WO2022004675A1 - プログラム、方法、及びシステム - Google Patents
プログラム、方法、及びシステム Download PDFInfo
- Publication number
- WO2022004675A1 WO2022004675A1 PCT/JP2021/024416 JP2021024416W WO2022004675A1 WO 2022004675 A1 WO2022004675 A1 WO 2022004675A1 JP 2021024416 W JP2021024416 W JP 2021024416W WO 2022004675 A1 WO2022004675 A1 WO 2022004675A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- information
- image information
- input
- manufacturing process
- image
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 54
- 238000004519 manufacturing process Methods 0.000 claims abstract description 64
- 239000000047 product Substances 0.000 claims description 11
- 239000000463 material Substances 0.000 claims description 6
- 230000004044 response Effects 0.000 claims description 5
- 239000013067 intermediate product Substances 0.000 claims description 3
- 230000008569 process Effects 0.000 description 48
- 238000007726 management method Methods 0.000 description 43
- 238000010586 diagram Methods 0.000 description 13
- 230000010365 information processing Effects 0.000 description 12
- 238000012545 processing Methods 0.000 description 10
- 238000004364 calculation method Methods 0.000 description 7
- 230000004048 modification Effects 0.000 description 7
- 238000012986 modification Methods 0.000 description 7
- 230000006870 function Effects 0.000 description 6
- 238000003860 storage Methods 0.000 description 5
- 238000003466 welding Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 238000012790 confirmation Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000003672 processing method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010191 image analysis Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/18—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
- G05B19/4097—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by using design data to control NC machines, e.g. CAD/CAM
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/18—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
- G05B19/4155—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by programme execution, i.e. part programme or machine function execution, e.g. selection of a programme
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Y—INFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
- G16Y10/00—Economic sectors
- G16Y10/25—Manufacturing
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/49—Nc machine tool, till multiple
- G05B2219/49004—Modeling, making, manufacturing model to control machine, cmm
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Definitions
- the present invention relates to programs, methods, and systems.
- Patent Document 1 discloses a system in which an operator operates a handy terminal to read a manufacturing instruction or a bar code on a parts shelf to manage parts.
- An object of the present invention is to provide a program capable of improving the work efficiency of progress confirmation.
- One aspect of the present invention indicates to a computer processor a step of accepting input of first information indicating the name of a part constituting a part of a finished product manufactured at a manufacturing site, and a name of a manufacturing process of the part.
- the step of accepting the input of the second information the step of accepting the input of the image information obtained by photographing the state of the manufacturing process, the step of associating the image information with the first information and the second information, and the image information.
- the step of presenting the image information to the user together with the first information and the second information and in the step of presenting the image information, one of the first information and the second information is performed.
- the image information is presented in the form of a table with the other as a column item as an item of, and the table has a front side in which one of the first information and the second information is arranged vertically and the other.
- a program composed of a front head arranged side by side and a plurality of frames partitioned by, and a plurality of images corresponding to the first information and the second information are displayed in the frames.
- the work efficiency of progress confirmation can be improved.
- FIG. 1 is a diagram showing an overall configuration of the system 1 according to the present embodiment.
- the system 1 is a manufacturing process progress management system used for managing the progress state of the manufacturing process at the manufacturing site in the factory 100.
- the system 1 can also be used for sharing the occurrence status of defects and the means for solving them, and for handing down the technology at the manufacturing site.
- the system 1 captures shooting data (hereinafter referred to as image information) of the state of the manufacturing site, its attributes (shooting date, member name, process name, photographer, saver), and the image information. It is a system that stores comments from users and shares them with each user.
- the users of the system 1 include those who need to understand the situation of the manufacturing site, such as the person in charge of progress management of the manufacturing process at the manufacturing site, the person in charge of work, the person in charge of the site, and the designer of each part. Be done.
- the system 1 is composed of an information processing server 10.
- the information processing server 10 is used together with the photographing device 15 or the operation terminals 20 and 30 having a photographing function.
- the operation terminals 20 and 30 are connected to the information processing server 10 via the network 50.
- a smartphone 20 and a tablet terminal 30 are used as operation terminals.
- the smartphone 20 and the tablet terminal 30 are not limited to the illustrated examples, and a plurality of smartphones 20 may be used.
- the smartphone 20 and the tablet terminal 30 are communicated and connected via the network 50.
- the smartphone 20 and the tablet terminal 30 are communicated and connected to the information processing server 10 via the network 50.
- User account information is registered in the information processing server 10.
- the data in the information processing server 10 can be viewed and edited by inputting the user's account information.
- the account information includes a user ID for identifying the user and a password for permitting access to the information processing server 10.
- System 1 can be operated by, for example, a smartphone 20 or a tablet terminal 30. Further, the system 1 can be operated by, for example, a stationary PC (Personal Computer), a laptop PC, or the like. As described above, when a terminal having no photographing function is used as the operating terminal, the image information photographed by the photographing device 15 such as a digital camera can be separately input to the operating terminal.
- a terminal having no photographing function is used as the operating terminal
- the image information photographed by the photographing device 15 such as a digital camera can be separately input to the operating terminal.
- the information processing server 10 includes an output unit 11, a communication IF (Interface) 12, an input / output IF (Interface) 13, a memory 14, a storage 15, and a processor 16.
- the information processing server 10 is a wireless base station 40 compatible with communication standards such as 5G, 4G, and LTE (Long Term Evolution), and a wireless LAN (Local Area Network) standard such as IEEE (Institute of Electrical and Electronics Engineers) 802.11. It is connected to the network 50 by communicating with a communication device such as a wireless LAN 60 corresponding to the above.
- 5G, 4G, and LTE Long Term Evolution
- LTE Long Term Evolution
- IEEE Institute of Electrical and Electronics Engineers
- the output unit 11 outputs the information to be presented to the user to the display of the smartphone 20 or the tablet terminal 30.
- the communication IF 12 is an interface for the information processing server 10 to input / output a signal for communicating with the smartphone 20 or the tablet terminal 30.
- the input / output IF 13 includes an input device and an output device.
- the input device is an input device for receiving an input operation (for example, a touch panel, a touch pad, a pointing device such as a mouse, a keyboard, etc.).
- the output device is a device other than a display among output devices for presenting information, and examples thereof include a speaker and the like.
- An input operation can be performed by an input device instead of an operation terminal such as the smartphone 20 and the tablet terminal 30.
- the memory 14 is for temporarily storing a program, data processed by the program, or the like, and is, for example, a volatile memory 14 such as a DRAM (Dynamic Random Access Memory).
- the memory 14 stores image information.
- FIG. 2 is a diagram showing the configurations of the processor 16 and the memory 14. As shown in FIG. 2, in addition to the image information, the memory 14 stores the first information, the second information, the scheduled number of days information, and the actual number of days information.
- the storage 15 is a storage device for storing data, for example, a flash memory or an HDD (Hard Disc Drive).
- Various programs executed by the processor 16 are stored in the storage 15. When the processor 16 executes these programs, various steps as the system 1 described later are executed.
- the processor 16 is hardware for executing an instruction set described in a program, and is composed of an arithmetic unit, registers, peripheral circuits, and the like.
- the processor 16 realizes functions as a reception unit 16A, a management table creation unit 16B, a data display unit 16C, and a number of days calculation unit 16D by executing a program stored in the storage 15. ..
- the reception unit 16A accepts the input of the first information.
- the first information is information indicating the names of parts that form a part of the finished product manufactured at the manufacturing site.
- a part refers to an intermediate product that is used in a manufacturing site to perform at least one process on a material and to form a part of a finished product in a post-process.
- an elemental part intermediate product that is a component constituting a part of the boiler and is subjected to at least one or more processing corresponds to the part. That is, a member that is used without any processing in the received state, such as a fastening member used for connecting element parts, does not fall under the parts in this description.
- the part names include a combustion chamber, a burner, a water pipe, a smoke pipe, a heat insulating material, and the like.
- parts 1, parts 2, ... are used as part names.
- the reception unit 16A accepts the input of the second information.
- the second information is information indicating the name of the manufacturing process of the part.
- the process names include, for example, material arrival, parts cutting, assembly, welding, and the like.
- the process name the name of the process required for the part can be arbitrarily input.
- the second information may include an assembly configuration in which each part is assembled into a finished product.
- FIG. 3 is a data structure diagram showing the relationship between the first information and the second information. As shown in FIG. 3, a process component which is the second information is set for each name of the component which is the first information. That is, since the required manufacturing process differs depending on each part, the necessary process is set and input for each part.
