WO2021131634A1 - 熱分解装置および熱分解方法 - Google Patents

熱分解装置および熱分解方法 Download PDF

Info

Publication number
WO2021131634A1
WO2021131634A1 PCT/JP2020/045453 JP2020045453W WO2021131634A1 WO 2021131634 A1 WO2021131634 A1 WO 2021131634A1 JP 2020045453 W JP2020045453 W JP 2020045453W WO 2021131634 A1 WO2021131634 A1 WO 2021131634A1
Authority
WO
WIPO (PCT)
Prior art keywords
combustion chamber
raw material
gas
thermal decomposition
fluidized
Prior art date
Application number
PCT/JP2020/045453
Other languages
English (en)
French (fr)
Inventor
藤原 孝
貴行 井原
Original Assignee
荏原環境プラント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 荏原環境プラント株式会社 filed Critical 荏原環境プラント株式会社
Priority to EP20905304.0A priority Critical patent/EP4083170A4/en
Priority to CN202080089816.XA priority patent/CN114846123A/zh
Priority to US17/786,102 priority patent/US20230025336A1/en
Priority to KR1020227021290A priority patent/KR20220119620A/ko
Publication of WO2021131634A1 publication Critical patent/WO2021131634A1/ja

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B49/00Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated
    • C10B49/02Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated with hot gases or vapours, e.g. hot gases obtained by partial combustion of the charge
    • C10B49/04Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated with hot gases or vapours, e.g. hot gases obtained by partial combustion of the charge while moving the solid material to be treated
    • C10B49/08Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated with hot gases or vapours, e.g. hot gases obtained by partial combustion of the charge while moving the solid material to be treated in dispersed form
    • C10B49/10Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated with hot gases or vapours, e.g. hot gases obtained by partial combustion of the charge while moving the solid material to be treated in dispersed form according to the "fluidised bed" technique
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/46Gasification of granular or pulverulent flues in suspension
    • C10J3/54Gasification of granular or pulverulent fuels by the Winkler technique, i.e. by fluidisation
    • C10J3/56Apparatus; Plants
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G1/00Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal
    • C10G1/10Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal from rubber or rubber waste
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B53/00Destructive distillation, specially adapted for particular solid raw materials or solid raw materials in special form
    • C10B53/07Destructive distillation, specially adapted for particular solid raw materials or solid raw materials in special form of solid raw materials consisting of synthetic polymeric materials, e.g. tyres
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B57/00Other carbonising or coking processes; Features of destructive distillation processes in general
    • C10B57/02Multi-step carbonising or coking processes
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/46Gasification of granular or pulverulent flues in suspension
    • C10J3/48Apparatus; Plants
    • C10J3/482Gasifiers with stationary fluidised bed
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/72Other features
    • C10J3/723Controlling or regulating the gasification process
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/02Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment
    • F23G5/027Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment pyrolising or gasifying stage
    • F23G5/0276Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment pyrolising or gasifying stage using direct heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/30Incineration of waste; Incinerator constructions; Details, accessories or control therefor having a fluidised bed
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G2300/00Aspects relating to hydrocarbon processing covered by groups C10G1/00 - C10G99/00
    • C10G2300/10Feedstock materials
    • C10G2300/1003Waste materials
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2200/00Details of gasification apparatus
    • C10J2200/15Details of feeding means
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/09Details of the feed, e.g. feeding of spent catalyst, inert gas or halogens
    • C10J2300/0903Feed preparation
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/09Details of the feed, e.g. feeding of spent catalyst, inert gas or halogens
    • C10J2300/0913Carbonaceous raw material
    • C10J2300/0946Waste, e.g. MSW, tires, glass, tar sand, peat, paper, lignite, oil shale
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/09Details of the feed, e.g. feeding of spent catalyst, inert gas or halogens
    • C10J2300/0953Gasifying agents
    • C10J2300/0956Air or oxygen enriched air
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/09Details of the feed, e.g. feeding of spent catalyst, inert gas or halogens
    • C10J2300/0953Gasifying agents
    • C10J2300/0959Oxygen
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/09Details of the feed, e.g. feeding of spent catalyst, inert gas or halogens
    • C10J2300/0983Additives
    • C10J2300/0993Inert particles, e.g. as heat exchange medium in a fluidized or moving bed, heat carriers, sand
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/12Heating the gasifier
    • C10J2300/1246Heating the gasifier by external or indirect heating
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/1603Integration of gasification processes with another plant or parts within the plant with gas treatment
    • C10J2300/1606Combustion processes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/005Fluidised bed combustion apparatus comprising two or more beds
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/18Details; Accessories
    • F23C10/28Control devices specially adapted for fluidised bed, combustion apparatus

