理装置5は、回収できなかったフィーダ24をAGV55に再度回収させに行くために、フィーダ24の回収予定を追加した走行計画TPを再度作成することになる。
 ここで、本実施形態の構成要素と本開示の構成要素との対応関係を明らかにする。本実施形態の実装ライン10(10A,10B)が実装ラインに相当し、管理装置5が作成部に相当し、AGV55が自動搬送車に相当し、搬送制御装置58が制御部に相当する。
 以上説明した実装システム1では、複数の実装ライン10の生産計画PPに基づいてAGVの走行計画TPを作成し、その走行計画TPに基づいて保管庫16へのAGV55の走行を制御する。このため、複数の実装ライン10の生産計画PPに応じた適切な状況でAGV55を走行させることができるから、各実装ライン10で行われる各種作業や実装関連処理などにAGV55が干渉したり、干渉防止のためにAGV55の待機時間が発生したりするのを抑制することができる。したがって、AGV55の走行制御を適切に行って、AGV55によるフィーダ24(部材)の搬送を効率よく行うことができる。
 また、生産計画PPの段取り替えの予定に基づいて、AGV55の走行が段取り替えの妨げとならないように、または段取り替えによってAGV55の走行が妨げられないように、走行計画TPを作成する。このため、段取り替えに遅延が生じたり、AGV55の待機時間が発生したりするのを抑制することができる。
 また、走行計画TPで定められた発車時刻以降にAGV55の走行を開始させるから、発車時刻前にAGV55が走行を開始することにより、各実装ライン10で行われる各種作業や実装関連処理などにAGV55が干渉するのを防止することができる。
 また、発車時刻となっても保管庫16におけるフィーダ24の回収が完了していない場合には、AGV55の走行の開始を遅らせるから、例えば保管庫16またはその近くでAGV55の待機時間が長時間となって干渉のおそれが高まるのを抑制することができる。
 また、発車時刻からの遅延時間が所定時間を超えるとAGV55の走行を開始させるから、発車の遅れが拡大することによって走行計画TPにおける以降の予定(図示は省略したが、図6の時刻t3以降の予定)に大きなずれ込みが出るのを抑制して、フィーダ24の搬送や回収に及ぼす影響を抑制することができる。
 なお、本開示は上述した実施形態に何ら限定されることはなく、本開示の技術的範囲に属する限り種々の態様で実施し得ることはいうまでもない。
 例えば、上述した実施形態では、搬送制御装置58は、S250ではAGV55の位置情報に基づいてAGV55が退避確認位置P2に到着したか否かを判定したが、これに限られず、AGV55の走行速度や退避確認位置P2までの距離などから退避確認位置P2への到着タイミングを予想しておき、S250ではその到着タイミングとなったか否かを判定してもよい。即ち、搬送制御装置58は、退避確認位置P2への到着が予想される到着タイミングとなった場合にローダ18の退避を確認してもよい。
 実施形態では、発車時刻からの遅延時間が所定時間を超えるとAGV55の走行を開始させたが、これに限られず、遅延時間が所定時間を超えてもフィーダ24の回収が完了していない場合にはAGV55の走行を開始させないものとしてもよい。
 実施形態では、発車時刻となった際に保管庫16におけるフィーダ24の回収が完了してフィーダ24の回収が可能な状況であるか否かを判定してからAGV55の走行を開始させたが、これに限られるものではない。例えば、フィーダ24の回収が可能な状況であるか否かに限られず、保管庫16にフィーダ24の配膳が可能な状況であるか否かを確認してもよいし、フィーダ24の回収が可能な状況であるかとフィーダ24の配膳が可能な状況であるかとを両方確認してもよい。即ち、保管庫16におけるフィーダ24などの部材の状況に関する所定条件が成立するか否かを判定するものであればよい。あるいは、このような部材の状況に関する判定を行わず、発車時刻になればAGV55の走行を開始させてもよい。
 また、発車時刻だけでなく、実装ライン10の生産状況を考慮してAGV55の走行を開始させてもよい。図9は、変形例のAGV走行制御を示すフローチャートである。変形例では、主に図7と処理が異なる部分を図9に示して説明する。
