WO2019225538A1 - 工作機械監視装置 - Google Patents

工作機械監視装置 Download PDF

Info

Publication number
WO2019225538A1
WO2019225538A1 PCT/JP2019/019885 JP2019019885W WO2019225538A1 WO 2019225538 A1 WO2019225538 A1 WO 2019225538A1 JP 2019019885 W JP2019019885 W JP 2019019885W WO 2019225538 A1 WO2019225538 A1 WO 2019225538A1
Authority
WO
WIPO (PCT)
Prior art keywords
machine tool
measurement
information
workpiece
monitoring device
Prior art date
Application number
PCT/JP2019/019885
Other languages
English (en)
French (fr)
Inventor
山田 智明
建太 神藤
Original Assignee
Dmg森精機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dmg森精機株式会社 filed Critical Dmg森精機株式会社
Publication of WO2019225538A1 publication Critical patent/WO2019225538A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q15/00Automatic control or regulation of feed movement, cutting velocity or position of tool or work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q17/00Arrangements for observing, indicating or measuring on machine tools
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • the present invention relates to a machine tool monitoring device for monitoring a machine tool.
  • Machine tool monitoring devices and monitoring device systems that monitor machine tools have been proposed.
  • a machine tool operating status management system has been proposed that can group multiple machine tools according to different group attributes and display the grouped machine tool operating status in each group. (For example, refer to Patent Document 1).
  • the present invention has been made in view of the above problems, and an object of the present invention is to provide a machine tool monitoring device that can effectively use a time before operation to realize efficient operation of the machine tool.
  • a machine tool monitoring device includes: A machine tool monitoring unit for obtaining machine tool information relating to the state of the machine tool; Based on the machine tool information, pre-operation is determined, A pre-operation instruction unit for sending the pre-operation instruction to the machine tool; Is provided.
  • the time before operation can be used effectively by the pre-operation determined by the pre-operation instruction unit, so that it is possible to provide a machine tool monitoring device that can realize efficient operation of the machine tool. .
  • FIG. 1 is a block diagram showing a configuration of a system including a machine tool monitoring device according to one embodiment of the present invention.
  • the machine tool monitoring system 2 mainly includes a machine tool monitoring apparatus 10 according to one embodiment of the present invention, a plurality of machine tools 20a to 20d, and a factory management apparatus 30.
  • the machine tool monitoring device 10 is electrically connected to the control devices of the machine tools 20a to 20d, and is also electrically connected to the factory management device 30.
  • the factory management device 30 manages the entire factory including the machine tools 20a to 20d and devices used in the previous process.
  • the machine tool monitoring device 10 determines a pre-operation based on the machine tool monitoring unit 12 that acquires machine tool information related to the states of the machine tools 20a to 20d, and instructs the pre-operation to the machine tool. And a pre-operation instruction unit 14 for sending. More specifically, the pre-operation instruction unit 14 selects a machine tool to perform the pre-operation from the plurality of machine tools 20a to 20d, and sends a pre-operation instruction to the control device of the selected machine tool.
  • the machine tool monitoring device 10 includes a workpiece monitoring unit 16 that is electrically connected to a factory management device 30 described later.
  • the machine tool monitoring apparatus 10 is provided with a display 18, and the machine tools 20a to 20d are also provided with displays 22a to 22d, respectively.
  • the machine tool monitoring device 10 exists as a separate device from the machine tools 20a to 20d.
  • the present invention is not limited to this, and the machine tool monitoring device 10 is a control device for any machine tool. In some cases, it may be included in the factory management device 30.
  • the case where the four machine tools 20a to 20d are included is shown as an example, but the present invention is not limited to this, and there may be other arbitrary numbers of machine tools.
  • the machine tools 20a to 20d may all be the same machine tool, may all be different machine tools, or may be partly the same machine tool and partly different machine tools.
  • the machine tool information acquired by the machine tool monitoring unit 12 includes information on whether the machine tools 20a to 20d are in operation or are inactive. Is included. For machine tools that are in operation, the estimated end time of operation is also included. Further, the machine tool information includes measurement results of the sensors provided in the machine tools 20a to 20d.
  • the pre-operation determined by the pre-operation instruction unit 14 includes warm-up operation of the machine tools 20a to 20d and measurement of the machine tool by at least one sensor.
  • the machine tool monitoring apparatus 10 based on the machine tool information, it is possible to cause the machine tool to perform a pre-operation according to the machine tool information. Efficient operation of machine tools can be realized.
  • the machine tool information includes the machine tool operation / pause determination, it is possible to perform a pre-operation before the workpiece arrives in the machine tool being paused. Therefore, efficient operation of the machine tool can be realized by effectively using the time before operation.
  • the machine tool information includes the downtime of the machine tool determined to be outage, for example, the machine tools with long downtime are operated preferentially, and the operation rate of each machine tool is leveled. Can be planned. During the pause period of the machine tool, it is possible to monitor a state including a standby state and a state where the power is completely turned off.
  • the pre-operation includes a warm-up operation of the machine tool
  • machining can be started in a state where the machine tool has reached a predetermined temperature in advance, and a reduction in machining accuracy due to a temperature change during machining is suppressed. Precision machining can be expected.
  • an operation part means the member which carries out translation movement or rotation movement, such as a main axis
  • the machine tool information includes measurement results of sensors provided in the machine tools 20a to 20d.
  • the measurement result of this sensor includes, for example, the temperature measurement result of the machine tool by the temperature sensor.
  • the temperature measurement result may be based on temperature measurement data when the machine tool is in operation or may be based on temperature measurement data after the machine tool is stopped. For example, when the measured temperature is lowered after the machine tool is stopped, it can be controlled to start the warm-up operation early.
  • the measurement temperature of a predetermined working part is high in the immediately preceding processing, it is conceivable to prioritize the measurement of the corresponding working member in advance operation.
  • the measurement result of the sensor further includes a vibration measurement result of the machine tool by the acceleration sensor.