- the reception unit 16A accepts the input of image information.
- the image information is image information obtained by photographing the state of the manufacturing process.
- the image information may include meta information such as a shooting date, a shooting terminal, a photographer information, a saver information, and a data capacity as incidental information.
- Comment information is associated and stored in the image information.
- the comment information is information that describes what the user who browses the image information should pay attention to regarding the content captured in the image.
- FIG. 5 is a diagram illustrating image information and comment information.
- the information input by the user in the comment field displayed in the upper right of the image information is described as comment information in the lower right of the comment information.
- the reception unit 16A receives the comment information input by the user by operating the input device or the operation terminals 10 and 20.
- the first information, the second information, the shooting date information, and the photographer's information are described.
- the saver information may be described together with the photographer information.
- the saver information refers to a person who has performed the work of saving the photographed image data in the system 1.
- FIG. 4 is a diagram showing the structure of information associated with image information. As shown in FIG. 4, the image information is associated with the first information and the second information. That is, the information as to which process of which part the image information is taken is stored in association with each image information. It should be noted that a plurality of image information may be stored for one process of one component.
- the association of each information is performed in response to the user's operation. Specifically, after the user newly registers the image information, the component name and the second information that have already been input are selected, so that the first information and the second information can be associated with the image information. Will be done.
- the first information and the second information can be obtained by shooting with the shooting device 15 and dragging and dropping the acquired plurality of image information toward a predetermined frame in the management table described later. It may be selected.
- the first information and the second information with respect to the image information acquired thereafter can be selected.
- Information may be associated with each other.
- the input device is operated with respect to the image information input to the reception unit 16A to specify the first information and the second information.
- the first information and the second information may be selected.
- the operation terminals 10 and 20 are operated with respect to the image information before being input to the reception unit 16A to obtain the first information and the second information.
- the first information and the second information may be selected by designating the information in advance.
- each information may be performed not by the user's operation but by the automatic determination of the reception unit 16A.
- the place where the shooting was performed may be specified from the position information of the smartphone 10 used for acquiring the image information, and the corresponding part name and the process name may be determined.
- the new image information may be subjected to image analysis using similar past image information to determine the component name and the process name.
- the reception unit 16A accepts input of schedule information indicating a manufacturing schedule for each manufacturing process of parts.
- the schedule information is input to the reception unit 16A by the user inputting a predetermined manufacturing schedule for each part and a schedule for assembling the parts from the input device or the operation terminal.
- FIG. 6 is a diagram illustrating an example of schedule information.
- a schedule for each manufacturing process is preset for each part.
- the user inputs this information to the information processing server 10 using an input device or an operation terminal.
- Schedule information is input by setting a scheduled start date and a scheduled end date for each process of each product.
- the material arrival of the part 1 is scheduled to start on May 1st and end on May 10th.
- the scheduled start date and the scheduled end date are set for all the processes of all the parts.
- the system 1 of the present invention presents image information to the user together with the first information and the second information. This function will be described.
- the management table creation unit 16B creates a management table in which the first information and the second information are management items.
- the management table is configured with the first information as a row item, that is, the front side, and the second information as a column item, that is, a front head.
- the data display unit 16C displays the image information as the management content of the management table, that is, as a table body.
- FIG. 7 is a diagram showing a management table.
- the component names are arranged vertically as the front side at the left end, and the process names are arranged horizontally as the front side at the upper end of each frame.
- a reduced image of image information is arranged in each frame.
- the frame located at the upper left end will be described.
- nine photographs are displayed in order of shooting date. If you scroll downward with the mouse icon placed on the frame, other photos will be displayed in sequence. Then, when any one is selected (reference numeral A in the figure), a screen (see FIG. 5) for displaying the process image photograph is displayed.
- the number of images displayed in each frame can be arbitrarily changed.
- the system 1 of the present invention refers to the schedule information, and in response to the operation of browsing the image information, highlights and displays the second information indicating the manufacturing process in which the work should be performed at the time of the operation.
- the management table creation unit 16B attaches an indicator 70 having a function of highlighting and displaying the second information on the management table.
- the indicator 70 is a display attached to the frame of the management table corresponding to the process name (second information) in which the work should be performed according to the schedule information in response to the operation when the user browses the management table. Is.
- the indicator 70 has a rectangular shape.
- the data display unit 16C displays the management table with the indicator 70 displayed on the table.
- the process of welding 1 of the member 1 is from May 27 to June 3.
- an indicator 70 is attached to the frame corresponding to the welding 1 process of each of the member 1 and the member 2.
- the image information of the member 1 is stored in the frame of the welding 1, it can be confirmed that the work is almost as planned.
- the member 2 it was confirmed that the assembly work of the member 2 was delayed because no image information was stored in the frame of the welding 1 scheduled to start on May 27. can.
- the data display unit 16C When displaying the image information, the data display unit 16C displays information about the shooting date that the image information has as a metafile together with the image information. In the example of FIG. 7, the shooting date is described at the lower end B of each image information. At the lower left of each image information, a comment display C indicating the presence or absence of comment information is displayed. The comment information is stored in the image information on which the comment display C is displayed.
- the number of days calculation unit 16D calculates the actual number of days required for the manufacturing process based on the shooting date information regarding the shooting date possessed by the image information associated with the manufacturing process. Specifically, the number of days calculation unit 16D required a period between the oldest shooting date and the newest shooting date in the group of image information associated with the second information in the process. The actual number of days.
- the number of days calculation unit 16D calculates the scheduled number of days of the manufacturing process specified in the schedule information. Specifically, the number of days calculation unit 16D sets the period set for performing a certain process in the schedule information as the scheduled number of days for the process. Then, the data display unit 16C displays the actual number of days together with the scheduled number of days.
- the data display unit 16C can change the display form of the management table.
- FIG. 8 is a diagram showing a first example of a modification of the management table.
- FIG. 9 is a diagram showing a second example of a modification of the management table.
- the data display unit 16C can display a list of image information corresponding to the selected first information in chronological order.
- component 1 is selected as the component.
- the image information about each process of the component 1 is displayed in chronological order.
- the data display unit 16C can display a list of image information corresponding to the selected second information in chronological order.
- material arrival is selected as the process.
- the image information regarding the material arrival of each part is displayed in chronological order.
- FIG. 10 is a diagram illustrating the first half of the processing flow in the system 1.
- FIG. 11 is a diagram illustrating an input operation screen.
- FIG. 12 is a diagram illustrating the latter half of the processing flow in the system.
- the user operates the input device or the operation terminal to input the first information (S101).
- the user also performs initial settings such as the construction name and user registration at the same time.
- the processing of receiving the first information input in step S101 by the receiving unit 16A of the processor is executed (S201).
- step S201 the user operates the input device or the operation terminal to input the second information (S102).
- the reception unit 16A executes a process of accepting the first information input in step S201 (S202).
- FIG. 11 shows a screen on which the input operations up to this point have been performed. As shown in FIG. 11, a process name is set and input for each part name. Since the number of processes differs depending on the part, the quantity of the process name may be different for each part. The quantity can be arbitrarily added to the input fields for the part name and the process name.
- step S202 the user operates an input device or an operation terminal to input schedule information (S103).
- the reception unit 16A executes a process of accepting the schedule information input in step S103 (S203).
- step S203 the user operates the input device or the camera of the operation terminal to acquire the process image (step S104).
- step S104 the reception unit 16A executes a process of receiving image information (S204).
- the reception unit 16A executes a process of associating the part name and the process name with the image information (S205).
- the management table creation unit 16B executes a process of creating a management table (S206).
- the data display unit 16C executes a process of displaying the management table (S207).
- the data display unit 16C displays the indicator 70 on the management table.
- the indicator 70 refers to the date when the user is browsing the management table and the date of the image information, and is displayed so as to surround the frame in which the image information taken on the corresponding date is stored.
- the indicator 70 does not have to be a rectangular display, and its display form can be arbitrarily changed.
- the indicator 70 may be shown in a circular shape or a straight line, or may be indicated by a symbol such as an arrow.
- the user gives an instruction to display the schedule forecast / actual using the input device or the operation terminal (S105).
- the number of days calculation unit 16D executes a process of calculating the schedule forecast (S208).
- the data display unit 16C outputs the scheduled number of days of the schedule and the number of days actually required for the work (S209).