 この変形例では、S200で発車時刻になると、搬送制御装置58は、実装制御装置38との通信により各実装ライン10の生産状況を取得し(S202)、各実装ライン10の段取り替えが完了しているか否かを判定する(S204)。例えば搬送制御装置58は、図6に例示した実装ライン10Aの段取り替えと実装ライン10Bの段取り替えがいずれも完了しているか否かを判定する。搬送制御装置58は、段取り替えが完了していれば、S230でAGV55の走行を開始する。また、搬送制御装置58は、段取り替えが完了していなければ、S202に戻り生産状況を取得しながら段取り替えが完了するのを待ち、段取り替えが完了するとS230でAGV55の走行を開始する。このように、変形例では、発車時刻になっても、生産状況が生産計画PPより遅れているために段取り替えが完了していない場合には、AGV55の走行開始を遅らせるのである。このため、段取り替えが完了していない状態でAGV55が走行を開始したことにより、AGV55の走行が段取り替えの妨げとなったり、段取り替えによってAGV55の走行が妨げられたりするのを、確実に防止することができる。
 また、S200で発車時刻になっていない場合でも、搬送制御装置58は、実装制御装置38との通信により各実装ライン10の生産状況を取得し(S206)、各実装ライン10の段取り替えが完了しているか否かを判定する(S208)。搬送制御装置58は、段取り替えが完了していなければ、S200に戻り発車時刻になるのを待つと共に、生産状況を取得しながら段取り替えが完了するのを待つ。また、搬送制御装置58は、発車時刻にならなくても段取り替えが完了すれば、S230でAGV55の走行を開始する。このように、変形例では、発車時刻になる前でも、生産状況が生産計画PPより早くなっているために段取り替えが完了している場合には、AGV55の走行開始を早くするのである。このため、生産状況に基づいてAGV55の走行が可能な状況になれば速やかにAGV55の走行を開始させることができるから、AGV55を効率よく走行させてフィーダ24の回収効率を上げることができる。
 変形例では、搬送制御装置58は、発車時刻になった後と、発車時刻になる前とのいずれにおいても生産状況から段取り替えが完了したか否かを判定したが、これに限られるものではない。例えば、搬送制御装置58は、発車時刻になった後と、発車時刻になる前とのうちいずれか一方において、生産状況から段取り替えが完了したか否かを判定してAGV55の走行を開始させてもよい。また、変形例では、搬送制御装置58は、取得した生産状況から段取り替えが完了したか否かを判定したが、段取り替えに限られず、取得した生産状況から生産計画PPに対して遅れがあるか否かを判定してもよい。そのようにする場合、搬送制御装置58は、生産状況が生産計画PPより早くなっている場合にAGV55の走行開始を早くする制御と、生産状況が生産計画PPより遅くなっている場合にAGV55の走行開始を遅くする制御とのうち少なくとも一方を行うものとすればよい。
 なお、変形例の図9では、図7のS210,S220,S240の図示を省略し、これらの処理が行われないものとしたが、これに限られず、実施形態と同様にS210の処理に進んで、S210,S220,S240の処理が行われてもよい。即ち、搬送制御装置58は、S200で発車時刻になった後にS204で段取り替えの完了を判定した場合と、S200で発車時刻になる前にS208で段取り替えの完了を判定した場合とのうち、両方または一方で、S210の処理に進むものとしてもよい。例えば、発車時刻になる前は、発車時刻になった後よりも回収が完了していない可能性が高いものといえる。このため、発車時刻になる前にS208で段取り替えの完了を判定した場合にはS210の処理に進み、発車時刻になった後にS204で段取り替えの完了を判定した場合にはS210(S220,S240)の処理を省略してS230の処理に進むようにしてもよい。
 実施形態では、生産計画PPの段取り替えの予定に基づいてAGV55の走行計画TPを作成したが、これに限られず、生産計画PPに基づいてAGV55の走行計画TPを作成するものであればよい。また、管理装置5が走行計画TPを作成したが、搬送制御装置58が走行計画TPを作成してもよい。即ち、走行計画TPの作成と、AGV55の走行制御とを別々の装置が行うものに限られず、同じ装置が行ってもよい。