  • a vibration measurement result of the machine tool by the acceleration sensor For example, when the value of the acceleration sensor is large in the immediately preceding machining, it is conceivable to measure the corresponding operating part in advance operation. As described above, since the measurement result of the sensor is included in the machine tool information, it is possible to execute an appropriate pre-operation according to the state of the machine tool to be operated.
  • measurement of the machine tool is included in the pre-operation, and further, preparatory work for executing the measurement of the machine tool may be included in the pre-operation.
  • a work for attaching the measurement probe to the main spindle of the machine tool and a work for installing a reference sphere for measurement can be exemplified.
  • the preliminary operation instruction unit 14 performs control for notifying information related to preparation work for performing measurement of the machine tool.
  • the information related to the preparation work can be displayed on the display 18 of the machine tool monitoring apparatus 10 or can be displayed on the display of the selected machine tool. Furthermore, not only can it be displayed on the display, but it can also be notified by voice or lamp display.
  • information related to the preparatory work can be notified to the operator, so that a measurement sensor, a reference ball, a jig, and the like can be quickly installed and measurement can be started quickly.
  • the machine tool monitoring device 10 includes a workpiece monitoring unit 16 that acquires workpiece information related to a workpiece to be processed from the factory management device 30.
  • the workpiece information is information on a workpiece scheduled to be processed by the machine tools 20a to 20d.
  • the workpiece information includes at least one of information related to workpiece processing, information related to a previous process of the workpiece, and estimated arrival time at the machine tool.
  • the information regarding the machining of the workpiece includes the dimension of the workpiece that arrives.
  • An acceptable machine tool can be selected based on the dimensional information of the workpiece. Further, it is possible to send an instruction to move the jig or the like to the selected machine tool in advance according to the dimensions of the workpiece. Further, the information related to the machining of the workpiece includes the machining content of the workpiece. An acceptable machine tool can be selected according to the machining content of the workpiece. Furthermore, in the selected machine tool, an operating part to be measured can be determined, and preliminary preparation can be started immediately.
  • the information on the previous process of the work includes information on what process has been performed on the work. More specifically, the information on the pre-process of the workpiece includes information on which process among quenching, annealing, carburizing, nitriding, and surface treatment (sand blasting) has been performed. For example, if the previous process is quenched or annealed based on the information on the previous process of the workpiece, it can be predicted that the workpiece will arrive at a high temperature, and therefore, measurement and warm-up operation considering the workpiece temperature can be performed.
  • the machine tool power is turned on or the operating part is moved to a certain degree of warm-up at an appropriate timing according to the workpiece arrival time. Can accept work. Furthermore, measurement of the machine tool can be started at an appropriate timing in accordance with the arrival time of the workpiece.
  • the workpiece information includes at least one of information related to machining of the workpiece, information on the previous process of the workpiece, and the estimated arrival time of the workpiece, an appropriate pre-operation can be performed accurately and efficiently.
  • the pre-operation includes measurement of the machine tool by at least one sensor, but in this embodiment, the machine tool information, the work information, and the measurement result of the machine tool are stored in association with each other. For example, by showing the history of machine tool downtime, temperature, machine tool measurement results, etc. in time series, the correlation between downtime and temperature drop, the correlation between downtime and offset amount, etc. can be grasped.
  • FIG. 2A is a graph showing an example of the relationship between the downtime of the machine tool and the temperature of the operating unit.
  • FIG. 2B is a graph showing an example of the relationship between the downtime of the machine tool and the offset amount of the operating unit.
  • the graph shown in FIG. 2A is a graph in which the elapsed time after the machine tool is stopped and the measured value of the temperature sensor attached to the operating part of the machine tool are stored in association with each other and the history is shown in time series. . Since the correlation between the downtime of the machine tool and the temperature drop of the operating part is clear from this graph, the temperature of the operating part can be estimated from the downtime of the machine tool. Therefore, it is possible to determine the optimal warm-up operation start time based on this correlation data.
  • the graph shown in FIG. 2B shows the history in chronological order by storing the elapsed time until the preliminary operation is started after the machine tool is stopped and the offset amount of the operating part measured in the preliminary operation in association with each other. It is a graph. Since the correction amount can be estimated in advance from this graph, it is possible to determine whether calibration is necessary with reference to the required processing accuracy and this graph. In addition, since the correction amount can be estimated in advance from this graph, the measurement items can be accurately determined, and the preparatory work for measurement can be accurately determined.
  • FIG. 3 is a flowchart illustrating an example of a control flow of a machine tool monitoring process performed by the machine tool monitoring apparatus.
  • step S10 it is determined whether or not the work monitoring unit 16 has acquired work information from the factory management device 30 (step S10).
  • the machine tool monitoring unit 12 acquires machine tool information from the machine tools 20a to 20d at regular intervals. If it is determined in step S10 that the workpiece information has not been acquired (NO), the control process in step S10 is repeated as it is. That is, it is in a standby state. If it is determined in step S10 that the workpiece information has been acquired (YES), it is next determined whether or not there is a paused machine tool suitable for the workpiece indicated in the workpiece information (step S12). . More specifically, it is determined whether or not there is a machine tool that is at rest or a machine tool that is scheduled to end operation at the estimated arrival time of the work based on the work information. Judge whether it is suitable or not.