- the image information obtained by photographing the state of the manufacturing process of the parts is systematically displayed as the management contents in the management table in which the first information and the second information are items. .. Therefore, the delivery date management person can immediately grasp the progress status of each process in each part by checking the image information displayed on the management table.
- the system 1 displays an indicator 70 indicating when the management table is being browsed for the process name of the management table. Therefore, by confirming whether or not the image information corresponding to the process name indicated by the indicator 70 is stored, it is possible to easily confirm whether or not the schedule is proceeding as planned. This makes it possible to further improve the work efficiency of progress confirmation.
- the system 1 displays the actual number of days required for the manufacturing process together with the scheduled number of days for the manufacturing process registered in advance. Therefore, it is possible to easily confirm the forecast and actuality such as how much delay has occurred with respect to the schedule. In addition, this makes it possible to accurately grasp the production capacity at the manufacturing site, which has been difficult to grasp until now, for each part and each process, and store it as a database.
- the management table creation unit 16B creates a management table with the first information as a row item and the second information as a column item. Therefore, in the management table, the process names are arranged side by side with the parts names arranged vertically, and the listability of the management table can be ensured.
- the data display unit 16C displays the shooting date of the image information together with the image information. Therefore, the date on which the process image was acquired can be easily confirmed.
- the data display unit 16C displays a list of image information corresponding to the selected first information in chronological order. Therefore, it is possible to ensure convenience when it is desired to confirm the progress of a certain part in the manufacturing process.
- the data display unit 16C displays a list of image information corresponding to the selected second information in chronological order. Therefore, it is possible to ensure convenience when checking the state of each component related to a certain process.
- the processing flow in the above embodiment can be changed within a consistent range.
- the second information may be input before the first information, or the process image may be acquired first.
- a configuration is shown in which a management table is created with the first information as a row item, that is, the front side, and the second information as a column item, that is, a front head, but the configuration is limited to such an embodiment.
- a management table may be created with the first information as a column item, that is, the front, and the second information as a row item, that is, the front side.
- the second information indicating the manufacturing process to be performed at the time of browsing is highlighted by the indicator 70, but the present invention is not limited to such an embodiment.
- the corresponding second information may be highlighted in such a manner that the corresponding second information is displayed brightly without using the indicator 70.
- the image information included in the corresponding second information frame may be displayed brightly.
- the corresponding image information may be highlighted in such a manner as to blink the corresponding second information.
- System 10 Information processing server 20 Smartphone 30 Tablet terminal 50 Network 16 Processor 16A Reception unit 16B Management table creation unit 16C Data display unit 16D Days calculation unit
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Manufacturing & Machinery (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Tourism & Hospitality (AREA)
- Automation & Control Theory (AREA)
- Quality & Reliability (AREA)
- Human Computer Interaction (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- Accounting & Taxation (AREA)
- Computing Systems (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Engineering & Computer Science (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本発明は、コンピュータのプロセッサに、製造現場において製造される完成品の一部を構成する部品の名称を示す第1の情報の入力を受け付けるステップと、部品の製造工程の名称を示す第2の情報の入力を受け付けるステップと、製造工程の様子を撮影した画像情報の入力を受け付けるステップと、画像情報と、第1の情報と、第2の情報と、を関連付けるステップと、画像情報を、第1の情報および第2の情報とともにユーザに対して提示するステップと、を実行させるプログラム。
Description
本発明は、プログラム、方法、及びシステムに関する。
従来、製造現場における進捗の確認作業は、管理担当者が製造現場に訪れ、直接確認する方法が一般的であった。
下記特許文献1には、作業者がハンディターミナルを操作して、製造指示書、又は部品棚のバーコードを読み取り、部品の管理を行うシステムが開示されている。
