WO2022135351A1 PCT/CN2021/139787 CN2021139787W WO2022135351A1 WO 2022135351 A1 WO2022135351 A1 WO 2022135351A1 CN 2021139787 W CN2021139787 W CN 2021139787W WO 2022135351 A1 WO2022135351 A1 WO 2022135351A1
Authority
WO
WIPO (PCT)
Prior art keywords
water supply
supply pump
voltage
water
quality
Prior art date
Application number
PCT/CN2021/139787
Other languages
English (en)
Chinese (zh)
Inventor
大谷贵史
青木均史
Original Assignee
海尔智家股份有限公司
青岛海尔电冰箱有限公司
Aqua 株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 海尔智家股份有限公司, 青岛海尔电冰箱有限公司, Aqua 株式会社 filed Critical 海尔智家股份有限公司
Priority to CN202180086471.7A priority Critical patent/CN116670394A/zh
Publication of WO2022135351A1 publication Critical patent/WO2022135351A1/fr

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D15/00Control, e.g. regulation, of pumps, pumping installations or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C1/00Producing ice
    • F25C1/22Construction of moulds; Filling devices for moulds
    • F25C1/25Filling devices for moulds
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Definitions

  • the invention relates to a method for inspecting a water supply water pump, in particular to a method for inspecting a water supply water pump for inspecting the water supply water pump provided in an ice maker of a refrigerator.
  • a refrigerator including an automatic ice maker there is a refrigerator including an automatic ice maker.
  • a water supply tank and a water supply pump are arranged in the refrigerating compartment, and an ice making tray is arranged in the freezing compartment.
  • the automatic ice maker makes ice
  • the water stored in the water supply tank is delivered to the ice making tray by the suction force of the water supply pump, and the water is frozen in the ice making tray, thereby making ice.
  • Patent Document 1 Japanese Patent Laid-Open No. 2003-014349.
  • the operation of various components included in the refrigerator is confirmed after the assembly process of the refrigerator is completed.
  • the operation of the automatic ice maker was also confirmed. Specifically, the operation of the automatic ice maker is confirmed by storing water in the water supply tank, operating the water supply pump, and confirming the flow rate of the water sent by the water supply pump.
  • the present invention has been made in view of the above-mentioned circumstances, and an object of the present invention is to provide an inspection method capable of determining the quality of an ice maker without confirming the amount of water discharged.
  • the inspection method of the water supply pump of the present invention is used for inspecting the water supply pump, which is arranged in the ice maker inside the refrigerator and is used to transport water from the water supply tank to the ice making tray, and is characterized in that, the inspection method includes: controlling the operation of the water supply water pump; and judging the quality of the water supply water pump based on the voltage of the water supply water pump during operation.
  • controlling the operation of the water supply pump includes controlling the water supply pump to operate in a forward rotation direction and a reverse rotation direction, and “acting based on the operation of the water supply pump” is characterized in that Judging whether the water supply pump is good or bad by using the voltage at the time of good or bad.
  • controlling the operation of the water supply pump includes a state in which there is water in the water supply tank and a state in which there is no water in the water supply tank Then, make the water supply pump run in the forward rotation direction and the reverse rotation direction; “judging the quality of the water supply pump based on the voltage of the water supply pump when it is working” includes: the state of water in the water supply tank and in the state where there is no water in the water supply tank, the water supply pump is determined based on the voltage when the water supply pump is operated in the forward rotation direction and the voltage when the water supply pump is operated in the reverse rotation direction good or bad.
  • determining the quality of the water supply pump based on the voltage when the water supply pump is operating includes: The voltage value is used to judge the quality of the water supply pump.
  • the inspection method of the water supply pump of the present invention is used to inspect the water supply pump, the water supply pump is arranged in the ice maker inside the refrigerator to transport water from the water supply tank to the ice making tray, and is characterized in that, the inspection method includes: controlling a The water supply pump is operated; and the quality of the water supply pump is judged based on the voltage of the water supply pump when it is working. Therefore, according to the inspection method of the water supply pump of the present invention, the quality of the water supply pump is determined based on the voltage at the time of operation of the water supply pump, so that it is not necessary to measure the discharge volume of the pump, so even without checking the water discharge volume, it is possible to determine the quality of the ice machine. Bad.
  • controlling the operation of the water supply pump includes operating the water supply pump in a forward rotation direction and a reverse rotation direction, and “operating the water supply pump based on the Judging whether the water supply pump is good or bad by using the voltage at the time of good or bad. Therefore, according to the inspection method of the water supply pump of the present invention, the quality of the water supply pump can be determined more accurately by determining whether the water supply pump is good or bad based on the voltage when the water supply pump is operated in the forward rotation direction and the reverse rotation direction.
  • controlling the operation of the water supply pump includes when there is water in the water supply tank and when there is no water in the water supply tank Then, make the water supply pump work in the forward rotation direction and the reverse rotation direction