Definitions

  • the present invention relates to a pyrolysis apparatus and a thermal decomposition method for thermally decomposing a raw material in a fluidized bed furnace, particularly a thermal decomposition apparatus and a thermal decomposition apparatus for thermally decomposing a raw material using an internal circulating fluidized bed gasification technique to obtain a thermal decomposition product.
  • a thermal decomposition method for thermally decomposing a raw material in a fluidized bed furnace, particularly a thermal decomposition apparatus and a thermal decomposition apparatus for thermally decomposing a raw material using an internal circulating fluidized bed gasification technique to obtain a thermal decomposition product.
  • the fluidized bed furnace disclosed in Patent Documents 1 and 2 has a structure in which the inside of the furnace is divided into a gasification chamber and a combustion chamber by a partition wall.
  • the flow medium circulates between the gasification chamber and the combustion chamber, and the raw material is charged into the gasification chamber.
  • the raw material is heated by a fluid medium in the gasification chamber, pyrolyzed, and then gasified.
  • the residue of the raw material is carried to the combustion chamber by the fluid medium.
  • the residue of the raw material burns in the fuel chamber to heat the fluid medium.
  • the heated fluid medium moves into the gasification chamber and functions as a heat source in the gasification chamber.
  • a fluidized bed furnace in which a fluidized bed circulates in the furnace in this way is known as an internal circulating fluidized bed gasification system.
  • Waste plastic is usually incinerated in an incinerator. Recently, from the viewpoint of suppressing carbon dioxide emissions, there is an increasing demand for recovering oil by thermally decomposing waste plastic (Patent Documents 3 and 4). However, it is difficult to recover oil in high yield, and the reality is that there are few examples of commercial success.
  • the above-mentioned internal circulation fluidized bed gasification system is a technology capable of heating waste plastic in a gasification chamber to thermally decompose it and recovering an organic compound that is liquid at normal temperature and pressure, that is, oil as a thermal decomposition product. Is expected as.
  • waste plastic has a high carbon content, and a large amount of carbide (char) is produced after thermal decomposition. This unburned carbon cannot be recovered as oil and must be burned in the combustion chamber. As a result, carbon dioxide emissions increase, while the yield of pyrolysis products decreases.
  • carbide char
  • the internal circulating fluidized bed gasification system is also attracting attention as a technology for recovering various substances including oil.
  • thermally decompose the raw material in the gasification chamber and recover the target substance as a thermal decomposition product it is necessary to heat the raw material at an appropriate temperature in the gasification chamber.
  • the hot fluid medium moved from the combustion chamber forms a local hot region in the gasification chamber. Therefore, a part of the raw material may be excessively heated by the high temperature fluid medium to produce an unintended substance.
  • the thermal decomposition of waste plastic accelerates as the temperature rises, and becomes a gas that is a gas at room temperature, so that the yield of oil that is liquid at room temperature decreases.
  • the higher the temperature the higher the transfer rate to carbide (char), and the lower the yield of pyrolysis products.
  • the above-mentioned internal circulating fluidized bed gasification system can also be used for the purpose of thermally decomposing combustible materials such as biomass, municipal waste, and organic waste, and recovering useful substances as thermal decomposition products.
  • biomass and municipal waste have a relatively low carbon (C) content compared to oxygen (O) and hydrogen (H), and a large amount of heat is required to burn these flammable materials in the combustion chamber. Needs. Therefore, most of the carbon contained in the flammable material is sent to the combustion chamber and consumed for combustion in the combustion chamber. As a result, the yield of carbon decreases in the gasification chamber.
  • the present invention provides a pyrolysis apparatus and a pyrolysis method capable of increasing the yield of the intended pyrolysis product.
  • a pyrolysis device for thermally decomposing raw materials in a flow bed made of a flowing flow medium, and divides the inside of the flow bed furnace and the flow bed furnace into a thermal decomposition chamber and a combustion chamber.
  • the first fluidized gas and the second flow into the first partition wall, the second partition wall that divides the combustion chamber into the main combustion chamber and the settling combustion chamber, the pyrolysis chamber, the main combustion chamber, and the settling combustion chamber.
  • the first air diffuser, the second air diffuser, and the third air diffuser that supply the chemical gas and the third fluidized gas, respectively, and the first raw material are supplied to the pyrolysis chamber in the first supply amount.
  • One raw material supply device and a second raw material supply device that supplies a second raw material having a lower ratio of carbon to hydrogen and a ratio of carbon to oxygen than the first raw material to the pyrolysis chamber in a second supply amount.
  • a pyrolysis apparatus including an operation control unit that independently controls the operation of the first raw material supply device and the second raw material supply device.
  • the operation control unit is configured to adjust the ratio of the first supply amount to the second supply amount based on the temperature in the main combustion chamber or the temperature in the sedimentation combustion chamber.
  • the pyrolysis apparatus further includes a third raw material supply device that supplies the first raw material to the main combustion chamber, and a fourth raw material supply device that supplies the second raw material to the main combustion chamber. There is.
  • the operation control unit is configured to control the operation of the third air diffuser so that the temperature in the settling combustion chamber falls within a predetermined temperature range.
  • the third air diffuser is attached to the air box arranged below the settling combustion chamber, the fluidized gas supply line connected to the air box, and the fluidized gas supply line.
  • a temperature controller and a gas flow control valve attached to the fluidized gas supply line are provided, and the operation control unit controls the temperature so that the temperature in the settling combustion chamber falls within the predetermined temperature range. It is configured to control the operation of at least one of the device and the gas flow control valve.
  • the pyrolysis apparatus further includes a heat recovery device that recovers heat from the flow medium in the sedimentation combustion chamber, and the operation control unit keeps the temperature in the sedimentation combustion chamber within a predetermined temperature range. It is configured to control the operation of the heat recovery device.
  • the heat recovery device includes a heat transfer tube arranged in the settling combustion chamber and a refrigerant flow rate adjusting valve for adjusting the flow rate of the cooling medium flowing in the heat transfer tube, and the operation control unit includes the operation control unit. The operation of the refrigerant flow control valve is controlled so that the temperature in the settling combustion chamber falls within the predetermined temperature range.
  • the third air diffuser includes a plurality of air boxes arranged under the settling combustion chamber, a plurality of fluidized gas supply lines connected to the plurality of air boxes, and the plurality of flow rate gas supply lines.
  • a plurality of gas flow rate control valves attached to each of the fluidized gas supply lines are provided, and the operation control unit comprises the plurality of gas flow rate control valves so that the opening degrees of the plurality of gas flow rate control valves are different from each other. It is configured to control the operation of.
  • the first air diffuser comprises at least one first fluidized gas supply source that supplies the first fluidized gas to the pyrolysis chamber, the first fluidized gas supply source. , Includes at least one source for supplying at least one of carbon monoxide gas, carbon dioxide gas, hydrogen gas, hydrocarbon gas, steam, nitrogen gas.
  • a pyrolysis device for thermally decomposing raw materials in a flow bed made of a flowing flow medium, and divides the inside of the flow bed furnace and the flow bed furnace into a thermal decomposition chamber and a combustion chamber.
  • the first fluidized gas and the second flow into the first partition wall, the second partition wall that divides the combustion chamber into the main combustion chamber and the settling combustion chamber, the pyrolysis chamber, the main combustion chamber, and the settling combustion chamber.
  • the first air diffuser, the second air diffuser, and the third air diffuser that supply the chemical gas and the third fluidized gas, respectively, the raw material supply device that supplies the raw material to the pyrolysis chamber, and the sedimentation combustion.
  • a pyrolysis apparatus including a sedimentation combustion chamber thermometer for measuring the temperature in the chamber and an operation control unit for controlling the temperature in the sedimentation combustion chamber.
  • the operation control unit is configured to control the operation of the third air diffuser so that the measured value of the temperature in the settling combustion chamber falls within a predetermined temperature range.
  • the third air diffuser is attached to the air box arranged below the settling combustion chamber, the fluidized gas supply line connected to the air box, and the fluidized gas supply line. It is provided with a temperature controller and a gas flow rate control valve attached to the fluidized gas supply line, and the operation control unit makes the measured value of the temperature in the settling combustion chamber within the predetermined temperature range. It is configured to control the operation of at least one of the temperature controller and the gas flow control valve.
  • the thermal decomposition apparatus further includes a heat recovery device that recovers heat from the flow medium in the sedimentation combustion chamber, and the operation control unit measures the temperature in the sedimentation combustion chamber within a predetermined temperature range. It is configured to control the operation of the heat recovery device so as to fit in the heat recovery device.
  • the heat recovery device includes a heat transfer tube arranged in the settling combustion chamber and a refrigerant flow rate adjusting valve for adjusting the flow rate of the cooling medium flowing in the heat transfer tube, and the operation control unit includes the operation control unit. The operation of the refrigerant flow control valve is controlled so that the measured value of the temperature in the settling combustion chamber falls within the predetermined temperature range.
  • the third air diffuser includes a plurality of air boxes arranged under the settling combustion chamber, a plurality of fluidized gas supply lines connected to the plurality of air boxes, and the plurality of flow rate gas supply lines.
  • a plurality of gas flow rate control valves attached to each of the fluidized gas supply lines are provided, and the operation control unit comprises the plurality of gas flow rate control valves so that the opening degrees of the plurality of gas flow rate control valves are different from each other. It is configured to control the operation of.
  • the third air diffuser comprises a fluidized gas supply source that supplies the third fluidized gas to the sedimentation combustion chamber, and the fluidized gas supply source is carbon monoxide gas, carbon dioxide. It includes at least one source for supplying at least one of carbon gas, hydrogen gas, hydrocarbon gas, steam and nitrogen gas.
  • it is a thermal decomposition method for thermally decomposing a raw material by using a thermal decomposition apparatus in which the inside of a fluidized bed furnace containing a fluid medium is partitioned into a thermal decomposition chamber, a main combustion chamber, and a sedimentation combustion chamber. Then, the first fluidized gas is supplied to the pyrolysis chamber, the first fluidized bed is formed in the pyrolysis chamber, and the first raw material is supplied to the pyrolysis chamber in the first supply amount.
  • a second raw material having a lower ratio of carbon to hydrogen and a ratio of carbon to oxygen than one raw material is supplied to the pyrolysis chamber in a second supply amount, and the first raw material and the second raw material are supplied to the pyrolysis chamber.
  • the second fluidized gas is supplied to the main combustion chamber to form a second fluidized bed in the main combustion chamber, and the residue of the first raw material and the residue of the second raw material are subjected to the main combustion.
  • Pyrolysis chamber from the main combustion chamber through the sedimentation combustion chamber while burning in the chamber and supplying a third fluidized gas to the sedimentation combustion chamber to form a third flow bed in the sedimentation combustion chamber.
  • a pyrolysis method is provided that moves to.
  • the ratio of the first supply amount to the second supply amount is controlled based on the temperature in the main combustion chamber or the temperature in the sedimentation combustion chamber. In one aspect, at least one of the first raw material and the second raw material is supplied to the main combustion chamber while supplying the first raw material and the second raw material to the thermal decomposition chamber. In one aspect, the temperature or flow rate of the third fluidized gas is adjusted so that the temperature in the settling combustion chamber falls within a predetermined temperature range.
  • a heat transfer tube through which a cooling medium flows is arranged in the settling combustion chamber, and the flow rate of the cooling medium is adjusted so that the temperature in the settling combustion chamber falls within a predetermined temperature range.
  • a fluidized medium forming the third fluidized bed by supplying the third fluidized gas to the sedimentation combustion chamber at different flow rates from a plurality of air boxes arranged below the sedimentation combustion chamber.
  • the first fluidized gas comprises at least one of carbon monoxide gas, carbon dioxide gas, hydrogen gas, hydrocarbon gas, steam and nitrogen gas.
  • it is a thermal decomposition method for thermally decomposing a raw material by using a thermal decomposition apparatus in which the inside of a fluidized bed furnace containing a fluid medium is partitioned into a thermal decomposition chamber, a main combustion chamber, and a sedimentation combustion chamber.
  • the first fluidized gas is supplied to the pyrolysis chamber to form the first fluidized bed in the pyrolysis chamber
  • the raw material is supplied to the pyrolysis chamber
  • the raw material is pyrolyzed in the pyrolysis chamber.
  • the residue of the raw material is burned in the main combustion chamber, and the sedimentation combustion chamber is charged with the third.
  • the flow medium While supplying fluidized gas to form a third flow bed in the sedimentation combustion chamber, the flow medium is moved from the main combustion chamber to the pyrolysis chamber through the sedimentation combustion chamber, and the temperature in the sedimentation combustion chamber is determined. Pyrolysis methods are provided that are controlled within the temperature range of.
  • the temperature or flow rate of the third fluidized gas is adjusted so that the temperature in the settling combustion chamber falls within the predetermined temperature range.
  • a heat transfer tube through which a cooling medium flows is arranged in the settling combustion chamber, and the flow rate of the cooling medium is adjusted so that the temperature in the settling combustion chamber falls within the predetermined temperature range.
  • a fluidized medium forming the third fluidized bed by supplying the third fluidized gas to the sedimentation combustion chamber at different flow rates from a plurality of air boxes arranged below the sedimentation combustion chamber. To turn.
  • the first raw material having a high ratio of carbon to hydrogen (carbon / hydrogen ratio) and the ratio of carbon to oxygen (carbon / oxygen ratio) has a ratio of these as compared with the first raw material.
  • a low second raw material is simultaneously supplied to the pyrolysis chamber.
  • the heat energy generated from the residue of the first raw material can sufficiently heat the fluid medium in the main combustion chamber. Therefore, the amount of heat that the residue of the second raw material should retain in the main combustion chamber may be low. As a result, the yield of pyrolysis products from the second raw material is improved.
  • the heated flow medium moves from the main combustion chamber through the sedimentation combustion chamber to the thermal decomposition chamber, and thermally decomposes the first raw material and the second raw material.
  • the fluid medium moves to the pyrolysis chamber after the temperature of the fluid medium is adjusted in advance, a local high temperature region is not formed in the pyrolysis chamber. Therefore, the raw material is heated in an appropriate temperature range in the pyrolysis chamber, and as a result, the yield of the desired pyrolysis product (for example, oil) can be improved.
  • the desired pyrolysis product for example, oil
  • FIG. 1 is a schematic view showing an embodiment of a thermal decomposition device.
  • the thermal decomposition apparatus shown in FIG. 1 includes a thermal decomposition chamber 4 that thermally decomposes a raw material to generate a thermal decomposition product, and a combustion chamber 5 that burns a residue of the thermally decomposed raw material.
  • the pyrolysis chamber 4 and the combustion chamber 5 are formed in one fluidized bed furnace 1. That is, the inside of the fluidized bed furnace 1 is partitioned into a thermal decomposition chamber 4 and a combustion chamber 5 by a first partition wall 11, and the combustion chamber 5 is further divided into a main combustion chamber 6 and a settling combustion chamber 7 by a second partition wall 12. It is partitioned into.
  • the overall shape of the fluidized bed furnace 1 is not particularly limited, but has, for example, a cylindrical shape or a rectangular shape.
  • a fluid medium (for example, silica sand) is housed in the pyrolysis chamber 4, the main combustion chamber 6, and the sedimentation combustion chamber 7.
  • the pyrolysis chamber 4, the main combustion chamber 6, and the sedimentation combustion chamber 7 are connected to the first air diffuser 15, the second air diffuser 25, and the third air diffuser 35, respectively.
  • the first air diffuser 15, the second air diffuser 25, and the third air diffuser 35 combine the first fluidized gas, the second fluidized gas, and the third fluidized gas into a pyrolysis chamber 4, a main combustion chamber.
  • the flow medium in each of the chambers 4, 5 and 7 is flowed by independently blowing into 6 and the sedimentation combustion chamber 7.
  • the fluidized bed forms the first fluidized bed 51, the second fluidized bed 52, and the third fluidized bed 53 in the thermal decomposition chamber 4, the main combustion chamber 6, and the settling combustion chamber 7.
  • the first air diffuser 15 includes a plurality of (two in FIG. 1) first air boxes 16 under the thermal decomposition chamber 4, and a first fluidized gas supply line 17 connected to these first air boxes 16. And the first fluidized gas supply source 18 connected to the first fluidized gas supply line 17, and a plurality of (two in FIG. 1) first gas flow rate adjustments attached to the first fluidized gas supply line 17. A valve (or a first gas flow rate adjusting damper) 19 is provided.
  • the first fluidized gas supply line 17 has a plurality of first branch lines 17a, and the first gas flow rate control valve 19 is attached to each of these first branch lines 17a.
  • the upper wall of the first wind box 16 is made of a perforated plate 16a.
  • the perforated plate 16a constitutes the hearth of the pyrolysis chamber 4.
  • water vapor is used as the first fluidized gas.
  • a boiler that generates water vapor is used as the first fluidized gas supply source 18.
  • air may be used as the first fluidized gas.
  • the first air diffuser 15 may include a blower as the first fluidized gas supply source 18. Further, the first air diffuser 15 may include a temperature controller for heating the first fluidized gas. The temperature controller is attached to the first fluidized gas supply line 17.
  • the second air diffuser 25 includes a plurality of (three in FIG. 1) second air boxes 26, a second fluidized gas supply line 27 connected to the second air box 26, and a second fluidized gas supply.
  • a second fluidized gas supply source 28 connected to the line 27 and a plurality of (three in FIG. 1) second gas flow rate adjusting valves (or second gas flow rate adjusting) attached to the second fluidized gas supply line 27. It includes a damper) 29 and a second temperature controller 30 attached to the second fluidized gas supply line 27.
  • the second fluidized gas supply line 27 has a plurality of second branch lines 27a, and the second gas flow rate control valve 29 is attached to each of these second branch lines 27a.
  • the upper wall of the second air box 26 is made of a perforated plate 26a.
  • the perforated plate 26a constitutes the hearth of the main combustion chamber 6.
  • the third air diffuser 35 is connected to at least one third air box 36, at least one third fluidized gas supply line 37 connected to the third air box 36, and a third fluidized gas supply line 37.
  • a third temperature controller 40 attached to the supply line 37 is provided.
  • the upper wall of the third air box 36 is made of a perforated plate 36a.
  • the perforated plate 36a constitutes the hearth of the settling combustion chamber 7.
  • the size of the white arrow shown in the wind boxes 16, 26, 36 indicates the flow velocity of the fluidized gas blown out. Due to the difference in the flow velocity of the fluidized gas, a swirling flow of the fluidized medium is formed in the pyrolysis chamber 4, and a swirled flow of the fluidized medium is also formed in the main combustion chamber 6.
  • the first fluidized bed 51 is formed of a swirling fluidized bed
  • the second fluidized bed 52 is also formed of a swirling fluidized bed.
  • the third fluidized bed 53 in the sedimentation combustion chamber 7 is formed from the downward flow of the fluidized medium. In one embodiment, the third fluidized bed 53 may also be formed from a swirling fluidized bed.
  • air is used for the second fluidized gas and the third fluidized gas supplied to the main combustion chamber 6 and the sedimentation combustion chamber 7, and the second fluidized gas supply source 28 and the third fluidized gas are supplied.
  • the fluidized gas supply source 38 is composed of a blower.
  • the present invention is not limited to the present embodiment, and other types of gases may be used as the second fluidized gas and the third fluidized gas.
  • the second fluidized gas source 28 may include at least one source for supplying at least one of carbon dioxide gas, steam, nitrogen gas, and oxygen.
  • the third fluidized gas supply source 38 provides at least one source for supplying at least one of carbon monoxide gas, carbon dioxide gas, hydrogen gas, hydrocarbon gas, steam, and nitrogen gas. It may be included.
  • the second fluidized gas supply source 28 and the third fluidized gas supply source 38 are connected to the second fluidized gas supply line 27 and the third fluidized gas supply line 37, respectively.
  • a common fluidized gas supply source may be connected to the second fluidized gas supply line 27 and the third fluidized gas supply line 37.
  • a common temperature controller may be attached to the second fluidized gas supply line 27 and the third fluidized gas supply line 37. ..
  • the pyrolysis chamber 4, the main combustion chamber 6, and the settling combustion chamber 7 constitute one fluidized bed furnace 1 as a whole.
  • the first partition wall 11 extends downward from the upper wall 1a of the fluidized bed furnace 1.
  • the lower end of the first partition wall 11 is not in contact with the hearth, and there is a first opening 61 under the first partition wall 11.
  • the first opening 61 is located at the bottom of the thermal decomposition chamber 4 and the settling combustion chamber 7, and the thermal decomposition chamber 4 and the settling combustion chamber 7 communicate with each other through the first opening 61. Therefore, the first opening 61 allows the fluid medium heated in the main combustion chamber 6 to move into the pyrolysis chamber 4 through the sedimentation combustion chamber 7.
  • the first opening 61 is located below the interface (upper surface) of the first fluidized bed 51 and the third fluidized bed 53 in the pyrolysis chamber 4 and the settling combustion chamber 7.
  • the second partition wall 12 extends upward from the hearth of the combustion chamber 5 (main combustion chamber 6 and sedimentation combustion chamber 7).
  • the upper end of the second partition wall 12 is not connected to the upper wall 1a of the fluidized bed furnace 1, and there is a second opening 62 above the second partition wall 12.
  • the second opening 62 is located in the freeboard portion 56 of the main combustion chamber 6 and the freeboard portion 57 of the settling combustion chamber 7, and the main combustion chamber 6 and the settling combustion chamber 7 pass through the second opening 62. Communicate with each other. More specifically, the freeboard portion 56 of the main combustion chamber 6 and the freeboard portion 57 of the sedimentation combustion chamber 7 communicate with each other through the second opening 62.
  • a weak fluidization region and a strong fluidization region are formed in the main combustion chamber 6, two regions having different flow velocities of the flow medium, that is, a weak fluidization region and a strong fluidization region are formed.
  • the weak fluidization region is formed in the center of the main combustion chamber 6, and the strong fluidization region is formed outside the weak fluidization region. Therefore, a downward flow of the flow medium is formed in the central region of the main combustion chamber 6, and an upward flow of the flow medium is formed in the outer region of the main combustion chamber 6.
  • the ascending and descending flows of these flow media form a swirling flow of the flow medium in the main combustion chamber 6.
  • the second fluidized bed 52 is formed from the swirling flow of such a fluidized bed.
  • the fluidized bed forms the third fluidized bed 53 while descending in the sedimentation combustion chamber 7.
  • the fluidized medium flows from the sedimentation combustion chamber 7 through the first opening 61 into the thermal decomposition chamber 4, and is mixed with the fluidized medium forming the first fluidized bed 51.
  • the flow medium forms a swirling flow.
  • the flow medium forming this swirling flow rises along the first partition wall 11, and this rising flow attracts the flow medium in the settling combustion chamber 7 into the thermal decomposition chamber 4.
  • the pyrolysis chamber 4 and the main combustion chamber 6 communicate with each other through the communication passage 70.
  • the arrow indicating the connecting passage 70 is drawn outside the fluidized bed furnace 1, but the connecting passage 70 is also located inside the fluidized bed furnace 1.
  • the pyrolysis chamber 4, the main combustion chamber 6, and the settling combustion chamber 7 are drawn in a plane, but in reality, these chambers 4, 6 and 7 have a three-dimensional shape.
  • the pyrolysis chamber 4 can be arranged next to both the main combustion chamber 6 and the sedimentation combustion chamber 7. Therefore, the communication passage 70 may be composed of a simple opening.
  • the thermal decomposition device includes a first raw material supply device 71 and a second raw material supply device 72 that supply the first raw material and the second raw material into the thermal decomposition chamber 4.
  • the raw material outlet of the first raw material supply device 71 is connected to the thermal decomposition chamber 4, and the raw material inlet of the first raw material supply device 71 is connected to a transport device (not shown) for transporting the first raw material.
  • the raw material outlet of the second raw material supply device 72 is connected to the thermal decomposition chamber 4, and the raw material inlet of the second raw material supply device 72 is connected to a transport device (not shown) for transporting the second raw material.
  • Specific examples of the first raw material supply device 71 and the second raw material supply device 72 include a screw feeder capable of quantitatively feeding raw materials into the thermal decomposition chamber 4.
  • the first raw material and the second raw material are provided from the first raw material supply device 71 and the second raw material supply device 72 to two supply ports 74 provided in the free board portion 55 of the thermal decomposition chamber 4. , 75 are supplied into the thermal decomposition chamber 4.
  • these two supply ports 74 and 75 are schematically drawn.
  • the first raw material and the second raw material are mixed after being sent out from the first raw material supply device 71 and the second raw material supply device 72, and a mixture of the first raw material and the second raw material is one supply port. May be supplied into the thermal decomposition chamber 4 from.
  • the first raw material and the second raw material charged into the thermal decomposition chamber 4 receive heat from the fluidized medium and thermally decompose while being agitated by the swirling flow of the fluidized medium forming the first fluidized bed 51.
  • some of the components contained in the first raw material and the second raw material form a thermal decomposition product.
  • the pyrolysis product is discharged from the pyrolysis chamber 4 through the product outlet 78 provided on the upper wall 1a of the fluidized bed furnace 1 constituting the pyrolysis chamber 4.
  • the product outlet 78 communicates with the pyrolysis chamber 4.
  • the residue of the first raw material and the residue of the second raw material move to the main combustion chamber 6 through the communication passage 70 together with the flow medium.
  • the residue burns while swirling with the fluidized medium forming the second fluidized bed 52.
  • the residue releases heat energy with combustion and heats the fluidized medium forming the second fluidized bed 52 while generating combustion exhaust gas.
  • the combustion exhaust gas is discharged from the combustion chamber through the exhaust gas outlet 79 provided on the upper wall 1a of the fluidized bed furnace 1 constituting the main combustion chamber 6.
  • the exhaust gas outlet 79 communicates with the main combustion chamber 6.
  • a part of the heated fluidized bed overflows the upper end of the second partition wall 12, moves to the settling combustion chamber 7 through the second opening 62, and descends in the settling combustion chamber 7 to form a third fluidized bed.
  • Form 53 Further, the heated flow medium flows into the pyrolysis chamber 4 through the first opening 61.
  • the heated fluid medium provides the amount of heat required for thermal decomposition, whereby the thermal decomposition of the first raw material and the second raw material proceeds in the thermal decomposition chamber 4.
  • the fluidized medium moved from the settling combustion chamber 7 has a high temperature, but the temperature of the fluidized medium decreases as it is mixed with the first fluidized bed 51 in the pyrolysis chamber 4. In this way, the flow medium that has moved from the main combustion chamber 6 to the thermal decomposition chamber 4 via the sedimentation combustion chamber 7 functions as a heat source for thermal decomposition of the first raw material and the second raw material.
  • the first raw material in the present embodiment is a material having a high carbon content, represented by a waste material of plastic produced from petroleum (hereinafter referred to as waste plastic).
  • the second raw material is a flammable material having a lower carbon content than the first raw material, and examples thereof include biomass, municipal waste, sludge, and organic waste.
  • the first raw material has a higher carbon content and a higher calorie content than the second raw material. Therefore, the first raw material is more flammable than the second raw material and generates high thermal energy when burned.
  • the second raw material since the second raw material has a lower carbon content than the first raw material and usually contains a relatively large amount of water, it is less likely to burn than the first raw material.
  • the first raw material may be a material having a higher ratio of carbon to hydrogen and carbon to oxygen than those of the second raw material (eg, municipal waste, industrial waste, etc.).
  • the first raw material contains at least waste plastic.
  • the pyrolysis product produced by the thermal decomposition of the first raw material is an oil obtained from waste plastic (mainly a hydrocarbon compound containing a large amount of carbon (C) and hydrogen (H), which is liquid at normal temperature and pressure, etc.).
  • the second raw material is an organic material such as biomass, and the ratio of carbon (C), oxygen (O), and hydrogen (H) contained in the second raw material, specifically, the ratio of carbon to hydrogen (carbon / hydrogen). Ratio), and the ratio of carbon to oxygen (carbon / oxygen ratio) may be lower than those in waste plastics.
  • the thermal decomposition produced by the thermal decomposition of the second raw material contains oxygen (O) and hydrogen (H) in addition to carbon (C)
  • the thermal decomposition produced by the thermal decomposition of the first raw material Compared to the product, the content of carbon (C) is low.
  • the first raw material and the second raw material do not burn in the thermal decomposition chamber 4, but are thermally decomposed. Since the first raw material contains a large amount of carbon, carbides (chars) are likely to be generated in the pyrolysis chamber 4.
  • the carbide (char) cannot be taken out from the pyrolysis chamber 4 as a pyrolysis product, but has a high calorific value.
  • a part of the first raw material is discharged from the thermal decomposition chamber 4 as a thermal decomposition product, and the residue of the first raw material is sent into the main combustion chamber 6 as a carbide (char).
  • This carbide (char) has a high calorific value. Therefore, the carbide (char) generates high thermal energy when burned in the main combustion chamber 6, and can heat the flow medium to a high temperature.
  • the carbon content of the second raw material is lower than that of the first raw material. Therefore, if the amount of heat required for the thermal decomposition of the second raw material is to be secured only by the second raw material, most of the carbon contained in the second raw material needs to be consumed in the main combustion chamber 6. As a result, the yield of pyrolysis products produced from the second raw material is reduced.
  • the first raw material containing a large amount of carbon and the second raw material containing a smaller amount of carbon are simultaneously supplied into the thermal decomposition chamber 4. The heat energy generated by burning the residue of the first raw material in the main combustion chamber 6 can sufficiently heat the fluid medium in the main combustion chamber 6.
  • the amount of heat that the residue of the second raw material should retain in the main combustion chamber 6 may be low.
  • the yield of pyrolysis products from the second raw material is improved.
  • the heated flow medium moves from the main combustion chamber 6 through the sedimentation combustion chamber 7 to the thermal decomposition chamber 4, and thermally decomposes the first raw material and the second raw material.
  • an incombustible material discharge port 82 is provided between the first air box 16 of the first air diffuser 15 and the third air box 36 of the third air diffuser 35.
  • the relatively large incombustibles contained in the first raw material and / or the second raw material are discharged from the incombustibles discharge port 82.
  • the ratio of the first raw material to the second raw material supplied into the thermal decomposition chamber 4 will be described.
  • the residue of the first raw material generates higher thermal energy during combustion than the residue of the second raw material. Therefore, the ratio of the supply amount of the first raw material to the supply amount of the second raw material to the pyrolysis chamber 4 affects the temperatures in the main combustion chamber 6 and the settling combustion chamber 7.
  • the thermal decomposition apparatus of the present embodiment controls the ratio of the supply amount of the first raw material to the supply amount of the second raw material to be supplied to the thermal decomposition chamber 4 based on the temperature in the main combustion chamber 6.
  • the ratio of the supply amount of the first raw material to the supply amount of the second raw material to the thermal decomposition chamber 4 so that the temperature in the main combustion chamber 6 falls within a predetermined target range. Is configured to adjust.
  • the thermal decomposition device includes an operation control unit 200 that independently controls the operations of the first raw material supply device 71 and the second raw material supply device 72.
  • the operation control unit 200 is connected to the first raw material supply device 71 and the second raw material supply device 72.
  • the operation control unit 200 controls the amount of the first raw material supply device 71 supplying the first raw material to the thermal decomposition chamber 4, and further controls the amount of the first raw material supply device 71 supplying the second raw material to the thermal decomposition chamber 4. It is configured to control.
  • the operation control unit 200 can independently control the supply amount of the first raw material and the supply amount of the second raw material to the thermal decomposition chamber 4.
  • the operation control unit 200 can control the ratio of the supply amount of the first raw material to the supply amount of the second raw material to the thermal decomposition chamber 4.
  • Examples of the ratio of the supply amount of the first raw material to the supply amount of the second raw material include the case where the supply amount of the first raw material is 0 and the case where the supply amount of the second raw material is 0.
  • the operation control unit 200 includes a storage device 200a in which the program is stored and an arithmetic unit 200b that executes an operation according to an instruction included in the program.
  • the storage device 200a includes a main storage device such as a RAM and an auxiliary storage device such as a hard disk drive (HDD) and a solid state drive (SSD).
  • Examples of the arithmetic unit 200b include a CPU (central processing unit) and a GPU (graphic processing unit).
  • the specific configuration of the motion control unit 200 is not limited to this embodiment.
  • the operation control unit 200 is composed of at least one computer.
  • the operation control unit 200 may be an edge server arranged near the fluidized bed furnace 1, or may be a cloud server connected to a communication network such as the Internet or a local area network.
  • the operation control unit 200 may be a combination of a plurality of servers.
  • the motion control unit 200 may be a combination of an edge server and a cloud server connected to each other by a communication network such as the Internet or a local area network.
  • the pyrolysis apparatus includes a pyrolysis chamber thermometer 85 arranged in the pyrolysis chamber 4, a main combustion chamber thermometer 86 arranged in the main combustion chamber 6, and settling combustion arranged in the settling combustion chamber 7. It is further equipped with a chamber thermometer 87.
  • a plurality of pyrolysis chamber thermometers 85 (three in FIG. 1) are arranged along the vertical direction in the pyrolysis chamber 4.
  • One of the plurality of pyrolysis chamber thermometers 85 is arranged in the free board portion 55 in the pyrolysis chamber 4, and the other pyrolysis chamber thermometer 85 is arranged in the first fluidized bed 51. ..
  • main combustion chamber thermometers 86 are arranged along the vertical direction in the main combustion chamber 6, and a plurality of (three in FIG. 1) settling combustion chamber thermometers 87 are settled. They are arranged along the vertical direction in the combustion chamber 7.
  • One of the plurality of main combustion chamber thermometers 86 is arranged in the free board portion 56 in the main combustion chamber 6, and the other main combustion chamber thermometer 86 is arranged in the second fluidized bed 52. ..
  • One of the plurality of settling combustion chamber thermometers 87 is arranged in the free board portion 57 in the settling combustion chamber 7, and the other settling combustion chamber thermometer 87 is arranged in the third fluidized bed 53. ..
  • the number and arrangement of the pyrolysis chamber thermometer 85, the main combustion chamber thermometer 86, and the sedimentation combustion chamber thermometer 87 are not limited to the embodiment shown in FIG.
  • a single pyrolysis chamber thermometer 85, a single main combustion chamber thermometer 86, and a single sedimentation combustion chamber thermometer 87 may be arranged.
  • four or more pyrolysis chamber thermometers 85, four or more main combustion chamber thermometers 86, and four or more settling combustion chamber thermometers 87 are pyrolysis chambers 4, main combustion chambers 6, and so on. And may be arranged in the sedimentation combustion chamber 7, respectively.
  • the pyrolysis chamber thermometer 85, the main combustion chamber thermometer 86, and the settling combustion chamber thermometer 87 measure the temperature in the pyrolysis chamber 4, the temperature in the main combustion chamber 6, and the temperature in the settling combustion chamber 7, respectively. To do.
  • the pyrolysis chamber thermometer 85, the main combustion chamber thermometer 86, and the sedimentation combustion chamber thermometer 87 are connected to the operation control unit 200.
  • the measured value of the temperature in the pyrolysis chamber 4 is sent from the pyrolysis chamber thermometer 85 to the operation control unit 200, and the measured value of the temperature in the main combustion chamber 6 is sent from the main combustion chamber thermometer 86 to the operation control unit 200.
  • the measured value of the temperature in the settling combustion chamber 7 is sent from the settling combustion chamber thermometer 87 to the operation control unit 200.
  • the operation control unit 200 is configured to adjust the ratio of the supply amount of the first raw material and the supply amount of the second raw material to the thermal decomposition chamber 4 based on the temperature in the main combustion chamber 6. More specifically, the operation control unit 200 is the first raw material supply device 71 so that the measured value of the temperature in the main combustion chamber 6 sent from the main combustion chamber thermometer 86 is within a predetermined target range. And at least one of the second raw material supply devices 72 is issued a command to adjust the ratio of the supply amount of the first raw material and the supply amount of the second raw material to the thermal decomposition chamber 4.
  • the operation control unit 200 issues a command to the first raw material supply device 71 to supply the amount of the first raw material to the thermal decomposition chamber 4. increase. At the same time, the operation control unit 200 may issue a command to the second raw material supply device 72 to reduce the supply amount of the second raw material to the thermal decomposition chamber 4. In another example, when the measured value of the temperature in the main combustion chamber 6 exceeds the above target range, the operation control unit 200 issues a command to the second raw material supply device 72 to the thermal decomposition chamber 4 of the second raw material. Increase supply. At the same time, the operation control unit 200 may issue a command to the first raw material supply device 71 to reduce the supply amount of the first raw material to the thermal decomposition chamber 4. The supply amount of the first raw material or the supply amount of the second raw material may be zero.
  • the first raw material having a high carbon content and the second raw material having a low carbon content are pyrolyzed in an appropriate ratio. It can be put into 4.
  • the pyrolysis in the pyrolysis chamber 4 and the combustion in the main combustion chamber 6 are optimized, and as a result, the yield of the pyrolysis product in the pyrolysis chamber 4 is improved.
  • the temperature of the pyrolysis chamber 4 is the flow sent from the main combustion chamber 6 via the sedimentation combustion chamber 7. It depends on the temperature of the medium. Specifically, if the temperature in the main combustion chamber 6 is high, the temperature in the thermal decomposition chamber 4 also rises.
  • the type of pyrolysis product produced in the pyrolysis chamber 4 depends on the temperature in the pyrolysis chamber 4.
  • the temperature in the thermal decomposition chamber 4 suitable for oil recovery is 200 ° C. or higher, preferably 250 ° C. or higher, more preferably 300 ° C. or higher, and 600 ° C. or lower, preferably 500 ° C. or higher.
  • the temperature in the thermal decomposition chamber 4 suitable for recovering a high-calorie fuel gas such as a hydrocarbon gas is preferably lower in the range of 600 ° C. to 900 ° C.
  • the temperature in the thermal decomposition chamber 4 suitable for recovering the synthetic gas of hydrogen and carbon monoxide is preferably higher in the range of 900 ° C. to 1300 ° C.
  • the temperature of the pyrolysis chamber 4 may be secured by supplying an oxidizing agent to the freeboard portion 55 of the pyrolysis chamber 4. As the oxidant, air, oxygen, or a combination of oxygen and steam is used.
  • the pyrolysis apparatus of the embodiment shown in FIG. 1 can selectively recover oil, fuel gas, or syngas.
  • the first raw material and the second raw material are supplied into the thermal decomposition chamber 4 in a state where the ratio of the supply amount of the first raw material to the supply amount of the second raw material is low.
  • the first raw material contains waste plastic, which is a high-calorie material, while the second raw material is a relatively low-calorie material such as biomass and municipal waste.
  • the first raw material is first thermally decomposed in the thermal decomposition chamber 4, and then the residue of the first raw material (char, which is a carbide) is sent to the main combustion chamber 6.
  • the residue of the first raw material is a high-calorie material containing a large amount of carbides, but since the amount of the residue of the first raw material supplied to the main combustion chamber 6 is relatively small, the temperature in the main combustion chamber 6 does not rise so much.
  • the temperature in the pyrolysis chamber 4 is 600 ° C. or lower, which is a temperature range suitable for recovering oil from waste plastic.
  • the first raw material and the second raw material are placed in the pyrolysis chamber 4 in a state where the ratio of the supply amount of the first raw material to the supply amount of the second raw material is increased.
  • Supply to. The first raw material is thermally decomposed in the thermal decomposition chamber 4, and then the residue of the first raw material (char, which is a carbide) is sent to the main combustion chamber 6. Since the amount of the residue of the first raw material supplied to the main combustion chamber 6 is relatively large, the temperature inside the main combustion chamber 6 rises. As a result, the temperature in the pyrolysis chamber 4 is in a temperature range of 600 ° C. to 900 ° C. suitable for producing hydrocarbon gas.
  • the first raw material and the second raw material are placed in the pyrolysis chamber 4 with the ratio of the supply amount of the first raw material to the supply amount of the second raw material further increased.
  • the first raw material is thermally decomposed in the thermal decomposition chamber 4, and then the residue of the first raw material (char, which is a carbide) is sent to the main combustion chamber 6. Since the amount of the residue of the first raw material supplied to the main combustion chamber 6 is quite large, the temperature inside the main combustion chamber 6 rises. As a result, the temperature in the pyrolysis chamber 4 is in a temperature range of 900 ° C. to 1300 ° C. suitable for producing hydrocarbon gas.
  • the operation control unit 200 controls the operations of the first raw material supply device 71 and the second raw material supply device 72 (that is, the supply amount of the first raw material and the supply amount of the second raw material to the thermal decomposition chamber 4). By adjusting the ratio of), the temperature in the pyrolysis chamber 4 can be adjusted and the yield of the intended pyrolysis product can be increased.
  • the operation control unit 200 supplies the first raw material supply device 71 and the second raw material based on the temperature in the main combustion chamber 6 (that is, the measured value of the temperature sent from the main combustion chamber thermometer 86).
  • the operation of the device 72 is controlled, but in one embodiment, the operation control unit 200 controls the operation of the first raw material based on the temperature in the settling combustion chamber 7 (that is, the measured value of the temperature sent from the settling combustion chamber thermometer 87).
  • the operation of the supply device 71 and the second raw material supply device 72 may be controlled.
  • the pyrolysis apparatus further includes a third raw material supply device 91 and a fourth raw material supply device 92 that supply the first raw material and the second raw material into the main combustion chamber 6. May be good.
  • the raw material outlet of the third raw material supply device 91 is connected to the main combustion chamber 6, and the raw material inlet of the third raw material supply device 91 is connected to a transfer device (not shown) for transporting the first raw material.
  • the raw material outlet of the fourth raw material supply device 92 is connected to the main combustion chamber 6, and the raw material inlet of the fourth raw material supply device 92 is connected to a transfer device (not shown) for transporting the second raw material.
  • Specific examples of the third raw material supply device 91 and the fourth raw material supply device 92 include a screw feeder capable of quantitatively feeding the raw materials into the main combustion chamber 6.
  • the first raw material and the second raw material are supplied from the third raw material supply device 91 and the fourth raw material supply device 92 to two supply ports 94 provided in the free board portion 56 of the main combustion chamber 6. , 95 is supplied into the main combustion chamber 6.
  • the supply ports 94 and 95 are schematically drawn.
  • the first raw material and the second raw material are mixed after being sent out from the third raw material supply device 91 and the fourth raw material supply device 92, and a mixture of the first raw material and the second raw material is one supply port. May be supplied into the main combustion chamber 6 from.
  • the operation control unit 200 is connected to the third raw material supply device 91 and the fourth raw material supply device 92.
  • the operation control unit 200 is configured to control the operations of the third raw material supply device 91 and the fourth raw material supply device 92 in addition to the operations of the first raw material supply device 71 and the second raw material supply device 72.
  • the third raw material supply device 91 controls the amount of the first raw material supplied to the main combustion chamber 6, and the fourth raw material supply device 92 supplies the second raw material to the main combustion chamber 6. It is configured to control the amount supplied to.
  • the operation control unit 200 can independently control the supply amount of the first raw material and the supply amount of the second raw material to the main combustion chamber 6. Therefore, the operation control unit 200 can control the ratio of the supply amount of the first raw material to the supply amount of the second raw material to the main combustion chamber 6.
  • the first raw material supply device 71 and the second raw material supply device 72 continue to supply the first raw material and the second raw material into the thermal decomposition chamber 4, whereas the third raw material supply device 91.
  • the fourth raw material supply device 92 supplies at least one of the first raw material and the second raw material into the main combustion chamber 6 when necessary. For example, when the measured value of the temperature in the main combustion chamber 6 falls below a predetermined lower limit value lower than the above target range, the operation control unit 200 issues a command to the third raw material supply device 91 to mainly use the first raw material. It is supplied into the combustion chamber 6.
  • the operation control unit 200 may also issue a command to the fourth raw material supply device 92 to supply the second raw material into the main combustion chamber 6.
  • the operation control unit 200 issues a command to the fourth raw material supply device 92 to send the second raw material into the main combustion chamber 6.
  • the operation control unit 200 may also issue a command to the third raw material supply device 91 to supply the first raw material into the main combustion chamber 6.
  • At least one of the first raw material and the second raw material is directly supplied into the main combustion chamber 6 and immediately burned. Therefore, the temperature in the main combustion chamber 6 rises, and the target range can be quickly reached.
  • the operation control unit 200 sets the third raw material supply device 91 and the fourth raw material supply device based on the temperature in the settling combustion chamber 7 (that is, the measured value of the temperature sent from the settling combustion chamber thermometer 87).
  • the operation of 92 may be controlled.
  • the operation control unit 200 has one of the third raw material supply device 91 and the fourth raw material supply device 92 instead of controlling the operation of the first raw material supply device 71 and the second raw material supply device 72. At least one operation may be controlled to keep the measured temperature in the main combustion chamber 6 or the sedimentation combustion chamber 7 within the target range. Specifically, while the first raw material supply device 71 and the second raw material supply device 72 supply the first raw material and the second raw material into the thermal decomposition chamber 4 in a fixed supply amount, the operation control unit 200 receives the operation control unit 200.
  • the operation of at least one of the third raw material supply device 91 and the fourth raw material supply device 92 is controlled so that the measured value of the temperature in the main combustion chamber 6 or the sedimentation combustion chamber 7 falls within the above target range.
  • At least one of the first raw material and the second raw material may be supplied to the main combustion chamber 6. According to such an operation, the thermal decomposition apparatus can control the temperature in the main combustion chamber 6 independently of the ratio of the first raw material and the second raw material in the thermal decomposition chamber 4.
  • the pyrolysis device may further include a harmful material supply device 100 that supplies a harmful material containing a volatile repellent substance to the main combustion chamber 6.
  • the material outlet of the hazardous material supply device 100 is connected to the main combustion chamber 6, and the material inlet of the hazardous material supply device 100 is connected to a transport device (not shown) for transporting the hazardous material.
  • the harmful material is supplied into the main combustion chamber 6 from the supply port 101 provided in the freeboard portion 56 of the main combustion chamber 6.
  • Specific examples of the hazardous material supply device 100 include a screw feeder capable of quantitatively feeding the hazardous material into the main combustion chamber 6.
  • the volatile repellent substance burns in the main combustion chamber 6 to generate combustion exhaust gas.
  • the combustion exhaust gas is discharged from the main combustion chamber 6 through the exhaust gas outlet 79. Since the volatile repellent does not move into the pyrolysis chamber 4, the volatile repellent does not mix with the pyrolysis product produced in the pyrolysis chamber 4.
  • the thermal decomposition apparatus of the embodiment shown in FIGS. 1 to 3 can discharge various thermal decomposition products (oil, hydrocarbon, etc.) derived from the first raw material and the second raw material from the thermal decomposition chamber 4.
  • thermal decomposition products oil, hydrocarbon, etc.
  • These pyrolysis products can be used in products such as petroleum products and fuels. Recently, there has been an increasing demand for treatment systems that can emit a wider variety of chemical substances.
  • the first air diffuser 15 includes a plurality of (two in the example of FIG. 4) first fluidized gas supply sources 18A and 18B connected to the first fluidized gas supply line 17.
  • a plurality of on-off valves 111 and 112 (two in the example of FIG. 4) arranged downstream of the plurality of first fluidized gas supply sources 18A and 18B are provided.
  • One of the plurality of first fluidized gas supply sources 18A and 18B is the main supply source 18A for supplying water vapor or air, and the other one is an additive gas supply source for supplying the additive gas. It is 18B.
  • the main supply source 18A is composed of a boiler that generates steam.
  • the main source 18A may consist of a blower that sends air. Further, in one embodiment, the main supply source 18A may not be provided.
  • the added gas is any one of carbon monoxide gas, carbon dioxide gas, hydrogen gas, hydrocarbon gas, and nitrogen gas.
  • the plurality of first fluidized gas supply sources 18A and 18B are a plurality of additional gases for supplying a plurality of types of additive gases selected from carbon monoxide gas, carbon dioxide gas, hydrogen gas, hydrocarbon gas, and nitrogen gas.
  • An additive gas source may be included.
  • the added gas may be obtained from a pyrolysis product.
  • the on-off valves 111 and 112 are arranged downstream of the main supply source 18A and the additive gas supply source 18B, respectively. These on-off valves 111 and 112 are connected to the operation control unit 200, and the on-off operation of the on-off valves 111 and 112 is controlled by the operation control unit 200.
  • the operation control unit 200 opens all the on-off valves 111 and 112, the mixture of water vapor and the added gas is supplied to the pyrolysis chamber 4 as the first fluidized gas through the first fluidized gas supply line 17. ..
  • the operation control unit 200 opens the on-off valve 111 while closing the on-off valve 112, only water vapor is supplied to the pyrolysis chamber 4 as the first fluidized gas through the first fluidized gas supply line 17.
  • the operation control unit 200 closes the on-off valve 111 and opens the on-off valve 112, only the added gas is supplied to the pyrolysis chamber 4 as the first fluidized gas through the first fluidized gas supply line 17.
  • the first fluidized gas include a mixture of water vapor and hydrogen gas, hydrogen gas only, and the like.
  • the first fluidized gas includes a mixture of water vapor, hydrogen gas and carbon monoxide, a mixture of hydrogen gas and carbon monoxide, and the like.
  • the main supply source 18A is a blower, air instead of water vapor constitutes at least a part of the first fluidized gas.
  • the proportion of carbon contained in the pyrolysis product is relatively large.
  • only hydrogen gas or a combination of water vapor and hydrogen gas is used as the first fluidized gas in order to balance the content of carbon and hydrogen in the pyrolysis product. ..
  • At least a part of hydrogen is subjected to thermal decomposition of the raw material in the thermal decomposition chamber 4, and is discharged from the thermal decomposition chamber 4 as a thermal decomposition product.
  • the first fluidized gas containing the required chemicals is used.
  • the pyrolysis product can contain the desired chemicals.
  • FIGS. 1 to 4 can be combined as appropriate.
  • the embodiment shown in FIG. 3 may be combined with the embodiment shown in FIG.
  • the embodiment shown in FIG. 4 may be combined with the embodiment shown in FIGS. 2 and 3.
  • a raw material supply device 71 for supplying the first raw material into the thermal decomposition chamber 4 is provided.
  • This raw material supply device 71 corresponds to the first raw material supply device 71 shown in FIG.
  • the first raw material is simply referred to as a raw material.
  • This raw material is of the same type as the first raw material described above, and contains at least waste plastic having a high carbon content.
  • the component corresponding to the second raw material supply device 72 of FIG. 1 is not provided, but the second raw material supply device 72 shown in FIG. 1 for supplying the second raw material into the thermal decomposition chamber 4 is provided. It may be provided.
  • the raw material is not burned in the pyrolysis chamber 4, and the residue of the raw material (for example, char) is burned in the main combustion chamber 6 and the sedimentation combustion chamber 7.
  • the flow medium in the main combustion chamber 6 and the sedimentation combustion chamber 7 is heated by the combustion of the residue of the raw material and flows into the thermal decomposition chamber 4 through the first opening 61.
  • the heated fluidized bed is deheated while being mixed with the first fluidized bed 51 in the thermal decomposition chamber 4, and the first fluidized bed 51 settles at a certain temperature.
  • the temperature in the pyrolysis chamber 4 suitable for recovering oil from waste plastic is 600 ° C. or lower. Therefore, the temperature in the pyrolysis chamber 4 is maintained at 600 ° C. or lower.
  • the flow medium that has just moved from the settling combustion chamber 7 to the thermal decomposition chamber 4 has a high temperature, and a high temperature region is locally present inside the thermal decomposition chamber 4.
  • a high temperature region is locally present inside the thermal decomposition chamber 4.
  • the overall temperature inside the pyrolysis chamber 4 is maintained at 600 ° C. or lower, the temperature near the first opening 61 may exceed 800 ° C.
  • the high temperature region is locally present in this way, the waste plastic in the high temperature region is excessively decomposed into carbides (chars) and light gas, and as a result, the yield of oil is lowered.
  • the temperature of the fluid medium in the settling combustion chamber 7 is adjusted to a temperature suitable for obtaining oil from the raw material in the thermal decomposition chamber 4.
  • the operation control unit 200 is configured to control at least one of the temperature and the flow rate of the third fluidized gas supplied into the sedimentation combustion chamber 7 based on the temperature in the sedimentation combustion chamber 7. Specifically, the operation control unit 200 operates at least one of the third temperature controller 40 and the third gas flow rate control valve 39 of the third air diffuser 35 to measure the temperature in the settling combustion chamber 7. At least one of the temperature and the flow rate of the third fluidized gas supplied into the sedimentation combustion chamber 7 is controlled so that the value falls within a predetermined temperature range. The measured value of the temperature in the settling combustion chamber 7 is sent from the settling combustion chamber thermometer 87 to the operation control unit 200.
  • the temperature of the third fluidized gas itself is lower than the temperature of the fluidized medium in the settling combustion chamber 7. Therefore, when the operation control unit 200 operates the third temperature controller 40 to further lower the temperature of the third fluidized gas, the temperature of the fluidized medium in the sedimentation combustion chamber 7 is lowered. Similarly, when the operation control unit 200 operates the third gas flow rate control valve 39 to increase the flow rate of the third fluidized gas, the temperature of the flow medium in the settling combustion chamber 7 decreases. Even if the operation control unit 200 operates both the third temperature controller 40 and the third gas flow rate control valve 39 to further lower the temperature of the third fluidized gas and increase the flow rate of the third fluidized gas. Good.
  • the flow medium flows into the thermal decomposition chamber 4 through the first opening 61.
  • the fluidized medium swirls in the pyrolysis chamber 4 to form the first fluidized bed 51 while maintaining the temperature in the pyrolysis chamber 4 in a temperature range in which the yield of the oil component is high.
  • the raw material containing waste plastic is heated while being agitated by the swirling flow of the fluid medium to generate vaporized oil.
  • the vaporized oil is discharged from the thermal decomposition chamber 4 as a thermal decomposition product through the product outlet 78.
  • the flow medium moves to the pyrolysis chamber 4 after the temperature of the flow medium is adjusted in advance, a local high temperature region is not formed in the pyrolysis chamber 4. As a result, a uniform pyrolysis reaction temperature field is formed, and the yield of the intended pyrolysis product can be improved.
  • FIG. 6 is a diagram showing another embodiment of a pyrolysis apparatus suitable for obtaining an intended pyrolysis product from a raw material. Since the configuration and operation of the present embodiment not particularly described are the same as those of the embodiment shown in FIG. 5, the duplicated description will be omitted.
  • the thermal decomposition apparatus of the present embodiment includes a heat recovery device 120 that recovers heat from the flow medium in the settling combustion chamber 7.
  • the heat recovery device 120 has a heat transfer tube 121 through which a cooling medium such as water flows, and a refrigerant flow rate control valve 124 attached to the heat transfer tube 121.
  • the heat transfer tube 121 is arranged in the settling combustion chamber 7. More specifically, it protrudes into the settling combustion chamber 7.
  • the heat recovery device 120 can recover heat from the flow medium in the sedimentation combustion chamber 7 and lower the temperature of the flow medium. That is, the heat of the flow medium in the sedimentation combustion chamber 7 is transferred to the cooling medium flowing in the heat transfer tube 121, and as a result, the temperature of the flow medium is lowered.
  • the refrigerant flow rate control valve 124 is connected to the operation control unit 200, and the operation of the refrigerant flow rate control valve 124 is controlled by the operation control unit 200.
  • the operation control unit 200 operates the refrigerant flow control valve 124 so that the measured value of the temperature sent from the settling combustion chamber thermometer 87 (that is, the temperature inside the settling combustion chamber 7) falls within a predetermined temperature range. , Control the flow rate of the cooling medium flowing through the heat transfer tube 121.
  • the third air diffuser 35 is connected to a plurality of third air boxes 36 and each of these third air boxes 36.
  • a plurality of third fluidized gas supply lines 37 and a plurality of third gas flow rate adjusting valves (or a plurality of third gas flow rate adjusting dampers) 39 attached to the third fluidized gas supply lines 37 are provided. ..
  • the operation control unit 200 is configured to control the operation of the plurality of third gas flow rate control valves 39 so that the opening degrees of the plurality of third gas flow rate control valves 39 are different from each other.
  • the opening degree of the third gas flow rate control valve 39 is different, the flow rates of the third fluidized gas blown out from the plurality of third air boxes 36 are also different from each other.
  • the third fluidized gas having a different flow rate is supplied into the settling combustion chamber 7, and the fluidized medium forming the third fluidized bed 53 swirls.
  • a part of the swirling flow of the flow medium comes into contact with the heat transfer tube 121 of the heat recovery device 120, and the temperature of the flow medium is lowered. Further, since the swirling flow of the flow medium makes the temperature of the flow medium uniform in the sedimentation combustion chamber 7, it is possible to prevent the high temperature flow medium from moving to the thermal decomposition chamber 4. Further, the flow rate of the flow medium from the sedimentation combustion chamber 7 to the thermal decomposition chamber 4 can be controlled by the strength and direction of the swirling flow of the flow medium. Further, by adjusting the flow rate of the third fluidized gas blown out from the plurality of third air boxes 36, the strength of the swirling flow of the fluidized medium is adjusted, and the heat transfer coefficient between the fluidized medium and the heat transfer tube 121 is adjusted. By changing the above, the amount of heat absorbed through the heat transfer tube 121 can be changed, and thus the temperature of the flow medium flowing from the sedimentation combustion chamber 7 to the thermal decomposition chamber 4 can be adjusted.
  • FIGS. 1 to 6 can be combined as appropriate.
  • the embodiment shown in FIG. 5 can be applied to any of the embodiments shown in FIGS. 1 to 4.
  • the heat recovery device 120 and the third air diffuser 35 shown in FIG. 6 can be combined with any of the embodiments shown in FIGS. 1 to 4.
  • all the embodiments shown in FIGS. 1 to 6 may be combined.
  • the present invention can be used in a pyrolysis apparatus and a thermal decomposition method for thermally decomposing a raw material in a fluidized bed furnace, and in particular, the raw material is thermally decomposed by using an internal circulating fluidized bed gasification technique to obtain a thermal decomposition product. It can be used for pyrolysis equipment and pyrolysis methods.

Abstract

熱分解装置は、流動床炉(1)と、流動床炉(1)の内部を熱分解室(4)と燃焼室(5)とに仕切る第1仕切壁(11)と、燃焼室(5)を主燃焼室(6)と沈降燃焼室(7)に仕切る第2仕切壁(12)と、熱分解室(4)、主燃焼室(6)、および沈降燃焼室(7)に、第1流動化ガス、第2流動化ガス、および第3流動化ガスをそれぞれ供給する第1散気装置(15)、第2散気装置(25)、および第3散気装置(35)と、第1原料を熱分解室(4)に第1供給量で供給する第1原料供給装置(71)と、第2原料を熱分解室(4)に第2供給量で供給する第2原料供給装置(72)と、第1原料供給装置(71)と第2原料供給装置(72)の動作を独立に制御する動作制御部(200)を備えている。

Description

熱分解装置および熱分解方法
 本発明は、原料を流動床炉内で熱分解する熱分解装置および熱分解方法に関し、特に内部循環流動床ガス化技術を用いて原料を熱分解し、熱分解生成物を得る熱分解装置および熱分解方法に関する。
 都市ごみ、産業廃棄物などの原料を熱分解後、ガス化して燃焼する処理システムとして、流動床炉がある。特許文献1,2に開示されている流動床炉は、炉の内部が仕切壁でガス化室と燃焼室に分けられた構造を有している。流動媒体はガス化室と燃焼室との間を循環しながら、原料はガス化室に投入される。原料はガス化室内で流動媒体により加熱され、熱分解後、ガス化される。原料の残渣は、流動媒体によって燃焼室に運ばれる。原料の残渣は燃料室内で燃焼して、流動媒体を加熱する。加熱された流動媒体は、ガス化室内に移動し、ガス化室内で熱源として機能する。このように流動媒体が炉内で循環する流動床炉は、内部循環流動床ガス化システムとして知られている。
 廃プラスチックは、通常、焼却炉で焼却処理されている。最近では、二酸化炭素の排出を抑制する観点から、廃プラスチックを熱分解して油を回収する要請が高まっている(特許文献3,4)。しかしながら、油を高い収率で回収することは難しく、商業的に成功している例はほとんどないのが実情である。上述した内部循環流動床ガス化システムは、廃プラスチックをガス化室内で加熱して熱分解し、常温・常圧で液体である有機化合物、すなわち油を熱分解生成物として回収することができる技術として期待されている。
 しかしながら、廃プラスチックは炭素の含有率が高く、熱分解後に炭化物(チャー)が多く生成される。この未燃炭素は、油として回収することができず、燃焼室内で燃焼せざるを得ない。結果として、二酸化炭素の排出量が増え、一方で熱分解生成物の収率が低下してしまう。
 内部循環流動床ガス化システムは、油を含む様々な物質を回収する技術としても注目されている。原料をガス化室内で熱分解し、目的の物質を熱分解生成物として回収するためには、原料をガス化室内で適切な温度で加熱する必要がある。しかしながら、燃焼室から移動した高温の流動媒体は、局所的な高温領域をガス化室内に形成する。このため、原料の一部は高温の流動媒体により過度に加熱され、意図しない物質が生成されることがある。例えば、廃プラスチックの熱分解は、高温になるほど促進し、常温で気体であるガスとなるため、常温で液体である油の収率が低下する。また、高温になるほど炭化物(チャー)への移行率が上昇し、熱分解生成物の収率が低下する。
 上述した内部循環流動床ガス化システムは、バイオマス、都市ごみ、有機性廃棄物などの可燃性材料を熱分解し、有用な物質を熱分解生成物として回収する用途にも用いることができる。しかしながら、一般に、バイオマスや都市ごみは、酸素(O)および水素(H)に比べて炭素(C)の含有率が相対的に低く、これら可燃性材料を燃焼室内で燃焼させるために多くの熱量を必要とする。したがって、可燃性材料に含まれる炭素の多くは燃焼室に送られ、燃焼室内で燃焼に消費される。結果として、ガス化室内では炭素の収率が低下する。
特許第4243919号公報 特開平10-2543号公報 特開2002-129169号公報 特許第3611306号公報
 そこで、本発明は、意図した熱分解生成物の収率を上げることができる熱分解装置および熱分解方法を提供する。
 一態様では、流動する流動媒体からなる流動床内で原料を熱分解するための熱分解装置であって、流動床炉と、前記流動床炉の内部を熱分解室と燃焼室とに仕切る第1仕切壁と、前記燃焼室を主燃焼室と沈降燃焼室に仕切る第2仕切壁と、前記熱分解室、前記主燃焼室、および前記沈降燃焼室に、第1流動化ガス、第2流動化ガス、および第3流動化ガスをそれぞれ供給する第1散気装置、第2散気装置、および第3散気装置と、第1原料を前記熱分解室に第1供給量で供給する第1原料供給装置と、前記第1原料よりも、水素に対する炭素の比率、および酸素に対する炭素の比率が低い第2原料を前記熱分解室に第2供給量で供給する第2原料供給装置と、前記第1原料供給装置と前記第2原料供給装置の動作を独立に制御する動作制御部を備えている、熱分解装置が提供される。
 一態様では、前記動作制御部は、前記主燃焼室内の温度または前記沈降燃焼室内の温度に基づいて、前記第1供給量と前記第2供給量の比率を調節するように構成されている。
 一態様では、前記熱分解装置は、前記第1原料を前記主燃焼室に供給する第3原料供給装置と、前記第2原料を前記主燃焼室に供給する第4原料供給装置をさらに備えている。
 一態様では、前記動作制御部は、前記沈降燃焼室内の温度が所定の温度範囲内に収まるように前記第3散気装置の動作を制御するように構成されている。
 一態様では、前記第3散気装置は、前記沈降燃焼室の下に配置された風箱と、前記風箱に連結された流動化ガス供給ラインと、前記流動化ガス供給ラインに取り付けられた温度調節器と、前記流動化ガス供給ラインに取り付けられたガス流量調節弁を備えており、前記動作制御部は、前記沈降燃焼室内の温度が前記所定の温度範囲内に収まるように前記温度調節器および前記ガス流量調節弁のうちの少なくとも一方の動作を制御するように構成されている。
 一態様では、前記熱分解装置は、前記沈降燃焼室内の流動媒体から熱を回収する熱回収器をさらに備え、前記動作制御部は、前記沈降燃焼室内の温度が所定の温度範囲内に収まるように前記熱回収器の動作を制御するように構成されている。
 一態様では、前記熱回収器は、前記沈降燃焼室内に配置された伝熱管と、前記伝熱管内を流れる冷却媒体の流量を調節する冷媒流量調節弁を備えており、前記動作制御部は、前記沈降燃焼室内の温度が前記所定の温度範囲内に収まるように前記冷媒流量調節弁の動作を制御するように構成されている。
 一態様では、前記第3散気装置は、前記沈降燃焼室の下に配置された複数の風箱と、前記複数の風箱にそれぞれ連結された複数の流動化ガス供給ラインと、前記複数の流動化ガス供給ラインにそれぞれ取り付けられた複数のガス流量調節弁を備えており、前記動作制御部は、前記複数のガス流量調節弁の開度が互いに異なるように、前記複数のガス流量調節弁の動作を制御するように構成されている。
 一態様では、前記第1散気装置は、前記第1流動化ガスを前記熱分解室に供給する少なくとも1つの第1流動化ガス供給源を備えており、前記第1流動化ガス供給源は、一酸化炭素ガス、二酸化炭素ガス、水素ガス、炭化水素ガス、蒸気、窒素ガスのうちの少なくとも1つを供給するための、少なくとも1つの供給源を含む。
 一態様では、流動する流動媒体からなる流動床内で原料を熱分解するための熱分解装置であって、流動床炉と、前記流動床炉の内部を熱分解室と燃焼室とに仕切る第1仕切壁と、前記燃焼室を主燃焼室と沈降燃焼室に仕切る第2仕切壁と、前記熱分解室、前記主燃焼室、および前記沈降燃焼室に、第1流動化ガス、第2流動化ガス、および第3流動化ガスをそれぞれ供給する第1散気装置、第2散気装置、および第3散気装置と、原料を前記熱分解室に供給する原料供給装置と、前記沈降燃焼室内の温度を測定する沈降燃焼室温度計と、前記沈降燃焼室内の温度を制御する動作制御部を備えている、熱分解装置が提供される。
 一態様では、前記動作制御部は、前記沈降燃焼室内の温度の測定値が所定の温度範囲内に収まるように前記第3散気装置の動作を制御するように構成されている。
 一態様では、前記第3散気装置は、前記沈降燃焼室の下に配置された風箱と、前記風箱に連結された流動化ガス供給ラインと、前記流動化ガス供給ラインに取り付けられた温度調節器と、前記流動化ガス供給ラインに取り付けられたガス流量調節弁を備えており、前記動作制御部は、前記沈降燃焼室内の温度の測定値が前記所定の温度範囲内に収まるように前記温度調節器および前記ガス流量調節弁のうちの少なくとも一方の動作を制御するように構成されている。
 一態様では、前記熱分解装置は、前記沈降燃焼室内の流動媒体から熱を回収する熱回収器をさらに備え、前記動作制御部は、前記沈降燃焼室内の温度の測定値が所定の温度範囲内に収まるように前記熱回収器の動作を制御するように構成されている。
 一態様では、前記熱回収器は、前記沈降燃焼室内に配置された伝熱管と、前記伝熱管内を流れる冷却媒体の流量を調節する冷媒流量調節弁を備えており、前記動作制御部は、前記沈降燃焼室内の温度の測定値が前記所定の温度範囲内に収まるように前記冷媒流量調節弁の動作を制御するように構成されている。
 一態様では、前記第3散気装置は、前記沈降燃焼室の下に配置された複数の風箱と、前記複数の風箱にそれぞれ連結された複数の流動化ガス供給ラインと、前記複数の流動化ガス供給ラインにそれぞれ取り付けられた複数のガス流量調節弁を備えており、前記動作制御部は、前記複数のガス流量調節弁の開度が互いに異なるように、前記複数のガス流量調節弁の動作を制御するように構成されている。
 一態様では、前記第3散気装置は、前記第3流動化ガスを前記沈降燃焼室に供給する流動化ガス供給源を備えており、前記流動化ガス供給源は、一酸化炭素ガス、二酸化炭素ガス、水素ガス、炭化水素ガス、蒸気、窒素ガスのうちの少なくとも1つを供給するための、少なくとも1つの供給源を含む。
 一態様では、流動媒体が収容された流動床炉の内部が熱分解室、主燃焼室、および沈降燃焼室に仕切られた熱分解装置を用いて原料を熱分解するための熱分解方法であって、前記熱分解室に第1流動化ガスを供給して、第1流動床を前記熱分解室内に形成し、第1原料を前記熱分解室に第1供給量で供給しながら、前記第1原料よりも、水素に対する炭素の比率、および酸素に対する炭素の比率が低い第2原料を前記熱分解室に第2供給量で供給し、前記第1原料および前記第2原料を前記熱分解室内で熱分解し、前記主燃焼室に第2流動化ガスを供給して第2流動床を前記主燃焼室内に形成しながら、前記第1原料の残渣および前記第2原料の残渣を前記主燃焼室内で燃焼し、前記沈降燃焼室に第3流動化ガスを供給して第3流動床を前記沈降燃焼室内に形成しながら、流動媒体を前記主燃焼室から前記沈降燃焼室を通じて前記熱分解室に移動させる、熱分解方法が提供される。
 一態様では、前記主燃焼室内の温度または前記沈降燃焼室内の温度に基づいて、前記第1供給量と前記第2供給量の比率を制御する。
 一態様では、前記第1原料および前記第2原料を前記熱分解室に供給しながら、前記第1原料および前記第2原料のうちの少なくとも一方を前記主燃焼室に供給する。
 一態様では、前記沈降燃焼室内の温度が所定の温度範囲内に収まるように前記第3流動化ガスの温度または流量を調節する。
 一態様では、前記沈降燃焼室内には、冷却媒体が流れる伝熱管が配置されており、前記沈降燃焼室内の温度が所定の温度範囲内に収まるように前記冷却媒体の流量を調節する。
 一態様では、前記沈降燃焼室の下に配置された複数の風箱から、異なる流量で前記第3流動化ガスを前記沈降燃焼室内に供給することによって、前記第3流動床を形成する流動媒体を旋回させる。
 一態様では、前記第1流動化ガスは、一酸化炭素ガス、二酸化炭素ガス、水素ガス、炭化水素ガス、蒸気、窒素ガスのうちの少なくとも1つを含む。
 一態様では、流動媒体が収容された流動床炉の内部が熱分解室、主燃焼室、および沈降燃焼室に仕切られた熱分解装置を用いて原料を熱分解するための熱分解方法であって、前記熱分解室に第1流動化ガスを供給して、第1流動床を前記熱分解室内に形成し、原料を前記熱分解室に供給し、前記原料を前記熱分解室内で熱分解し、前記主燃焼室に第2流動化ガスを供給して第2流動床を前記主燃焼室内に形成しながら、前記原料の残渣を前記主燃焼室内で燃焼し、前記沈降燃焼室に第3流動化ガスを供給して第3流動床を前記沈降燃焼室内に形成しながら、流動媒体を前記主燃焼室から前記沈降燃焼室を通じて前記熱分解室に移動させ、前記沈降燃焼室内の温度を所定の温度範囲内に制御する、熱分解方法が提供される。
 一態様では、前記沈降燃焼室内の温度が前記所定の温度範囲内に収まるように前記第3流動化ガスの温度または流量を調節する。
 一態様では、前記沈降燃焼室内には、冷却媒体が流れる伝熱管が配置されており、前記沈降燃焼室内の温度が前記所定の温度範囲内に収まるように前記冷却媒体の流量を調節する。
 一態様では、前記沈降燃焼室の下に配置された複数の風箱から、異なる流量で前記第3流動化ガスを前記沈降燃焼室内に供給することによって、前記第3流動床を形成する流動媒体を旋回させる。
 本発明の一態様によれば、水素に対する炭素の比率(炭素/水素比)、および酸素に対する炭素の比率(炭素/酸素比)が高い第1原料と、第1原料に比べてこれらの比率が低い第2原料が、同時に熱分解室内に供給される。第1原料の残渣から発生する熱エネルギーは、主燃焼室内の流動媒体を十分に加熱することができる。したがって、主燃焼室内において第2原料の残渣が保有すべき熱量は低くてよい。結果として、第2原料からの熱分解生成物の収率が向上する。加熱された流動媒体は、主燃焼室から沈降燃焼室を通って熱分解室に移動し、第1原料および第2原料を熱分解する。
 本発明の一態様によれば、流動媒体の温度が予め調節された後に、流動媒体が熱分解室に移動するので、局所的な高温領域が熱分解室内に形成されない。したがって、原料は熱分解室内で適正な温度範囲内で加熱され、結果として、所望の熱分解生成物(例えば油)の収率を向上させることができる。
熱分解装置の一実施形態を示す模式図である。 熱分解装置の他の実施形態を示す模式図である。 熱分解装置のさらに他の実施形態を示す模式図である。 熱分解装置のさらに他の実施形態を示す模式図である。 熱分解装置のさらに他の実施形態を示す模式図である。 熱分解装置のさらに他の実施形態を示す模式図である。 熱分解装置のさらに他の実施形態を示す模式図である。
 以下、本発明の実施形態について図面を参照して説明する。
 図1は、熱分解装置の一実施形態を示す模式図である。図1に示す熱分解装置は、原料を熱分解し、熱分解生成物を生成する熱分解室4と、熱分解された原料の残渣を燃焼する燃焼室5を備えている。熱分解室4および燃焼室5は、1つの流動床炉1内に形成されている。すなわち、流動床炉1の内部は、第1仕切壁11によって熱分解室4と燃焼室5に仕切られており、さらに燃焼室5は第2仕切壁12によって主燃焼室6と沈降燃焼室7に仕切られている。流動床炉1の全体の形状は特に限定されないが、例えば円筒形または矩形を有している。
 熱分解室4、主燃焼室6、沈降燃焼室7内には、流動媒体(例えば珪砂)が収容されている。流動媒体を流動させるために、熱分解室4、主燃焼室6、および沈降燃焼室7は、第1散気装置15、第2散気装置25、および第3散気装置35にそれぞれ接続されている。第1散気装置15、第2散気装置25、および第3散気装置35は、第1流動化ガス、第2流動化ガス、および第3流動化ガスを熱分解室4、主燃焼室6、および沈降燃焼室7にそれぞれ独立に吹き込み、各室4,5,7内の流動媒体を流動させる。流動する流動媒体は、第1流動床51、第2流動床52、および第3流動床53を熱分解室4、主燃焼室6、および沈降燃焼室7内に形成する。第1流動床51、第2流動床52、および第3流動床53の上方には、流動媒体がほとんど存在しないフリーボード部55、フリーボード部56、およびフリーボード部57がある。
 第1散気装置15は、熱分解室4の下にある複数(図1では2つ)の第1風箱16と、これら第1風箱16に連結された第1流動化ガス供給ライン17と、第1流動化ガス供給ライン17に接続された第1流動化ガス供給源18と、第1流動化ガス供給ライン17に取り付けられた複数(図1では2つ)の第1ガス流量調節弁(または第1ガス流量調節ダンパ)19を備えている。第1流動化ガス供給ライン17は複数の第1分岐ライン17aを有しており、第1ガス流量調節弁19はこれらの第1分岐ライン17aにそれぞれ取り付けられている。第1風箱16の上壁は多孔板16aから構成されている。多孔板16aは、熱分解室4の炉床を構成する。
 本実施形態では、第1流動化ガスとして、水蒸気が使用されている。第1流動化ガス供給源18には、水蒸気を発生させるボイラが使用されている。一実施形態では、第1流動化ガスとして空気を使用してもよい。この場合は、第1散気装置15は、第1流動化ガス供給源18として送風機を備えてもよい。さらに、第1散気装置15は、第1流動化ガスを加熱するための温度調節器を備えてもよい。温度調節器は、第1流動化ガス供給ライン17に取り付けられる。
 第2散気装置25は、複数(図1では3つ)の第2風箱26と、これら第2風箱26に連結された第2流動化ガス供給ライン27と、第2流動化ガス供給ライン27に接続された第2流動化ガス供給源28と、第2流動化ガス供給ライン27に取り付けられた複数(図1では3つ)の第2ガス流量調節弁(または第2ガス流量調節ダンパ)29と、第2流動化ガス供給ライン27に取り付けられた第2温度調節器30を備えている。第2流動化ガス供給ライン27は複数の第2分岐ライン27aを有しており、第2ガス流量調節弁29はこれらの第2分岐ライン27aにそれぞれ取り付けられている。第2風箱26の上壁は多孔板26aから構成されている。多孔板26aは、主燃焼室6の炉床を構成する。
 第3散気装置35は、少なくとも1つの第3風箱36と、第3風箱36に連結された少なくとも1つの第3流動化ガス供給ライン37と、第3流動化ガス供給ライン37に接続された第3流動化ガス供給源38と、第3流動化ガス供給ライン37に取り付けられた少なくとも1つの第3ガス流量調節弁(または第3ガス流量調節ダンパ)39と、第3流動化ガス供給ライン37に取り付けられた第3温度調節器40を備えている。第3風箱36の上壁は多孔板36aから構成されている。多孔板36aは、沈降燃焼室7の炉床を構成する。
 風箱16,26,36内に示す白抜き矢印の大きさは、吹き出される流動化ガスの流速を示している。流動化ガスの流速の違いにより、熱分解室4内には流動媒体の旋回流が形成され、主燃焼室6内にも流動媒体の旋回流が形成される。第1流動床51は、旋回する流動媒体から形成され、第2流動床52も、旋回する流動媒体から形成される。一方、沈降燃焼室7内の第3流動床53は、流動媒体の下降流から形成されている。一実施形態では、第3流動床53も、旋回する流動媒体から形成されてもよい。
 本実施形態では、主燃焼室6および沈降燃焼室7に供給される第2流動化ガスおよび第3流動化ガスには、空気が使用されており、第2流動化ガス供給源28および第3流動化ガス供給源38は、送風機から構成されている。ただし、本発明は本実施形態には限定されず、第2流動化ガスおよび第3流動化ガスとして、他のタイプのガスを用いてもよい。例えば、第2流動化ガス供給源28は、二酸化炭素ガス、蒸気、窒素ガス、酸素のうちの少なくとも1つを供給するための少なくとも1つの供給源を含んでもよい。また、および第3流動化ガス供給源38は、一酸化炭素ガス、二酸化炭素ガス、水素ガス、炭化水素ガス、蒸気、窒素ガスのうちの少なくとも1つを供給するための少なくとも1つの供給源を含んでもよい。
 図1に示す実施形態では、第2流動化ガス供給源28および第3流動化ガス供給源38は、第2流動化ガス供給ライン27および第3流動化ガス供給ライン37にそれぞれ連結されているが、一実施形態では、共通の流動化ガス供給源が第2流動化ガス供給ライン27および第3流動化ガス供給ライン37に連結されてもよい。この場合は、第2温度調節器30および第3温度調節器40に代えて、共通の温度調節器が第2流動化ガス供給ライン27および第3流動化ガス供給ライン37に取り付けられてもよい。
 熱分解室4、主燃焼室6、沈降燃焼室7は、全体として1つの流動床炉1を構成する。第1仕切壁11は、流動床炉1の上壁1aから下方に延びている。第1仕切壁11の下端は炉床に接していなく、第1仕切壁11の下に第1開口部61がある。この第1開口部61は、熱分解室4および沈降燃焼室7の底部に位置しており、熱分解室4と沈降燃焼室7は第1開口部61を通じて互いに連通している。したがって、第1開口部61は、主燃焼室6内で加熱された流動媒体が沈降燃焼室7を通って熱分解室4内に移動することを許容する。第1開口部61は、熱分解室4および沈降燃焼室7内の第1流動床51および第3流動床53の界面(上面)よりも下方に位置している。
 第2仕切壁12は、燃焼室5(主燃焼室6および沈降燃焼室7)の炉床から上方に延びている。第2仕切壁12の上端は、流動床炉1の上壁1aに接続されていなく、第2仕切壁12の上に第2開口部62がある。この第2開口部62は、主燃焼室6のフリーボード部56と、沈降燃焼室7のフリーボード部57に位置しており、主燃焼室6と沈降燃焼室7は第2開口部62を通じて互いに連通している。より具体的には、主燃焼室6のフリーボード部56と、沈降燃焼室7のフリーボード部57は、第2開口部62を通じて互いに連通している。
 主燃焼室6内には、流動媒体の流速が異なる2つの領域、すなわち弱流動化領域と強流動化領域が形成されている。弱流動化領域は、主燃焼室6の中央に形成され、強流動化領域は、弱流動化領域の外側に形成されている。したがって、主燃焼室6の中央領域では流動媒体の下降流が形成され、主燃焼室6の外側領域では流動媒体の上昇流が形成されている。これらの流動媒体の上昇流および下降流は、主燃焼室6内で、流動媒体の旋回流を形成する。第2流動床52は、このような流動媒体の旋回流から形成される。
 主燃焼室6内で旋回流を形成する流動媒体の一部は、第2仕切壁12の上端を越流し、第2開口部62を通って沈降燃焼室7内に流入する。流動媒体は、沈降燃焼室7内で下降しながら、第3流動床53を形成する。さらに、流動媒体は、沈降燃焼室7から第1開口部61を通って熱分解室4に流入し、第1流動床51を形成する流動媒体に混合される。熱分解室4内では、流動媒体は旋回流を形成している。この旋回流を形成する流動媒体は、第1仕切壁11に沿って上昇し、この上昇流は沈降燃焼室7内の流動媒体を熱分解室4内に誘引する。
 熱分解室4と主燃焼室6は、連通路70を通じて互いに連通している。図1では連通路70を示す矢印は流動床炉1の外に描かれているが、連通路70も流動床炉1内に位置している。加えて、図1では、熱分解室4、主燃焼室6、および沈降燃焼室7は、平面的に描かれているが、実際にはこれらの室4,6,7は立体的な形状であり、熱分解室4は主燃焼室6および沈降燃焼室7の両方の隣に配置することも可能である。したがって、連通路70は単なる開口部から構成されていることもある。
 熱分解装置は、第1原料と第2原料を熱分解室4内に供給する第1原料供給装置71および第2原料供給装置72を備えている。第1原料供給装置71の原料出口は、熱分解室4に連結され、第1原料供給装置71の原料入口は、第1原料を搬送する搬送装置(図示せず)に接続されている。同じように、第2原料供給装置72の原料出口は、熱分解室4に連結され、第2原料供給装置72の原料入口は、第2原料を搬送する搬送装置(図示せず)に接続されている。第1原料供給装置71および第2原料供給装置72の具体例としては、原料を定量的に熱分解室4内に送ることができるスクリューフィーダーが挙げられる。
 図1に示す実施形態では、第1原料および第2原料は、第1原料供給装置71および第2原料供給装置72から、熱分解室4のフリーボード部55に設けられた2つの供給口74,75を通じて熱分解室4内に供給される。図1では、これら2つの供給口74,75は模式的に描かれている。一実施形態では、第1原料および第2原料は、第1原料供給装置71および第2原料供給装置72から送り出された後に混合され、第1原料と第2原料との混合物が1つの供給口から熱分解室4内に供給されてもよい。
 熱分解室4内に投入された第1原料および第2原料は、第1流動床51を形成する流動媒体の旋回流によって撹拌されながら、流動媒体から熱を受け、熱分解する。熱分解の結果、第1原料および第2原料に含まれる成分の一部は、熱分解生成物を形成する。熱分解生成物は、熱分解室4を構成する流動床炉1の上壁1aに設けられた生成物出口78を通って熱分解室4から排出される。生成物出口78は熱分解室4に連通している。第1原料の残渣および第2原料の残渣は、流動媒体とともに、連通路70を通って主燃焼室6に移動する。残渣は、第2流動床52を形成する流動媒体とともに旋回しながら燃焼する。残渣は燃焼とともに熱エネルギーを放出し、燃焼排ガスを発生しながら、第2流動床52を形成する流動媒体を加熱する。燃焼排ガスは、主燃焼室6を構成する流動床炉1の上壁1aに設けられた排ガス出口79を通って燃焼室から排出される。排ガス出口79は主燃焼室6に連通している。
 加熱された流動媒体の一部は、第2仕切壁12の上端を越流し、第2開口部62を通って沈降燃焼室7に移動し、沈降燃焼室7内で下降しながら第3流動床53を形成する。さらに、加熱された流動媒体は第1開口部61を通って熱分解室4内に流入する。加熱された流動媒体は、熱分解に必要な熱量を提供し、これにより第1原料および第2原料の熱分解が熱分解室4内で進行する。沈降燃焼室7から移動した流動媒体は高温であるが、熱分解室4内の第1流動床51に混合されるにつれて、流動媒体の温度は低下する。このように、主燃焼室6から沈降燃焼室7を経由して熱分解室4に移動した流動媒体は、第1原料および第2原料の熱分解の熱源として機能する。
 本実施形態における第1原料は、石油から製造されたプラスチックの廃材(以下、廃プラスチックという)に代表される、炭素の含有率が高い材料である。第2原料は、第1原料よりも炭素の含有率が低い可燃性材料であり、例えば、バイオマス、都市ごみ、汚泥、有機性廃棄物などが挙げられる。第1原料は、第2原料よりも炭素の含有量が高く、かつカロリーも高い。したがって、第1原料は、第2原料に比べて燃えやすく、燃焼したときに高い熱エネルギーを生じる。一方、第2原料は、第1原料に比べて、炭素の含有率が低く、かつ通常水分を比較的多く含んでいるため、第1原料によりも燃えにくい。一実施形態では、第1原料は、水素に対する炭素の比率、および酸素に対する炭素の比率が、第2原料のそれらよりも高い材料(例えば、都市ごみ、産業廃棄物など)であってもよい。
 第1原料は、少なくとも廃プラスチックを含む。第1原料の熱分解により生成された熱分解生成物は、廃プラスチックから得られた油(主に炭素(C)および水素(H)を多く含む、常温常圧で液体の炭化水素化合物等)を含む。第2原料は、バイオマスなどの有機材料であり、第2原料に含まれる炭素(C)、酸素(O)、水素(H)の割合、具体的には、水素に対する炭素の比率(炭素/水素比)、および酸素に対する炭素の比率(炭素/酸素比)は、廃プラスチックにおけるそれらの比率よりも低いことがある。したがって、第2原料の熱分解により生成された熱分解生成物は、炭素(C)に加え、酸素(O)および水素(H)を含むため、第1原料の熱分解により生成された熱分解生成物に比べ、炭素(C)の含有割合が低い。
 第1原料および第2原料は、熱分解室4内では燃焼せず、熱分解される。第1原料は、炭素を多く含むため、熱分解室4内で炭化物(チャー)が生成されやすい。炭化物(チャー)は、熱分解生成物として熱分解室4から取り出すことができない反面、高い熱量を保有している。第1原料の一部は、熱分解生成物として熱分解室4から排出され、第1原料の残渣は炭化物(チャー)として主燃焼室6内に送られる。この炭化物(チャー)は高い熱量を有している。したがって、炭化物(チャー)は主燃焼室6内で燃焼したときに高い熱エネルギーを発生し、流動媒体を高温に加熱することができる。
 一方、第2原料は、炭素の含有率が第1原料に比べて低い。このため、第2原料の熱分解に必要な熱量を第2原料のみで確保しようとすると、第2原料に含まれる炭素のうちの大部分を主燃焼室6内で消費する必要がある。結果として、第2原料から生成される熱分解生成物の収率が低下する。この点、本実施形態によれば、炭素を多く含む第1原料と、より少ない量の炭素を含む第2原料が、同時に熱分解室4内に供給される。第1原料の残渣が主燃焼室6内で燃焼することにより発生する熱エネルギーは、主燃焼室6内の流動媒体を十分に加熱することができる。したがって、主燃焼室6内において第2原料の残渣が保有すべき熱量は低くてよい。結果として、第2原料からの熱分解生成物の収率が向上する。加熱された流動媒体は、主燃焼室6から沈降燃焼室7を通って熱分解室4に移動し、第1原料および第2原料を熱分解する。
 図1に示すように、第1散気装置15の第1風箱16と、第3散気装置35の第3風箱36との間には、不燃物排出口82が設けられている。第1原料および/または第2原料中に含まれる比較的大きな不燃物は不燃物排出口82から排出される。
 次に、熱分解室4内に供給される第1原料と第2原料の比率について説明する。上述したように、第1原料の残渣は、燃焼時に第2原料の残渣よりも高い熱エネルギーを発生する。したがって、熱分解室4への第1原料の供給量と第2原料の供給量の比率は、主燃焼室6および沈降燃焼室7内の温度に影響する。本実施形態の熱分解装置は、主燃焼室6内の温度に基づいて、熱分解室4内に供給すべき第1原料の供給量と第2原料の供給量の比率を制御する。より具体的には、熱分解装置は、主燃焼室6内の温度が所定の目標範囲内に収まるように、熱分解室4への第1原料の供給量と第2原料の供給量の比率を調節するように構成される。
 図1に示すように、熱分解装置は、第1原料供給装置71および第2原料供給装置72の動作を独立に制御する動作制御部200を備えている。動作制御部200は、第1原料供給装置71および第2原料供給装置72に接続されている。動作制御部200は、第1原料供給装置71が第1原料を熱分解室4に供給する量を制御し、さらに第1原料供給装置71が第2原料を熱分解室4に供給する量を制御するように構成されている。動作制御部200は、熱分解室4への第1原料の供給量および第2原料の供給量を独立して制御することが可能である。したがって、動作制御部200は、熱分解室4への第1原料の供給量と第2原料の供給量の比率を制御することができる。第1原料の供給量と第2原料の供給量の比率の例には、 第1原料の供給量が0の場合、および第2原料の供給量が0の場合も含む。
 動作制御部200は、プログラムが格納された記憶装置200aと、プログラムに含まれる命令に従って演算を実行する演算装置200bを備えている。記憶装置200aは、RAMなどの主記憶装置と、ハードディスクドライブ(HDD)、ソリッドステートドライブ(SSD)などの補助記憶装置を備えている。演算装置200bの例としては、CPU(中央処理装置)、GPU(グラフィックプロセッシングユニット)が挙げられる。ただし、動作制御部200の具体的構成は本実施形態に限定されない。
 動作制御部200は、少なくとも1台のコンピュータから構成される。例えば、動作制御部200は、流動床炉1の近くに配置されたエッジサーバであってもよいし、インターネットやローカルエリアネットワークなどの通信ネットワークに接続されたクラウドサーバであってもよい。動作制御部200は、複数のサーバの組み合わせであってもよい。例えば、動作制御部200は、インターネットまたはローカルエリアネットワークなどの通信ネットワークにより互いに接続されたエッジサーバとクラウドサーバとの組み合わせであってもよい。
 熱分解装置は、熱分解室4内に配置された熱分解室温度計85と、主燃焼室6内に配置された主燃焼室温度計86と、沈降燃焼室7内に配置された沈降燃焼室温度計87をさらに備えている。本実施形態では、複数の(図1では3つの)熱分解室温度計85が熱分解室4内で縦方向に沿って配列されている。複数の熱分解室温度計85のうち1つは、熱分解室4内のフリーボード部55に配置されており、他の熱分解室温度計85は第1流動床51内に配置されている。同様に、複数の(図1では3つの)主燃焼室温度計86が主燃焼室6内で縦方向に沿って配列され、複数の(図1では3つの)沈降燃焼室温度計87が沈降燃焼室7内で縦方向に沿って配列されている。複数の主燃焼室温度計86のうち1つは、主燃焼室6内のフリーボード部56に配置されており、他の主燃焼室温度計86は第2流動床52内に配置されている。複数の沈降燃焼室温度計87のうち1つは、沈降燃焼室7内のフリーボード部57に配置されており、他の沈降燃焼室温度計87は第3流動床53内に配置されている。
 熱分解室温度計85、主燃焼室温度計86、および沈降燃焼室温度計87の数および配置は、図1に示す実施形態に限定されない。一実施形態では、単一の熱分解室温度計85、単一の主燃焼室温度計86、および単一の沈降燃焼室温度計87が配置されてもよい。別の実施形態では、4つ以上の熱分解室温度計85、4つ以上の主燃焼室温度計86、および4つ以上の沈降燃焼室温度計87が熱分解室4、主燃焼室6、および沈降燃焼室7内にそれぞれ配置されてもよい。
 熱分解室温度計85、主燃焼室温度計86、および沈降燃焼室温度計87は、熱分解室4内の温度、主燃焼室6内の温度、および沈降燃焼室7内の温度をそれぞれ測定する。熱分解室温度計85、主燃焼室温度計86、および沈降燃焼室温度計87は、動作制御部200に接続されている。熱分解室4内の温度の測定値は熱分解室温度計85から動作制御部200に送られ、主燃焼室6内の温度の測定値は主燃焼室温度計86から動作制御部200に送られ、沈降燃焼室7内の温度の測定値は沈降燃焼室温度計87から動作制御部200に送られるようになっている。
 動作制御部200は、主燃焼室6内の温度に基づいて、熱分解室4への第1原料の供給量および第2原料の供給量の比率を調節するように構成されている。より具体的には、動作制御部200は、主燃焼室温度計86から送られてくる主燃焼室6内の温度の測定値が所定の目標範囲内に収まるように、第1原料供給装置71および第2原料供給装置72のうちの少なくとも一方に指令を発して、熱分解室4への第1原料の供給量および第2原料の供給量の比率を調節する。
 例えば、主燃焼室6内の温度の測定値が上記目標範囲を下回ったとき、動作制御部200は第1原料供給装置71に指令を発して第1原料の熱分解室4への供給量を増加させる。同時に、動作制御部200は第2原料供給装置72に指令を発して第2原料の熱分解室4への供給量を減少させてもよい。他の例では、主燃焼室6内の温度の測定値が上記目標範囲を上回ったとき、動作制御部200は第2原料供給装置72に指令を発して第2原料の熱分解室4への供給量を増加させる。同時に、動作制御部200は第1原料供給装置71に指令を発して第1原料の熱分解室4への供給量を減少させてもよい。第1原料の供給量または第2原料の供給量は0であってもよい。
 本実施形態によれば、第1原料供給装置71および第2原料供給装置72は、炭素の含有率が高い第1原料と、炭素の含有率が低い第2原料を適切な比で熱分解室4に投入することができる。熱分解室4内での熱分解と主燃焼室6内での燃焼は最適化され、結果として、熱分解室4での熱分解生成物の収率が向上する。
 熱分解室4と主燃焼室6との間の流動媒体の循環流量が一定である条件下では、熱分解室4の温度は、主燃焼室6から沈降燃焼室7を経由して送られる流動媒体の温度に依存する。具体的には、主燃焼室6内の温度が高ければ、熱分解室4内の温度も上がる。熱分解室4で生成される熱分解生成物の種類は、熱分解室4内の温度に依存する。例えば、油の回収に適した熱分解室4内の温度は、200℃以上であり、好ましくは250℃以上であり、更に好ましくは300℃以上であり、かつ600℃以下であり、好ましくは500℃以下であり、更に好ましくは400℃以下である。炭化水素ガスなどの高カロリーの燃料ガスの回収に適した熱分解室4内の温度は、600℃~900℃の範囲内でより温度が低い方が好ましい。水素と一酸化炭素の合成ガスの回収に適した熱分解室4内の温度は、900℃~1300℃の範囲内でより温度が高い方が好ましい。なお、熱分解室4の温度は、熱分解室4のフリーボード部55に酸化剤を供給することで確保してもよい。酸化剤としては、空気、酸素、酸素と蒸気の組み合わせが用いられる。
 図1に示す実施形態の熱分解装置は、油、燃料ガス、または合成ガスを選択的に回収することが可能である。例えば、油の収率を上げる場合は、第2原料の供給量に対する第1原料の供給量の比率が低い状態で、第1原料および第2原料を熱分解室4内に供給する。第1原料は、高カロリー材である廃プラスチックを含むのに対して、第2原料はバイオマス、都市ごみなどの比較的カロリーの低い材料である。
 第1原料は、まず、熱分解室4内で熱分解され、その後、第1原料の残渣(炭化物であるチャー)は、主燃焼室6に送られる。第1原料の残渣は、炭化物を多く含む高カロリー材料であるが、主燃焼室6への第1原料の残渣の供給量は比較的少ないため、主燃焼室6内の温度はあまり上がらない。結果として、熱分解室4内の温度は、廃プラスチックからの油の回収に適した温度範囲600℃以下となる。
 炭化水素ガスなどの燃料ガスの収率を上げる場合には、第2原料の供給量に対する第1原料の供給量の比率を高めた状態で、第1原料および第2原料を熱分解室4内に供給する。第1原料は、熱分解室4内で熱分解され、その後、第1原料の残渣(炭化物であるチャー)は、主燃焼室6に送られる。主燃焼室6への第1原料の残渣の供給量は比較的多いため、主燃焼室6内の温度が上がる。結果として、熱分解室4内の温度は、炭化水素ガスの生成に適した温度範囲600℃~900℃となる。
 水素と一酸化炭素の合成ガスの収率を上げる場合は、第2原料の供給量に対する第1原料の供給量の比率をさらに高めた状態で、第1原料および第2原料を熱分解室4内に供給する。第1原料は、熱分解室4内で熱分解され、その後、第1原料の残渣(炭化物であるチャー)は、主燃焼室6に送られる。主燃焼室6への第1原料の残渣の供給量はかなり多いため、主燃焼室6内の温度が上がる。結果として、熱分解室4内の温度は、炭化水素ガスの生成に適した温度範囲900℃~1300℃となる。
 このように、動作制御部200は、第1原料供給装置71および第2原料供給装置72の動作を制御する(すなわち、熱分解室4への第1原料の供給量と第2原料の供給量の比率を調節する)ことで、熱分解室4内の温度を調節し、意図した熱分解生成物の収率を上げることができる。
 上述した実施形態では、動作制御部200は、主燃焼室6内の温度(すなわち主燃焼室温度計86から送られた温度の測定値)に基づいて第1原料供給装置71および第2原料供給装置72の動作を制御するが、一実施形態では、動作制御部200は、沈降燃焼室7内の温度(すなわち沈降燃焼室温度計87から送られた温度の測定値)に基づいて第1原料供給装置71および第2原料供給装置72の動作を制御してもよい。
 一実施形態では、図2に示すように、熱分解装置は、第1原料と第2原料を主燃焼室6内に供給する第3原料供給装置91および第4原料供給装置92をさらに備えてもよい。第3原料供給装置91の原料出口は、主燃焼室6に連結され、第3原料供給装置91の原料入口は、第1原料を搬送する搬送装置(図示せず)に接続されている。同じように、第4原料供給装置92の原料出口は、主燃焼室6に連結され、第4原料供給装置92の原料入口は、第2原料を搬送する搬送装置(図示せず)に接続されている。第3原料供給装置91および第4原料供給装置92の具体例としては、原料を定量的に主燃焼室6内に送ることができるスクリューフィーダーが挙げられる。
 図2に示す実施形態では、第1原料および第2原料は、第3原料供給装置91および第4原料供給装置92から、主燃焼室6のフリーボード部56に設けられた2つの供給口94,95を通じて主燃焼室6内に供給される。図2では、供給口94,95は模式的に描かれている。一実施形態では、第1原料および第2原料は、第3原料供給装置91および第4原料供給装置92から送り出された後に混合され、第1原料と第2原料との混合物が1つの供給口から主燃焼室6内に供給されてもよい。
 動作制御部200は、第3原料供給装置91および第4原料供給装置92に接続されている。本実施形態では、動作制御部200は、第1原料供給装置71および第2原料供給装置72の動作に加え、第3原料供給装置91および第4原料供給装置92の動作を制御するように構成されている。具体的には、動作制御部200は、第3原料供給装置91が第1原料を主燃焼室6に供給する量を制御し、さらに第4原料供給装置92が第2原料を主燃焼室6に供給する量を制御するように構成されている。動作制御部200は、主燃焼室6への第1原料の供給量および第2原料の供給量を独立して制御することが可能である。したがって、動作制御部200は、主燃焼室6への第1原料の供給量と第2原料の供給量の比率を制御することができる。
 熱分解装置の運転中、第1原料供給装置71および第2原料供給装置72は、第1原料および第2原料を熱分解室4内に供給し続けるのに対して、第3原料供給装置91および第4原料供給装置92は必要なときに第1原料および第2原料の少なくとも一方を主燃焼室6内に供給する。例えば、主燃焼室6内の温度の測定値が、上記目標範囲よりも低い所定の下限値を下回ったとき、動作制御部200は第3原料供給装置91に指令を発して第1原料を主燃焼室6内に供給させる。このとき、動作制御部200は第4原料供給装置92にも指令を発して第2原料を主燃焼室6内に供給させもよい。他の例では、主燃焼室6内の温度の測定値が、上記下限値を下回ったとき、動作制御部200は第4原料供給装置92に指令を発して第2原料を主燃焼室6内に供給させる。このとき、動作制御部200は第3原料供給装置91にも指令を発して第1原料を主燃焼室6内に供給させもよい。
 本実施形態では、第1原料および第2原料の少なくとも一方は、主燃焼室6内に直接供給され、直ちに燃焼される。したがって、主燃焼室6内の温度は上昇し、上記目標範囲内に速やかに到達することができる。
 一実施形態では、動作制御部200は、沈降燃焼室7内の温度(すなわち沈降燃焼室温度計87から送られた温度の測定値)に基づいて第3原料供給装置91および第4原料供給装置92の動作を制御してもよい。
 さらに、一実施形態では、動作制御部200は、第1原料供給装置71および第2原料供給装置72の動作を制御する代わりに、第3原料供給装置91および第4原料供給装置92のうちの少なくとも一方の動作を制御し、主燃焼室6または沈降燃焼室7内の温度の測定値を上記目標範囲内に維持してもよい。具体的には、第1原料供給装置71および第2原料供給装置72は、第1原料および第2原料を固定された供給量で熱分解室4内に供給しながら、動作制御部200は、主燃焼室6または沈降燃焼室7内の温度の測定値が上記目標範囲内に収まるように、第3原料供給装置91および第4原料供給装置92のうちの少なくとも一方の動作を制御し、第1原料および第2原料の少なくとも一方を主燃焼室6に供給してもよい。このような動作によれば、熱分解装置は、熱分解室4内での第1原料と第2原料の比率とは独立に、主燃焼室6内の温度を制御することができる。
 一実施形態では、図3に示すように、熱分解装置は、揮発性忌避物質を含む有害材料を主燃焼室6に供給する有害材料供給装置100をさらに備えてもよい。有害材料供給装置100の材料出口は、主燃焼室6に連結され、有害材料供給装置100の材料入口は、有害材料を搬送する搬送装置(図示せず)に接続されている。有害材料は、主燃焼室6のフリーボード部56に設けられた供給口101から主燃焼室6内に供給される。有害材料供給装置100の具体例としては、有害材料を定量的に主燃焼室6内に送ることができるスクリューフィーダーが挙げられる。
 揮発性忌避物質は、主燃焼室6内で燃焼し、燃焼排ガスを生成する。燃焼排ガスは、排ガス出口79を通って主燃焼室6から排出される。揮発性忌避物質は、熱分解室4内に移動しないので、揮発性忌避物質は、熱分解室4内で生成された熱分解生成物に混入することがない。
 図1乃至図3に示す実施形態の熱分解装置は、第1原料および第2原料由来の種々の熱分解生成物(油、炭化水素など)を熱分解室4から排出することができる。これらの熱分解生成物は、石油製品や燃料などの製品に利用することができる。最近では、より多種多様の化学物質を排出することができる処理システムへの要請が高まっている。
 そこで、次に、第1原料および第2原料由来の物質に加えて、他の化学物質を熱分解生成物として排出することができる熱分解装置の一実施形態について説明する。図4に示すように、第1散気装置15は、第1流動化ガス供給ライン17に接続された複数の(図4の例では2つの)第1流動化ガス供給源18A,18Bと、これら複数の第1流動化ガス供給源18A,18Bの下流にそれぞれ配置された複数の(図4の例では2つの)開閉弁111,112を備えている。
 複数の第1流動化ガス供給源18A,18Bのうちの1つは、水蒸気または空気を供給するための主供給源18Aであり、他の1つは添加ガスを供給するための添加ガス供給源18Bである。本実施形態では、主供給源18Aは、水蒸気を発生させるボイラから構成されている。一実施形態では、主供給源18Aは、空気を送る送風機から構成されてもよい。さらに、一実施形態では、主供給源18Aが設けられない場合もある。添加ガスは、一酸化炭素ガス、二酸化炭素ガス、水素ガス、炭化水素ガス、窒素ガスのうちのいずれか1つである。上記複数の第1流動化ガス供給源18A,18Bは、一酸化炭素ガス、二酸化炭素ガス、水素ガス、炭化水素ガス、窒素ガスから選択された複数の種類の添加ガスを供給するための複数の添加ガス供給源を含んでもよい。添加ガスは熱分解生成物から得てもよい。
 開閉弁111,112は、主供給源18Aおよび添加ガス供給源18Bの下流にそれぞれ配置されている。これら開閉弁111,112は動作制御部200に接続されており、開閉弁111,112の開閉動作は動作制御部200によって制御される。動作制御部200がすべての開閉弁111,112を開くと、水蒸気および添加ガスの混合体は、第1流動化ガスとして第1流動化ガス供給ライン17を通って熱分解室4に供給される。動作制御部200が開閉弁111を開き、一方で開閉弁112を閉じると、水蒸気のみが第1流動化ガスとして第1流動化ガス供給ライン17を通って熱分解室4に供給される。動作制御部200が開閉弁111を閉じ、一方で開閉弁112を開くと、添加ガスのみが第1流動化ガスとして第1流動化ガス供給ライン17を通って熱分解室4に供給される。第1流動化ガスの例としては、水蒸気と水素ガスとの混合体、水素ガスのみ等が挙げられる。複数の添加ガス供給源18Bを設けた場合は、第1流動化ガスは、水蒸気と水素ガスと一酸化炭素との混合体、水素ガスと一酸化炭素との混合体などが挙げられる。主供給源18Aが送風機である場合は、水蒸気に代えて空気が第1流動化ガスの少なくとも一部を構成する。
 上述した第1原料と第2原料の組み合わせを熱分解室4内に供給すると、熱分解生成物に含まれる炭素の割合は比較的大きい。このような場合、一例では、熱分解生成物内の炭素と水素との含有量をバランスさせるために、第1流動化ガスとして、水素ガスのみ、あるいは水蒸気と水素ガスとの組み合わせが使用される。水素の少なくとも一部は、熱分解室4内で原料の熱分解に供され、熱分解生成物として熱分解室4から排出される。このように、本実施形態では、必要とされる化学物質を含む第1流動化ガスが使用される。結果として、熱分解生成物は、所望の化学物質を含有することができる。
 図1乃至図4に示す実施形態は、適宜組み合わせることができる。例えば、図3に示す実施形態は、図2に示す実施形態と組み合わせてもよい。図4に示す実施形態は、図2および図3に示す実施形態に組み合わせてもよい。
 次に、油を原料から回収するのに適した熱分解装置の一実施形態について、図5を参照して説明する。特に説明しない本実施形態の構成および動作は、図1を参照して説明した実施形態と同じであるので、その重複する説明を省略する。図5に示す実施形態では、第1原料を熱分解室4内に供給するための原料供給装置71を備えている。この原料供給装置71は図1に示す第1原料供給装置71に相当する。以下の説明では、第1原料を、単に原料と称する。この原料は、上述した第1原料と同じタイプであり、炭素の含有率が高い廃プラスチックを少なくとも含む。本実施形態では図1の第2原料供給装置72に相当する構成要素は設けられていないが、第2原料を熱分解室4内に供給するための図1に示す第2原料供給装置72が設けられてもよい。
 原料は熱分解室4内では燃焼されず、原料の残渣(例えばチャー)は主燃焼室6および沈降燃焼室7内で燃焼される。主燃焼室6および沈降燃焼室7内の流動媒体は、原料の残渣の燃焼によって加熱され、第1開口部61を通って熱分解室4内に流入する。加熱された流動媒体は、熱分解室4内で第1流動床51と混合されるうちに除熱され、第1流動床51はある温度に落ち着く。油を廃プラスチックから回収するのに適した熱分解室4内の温度は、600℃以下である。したがって、熱分解室4内の温度は600℃以下に維持される。
 しかしながら、沈降燃焼室7から熱分解室4に移動したばかりの流動媒体は高温であり、熱分解室4の内部には高温領域が局所的に存在する。例えば、熱分解室4内の全体の温度は、600℃以下に維持されているにもかかわらず、第1開口部61の付近の温度は800℃を超えることがある。このように高温領域が局所的に存在すると、高温領域にある廃プラスチックは過度に分解が進み、炭化物(チャー)と軽質ガスになり、結果として、油の収率が低下してしまう。
 そこで、本実施形態では、沈降燃焼室7内の流動媒体の温度を、熱分解室4内で油を原料から得るのに適した温度に調節する。動作制御部200は、沈降燃焼室7内の温度に基づいて、沈降燃焼室7内に供給される第3流動化ガスの温度および流量のうちの少なくとも一方を制御するように構成されている。具体的には、動作制御部200は、第3散気装置35の第3温度調節器40および第3ガス流量調節弁39のうちの少なくとも一方を操作し、沈降燃焼室7内の温度の測定値が所定の温度範囲内に収まるように、沈降燃焼室7内に供給される第3流動化ガスの温度および流量のうちの少なくとも一方を制御する。沈降燃焼室7内の温度の測定値は、沈降燃焼室温度計87から動作制御部200に送られる。
 第3流動化ガス自体の温度は、沈降燃焼室7内の流動媒体の温度よりも低い。したがって、動作制御部200が第3温度調節器40を操作して第3流動化ガスの温度をさらに下げると、沈降燃焼室7内の流動媒体の温度は低下する。同じように、動作制御部200が第3ガス流量調節弁39を操作して第3流動化ガスの流量を上げると、沈降燃焼室7内の流動媒体の温度は低下する。動作制御部200は、第3温度調節器40および第3ガス流量調節弁39の両方を操作して、第3流動化ガスの温度をさらに下げつつ、第3流動化ガスの流量を上げてもよい。
 このような流動媒体の温度の最適化の後、流動媒体は第1開口部61を通って熱分解室4内に流入する。流動媒体は熱分解室4内で旋回し、第1流動床51を形成しながら、熱分解室4内の温度を油成分の収率が高くなる温度域に維持する。廃プラスチックを含む原料は、流動媒体の旋回流によって撹拌されながら加熱され、気化した油を発生する。気化した油は、熱分解生成物として生成物出口78を通って熱分解室4から排出される。
 本実施形態によれば、流動媒体の温度が予め調節された後に、流動媒体が熱分解室4に移動するので、局所的な高温領域が熱分解室4内に形成されない。結果として、均一な熱分解反応温度場が形成され、意図する熱分解生成物の収率を向上させることができる。
 図6は、意図する熱分解生成物を原料から得るのに適した熱分解装置の他の実施形態を示す図である。特に説明しない本実施形態の構成および動作は、図5に示す実施形態と同じであるので、その重複する説明を省略する。
 図6に示すように、本実施形態の熱分解装置は、沈降燃焼室7内の流動媒体から熱を回収する熱回収器120を備えている。この熱回収器120は、水などの冷却媒体が内部を流れる伝熱管121と、伝熱管121に取り付けられた冷媒流量調節弁124を有している。伝熱管121は沈降燃焼室7内に配置されている。より具体的には、沈降燃焼室7内に突出している。熱回収器120は、沈降燃焼室7内の流動媒体から熱を回収し、流動媒体の温度を低下させることができる。すなわち、沈降燃焼室7内の流動媒体の熱は、伝熱管121内を流れる冷却媒体に伝達され、結果として流動媒体の温度が低下する。
 冷媒流量調節弁124は、動作制御部200に接続されており、冷媒流量調節弁124の動作は動作制御部200によって制御される。動作制御部200は、沈降燃焼室温度計87から送られる温度の測定値(すなわち、沈降燃焼室7内の温度)が所定の温度範囲内に収まるように、冷媒流量調節弁124を操作して、伝熱管121を流れる冷却媒体の流量を制御する。
 沈降燃焼室7内の流動媒体が伝熱管121に接触することを確実とするため、第3散気装置35は、複数の第3風箱36と、これら第3風箱36にそれぞれ連結された複数の第3流動化ガス供給ライン37と、これら第3流動化ガス供給ライン37にそれぞれ取り付けられた複数の第3ガス流量調節弁(または複数の第3ガス流量調節ダンパ)39を備えている。動作制御部200は、複数の第3ガス流量調節弁39の開度が互いに異なるように、複数の第3ガス流量調節弁39の動作を制御するように構成されている。第3ガス流量調節弁39の開度が異なるので、複数の第3風箱36から吹き出す第3流動化ガスの流量も互いに異なっている。このような流量の異なる第3流動化ガスが沈降燃焼室7内に供給され、第3流動床53を形成する流動媒体は旋回する。
 流動媒体の旋回流の一部は、熱回収器120の伝熱管121に接触し、流動媒体の温度低下が達成される。また、流動媒体の旋回流は、沈降燃焼室7内での流動媒体の温度を均一にするので、高温の流動媒体が熱分解室4に移動することが防止できる。さらには、流動媒体の旋回流の強さや方向によって、沈降燃焼室7から熱分解室4への流動媒体の流量を制御することができる。また、複数の第3風箱36から吹き出す第3流動化ガスの流量を調節することによって、流動媒体の旋回流の強弱を調節することにより、流動媒体と伝熱管121との間の熱伝達係数を変化させることで、伝熱管121を介した吸熱量を変化させ、もって沈降燃焼室7から熱分解室4へ流れる流動媒体の温度を調節することができる。
 図1乃至図6を参照して説明した実施形態は、適宜組み合わせることができる。例えば、図5に示す実施形態は、図1乃至図4に示す実施形態のいずれにも適用することができる。また、図6に示す熱回収器120および第3散気装置35は、図1乃至図4に示す実施形態のいずれにも組み合わせることが可能である。さらには、図7に示すように、図1乃至図6に示す実施形態をすべて組み合わせてもよい。
 図1乃至図6を参照して説明した実施形態を適宜組み合わせることにより、意図した熱分解生成物の収率を上げつつ、燃焼効率のよい運転が達成できる。さらには、多種多様の化学物質を高い収率で回収することができる。
 上述した実施形態は、本発明が属する技術分野における通常の知識を有する者が本発明を実施できることを目的として記載されたものである。上記実施形態の種々の変形例は、当業者であれば当然になしうることであり、本発明の技術的思想は他の実施形態にも適用しうる。したがって、本発明は、記載された実施形態に限定されることはなく、特許請求の範囲によって定義される技術的思想に従った最も広い範囲に解釈されるものである。
 本発明は、原料を流動床炉内で熱分解する熱分解装置および熱分解方法に利用可能であり、特に内部循環流動床ガス化技術を用いて原料を熱分解し、熱分解生成物を得る熱分解装置および熱分解方法に利用可能である。
 1   流動床炉
 4   熱分解室
 5   燃焼室
 6   主燃焼室
 7   沈降燃焼室
11   第1仕切壁
12   第2仕切壁
15   第1散気装置
16   第1風箱
17   第1流動化ガス供給ライン
18,18A,18B   第1流動化ガス供給源
19   第1ガス流量調節弁
25   第2散気装置
26   第2風箱
27   第2流動化ガス供給ライン
28   第2流動化ガス供給源
29   第2ガス流量調節弁
30   第2温度調節器
35   第3散気装置
36   第3風箱
37   第3流動化ガス供給ライン
38   第3流動化ガス供給源
39   第3ガス流量調節弁
40   第3温度調節器
51   第1流動床
52   第2流動床
53   第3流動床
55,56,57   フリーボード部
61   第1開口部
62   第2開口部
70   連通路
71   第1原料供給装置
72   第2原料供給装置
74,75   供給口
78   生成物出口
79   排ガス出口
82   不燃物排出口
85   熱分解室温度計
86   主燃焼室温度計
87   沈降燃焼室温度計
91   第3原料供給装置
92   第4原料供給装置
94,95   供給口
100   有害材料供給装置
101   供給口
111,112   開閉弁
120   熱回収器
121   伝熱管
124   冷媒流量調節弁
200   動作制御部