下記特許文献1には、作業者がハンディターミナルを操作して、製造指示書、又は部品棚のバーコードを読み取り、部品の管理を行うシステムが開示されている。
しかしながら、例えば製造現場が海外工場等の遠隔地にある場合には、進捗確認の作業に時間を要し、効率的な進捗確認を行うことに改善の余地があった。
本発明は、進捗確認の作業効率を向上することができるプログラムを提供することを目的とする。
本発明の一態様は、コンピュータのプロセッサに、製造現場において製造される完成品の一部を構成する部品の名称を示す第1の情報の入力を受け付けるステップと、部品の製造工程の名称を示す第2の情報の入力を受け付けるステップと、製造工程の様子を撮影した画像情報の入力を受け付けるステップと、画像情報と、第1の情報と、第2の情報と、を関連付けるステップと、画像情報を、第1の情報および第2の情報とともにユーザに対して提示するステップと、を実行させ、画像情報を提示するステップにおいて、第1の情報および第2の情報のうちのいずれか一方を行の項目として、他方を列の項目として、表の形式で画像情報を提示し、表は、第1の情報および第2の情報のうち、いずれか一方が縦並びに配置された表側と、他方が横並びに配置された表頭と、により区画される複数のフレームにより構成され、フレーム内には、第1の情報および第2の情報に該当する画像が複数表示されている、プログラム。
本発明のプログラムによれば、進捗確認の作業効率を向上することができる。
以下、本発明の一実施形態について、図面に基づいて詳細に説明する。なお、実施形態を説明するための図面において、同一の構成要素には原則として同一の符号を付し、その繰り返しの説明は省略する。
図1は、本実施形態に係るシステム1の全体構成を示す図である。
図1に示すように、システム1は、工場100内の製造現場において、製造工程の進捗状態を管理するために用いられる製造工程の進捗管理システムである。
また、システム1は、製造工程の進捗管理の他に、不具合の発生状況およびその解決手段の共有、並びに製造現場における技術の伝承に用いることもできる。
図1に示すように、システム1は、工場100内の製造現場において、製造工程の進捗状態を管理するために用いられる製造工程の進捗管理システムである。
また、システム1は、製造工程の進捗管理の他に、不具合の発生状況およびその解決手段の共有、並びに製造現場における技術の伝承に用いることもできる。
具体的には、システム1は、製造現場の状態を撮影した撮影データ(以下、画像情報という)を、その属性(撮影日、部材名称、工程名称、撮影者、保存者)、および当該画像情報に対するユーザからのコメントとともに記憶して、各ユーザに共有するシステムである。
システム1のユーザとしては、製造現場における製造工程の進捗管理担当者、作業担当者、現場責任者の他、各部品の設計者等のように、製造現場の状況の把握が必要な者が挙げられる。
図1に示すように、システム1は、情報処理サーバ10により構成されている。情報処理サーバ10は、撮影装置15、または撮影機能を備えた操作端末20、30と、ともに用いられる。
操作端末20、30は、ネットワーク50を介して情報処理サーバ10と接続されている。
図示の例では、操作端末として、スマートフォン20とタブレット端末30が用いられている。なお、スマートフォン20とタブレット端末30は、図示の例に限られず、複数台ずつ用いられてもよい。
操作端末20、30は、ネットワーク50を介して情報処理サーバ10と接続されている。
図示の例では、操作端末として、スマートフォン20とタブレット端末30が用いられている。なお、スマートフォン20とタブレット端末30は、図示の例に限られず、複数台ずつ用いられてもよい。
スマートフォン20とタブレット端末30は、ネットワーク50を介して通信接続されている。スマートフォン20とタブレット端末30は、ネットワーク50を介してと情報処理サーバ10と通信接続されている。
情報処理サーバ10には、ユーザのアカウント情報が登録されている。情報処理サーバ10内のデータは、ユーザのアカウント情報を入力することで、閲覧、編集することができる。アカウント情報は、ユーザを特定するためのユーザIDと、情報処理サーバ10へのアクセスを許可するためのパスワードと、を含んでいる。
システム1は、例えば、スマートフォン20、又はタブレット端末30により操作することができる。また、システム1は、例えば、据え置き型のPC(Personal Computer)、ラップトップPCなどにより操作することができる。このように、操作端末として、撮影機能を有していない端末を使用する場合には、デジタルカメラ等の撮影装置15により撮影した画像情報を、別途操作端末に入力することができる。
図1に示すように、情報処理サーバ10は、出力部11と、通信IF(Interface)12と、入出力IF(Interface)13と、メモリ14と、ストレージ15と、プロセッサ16と、を備える。
情報処理サーバ10は、5G、4G、LTE(Long Term Evolution)などの通信規格に対応した無線基地局40、IEEE(Institute of Electrical and Electronics Engineers)802.11などの無線LAN(Local Area Network)規格に対応した無線LAN60等の通信機器と通信することによりネットワーク50に接続されている。
出力部11は、ユーザに提示するための情報を、スマートフォン20又はタブレット端末30のディスプレイに出力する。
通信IF12は、情報処理サーバ10が、スマートフォン20又はタブレット端末30と通信するための信号を入出力するためのインタフェースである。
通信IF12は、情報処理サーバ10が、スマートフォン20又はタブレット端末30と通信するための信号を入出力するためのインタフェースである。
入出力IF13は、入力装置と出力装置を備えている。
入力装置は、入力操作を受け付けるための入力装置(例えば、タッチパネル、タッチパッド、マウス等のポインティングデバイス、キーボード等)である。出力装置は、情報を提示するための出力装置のうち、ディスプレイを除く装置であり、例えばスピーカ等が挙げられる。スマートフォン20およびタブレット端末30のような操作端末に代えて、入力装置により入力操作を行うこともできる。
入力装置は、入力操作を受け付けるための入力装置(例えば、タッチパネル、タッチパッド、マウス等のポインティングデバイス、キーボード等)である。出力装置は、情報を提示するための出力装置のうち、ディスプレイを除く装置であり、例えばスピーカ等が挙げられる。スマートフォン20およびタブレット端末30のような操作端末に代えて、入力装置により入力操作を行うこともできる。
メモリ14は、プログラム、及び、プログラム等で処理されるデータ等を一時的に記憶するためのものであり、例えばDRAM(Dynamic Random Access Memory)等の揮発性のメモリ14である。メモリ14は、画像情報を記憶する。図2は、プロセッサ16およびメモリ14の構成を示す図である。図2に示すように、メモリ14には、画像情報の他、第1の情報、第2の情報、予定日数情報、実績日数情報が記憶されている。
図1に示すように、ストレージ15は、データを保存するための記憶装置であり、例えばフラッシュメモリ、HDD(Hard Disc Drive)である。ストレージ15には、プロセッサ16で実行される各種のプログラムが記憶されている。これらのプログラムをプロセッサ16が実行することで、後述するシステム1としての各種のステップが実行される。
プロセッサ16は、プログラムに記述された命令セットを実行するためのハードウェアであり、演算装置、レジスタ、周辺回路などにより構成される。
プロセッサ16の機能的な構成について説明する。
図2に示すように、プロセッサ16は、ストレージ15に記憶されるプログラムを実行することで、受付部16A、管理表作成部16B、データ表示部16C、日数算出部16D、としての機能を実現する。
図2に示すように、プロセッサ16は、ストレージ15に記憶されるプログラムを実行することで、受付部16A、管理表作成部16B、データ表示部16C、日数算出部16D、としての機能を実現する。
受付部16Aは、第1の情報の入力を受け付ける。第1の情報とは、製造現場において製造される完成品の一部を構成する部品の名称を示す情報である。
この説明において、部品とは、製造現場において、材料に対して少なくとも1つ以上の加工が施され、後工程において完成品の一部を構成するように用いられる中間生成物を指す。例えば、完成品がボイラである場合には、ボイラの一部を構成する構成物であって、少なくとも1つ以上の加工が施される要素部品(中間生成物)が部品に該当する。即ち、要素部品同士の連結に用いられる締結部材のように、入荷された状態で一切の加工を必要とせずに使用される部材は、この説明における部品には該当しない 。例えば完成品がボイラである場合には、部品名称としては、燃焼室、バーナ、水管、煙管、断熱材等が挙げられる。以下の説明では、部品名称として、部品1、部品2、…を用いる。
この説明において、部品とは、製造現場において、材料に対して少なくとも1つ以上の加工が施され、後工程において完成品の一部を構成するように用いられる中間生成物を指す。例えば、完成品がボイラである場合には、ボイラの一部を構成する構成物であって、少なくとも1つ以上の加工が施される要素部品(中間生成物)が部品に該当する。即ち、要素部品同士の連結に用いられる締結部材のように、入荷された状態で一切の加工を必要とせずに使用される部材は、この説明における部品には該当しない 。例えば完成品がボイラである場合には、部品名称としては、燃焼室、バーナ、水管、煙管、断熱材等が挙げられる。以下の説明では、部品名称として、部品1、部品2、…を用いる。
受付部16Aは、第2の情報の入力を受け付ける。第2の情報とは、部品の製造工程の名称を示す情報である。工程名称としては、例えば、材料入荷、部品切断、組み立て、溶接等である。工程名称としては、部品に必要な工程の名称を任意に入力することができる。
また、第2の情報には、各部品同士を組み立てて完成品とする組み立て構成を含んでもよい。
また、第2の情報には、各部品同士を組み立てて完成品とする組み立て構成を含んでもよい。
図3は、第1情報と第2情報の関係を示すデータ構造図である。図3に示すように、第1の情報である部品の名称毎に、第2の情報である工程部品が設定されている。すなわち、各部品によって、必要となる製造工程が異なるため、部品毎に必要な工程が設定され、入力される。
受付部16Aは、画像情報の入力を受け付ける。画像情報は、製造工程の様子を撮影した画像情報である。画像情報は、付帯情報として、撮影日、撮影端末、撮影者情報、保存者情報、データ容量等のメタ情報を含んでもよい。
画像情報には、コメント情報が関連付けられて記憶されている。コメント情報は、画像情報を閲覧したユーザが、当該画像に撮影された内容に関して、留意するべきことを記載した情報である。図5は、画像情報とコメント情報を説明する図である。