  • "judging the quality of the water supply pump based on the voltage of the water supply pump when it is working” includes: the situation that there is water in the water supply tank down, and in the case where there is no water in the water supply tank, based on the voltage when the water supply pump is operating in the forward direction and the voltage when the water supply pump is operating in the reverse direction, determine the supply The quality of the pump.
  • the inspection method of the water supply pump of the present invention when there is water in the water supply tank and when there is no water in the water supply tank, the quality is judged based on the voltage of the water supply pump, thereby in addition to the operation confirmation of the water supply tank, the inspection of the conversion circuit can also be performed.
  • "judging whether the water supply pump is good or bad based on the voltage when the water supply pump is operating" includes: based on the detection by the inverter circuit in the refrigerator. The voltage value, judge the quality of the water supply pump. Therefore, according to the inspection method of the water supply pump of the present invention, by using the inverter circuit in the refrigerator, the inspection can be easily performed using an externally prepared inspection device.
  • FIG. 1 is a side cross-sectional view showing a refrigerator according to an embodiment of the present invention.
  • Fig. 2 is a view showing the refrigerator according to the embodiment of the present invention, and is a perspective view showing the ice maker.
  • FIG. 3 is a diagram showing a refrigerator according to an embodiment of the present invention, and is a connection diagram showing a connection structure when the ice maker is tested.
  • FIG. 4 is a diagram showing the refrigerator according to the embodiment of the present invention, and is a circuit diagram showing a conversion circuit that converts the current from the water supply pump into a voltage.
  • FIG. 5 is a diagram showing the refrigerator according to the embodiment of the present invention, and is a flowchart showing a method of inspecting a water supply pump.
  • 6(A) is a graph showing a change in voltage when the water supply water pump is an acceptable product in the refrigerator according to the embodiment of the present invention and there is water in the water supply tank;
  • Fig. 6(B) is a graph showing a change in voltage when the water supply water pump is an acceptable product and there is no water in the water supply tank in the refrigerator according to the embodiment of the present invention.
  • Fig. 7(A) is a graph showing a case where a defective product occurs in a water supply pump and a lead wire is disconnected in the refrigerator according to the embodiment of the present invention
  • FIG. 7(B) is a graph showing the case where other lead wires are disconnected
  • FIG. 7(C) is a graph showing the case where the leads are connected in opposite directions.
  • the refrigerator 10 which concerns on embodiment of this invention is demonstrated in detail based on drawing.
  • the same number is used for the same member, and the overlapping description is omitted.
  • it demonstrates using each direction of up-down, front-back, and left-right, and right and left are the right and left when the refrigerator 10 is seen from the front.
  • FIG. 1 is a side sectional view showing the refrigerator 10 .
  • the thermal insulation box 11 is composed of an outer box 12, an inner box 13, and a thermal insulation material 14, and the thermal insulation box 11 constitutes the main body of the refrigerator 10.
  • the outer box 12 is composed of a steel plate bent into a predetermined shape, so
  • the inner box 13 is disposed inside the outer box 12 and separated from the outer box 12
  • the inner box 13 is made of a synthetic resin board
  • the heat insulating material 14 is filled between the outer box 12 and the inner box 13 .
  • the refrigerator compartment 18 and the freezer compartment 19 are separated by an insulating partition wall 23 having an insulating structure.
  • a cooling compartment 15 is divided and formed. Inside the cooling chamber 15, an evaporator 16 serving as a cooler is provided. Moreover, in the rear of the lower end side of the refrigerator 10, the machine room 20 is partitioned and formed, and the compressor 22 is arrange
  • the cool air blown from the blower 24 is blown to the refrigerator compartment 18 and the freezer compartment 19 via an air duct not shown.
  • the cool air which cooled the refrigerator compartment 18 and the freezer compartment 19 is returned to the cooling compartment 15 via the return air path which is not shown in figure.
  • a defrosting heater 17 is provided inside the cooling chamber 15 and below the evaporator 16. With the operation of the refrigerant compression refrigeration cycle, thick frost is generated on the surface of the evaporator 16 . In this way, the control unit (not shown) stops the compressor 22, closes the cooling chamber 15, and energizes and heats the defrost heater 17, thereby performing the defrosting operation by melting the frost.
  • the ice maker 25 is a device built in the refrigerator 10 and realizing an automatic ice making function.
  • the ice maker 25 has a water supply tank 26 , a water supply pump 28 and an ice making tray 27 .
  • the water supply tank 26 is a tank made of a synthetic resin plate that is arranged in the lower part of the refrigerator compartment 18 and stores water for ice making. The user replenishes water (tap water or the like) to the water supply tank 26 .
  • the water supply pump 28 is arranged near the water supply tank 26 in the refrigerator compartment 18 , and supplies water from the water supply tank 26 to the ice tray 27 .
  • the ice making tray 27 is arranged in the upper part of the freezing compartment 19 and is a member for freezing water to make ice.
  • the water supply tank 26 and the water supply pump 28 are connected via a delivery pipe 32 . Further, the water supply pump 28 and the ice making tray 27 are connected via the delivery pipe 31 .
  • the user replenishes the water supply tank 26 with water.
  • the water supply pump 28 transfers the water in the water supply tank 26 to the ice tray 27 based on the instruction of the control unit (not shown here).
  • the water in the water supply tank 26 is supplied to the ice tray 27 via the delivery pipe 32 , the water supply pump 28 , and the delivery pipe 31 .
  • a de-icing process of releasing ice from the ice making tray 27 is performed.
  • ice is stored in an ice storage container (not shown here).
  • FIG. 2 is a perspective view partially showing the ice maker 25 .
  • the water supply tank 26 has a substantially rectangular parallelepiped shape, and can store water therein.
  • a water supply pump 28 is arranged, and the water supply tank 26 and the water supply pump 28 are connected via a transfer pipe 32 . Furthermore, the delivery pipe 31 extends downward from the water supply pump 28 .
  • FIG. 3 is a connection diagram showing a connection structure when a test of the ice maker 25 is performed.
  • a water supply pump 28 and a conversion circuit 29 are built in the refrigerator 10 .
  • the water supply pump 28 has a function of conveying water from the water supply tank 26 to the ice making tray 27 using the driving force of the motor.
  • the conversion circuit 29 is a circuit that converts the current supplied to the water supply pump 28 into a voltage when checking the quality of the water supply water pump 28 , and is incorporated in a control board that controls the cooling operation of the refrigerator 10 .
  • the inspection machine 30 is an external device connected to the refrigerator 10 in the step of inspecting the quality of the refrigerator 10, and is, for example, a small computer in which a predetermined program is incorporated.
  • the conversion circuit 29 is connected to the inspection machine 30 .
  • the conversion circuit 29 and the inspection machine 30 may be connected by a cable or wirelessly.
  • FIG. 4 is a circuit diagram showing an example of the conversion circuit 29 that converts the current from the water supply pump 28 into a voltage.
  • the conversion circuit 29 can convert the current input from the water supply pump 28 into a voltage.
  • One side terminal of the feed pump 28 is connected to the non-inverting input terminal of the operational amplifier 55 via the path 33 . Furthermore, the inverting input terminal of the operational amplifier 55 is grounded via the path 35 , and the resistor 50 is inserted into the path 35 .
  • the connection point 61 of the path 33 and the connection point 60 of the path 35 are connected via the path 34 , and the resistor 51 is inserted into the path 34 .
  • the connection point 63 of the path 35 is connected to the inspection machine 30 via the path 36 . Resistor 52 and resistor 53 are inserted into path 36 .
  • Operational amplifier 55 is connected to the power supply via path 37 and grounded via path 38 . Furthermore, the connection point 64 of the path 37 and the connection point 62 of the path 38 are connected via the path 39 . Capacitor 56 is inserted into path 39 .
  • the output terminal of operational amplifier 55 is connected via path 40 to connection point 65 of path 36 .
  • One end side terminals of the resistor 54 , the capacitor 57 , the capacitor 58 , and the diode 59 are connected to the path 36 , and the other end side terminals are commonly grounded.
  • the resistor 54 , the capacitor 57 , the capacitor 58 , and the diode 59 are elements that stabilize the voltage of the output to the inspection machine 30 .
  • FIG. 5 is a flowchart showing a method of inspecting the water supply pump 28 .
  • the inspection of various components such as a refrigeration cycle, is performed after an assembly process is complete
  • the inspection procedure of the water supply pump 28 is one such inspection.
  • step S10 after the assembling process of the refrigerator 10 is completed, the operator connects the inverter circuit 29 to the inspection machine 30 in order to determine the quality of the water supply pump 28 .
  • the terminals of the inspection machine 30 are connected to the conversion circuit 29 which is a part of the control board of the refrigerator 10 .
  • step S11 the operator fills the water supply tank 26 with water.
  • step S12 based on the instruction
  • step S13 based on the instruction of the control device of the inspection machine 30, the voltage output from the conversion circuit 29 is measured and recorded when the water supply pump 28 is rotated forward and reversely in step S12.
  • the control device is, for example, a control panel included in the refrigerator 10 or a microcomputer included in the inspection machine 30 .
  • the operating current of the water supply pump 28 is detected as a voltage by the conversion circuit 29, and the quality of the water supply pump 28 is determined based on the voltage value.
  • step S14 water is drawn from the water supply tank 26 .
  • the water supply pump 28 is operated until the water stored in the water supply tank 26 is discharged.
  • step S15 based on the instruction
  • step S16 based on the instruction of the control device of the inspection machine 30, the voltage output from the conversion circuit 29 is measured and recorded when the feed pump 28 is rotated forward and reversely in step S15.
  • step S17 according to the instruction of the control device of the inspection machine 30, based on the change of the voltage value recorded in the said step S13 and step S16, it is judged whether the water supply pump 28 is good or bad. In addition, after the completion of step S17, the operator may be notified of the quality judgment using notification means such as a display or a speaker.
  • connection terminals of the inspection machine 30 are removed from the conversion circuit 29 .
  • the water supply pump 28 is an acceptable product, the results of other test items are also considered, and the manufacturing process of the refrigerator 10 is completed. On the other hand, if the water supply pump 28 is a defective product, the water supply pump 28 is replaced. Alternatively, if the connection of the water supply pump 28 to the lead wire is not appropriate, the connection of the lead wire is corrected.
  • FIGS. 6(A) and 6(B) show the above-mentioned water supply pump 28 and its connection in a normal state
  • FIG. 6(A) is a graph showing a change in voltage when there is water in the water supply tank 26
  • B) is a graph showing the change in voltage when there is no water in the water supply tank 26 .
  • the horizontal axis shows time
  • the vertical axis shows the voltage applied to the inspection machine 30 .
  • the water supply pump 28 when there is water in the water supply tank 26, the water supply pump 28 is reversely rotated in the period T11, the water supply pump 28 is rotated forward in the period T12, and the water supply pump 28 is reversed in the period T13 .
  • the period other than that is a non-operation period in which the water supply pump 28 does not operate.
  • the operation of the water supply pump 28 when there is water in the water supply tank 26 can be confirmed, and the water supply amount of the water supply pump 28 can be confirmed.
  • it when there is water in the water supply tank 26, by confirming the operation of the water supply pump 28, it can be checked whether the forward rotation and the reverse rotation of the water supply pump 28 are properly switched.
  • the voltage is higher than the non-operation period.
  • the voltage in the period T11 and the voltage in the period T12 it is possible to determine whether the water supply pump 28 is good or bad.
  • the water supply pump 28 flows a current of 0.05A to 0.16A under no load, and flows a current of 0.2A to 0.5A under a rated load.
  • the output voltage of the conversion circuit 29 is 6.4 times the current flowing in the water supply pump 28 . Therefore, when there is no load, the output voltage of the conversion circuit 29 is 0.32V to 1.02V, and when the load is rated, the output voltage of the conversion circuit 29 is 1.28V to 3.2V.
  • the inspection machine 30 determines the quality of the water supply pump 28 based on the voltage value.
  • the water supply pump 28 can be determined to be an acceptable product. That is, the feed water pump 28 is not faulty and the wiring to the feed water pump 28 is correct. In addition, it can be confirmed that the signal for switching the forward rotation and the reverse rotation of the water supply pump 28 is correctly output.
  • the water supply pump 28 when the peak voltage during T12 (when the water supply pump 28 is at the rated load) is equal to or higher than a predetermined threshold voltage (eg, 1.2 V), the water supply pump 28 can be determined to be an acceptable product.
  • a predetermined threshold voltage eg, 1.2 V
  • the water supply pump 28 is an acceptable product. For example, referring to FIG. 6(A) , if the voltage in the period T11 is higher than the voltage between the period T11 and the period T12, it can be determined that the water supply pump 28 is an acceptable product.
  • any one of the above-mentioned determinations may be used, or two or more of them may be used.
  • the water supply pump 28 when there is no water in the water supply tank 26, the water supply pump 28 is reversely rotated during the period T21, the forward rotation of the water supply pump 28 is caused during the period T22, and the water supply pump is caused to rotate during the period T23. 28 reverse. In this way, the operation of the water supply pump 28 when there is no water in the water supply tank 26 can be confirmed.
  • the peak voltage during T22 when the water supply pump 28 becomes no-load is less than a predetermined threshold voltage (eg, 1.2 V), it can be determined that the water supply pump 28 is an acceptable product. Furthermore, by performing the inspection in a state where the water supply pump 28 is empty, it is possible to check whether or not there is no water in the water supply tank 26 when the refrigerator 10 is shipped from the factory. At the same time, the function of the conversion circuit 29 can also be checked.
  • a predetermined threshold voltage eg, 1.2 V
  • Fig. 7(A) is a graph showing a case where a lead wire is disconnected
  • Fig. 7(B) is a graph showing a case where another lead wire is disconnected
  • Fig. 7(C) is a graph showing a case where the wires are connected in reverse.
  • a control signal is inputted from the control device to the water supply pump 28 for forward rotation and reverse rotation of the water supply pump 28 run.
  • the water supply pump 28 does not operate, and no change is seen in the voltage value.
  • the reason for this is disconnection of the lead wire connected to the water supply pump 28 for supplying electric power, or damage to the control board or circuit elements in which the above-described conversion circuit 29 is incorporated.
  • the water supply pump 28 does not operate, and no change is seen in the voltage value.
  • the reason for this is that the lead wires are connected oppositely with respect to the water supply pump 28 .
  • the quality of the water supply pump 28 is determined based on the voltage at the time of operation of the water supply pump 28, it is not necessary to measure the discharge amount of the pump, and thus the quality of the pump can be easily determined.
  • the inspection of the water supply pump 28 can be performed, and the connection of the water supply pump 28 can also be accurately determined. good or bad condition.
  • the quality of the water supply pump 28 can be determined based on the voltage of the water supply pump 28.
  • the inspection of the conversion circuit 29 can also be performed at the same time.
  • the inspection can be easily performed using an externally prepared inspection device.
  • the reverse rotation operation, the forward rotation operation, and the reverse rotation operation of the water supply pump 28 can be performed based on an instruction from the control unit.
  • the first reverse operation the accumulated water existing at the front end of the conveying pipe 31 was sucked up.
  • water is supplied from the water supply tank 26 to the ice tray 27 by the forward rotation operation.
  • the siphon phenomenon does not occur.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Thermal Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Production, Working, Storing, Or Distribution Of Ice (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

L'invention concerne un procédé d'inspection de pompe d'alimentation en eau. La pompe d'alimentation en eau (28) est disposée dans une machine à glaçons (25) à l'intérieur d'un réfrigérateur (10) pour transporter de l'eau depuis un réservoir d'alimentation en eau (26) vers un disque de fabrication de glaçons (27). Le procédé d'inspection comprend les étapes suivantes : commande de la pompe d'alimentation en eau (28) pour fonctionner ; et détermination de la qualité de la pompe d'alimentation en eau (28) sur la base d'une tension à laquelle fonctionne la pompe d'alimentation en eau (28). La qualité de la pompe d'alimentation en eau (28) est déterminée sur la base de la tension à laquelle fonctionne la pompe d'alimentation en eau (28) sans mesurer une quantité de décharge d'eau de la pompe d'alimentation en eau (28). Par conséquent, la qualité d'une pompe peut être déterminée de manière simple et efficace.
PCT/CN2021/139787 2020-12-25 2021-12-20 Procédé d'inspection de pompe d'alimentation en eau WO2022135351A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202180086471.7A CN116670394A (zh) 2020-12-25 2021-12-20 供水泵的检查方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020-216016 2020-12-25
JP2020216016A JP2022101755A (ja) 2020-12-25 2020-12-25 給水ポンプの検査方法

Publications (1)

Publication Number Publication Date
WO2022135351A1 true WO2022135351A1 (fr) 2022-06-30

Family

ID=82157374

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/139787 WO2022135351A1 (fr) 2020-12-25 2021-12-20 Procédé d'inspection de pompe d'alimentation en eau

Country Status (3)

Country Link
JP (1) JP2022101755A (fr)
CN (1) CN116670394A (fr)
WO (1) WO2022135351A1 (fr)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1157882A (zh) * 1995-12-21 1997-08-27 Lg电子株式会社 用于驱动冰箱分配器的水泵电动机的方法和装置
JP2012082688A (ja) * 2010-10-06 2012-04-26 Panasonic Corp 電動ポンプの駆動制御装置
US20150219104A1 (en) * 2014-02-06 2015-08-06 Hyundai Motor Company Method of determining circulation state of cooling water
CN204636250U (zh) * 2015-03-23 2015-09-16 佛山市顺德区美的洗涤电器制造有限公司 一种洗碗机及其排水泵运转状态检测装置
CN208431175U (zh) * 2018-06-22 2019-01-25 浙江源控节能科技有限公司 水泵安全检测电路
CN110165964A (zh) * 2019-06-10 2019-08-23 爱科赛智能科技(台州)有限公司 一种交流潜水泵的智能控制方法及其控制装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1157882A (zh) * 1995-12-21 1997-08-27 Lg电子株式会社 用于驱动冰箱分配器的水泵电动机的方法和装置
JP2012082688A (ja) * 2010-10-06 2012-04-26 Panasonic Corp 電動ポンプの駆動制御装置
US20150219104A1 (en) * 2014-02-06 2015-08-06 Hyundai Motor Company Method of determining circulation state of cooling water
CN204636250U (zh) * 2015-03-23 2015-09-16 佛山市顺德区美的洗涤电器制造有限公司 一种洗碗机及其排水泵运转状态检测装置
CN208431175U (zh) * 2018-06-22 2019-01-25 浙江源控节能科技有限公司 水泵安全检测电路
CN110165964A (zh) * 2019-06-10 2019-08-23 爱科赛智能科技(台州)有限公司 一种交流潜水泵的智能控制方法及其控制装置

Also Published As

Publication number Publication date
CN116670394A (zh) 2023-08-29
JP2022101755A (ja) 2022-07-07

Similar Documents

Publication Publication Date Title
KR101832962B1 (ko) 냉장고 진단방법 및 그를 이용한 냉장고
KR100437388B1 (ko) 냉장고용 제빙기 및 검사방법
CN107923689B (zh) 超低温冰箱
US20210010738A1 (en) Refrigerator and method for controlling same
US8215119B2 (en) Refrigerant filling apparatus of refrigerating and air conditioning apparatus and refrigerant filling method of refrigerating and air conditioning apparatus
JP4474455B2 (ja) 冷凍空調装置への冷媒充填装置及び冷凍空調装置への冷媒充填方法
US20090007575A1 (en) Cooling apparatus
KR930004399B1 (ko) 냉장고의 제상회로
CN111503994B (zh) 风冷冰箱的控制方法及风冷冰箱
JP2013050294A (ja) 輸送用冷凍装置
WO2022135351A1 (fr) Procédé d'inspection de pompe d'alimentation en eau
CN109906348B (zh) 冰箱及其控制方法
JP2007017075A (ja) 冷凍装置およびその運転方法
WO2020119576A1 (fr) Réfrigérateur et procédé de commande de réfrigérateur
US8353171B2 (en) Refrigerating appliance comprising an ice-making machine
JP4434260B2 (ja) 冷凍空調装置への冷媒充填方法、冷凍空調装置への冷媒充填装置
JP2019199837A (ja) 圧縮機検査装置
KR100389417B1 (ko) 자동제빙기의 제어장치
KR20060003397A (ko) 자동 제빙기의 급수 제어장치 및 급수 제어방법
JP2010025545A (ja) 冷凍空調装置への冷媒充填方法、冷凍空調装置への冷媒充填装置
KR100208350B1 (ko) 냉장고 및 그 제어방법
KR20050114467A (ko) 압축기 검사 장치
JP2003336945A (ja) セル型製氷機
US20220260296A1 (en) Ice maker, refrigerator and control method of the same
JP2557738B2 (ja) 低温庫

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21909347

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 202180086471.7

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21909347

Country of ref document: EP

Kind code of ref document: A1