 実施形態では、搬送制御装置58は、ローダ18の退避完了を確認できなかった場合にAGV55を退避確認位置P2で待機させたが、これに限られず、退避確認位置P2とは別の位置でAGV55を待機させてもよい。即ち、退避確認位置P2よりも目的地である保管庫16により近い位置でAGV55を待機させてもよい。あるいは、ローダ18の退避完了を確認できるか否かに拘わらず、退避確認位置P2で一旦AGV55を停止させ、ローダ18の退避完了を確認できなかった場合にはそのまま待機させ、ローダ18の退避完了を確認できた場合にはAGV55を再度走行させるものとしてもよい。
 実施形態では、フィーダ24などの実装関連処理に用いられる部材が、AGV55により実装ライン10内の専用の保管庫16に搬送されたが、これに限られず、実装ライン10の所定箇所に搬送されるものであればよい。例えば、図3の実装装置20の下方に設けられた保管庫など、各装置(印刷装置12や印刷装置14、実装装置20、実装検査装置28など)に設けられた保管庫に搬送されるものでもよい。
 ここで、本開示の実装システムは、以下のように構成してもよい。なお、以下では、複数の実装ラインの生産計画に基づくものに限られず、例えば自動搬送車の目的地(所定箇所)を含む実装ラインなど、1の実装ラインの生産計画に基づくものでもよく、実装システムが複数の実装ラインを備えるものに限られない。例えば、本開示の実装システムにおいて、前記生産計画における前記実装関連装置の段取り替えの予定に基づいて、前記段取り替えが前記自動搬送車の走行の妨げとならないように、または前記自動搬送車の走行が前記段取り替えの妨げとならないように、前記走行計画を作成するものとしてもよい。こうすれば、各実装ラインで行われる段取り替えの作業に自動搬送車が干渉するのを防止することができる。また、この構成では、複数の実装ラインに限られず、1の実装ラインの段取り替えでもよく、1の実装ラインの複数の実装関連装置の段取り替えでもよい。
 本開示の実装システムにおいて、前記制御部は、前記走行計画で定められた発車時刻になるまで前記所定箇所への走行を開始させず、前記発車時刻になると前記所定箇所への走行を開始するように前記自動搬送車を制御するものとしてもよい。こうすれば、発車時刻より前に自動搬送車が発車することにより、各実装ラインの各種作業や実装関連処理などに自動搬送車が干渉するのを防止することができる。
 本開示の実装システムにおいて、前記制御部は、前記所定箇所における前記部材の状況を取得可能であり、前記発車時刻になっても前記所定箇所における前記部材の状況に関する所定条件が成立しない場合には、前記所定箇所への走行の開始を遅らせるように前記自動搬送車を制御するものとしてもよい。こうすれば、所定箇所またはその近くで所定条件の成立を待つことにより、自動搬送車の待機時間が長時間となって干渉のおそれが高まるのを抑制することができる。
 本開示の実装システムにおいて、前記制御部は、前記所定条件が成立しない場合でも前記発車時刻からの遅れが所定時間を超えると前記所定箇所への走行を開始するように前記自動搬送車を制御するものとしてもよい。こうすれば、発車の遅れが拡大することによって走行計画における以降の予定に大きなずれ込みが出るのを抑制することができる。このため、部材の自動搬送に及ぼす影響を抑制することができる。
 本開示の実装システムにおいて、前記制御部は、前記複数の実装ラインにおける生産の状況を取得可能であり、前記生産の状況が前記生産計画より早くなっている場合に前記走行計画で定められた発車時刻よりも前記自動搬送車の走行開始を早くする制御と、前記生産の状況が前記生産計画より遅れている場合に前記発車時刻よりも前記自動搬送車の走行開始を遅らせる制御とのうち少なくとも一方を行うものとしてもよい。こうすれば、生産の状況に応じて適切なタイミングで自動搬送車の走行を開始させることができるから、さらに効率よく自動搬送車を走行させることができる。
 本開示は、部材が自動搬送車で搬送される実装システムなどに利用可能である。
 1 実装システム、5 管理装置、5a CPU、5b ROM、5c RAM、5d HDD、10,10A,10B 実装ライン、12 印刷装置、14 印刷検査装置、16 保管庫、16a 第1保管部、16b 第2保管部、18 ローダ、20 実装装置、22 実装ユニット、24 フィーダ、28 実装検査装置、30 リフロー装置、32 リフロー検査装置、38 実装制御装置、50 搬送システム、55 自動搬送車(AGV)、55a マガジン、57 充電ステーション、58 搬送制御装置、60 倉庫、M 作業者、PP 生産計画、S 基板、TP 走行計画。

Claims (6)

  1.  部品の実装に関する実装関連処理を行う複数の実装関連装置が並んで配置された複数の実装ラインを備え、前記実装関連処理に用いられる部材が自動搬送車により前記実装ラインの所定箇所に搬送される実装システムであって、
     前記複数の実装ラインの生産計画に基づいて前記自動搬送車の走行計画を作成する作成部と、
     前記走行計画に基づいて前記所定箇所への前記自動搬送車の走行を制御する制御部と、
     を備える実装システム。
  2.  請求項1に記載の実装システムであって、
     前記作成部は、前記生産計画における前記実装関連装置の段取り替えの予定に基づいて、前記段取り替えが前記自動搬送車の走行の妨げとならないように、または前記自動搬送車の走行が前記段取り替えの妨げとならないように、前記走行計画を作成する
     実装システム。
  3.  請求項1または2に記載の実装システムであって、
     前記制御部は、前記走行計画で定められた発車時刻になるまで前記所定箇所への走行を開始させず、前記発車時刻になると前記所定箇所への走行を開始するように前記自動搬送車を制御する
     実装システム。
  4.  請求項3に記載の実装システムであって、
     前記制御部は、前記所定箇所における前記部材の状況を取得可能であり、前記発車時刻になっても前記所定箇所における前記部材の状況に関する所定条件が成立しない場合には、前記所定箇所への走行の開始を遅らせるように前記自動搬送車を制御する
     実装システム。
  5.  請求項4に記載の実装システムであって、
     前記制御部は、前記所定条件が成立しない場合でも前記発車時刻からの遅れが所定時間を超えると前記所定箇所への走行を開始するように前記自動搬送車を制御する
     実装システム。
  6.  請求項1ないし5のいずれか1項に記載の実装システムであって、
     前記制御部は、前記複数の実装ラインにおける生産の状況を取得可能であり、前記生産の状況が前記生産計画より早くなっている場合に前記走行計画で定められた発車時刻よりも前記自動搬送車の走行開始を早くする制御と、前記生産の状況が前記生産計画より遅れている場合に前記発車時刻よりも前記自動搬送車の走行開始を遅らせる制御とのうち少なくとも一方を行う
     実装システム。
PCT/JP2021/003739 2021-02-02 2021-02-02 実装システム WO2022168166A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US18/261,608 US20240074132A1 (en) 2021-02-02 2021-02-02 Mounting system
CN202180083770.5A CN116671271A (zh) 2021-02-02 2021-02-02 安装系统
JP2022579186A JPWO2022168166A1 (ja) 2021-02-02 2021-02-02
EP21924563.6A EP4290996A4 (en) 2021-02-02 2021-02-02 MOUNTING SYSTEM
PCT/JP2021/003739 WO2022168166A1 (ja) 2021-02-02 2021-02-02 実装システム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2021/003739 WO2022168166A1 (ja) 2021-02-02 2021-02-02 実装システム

Publications (1)

Publication Number Publication Date
WO2022168166A1 true WO2022168166A1 (ja) 2022-08-11

Family

ID=82741152

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/003739 WO2022168166A1 (ja) 2021-02-02 2021-02-02 実装システム

Country Status (5)

Country Link
US (1) US20240074132A1 (ja)
EP (1) EP4290996A4 (ja)
JP (1) JPWO2022168166A1 (ja)
CN (1) CN116671271A (ja)
WO (1) WO2022168166A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017208287A1 (ja) * 2016-06-01 2017-12-07 パナソニックIpマネジメント株式会社 部品実装システム
WO2018008148A1 (ja) * 2016-07-08 2018-01-11 富士機械製造株式会社 部品実装システムおよび管理装置
JP2019091770A (ja) 2017-11-13 2019-06-13 Juki株式会社 部品搬送装置
WO2019187033A1 (ja) * 2018-03-30 2019-10-03 ヤマハ発動機株式会社 作業管理システム及び部品実装システム
WO2020039495A1 (ja) * 2018-08-21 2020-02-27 株式会社Fuji 部品実装システム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11778800B2 (en) * 2019-02-15 2023-10-03 Fuji Corporation Article management apparatus and article management method
JP7475490B2 (ja) * 2020-11-20 2024-04-26 株式会社Fuji 実装関連システム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017208287A1 (ja) * 2016-06-01 2017-12-07 パナソニックIpマネジメント株式会社 部品実装システム
WO2018008148A1 (ja) * 2016-07-08 2018-01-11 富士機械製造株式会社 部品実装システムおよび管理装置
JP2019091770A (ja) 2017-11-13 2019-06-13 Juki株式会社 部品搬送装置
WO2019187033A1 (ja) * 2018-03-30 2019-10-03 ヤマハ発動機株式会社 作業管理システム及び部品実装システム
WO2020039495A1 (ja) * 2018-08-21 2020-02-27 株式会社Fuji 部品実装システム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4290996A4

Also Published As

Publication number Publication date
US20240074132A1 (en) 2024-02-29
CN116671271A (zh) 2023-08-29
EP4290996A4 (en) 2024-03-27
EP4290996A1 (en) 2023-12-13
JPWO2022168166A1 (ja) 2022-08-11

Similar Documents

Publication Publication Date Title
JP7093414B2 (ja) 部品実装システム
JPWO2017033268A1 (ja) 部品実装ライン
JPWO2018008148A1 (ja) 部品実装システムおよび管理装置
CN109557877B (zh) 材料补给辅助装置及材料补给辅助方法
JP6817005B2 (ja) 部品供給システム、自律走行台車および部品供給方法
CN113519207B (zh) 管理装置、移动型作业装置、安装系统以及管理方法
JP7436609B2 (ja) 部品実装ラインおよび部品供給方法
JP2019061312A (ja) 材料補給支援装置および材料補給支援方法
JP2018190944A (ja) 部品実装システム
WO2020039543A1 (ja) 実装システム、移動型作業装置及び移動作業管理方法
JP7108830B2 (ja) 準備計画作成方法および準備計画作成装置
JP7475490B2 (ja) 実装関連システム
WO2022168166A1 (ja) 実装システム
JP2018201021A (ja) 部品実装システム
WO2021234942A1 (ja) 生産管理装置
JP7437660B2 (ja) 統合ナビゲーションシステムおよび作業指示方法
JP7220238B2 (ja) 管理装置、移動型作業装置、実装装置、実装システム及び管理方法
WO2022168165A1 (ja) 実装システム
WO2022168164A1 (ja) 実装システム
WO2019058416A1 (ja) 部品実装システム
WO2021191968A1 (ja) 管理装置、実装システム及び管理方法
JP7481478B2 (ja) 作業システム
JP2020014019A (ja) 部品実装ライン
JP2020014021A (ja) ユニット保管庫および部品実装ライン
WO2020039541A1 (ja) 移動作業管理装置、実装システム及び移動作業管理方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21924563

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 202180083770.5

Country of ref document: CN

ENP Entry into the national phase

Ref document number: 2022579186

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 18261608

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2021924563

Country of ref document: EP

Effective date: 20230904