図5に示すように、画像情報に対して右上に表示されるコメント欄にユーザが入力した情報が、コメント情報とした右下にコメント情報として記載される。ユーザが、入力装置、又は操作端末10、20を操作して入力したコメント情報を、受付部16Aが受け付ける。
画像情報の右上には、第1情報、第2情報、撮影日の情報、および撮影者の情報が記載されている。なお、撮影者情報とともに、保存者情報を記載してもよい。保存者情報とは、撮影した画像データを、本システム1に写真を保存する作業を行った者を指す。
画像情報の右上には、第1情報、第2情報、撮影日の情報、および撮影者の情報が記載されている。なお、撮影者情報とともに、保存者情報を記載してもよい。保存者情報とは、撮影した画像データを、本システム1に写真を保存する作業を行った者を指す。
受付部16Aは、画像情報が入力された際に、画像情報と、第1の情報と、第2の情報と、を関連付ける。図4は、画像情報と関連付けられた情報の構造を示す図である。
図4に示すように、画像情報は、第1の情報および第2の情報と関連付けられている。すなわち、画像情報が、どの部品のどの工程の様子を撮影したものであるかという情報が、それぞれの画像情報と関連付けて記憶されている。なお、一つの部品の一つの工程に対して、複数の画像情報が記憶されていてよい。
図4に示すように、画像情報は、第1の情報および第2の情報と関連付けられている。すなわち、画像情報が、どの部品のどの工程の様子を撮影したものであるかという情報が、それぞれの画像情報と関連付けて記憶されている。なお、一つの部品の一つの工程に対して、複数の画像情報が記憶されていてよい。
各情報の関連付けは、ユーザの操作に応答して行われる。具体的には、ユーザが新たに画像情報を登録した後に、既に入力されている部品名称および第2の情報を選択することで、画像情報に対する第1の情報および第2の情報の対応付けが行われる。
また、例えば、撮影装置15により撮影を行い、取得した複数の画像情報に対して、後述する管理表における所定のフレームに向けてドラッグ&ドロップすることにより、第1の情報および第2の情報が選択されてもよい。
また、例えば、操作端末10、20により工程画像の撮影を行う前に、予め第1の情報および第2の情報の選択を行うことで、その後に取得した画像情報に対する第1の情報および第2の情報の対応付けを行ってもよい。
また、例えば、操作端末10、20により工程画像の撮影を行った後に、受付部16Aに入力した画像情報に対して、入力装置を操作して、第1の情報および第2の情報を指定することにより、第1の情報および第2の情報を選択してもよい。
また、例えば、操作端末10、20により工程画像の撮影を行った後に、受付部16Aに入力する前の画像情報に対して、操作端末10、20を操作して、第1の情報および第2の情報を予め指定しておくことにより、第1の情報および第2の情報を選択してもよい。
また、例えば、操作端末10、20により工程画像の撮影を行った後に、受付部16Aに入力した画像情報に対して、入力装置を操作して、第1の情報および第2の情報を指定することにより、第1の情報および第2の情報を選択してもよい。
また、例えば、操作端末10、20により工程画像の撮影を行った後に、受付部16Aに入力する前の画像情報に対して、操作端末10、20を操作して、第1の情報および第2の情報を予め指定しておくことにより、第1の情報および第2の情報を選択してもよい。
なお、各情報の関連付けは、ユーザの操作ではなく、受付部16Aの自動判別により行われてもよい。
この場合には、例えば、画像情報の取得に用いたスマートフォン10の位置情報から、撮影が行われた場所を特定して、該当する部品名称、および工程名称を判断してもよい。また、例えば、新規の画像情報に対して、類似する過去の画像情報を用いた画像解析を行い、部品名称、および工程名称を判断してもよい。
この場合には、例えば、画像情報の取得に用いたスマートフォン10の位置情報から、撮影が行われた場所を特定して、該当する部品名称、および工程名称を判断してもよい。また、例えば、新規の画像情報に対して、類似する過去の画像情報を用いた画像解析を行い、部品名称、および工程名称を判断してもよい。
受付部16Aは、部品の製造工程毎の製造スケジュールを示すスケジュール情報の入力を受け付ける。スケジュール情報は、予め定められている部品毎の製造スケジュール、および部品同士の組み立て作業に関するスケジュールを、ユーザが入力装置、又は操作端末から入力することで、受付部16Aに入力される。図6は、スケジュール情報の例を説明する図である。
図6に示すように、各部品について、製造工程毎のスケジュールが予め設定されている。ユーザは、この情報を、入力装置、又は操作端末を用いて情報処理サーバ10に入力する。
スケジュール情報は、各品の工程毎に、開始予定日と終了予定日を設定することで入力される。図6の例では、部品1の材料入荷は5月1日に開始が予定され、5月10日に終了が予定されている。スケジュール情報の入力の際は、全ての部品の全ての工程に対して、開始予定日と終了予定日を設定する。
スケジュール情報は、各品の工程毎に、開始予定日と終了予定日を設定することで入力される。図6の例では、部品1の材料入荷は5月1日に開始が予定され、5月10日に終了が予定されている。スケジュール情報の入力の際は、全ての部品の全ての工程に対して、開始予定日と終了予定日を設定する。
本発明のシステム1は、画像情報を、第1の情報および第2の情報とともにユーザに対して提示する。この機能について説明する。
管理表作成部16Bは、第1の情報、第2の情報が管理項目となる管理表を作成する。管理表は、第1の情報を行の項目、すなわち表側とし、第2の情報を列の項目、すなわち表頭として構成されている。そして、データ表示部16Cは、画像情報を、管理表の管理内容、すなわち表体として表示する。図7は、管理表を示す図である。
管理表作成部16Bは、第1の情報、第2の情報が管理項目となる管理表を作成する。管理表は、第1の情報を行の項目、すなわち表側とし、第2の情報を列の項目、すなわち表頭として構成されている。そして、データ表示部16Cは、画像情報を、管理表の管理内容、すなわち表体として表示する。図7は、管理表を示す図である。
図7に示すように、管理表では、部品名称が左端に表側として縦並びに配置され、工程名称がそれぞれのフレームの上端に表頭として横並びに配置されている。各フレームには画像情報の縮小画像が配列されている。ここで、左端の上段に位置するフレームを説明する。
各フレームでは、図示の例では、撮影日順に9枚の写真が表示されている。フレーム上にマウスのアイコンを配置した状態で下方に向けてスクロールをすると、他の写真が順次表示される。そして、いずれか1つを選択すると(図示の符号A)、当該工程画像写真を表示する画面(図5参照)が表示される。なお、各フレームに表示される画像の枚数は任意に変更することができる。
各フレームでは、図示の例では、撮影日順に9枚の写真が表示されている。フレーム上にマウスのアイコンを配置した状態で下方に向けてスクロールをすると、他の写真が順次表示される。そして、いずれか1つを選択すると(図示の符号A)、当該工程画像写真を表示する画面(図5参照)が表示される。なお、各フレームに表示される画像の枚数は任意に変更することができる。
本発明のシステム1は、スケジュール情報を参照し、画像情報を閲覧する操作に応答して、当該操作の時点で作業がされているべき製造工程を示す第2の情報を強調して表示する。この機能について説明する。
管理表作成部16Bは、管理表に第2の情報を強調して表示する機能を有するインジケータ70を付す。インジケータ70は、ユーザにおける管理表の閲覧時の操作に応答して、スケジュール情報に即して作業がされているべき工程名称(第2の情報)に対応する管理表のフレームに付される表示である。図示の例では、インジケータ70は、矩形状を呈している。
管理表作成部16Bは、管理表に第2の情報を強調して表示する機能を有するインジケータ70を付す。インジケータ70は、ユーザにおける管理表の閲覧時の操作に応答して、スケジュール情報に即して作業がされているべき工程名称(第2の情報)に対応する管理表のフレームに付される表示である。図示の例では、インジケータ70は、矩形状を呈している。
データ表示部16Cは、インジケータ70を表体に表示した状態で、管理表を表示する。
具体的に説明すると、図6に示すように、部材1の溶接1の工程は、5月27日から6月3日となっている。そして、例えば6月1日に画像情報を閲覧すると、図7に示すように、部材1および部材2それぞれの溶接1の工程に該当するフレームに対して、インジケータ70が付されている。
ここで、部材1については、溶接1のフレーム内に画像情報が保存されているので、概ね予定通り作業が進んでいることが確認できる。一方、部材2については、5月27日に開始される予定の溶接1のフレーム内に、画像情報が一枚も保存されていないので、部材2の組み立て作業に遅れが生じていることが確認できる。
具体的に説明すると、図6に示すように、部材1の溶接1の工程は、5月27日から6月3日となっている。そして、例えば6月1日に画像情報を閲覧すると、図7に示すように、部材1および部材2それぞれの溶接1の工程に該当するフレームに対して、インジケータ70が付されている。
ここで、部材1については、溶接1のフレーム内に画像情報が保存されているので、概ね予定通り作業が進んでいることが確認できる。一方、部材2については、5月27日に開始される予定の溶接1のフレーム内に、画像情報が一枚も保存されていないので、部材2の組み立て作業に遅れが生じていることが確認できる。
データ表示部16Cは、画像情報を表示する際に、画像情報がメタファイルとして有する撮影日に関する情報を、画像情報とともに表示する。図7の例では、各画像情報の下端部Bに、撮影日が記載されている。
各画像情報の左下部には、コメント情報の有無を示すコメント表示Cが表示されている。このコメント表示Cが表示された画像情報は、コメント情報が保存されている。
各画像情報の左下部には、コメント情報の有無を示すコメント表示Cが表示されている。このコメント表示Cが表示された画像情報は、コメント情報が保存されている。
日数算出部16Dは、製造工程に対応付けられる画像情報が有する撮影日に関する撮影日情報に基づいて、当該製造工程に要した実績日数を算出する。具体的には、日数算出部16Dは、第2の情報と対応づけられた一群の画像情報のうち、最も古い撮影日と、最も新しい撮影日と、の間の期間を、当該工程に要した実績日数とする。
日数算出部16Dは、スケジュール情報に定められた当該製造工程の予定日数を算出する。具体的には、日数算出部16Dは、スケジュール情報において、ある工程を行うために設定された期間を、当該工程の予定日数とする。
そして、データ表示部16Cは、実績日数を予定日数とともに表示する。