  • step S12 If it is determined in step S12 that there is no machine tool that is not suitable for the workpiece (NO), this control flow is terminated. If it is determined in step S12 that there is a paused machine tool suitable for the workpiece (YES), if there are a plurality of corresponding machine tools, the machine tool having the minimum pause time is selected (step S12). S14). Next, history data such as the pause time, temperature, measurement result, etc. are read (step S16). Then, it is determined whether calibration is necessary with reference to the workpiece information and the read history data (step S18). If it is determined in this determination that calibration is not required (NO), the control process for calibration is not performed, and the process proceeds to step S24.
  • step S18 If it is determined in step S18 that calibration is necessary (YES), then information related to the preparation work for measurement is displayed on the display 18 (step S20), including measurement of the machine tool. A signal for performing calibration is transmitted to the selected machine tool (step S22). Thereby, the operator makes preparations necessary for measurement of the machine tool and performs measurement. The actual measurement method of machine tools will be described in detail later.
  • step S24 it is determined whether or not the warm-up operation is necessary with reference to the work information and the history data of the downtime and the temperature (step S24). In addition, it can also judge based on the measured temperature value of the working part of the machine tool included in the acquired latest machine tool information instead of the downtime and temperature history data.
  • step S24 If it is determined in step S24 that the warm-up operation is not required (NO), this control process is terminated. If it is determined in step S24 that the warm-up operation is necessary (YES), then the warm-up operation start time is determined from the estimated work arrival time based on the work information, the pause time, and the temperature history data. Determine. In this case as well, the start time of the warm-up operation can be determined based on the temperature measurement value included in the latest acquired machine tool information instead of the downtime and temperature history data.
  • step S28 it is determined whether or not a predetermined warm-up operation start time has been reached. It is in a standby state until the warm-up operation start time is reached, and when it is determined that the warm-up operation start time has been reached (YES), a warm-up operation start instruction signal is transmitted to the selected machine tool (step S30). ), A series of control processing is terminated.
  • FIGS. 4 to 6A and 6B show the direction (6 degrees of freedom) in which the operating unit moves.
  • a case where the measurement is performed with a reference sphere 60 for measurement placed on the table 50 rotating in the C-axis direction around the Z-axis is shown.
  • FIG. 4 is a perspective view schematically showing an example of measuring the position of the rotation center of the rotation axis of the table 50 using the contact-type measurement probe 70.
  • a contact-type measurement probe 70 is attached to the main shaft 40 for measurement.
  • the table 50 to which the reference sphere 60 is fixed is rotated in the C-axis direction, and the table 50 is stopped at angles of 0, 120, and 240 degrees on the plane, and the measurement probe 70 is placed on the surface of the reference sphere 60.
  • a three-dimensional position is detected by contact.
  • the center of the reference sphere 60 can be obtained, and from this, the offset amount from the true rotation center of the rotation axis of the table 50 can be obtained.
  • Calibration can be performed by correcting the offset amount.
  • the contact-type measurement probe 70 not only a normal touch probe but also a ball bar measuring device that connects two spheres with an extendable bar and measures the extension / contraction amount with a built-in encoder can be used.
  • one of the two spheres is in contact with the main shaft 40, and the other sphere is in contact with the reference sphere 60.
  • so-called R-test can be performed by performing TCP control for moving the spindle 40 so that relative displacement does not occur between the spindle 40 and the table 50 as the table 50 rotates.
  • FIG. 5 is a perspective view schematically showing an example of measuring the position of the rotation center of the rotation axis of the table using the image probe.
  • the image probe 80 is attached to the main shaft 40 and measured.
  • the image probe 80 rotates the table 50 to which the reference sphere 60 is fixed in the C-axis direction, stops the table 50 at angles of 0 degrees, 120 degrees, and 240 degrees on the plane, and then rotates the table 50 with the image probe 80. Get a dimensional image.
  • the offset amount from the true rotation center of the rotation axis of the table 50 can be obtained. Calibration can be performed by correcting the offset amount.
  • the interpolation resolution of the image probe 80 can be less than 1 ⁇ m, so that it has sufficient detection sensitivity for processing accuracy.
  • FIG. 6A is a perspective view schematically illustrating an example of measuring the position of the rotation center of the rotation axis of the table using an optical cutting probe.
  • FIG. 6B is a diagram schematically showing a spherical point group acquired by the optical cutting probe.
  • the optical cutting probe 90 is attached to the main shaft 40 and measured.
  • the table 50 is stopped and measured at a predetermined angle, but in the measurement example 3, the table 50 to which the reference sphere 60 is fixed is stopped while rotating in the C-axis direction. Measurement can be performed without any problem.
  • the object is irradiated with line light from the light source, and the reflected light is received by the light receiving unit.
  • the reference sphere 60 is fixed to the table 50.
  • the optical cutting probe 90 is attached to the main shaft 40, and the main shaft is moved in the XY direction to position the optical cutting probe 90 in the XY coordinates.
  • the table 50 is rotated in the C-axis direction and received by the light receiving unit.
  • a spherical point group P at three points on the C axis can be obtained as schematically shown in FIG. 6B.
  • the offset amount from the true rotation center of the rotation axis of the table 50 can be obtained. Calibration can be performed by correcting the offset amount.
  • the optical cutting probe using the triangulation method it is necessary to lengthen the optical cutting probe (for example, 400 mm) in order to prevent interference of light by the object to be measured.
  • the optical cutting probe is not moved in the XY direction, but the measurement is performed by moving the reference sphere 60 side (measurement object side) in the C-axis direction. Therefore, instability caused by the length of the optical cutting probe. Can be eliminated.
  • the pre-operation includes the measurement of the position of the rotation center of the machine tool's rotation axis, which greatly affects the machining accuracy
  • the position of the center axis of the machine tool's rotation axis is measured in advance and measured By correcting only the offset amount, the machining accuracy of the machine tool can be effectively increased with a small work amount.
  • Machine tool monitoring system 10
  • Machine tool monitoring device 12
  • Machine tool monitoring unit 14
  • Pre-operation instruction unit 16
  • Work monitoring unit 18
  • Machine tool 22a to 22d Display 30
  • Factory management device 40
  • Spindle 50
  • Table 60
  • Reference ball 70
  • Contact type Measurement probe 80
  • Image probe 90