Claims (27)

  1.  流動する流動媒体からなる流動床内で原料を熱分解するための熱分解装置であって、
     流動床炉と、
     前記流動床炉の内部を熱分解室と燃焼室とに仕切る第1仕切壁と、
     前記燃焼室を主燃焼室と沈降燃焼室に仕切る第2仕切壁と、
     前記熱分解室、前記主燃焼室、および前記沈降燃焼室に、第1流動化ガス、第2流動化ガス、および第3流動化ガスをそれぞれ供給する第1散気装置、第2散気装置、および第3散気装置と、
     第1原料を前記熱分解室に第1供給量で供給する第1原料供給装置と、
     前記第1原料よりも、水素に対する炭素の比率、および酸素に対する炭素の比率が低い第2原料を前記熱分解室に第2供給量で供給する第2原料供給装置と、
     前記第1原料供給装置と前記第2原料供給装置の動作を独立に制御する動作制御部を備えている、熱分解装置。
  2.  前記動作制御部は、前記主燃焼室内の温度または前記沈降燃焼室内の温度に基づいて、前記第1供給量と前記第2供給量の比率を調節するように構成されている、請求項1に記載の熱分解装置。
  3.  前記第1原料を前記主燃焼室に供給する第3原料供給装置と、
     前記第2原料を前記主燃焼室に供給する第4原料供給装置をさらに備えている、請求項1または2に記載の熱分解装置。
  4.  前記動作制御部は、前記沈降燃焼室内の温度が所定の温度範囲内に収まるように前記第3散気装置の動作を制御するように構成されている、請求項1乃至3のいずれか一項に記載の熱分解装置。
  5.  前記第3散気装置は、前記沈降燃焼室の下に配置された風箱と、前記風箱に連結された流動化ガス供給ラインと、前記流動化ガス供給ラインに取り付けられた温度調節器と、前記流動化ガス供給ラインに取り付けられたガス流量調節弁を備えており、
     前記動作制御部は、前記沈降燃焼室内の温度が前記所定の温度範囲内に収まるように前記温度調節器および前記ガス流量調節弁のうちの少なくとも一方の動作を制御するように構成されている、請求項4に記載の熱分解装置。
  6.  前記沈降燃焼室内の流動媒体から熱を回収する熱回収器をさらに備え、
     前記動作制御部は、前記沈降燃焼室内の温度が所定の温度範囲内に収まるように前記熱回収器の動作を制御するように構成されている、請求項1乃至3のいずれか一項に記載の熱分解装置。
  7.  前記熱回収器は、前記沈降燃焼室内に配置された伝熱管と、前記伝熱管内を流れる冷却媒体の流量を調節する冷媒流量調節弁を備えており、
     前記動作制御部は、前記沈降燃焼室内の温度が前記所定の温度範囲内に収まるように前記冷媒流量調節弁の動作を制御するように構成されている、請求項6に記載の熱分解装置。
  8.  前記第3散気装置は、前記沈降燃焼室の下に配置された複数の風箱と、前記複数の風箱にそれぞれ連結された複数の流動化ガス供給ラインと、前記複数の流動化ガス供給ラインにそれぞれ取り付けられた複数のガス流量調節弁を備えており、
     前記動作制御部は、前記複数のガス流量調節弁の開度が互いに異なるように、前記複数のガス流量調節弁の動作を制御するように構成されている、請求項6または7に記載の熱分解装置。
  9.  前記第1散気装置は、前記第1流動化ガスを前記熱分解室に供給する少なくとも1つの第1流動化ガス供給源を備えており、
     前記第1流動化ガス供給源は、一酸化炭素ガス、二酸化炭素ガス、水素ガス、炭化水素ガス、蒸気、窒素ガスのうちの少なくとも1つを供給するための、少なくとも1つの供給源を含む、請求項1乃至8のいずれか一項に記載の熱分解装置。
  10.  流動する流動媒体からなる流動床内で原料を熱分解するための熱分解装置であって、
     流動床炉と、
     前記流動床炉の内部を熱分解室と燃焼室とに仕切る第1仕切壁と、
     前記燃焼室を主燃焼室と沈降燃焼室に仕切る第2仕切壁と、
     前記熱分解室、前記主燃焼室、および前記沈降燃焼室に、第1流動化ガス、第2流動化ガス、および第3流動化ガスをそれぞれ供給する第1散気装置、第2散気装置、および第3散気装置と、
     原料を前記熱分解室に供給する原料供給装置と、
     前記沈降燃焼室内の温度を測定する沈降燃焼室温度計と、
     前記沈降燃焼室内の温度を制御する動作制御部を備えている、熱分解装置。
  11.  前記動作制御部は、前記沈降燃焼室内の温度の測定値が所定の温度範囲内に収まるように前記第3散気装置の動作を制御するように構成されている、請求項10に記載の熱分解装置。
  12.  前記第3散気装置は、前記沈降燃焼室の下に配置された風箱と、前記風箱に連結された流動化ガス供給ラインと、前記流動化ガス供給ラインに取り付けられた温度調節器と、前記流動化ガス供給ラインに取り付けられたガス流量調節弁を備えており、
     前記動作制御部は、前記沈降燃焼室内の温度の測定値が前記所定の温度範囲内に収まるように前記温度調節器および前記ガス流量調節弁のうちの少なくとも一方の動作を制御するように構成されている、請求項11に記載の熱分解装置。
  13.  前記沈降燃焼室内の流動媒体から熱を回収する熱回収器をさらに備え、
     前記動作制御部は、前記沈降燃焼室内の温度の測定値が所定の温度範囲内に収まるように前記熱回収器の動作を制御するように構成されている、請求項10に記載の熱分解装置。
  14.  前記熱回収器は、前記沈降燃焼室内に配置された伝熱管と、前記伝熱管内を流れる冷却媒体の流量を調節する冷媒流量調節弁を備えており、
     前記動作制御部は、前記沈降燃焼室内の温度の測定値が前記所定の温度範囲内に収まるように前記冷媒流量調節弁の動作を制御するように構成されている、請求項13に記載の熱分解装置。
  15.  前記第3散気装置は、前記沈降燃焼室の下に配置された複数の風箱と、前記複数の風箱にそれぞれ連結された複数の流動化ガス供給ラインと、前記複数の流動化ガス供給ラインにそれぞれ取り付けられた複数のガス流量調節弁を備えており、
     前記動作制御部は、前記複数のガス流量調節弁の開度が互いに異なるように、前記複数のガス流量調節弁の動作を制御するように構成されている、請求項13または14に記載の熱分解装置。
  16.  前記第3散気装置は、前記第3流動化ガスを前記沈降燃焼室に供給する流動化ガス供給源を備えており、
     前記流動化ガス供給源は、一酸化炭素ガス、二酸化炭素ガス、水素ガス、炭化水素ガス、蒸気、窒素ガスのうちの少なくとも1つを供給するための、少なくとも1つの供給源を含む、請求項10乃至15のいずれか一項に記載の熱分解装置。
  17.  流動媒体が収容された流動床炉の内部が熱分解室、主燃焼室、および沈降燃焼室に仕切られた熱分解装置を用いて原料を熱分解するための熱分解方法であって、
     前記熱分解室に第1流動化ガスを供給して、第1流動床を前記熱分解室内に形成し、
     第1原料を前記熱分解室に第1供給量で供給しながら、前記第1原料よりも、水素に対する炭素の比率、および酸素に対する炭素の比率が低い第2原料を前記熱分解室に第2供給量で供給し、
     前記第1原料および前記第2原料を前記熱分解室内で熱分解し、
     前記主燃焼室に第2流動化ガスを供給して第2流動床を前記主燃焼室内に形成しながら、前記第1原料の残渣および前記第2原料の残渣を前記主燃焼室内で燃焼し、
     前記沈降燃焼室に第3流動化ガスを供給して第3流動床を前記沈降燃焼室内に形成しながら、流動媒体を前記主燃焼室から前記沈降燃焼室を通じて前記熱分解室に移動させる、熱分解方法。
  18.  前記主燃焼室内の温度または前記沈降燃焼室内の温度に基づいて、前記第1供給量と前記第2供給量の比率を制御する、請求項17に記載の熱分解方法。
  19.  前記第1原料および前記第2原料を前記熱分解室に供給しながら、前記第1原料および前記第2原料のうちの少なくとも一方を前記主燃焼室に供給する、請求項17または18に記載の熱分解方法。
  20.  前記沈降燃焼室内の温度が所定の温度範囲内に収まるように前記第3流動化ガスの温度または流量を調節する、請求項17乃至19のいずれか一項に記載の熱分解方法。
  21.  前記沈降燃焼室内には、冷却媒体が流れる伝熱管が配置されており、
     前記沈降燃焼室内の温度が所定の温度範囲内に収まるように前記冷却媒体の流量を調節する、請求項17乃至19のいずれか一項に記載の熱分解方法。
  22.  前記沈降燃焼室の下に配置された複数の風箱から、異なる流量で前記第3流動化ガスを前記沈降燃焼室内に供給することによって、前記第3流動床を形成する流動媒体を旋回させる、請求項21に記載の熱分解方法。
  23.  前記第1流動化ガスは、一酸化炭素ガス、二酸化炭素ガス、水素ガス、炭化水素ガス、蒸気、窒素ガスのうちの少なくとも1つを含む、請求項17乃至22のいずれか一項に記載の熱分解方法。
  24.  流動媒体が収容された流動床炉の内部が熱分解室、主燃焼室、および沈降燃焼室に仕切られた熱分解装置を用いて原料を熱分解するための熱分解方法であって、
     前記熱分解室に第1流動化ガスを供給して、第1流動床を前記熱分解室内に形成し、
     原料を前記熱分解室に供給し、
     前記原料を前記熱分解室内で熱分解し、
     前記主燃焼室に第2流動化ガスを供給して第2流動床を前記主燃焼室内に形成しながら、前記原料の残渣を前記主燃焼室内で燃焼し、
     前記沈降燃焼室に第3流動化ガスを供給して第3流動床を前記沈降燃焼室内に形成しながら、流動媒体を前記主燃焼室から前記沈降燃焼室を通じて前記熱分解室に移動させ、
     前記沈降燃焼室内の温度を所定の温度範囲内に制御する、熱分解方法。
  25.  前記沈降燃焼室内の温度が前記所定の温度範囲内に収まるように前記第3流動化ガスの温度または流量を調節する、請求項24に記載の熱分解方法。
  26.  前記沈降燃焼室内には、冷却媒体が流れる伝熱管が配置されており、
     前記沈降燃焼室内の温度が前記所定の温度範囲内に収まるように前記冷却媒体の流量を調節する、請求項24に記載の熱分解方法。
  27.  前記沈降燃焼室の下に配置された複数の風箱から、異なる流量で前記第3流動化ガスを前記沈降燃焼室内に供給することによって、前記第3流動床を形成する流動媒体を旋回させる、請求項26に記載の熱分解方法。
PCT/JP2020/045453 2019-12-27 2020-12-07 熱分解装置および熱分解方法 WO2021131634A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP20905304.0A EP4083170A4 (en) 2019-12-27 2020-12-07 THERMAL DECOMPOSITION APPARATUS AND METHOD FOR THERMAL DECOMPOSITION
CN202080089816.XA CN114846123A (zh) 2019-12-27 2020-12-07 热分解装置及热分解方法
US17/786,102 US20230025336A1 (en) 2019-12-27 2020-12-07 Pyrolysis apparatus and pyrolysis method
KR1020227021290A KR20220119620A (ko) 2019-12-27 2020-12-07 열분해 장치 및 열분해 방법

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019-238494 2019-12-27
JP2019238494A JP6935482B2 (ja) 2019-12-27 2019-12-27 熱分解装置および熱分解方法

Publications (1)

Publication Number Publication Date
WO2021131634A1 true WO2021131634A1 (ja) 2021-07-01

Family

ID=76573954

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/045453 WO2021131634A1 (ja) 2019-12-27 2020-12-07 熱分解装置および熱分解方法

Country Status (6)

Country Link
US (1) US20230025336A1 (ja)
EP (1) EP4083170A4 (ja)
JP (2) JP6935482B2 (ja)
KR (1) KR20220119620A (ja)
CN (1) CN114846123A (ja)
WO (1) WO2021131634A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115215347A (zh) * 2022-06-17 2022-10-21 合盛硅业股份有限公司 一种气相二氧化硅脱酸装置及脱酸方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS611306B2 (ja) 1977-08-25 1986-01-16 Konishiroku Photo Ind
JPH102543A (ja) 1996-06-11 1998-01-06 Ebara Corp 流動層ガス化燃焼炉
JPH11181450A (ja) * 1997-12-18 1999-07-06 Ebara Corp 統合型ガス化炉
JP2002129169A (ja) 2000-10-23 2002-05-09 Mitsubishi Heavy Ind Ltd 廃プラスチック熱分解油化方法及び装置
JP2003156209A (ja) * 2001-09-07 2003-05-30 Ebara Corp ガス供給装置、ガス供給利用システム、ガス化溶融システム及びガス供給方法
JP2003171673A (ja) * 2001-12-03 2003-06-20 Ebara Corp ガス発生装置
JP2006063290A (ja) * 2004-08-30 2006-03-09 Ebara Corp 高分子炭化水素の利用システムおよび方法
JP2007024492A (ja) * 2005-07-14 2007-02-01 Ebara Corp 流動床ガス化炉および熱分解ガス化方法
JP4243919B2 (ja) 1997-12-18 2009-03-25 株式会社荏原製作所 燃料のガス化システム
JP4283222B2 (ja) * 2002-08-15 2009-06-24 株式会社荏原製作所 ガス化炉及びガス化方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS611306A (ja) 1984-06-14 1986-01-07 株式会社クボタ 自動走行作業車
US5365889A (en) * 1992-11-13 1994-11-22 Fostyer Wheeler Energy Corporation Fluidized bed reactor and system and method utilizing same
CN1286749A (zh) * 1997-11-04 2001-03-07 株式会社荏原制作所 流动层气化燃烧炉
WO2005033250A2 (en) * 2003-10-02 2005-04-14 Ebara Corporation Gasification method and apparatus
WO2019239270A2 (en) * 2018-06-11 2019-12-19 Bioshare Ab Biomass upgrading system
CN107723012B (zh) * 2017-09-15 2019-08-23 王树宽 多级流化床粉煤热解及除尘耦合制取煤焦油煤气的系统及方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS611306B2 (ja) 1977-08-25 1986-01-16 Konishiroku Photo Ind
JPH102543A (ja) 1996-06-11 1998-01-06 Ebara Corp 流動層ガス化燃焼炉
JPH11181450A (ja) * 1997-12-18 1999-07-06 Ebara Corp 統合型ガス化炉
JP4243919B2 (ja) 1997-12-18 2009-03-25 株式会社荏原製作所 燃料のガス化システム
JP2002129169A (ja) 2000-10-23 2002-05-09 Mitsubishi Heavy Ind Ltd 廃プラスチック熱分解油化方法及び装置
JP2003156209A (ja) * 2001-09-07 2003-05-30 Ebara Corp ガス供給装置、ガス供給利用システム、ガス化溶融システム及びガス供給方法
JP2003171673A (ja) * 2001-12-03 2003-06-20 Ebara Corp ガス発生装置
JP4283222B2 (ja) * 2002-08-15 2009-06-24 株式会社荏原製作所 ガス化炉及びガス化方法
JP2006063290A (ja) * 2004-08-30 2006-03-09 Ebara Corp 高分子炭化水素の利用システムおよび方法
JP2007024492A (ja) * 2005-07-14 2007-02-01 Ebara Corp 流動床ガス化炉および熱分解ガス化方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4083170A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115215347A (zh) * 2022-06-17 2022-10-21 合盛硅业股份有限公司 一种气相二氧化硅脱酸装置及脱酸方法
CN115215347B (zh) * 2022-06-17 2023-09-22 合盛硅业股份有限公司 一种气相二氧化硅脱酸装置及脱酸方法

Also Published As

Publication number Publication date
EP4083170A4 (en) 2024-01-24
JP6935482B2 (ja) 2021-09-15
KR20220119620A (ko) 2022-08-30
EP4083170A1 (en) 2022-11-02
US20230025336A1 (en) 2023-01-26
CN114846123A (zh) 2022-08-02
JP2021138960A (ja) 2021-09-16
JP2021107471A (ja) 2021-07-29

Similar Documents

Publication Publication Date Title
JP5631313B2 (ja) 熱反応装置
JP4835581B2 (ja) 循環流動層改質装置
KR950027307A (ko) 가압 내부 순환형 유동층 보일러
JP2007024492A (ja) 流動床ガス化炉および熱分解ガス化方法
WO2012066802A1 (ja) 流動床炉及び廃棄物の処理方法
WO2021131634A1 (ja) 熱分解装置および熱分解方法
JP2009019870A (ja) 流動層ガス化燃焼炉
JP6008082B2 (ja) ガス化装置及びガス化方法
JPH11181450A (ja) 統合型ガス化炉
JP2011149658A (ja) 循環流動層ボイラの運転制御方法
WO2004016716A1 (ja) ガス化炉
CN101611122A (zh) 气化燃料的气化方法和装置
JP2006206840A (ja) 統合型ガス化炉及びその操業方法
JP2002098308A (ja) 循環流動層燃焼装置
JP5699523B2 (ja) ガス生成量制御方法及びガス生成量制御装置
JP2005300077A (ja) 循環流動炉
WO2019107421A1 (ja) 流動床炉
JP2006206842A (ja) 統合型ガス化炉及びその操業方法
JP4102167B2 (ja) ガス化炉
JP3327749B2 (ja) 廃棄物の焼却熱を利用した過熱蒸気製造装置
WO2019107423A1 (ja) 流動床炉及びその運転方法
JP2005121342A (ja) 循環流動層炉の運転方法
WO2023218128A1 (en) Grate arrangement and method
JPH0979536A (ja) 廃棄物の焼却熱を利用した過熱蒸気製造装置
Rao et al. Combustion studies of rice husk in fluidized bed

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20905304

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020905304

Country of ref document: EP

Effective date: 20220727