そして、データ表示部16Cは、実績日数を予定日数とともに表示する。
また、データ表示部16Cは、管理表の表示形態を変更することができる。図8は、管理表の変形例の第1例を示す図である。図9は、管理表の変形例の第2例を示す図である。
図8に示すように、データ表示部16Cは、選択した第1の情報に該当する画像情報を、時系列に沿って一覧表示することができる。図示の例では、部品として、部品1が選択されている。そしてこの場合には、部品1の各工程に関する画像情報が、時系列に沿って表示されている。
図8に示すように、データ表示部16Cは、選択した第1の情報に該当する画像情報を、時系列に沿って一覧表示することができる。図示の例では、部品として、部品1が選択されている。そしてこの場合には、部品1の各工程に関する画像情報が、時系列に沿って表示されている。
図9に示すように、データ表示部16Cは、選択した第2の情報に該当する画像情報を、時系列に沿って一覧表示することができる。図示の例では、工程として、材料入荷が選択されている。そしてこの場合には、各部品の材料入荷に関する画像情報が、時系列に沿って表示されている。
<システム1の処理の第1例>
次に、システム1の処理について説明する。図10は、システム1における処理フローの前半を説明する図である。図11は、入力操作画面を説明する図である。図12は、システムにおける処理フローの後半を説明する図である。
次に、システム1の処理について説明する。図10は、システム1における処理フローの前半を説明する図である。図11は、入力操作画面を説明する図である。図12は、システムにおける処理フローの後半を説明する図である。
図10に示すように、ユーザが、入力装置、又は操作端末を操作して、第1の情報の入力(S101)を行う。この際、ユーザは、工事名、およびユーザ登録等の初期設定も同時に行う。
ステップS101により入力された第1の情報を、プロセッサの受付部16Aが受け付ける処理を実行する(S201)。
ステップS101により入力された第1の情報を、プロセッサの受付部16Aが受け付ける処理を実行する(S201)。
ステップS201の後に、ユーザが、入力装置、又は操作端末を操作して、第2の情報の入力(S102)を行う。ステップS201により入力された第1の情報を、受付部16Aが受け付ける処理を実行する(S202)。ここまでの入力操作を行った画面を図11に示す。
図11に示すように、部品名称毎に、工程名称が設定されて入力される。部品により工程数がことなるため、部品毎に工程名称の数量は異なっていてもよい。部品名称、および工程名称の入力欄は、その数量を任意に追加することができる。
図11に示すように、部品名称毎に、工程名称が設定されて入力される。部品により工程数がことなるため、部品毎に工程名称の数量は異なっていてもよい。部品名称、および工程名称の入力欄は、その数量を任意に追加することができる。
ステップS202の後に、ユーザが、入力装置、又は操作端末を操作して、スケジュール情報の入力(S103)を行う。ステップS103により入力されたスケジュール情報を、受付部16Aが受け付ける処理を実行する(S203)。
ステップS203の後に、ユーザが、入力装置、又は操作端末のカメラを操作して、工程画像を取得する(ステップS104)。ステップS104の後に、受付部16Aが、画像情報を受け付ける処理を実行する(S204)。
ステップS204の後に、受付部16Aが、画像情報に対して、部品名称および工程名称を関連付ける処理を実行する(S205)。
ステップS205の後に、管理表作成部16Bが、管理表を作成する処理を実行する(S206)。
ステップS205の後に、管理表作成部16Bが、管理表を作成する処理を実行する(S206)。
ステップS206の後に、データ表示部16Cが、管理表を表示する処理を実行する(S207)。この際、データ表示部16Cは、管理表にインジケータ70を表示する。インジケータ70は、ユーザが管理表を閲覧している日付と、画像情報の日付と、を参照し、該当する日付に撮影された画像情報が保存されたフレームを囲むように表示される。なお、インジケータ70は矩形状の表示である必要はなく、その表示形態は任意に変更することができる。例えば、インジケータ70は円形状や直線状に示してもよいし、矢印等の記号により示してもよい。
次に、図12に示すように、ユーザが、、入力装置、又は操作端末を使用して、スケジュールの予実を表示させるための指示を行う(S105)。ステップS106の後に、日数算出部16Dは、スケジュール予実の算出を行う処理を実行する(S208)。
ステップS208の後に、データ表示部16Cは、スケジュールの予定日数と、実際に作業に要した日数の出力を行う(S209)。
ステップS208の後に、データ表示部16Cは、スケジュールの予定日数と、実際に作業に要した日数の出力を行う(S209)。
以上、説明したように、本発明によれば、部品の製造工程の様子を撮影した画像情報を、第1の情報および第2の情報が項目となる管理表における管理内容として体系的に表示する。
このため、納期管理担当者が、管理表に表示された画像情報を確認することで、各部品における各工程の進捗状況を即座に把握することができる。
このため、納期管理担当者が、管理表に表示された画像情報を確認することで、各部品における各工程の進捗状況を即座に把握することができる。
そして、例えば、当該担当者が現地に出向いて進捗状況を確認するような作業を省くことができ、進捗確認の作業効率を向上することができる。
また、関係者に管理表を共有することで、進捗状況の一覧性を確保して、関係者間で進捗状況を円滑に共有することができる。
また、例えば製造現場における実際の加工方法に対する理解の乏しい設計者等に対して、当該加工方法の様子を、画像情報を用いて伝えることで、技術伝承の役割を果たすこともできる。
また、製造現場の画像情報が、部材の名称、および工程の名称で整理されることで、現場を一度も見たことが無い設計者が、過去の製造実績の様子を、システム1を用いて確認することができる。これにより、当該製造現場における製造プロセスを円滑に理解することができる。
また、関係者に管理表を共有することで、進捗状況の一覧性を確保して、関係者間で進捗状況を円滑に共有することができる。
また、例えば製造現場における実際の加工方法に対する理解の乏しい設計者等に対して、当該加工方法の様子を、画像情報を用いて伝えることで、技術伝承の役割を果たすこともできる。
また、製造現場の画像情報が、部材の名称、および工程の名称で整理されることで、現場を一度も見たことが無い設計者が、過去の製造実績の様子を、システム1を用いて確認することができる。これにより、当該製造現場における製造プロセスを円滑に理解することができる。
また、システム1は、管理表の工程名称に対して、管理表の閲覧時を示すインジケータ70を表示する。このため、インジケータ70が示された工程名称に該当する画像情報が保存されているかどうかを確認することで、スケジュールが予定通り進んでいるかどうかを容易に確認することができる。これにより、進捗確認の作業効率をより一層向上することができる。
また、システム1は、製造工程に要した実績日数を、予め登録された製造工程の予定日数とともに表示する。このため、スケジュールに対してどの程度の遅れが生じたか等の予実の確認を容易に行うことができる。
またこれにより、これまで把握が困難であった製造現場における生産能力を、部品毎、工程毎に正確に把握して、データベースとして蓄積することが可能になる。
またこれにより、これまで把握が困難であった製造現場における生産能力を、部品毎、工程毎に正確に把握して、データベースとして蓄積することが可能になる。
また、管理表作成部16Bが、第1の情報を行の項目とし、第2の情報を列の項目として、管理表を作成する。このため、管理表において、各部品名称を縦に並べた状態で、工程名称が横に並ぶ状態となり、管理表の一覧性を確保することができる。
また、データ表示部16Cが、画像情報が有する撮影日を、当該画像情報とともに表示する。このため、工程画像を取得した日付を容易に確認することができる。
また、データ表示部16Cは、選択した第1の情報に該当する画像情報を、時系列に沿って一覧表示する。このため、ある部品の製造工程での経過を確認したい際の利便性を確保することができる。
また、データ表示部16Cは、選択した第2の情報に該当する画像情報を、時系列に沿って一覧表示する。このため、ある工程に関する各部品の状態を確認する際の利便性を確保することができる。
<変形例>
次に、変形例について説明する。
上記実施形態では、プログラムが、製造工場100内の製造現場で使用される例を示したが、このような例に限られない。プログラムは、例えば建築現場等の屋外で用いられてもよい。このような場合には、第1の情報に代えて、施工の内容を示す施工名称情報を採用してもよい。
次に、変形例について説明する。
上記実施形態では、プログラムが、製造工場100内の製造現場で使用される例を示したが、このような例に限られない。プログラムは、例えば建築現場等の屋外で用いられてもよい。このような場合には、第1の情報に代えて、施工の内容を示す施工名称情報を採用してもよい。
上記実施形態における処理の流れは、矛盾しない範囲で変更可能である。例えば、第2の情報を第1の情報の前に入力してもよいし、工程画像を最初に取得してもよい。
上記実施形態では、第1の情報を行の項目、すなわち表側とし、第2の情報を列の項目、すなわち表頭として、管理表を作成する構成を示したが、このような態様に限られない。第1の情報を列の項目、すなわち表頭とし、第2の情報を行の項目、すなわち表側として、管理表を作成してもよい。
上記実施形態では、閲覧時に作業がされているべき製造工程を示す第2の情報を、インジケータ70により強調して表示する構成を示したが、このような態様に限られない。
例えば、インジケータ70を用いることなく、該当する第2の情報が明るく表示されるような態様により、該当する第2の情報を強調表示してもよい。また、該当する第2の情報のフレームに含まれる画像情報を明るく表示してもよい。また、該当する第2の情報を点滅させるような態様により、該当する画像情報を強調表示してもよい。
例えば、インジケータ70を用いることなく、該当する第2の情報が明るく表示されるような態様により、該当する第2の情報を強調表示してもよい。また、該当する第2の情報のフレームに含まれる画像情報を明るく表示してもよい。また、該当する第2の情報を点滅させるような態様により、該当する画像情報を強調表示してもよい。
以上、本開示の好ましい実施形態について説明したが、本開示は係る特定の実施形態に限定されるものではなく、本開示には、特許請求の範囲に記載された発明とその均等の範囲が含まれる。
また、上記実施形態及び変形例で説明した装置の構成は、技術的な矛盾が生じない限り、適宜組み合わせ可能である。
また、上記実施形態及び変形例で説明した装置の構成は、技術的な矛盾が生じない限り、適宜組み合わせ可能である。