Abstract

工作機械20a~20dの状態に関する工作機械情報を取得する工作機械監視部12と、工作機械情報に基づいて、事前動作を定め、工作機械20a~20dに対して事前動作の指示を送る事前動作指示部14と、を備える工作機械監視装置10を提供する。これにより、稼働前の時間を有効に使って工作機械の効率的な稼働が実現できる。

Description

工作機械監視装置
 本発明は、工作機械に関する監視を行う工作機械監視装置に関する。
 工作機械に関する監視を行う工作機械の監視装置や監視装置システムが提案されている。その中には、複数の工作機械を異なるグループ属性に従ってグループ分けして、グループ分けされた複数の工作機械の稼働状況を、それぞれのグループ単位で表示可能な工作機械の稼働状況管理システムが提案されている(例えば、特許文献1参照)。
特願2005-115736
 特許文献1に記載の稼働状況管理システムでは、複数の工作機械の稼働状況を広い視点で多角的に分析することができる。しかし、個々の工作機械の管理については、加工開始前に、暖気運転やキャリブレーションのための時間を要するため、このシステムでは、工作機械を速やかに稼働させて、工作機械を効率的に稼働させることはできない。
 本発明は、上記問題に鑑みてなされたものであり、稼働前の時間を有効に使って工作機械の効率的な稼働が実現できる工作機械監視装置を提供することを目的とする。
 上記課題を解決するために、本発明の1つの実施態様に係る工作機械監視装置は、
 工作機械の状態に関する工作機械情報を取得する工作機械監視部と、
前記工作機械情報に基づいて、事前動作を定め、
前記工作機械に対して前記事前動作の指示を送る事前動作指示部と、
を備える。
 上記の実施態様によれば、事前動作指示部により定められた事前動作により、稼働前の時間を有効に使えるので、工作機械の効率的な稼働が実現できる工作機械監視装置を提供することができる。
本発明の1つの実施形態に係る工作機械監視装置を含むシステムの構成を示すブロック図である。 工作機械の休止時間及び稼働部の温度の関係の一例を示すグラフである。 工作機械の休止時間及び稼働部のオフセット量の関係の一例を示すグラフである。 工作機械監視装置が行う工作機械監視処理の制御フローの一例を示すフローチャートである。 接触型の測定プローブを用いて、テーブルの回転軸の回転中心の位置を測定する一例を模式的に示す斜視図である。 画像プローブを用いて、テーブルの回転軸の回転中心の位置を測定する一例を模式的に示す斜視図である。 光学切断プローブを用いて、テーブルの回転軸の回転中心の位置を測定する一例を模式的に示す斜視図である。 光学切断プローブにより取得された球点群を模式的に示す図である。
 以下、図面を参照しながら、本発明を実施するための実施形態を説明する。以下に説明する実施形態は、本発明の技術思想を具体化するためのものであって、特定的な記載がない限り、本発明を以下のものに限定しない。
 各図面中、同一の機能を有する部材には、同一符号を付している場合がある。要点の説明または理解の容易性を考慮して、便宜上実施形態を分けて示す場合があるが、異なる実施形態で示した構成の部分的な置換または組み合わせは可能である。後述の実施形態では前述の実施形態と共通の事柄についての記述を省略し、異なる点についてのみ説明する。特に、同様の構成による同様の作用効果については、実施形態ごとには逐次言及しないものとする。各図面が示す部材の大きさや位置関係等は、説明を明確にするため、誇張して示している場合もある。 
(1つの実施形態に係る測定装置)
 始めに、図1を参照しながら、本発明の1つの実施形態に係る工作機械監視装置及びこの工作機械監視装置を含むシステムの説明を行う。図1は、本発明の1つの実施形態に係る工作機械監視装置を含むシステムの構成を示すブロック図である。
 工作機械監視システム2は、本発明の1つの実施形態に係る工作機械監視装置10と、複数の工作機械20a~20dと、工場管理装置30とから主に構成される。工作機械監視装置10は、工作機械20a~20dの制御装置と電気的に接続され、工場管理装置30とも電気的に接続されている。工場管理装置30では、工作機械20a~20dや前工程で用いる装置を含む工場全体の管理を行っている。
 工作機械監視装置10は、工作機械20a~20dの状態に関する工作機械情報を取得する工作機械監視部12と、工作機械情報に基づいて、事前動作を定め、工作機械に対して事前動作の指示を送る事前動作指示部14とを備える。更に詳細に述べれば、事前動作指示部14は、複数の工作機械20a~20dの中から、事前動作を実施させる工作機械を選択し、選択した工作機械の制御装置に事前動作の指示を送る。
 工作機械監視装置10は、後述する工場管理装置30と電気的に繋がったワーク監視部16を備える。工作機械監視装置10には、ディスプレイ18が備えられ、工作機械20a~20dにも、それぞれディスプレイ22a~22dが備えられている。
 本実施形態では、工作機械監視装置10が、工作機械20a~20dとは個別の装置として存在するが、これに限られるものではなく、工作機械監視装置10が何れかの工作機械の制御装置の中に含まれる場合もあり得るし、工場管理装置30の中に含まれる場合もあり得る。
 本実施形態では、一例として4つの工作機械20a~20dを有する場合を示しているが、これに限られるものではなく、その他の任意の数の工作機械を有する場合もあり得る。工作機械20a~20dは、全て同じ工作機械の場合もあり得るし、全てが異なる工作機械の場合もあり得るし、一部が同じ工作機械で一部が異なる工作機械の場合もあり得る。
<工作機械監視部/事前動作指示部>
 工作機械監視部12が取得する工作機械情報については、工作機械20a~20dが稼働しているかまたは休止しているかの情報が含まれ、休止と判定された工作機械については、その休止時間の情報が含まれる。稼働中の工作機械については、稼働終了予測時刻も含まれる。更に、工作機械情報には、工作機械20a~20dに備えられている各センサの測定結果が含まれる。
 一方、事前動作指示部14が定める事前動作には、工作機械20a~20dの暖気運転や、少なくとも1つのセンサによる工作機械の測定が含まれる。
 以上のように、本実施形態に係る工作機械監視装置10では、工作機械情報に基づいて、それに応じた事前動作を工作機械に実施させることができるので、稼働前の時間を有効利用して、工作機械の効率的な稼働が実現できる。特に、工作機械情報に、工作機械の稼働/休止判定が含まれるので、休止中の工作機械において、ワークが到着する前に事前動作を行うことができる。よって、稼働前の時間を有効に使って工作機械の効率的な稼働が実現できる。更に、工作機械情報に、休止と判定された工作機械の休止時間が含まれるので、例えば、休止時間の長い工作機械を優先的に稼働させるようにして、各工作機械の稼働率の平準化を図ることができる。工作機械の休止期間において、スタンバイ状態や、完全に電源を落とした状態を含めた状態監視を行うことができる。
 特に、事前動作に工作機械の暖気運転が含まれるので、工作機械が予め所定の温度に達した状態で加工を開始することができ、加工中の温度変化による加工精度低下を抑制して、高精度の機械加工が期待できる。
 通常、加工開始前に工作機械の測定を行ってキャリブレーションする必要があるため、工作機械を稼働することができない。一方、本実施形態では、事前動作に工作機械の測定が含まれるので、加工開始前の時間を工作機械の測定のために有効利用することができ、測定のための時間ロスを抑制して、高精度なワークの加工を効率的に実現できる。
 以上のように、本実施形態では、工作機械が稼働していない“空き時間”に補正ができるようにしたもので、工作機の稼働状況をモニタすることにより、工作機械の休止時間が長く続く場合には、工作機械の計測を行ったり、暖機のために稼働部を動かすことができるので、補正計測や暖機運転が工作機械の稼働時間を圧迫することを防ぐことができる。なお、稼働部とは、主軸、テーブル等の並進移動または回転移動する部材を意味する。
 工作機械情報には、工作機械20a~20dに備えられているセンサの測定結果が含まれる。このセンサの測定結果には、例えば、温度センサによる工作機械の温度測定結果が含まれる。温度測定結果は、工作機械が稼働中の温度測定データに基づく場合も、工作機械が休止した後の温度測定データに基づく場合もあり得る。例えば、工作機械休止後、測定温度が低下している場合には、早めに暖気運転を開始するように制御することができる。また、直前の加工で、所定の稼働部の測定温度が高い場合には、事前動作で該当する稼働部材の測定を優先して行うことが考えられる。
 センサの測定結果には、更に、加速度センサによる工作機械の振動測定結果が含まれる。例えば、直前の加工で加速度センサの値が大きい場合には、事前動作で該当する稼働部の測定を行うことが考えられる。
 以上のように、工作機械情報にセンサの測定結果が含まれるので、稼働させる工作機械の状況に応じた適確な事前動作を実行できる。
 上記のように、事前動作に工作機械の測定が含まれるが、更に、事前動作に工作機械の測定を実行するための準備作業が含まれる場合もある。準備作業として、工作機械の測定に当たり、測定プローブを工作機械の主軸に取り付ける作業や、測定用の基準球を設置する作業を例示することができる。この準備作業により、工作機械の正確な測定が実現できる。
 特に、本実施形態では、事前動作指示部14が、工作機械の測定を実行するための準備作業に関する情報を報知する制御を行う。例えば、準備作業に関する情報を、工作機械監視装置10のディスプレイ18に表示することもできるし、選択された工作機械のディスプレイに表示することもできる。更に、ディスプレイに表示するだけでなく、音声やランプ表示により報知することもできる。
 以上のように、本実施形態では、準備作業に関する情報をオペレータに報知することができるので、速やかに、測定用のセンサ、基準球、治具等を設置して、速やかに計測を開始できる。
<ワーク監視部>
 工作機械監視装置10は、工場管理装置30から、加工予定のワークに関するワーク情報を取得するワーク監視部16を備える。ワーク情報は、工作機械20a~20dが加工を行う予定のワークの情報である。具体的には、ワークの情報には、ワークの加工に関する情報、ワークの前工程に関する情報、及び工作機械への到着推定時刻の少なくとも1つが含まれている。
 ワークの加工に関する情報には、到着するワークの寸法が含まれる。このワークの寸法情報により、受け入れ可能な工作機械を選択することができる。また、選択された工作機械に、事前にワークの寸法に合わせて、治具等を移動させておく指示を送ることもできる。
 更に、ワークの加工に関する情報には、ワークの加工内容が含まれる。ワークの加工内容に合わせて、受け入れ可能な工作機械を選択することができる。更に、選択された工作機械において、測定すべき稼働部を定めて、速やかに事前準備を開始することができる。
 ワークの前工程の情報には、ワークに何の工程が施されたかの情報が含まれる。更に詳細に述べれば、ワークの前工程の情報には、焼き入れ、焼鈍、侵炭、窒化、表面処理(サンドブラスト)の中の何れの工程が行われたかの情報が含まれる。例えば、ワークの前工程の情報により、前工程が焼き入れや焼鈍であれば、ワークが高温で到着することが予想できるので、ワーク温度を考慮した測定や暖気運転を実施することができる。
 ワーク情報にワークの到着推定時刻が含まれているので、ワークの到着時刻に合わせて、適確なタイミングで、工作機械の電源を起動したり、稼働部を動かして、ある程度暖機した状態でワークを受け入れることができる。更に、ワークの到着時刻に合わせて、適確なタイミングで、工作機械の測定を開始することもできる。
 以上のように、ワーク情報に、ワークの加工に関する情報、ワークの前工程の情報、及びワークの到着推定時刻少なくとも1つが含まれるので、適切な事前動作を的確に効率的に行うことができる。
 上記のように、事前動作に少なくとも1つのセンサによる工作機械の測定が含まれるが、本実施形態では、工作機械情報、ワーク情報、工作機械の測定結果を関連付けて記憶するようになっている。例えば、工作機械の休止時間、温度、工作機械の測定結果等の履歴を時系列に示すことにより、休止時間及び温度降下の相関、休止時間及びオフセット量の相関等を把握することができる。
 次に、図2A及び図2Bを参照しながら、工作機械情報、ワーク情報、工作機械の測定結果を関連付けて記憶することにより得られたデータについて説明する。図2Aは、工作機械の休止時間及び稼働部の温度の関係の一例を示すグラフである。図2Bは、工作機械の休止時間及び稼働部のオフセット量の関係の一例を示すグラフである。
 図2Aに示すグラフは、工作機械が休止した後の経過時間と、工作機械の稼働部に取り付けられた温度センサの測定値とを関連させて記憶して履歴を時系列に示したグラフである。このグラフから、工作機械の休止時間及び稼働部の温度降下の相関が明らかなので、工作機械の休止時間から稼働部の温度が推定できる。よって、この相関データに基づいて、最適な暖気運転の開始時期を定めることができる。
 図2Bに示すグラフは、工作機械が休止した後、事前動作を開始するまでの経過時間と、事前動作において測定された稼働部のオフセット量とを関連させて記憶して履歴を時系列に示したグラフである。このグラフから、予め補正量を推測することができるので、必要な加工精度及び本グラフを参照して、キャリブレーションが必要であるか否か判断することができる。また、このグラフから、予め補正量を推測することができるので、測定項目を適確に定めたり、測定のための準備作業を適確に定めたりすることができる。
 以上のように、工作機械の休止時間、温度、工作機械の測定結果等の履歴を時系列に示すことにより、工作機械が稼働していないときの工作機械の変化を把握することができ、工作機械の休止時間に応じて、適切な事前動作を定めることができ、工作機械のパラメータを適確に予測、補正することができる。
(工作機械監視処理の制御フロー)
 次に、図3を参照しながら、上記の実施形態に係る工作機械監視装置10で行われる工作機械監視処理の一例について説明する。図3は、工作機械監視装置が行う工作機械監視処理の制御フローの一例を示すフローチャートである。
 図3において、まず、ワーク監視部16が工場管理装置30からワーク情報を取得したか否か判断する(ステップS10)。なお、工作機械監視部12は、一定のインターバルで工作機械20a~20dから工作機械情報を取得している。ステップS10の判断で、もし、ワーク情報を取得していない(NO)と判別したときには、そのまま、ステップS10の制御処理を繰り返す。つまり、待機状態になっている。ステップS10の判断で、もし、ワーク情報を取得した(YES)と判別したときには、次に、ワーク情報に示されたワークに適合した休止中の工作機械があるか否か判断する(ステップS12)。更に詳細に述べれば、休止中の工作機械、またはワーク情報に基づくワークの到着推定時刻において稼働が終了する予定の工作機械があるか否か判断し、ある場合には、その工作機械がワークに適したものであるか否か判断する。
 ステップS12の判断で、もし、ワークに適合した休止中の工作機械がない(NO)と判別したときには、そのまま本制御フローを終了する。ステップS12の判断で、もし、ワークに適合した休止中の工作機械がある(YES)と判別したときには、該当する工作機械が複数ある場合には、休止時間が最小の工作機械を選択する(ステップS14)。
