WO2022116612A1 - 一种整体式双t梁浇筑模具拆装装置及拆装方法 - Google Patents
一种整体式双t梁浇筑模具拆装装置及拆装方法 Download PDFInfo
- Publication number
- WO2022116612A1 WO2022116612A1 PCT/CN2021/116149 CN2021116149W WO2022116612A1 WO 2022116612 A1 WO2022116612 A1 WO 2022116612A1 CN 2021116149 W CN2021116149 W CN 2021116149W WO 2022116612 A1 WO2022116612 A1 WO 2022116612A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- mold
- power
- traverse trolley
- disassembly
- traverse
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 11
- 230000007246 mechanism Effects 0.000 claims abstract description 22
- 238000005266 casting Methods 0.000 claims description 24
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 238000009434 installation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/26—Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other
- B28B7/266—Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other for making oblong objects, e.g. girders
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B13/00—Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
- B28B13/04—Discharging the shaped articles
- B28B13/06—Removing the shaped articles from moulds
Definitions
- the invention belongs to the field of making prefabricated components, and in particular relates to an integral double-T beam casting mold disassembly device and a disassembly method.
- the present invention provides an integral double-T beam casting mold disassembly and assembly device, which can save the cost of the traditional double-T beam casting mold and greatly improve the safety factor during demoulding. .
- the present invention also provides a method for disassembling and assembling an integral double-T beam casting mold.
- the present invention adopts the following technical solutions:
- a first aspect of the present invention provides an integral double-T beam casting mold disassembly and assembly device, including a top mold disassembly mechanism and a side mold disassembly mechanism,
- the top mold disassembly and assembly mechanism includes a bracket, a guide rail, a guide wheel, a power slider, a power slide rail, a power pulley block and a longitudinal pull rod. Installed on both ends of the bracket, perpendicular to the direction of the beam length, the top of the power slider is welded to the top mold, and a sliding groove is formed through the power slider, and the sliding groove runs along the length of the beam. The direction is inclined, and the guide wheels are installed on both sides of the power slider, and the guide wheels are installed in cooperation with the guide rails.
- the power slide rail is parallel to the length of the beam
- the power pulley set includes a first power pulley and a second power pulley integrally mounted on the link plate, and the first power pulley cooperates with the power slide rail installation, the second power pulley is installed in cooperation with the sliding groove, the longitudinal pull rod is connected to the linkage plate,
- the side mold disassembly and assembly mechanism includes a first track, a second track, a first traverse trolley, and a second traverse trolley.
- the first track and the second track are connected to the ground through embedded parts to form a whole.
- the first track and the second track are arranged in parallel, the first track and the second track are perpendicular to the direction of the beam length, the first traverse trolley is installed on the first track, and the second traverse
- the trolley is installed on the second track, the first traverse trolley is connected to the left outer mold and the right inner mold, and the second traverse trolley is connected to the right outer mold and the left inner mold.
- the first traverse trolley and the left outer mold are connected by an outer mold diagonal brace, and the second traverse trolley and the right outer mold are connected.
- the first traverse trolley is connected to the left outer die and the right inner die through a jack
- the second traverse trolley is connected to the right outer die and the left inner die through a jack
- the bracket is welded with the ground beam, and the elevation of the upper surface of the bracket is consistent.
- the longitudinal tie rod is a pair of tie rods.
- the length of the guide rail is greater than the height difference between the two ends of the sliding groove.
- the power pulley set includes two first power pulleys, and the two first power pulleys are fitted in the power slide rail.
- three guide wheels are arranged up and down on each side of the power slider.
- a second aspect of the present invention provides a method for disassembling and assembling an integral double-T beam casting mould, using the above-mentioned integral double-T beam casting mould disassembling and assembling device, comprising the following steps:
- Step 1 Arrange several top mold disassembly and assembly mechanisms along the beam length, weld the bracket to the ground beam, connect the first track and the second track to the ground through embedded parts to form a whole, and connect the first traverse trolley to the left outer The mold and the right inner mold are connected, and the second traverse trolley is connected with the right outer mold and the left inner mold;
- Step 2 Initial mold clamping state; the second power pulley is located at the bottom end of the sliding groove, the top mold is located at the top end, the first traverse trolley and the second traverse trolley are in the initial position, and the top mold is clamped with the left inner mold and the right inner mold. Closed, in the closed state;
- Step 3 Demoulding; pull the two ends of the longitudinal tie rod with a lever block respectively, manually control the lever block to be in a tensioned state, and continue to tighten the lever block at one end so that the second power pulley slides to the other end of the sliding groove, and the other One end of the lever hoist is slowly released, the second power pulley moves to the uppermost end of the sliding groove, and the top die is located at the lowermost end.
- the trolley moves, the first traverse trolley moves to the designated position for fixing, the right power unit is activated to pull the second traverse trolley, the right outer mold and the left inner mold move with the second traverse trolley, and the second traverse trolley moves to The specified position is fixed, and the mold is in the demolding state;
- Step 4 Clamp the mold; start the left power unit to push the first traverse trolley, the first traverse trolley drives the left outer mold and the right inner mold to move back to the initial position for fixing, and start the right power unit to push the second traverse trolley , the second traverse trolley drives the right outer mold and the left inner mold to move back to the initial positions for fixing, and the lever hoist is used in the opposite direction to drive the second power pulley to slide to the lowermost end of the sliding groove, and the top mold is connected to the left inner mold and the right inner mold. The inner mold is engaged and is in the mold clamping state.
- the top mold disassembly and assembly mechanisms are arranged at equal intervals.
- the beneficial effects of the present invention are as follows: the present invention improves the process of the original box girder inner mold, the original box girder inner mold needs to manually enter the inner mold cavity for disassembly, the internal structure is complex, and the safety hazard is extremely high.
- the original box girder outer formwork is installed by lifting equipment, which has low installation accuracy and high safety hazard.
- the present invention can simply realize the process of disassembling and assembling the mold with the help of external force, greatly shortening the installation time of the top mold and the side mold, and improving the work efficiency.
- the device of the invention is easy to disassemble and assemble, has strong flexibility, simple operation and high practicability.
- FIG. 1 is a schematic structural diagram of the top mold disassembly and assembly mechanism in the integral double T beam casting mold disassembly and assembly device of the present invention.
- FIG. 2 is a schematic structural diagram of an integral double-T beam casting mold disassembly and assembly device according to the present invention.
- bracket 1 guide rail 2, power slide rail 3, second power pulley 4, longitudinal pull rod 5, power slide block 6, guide wheel 7, top die 8, first power pulley 9, Sliding groove 10, first track 11, second track 12, first traverse trolley 13, second traverse trolley 14, outer die brace 15, left outer die 16, right outer die 17, left inner die 18, right Inner mold 19.
- this embodiment provides an integral double-T beam casting mold disassembly and assembly device, including a top mold disassembly mechanism and a side mold disassembly mechanism. It is used to disassemble and assemble the double T beam casting mold.
- the double T beam casting mold includes the left outer mold 16, the right outer mold 17, the left inner mold 18, the right inner mold 19 and the top mold 8.
- the mold 18 and the right inner mold 19 are close to each other, the left outer mold 16 and the right outer mold 17 are close to each other, and the top mold 8 moves upwards and engages with the left inner mold 18 and the right inner mold 19 to form a closed inner mold.
- demoulding the top mold 8 moves down, the two inner molds move closer to each other, and the two outer molds move away from each other to realize the demoulding process.
- the top mold disassembly mechanism includes a bracket 1 , a guide rail 2 , a guide wheel 7 , a power slider 6 , a power slide rail 3 , a power pulley block and a longitudinal pull rod 5 .
- the bracket 1 is used as a supporting carrier, which is welded to the ground beam and is arranged along the direction of the beam length, and the upper surface of the bracket 1 has the same elevation.
- the bracket 1 includes a top support surface and support legs, and diagonal braces are arranged between the top support surface and the support legs for reinforcement.
- the guide rails 2 are welded to both ends of the bracket 1 , one on each side of the two ends, four in total, and the guide rails 2 are arranged vertically.
- the top of the power slider 6 is welded with the top die 8.
- the two sides of the power slide block 6 are equipped with guide wheels. 7.
- Each side is provided with three guide wheels 7 arranged in parallel up and down, and the guide wheels 7 are installed in cooperation with the guide rail 2 .
- the power slider 6 is provided with a sliding groove 10 , the sliding groove 10 is inclined along the direction of the beam length, and the length of the guide rail 2 is greater than the height difference between the two ends of the sliding groove 10 .
- the power slide rails 3 are welded on the bracket 1 , and two power slide rails 3 are provided, which are respectively located directly under the power slide block 6 , and the power slide rails 3 are parallel to the direction of the beam length.
- the power pulley set includes a first power pulley 9 and a second power pulley 4 integrated on the linkage plate.
- the first power pulley 9 is arranged in two, the first power pulley 9 is installed in cooperation with the power slide rail 3, and the second power pulley
- the power pulley 4 is installed in cooperation with the sliding groove 10 .
- the longitudinal tie rod 5 is a pair of pull bolts, and the longitudinal tie rod 5 is connected to the linkage plate.
- the side mold disassembly and assembly mechanism includes a first track 11, a second track 12, a first traverse trolley 13, and a second traverse trolley 14.
- the first track 11 and the second track 12 are connected to the ground through embedded parts to form a whole.
- the track 11 and the second track 12 are arranged in parallel, the first track 11 and the second track 12 are perpendicular to the direction of the beam length, the first traverse trolley 13 is installed on the first track 11, and the second traverse trolley 14 is installed on the second On the track 12, the first traverse trolley 13 connects the left outer die 16 and the right inner die 19 through a jack, and the second traverse trolley 14 connects the right outer die 17 and the left inner die 18 through a jack.
- the first traverse trolley 13 and the left outer mold 16 and the second traverse trolley 14 and the right outer mold 17 are connected by the outer mold diagonal brace 15 .
- the present embodiment provides a method for disassembling and assembling an integral double-T beam casting mold, comprising the following steps:
- Step 1 Arrange a number of top mold disassembly and assembly mechanisms along the beam length direction, the top mold disassembly and assembly mechanisms are arranged at equal intervals, weld the bracket 1 to the ground beam, and connect the first rail 11 and the second rail 12 to the ground through embedded parts To form a whole, connect the first traverse trolley 13 with the left outer mold 16 and the right inner mold 19, and connect the second traverse trolley 14 with the right outer mold 17 and the left inner mold 18;
- Step 2 the initial clamping state; the second power pulley 4 is located at the lowermost end of the sliding groove 10, the top mold 8 is located at the uppermost end, the first traverse trolley 13, the second traverse trolley 14 are in the initial position, the top mold 8 and the left inner The mold 18 and the right inner mold 19 are engaged and are in the mold clamping state;
- Step 3 demoulding; respectively pull the two ends of the longitudinal tie rod 5 with a lever block, manually control the lever block to be in a tensioned state, and continue to tighten the lever block at one end to make the second power pulley 4 move to the other end of the sliding groove 10 Slide, slowly release the lever hoist at the other end, the second power pulley 4 moves to the uppermost end of the sliding groove 10, and the top die 8 is located at the lowermost end.
- the hand hoist can be replaced with other power mechanisms, such as hydraulic jacks;
- Step 4 Clamp the mold; start the left power unit to push the first traverse trolley 13, the first traverse trolley 13 drives the left outer mold 16 and the right inner mold 19 to move back to the initial position for fixing, and activate the right power unit to push the first traverse trolley 13.
- Two traverse trolleys 14, the second traverse trolley 14 drives the right outer mold 17 and the left inner mold 18 to move back to their original positions, install the outer mold diagonal braces 15 for fixing, and use the lever hoist in the opposite direction to drive the second power pulley 4
- the top mold 8 By sliding to the lowermost end of the sliding groove 10, the top mold 8 is engaged with the left inner mold 18 and the right inner mold 19, and is in a mold clamping state.
Landscapes
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Mounting, Exchange, And Manufacturing Of Dies (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (10)
- 一种整体式双T梁浇筑模具拆装装置,其特征在于,包括顶模拆装机构及侧模拆装机构,所述顶模拆装机构包括支架(1)、导向轨(2)、导向轮(7)、动力滑块(6)、动力滑轨(3)、动力滑轮组及纵向拉杆(5),所述支架(1)设置于地梁上,沿梁长的方向设置,所述导向轨(2)安装于所述支架(1)的两端,与梁长的方向垂直,所述动力滑块(6)的顶部焊接于顶模(8)上,所述动力滑块(6)上贯穿开设有滑动槽(10),所述滑动槽(10)沿着梁长的方向倾斜设置,所述动力滑块(6)的两侧轴安装有所述导向轮(7),所述导向轮(7)与所述导向轨(2)配合安装,所述动力滑轨(3)设置于支架(1)上且位于所述动力滑块(6)的正下方,所述动力滑轨(3)与梁长的方向平行,所述动力滑轮组包括集成安装在连动板上的第一动力滑轮(9)与第二动力滑轮(4),所述第一动力滑轮(9)与所述动力滑轨(3)配合安装,所述第二动力滑轮(4)与滑动槽(10)配合安装,所述纵向拉杆(5)连接所述连动板,所述侧模拆装机构包括第一轨道(11)、第二轨道(12)、第一横移小车(13)、第二横移小车(14),所述第一轨道(11)、所述第二轨道(12)通过埋件与地面连接形成整体,所述第一轨道(11)与所述第二轨道(12)平行设置,所述第一轨道(11)、所述第二轨道(12)与梁长的方向垂直,所述第一横移小车(13)安装于第一轨道(11)上,所述第二横移小车(14)安装于第二轨道(12)上,所述第一横移小车(13)连接左外模(16)与右内模(19),所述第二横移小车(14)连接右外模(17)与左内模(18)。
- 如权利要求1所述的一种整体式双T梁浇筑模具拆装装置,其特征在于,所述第一横移小车(13)与左外模(16)之间、所述第二横移小车(14)与右外模(17)之间通过外模斜撑(15)连接。
- 如权利要求1所述的一种整体式双T梁浇筑模具拆装装置,其特征在于,所述第一横移小车(13)与左外模(16)、右内模(19)通过千斤顶连接,所述第二横移小车(14)与右外模(17)、左内模(18)通过千斤顶连接。
- 如权利要求1所述的一种整体式双T梁浇筑模具拆装装置,其特征在于,所述支架(1)与地梁焊接,所述支架(1)的上表面标高一致。
- 如权利要求1所述的一种整体式双T梁浇筑模具拆装装置,其特征在于,所述纵向拉杆(5)为对拉螺杆。
- 如权利要求1所述的一种整体式双T梁浇筑模具拆装装置,其特征在于,所述导向轨(2)的长度大于所述滑动槽(10)两端的高度差。
- 如权利要求1所述的一种整体式双T梁浇筑模具拆装装置,其特征在于,所述动力滑轮组包括两个第一动力滑轮(9),两个所述第一动力滑轮(9)配合安装于所述动力滑轨(3)内。
- 如权利要求1所述的一种整体式双T梁浇筑模具拆装装置,其特征在于,所述动力滑块(6)的每侧上下并列设置有三个导向轮(7)。
- 一种整体式双T梁浇筑模具拆装方法,采用权利要求1-8任一项所述的整体式双T梁浇筑模具拆装装置,其特征在于,包括以下步骤:步骤一、沿梁长的方向布置若干个顶模拆装机构,将支架(1)与地梁焊接,将第一轨道(11)、第二轨道(12)通过埋件与地面连接形成整体,将第一横移小车(13)与左外模(16)、右内模(19)连接,将第二横移小车(14)与右外模(17)、左内模(18)连接;步骤二、初始合模状态;第二动力滑轮(4)位于滑动槽(10)的最下端,顶模(8)位于最上端第一横移小车(13)、第二横移小车(14)处于初始位,顶模(8)与左内模(18)、右内模(19)卡合,处于合模状态;步骤三、脱模;用手扳葫芦分别拉住纵向拉杆(5)的两端,手动控制手扳葫芦处于拉紧状态,一端对手扳葫芦继续拉紧使第二动力滑轮(4)向滑动槽(10)的另一端滑动,另一端缓慢释放手扳葫芦,第二动力滑轮(4)移动至滑动槽(10)的最上端,顶模(8)位于最下端,启动左侧动力装置拉动第一横移小车(13),左外模(16)与右内模(19)随着第一横移小车(13)移动,第一横移小车(13)运动到指定位置进行固定,启动右侧动力装置拉动第二横移小车(14),右外模(17)与左内模(18)随着第二横移小车(14)移动,第二横移小车(14)运动到指定位置进行固定,模具处于脱模状态;步骤四、合模;启动左侧动力装置推动第一横移小车(13),第一横移小车(13)带动左外模(16)与右内模(19)运动回到初始位置进行固定,启动右侧动力装置推动第二横移小车(14),第二横移小车(14)带动右外模(17)、左内模(18)运动回到初始位置进行固定,反向使用手扳葫芦,带动第二动力滑轮(4)向滑动槽(10) 的最下端滑动,顶模(8)与左内模(18)、右内模(19)卡合,处于合模状态。
- 如权利要求9所述的一种整体式双T梁浇筑模具拆装方法,其特征在于,所述步骤一中,顶模拆装机构等间距布置。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011385735.2A CN112518962B (zh) | 2020-12-02 | 2020-12-02 | 一种整体式双t梁浇筑模具拆装装置及拆装方法 |
CN202011385735.2 | 2020-12-02 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022116612A1 true WO2022116612A1 (zh) | 2022-06-09 |
Family
ID=74995937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2021/116149 WO2022116612A1 (zh) | 2020-12-02 | 2021-09-02 | 一种整体式双t梁浇筑模具拆装装置及拆装方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN112518962B (zh) |
WO (1) | WO2022116612A1 (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115816613A (zh) * | 2022-12-26 | 2023-03-21 | 山东鲁中公路建设有限公司 | 一种移动液压模板预制梁板及铺设装置及铺设方法 |
CN118305872A (zh) * | 2024-03-29 | 2024-07-09 | 中铁四局集团有限公司 | 一种铁路t梁预制化生产模具 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112536897B (zh) * | 2020-12-02 | 2022-08-05 | 上海建工建材科技集团股份有限公司 | 一种双t梁浇筑模具顶模推拉式拆装装置及拆装方法 |
CN112518962B (zh) * | 2020-12-02 | 2022-04-08 | 上海建工建材科技集团股份有限公司 | 一种整体式双t梁浇筑模具拆装装置及拆装方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100476333B1 (ko) * | 2001-09-28 | 2005-03-15 | 브이에스엘코리아 주식회사 | 이동식비계공법으로 더블-티 교량의 내부거푸집의동시이동 및 거푸집 조립 설치 자동화 시스템 |
CN206736734U (zh) * | 2017-04-24 | 2017-12-12 | 山东淄博环宇桥梁模板有限公司 | 一种液压公路t梁整体拆模自行走装置 |
CN206768610U (zh) * | 2017-04-24 | 2017-12-19 | 山东淄博环宇桥梁模板有限公司 | 一种公路小箱梁外模自行走装置 |
CN108638297A (zh) * | 2018-05-09 | 2018-10-12 | 中国建筑第五工程局有限公司 | 用于单轨轨道梁模板的纵移小车、调节组件及使用方法 |
CN109968499A (zh) * | 2019-04-26 | 2019-07-05 | 四川东泉机械设备制造有限公司 | 一种t型梁浇筑专用模具及其使用方法 |
CN211806846U (zh) * | 2020-03-02 | 2020-10-30 | 河北东风世景模板有限公司 | 一种预制双t梁用内模 |
CN211806822U (zh) * | 2020-03-02 | 2020-10-30 | 河北东风世景模板有限公司 | 一种用于预制梁的移动台座模板系统及其施工场区 |
CN112518962A (zh) * | 2020-12-02 | 2021-03-19 | 上海建工建材科技集团股份有限公司 | 一种整体式双t梁浇筑模具拆装装置及拆装方法 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE445315B (sv) * | 1982-10-25 | 1986-06-16 | Lennqvist Mek Verkstad Ab | Anordning vid stellbar form for betonggjutning |
DE20122914U1 (de) * | 2001-03-06 | 2009-10-01 | Kobra Formen Gmbh | Form zur Herstellung von Formkörpern |
CN104149177B (zh) * | 2014-08-13 | 2016-09-14 | 宁夏平罗凌云建材实业有限公司 | 组装式钢筋混凝土电缆沟槽生产模具 |
CN206092022U (zh) * | 2016-10-25 | 2017-04-12 | 陕西铁路工程职业技术学院 | 一种用于衬砌矩形断面或放射渐变矩形断面爬行式作业车 |
CN208215982U (zh) * | 2018-01-29 | 2018-12-11 | 温作银 | 一种吹瓶机的合模装置 |
CN108687950A (zh) * | 2018-04-03 | 2018-10-23 | 中铁局集团厦门建设工程有限公司 | 一种综合管廊预制台车及管廊预制方法 |
AU2018271273B1 (en) * | 2018-11-27 | 2019-05-02 | Nicholas Murphy | Method of Casting |
CN110126082A (zh) * | 2019-02-26 | 2019-08-16 | 北京市政路桥股份有限公司 | 一种混凝土箱梁内模脱模装置及脱模方法 |
CN111195978A (zh) * | 2020-02-24 | 2020-05-26 | 宁夏桥多美路桥钢模板科技有限公司 | 一种预制高速公路砼板梁新型抽拉式内模 |
-
2020
- 2020-12-02 CN CN202011385735.2A patent/CN112518962B/zh active Active
-
2021
- 2021-09-02 WO PCT/CN2021/116149 patent/WO2022116612A1/zh active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100476333B1 (ko) * | 2001-09-28 | 2005-03-15 | 브이에스엘코리아 주식회사 | 이동식비계공법으로 더블-티 교량의 내부거푸집의동시이동 및 거푸집 조립 설치 자동화 시스템 |
CN206736734U (zh) * | 2017-04-24 | 2017-12-12 | 山东淄博环宇桥梁模板有限公司 | 一种液压公路t梁整体拆模自行走装置 |
CN206768610U (zh) * | 2017-04-24 | 2017-12-19 | 山东淄博环宇桥梁模板有限公司 | 一种公路小箱梁外模自行走装置 |
CN108638297A (zh) * | 2018-05-09 | 2018-10-12 | 中国建筑第五工程局有限公司 | 用于单轨轨道梁模板的纵移小车、调节组件及使用方法 |
CN109968499A (zh) * | 2019-04-26 | 2019-07-05 | 四川东泉机械设备制造有限公司 | 一种t型梁浇筑专用模具及其使用方法 |
CN211806846U (zh) * | 2020-03-02 | 2020-10-30 | 河北东风世景模板有限公司 | 一种预制双t梁用内模 |
CN211806822U (zh) * | 2020-03-02 | 2020-10-30 | 河北东风世景模板有限公司 | 一种用于预制梁的移动台座模板系统及其施工场区 |
CN112518962A (zh) * | 2020-12-02 | 2021-03-19 | 上海建工建材科技集团股份有限公司 | 一种整体式双t梁浇筑模具拆装装置及拆装方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115816613A (zh) * | 2022-12-26 | 2023-03-21 | 山东鲁中公路建设有限公司 | 一种移动液压模板预制梁板及铺设装置及铺设方法 |
CN115816613B (zh) * | 2022-12-26 | 2023-07-14 | 山东鲁中公路建设有限公司 | 一种移动液压模板预制梁板的铺设装置及铺设方法 |
CN118305872A (zh) * | 2024-03-29 | 2024-07-09 | 中铁四局集团有限公司 | 一种铁路t梁预制化生产模具 |
Also Published As
Publication number | Publication date |
---|---|
CN112518962B (zh) | 2022-04-08 |
CN112518962A (zh) | 2021-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022116612A1 (zh) | 一种整体式双t梁浇筑模具拆装装置及拆装方法 | |
WO2020233687A1 (zh) | 一种轨枕模具出入窑自动吊装设备 | |
CN111365035A (zh) | 一种管廊横隔板快速联动施工台车及管廊横隔板施工方法 | |
WO2022116585A1 (zh) | 一种双t梁浇筑模具顶模推拉式拆装装置及拆装方法 | |
CN102691270B (zh) | 一种高效快速移动模架 | |
CN111434439B (zh) | 一种焊接大型箱梁用的拼对点焊机构 | |
WO2022001169A1 (zh) | 一种城市轨道交通工程公铁两用铺轨机 | |
CN114182952A (zh) | 一种预制构件模架系统及其操作方法 | |
CN111438811A (zh) | 砼预制块翻转脱模装置 | |
CN219788788U (zh) | 立式振动模具开合结构 | |
CN2693737Y (zh) | 翻转起重机 | |
CN107984600B (zh) | 一种预制钢筋混凝土楼梯自动开合组合模具 | |
CN217072831U (zh) | 一种空心墩柱预制的自定位、走行模板移动台车 | |
CN114412203B (zh) | 一种预制墙体构件吊装定位辅助装置 | |
TWM517757U (zh) | 橋樑上部結構使用之支撐升降式系統 | |
CN213328697U (zh) | 一种装配式桥面系拼装对位设备 | |
CN210003298U (zh) | 一种地铁车站轨顶风道施工台车 | |
CN213794179U (zh) | 用于铁型覆砂铸造浇注小车的自动锁箱装置 | |
CN108798714A (zh) | 一种通道墙身施工用的轻便式移模台车及其施工方法 | |
CN113910421A (zh) | 合模系统 | |
CN212045235U (zh) | 一种坡度可调的t梁模板 | |
CN221002779U (zh) | 一种中断面全圆隧洞一次性衬砌组合台车 | |
CN111745789A (zh) | 一种墩柱模具系统 | |
CN221322421U (zh) | 一种外模成型衬砌台车 | |
CN220768069U (zh) | 一种超高挡浪墙模板移动式支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21899648 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 21899648 Country of ref document: EP Kind code of ref document: A1 |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 21899648 Country of ref document: EP Kind code of ref document: A1 |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 08/12/2023) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 21899648 Country of ref document: EP Kind code of ref document: A1 |