1 システム
10 情報処理サーバ
20 スマートフォン
30 タブレット端末
50 ネットワーク
16 プロセッサ
16A 受付部
16B 管理表作成部
16C データ表示部
16D 日数算出部
10 情報処理サーバ
20 スマートフォン
30 タブレット端末
50 ネットワーク
16 プロセッサ
16A 受付部
16B 管理表作成部
16C データ表示部
16D 日数算出部
Claims (12)
- コンピュータのプロセッサに、
製造現場において製造される完成品の一部を構成する部品の名称を示す第1の情報の入力を受け付けるステップと、
前記部品の製造工程の名称を示す第2の情報の入力を受け付けるステップと、
前記製造工程の様子を撮影した画像情報の入力を受け付けるステップと、
前記画像情報と、前記第1の情報と、前記第2の情報と、を関連付けるステップと、
前記画像情報を、前記第1の情報および前記第2の情報とともにユーザに対して提示す
るステップと、を実行させ、
前記画像情報を提示するステップにおいて、
前記第1の情報および前記第2の情報のうちのいずれか一方を行の項目として、他方を列の項目として、表の形式で前記画像情報を提示し、
前記表は、前記第1の情報および前記第2の情報のうち、いずれか一方が縦並びに配置された表側と、他方が横並びに配置された表頭と、により区画される複数のフレームにより構成され、
前記フレーム内には、前記第1の情報および前記第2の情報に該当する画像が複数表示されている、プログラム。 - 前記プロセッサに、
ユーザから、前記フレーム上でのスクロール操作を受け付けるステップと、
前記スクロール操作に伴って、前記フレームに該当する他の画像情報を順次表示させるステップと、を実行させる請求項1に記載のプログラム。 - コンピュータのプロセッサに、
前記部品の製造工程毎の製造スケジュールを示すスケジュール情報の入力を受け付けるステップと、
前記スケジュール情報を参照し、前記画像情報を閲覧する操作に応答して、当該操作の時点で作業がされているべき製造工程を示す前記第2の情報を強調して表示するステップと、を実行させる、
請求項1又は2に記載のプログラム。 - 前記第2の情報を強調して表示するステップにおいて、
前記表における前記第2の情報と対応するフレームに対して、インジケータを付することで、記第2の情報を強調して表示する、
請求項1から3のいずれか1項に記載のプログラム。 - コンピュータのプロセッサに、
前記部品の製造工程毎の製造スケジュールを示すスケジュール情報の入力を受け付けるステップと、
前記製造工程に対応付けられる画像情報が有する撮影日に関する撮影日情報に基づいて、当該製造工程に要した実績日数を算出するステップと、
前記スケジュール情報に定められた当該製造工程の予定日数を算出するステップと、
前記実績日数を、前記予定日数とともにユーザに対して提示するステップと、を実行させる、
請求項1から4のいずれか1項に記載のプログラム。 - 前記画像情報を提示するステップにおいて、
コンピュータのプロセッサに、
前記画像情報が有する撮影日を、当該画像情報とともに表示させる、
請求項1から5のいずれか1項に記載のプログラム - コンピュータのプロセッサに、
選択した前記第1の情報に該当する画像情報を、時系列に沿って一覧表示するステップを実行させる、
請求項1から6のいずれか1項に記載のプログラム。 - コンピュータのプロセッサに、
選択した前記第2の情報に該当する画像情報を、時系列に沿って一覧表示するステップを実行させる、
請求項1から7のいずれか1項に記載のプログラム。 - 前記画像情報を関連付けるステップにおいて、
ユーザの操作に応答して、前記画像情報と、前記第1の情報と、前記第2の情報と、を関連付ける、
請求項1から8のいずれか1項に記載のプログラム。 - 前記部品とは、前記製造現場において、材料に対して少なくとも1つ以上の加工が施され、後工程において完成品の一部を構成するように用いられる中間生成物である、
請求項1から9のいずれか1項に記載のプログラム。 - コンピュータのプロセッサが、
製造現場において製造される完成品の一部を構成する部品の名称を示す第1の情報の入力を受け付けるステップと、
前記部品の製造工程の名称を示す第2の情報の入力を受け付けるステップと、
前記製造工程の様子を撮影した画像情報の入力を受け付けるステップと、
前記画像情報と、前記第1の情報と、前記第2の情報と、を関連付けるステップと、
前記画像情報を、前記第1の情報および前記第2の情報とともにユーザに対して提示するステップと、を実行し、
前記画像情報を提示するステップにおいて、
前記第1の情報および前記第2の情報を、行および列の項目として表の形式で前記画
像情報を提示し、
前記表は、前記第1の情報および前記第2の情報のうち、いずれか一方が縦並びに配置された表側と、他方が横並びに配置された表頭と、により区画される複数のフレームにより構成され、
前記フレーム内には、前記第1の情報および前記第2の情報に該当する画像が複数表示されている、方法。 - プロセッサとメモリとを備えるシステムであって、
前記プロセッサは、
製造現場において製造される完成品の一部を構成する部品の名称を示す第1の情報の入力を受け付け、
前記部品の製造工程の名称を示す第2の情報の入力を受け付け、
前記製造工程の様子を撮影した画像情報の入力を受け付け、
前記画像情報と、前記第1の情報と、前記第2の情報と、を関連付け、
前記第1の情報、および前記第2の情報が、項目となる管理表を作成し、
前記画像情報を、前記第1の情報および前記第2の情報とともにユーザに対して提示し、
前記画像情報を提示する際に、
前記第1の情報および前記第2の情報を、行および列の項目として表の形式で前記画
像情報を提示し、
前記表は、前記第1の情報および前記第2の情報のうち、いずれか一方が縦並びに配置された表側と、他方が横並びに配置された表頭と、により区画される複数のフレームにより構成され、
前記フレーム内には、前記第1の情報および前記第2の情報に該当する画像が複数表示されているように構成されているシステム。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020227006091A KR20220039768A (ko) | 2020-07-03 | 2021-06-28 | 프로그램, 방법, 및 시스템 |
EP21833134.6A EP4177816A4 (en) | 2020-07-03 | 2021-06-28 | PROGRAM, METHOD AND SYSTEM |
CN202180005052.6A CN114287015B (zh) | 2020-07-03 | 2021-06-28 | 程序、方法以及系统 |
US17/665,963 US11360457B2 (en) | 2020-07-03 | 2022-02-07 | System and method for reporting manufacturing progress |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020115414A JP6931439B1 (ja) | 2020-07-03 | 2020-07-03 | プログラム、方法、及びシステム |
JP2020-115414 | 2020-07-03 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/665,963 Continuation US11360457B2 (en) | 2020-07-03 | 2022-02-07 | System and method for reporting manufacturing progress |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022004675A1 true WO2022004675A1 (ja) | 2022-01-06 |
Family
ID=77549883
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2021/024416 WO2022004675A1 (ja) | 2020-07-03 | 2021-06-28 | プログラム、方法、及びシステム |
Country Status (6)
Country | Link |
---|---|
US (1) | US11360457B2 (ja) |
EP (1) | EP4177816A4 (ja) |
JP (2) | JP6931439B1 (ja) |
KR (1) | KR20220039768A (ja) |
CN (1) | CN114287015B (ja) |
WO (1) | WO2022004675A1 (ja) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08185447A (ja) * | 1994-12-27 | 1996-07-16 | Shin Caterpillar Mitsubishi Ltd | 工事写真アルバム作成システム |
JP2002024330A (ja) * | 2000-05-01 | 2002-01-25 | Sanei House Kk | 情報提供方法 |
JP2002297954A (ja) * | 2001-01-23 | 2002-10-11 | Mazda Motor Corp | 車両情報提供装置、車両情報提供システム、車両情報提供方法、並びにコンピュータ・プログラム及びコンピュータ読み取り可能な記憶媒体 |
JP2003303219A (ja) * | 2002-04-11 | 2003-10-24 | Mitsubishi Materials Corp | 状況管理システム、状況管理方法および状況管理プログラム |
JP2007164446A (ja) | 2005-12-13 | 2007-06-28 | Tohoku Ricoh Co Ltd | 製造工程管理システム |
WO2013035687A1 (ja) * | 2011-09-05 | 2013-03-14 | 株式会社Tecapo | 作業管理システム、作業管理端末、プログラム及び作業管理方法 |
JP2013250713A (ja) * | 2012-05-31 | 2013-12-12 | Mitsubishi Heavy Ind Ltd | スケジュール管理装置およびその管理方法並びに管理プログラム、それを備えたスケジュール管理システム |
JP2015212916A (ja) * | 2014-04-15 | 2015-11-26 | 福井コンピュータホールディングス株式会社 | 進捗管理システム |