 次に、上記の休止時間、温度、測定結果等の履歴データを読み出す(ステップS16)。そして、ワーク情報及び読み出した履歴データを参照して、キャリブレーションが必要か否か判断する(ステップS18)。この判断で、もし、キャリブレーションは不要である(NO)と判別したときには、キャリブレーションのための制御処理は行わずに、ステップS24へ進む。
 ステップS18の判断で、もし、キャリブレーションは必要である(YES)と判別したときには、次に、測定のための準備作業に関する情報をディスプレイ18に表示し(ステップS20)、工作機械の測定を含むキャリブレーション実施のための信号を、選択された工作機械に送信する(ステップS22)。これにより、オペレータは、工作機械の測定に必要な準備を行い、計測を行う。実際の工作機械の計測のやり方については、追って詳細に述べる。
 次に、ワーク情報と休止時間及び温度の履歴データとを参照して、暖気運転が必要か否か判断する(ステップS24)。なお、休止時間及び温度の履歴データの代わりに、取得した最新の工作機械情報に含まれる工作機械の稼働部の温度測定値に基づいて判断することもできる。
 ステップS24の判断で、もし、暖気運転が不要である(NO)と判別したときには、本制御処理を終了する。ステップS24の判断で、もし、暖気運転が必要である(YES)と判別したときには、次に、ワーク情報に基づくワークの到着推定時刻、及び休止時間、温度の履歴データから、暖気運転の開始時刻を定める。なお、ここでも、休止時間及び温度の履歴データの代わりに、取得した最新の工作機械情報に含まれる温度測定値に基づいて、暖気運転の開始時刻を定めることもできる。
 そして、定められた暖気運転開始時刻に達したか否か判断する(ステップS28)。暖気運転開始時刻に達するまでは待機状態になっており、暖気運転開始時刻に達した(YES)と判別したときに、暖気運転開始の指示信号を選択された工作機械に送信して(ステップS30)、一連の制御処理を終了する。
(回転軸の回転中心の位置の測定)
 事前動作として行われる工作機械の測定について、図4から図6を参照しながら、テーブルの回転軸の回転中心の位置の測定を例にとって説明する。図4から図6A、Bには、稼働部が移動する向き(6自由度)が図示されている。何れの場合も、Z軸周りのC軸方向に回転するテーブル50の上に測定のための基準球60を設置して測定した場合を示す。
<測定例1>
 始めに、図4を参照しながら、接触型の測定プローブを用いて、テーブルの回転軸の回転中心の位置を測定する測定例1を説明する。図4は、接触型の測定プローブ70を用いて、テーブル50の回転軸の回転中心の位置を測定する一例を模式的に示す斜視図である。
 測定例1では、接触型の測定プローブ70を主軸40に取り付けて測定する。基準球60が固定されたテーブル50をC軸方向に回転させて、平面における角度で、0度、120度、240度の角度でテーブル50を止めて、測定プローブ70を基準球60の面に接触させて三次元の位置を検出する。これにより基準球60の中心を求めることができ、これからテーブル50の回転軸の真の回転中心からのオフセット量を求めることができる。このオフセット量を補正することにより、キャリブレーションを行うことができる。
 接触型の測定プローブ70として、通常のタッチプローブだけでなく、例えば、2つの球を伸縮可能なバーで繋ぎ、その伸縮量を内蔵のエンコーダで測定するボールバー測定器を用いることもできる。この場合、2つの球のうちの一方の球が主軸40に接触しており、他方の球が基準球60に接する。
 更に、テーブル50の回転にともなって、主軸40とテーブル50との間で相対変位が生じないように、主軸40も動かすTCP制御を行うことにより、所謂R-testを実施することもできる。
<測定例2>
 次に、図5を参照しながら、画像プローブを用いて、テーブルの回転軸の回転中心の位置を測定する測定例2を説明する。図5は、画像プローブを用いて、テーブルの回転軸の回転中心の位置を測定する一例を模式的に示す斜視図である。
 測定例2では、画像プローブ80を主軸40に取り付けて測定する。画像プローブ80は、基準球60が固定されたテーブル50をC軸方向に回転させて、平面における角度で、0度、120度、240度の角度でテーブル50を止めて、画像プローブ80で二次元画像を取得する。取得した3枚の画像の解析により、テーブル50の回転軸の真の回転中心からのオフセット量を求めることができる。このオフセット量を補正することにより、キャリブレーションを行うことができる。
 例えば、画像プローブ80の視野を20mmとし、画素を1000×1000とすると、画像プローブ80の補間分解能は1μmを下回ることができるので、加工精度に対して十分な検出感度を有する。
<測定例3>
 次に、図6A及び図6Bを参照しながら、光学切断プローブを用いて、テーブルの回転軸の回転中心の位置を測定する測定例3を説明する。図6Aは、光学切断プローブを用いて、テーブルの回転軸の回転中心の位置を測定する一例を模式的に示す斜視図である。図6Bは、光学切断プローブにより取得された球状の点群を模式的に示す図である。
 測定例3では、光学切断プローブ90を主軸40に取り付けて測定する。上記の2つの測定例では、テーブル50を所定の角度で止めて計測を行っていたが、測定例3では、基準球60が固定されたテーブル50をC軸方向に回転させたまま、停止させることなく測定を行うことができる。
 3角測量方式を用いる光学切断プローブでは、光源からライン光を物体に照射し、その反射光を受光部で受光する。測定に当たり、テーブル50に基準球60を固定する。光学切断プローブ90を主軸40に取り付け、主軸をXY方向に移動させて、光学切断プローブ90のXY座標の位置決めを行う。そして、光学切断プローブ90で基準球60にライン光を照射しながら、テーブル50をC軸方向に回転させ、受光部で受光する。これにより、テーブル50の回転を止めることなく、図6Bに模式的に示すように、C軸上の3点での球状の点群Pを得ることができる。これにより、テーブル50の回転軸の真の回転中心からのオフセット量を求めることができる。このオフセット量を補正することにより、キャリブレーションを行うことができる。
 3角測量方式を用いる光学切断プローブでは、被測定物による光の干渉を防ぐため、光学切断プローブを長くする必要がある(例えば400mm)。測定例3では、光学切断プローブをXY方向に移動させるのではなく、基準球60側(被測定物側)をC軸方向に移動させて測定するので、光学切断プローブの長さにより生じる不安定性を排除することができる。
 以上のように、事前動作に、加工精度に大きな影響を与える工作機械の回転軸の回転中心の位置の測定が含まれるので、工作機械の回転軸の中心軸の位置を事前に測定し、計測されたオフセット量だけ補正することにより、少ない作業量で効果的に工作機械の加工精度を高めることができる。
 本発明の実施の形態、実施の態様を説明したが、開示内容は構成の細部において変化してもよく、実施の形態、実施の態様における要素の組合せや順序の変化等は請求された本発明の範囲および思想を逸脱することなく実現し得るものである。
2   工作機械監視システム
10  工作機械監視装置
12  工作機械監視部
14  事前動作指示部
16  ワーク監視部
18  ディスプレイ
20a~20d 工作機械
22a~22d ディスプレイ
30  工場管理装置
40  主軸
50  テーブル
60  基準球
70  接触型の測定プローブ
80  画像プローブ
90  光学切断プローブ
P1~P3 点群

Claims (10)

  1.  工作機械の状態に関する工作機械情報を取得する工作機械監視部と、
    前記工作機械情報に基づいて、事前動作を定め、
    前記工作機械に対して前記事前動作の指示を送る事前動作指示部と、
    を備えることを特徴とする工作機械監視装置。
  2.  前記事前動作に、前記工作機械の暖気運転が含まれることを特徴とする請求項1に記載の工作機械監視装置。
  3.  前記事前動作に、少なくとも1つのセンサによる前記工作機械の測定が含まれることを特徴とする請求項1又は2に記載の工作機械監視装置。
  4.  前記事前動作に、前記工作機械の測定を実行するための準備作業が含まれることを特徴とする請求項1から3の何れか1項に記載の工作機械監視装置。
  5.  前記事前動作指示部が、前記工作機械の測定を実行するための前記準備作業に関する情報を報知する制御を行うことを特徴とする請求項4に記載の工作機械監視装置。
  6.  前記工作機械情報に、工作機械の稼働/休止判定、休止と判定された工作機械の休止時間が含まれることを特徴とする請求項1から5の何れか1項に記載の工作機械監視装置。
  7.  前記工作機械情報に、工作機械に備えられているセンサの測定結果が含まれることを特徴とする請求項1から6の何れか1項に記載の工作機械監視装置。
  8.  前記工作機械により加工予定のワークに関するワーク情報を取得するワーク監視部をさらに備え、
    前記ワーク情報に、ワークの加工に関する情報、ワークの前工程に関する情報、及び前記工作機械への到着推定時刻の少なくとも1つが含まれることを特徴とする請求項1から7の何れか1項に記載の工作機械監視装置。
  9.  前記事前動作に、少なくとも1つのセンサによる工作機械の測定が含まれ、更に前記工作機械情報、前記ワーク情報、前記工作機械の測定結果が関連付けられて記憶されることを特徴とする請求項8に記載の工作機械監視装置。
  10.  前記事前動作に、少なくとも1つのセンサによる工作機械の測定が含まれ、更に前記工作機械の測定に、前記工作機械の回転軸の回転中心の位置の測定が含まれることを特徴とする請求項1から9の何れか1項に記載の工作機械監視装置。
PCT/JP2019/019885 2018-05-21 2019-05-20 工作機械監視装置 WO2019225538A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018096875A JP6660976B2 (ja) 2018-05-21 2018-05-21 工作機械監視装置
JP2018-096875 2018-05-21

Publications (1)

Publication Number Publication Date
WO2019225538A1 true WO2019225538A1 (ja) 2019-11-28

Family

ID=68615834

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/019885 WO2019225538A1 (ja) 2018-05-21 2019-05-20 工作機械監視装置

Country Status (2)

Country Link
JP (1) JP6660976B2 (ja)
WO (1) WO2019225538A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113031514A (zh) * 2021-03-18 2021-06-25 西南交通大学 一种基于计量学的R-test标定不确定度评定方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7380302B2 (ja) 2020-02-18 2023-11-15 コベルコ建機株式会社 操作支援サーバ、操作支援システムおよび操作支援方法
WO2022250449A1 (ko) * 2021-05-25 2022-12-01 젠틀에너지 주식회사 데이터 분류 장치 및 방법

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008073813A (ja) * 2006-09-22 2008-04-03 Denso Corp マシニングセンタによる加工方法
JP2013134563A (ja) * 2011-12-26 2013-07-08 Jtekt Corp フレキシブル生産システム
JP2014191607A (ja) * 2013-03-27 2014-10-06 Fanuc Ltd 数値制御工作機械および数値制御工作機械の主軸誤差補正方法
JP2015223635A (ja) * 2014-05-26 2015-12-14 ファナック株式会社 暖機運転機能を有する工作機械
JP2016013605A (ja) * 2014-07-03 2016-01-28 ファナック株式会社 工作機械の制御装置
JP2017027360A (ja) * 2015-07-22 2017-02-02 オークマ株式会社 機械の誤差補償システム及び誤差補償方法、誤差補償プログラム
WO2017055637A1 (de) * 2015-10-02 2017-04-06 Deckel Maho Seebach Gmbh Verfahren und vorrichtung zur vermessung einer numerisch gesteuerten werkzeugmaschine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0896656A4 (en) * 1995-11-14 2000-11-22 Kam C Lau MACHINE-MOUNTED BALL STICK SYSTEM AND METHOD FOR USE THEREOF
WO1997046925A1 (en) * 1996-06-06 1997-12-11 The Boeing Company Method for improving the accuracy of machines

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008073813A (ja) * 2006-09-22 2008-04-03 Denso Corp マシニングセンタによる加工方法
JP2013134563A (ja) * 2011-12-26 2013-07-08 Jtekt Corp フレキシブル生産システム
JP2014191607A (ja) * 2013-03-27 2014-10-06 Fanuc Ltd 数値制御工作機械および数値制御工作機械の主軸誤差補正方法
JP2015223635A (ja) * 2014-05-26 2015-12-14 ファナック株式会社 暖機運転機能を有する工作機械
JP2016013605A (ja) * 2014-07-03 2016-01-28 ファナック株式会社 工作機械の制御装置
JP2017027360A (ja) * 2015-07-22 2017-02-02 オークマ株式会社 機械の誤差補償システム及び誤差補償方法、誤差補償プログラム
WO2017055637A1 (de) * 2015-10-02 2017-04-06 Deckel Maho Seebach Gmbh Verfahren und vorrichtung zur vermessung einer numerisch gesteuerten werkzeugmaschine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113031514A (zh) * 2021-03-18 2021-06-25 西南交通大学 一种基于计量学的R-test标定不确定度评定方法

Also Published As

Publication number Publication date
JP6660976B2 (ja) 2020-03-11
JP2019202352A (ja) 2019-11-28

Similar Documents

Publication Publication Date Title
WO2019225538A1 (ja) 工作機械監視装置
CN106346315B (zh) 能够取得工件原点的机床控制系统以及工件原点设定方法
CN104175223B (zh) 机床的自我诊断方法和机床的机床精度的修正方法
US8494800B2 (en) Method and program for identifying mechanical errors
CN108732994B (zh) 机床的控制系统
JP6496338B2 (ja) 工作機械の制御システム
JP2017027360A (ja) 機械の誤差補償システム及び誤差補償方法、誤差補償プログラム
JP2006231509A (ja) プログラム制御の工作機械を測定する方法
JP2009012083A (ja) 工作機械の運動誤差測定方法及び運動誤差測定装置
US20180369977A1 (en) Calibration device and method
JP2012220338A (ja) 形状測定装置
JP7306883B2 (ja) 座標測定機、及び座標測定プログラム
JPH09253979A (ja) 刃先位置計測装置
CN112775718A (zh) 机床的位置测量传感器的校正值测量方法和校正值测量系统
JP2007219951A (ja) ワークの姿勢制御方法およびnc工作機械
WO2018033704A1 (en) Inspection apparatus and a method of operating an inspection apparatus
JP2019195869A (ja) 補正装置および補正方法
JP2017193043A (ja) 工作機械における対象物の位置計測方法及び位置計測システム
JP2019211374A (ja) 測定装置及び測定方法
JP2017124485A (ja) 工作機械および工具先端位置の補正方法
JP6824593B2 (ja) ステージ装置及び複合ステージの制御装置
JP2013030005A (ja) 多軸工作機械の幾何誤差補正システム。
JP2003121134A (ja) 運動精度の測定方法
JP2009128157A (ja) 表面検査装置の検査システム
JP7266511B2 (ja) 工作機械における対象物の位置計測方法及び位置計測システム、位置計測プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19808431

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19808431

Country of ref document: EP

Kind code of ref document: A1