US20170286890A1 (en) * | 2016-04-01 | 2017-10-05 | Thomas J. Fuessel, JR. | Method for Arranging and Managing Employment Contracts |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4735172B2 (ja) * | 2005-10-06 | 2011-07-27 | オムロン株式会社 | 生産管理装置、生産管理方法、生産管理プログラム、生産管理プログラムを記録した記録媒体、および生産システム |
CN101639912A (zh) * | 2008-08-11 | 2010-02-03 | 香港纺织及成衣研发中心 | 基于射频识别的生产监测系统 |
JP2011198353A (ja) * | 2010-02-24 | 2011-10-06 | Hitachi Ltd | 作業者割付装置、作業者割付プログラム、作業者割付システム及び作業者割付方法 |
JP2011227811A (ja) | 2010-04-22 | 2011-11-10 | Hitachi-Ge Nuclear Energy Ltd | 作業管理システム及び作業管理方法 |
JP6519656B2 (ja) * | 2015-07-24 | 2019-05-29 | 富士通株式会社 | 製造工程管理システム、製造工程管理方法および製造工程管理プログラム |
CN108139739B (zh) * | 2015-09-30 | 2020-12-08 | 富士通株式会社 | 制造状态显示系统和显示方法及记录制造状态显示程序的记录介质 |
US10401836B2 (en) * | 2016-03-21 | 2019-09-03 | Fisher-Rosemount Systems, Inc. | Methods and apparatus to setup single-use equipment/processes |
JP6824838B2 (ja) | 2017-07-07 | 2021-02-03 | 株式会社日立製作所 | 作業データ管理システム及び作業データ管理方法 |
CN109840649A (zh) * | 2017-11-28 | 2019-06-04 | 株式会社日立制作所 | 作业人员评价系统、作业人员评价装置及评价方法 |
JP7054668B2 (ja) * | 2018-11-08 | 2022-04-14 | 株式会社日立製作所 | 動的生産計画システムおよび動的生産計画装置 |
JP7418973B2 (ja) * | 2019-06-06 | 2024-01-22 | 株式会社東芝 | 制御システム及び制御方法 |
-
2020
- 2020-07-03 JP JP2020115414A patent/JP6931439B1/ja active Active
-
2021
- 2021-06-23 JP JP2021104004A patent/JP2022013774A/ja active Pending
- 2021-06-28 EP EP21833134.6A patent/EP4177816A4/en active Pending
- 2021-06-28 KR KR1020227006091A patent/KR20220039768A/ko not_active Application Discontinuation
- 2021-06-28 WO PCT/JP2021/024416 patent/WO2022004675A1/ja active Application Filing
- 2021-06-28 CN CN202180005052.6A patent/CN114287015B/zh active Active
-
2022
- 2022-02-07 US US17/665,963 patent/US11360457B2/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08185447A (ja) * | 1994-12-27 | 1996-07-16 | Shin Caterpillar Mitsubishi Ltd | 工事写真アルバム作成システム |
JP2002024330A (ja) * | 2000-05-01 | 2002-01-25 | Sanei House Kk | 情報提供方法 |
JP2002297954A (ja) * | 2001-01-23 | 2002-10-11 | Mazda Motor Corp | 車両情報提供装置、車両情報提供システム、車両情報提供方法、並びにコンピュータ・プログラム及びコンピュータ読み取り可能な記憶媒体 |
JP2003303219A (ja) * | 2002-04-11 | 2003-10-24 | Mitsubishi Materials Corp | 状況管理システム、状況管理方法および状況管理プログラム |
JP2007164446A (ja) | 2005-12-13 | 2007-06-28 | Tohoku Ricoh Co Ltd | 製造工程管理システム |
WO2013035687A1 (ja) * | 2011-09-05 | 2013-03-14 | 株式会社Tecapo | 作業管理システム、作業管理端末、プログラム及び作業管理方法 |
JP2013250713A (ja) * | 2012-05-31 | 2013-12-12 | Mitsubishi Heavy Ind Ltd | スケジュール管理装置およびその管理方法並びに管理プログラム、それを備えたスケジュール管理システム |
JP2015212916A (ja) * | 2014-04-15 | 2015-11-26 | 福井コンピュータホールディングス株式会社 | 進捗管理システム |
US20170286890A1 (en) * | 2016-04-01 | 2017-10-05 | Thomas J. Fuessel, JR. | Method for Arranging and Managing Employment Contracts |
Non-Patent Citations (1)
Title |
---|
See also references of EP4177816A1 |
Also Published As
Publication number | Publication date |
---|---|
EP4177816A4 (en) | 2023-09-06 |
CN114287015A (zh) | 2022-04-05 |
JP2022013774A (ja) | 2022-01-18 |
CN114287015B (zh) | 2023-08-18 |
KR20220039768A (ko) | 2022-03-29 |
JP2022013092A (ja) | 2022-01-18 |
JP6931439B1 (ja) | 2021-09-08 |
US20220155753A1 (en) | 2022-05-19 |
US11360457B2 (en) | 2022-06-14 |
EP4177816A1 (en) | 2023-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5994979B2 (ja) | 作業情報登録装置及び作業情報管理システム | |
JP5069764B2 (ja) | 工事現場管理システム及びサーバ | |
CN105320695A (zh) | 图片处理方法及装置 | |
JP6187958B2 (ja) | 工事現場撮影装置及びシステム | |
CN105005599A (zh) | 一种照片分享方法及移动终端 | |
JP4801738B2 (ja) | 作業支援プログラム | |
WO2022004675A1 (ja) | プログラム、方法、及びシステム | |
TW201234201A (en) | Intelligent data management methods and systems, and computer program products thereof | |
TWI677833B (zh) | 個性化定制系統及方法 | |
JP6358701B2 (ja) | 建築物工程管理サーバ及び建築物工程管理システム | |
JP5747886B2 (ja) | 画像管理装置及びプログラム | |
JP7019641B2 (ja) | メータ管理システム及びメータ管理携帯端末 | |
JP7216421B2 (ja) | 受発注システム | |
US20140063240A1 (en) | Systems, apparatuses, and methods for branding and/or advertising through immediate user interaction, social networking, and image sharing | |
JP7497969B2 (ja) | 画像掲載支援システム、画像掲載支援端末、およびプログラム | |
CN106201205A (zh) | 显示方法和装置 | |
JP2018107775A (ja) | 情報処理装置、及びその制御方法、プログラム | |
JP6927608B2 (ja) | 画像管理システム、画像管理方法、および画像管理プログラム | |
JP2000267972A (ja) | ネットワークシステム、このシステムで用いられるサーバ装置 | |
US20230154190A1 (en) | Display control system, display control method, and recording medium containing display control program | |
JP2017146979A (ja) | 画像データ提供装置、画像データ表示方法、およびカレンダ表示用プログラム | |
JP2007286792A (ja) | 建築コミュニケーションシステム | |
JP2014139779A (ja) | 情報処理装置、情報処理システム、その制御方法及びプログラム | |
JP6166295B2 (ja) | 画像データ提供システム、画像データ提供方法、および画像データ提供プログラム | |
JP2017126226A (ja) | データ送信方法、データ送信プログラム、及びデータ送信装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21833134 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 20227006091 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2021833134 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |