WO2019139086A1 - サプライチェーンモデル生成システム、サプライチェーンモデル生成方法およびプログラム - Google Patents

サプライチェーンモデル生成システム、サプライチェーンモデル生成方法およびプログラム Download PDF

Info

Publication number
WO2019139086A1
WO2019139086A1 PCT/JP2019/000546 JP2019000546W WO2019139086A1 WO 2019139086 A1 WO2019139086 A1 WO 2019139086A1 JP 2019000546 W JP2019000546 W JP 2019000546W WO 2019139086 A1 WO2019139086 A1 WO 2019139086A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
resource
unit
time
base
Prior art date
Application number
PCT/JP2019/000546
Other languages
English (en)
French (fr)
Inventor
哲也 玉置
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2019564740A priority Critical patent/JP6873279B2/ja
Priority to CN201980005983.9A priority patent/CN111615710B/zh
Publication of WO2019139086A1 publication Critical patent/WO2019139086A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G61/00Use of pick-up or transfer devices or of manipulators for stacking or de-stacking articles not otherwise provided for
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • the present invention relates to a supply chain model generation system, a supply chain model generation method, and a program.
  • This supply chain optimization system includes product information, production information, and configuration of the supply chain, that is, information indicating product information, production information, and distribution route from an ERP (Enterprise Resource Planning) package in which information indicating the distribution route is stored. Get and set up your supply chain model.
  • ERP Enterprise Resource Planning
  • the components of the supply chain change daily due to the expansion and renewal of facilities at plants that manufacture products related to the supply chain, changes in suppliers, and changes in the means of distribution of parts or materials required to manufacture products. obtain. Therefore, if the information on the components of the supply chain is not updated in response to such changes in the components of the supply chain, the set supply chain model will deviate from the reality of the supply chain. If supply chain management is performed in accordance with a supply chain model that is different from the actual state of such a supply chain, there is a possibility that adverse effects such as late delivery of products and excess stock may occur.
  • the present invention has been made in view of the above, and it is an object of the present invention to provide a supply chain model generation system, a supply chain model generation method, and a program capable of generating a supply chain model conforming to the actual condition of the supply chain.
  • a supply chain model generation system comprises a plurality of resources disposed at each of a plurality of bases for performing processing of parts or materials, transportation within a site or transportation to another site.
  • a supply chain model generation system that generates a supply chain model that models the optimum supply chain for the production of products using.
  • the supply chain model generation system includes a resource information generation unit that generates resource information about each of a plurality of resources arranged in any one of a plurality of bases, and a positioning device that measures position coordinates of the resources in the bases
  • a resource information generation apparatus having a position acquisition unit for acquiring resource position information indicating position coordinates in a resource base, resource information and resource position information, and a date and time when the resource information generation apparatus generated resource information Resource information stored in the base resource storage unit by the first update unit, the first update unit updating the resource information and the resource position information based on the date and time information, and the base resource storage unit stored in association with the date and time information
  • a flag storage unit for storing flag information indicating whether or not the resource location information has been updated; and a plurality of base resource management devices, each having a plurality of bases.
  • Base resource storage based on a plurality of base resource storage units for storing resource information and resource position information generated for each source, and flag information stored in a flag storage unit of the base resource management device corresponding to each of a plurality of bases
  • the first updating unit is used by the first updating unit from the identifying unit that identifies the base where the resource information and the resource position information stored by the unit are updated, and the base resource storage unit included in the base resource management device corresponding to the base identified by the identifying unit
  • a second update unit that updates resource information stored in the multiple-base resource storage unit using the acquisition unit that acquires updated resource information and resource position information, and the resource information and resource position information acquired by the acquisition unit Using the resource information and the resource position information stored in the multipoint resource storage unit updated by the second update unit, to generate a supply chain model.
  • Comprising a model generation apparatus having a model generating unit for, a.
  • the site where the multipoint resource management apparatus identifies the site where the resource information and the resource position information have been updated based on the flag information of the site resource management apparatus corresponding to each of the plurality of sites
  • the updated resource information and the resource position information are acquired from the base resource storage unit corresponding to.
  • the multipoint resource management apparatus updates the resource information and the resource position information stored in the multipoint resource storage unit using the acquired resource information and the resource position information.
  • the model generation device generates a supply chain model using the resource information and the resource position information stored in the multipoint resource storage unit.
  • the resource information and the resource position information stored in the base resource storage unit are updated, the resource information and the resource position information stored in the multiple base resource storage units are also updated accordingly. Therefore, the resource information and resource position information stored in the multi-location resource storage unit are also updated following changes in resource information and resource position information regarding resources that are components of the supply chain.
  • a tailored supply chain model is generated.
  • a schematic configuration diagram of a supply chain generation system Block diagram showing the configuration of the apparatus information generation apparatus according to the embodiment
  • Block diagram showing a configuration of a worker information generation apparatus according to an embodiment A diagram showing the contents of a work content database according to an embodiment Diagram showing contents of work preparation time database according to the embodiment
  • Block diagram showing the configuration of the supplier information generation apparatus according to the embodiment A diagram showing the contents of the parts / material database according to the embodiment
  • Block diagram showing the configuration of the conveyance information generation device A diagram showing the contents of the transported object database according to the embodiment
  • a diagram showing the contents of the transfer time database according to the embodiment A diagram showing the contents of the transport amount database according to the embodiment Block diagram showing the configuration of the transportation information
  • the supply chain model generation system is a system for producing a product using a plurality of resources disposed at each of a plurality of bases and performing processing of parts or materials, transportation within a base or transportation to another site.
  • Supply chain model that models the most suitable supply chain.
  • This supply chain model generation system comprises a local resource management device and a global resource management device.
  • the local resource management device is a base resource management device that manages resource information on resources at each of a plurality of bases.
  • the global resource management device is a multipoint resource management device that manages resource information related to resources at a plurality of entire sites.
  • the global resource management device identifies the base where the resource information has been updated, and follows the update of the resource information of the identified base to perform global resource management. Update resource information across multiple sites managed by the device. In this way, resource information across multiple sites managed by the global resource management device is maintained in a form that is in line with the actual conditions of the product supply chain.
  • the supply chain generation system is, as shown in FIG. 1, arranged across two bases A and B for manufacturing a product.
  • the base A is, for example, a factory located in Japan
  • the base B is, for example, a factory located overseas.
  • an apparatus information generation apparatus 5 for generating production apparatus information on a production apparatus 51, a worker information generation apparatus 6 for generating worker information on a worker, and supplier information on a supplier A supplier information generating device 7 to be generated and a transfer information generating device 8 to generate transfer information on the transfer device 84 moving in the base A are arranged.
  • a transportation information generation apparatus 2008 is disposed as a resource information generation apparatus, which generates transportation information on transportation means for transporting parts or materials from the site B to the site A.
  • a production device 51 including a programmable logic controller (PLC) 51a is connected to the device information generation device 5.
  • PLC programmable logic controller
  • Connected to the worker information generation device 6 is a terminal device 61 for a worker working at the site A to input a work record to the worker information generation device 6.
  • Connected to the supplier information generation device 7 is a terminal device 71 for a user belonging to the purchasing department that manages the parts or materials supplied to the base A to input information on the order for parts or materials to the supplier information generation device 7 It is done.
  • the conveyance information generation device 8 is connected to a conveyance control device 81 that controls the conveyance device 84 moving in the base A.
  • a user belonging to a production management department that controls supply of parts or materials to the base A at the base B inputs information indicating the type of carrier and the record of the transportation schedule to the transportation information generation apparatus 2008
  • a terminal device 2081 for connection is connected.
  • resource information on a plurality of types of resources of the site A such as a production apparatus 51, an operator and the transport apparatus 84 disposed at the site A, or a supplier supplying parts or materials to the site A is managed.
  • a local resource management device 3 is arranged.
  • a local resource management device 2003 that manages resource information on resources of the site B, such as transportation means from the site B to the site A, is disposed.
  • a global resource management device 2 that manages resource information of the entire sites A and B is disposed.
  • a model generation device 1 is disposed which generates an optimal model for a supply chain of a product manufactured using parts or materials manufactured at the bases A and B.
  • the local resource management device 3, 2003 is disposed, for example, in the manufacturing department of each of the bases A, B, and the global resource management device 2 and the model generation device 1 are disposed, for example, in the production management department of the base A.
  • the device information generation device 5, the worker information generation device 6, the supplier information generation device 7, the transport information generation device 8, the local resource management device 3, the global resource management device 2, and the model generation device 1 Connected to NT1.
  • the transport information generation device 2008 and the local resource management device 2003 are connected to the network NT2 installed at the base B.
  • the networks NT1 and NT2 are, for example, LANs (Local Area Networks) conforming to the Ethernet (registered trademark) standard.
  • the network NT1 of the base A and the network NT2 of the base B are connected to the wide area network WNT via the firewall devices 10 and 2010, respectively.
  • the device information generation device 5, the worker information generation device 6, the supplier information generation device 7, the transport information generation device 8, the local resource management device 3, 2003, the global resource management device 2 and the model generation device 1 each have an IP address. It is set. For example, a fixed global IP address based on the IPv6 standard may be adopted as this IP address.
  • the firewall devices 10, 2010 communicate with each other via a wide area network, for example, according to a communication method conforming to the 3G and 4G standards.
  • the device information generation device 5 is constituted of, for example, a general-purpose personal computer, and as shown in FIG. 2, a CPU (Central Processing Unit) 501, a main storage unit 502, an auxiliary storage unit 503, and a device communication unit 505. A network communication unit 506 and a bus 509 interconnecting these are provided.
  • the main storage unit 502 includes volatile memory and is used as a work area of the CPU 501.
  • the auxiliary storage unit 503 is composed of a non-volatile memory such as a magnetic disk or a semiconductor flash memory, and stores programs for realizing various functions of the device information generation apparatus 5.
  • the apparatus communication unit 505 When various apparatus parameters are input from the PLC 51 a of the production apparatus 51, the apparatus communication unit 505 generates information according to the input and notifies the CPU 501.
  • the device communication unit 505 is connected to a positioning device 52 that measures the position of the production device 51 by communicating with the tag 53 attached to the production device 51. Then, the device communication unit 505 notifies the CPU 501 of position information indicating the position of the production device 51 input from the positioning device 52.
  • the network communication unit 506 is connected to the network NT1 installed in the base A.
  • One apparatus information generation apparatus 5 may be provided for one production apparatus 51, and may generate apparatus information of only the one production apparatus 51.
  • one device information generation device 5 may be provided for a plurality of production devices 51, and may generate device information of each of the plurality of production devices 51.
  • the CPU 501 functions as a device information generation unit 511, a position acquisition unit 512, and a transmission unit 513 by reading the program stored in the auxiliary storage unit 503 into the main storage unit 502 and executing the program.
  • the auxiliary storage unit 103 stores a process content database (hereinafter referred to as “DB”) 531 storing information indicating the content of the process executed by the production apparatus 51 and information indicating the lead time of the production apparatus 51.
  • DB 532 to be stored and a cycle time DB 533 to store information indicating the cycle time of the production apparatus 51 are included. For example, as shown in FIG.
  • the processing content DB 531 stores the recording date and time information, the input part / material identification information, and the discharged processed product identification information in association with the apparatus identification information identifying the production apparatus 51.
  • the recording date and time information is information indicating the date and time when various information related to the production apparatus 51 is recorded.
  • the input part / material identification information is information for identifying a part or material input to the production apparatus 51.
  • the discharged processed product identification information is information for identifying the processed product discharged from the production apparatus 51.
  • the lead time DB 532 is, for example, as shown in FIG. 3B, information indicating the processing setup time required for setup before processing by the production apparatus 51, and information on the post-processing stage required for setup after processing by the production apparatus 51.
  • Information indicating time is stored in association with device identification information.
  • the cycle time DB 533 stores information indicating the cycle time of the production apparatus 51, that is, the processing time by the production apparatus 51 in association with the apparatus identification information.
  • the information indicating the pre-processing time, the information indicating the post-processing time, and the information indicating the processing time correspond to processing time information indicating the processing time required for processing by the resource called the production apparatus 51.
  • the device information generation unit 511 is a resource information generation unit, and using various device parameters input from the PLC 51 a of the production device 51, device identification information, input parts / material identification information, and processed products
  • the identification information, information indicating the pre-processing time, information indicating the post-processing time, and various resource information of information indicating the processing time are generated. Further, the device information generation unit 511 generates recording date and time information based on the date and time when the various resource information described above is generated. Then, the device information generation unit 511 updates the contents of the processing content DB 531, the lead time DB 532 and the cycle time DB 533 using the generated various resource information.
  • the position acquisition unit 512 acquires position information of the production device 51 from the positioning device 52 via the device communication unit 505.
  • the transmitting unit 513 acquires various resource information from the processing content DB 531, the lead time DB 532 and the cycle time DB 533. Then, the transmission unit 513 generates a packet including the acquired various resource information and the position information of the production apparatus 51 acquired by the position acquisition unit 512, and transmits the packet to the local resource management device 3.
  • the worker information generation device 6 includes a CPU 601, a main storage unit 602, an auxiliary storage unit 603, a device communication unit 605, a network communication unit 606, and a bus 609 as the device information generation device 5. .
  • the auxiliary storage unit 603 stores a program for realizing various functions of the worker information generation device 6.
  • the device communication unit 605 When information indicating a worker's work record is input from the terminal device 61, the device communication unit 605 generates information according to the information and notifies the CPU 601 of the information. Further, the device communication unit 605 is connected to a positioning device 62 that measures the position of the worker by communicating with the tag 63 held by the worker.
  • the device communication unit 605 then notifies the CPU 601 of position information indicating the position coordinates of the worker input from the positioning device 62, that is, resource position information.
  • the network communication unit 606 is connected to the network NT1 installed in the base A.
  • One worker information generation device 6 may be provided for one worker, and may generate worker information of only one worker. Alternatively, one worker information generation device 6 may be provided for a plurality of workers, and may generate worker information of each of the plurality of workers.
  • the CPU 601 functions as a worker information generation unit 611, a position acquisition unit 612, and a transmission unit 613 by reading the program stored in the auxiliary storage unit 603 to the main storage unit 602 and executing the program.
  • the auxiliary storage unit 603 stores a work content DB 631 storing information indicating the content of work performed by the worker, a work preparation time DB 632 storing information indicating the time required for the work preparation by the worker, and the work of the worker And a work time DB 633 for storing information indicating time.
  • the work content DB 631 stores the recording date and time information, the received part / material identification information, and the completed processed product identification information in association with the worker identification information for identifying the worker.
  • the recording date and time information is information indicating the date and time when various information related to the worker was recorded.
  • the received part / material identification information is information for identifying a part or material received by the worker.
  • the completed workpiece identification information is information for identifying a workpiece obtained by the worker completing the work.
  • the work preparation time DB 632 is information indicating the work preparation time required for preparation before the worker performs the work, and information indicating the tidying up time required for the worker to clean up after the work is completed.
  • the work time DB 633 stores information indicating the work time of the worker in association with the worker identification information.
  • the information indicating the work preparation time, the information indicating the tiling up time, and the information indicating the work time correspond to processing time information indicating the processing time required for processing by the resource worker.
  • the worker information generation unit 611 is a resource information generation unit, and uses the information indicating the work record of the worker input from the terminal device 61 to identify worker identification information, received parts and material identification. Various resource information of information, completed processed product identification information, information indicating work preparation time, information indicating tiling up time, and information indicating work time is generated. Further, the worker information generation unit 611 generates recording date and time information based on the date and time when various resource information is generated. Then, the worker information generation unit 611 updates the contents of the work content DB 631, the work preparation time DB 632, and the work time DB 633 using the generated various resource information.
  • the position acquisition unit 612 acquires position information of the worker from the positioning device 62 via the device communication unit 605.
  • the transmission unit 613 acquires various resource information from the work content DB 631, the work preparation time DB 632 and the work time DB 633. Then, the transmitting unit 613 generates a packet including the acquired various resource information and the position information of the worker acquired by the position acquiring unit 612, and transmits the packet to the local resource management device 3.
  • the supplier information generation device 7 includes a CPU 701, a main storage unit 702, an auxiliary storage unit 703, an apparatus communication unit 705, a network communication unit 706, and a bus 709, as in the device information generation device 5.
  • the auxiliary storage unit 703 stores a program for realizing various functions of the supplier information generation device 7.
  • the device communication unit 705 receives, from the terminal device 71, information indicating a record of arranging parts or materials from the supplier to the supplier, the device communication unit 705 generates information according to the information and notifies the CPU 701.
  • the network communication unit 706 is connected to the network NT1 installed in the base A.
  • One supplier information generating device 7 may be provided for one supplier, and may generate supplier information of only one supplier. Alternatively, one supplier information generation device 7 may be provided for a plurality of suppliers, and may generate supplier information for each of the plurality of suppliers.
  • the CPU 701 functions as a supplier information generation unit 711, a position acquisition unit 712, and a transmission unit 713 by loading a program stored in the auxiliary storage unit 703 into the main storage unit 702 and executing the program.
  • the auxiliary storage unit 703 stores a part / material DB 731 for storing information on parts delivered from the supplier, a due date DB 732 for storing information on the due date of the supplier, and a supply capability of parts or materials from the supplier to the base A.
  • supply capability DB 733 for storing information to be shown. For example, as shown in FIG.
  • the parts / material DB 731 stores the recording date and time information, the order form identification information, and the deliverable identification information in association with the supplier identification information for identifying the supplier.
  • the recording date and time information is information indicating the date and time when various information on the supplier was recorded.
  • the order form identification information is information that identifies the order form for the supplier to arrange parts or materials.
  • the delivery item identification information is information for identifying a part or material delivered from the supplier to the site A.
  • the delivery date DB 732 stores information indicating the preparation time before manufacturing, information indicating the manufacturing time, and information indicating the post-manufacturing delivery time in association with supplier identification information.
  • the pre-manufacturing preparation time corresponds to the time required for preparation from the receipt of the order to the supplier to the start of production of the parts or materials according to the order.
  • the production time corresponds to the time required for the supplier to produce the parts or materials according to the order form.
  • the post-manufacturing delivery time corresponds to the time from delivery of the manufactured parts or material to the site A to production of the parts or materials according to the order form at the supplier.
  • the supply capability DB 733 stores information indicating the possible supply of parts or materials from the supplier to the site A in association with the supplier identification information.
  • the information indicating the preparation time before manufacturing, the information indicating the manufacturing time, and the information indicating the delivery time after manufacturing correspond to processing time information indicating the processing time required for processing by the supplier supplier.
  • the supplier information generation unit 711 is a resource information generation unit, and uses supplier information input from the terminal device 71 to indicate a record for arranging parts or materials to the supplier, supplier identification information, order identification Various resource information of information, delivery item identification information, information indicating preparation time before manufacture, information indicating manufacturing time, information indicating delivery time after manufacture, and information indicating possible supply number is generated. Further, the supplier information generation unit 711 generates recording date and time information based on the date and time when various information is generated. Then, the supplier information generation unit 711 updates the contents of each of the component / material DB 731, the due date DB 732, and the supply capacity DB 733 using the generated various resource information.
  • the position acquisition unit 712 acquires supplier's position information from the server owned by the supplier, for example, via the wide area network WNT, the network NT1, and the network communication unit 706.
  • the transmission unit 713 acquires various resource information from the part / material DB 731, the due date DB 732, and the supply capacity DB 733. Then, the transmitting unit 713 generates a packet including the acquired various resource information and the position information of the supplier acquired by the position acquiring unit 712, and transmits the packet to the local resource management device 3.
  • the transport information generation device 8 includes a CPU 801, a main storage unit 802, an auxiliary storage unit 803, a device communication unit 805, a network communication unit 806, and a bus 809 as the device information generation device 5.
  • the auxiliary storage unit 803 stores a program for realizing various functions of the conveyance information generation device 8.
  • the apparatus communication unit 805 receives information on the conveyance apparatus 84 from the conveyance control apparatus 81, the apparatus communication unit 805 generates information corresponding to the information and notifies the CPU 801.
  • the device communication unit 805 is connected to a positioning device 82 that measures position coordinates of the transport device 84 by communicating with a tag 83 incorporated in the transport device 84.
  • the device communication unit 805 notifies the CPU 801 of position information indicating position coordinates of the transport device 84 input from the positioning device 82, that is, resource position information.
  • the network communication unit 806 is connected to the network NT1 installed in the base A.
  • one conveyance information generating device 8 may be provided for one conveyance device 84, and may generate conveyance information of only the one conveyance device 84.
  • one conveyance information generation device 8 may be provided for a plurality of conveyance devices 84, and may generate conveyance information of each of the plurality of conveyance devices 84.
  • the CPU 801 functions as a conveyance information generation unit 811, a position acquisition unit 812, and a transmission unit 813 by reading a program stored in the auxiliary storage unit 803 into the main storage unit 802 and executing the program. Further, the auxiliary storage unit 803 stores a transported object DB 831 storing information on the transported object transported by the transporting device 84, a transporting time DB 832 storing information on the transporting time by the transporting device 84, and information on the transporting amount of the transporting device 84. And a transport amount DB 833 for storing For example, as shown in FIG.
  • the transported product DB 831 stores the recording date and time information, the transported product identification information before transporting, and the transported product identification information after transporting in association with the transporting apparatus identifying information for identifying the transporting apparatus 84.
  • the recording date and time information is information indicating the date and time when various information related to the transport device 84 is recorded.
  • the conveyed product identification information before conveyance is information for identifying the conveyed product before conveyance.
  • the post-conveyed transported item identification information is information for identifying the transported object after being transported.
  • the before-conveyed transported item identification information and the after-conveyed transported item identification information are set so that, for example, a component in a non-packed state before transport and a component in a packaged state after transport can be distinguished.
  • the transport time DB 832 is, for example, as shown in FIG. 9B, information indicating the transport setup time required for the preparation before transporting the transported product, information indicating the transport time of the transported product, and after transporting the transported product.
  • Information indicating the transport post-take-up time required for setup is stored in association with transport device identification information.
  • the transport amount DB 833 stores information indicating the transportable amount indicating the transportable amount by one transport of the transport device 84 in association with the transport device identification information.
  • the information indicating the transport pre-setting time, the information indicating the transport time, and the information indicating the post-transport time are equivalent to transport time information indicating the transport time required for intra-base A transport by the resource of the transport device 84.
  • the transport information generation unit 811 is a resource information generation unit, and uses transport parameter identification information indicating various parameters set in the transport device 84 input from the transport control device 81 to transfer transport device identification information, It generates various resource information of pre-conveyed article identification information, post-conveyed article identification information, information indicating the pre-conveying time, information indicating the pre-conveying time, and information indicating the post-consuming time. Further, the transport information generation unit 811 generates recording date and time information based on the date and time when various information is generated. Then, the conveyance information generation unit 811 updates the contents of the conveyance object DB 831, the conveyance time DB 832, and the conveyance amount DB 833 using the generated various resource information.
  • the position acquisition unit 812 acquires position information of the transport device 84 from the positioning device 82 via the device communication unit 805.
  • the transmission unit 813 acquires various resource information from the conveyed product DB 831, the conveyance time DB 832, and the conveyance amount DB 833. Then, the transmission unit 813 generates a packet including the various resource information acquired and the position information of the transport apparatus 84 acquired by the position acquisition unit 812 and transmits the packet to the local resource management device 3.
  • the transport information generating apparatus 2008 includes a CPU 2801, a main storage unit 2802, an auxiliary storage unit 2803, an apparatus communication unit 2805, a network communication unit 2806, and a bus 2809 as the device information generating apparatus 5.
  • the auxiliary storage unit 2803 stores programs for realizing various functions of the transport information generation apparatus 2008.
  • Device communication unit 2805 generates information according to the type of carrier performing transportation of parts or materials from terminal B 2081 to site A to site A and information indicating the record of the transportation schedule.
  • the network communication unit 2806 is connected to the network NT2 installed in the base B.
  • one transport information generating device 2008 may be provided for one transport means, and may generate transport information of only the one transport means.
  • one transport information generation apparatus 2008 may be provided for a plurality of transport means, and may generate transport information of each of the plurality of transport means.
  • the CPU 2801 functions as a transportation information generation unit 2811, a position acquisition unit 2812, and a transmission unit 2813 by loading the program stored in the auxiliary storage unit 2803 into the main storage unit 2802 and executing the program.
  • the auxiliary storage unit 2803 stores a package DB 2831 for storing information on a package transported from the base B to the base A, a transportation time DB 2832 for storing information on a transportation time by transportation means, and information on the transportation amount of the transportation means And transport amount DB 2833 for storing.
  • the transport object DB 2831 stores the recording date and time information, the transport object identification information before transport, and the transport object identification information after transport in association with the transport means identification information for identifying the transport means.
  • the recording date and time information is information indicating the date and time when various information related to the transportation means is recorded.
  • the pre-shipment package identification information is information for identifying a package before transportation.
  • the transported object identification information is information for identifying the transported object after transportation.
  • it is set such that the pre-shipment transported item identification information and the post-shipment transported item identification information can be distinguished and distinguished, for example, from a part in an unpackaged state before transport and a part in a packaged state after transport. It is done.
  • the transport time DB 2832 is, for example, as shown in FIG.
  • Information indicating the transportation post-take-up time required for setup is stored in association with the transportation means identification information.
  • the transport amount DB 2833 stores information indicating the transportable amount indicating the transportable amount by one transport in association with the transport means identification information.
  • the information indicating the transportation setup time, the information indicating the transportation time, and the information indicating the transportation post-assembly time correspond to transportation time information indicating the transportation time required for transportation from the base A to the base B by the resource transportation means.
  • the transportation information generation unit 2811 is a resource information generation unit, and uses the information indicating the type of transportation carrier and the transportation schedule recorded from the terminal device 2081 to identify transportation means identification information, before transportation
  • the various resource information of the transport object identification information, the transport object identification information, the information indicating the transportation setup time, the information indicating the transportation time, the information indicating the transportation second setup time, and the information indicating the transportable amount is generated.
  • the transportation information generation unit 2811 generates recording date and time information based on the date and time when the various resource information is generated. Then, the transportation information generation unit 2811 updates the contents of the transported object DB 2831, the transportation time DB 2832 and the transportation amount DB 2833 using the generated various resource information.
  • the position acquisition unit 2812 is, for example, position information indicating position coordinates of the transportation means from a terminal (not shown) provided in the transportation means via the wide area network WNT, the network NT2 and the network communication unit 2806, ie, resource location information To get
  • the transmission unit 2813 acquires various resource information from the transported object DB 2831, the transportation time DB 2832 and the transportation amount DB 2833. Then, the transmitting unit 2813 generates a packet including the various resource information acquired and the position information of the transportation means acquired by the position acquiring unit 2812 and transmits the packet to the local resource management device 2003.
  • the local resource management device 3 comprises, for example, a general-purpose personal computer, and as shown in FIG. 12A, mutually connects the CPU 301, the main storage unit 302, the auxiliary storage unit 303, and the network communication unit 306. And a bus 309.
  • the auxiliary storage unit 303 stores a program for realizing various functions of the local resource management device 3.
  • the network communication unit 306 is connected to the network NT1 installed at the base A.
  • the CPU 301 functions as an acquisition unit 311, a first update unit 312, a flag setting unit 313, and a transmission unit 314 by reading out a program stored in the auxiliary storage unit 303 to the main storage unit 302 and executing the program.
  • the auxiliary storage unit 303 has a local DB 331 that collectively stores information on a plurality of resources of the base A, and a flag DB 332.
  • the local DB 331 includes recording date and time information, input identification information, output identification information, information indicating an operation pre-processing time, information indicating an operation post-processing time, information indicating an operation time, and processing number.
  • the information to be shown is stored in association with the resource identification information for identifying the resource of the base A.
  • the resource identification information corresponds to any of the above-described device identification information, worker identification information, supplier identification information, and transport device identification information.
  • the input identification information is input information indicating the input input to the resource, and any of the above-mentioned input parts / material identification information, received parts / material identification information, order sheet identification information and transported object identification information before transfer.
  • the output identification information is emission information indicating the emissions discharged from the resource, and may be any one of the above-mentioned emission processed product identification information, completed processed product identification information, delivered product identification information and transported product identification information. Equivalent to.
  • the information indicating the operation pretreatment time corresponds to the information indicating any of the above-described processing preparation time, work preparation time, preparation preparation time, and transfer preparation time.
  • the information indicating the operation post-processing time corresponds to the information indicating any one of the above-described post-processing post-processing time, the tidying-up time, the post-manufacturing delivery time, and the post-delivery post-processing time.
  • the information indicating the operation time corresponds to the information indicating any of the cycle time, the operation time, the manufacturing time, and the transfer time described above.
  • the information indicating the number of processes corresponds to information on the number of processes that can be processed by the resource or the information on the number of transports that can be transported by the resource.
  • the local DB 331 stores position information indicating the position of each resource of the base A in association with the resource identification information.
  • the flag DB 332 is a flag storage unit that stores flag information indicating whether the local DB 331 has been updated.
  • the acquisition unit 311 acquires various resource information from the device information generation device 5, the worker information generation device 6, the supplier information generation device 7, and the transport information generation device 8 through the network NT1.
  • the first update unit 312 updates the local DB 331 using the various resource information acquired by the acquisition unit 311.
  • the first update unit 312 determines whether or not the various resource information corresponding to the same resource identification information as the resource identification information in the newly acquired various resource information has already been stored in the local DB 331.
  • the first update unit 312 compares the recording date and time information corresponding to the resource identification information of the both, and the recording date and time The resource information with the older recording date and time indicated by the information is deleted from the local DB 331.
  • the flag setting unit 313 sets the flag stored in the flag DB 332 to ON each time the first updating unit 312 updates the local DB 331. Also, the flag setting unit 313 sets the flag to OFF when various information stored in the local DB 331 is transmitted to the global resource management device 2 after the local DB 331 is updated.
  • the transmitting unit 314 transmits various resource information stored in the local DB 331 to the global resource management device 2.
  • the local resource management device 2003 mutually connects the CPU 2301, the main storage unit 2302, the auxiliary storage unit 2303, and the network communication unit 2306 as in the local resource management device 3. And a bus 2309.
  • the auxiliary storage unit 2303 stores programs for realizing various functions of the local resource management device 2003.
  • the network communication unit 2306 is connected to the network NT2 installed at the base B.
  • the CPU 2301 functions as an acquisition unit 2311, a first update unit 2312, a flag setting unit 2313, and a transmission unit 2314 by reading the program stored in the auxiliary storage unit 2303 into the main storage unit 2302 and executing the program.
  • the auxiliary storage unit 2303 has a local DB 2331 which collectively stores information on a plurality of resources of the base B, and a flag DB 2332 which stores a flag indicating whether or not the local DB 2331 is updated.
  • the local DB 2331 stores various information in association with resource identification information for identifying the resource of the site B, as in the local DB 331.
  • the resource identification information includes the above-mentioned transportation means identification information.
  • the input identification information includes the above-mentioned pre-shipment package identification information.
  • the output identification information includes the above-described transported object identification information.
  • the information indicating the pre-operation processing time includes the information indicating the above-mentioned transport pre-setting time.
  • the information indicating the operation post-processing time includes the information indicating the above-described post-transportation time.
  • the information indicating the operation time includes the information indicating the transportation time described above.
  • the information indicating the number of treatments corresponds to the number-of-transports information indicating the number of transportable resources.
  • the acquisition unit 2311 acquires various resource information from the transportation information generation apparatus 2008 through the network NT2.
  • the first update unit 2312 updates the local DB 2331 using the various resource information acquired by the acquisition unit 2311.
  • the transmitting unit 2314 transmits various resource information stored in the local DB 2331 to the global resource management device 2.
  • the flag setting unit 2313 sets the flag stored in the flag DB 2332 to ON each time the first update unit 2312 updates the local DB 2331.
  • the flag setting unit 2313 sets the flag to OFF when various information stored in the local DB 2331 is transmitted to the global resource management device 2 via the wide area network WNT after the local DB 2331 is updated.
  • the global resource management device 2 is composed of, for example, a general-purpose personal computer, and as shown in FIG. 14, mutually connects the CPU 201, the main storage unit 202, the auxiliary storage unit 203, and the network communication unit 206. And a bus 209.
  • the auxiliary storage unit 203 stores a program for realizing various functions of the global resource management device 2.
  • the network communication unit 206 is connected to the network NT1 installed at the base A.
  • the CPU 201 functions as a specifying unit 211, an acquiring unit 212, and a second updating unit 213 by reading out a program stored in the auxiliary storage unit 203 to the main storage unit 202 and executing the program.
  • the auxiliary storage unit 203 has a global DB 231 and a local list DB 232 that stores a list of site identification information of the local resource management devices 3 and 2003 at each site.
  • the global DB 231 is a multipoint resource storage unit that stores various resource information and position information generated for each of a plurality of resources disposed at each of the bases A and B, that is, resource position information. For example, as shown in FIG.
  • the global DB 231 shows information indicating recording date and time information, input identification information, output identification information, operation pre-processing time, and operation post-processing time acquired from the local resource management device 3, 2003.
  • the information, the information indicating the operation time, the information indicating the number of processes, and the location information of the resource are stored in association with the resource identification information identifying the resource.
  • the local list DB 232 stores flag information indicating whether the contents of the local DBs 331 and 2331 corresponding to the bases A and B have been updated in association with the base identification information of the bases A and B.
  • the identifying unit 211 determines various resource information stored in the local DB 331 or 2331 based on the flag information stored in the flag DB 332 or 2332 of the local resource management device 3 corresponding to the bases A and B, respectively. Identify the location where the was updated.
  • the specifying unit 211 periodically acquires flag information from the flag DBs 332 and 2332 of the local resource management devices 3 and 2003 corresponding to the bases A and B, respectively, to check flag information stored in the flag DBs 332 and 2332.
  • the acquisition unit 212 acquires various resource information and positions updated by the first update unit 312 or 2312 from the local DB 331 or 2331 which the local resource management device 3 or 2003 corresponding to the bases A or B identified by the identification unit 211 has. Get information and.
  • the acquisition unit 212 generates a packet including transmission request information for requesting the local resource management devices 3 and 2003 corresponding to the bases A and B identified by the identification unit 211 to transmit the updated various resource information. Send.
  • the acquiring unit 212 extracts the various resource information included in the packet.
  • the second updating unit 213 updates various resource information stored in the global DB 231 using the various resource information and the position information acquired by the acquiring unit 212.
  • the model generation device 1 is configured of, for example, a general-purpose personal computer, and as shown in FIG. 16, includes the CPU 101, the main storage unit 102, the auxiliary storage unit 103, the user interface 104, and the network communication unit 106. And a bus 109 connected to each other.
  • the auxiliary storage unit 103 stores a program for realizing various functions of the model generation device 1.
  • the user interface 104 includes, for example, an input unit such as a keyboard and a touch panel, and a display unit such as a liquid crystal display.
  • the network communication unit 106 is connected to the network NT1 installed at the base A.
  • the CPU 101 reads the program stored in the auxiliary storage unit 103 to the main storage unit 102 and executes the program to function as a reception unit 111, a selection unit 112, and a model generation unit 113 for receiving a supply chain model generation request.
  • the auxiliary storage unit 103 also has a selected resource DB 131 that stores various resource information related to the resource selected from the global DB 231, and a model DB 132 that stores the generated supply chain model.
  • the selected resource DB 131 stores various resource information and position information on each of a plurality of resources selected to realize a supply chain corresponding to the received supply chain model generation request.
  • the model DB 132 stores information indicating the supply chain model generated by the model generation unit 113.
  • the receiving unit 111 receives, for example, model generation request information input by a user belonging to the production management department via the user interface 104.
  • the model generation request information includes identification information for identifying the target final product, and information indicating a predicted demand amount of the target final product.
  • the selecting unit 112 selects resources to be candidates for a plurality of resources necessary to realize an optimal supply chain.
  • the selecting unit 112 first transmits transmission request information for requesting transmission of various resource information stored in the global DB 231 to the global resource management device 2, thereby acquiring various resource information stored in the global DB 231.
  • the selection unit 112 selects a resource based on the model generation request information and the acquired various resource information.
  • the selection unit 112 causes the selected resource DB 131 to store various resource information corresponding to the selected resource.
  • the model generation unit 113 uses the various resource information corresponding to the plurality of resources selected by the selection unit 112 to generate a supply chain model optimal for producing the target final product by the demand forecast amount.
  • the model generation unit 113 generates an optimal supply chain model that maximizes the profit, using an optimization tool such as linear programming, sequential linear programming, or mixed integer programming, for example.
  • the model generation unit 113 causes the model DB 132 to store information indicating the generated supply chain model.
  • step S 1 when the processing content DB 531, the lead time DB 532 or the cycle time DB 533 is updated in the device information generation device 5 (step S 1), the production device information including various resource information after updating is updated from the device information generation device 5 to the local resource It is transmitted to the management device 3 (step S2).
  • the local resource management device 3 when receiving the production device information, the local resource management device 3 updates the local DB 331 using the various resource information included in the production device information (step S3). Subsequently, the local resource management device 3 sets the flag information stored in the flag DB 332 to ON (step S4).
  • flag information stored in the flag DBs 332 and 2332 of the local resource management device 3 and 2003 is transmitted from the local resource management device 3 2003 to the global resource management device 2 (steps S5 and S6).
  • the global resource management device 2 stores the received flag information in the local list DB 232 in association with the base identification information of the bases A and B, searches the flag information stored in the local list DB 232, and updates the local DB 331 The identified base A is identified (step S7).
  • transmission request information for requesting transmission of various resource information stored in the updated local DB 331 is transmitted from the global resource management device 2 to the local resource management device 3 of the base A identified (step S8).
  • various resource information stored in the local DB 331 is transmitted from the local resource management device 3 to the global resource management device 2 (step S9).
  • the local resource management device 3 sets the flag information stored in the flag DB 332 to off (step S10).
  • the global resource management device 2 updates the global DB 231 using the received various resource information (step S11).
  • step S 12 when the work content DB 631, the work preparation time DB 632 or the work time DB 633 is updated in the worker information generation device 6 (step S 12), the worker information including various resource information after the update is the worker information generation device 6 to the local resource management device 3 (step S13).
  • the local resource management device 3 when receiving the worker information, updates the local DB 331 using the various resource information included in the worker information (step S14). Subsequently, the local resource management device 3 sets the flag information stored in the flag DB 332 to ON (step S15).
  • step S 16 the supplier information including various resource information after updating is updated from the supplier information generating device 7 to local resource management. It is transmitted to the device 3 (step S17).
  • the local resource management device 3 when receiving the worker information, updates the local DB 331 by using various resource information included in the worker information (step S18). At this time, the local resource management device 3 keeps the flag information stored in the flag DB 332 ON (step S19).
  • the transport device information including various resource information after updating is transmitted locally from the transport information generation device 8. It is transmitted to the resource management device 3 (step S21).
  • the local resource management device 3 updates the local DB 331 using various resource information included in the transport device information (step S22). At this time, as shown in FIG. 18, the local resource management device 3 keeps the flag information stored in the flag DB 332 ON (step S23).
  • the transportation information including the various resource information after updating is the transportation information generation device 2008 Are transmitted to the local resource management device 2003 of the base B (step S25).
  • the local resource management device 2003 updates the local DB 2331 using the various resource information included in the transportation information (step S26). Thereafter, the local resource management device 2003 sets the flag information stored in the flag DB 2332 to ON (step S27).
  • flag information is transmitted from the local resource management device 3 2003 to the global resource management device 2 (steps S 28 and S 29).
  • the global resource management device 2 specifies the bases A and B in which the local DBs 331 and 2331 have been updated based on the received flag information (step S30).
  • transmission request information is transmitted from the global resource management device 2 to the local resource management devices 3 and 2003 of the bases A and B specified (steps S31 and S32).
  • various resource information stored in the local DB 331 is transmitted from the local resource management device 3 to the global resource management device 2 (step S33).
  • the local resource management device 3 sets the flag information stored in the flag DB 332 to off (step S34). Further, when the local resource management device 2003 receives the transmission request information, various resource information stored in the local DB 2331 is transmitted from the local resource management device 2003 to the global resource management device 2 (step S35). Subsequently, the local resource management device 2003 sets the flag information stored in the flag DB 2332 to off (step S36). On the other hand, when the global resource management device 2 receives various resource information from each of the local resource management devices 3 and 2003, the global resource management device 2 updates the global DB 231 using the received various resource information (step S37).
  • the model generation device 1 receives a model generation request that requests generation of a supply chain model (step S38).
  • transmission request information for requesting various resource information corresponding to each of a plurality of resources selected to realize an optimal supply chain is transmitted from the model generation device 1 to the global resource management device 2 (step S39).
  • various resource information corresponding to each of a plurality of resources corresponding to the transmission request information is transmitted from the global resource management device 2 to the model generation device 1 (step S40) ).
  • the model generation device 1 when receiving the various resource information, the model generation device 1 generates a supply chain model using the received various resource information (step S41).
  • the global resource management device 2 receives the flag from the local resource management device 3, 2003 corresponding to each of the bases A and B each time the flag check time arrives. Get information. Then, the global resource management device 2 acquires various resource information only from the base where the flag information is set to ON. Thus, it is possible to prevent the global resource management device 2 from needlessly acquiring various resource information from all the local DBs 331 and 2331 even though the contents of the local DBs 331 and 2331 are not updated. Therefore, for example, even when the number of sites increases, there is an advantage that the increase in the processing load of the global resource management device 2 is suppressed.
  • the device information generation unit 511, the worker information generation unit 611, the supplier information generation unit 711, the transport information generation unit 811 or the transport information generation unit 2811 are the production device 51, the terminal devices 61, 71, 2081 or the transport control device 81. It is determined whether or not there has been input of new information (step S101). If it is determined by the device information generation unit 511, the worker information generation unit 611, the supplier information generation unit 711, the transport information generation unit 811 or the transport information generation unit 2811 that there is no input of new information (step S101: No), The process of step S105 described later is executed as it is.
  • the device information generation unit 511, the worker information generation unit 611, the supplier information generation unit 711, the conveyance information generation unit 811 or the transportation information generation unit 2811 determines that new information has been input (step S101). : Yes).
  • the device information generation unit 511, the worker information generation unit 611, the supplier information generation unit 711, the transport information generation unit 811 or the transport information generation unit 2811 generate various resource information using the input information and generate The various DBs are updated using the various resource information (step S102).
  • the device information generation unit 511 uses the various device parameter information input from the PLC 51 a of the production device 51 to indicate device identification information, input component / material identification information, discharged processed product identification information, and processing preparation time. Information, information indicating post-machining processing time, information indicating processing time, and recording date and time information are generated. Then, the device information generation unit 511 updates the contents of the processing content DB 531, the lead time DB 532 and the cycle time DB 533 of the generated various information.
  • the worker information generation unit 611 uses the information indicating the work record of the worker input from the terminal device 61 to indicate worker identification information, received parts / material identification information, completed processed product identification information, and work preparation time.
  • the supplier information generation unit 711 uses the information indicating the record of arranging parts or materials to the supplier input from the terminal device 61, and indicates supplier identification information, order document identification information, deliverable identification information, preparation time before manufacturing Information, information indicating manufacturing time, information indicating post-manufacturing delivery time, information indicating the number of available supplies, and recording date and time information are generated.
  • the supplier information generation unit 711 updates the contents of each of the component / material DB 731, the due date DB 732, and the supply capacity DB 733 using the generated various resource information.
  • the conveyance information generation unit 811 uses the parameter information indicating various parameters set in the conveyance device 84 input from the conveyance control device 81, and conveys the conveyance device identification information, the conveyance object identification information before conveyance, the conveyance object identification information after conveyance The information indicating the pre-conveying time, the information indicating the conveying time, the information indicating the post-conveying time, and the recording date and time information are generated.
  • the conveyance information generation unit 811 updates the contents of the conveyance object DB 831, the conveyance time DB 832, and the conveyance amount DB 833 using the generated various resource information.
  • the transport information generation unit 2811 uses the information indicating the type of the carrier and the record of the transport schedule input from the terminal device 2081 to identify the transport means identification information, the transport object identification information before transport, the transport object identification information after transport, Information indicating pre-setting time, information indicating transport time, information indicating post transport time, information indicating transportable amount, and recording date and time information are generated. Then, the transportation information generation unit 2811 updates the contents of the transported object DB 2831, the transportation time DB 2832 and the transportation amount DB 2833 using the generated various resource information.
  • the position acquisition units 512, 612, 712, 812, and 2812 acquire position information of the corresponding resources (step S103).
  • the position acquisition unit 512 acquires the position information of the production device 51 from the positioning device 52.
  • the position acquisition unit 612 acquires the position information of the worker from the positioning device 62.
  • the position acquisition unit 712 acquires the position information of the supplier from the server held by the supplier.
  • the position acquisition unit 812 acquires position information of the transport device 84 from the positioning device 82.
  • the position acquisition unit 2812 acquires position information of the transportation means from a terminal device provided in the transportation means.
  • the transmitting units 513, 613, 713, 813, and 2813 acquire various resource information from the updated various DBs, and generate a packet including the acquired various resource information and position information to obtain the local resource management device 3 , 2003 (step S104).
  • the transmitting unit 513 acquires various types of information from the processing content DB 531, the lead time DB 532 and the cycle time DB 533, and generates a packet including the acquired various types of information and the position information of the production device 51 Send to
  • the transmitting unit 613 acquires various resource information from the work content DB 631, the work preparation time DB 632 and the work time DB 633, generates a packet including the acquired various resource information and the position information of the worker, and sends the packet to the local resource management device 3. Send.
  • the transmitting unit 713 acquires various resource information from the parts / material DB 731, the due date DB 732 and the supply capability DB 733, generates a packet including the acquired various resource information and the position information of the supplier, and transmits the packet to the local resource management device 3 .
  • the transmitting unit 813 acquires various resource information from the conveyed product DB 831, the conveyance time DB 832, and the conveyance amount DB 833, generates a packet including the acquired various resource information and the position information of the conveyance device 84, and sends the packet to the local resource management device 3. Send.
  • the transmitting unit 2813 acquires various resource information from the shipment DB 2831, the transportation time DB 2832 and the transportation amount DB 2833, generates a packet including the acquired various resource information and the position information of the transportation means, and transmits it to the local resource management device 2003 Do.
  • step S105 whether the device information generation unit 511, the worker information generation unit 611, the supplier information generation unit 711, the conveyance information generation unit 811 or the transportation information generation unit 2811 has an end instruction instructing to end the resource information generation process It is determined whether or not it is (step S105).
  • the end instruction is issued when, for example, the user performs an operation to stop the device information generation device 5, the worker information generation device 6, the supplier information generation device 7, the conveyance information generation device 8, and the conveyance information generation device 2008. Occur. If it is determined by the device information generation unit 511, the worker information generation unit 611, the supplier information generation unit 711, the conveyance information generation unit 811 or the transportation information generation unit 2811 that there is no end command (step S105: No), step S101 again. Processing is performed.
  • step S105 determines that the termination instruction is present (step S105: Yes). If the device information generation unit 511, the worker information generation unit 611, the supplier information generation unit 711, the conveyance information generation unit 811 or the transportation information generation unit 2811 determines that the termination instruction is present (step S105: Yes), resource information generation is performed. Processing ends.
  • This local DB update process executed by the local resource management device 3 or 2003 according to the present embodiment will be described with reference to FIG.
  • This local DB update process is started, for example, when the local resource management device 3 or 2003 is powered on.
  • the acquisition units 311 and 2311 determine whether or not various resource information is received from the device information generation device 5, the worker information generation device 6, the supplier information generation device 7, the transport information generation device 8, or the transport information generation device 2008. It determines (step S201). If it is determined that the acquisition units 311 and 2311 have not received various resource information (step S201: No), the process of step S207 described below is executed.
  • the acquisition units 311 and 2311 have determined that various resource information has been received (step S201: Yes).
  • the first updating units 312 and 2312 update the contents of the local DBs 331 and 2331 using the various resource information acquired by the acquiring units 311 and 2311 (step S202).
  • the first update unit 312, 2312 determines whether or not the various resource information corresponding to the same resource identification information as the resource identification information in the newly acquired various resource information has already been stored in the local DB 331. .
  • the first update unit 312 compares the recording date and time information corresponding to the resource identification information of the both, and the recording date and time The resource information with the older recording date and time indicated by the information is deleted from the local DB 331.
  • the flag setting units 313 and 2313 set the flag information stored in the flag DBs 332 and 2332 to ON (step S203).
  • the transmission units 314 and 2314 determine whether transmission request information has been received from the global resource management device 2 (step S204). If it is determined that the transmission request information is not received (step S204: No), the process of step S207 described later is executed.
  • step S204 when it is determined that the transmission request information has been received (step S204: Yes), the transmitting units 314 and 2314 transmit various resource information after update stored in the local DB 331 to the global resource management device 2 (step S205). . Thereafter, the flag setting units 313 and 2313 set the flag information stored in the flag DBs 332 and 2332 to off (step S206).
  • the transmitting units 314 and 2314 determine whether or not flag request information for requesting transmission of flag information has been received from the global resource management device 2 (step S207). If it is determined by the transmission units 314 and 2314 that the flag request information has not been received (step S207: No), the process of step S209 described later is executed as it is. On the other hand, when determining that the flag request information has been received (step S207: Yes), the transmitting units 314 and 2314 acquire flag information from the flag DB 332 and 2332 and transmit the flag information to the global resource management device 2 (step S208).
  • the acquiring units 311 and 2311 determine whether or not there is an end instruction to end the local DB update processing (step S209).
  • This termination instruction occurs, for example, when an operation for stopping the local resource management device 3 2003 is performed by the user. If the acquisition units 311 and 2311 determine that there is no end instruction (step S209: No), the process of step S201 is performed again. On the other hand, when it is determined by the acquisition units 311 and 2311 that there is a termination instruction (step S209: Yes), the local DB update processing is terminated.
  • This global DB update process is started when the global resource management device 2 is powered on.
  • the identifying unit 211 determines whether a flag check time has come (step S301).
  • the flag check timings managed by the local resource management devices 3 and 2003 are synchronized within a delay time range set in advance as compared with the flag check timings managed by the local resource management devices 3 and 2003. If it is determined by the identifying unit 211 that the flag check time has not arrived (step S301: No), the process of step S310 described below is executed as it is.
  • the specifying unit 211 determines that the flag check time has come (step S301: Yes), the flag request information for requesting transmission of flag information stored in the flag DBs 332 and 2332 of the local resource management devices 3 and 2003, respectively. It transmits (step S302).
  • the specifying unit 211 receives the flag information from the local resource management device 3, 2003, the specifying unit 211 stores the flag information in the local list DB 232 (step S303). Subsequently, the specifying unit 211 searches for flag information set to ON for the flag information stored in the local list DB 232 (step S304).
  • the specifying unit 211 determines whether or not there is flag information set to ON in the flag information stored in the local list DB 232 (step S305). If it is determined that there is no flag information set to ON by the identifying unit 211 (step S305: No), the process of step S310 described below is executed as it is.
  • step S305 when determining that the flag information set to ON is present (step S305: Yes), the specifying unit 211 specifies bases A and B corresponding to the flag information set to ON (step S306).
  • the acquisition unit 212 sends transmission request information for requesting transmission of various resource information stored in the local DBs 331 and 2331 to the local resource management devices 3 and 2003 corresponding to the bases A and B identified by the identification unit 211. It transmits (step S307).
  • the second updating unit 213 updates the contents of the global DB 231 using the received various resource information ((S308) Step S309).
  • the identifying unit 211 determines whether or not there is an end command instructing to end the global DB update processing (step S310). This termination instruction occurs, for example, when an operation for stopping the global resource management device 2 is performed by the user. If it is determined by the specifying unit 211 that there is no end command (step S310: No), the process of step S301 is executed again. On the other hand, when the specifying unit 211 determines that the end instruction is present (step S310: Yes), the global DB update process ends.
  • model generation processing performed by the model generation device 1 according to the present embodiment will be described with reference to FIG.
  • the model generation process is started, for example, when the model generation device 1 is powered on.
  • the receiving unit 111 determines whether model generation request information has been received from the user interface 104 (step S401). If it is determined that the receiving unit 111 has not received the model generation request information (step S401: No), the process of step S406 described below is performed as it is.
  • the selecting unit 112 transmits, to the global resource management device 2, transmission request information requesting transmission of various resource information stored in the global DB 231. (Step S402), various resource information stored in the global DB 231 is acquired (step S403).
  • the selection unit 112 temporarily stores, for example, the acquired various resource information in the main storage unit 102.
  • the selection unit 112 selects a resource that is a candidate for a plurality of resources necessary to realize an optimal supply chain (step S404).
  • the selection unit 112 stores various resource information corresponding to the selected resource in the selected resource DB 131.
  • the model generation unit 113 uses various resource information corresponding to a plurality of resources selected by the selection unit 112, the model generation unit 113 generates a supply chain model optimal for producing the target final product by the demand forecast amount. (Step S405). Then, the model generation unit 113 causes the model DB 132 to store information indicating the generated supply chain model.
  • the accepting unit 111 determines whether or not there is an end command instructing to end the model generation processing (step S406).
  • the end instruction is generated, for example, when the user performs an operation for stopping the model generation device 1. If it is determined by the receiving unit 111 that there is no end command (step S406: No), the process of step S401 is performed again. On the other hand, when the accepting unit 111 determines that the termination instruction is present (step S406: Yes), the model generation processing is terminated.
  • the resource information is updated based on the flag information of the base resource management device corresponding to each of the plurality of bases in the multipoint resource management apparatus.
  • the base is identified, and the updated resource information is acquired from the base resource storage unit corresponding to the identified base.
  • the multipoint resource management apparatus updates the resource information stored in the multipoint resource storage unit using the acquired resource information.
  • the model generation device generates a supply chain model using the resource information and the resource position information stored in the multipoint resource storage unit.
  • the resource information stored in the base resource storage unit is updated, the resource information stored in the multiple base resource storage units is also updated following it. Therefore, the resource information stored in the multi-location resource storage unit is also updated following changes in resource information on resources that are components of the supply chain, so that a supply chain model conforming to the actual condition of the supply chain is generated. It has the advantage of
  • the first update units 312 and 2312 store the local DBs 331 and 2331 based on the recording date and time information and the resource identification information of each of the plurality of resources. Update resource information. Specifically, when the first updating unit 312 and 2312 newly acquire various resource information, the first updating unit 312 corresponds to the same resource identification information as the resource identification information in the newly acquired various resource information. It is determined whether or not various resource information to be stored is already stored in the local DB 331, 2331.
  • the first update units 312 and 2312 compare the recording date and time information corresponding to the resource identification information of the two, The resource information whose recording date and time indicated by the recording date and time information is older is deleted from the local DB 331. As a result, since only the latest various resource information is always stored in the local DB 331, 2331, the storage capacity required of the local DB 331, 2331 can be reduced accordingly.
  • the global resource management device 2 may be able to update the global DB 231 according to the update request information requested from the local resource management device 3 2003 to update the global DB 231. That is, the local resource management device 3, 2003 may update the contents of the global DB 231 by transmitting update request information to the global resource management device 2.
  • the update request information includes, for example, command information for updating the global DB 231, and various resource information stored in the updated local DBs 331 and 2331.
  • the global resource management device 3002 according to the present modification includes a permitted base list DB 3233, an extraction unit 3214, and a collation unit 3215.
  • the same components as those of the embodiment are denoted by the same reference numerals as those of FIG.
  • the global resource management device 2 is replaced with the global resource management device 3002 according to the present modification in the supply chain model generation system according to the embodiment shown in FIG. It corresponds to
  • the permitted base list DB 3233 is identification information of a local resource management apparatus corresponding to a base which is permitted to update the contents of the global DB 231 by transmitting update request information, for example, the base A, for example, the local resource apparatus 3.
  • It is a permitted base list storage unit that stores permitted base list information that is a list of base identification information.
  • the extraction unit 3214 extracts the command information included in the update request information received from the local resource management device 3, 2003 and the base identification information of the local resource management device 3, 2003 of the transmission source.
  • the extraction unit 3214 also extracts various resource information included in the update request information.
  • the collation unit 3215 is a local resource management device stored in the permitted base list DB 3233, for example, the permitted base list information including the base identification information of the local resource management unit 3, and the transmission source of the extraction unit 3214 extracted from the update request information. Check the location identification information. Then, the collation unit 3215 determines whether the transmission source base identification information extracted from the update request information is included in the permitted base list information.
  • step S3001 determines whether update request information has been received from the local resource management device 3 or 2003 (step S3001). If it is determined by the acquisition unit 212 that the update request information has not been received (step S3001: NO), the processes after step S310 are executed as they are.
  • the extraction unit 3214 extracts site identification information from the update request information (step S3002).
  • the collation unit 3215 collates the base identification information stored in the permitted base list DB 3233 with the base identification information of the transmission source extracted from the update request information (step S3003).
  • the collation unit 3215 determines whether the transmission source base identification information extracted from the update request information is included in the permitted base list information (step S3004). It is assumed that it is determined by the verification unit 3215 that the base identification information of the transmission source of the update request information is not included in the permitted base list information (step S3004: No). In this case, the second update unit 213 discards the received update request information (step S3005), and then the processes after step S310 are executed.
  • Step S3004 when it is determined by the collation unit 3215 that the base identification information of the transmission source of the update request information is included in the permitted base list information (Step S3004: Yes), the extraction unit 3214 determines from the update request information. Command information and various resource information are extracted (step S3006). Next, the second update unit 213 updates the contents of the global DB 231 using various resource information according to the command information included in the received update request information (step S3007). Then, the process after step S310 is performed.
  • a user who is present at a site other than the site where the global resource management device 3002 is disposed can update the contents of the global DB 231 using the local resource management device 2003. Therefore, the maintainability of the global DB 231 can be improved.
  • the local resource management device 3, 2003 may have a function of sorting the received information according to the transmission source of the information to the local resource management device 3, 2003.
  • the local resource management device 4003 according to the present modification includes an adopted transmission source list DB 4333, an extraction unit 4315, and a collation unit 4316.
  • the same components as those of the embodiment are denoted by the same reference numerals as those of FIG. 12A.
  • the supply chain model generation system according to the present modification is the supply chain model generation system according to the embodiment shown in FIG. 1, for example, the local resource management device 3 is replaced with the local resource management device 4003 according to the present modification. It corresponds to a thing.
  • the adoption transmission source list DB 4333 stores adoption transmission source list information which is a list of identification information of transmission sources of various information such as production apparatus information and worker information which can be adopted for generation of various resource information.
  • the transmission source is the device information generation device 5, the worker information generation device 6, the supplier information generation device 7 or the transport information generation device 8.
  • the extraction unit 4315 extracts identification information of a transmission source included in various information received from the device information generation device 5, the worker information generation device 6, the supplier information generation device 7 or the conveyance information generation device 8.
  • the collation unit 4316 collates the adopted transmission source list information stored in the adopted transmission source list DB 4333 with the identification information of the transmission source extracted by the extraction unit 4315. Then, the collation unit 4316 determines whether or not the extracted identification information of the transmission source is included in the adopted transmission source list information.
  • step S201 when it is determined in step S201 that the acquisition unit 311 has received various resource information (step S201: Yes), the extraction unit 4315 identifies the transmission source identification information of the various resource information from the header portion of the packet including the various resource information. Are extracted (step S4001).
  • the collation unit 4316 collates the adopted transmission source list information stored in the adopted transmission source list DB 4333 with the identification information of the transmission source extracted by the extraction unit 4315 (step S4002). Subsequently, the collation unit 4316 determines whether or not the extracted identification information of the transmission source is included in the adopted transmission source list information (step S4003). It is assumed that the collation unit 4316 determines that the identification information of the transmission source is not included in the adopted transmission source list information (step S4003: No). In this case, the first update unit 312 discards the received various resource information (step S4004), and thereafter, the processes after step S207 are performed.
  • the collation unit 4316 determines that the identification information of the transmission source is included in the adopted transmission source list information (step S4003: Yes).
  • the first updating unit 312 updates the contents of the local DB 331 using the received various resource information (step S202). After that, the processes after step S203 are executed.
  • the contents of the local DB 331 are, for example, using various resource information received from the device impersonating the device information generation device 5, the worker information generation device 6, the supplier information generation device 7 or the transport information generation device 8. Updating is suppressed. Therefore, the security performance of the local DB 331 can be improved.
  • the supply chain generation system for example, even if the model generation device 1 calculates the theoretical value of the time required to supply the final product according to the supply chain model after the final product is ordered. Good. Then, the supply chain system calculates the average required time which is the average of the actual values of the time required for the final product to be supplied to the order source according to the supply chain model after the final product is ordered, and the average for the theoretical value of the required time
  • a required time calculation device may be provided which calculates a path stability index value which is a ratio of required time.
  • the required time calculation device is disposed, for example, in the production management department of the site A together with the model generation device 1. Further, the required time calculation device may have a user interface.
  • the required time calculation device inquires about the required time required to supply the final product according to one supply chain model since the user belonging to the production management department of the base A, for example, has ordered the final product through the user interface
  • the above-mentioned average required time and the route stability index value may be presented to the user accordingly.
  • the model generation device 4001 mutually connects the CPU 101, the main storage unit 102, the auxiliary storage unit 103, the user interface 104, and the network communication unit 106. And a bus 109.
  • the same components as those in the embodiment are denoted by the same reference numerals as those in FIG.
  • the CPU 101 functions as the reception unit 111, the selection unit 112, the model generation unit 113, and the required time theoretical value calculation unit 4114 by reading out the program stored in the auxiliary storage unit 103 to the main storage unit 102 and executing it.
  • the auxiliary storage unit 103 also has a selected resource DB 131, a model DB 132, and a required time theoretical value DB 4133 for storing required time theoretical value information indicating theoretical values of the required time corresponding to the generated supply chain models. .
  • the required time theoretical value DB 4133 stores the required time theoretical value information corresponding to each supply chain model in association with model identification information that identifies the supply chain model.
  • the required time theoretical value calculation unit 4114 corresponds to each supply chain model based on various resource information regarding the resource selected by the selection unit 112 stored in the selected resource DB 131 and the supply chain model stored in the model DB 132. Calculate the required time theoretical value.
  • the required time theoretical value calculation unit 4114 determines the order of the final product from the order of the final product from the pre-operation time, the post-operation time, the operation time and the number of processing corresponding to each of the plurality of resources constituting the supply chain model for each supply chain model. Calculate the theoretical time required to supply the final product to the order source according to the model.
  • the required time theoretical value calculation unit 4114 associates the required time theoretical value information indicating the calculated required time theoretical value with the model identification information and stores the required time theoretical value information in the required time theoretical value DB 4113.
  • the required time theoretical value transmission unit 4115 receives the theoretical value request information requesting to transmit the required time theoretical value information from the required time calculation device 4009, and supplies the supply chain model indicated by the model identification information included in the theoretical value request information. Identify the corresponding theoretical duration information. Then, the required time theoretical value transmission unit 4115 transmits the specified required time theoretical value information to the required time calculation device 4009.
  • the required time calculation device 4009 comprises, for example, a general-purpose personal computer, and as shown in FIG. 28, for example, a CPU 4901, a main storage unit 4902, an auxiliary storage unit 4903, a user interface 4904, and a network communication unit 4906 And a bus 4909 interconnecting these.
  • the auxiliary storage unit 4903 stores programs for realizing various functions of the required time calculation device 4009.
  • the user interface 4904 is similar to the user interface 104 described in the embodiment.
  • the network communication unit 4906 is connected to, for example, the network NT1 installed at the base A.
  • the CPU 4901 acquires the required time actual value information indicating the actual value of the required time corresponding to the supply chain model by reading and executing the program stored in the auxiliary storage unit 4903 in the main storage unit 4902. It functions as a theoretical value acquisition unit 4912, an average required time calculation unit 4913, a stability index value calculation unit 4914, an inquiry reception unit 4915, and a required time presentation unit 4916. Further, the auxiliary storage unit 4903 has a record DB 4931 and a required time DB 4932. For example, as shown in FIG. 29A, the actual result DB 4931 corresponds to the required final time actual value information indicating the actual required time from the final product being ordered to the final product being supplied to the order source according to the supply chain model.
  • the result identification information that identifies the product supply record, the result occurrence date and time information that indicates the date and time when the supply record occurred, the model identification information of the adopted supply chain model, and the time required for the applied supply chain model Required time indicating theoretical value is stored in correspondence with theoretical value information.
  • the required time DB 4932 is a supply chain model that includes average required time information indicating the average required time of the actual required time described above and path stability index value information indicating the path stability of the distribution path according to the supply chain model. Is stored separately for each month and month when it was applied.
  • the required time DB 4932 is, for example, as shown in FIG. 29B, the average required time information and the route stability index value information, the application month information indicating the month to which the supply chain model is applied, the time zone in which the supply chain model is applied Stored in association with application time zone information indicating model ID and model identification information.
  • the actual value acquisition unit 4911 indicates the required time actual value input by the user belonging to the production management department via the user interface 4904 or the required time actual value managed by the global resource management device 2, for example. Get actual value information.
  • the required time actual value information includes model identification information that identifies the corresponding supply chain model.
  • the actual value acquisition unit 4911 stores the acquired required time actual value information in the actual result DB 4931.
  • the theoretical value acquisition unit 4912 transmits theoretical value request information requesting transmission of required time theoretical value information to the model generation apparatus 4001, thereby acquiring required time theoretical value information from the model generation apparatus 4001.
  • the theoretical value acquisition unit 4912 extracts model identification information from the required time actual value information, generates theoretical value request information including the extracted model identification information, and transmits it to the model generation apparatus 4001.
  • the theoretical value acquisition unit 4912 stores the acquired required time theoretical value information in the actual result DB 4931 in association with the required time actual value information acquired by the actual value acquisition unit 4911.
  • the average required time calculation unit 4913 is a representative value calculation unit that calculates an average required time, which is an average value of actual required time values, as a representative value of actual required time values, based on actual required time values.
  • the average required time calculation unit 4913 classifies the required time actual value information by a combination of the month and the time zone to which the corresponding supply chain model is applied. Then, the average required time calculation unit 4913 calculates an average required time which is an average value of required time actual values indicated by required time actual value information, for each combination of a month and a time zone to which the supply chain model is applied. Then, the average required time calculation unit 4913 stores average required time information indicating the calculated average required time in the required time DB 4932 in association with model identification information, the month, and the time zone.
  • the stability index value calculation unit 4914 calculates, for each combination of the month and the time zone to which the supply chain model is applied, the path stability index value corresponding to the ratio of the above-mentioned average required time to the above-mentioned required time theoretical value. Do.
  • the route stability index value indicates that the closer to 100% the average travel time is closer to the theoretical travel time value, the more stable the distribution channel according to the supply chain model.
  • the stability index value calculation unit 4914 stores path stability index value information indicating the calculated path stability index value in the required time DB in association with the model identification information, the month, and the time zone.
  • the inquiry receiving unit 4915 determines whether or not required time inquiry information for inquiring the required time corresponding to the supply chain model is received from the user interface 4904. Here, when the user performs an operation for inquiring the required time via the user interface 4904, the inquiry receiving unit 4915 receives the required time inquiry information.
  • the required time inquiry information includes model identification information of the supply chain model related to the inquiry from the user, and information indicating a month and a time zone to which it is applied.
  • the required time presentation unit 4916 is an average required corresponding to a combination of the model identification information included in the required time inquiry information and the month and the time zone to which the supply chain model is applied in the average required time information stored in the required time DB 4932 It is determined whether time information exists. And if the required time presentation part 4916 determines that the above-mentioned average required time information exists in the average required time information stored in the required time DB 4932, the average required time indicated by the average required time information and the corresponding route stability The path stability index value indicated by the index value information is presented via the user interface 4904.
  • the required time presentation unit 4916 determines that the above-described average required time information does not exist in the average required time information stored in the required time DB 4932, the required time theoretical value information acquired from the model generation device 4001 indicates The theoretical duration is presented via the user interface 4904.
  • the model generation device 4001 calculates the required time theoretical value corresponding to the generated supply chain model, and stores the calculated theoretical value in the above-described required time theoretical value DB 4133. (Step S4001).
  • the required time calculation device 4009 acquires required time actual value information (step S4002), it generates theoretical value request information for requesting the model generation device 4001 to transmit the required time theoretical value information. (Step S4003). Subsequently, the generated theoretical value request information is transmitted from the required time calculation device 4009 to the model generation device 4001 (step S4004).
  • the theoretical value request information includes model identification information included in the required time actual value information.
  • the model generation device 4001 identifies required time theoretical value information corresponding to the supply chain model to which the model identification information included in the theoretical value request information is added (step S4005). Subsequently, the specified required time theoretical value information is transmitted from the model generation device 4001 to the required time calculation device 4009 (step S4006).
  • the required time calculation device 4009 stores the received required time theoretical value information in the actual result DB 4931 in association with the required time actual value information (step S4007).
  • the required time calculation device 4009 calculates an average required time corresponding to the application month and the application time zone to which the actual occurrence date and time of the acquired required time actual value information belongs (step S4008).
  • the required time calculation device 4009 stores average required time information indicating the calculated average required time in the required time DB 4932.
  • the required time calculation device 4009 calculates a path stability index value corresponding to the ratio of the average required time to the required time theoretical value (step S4009).
  • the required time calculation device 4009 stores path stability index value information indicating the calculated path stability index value in the required time DB 4932 in association with the average required time information and the model identification information.
  • the required time calculation unit 4009 receives the required time inquiry information (step S4010). Subsequently, the required time calculation device 4009 searches for required time information stored in the required time DB 4932, and supports the combination of the model identification information included in the required time inquiry information and the month and time zone to which the supply chain model is applied. It is assumed that it is determined that the required average required time information exists (step S4011).
  • the required time calculation device 4009 acquires the average required time information and the path stability index value information from the required time DB 4932, and indicates the average required time indicated by the acquired average required time information and the path indicated by the path stability index value information.
  • the stability index value is presented via the user interface 4904 (step S4012).
  • model generation processing executed by the model generation apparatus 4001 according to the present modification will be described with reference to FIG.
  • the same processing as the model generation processing described in the embodiment is assigned the same reference numeral as that in FIG.
  • the required time theoretical value calculation unit 4114 calculates the required time theoretical value corresponding to the supply chain model generated by the model generation unit 113, and the required time The theoretical value DB 4133 is stored (step S4401).
  • the required time theoretical value transmission unit 4115 determines whether the aforementioned theoretical value request information has been received from the required time calculation device 4009 (step S4402). If it is determined by the required time theoretical value transmission unit 4115 that the theoretical value request information has not been received (step S4402: NO), the process of step S406 is executed.
  • step S4402 when it is determined that the theoretical value transmission unit 4115 has received the theoretical value request information (step S4402: Yes), the required time corresponding to the supply chain model indicated by the model identification information included in the theoretical value request information The theoretical value information is specified (step S4403). Subsequently, the required time theoretical value transmission unit 4115 transmits the specified required time theoretical value information to the required time calculation device 4009 (step S4404). Thereafter, the process of step S406 is performed.
  • step S4901 determines whether the required time actual value information has been acquired. If it is determined that the actual value acquisition unit 4911 has not acquired the required time actual value information (step S4901: NO), the process of step S4907 described later is executed as it is.
  • the actual value acquisition unit 4911 stores the acquired required time actual value information in the actual result DB 4931 (Step S4902).
  • the theoretical value acquisition unit 4912 extracts model identification information from the required time actual value information, generates theoretical value request information including the extracted model identification information, and transmits it to the model generation apparatus 4001 (step S 4903). Subsequently, the theoretical value acquisition unit 4912 acquires required time theoretical value information from the model generation device 4001, and stores the acquired required time theoretical value information in the required time DB 4932 (step S4904).
  • the average required time calculation unit 4913 classifies the acquired required time actual value information as a combination of a month and a time zone to which the corresponding supply chain model is applied (step S4905). Next, the average required time calculation unit 4913 calculates an average required time which is an average value of required time actual values indicated by required time actual value information, for each combination of the month and time zone to which the supply chain model is applied. The average required time information indicating the calculated average required time is stored in the required time DB in association with the model identification information, the month, and the time zone (step S4906).
  • the stability index value calculation unit 4914 calculates a path stability index value corresponding to the ratio of the average required time to the theoretical required time for each combination of the month and the time zone to which the supply chain model is applied.
  • the route stability index value information indicating the calculated route stability index value is stored in the required time DB 4932 (step S4907).
  • the actual value acquisition unit 4911 determines whether or not there is an end instruction to end the average required time / route stability index value calculation processing (step S4908).
  • This end instruction occurs, for example, when the user performs an operation for stopping the required time calculation device 4009. If it is determined by the actual value acquisition unit 4911 that there is no end command (step S4908: NO), the process of step S4901 is executed again. On the other hand, when the actual value acquisition unit 4911 determines that the end instruction is present (step S4908: Yes), the average required time / route stability index value calculation processing ends.
  • the required time presentation process is started, for example, when the required time calculation device 4009 is powered on.
  • the inquiry receiving unit 4915 determines whether the required time inquiry information for inquiring the required time corresponding to the supply chain model has been received from the user interface 4904 (step S4951).
  • the inquiry receiving unit 4915 receives the required time inquiry information.
  • the process of step S4951 is repeatedly executed.
  • the inquiry receiving unit 4915 receives the required time inquiry information (step S4951: Yes).
  • the required time presentation unit 4916 retrieves required time information stored in the required time DB 4932, and uses model identification information included in the required time inquiry information and information indicating the month and time zone to which the supply chain model is applied. It is determined whether there is average required time information corresponding to the combination (step S4952).
  • the required time presentation unit 4916 determined that the required time information corresponding to the combination of the above-mentioned model identification information and the information indicating the month and the time zone to be applied exists in the required time information stored in the required time DB 4932 And (step S4952: Yes). In this case, the required time presentation unit 4916 acquires the average required time information and the route stability index value information from the required time DB 4932, and indicates the average required time indicated by the acquired average required time information and the route indicated by the route stability index value information. The stability index value is presented via the user interface 4904 (step S4953).
  • step S4952 there is no average required time information corresponding to a combination of the above-mentioned model identification information and information indicating the month and time zone to be applied in the required time information stored in the required time DB 4932 for the required time presentation unit 4916
  • the theoretical value acquisition unit 4912 extracts model identification information from the required time inquiry information, generates theoretical value request information including the extracted model identification information, and transmits the theoretical value request information to the model generation device 4001 (step S4954).
  • the theoretical value acquisition unit 4912 acquires required time theoretical value information from the model generation device 4001 (step S4955).
  • the required time presentation unit 4916 presents the required time theoretical value indicated by the required time theoretical value information acquired by the theoretical value acquisition unit 4912, via the user interface 4904 (step S4956).
  • the supply chain model generation system including the average required time calculation unit 4913 which calculates the average required time which is an average value of required time actual values as a representative value of actual required time values.
  • the supply chain model generation system includes a representative value calculation unit that calculates the maximum value, the intermediate value or the minimum value of the required time actual value as a representative value of the actual required time value. It is also good.
  • the present invention is not limited thereto, and may be, for example, a power line communication network.
  • the device information generation device 5, the worker information generation device 6, the supplier information generation device 7, the transport information generation device 8, the transport information generation device 2008, the local resource management device 3, 2003, the global resource management device 2, and the model generation device It is assumed that 1 includes a wireless module.
  • the networks NT1 and NT2 may be wireless communication networks via access points.
  • the device 1 may communicate with the access point in a communication scheme compatible with short distance wireless communication standards such as Bluetooth (registered trademark), for example.
  • device information generation device 5, worker information generation device 6, supplier information generation device 7, transport information generation device 8, transport information generation device 2008, local resource management device 3, 2003, global resource management device 2, and model generation device It is assumed that 1 includes an infrared communication module.
  • the networks NT1 and NT2 may be networks via infrared communication conforming to the IR-DR standard.
  • the positioning devices 52, 62, and 82 communicate with the tags 53, 63, and 83 to measure the positions of the production device 51, the worker, or the transport device 84.
  • the positioning device 52 may measure the position of the production device 51, the worker or the transport device 84 using a GPS signal, or the production device 51, the worker or the transport
  • the position of the production device 51, the worker or the transport device may be measured using radio waves conforming to the short distance wireless communication standard such as Bluetooth (registered trademark) transmitted from the device 84.
  • the positioning devices 52, 62, 82 may measure the position of the production device 51, the worker or the transport device 84 using A-GPS signals or sound waves.
  • the positioning devices 52, 62, 82 and the tags 53, 63, 83 may not exist.
  • the device information generation device 5, the worker information generation device 6, and the conveyance information generation device 8 have user interfaces, and the user uses the user interface device to position information of the production device 51, the worker, and the conveyance device 84. May be directly input to the device information generation device 5, the worker information generation device 6, and the transport information generation device 8.
  • the receiving unit 111 receives model generation request information including information indicating the forecasted demand amount of the target final product.
  • the sales performance information is acquired from a server (not shown) that manages the sales performance information of the final product
  • the future sales volume may be predicted from the acquired sales performance information.
  • the receiving unit 111 predicts the sales volume of the final product to be targeted in the future, using a known prediction method such as, for example, linear regression method, exponential smoothing method, weighted moving average method, Holtz / Winter method, etc. May be
  • the device information generation device 5, the worker information generation device 6, the supplier information generation device 7, the transport information generation device 8, the transport information generation device 2008, the local resource management device 3, 2003, the global resource management device 2 according to the present invention.
  • the various functions of the model generation device 1 can be realized using a normal computer system without using a dedicated system.
  • a program for performing the above operation is stored in a non-transitory recording medium (CD-ROM (Compact Disc Read Only Memory) etc.) readable by the computer system.
  • Local resource management device 3, 2003, global resource management device 2, and model generation device 1 may be configured.
  • the method of providing the program to the computer is arbitrary.
  • the program may be uploaded to a bulletin board (BBS (Bulletin Board System)) of a communication line and distributed to a computer via the communication line.
  • BBS bulletin Board System
  • the computer starts this program and executes it under the control of the OS (Operating System) like other applications.
  • the computer executes the above-described processing, the device information generation device 5, the worker information generation device 6, the supplier information generation device 7, the transport information generation device 8, the transport information generation device 2008, the local resource management device 3, 2003 Functions as a global resource management device 2 and a model generation device 1.
  • the present invention is suitable for supply chain management implemented in a department that manages product production and distribution.
  • 1,4001 model generation device 2,3002 global resource management device, 3,2003, 4003 local resource management device, 5 device information generation device, 6 worker information generation device, 7 supplier information generation device, 8 transport information generation device, 10, 2010 Firewall apparatus, 51 production apparatus, 51a PLC, 52, 62, 82 positioning apparatus, 53, 63, 83 tag, 61, 71, 2081 terminal apparatus, 81 transport control apparatus, 84 transport apparatus, 101, 201, 301 , 501, 601, 701, 801, 2301, 2801, 4901 CPU, 102, 202, 302, 502, 602, 702, 802, 2802, 2802, 4902 Main storage unit, 103, 203, 303, 503, 603, 703 , 803, 2303, 2803, 903 auxiliary storage unit, 104, 4904 user interface, 109, 209, 309, 509, 609, 709, 809, 2309, 2809, 4909 bus, 111 reception unit, 112 selection unit, 113 model generation unit, 131 selection resource DB,

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Strategic Management (AREA)
  • Quality & Reliability (AREA)
  • Theoretical Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • General Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

サプライチェーンモデル生成システムは、複数の拠点それぞれに配置された複数のリソースそれぞれについて生成された資源情報を記憶するグローバルDB(231)と、ローカル資源管理装置のフラグDBが記憶するフラグ情報に基づいて、ローカルDBが記憶する資源情報と資源位置情報とが更新された拠点を特定する特定部(211)と、特定部(211)により特定された拠点に対応するローカル資源管理装置が有するローカルDBから、更新部により更新された資源情報と資源位置情報とを取得する取得部(212)と、取得部(212)が取得した資源情報と資源位置情報とを用いて、グローバルDB(231)が記憶する資源情報と資源位置情報とを更新する第2更新部(213)と、を有するグローバル資源管理装置(2)を備える。

Description

サプライチェーンモデル生成システム、サプライチェーンモデル生成方法およびプログラム
 本発明は、サプライチェーンモデル生成システム、サプライチェーンモデル生成方法およびプログラムに関する。
 製品の資材調達から生産を経て販売に至る一連のサプライチェーンをモデル化したサプライチェーンモデルを設定し、設定したサプライチェーンモデルを使って販売計画変動に対応したシミュレーションを行い、そのシミュレーションデータに基づいて最適な物流ルートを選定するサプライチェーン最適化システムが提案されている(例えば特許文献1参照)。このサプライチェーン最適化システムは、製品情報、生産情報およびサプライチェーンの構成、即ち、物流ルートを示す情報が格納されているERP(Enterprise Resource Planning)パッケージから製品情報、生産情報および物流ルートを示す情報を取得してサプライチェーンモデルを設定する。
特開2009-140140号公報
 ところで、サプライチェーンの構成要素は、サプライチェーンに係る製品を製造する工場における設備の増設および更新、サプライヤの変更、製品を製造するために必要な部品または材料の物流手段の変更等により日々変化し得る。従って、このようなサプライチェーンの構成要素の変化に追従して、サプライチェーンの構成要素に関する情報を更新しなければ、設定したサプライチェーンモデルがサプライチェーンの実態と乖離したものとなる。このようなサプライチェーンの実態と乖離したサプライチェーンモデルに沿ってサプライチェーンマネジメントを実施すると、製品の納期遅延、在庫超過等の弊害が発生する虞がある。
 本発明は、上記事由に鑑みてなされたものであり、サプライチェーンの実態に即したサプライチェーンモデルを生成できるサプライチェーンモデル生成システム、サプライチェーンモデル生成方法およびプログラムを提供することを目的とする。
 上記目的を達成するために、本発明に係るサプライチェーンモデル生成システムは、複数の拠点それぞれに配置された、部品または材料の処理、拠点内搬送或いは他の拠点への輸送を実行する複数の資源を使用した製品の生産に最適なサプライチェーンをモデル化したサプライチェーンモデルを生成するサプライチェーンモデル生成システムである。サプライチェーンモデル生成システムは、複数の拠点のうちのいずれか1つに配置された複数の資源それぞれに関する資源情報を生成する資源情報生成部と、資源の拠点内における位置座標を測定する測位装置から資源の拠点内における位置座標を示す資源位置情報を取得する位置取得部と、を有する資源情報生成装置と、資源情報と資源位置情報とを、資源情報生成装置が資源情報を生成した日時を示す日時情報と対応づけて記憶する拠点資源記憶部と、日時情報に基づいて、資源情報と資源位置情報とを更新する第1更新部と、第1更新部により拠点資源記憶部が記憶する資源情報と資源位置情報とが更新されたか否かを示すフラグ情報を記憶するフラグ記憶部と、を有する拠点資源管理装置と、複数の拠点それぞれに配置された複数の資源それぞれについて生成された資源情報と資源位置情報とを記憶する複数拠点資源記憶部と、複数の拠点それぞれに対応する拠点資源管理装置のフラグ記憶部が記憶するフラグ情報に基づいて、拠点資源記憶部が記憶する資源情報と資源位置情報とが更新された拠点を特定する特定部と、特定部により特定された拠点に対応する拠点資源管理装置が有する拠点資源記憶部から、第1更新部により更新された資源情報と資源位置情報とを取得する取得部と、取得部が取得した資源情報と資源位置情報とを用いて、複数拠点資源記憶部が記憶する資源情報を更新する第2更新部と、を有する複数拠点資源管理装置と、第2更新部により更新された複数拠点資源記憶部が記憶する資源情報と資源位置情報とを用いて、サプライチェーンモデルを生成するモデル生成部を有するモデル生成装置と、を備える。
 本発明によれば、複数拠点資源管理装置が、複数の拠点それぞれに対応する拠点資源管理装置のフラグ情報に基づいて、資源情報と資源位置情報とが更新された拠点を特定し、特定した拠点に対応する拠点資源記憶部から、更新された資源情報と資源位置情報とを取得する。また、複数拠点資源管理装置は、取得した資源情報と資源位置情報とを用いて、複数拠点資源記憶部が記憶する資源情報と資源位置情報とを更新する。そして、モデル生成装置は、複数拠点資源記憶部が記憶する資源情報と資源位置情報とを用いて、サプライチェーンモデルを生成する。これにより、拠点資源記憶部が記憶する資源情報と資源位置情報とが更新される毎に、それに追従して複数拠点資源記憶部が記憶する資源情報と資源位置情報とも更新される。従って、サプライチェーンの構成要素である資源に関する資源情報と資源位置情報との変化に追従して、複数拠点資源記憶部が記憶する資源情報および資源位置情報も更新されるので、サプライチェーンの実態に即したサプライチェーンモデルが生成されるという利点がある。
本発明の実施の形態に係るサプライチェーン生成システムの概略構成図 実施の形態に係る装置情報生成装置の構成を示すブロック図 実施の形態に係る処理内容データベースの内容を示す図 実施の形態に係るリードタイムデータベースの内容を示す図 実施の形態に係るサイクルタイムデータベースの内容を示す図 実施の形態に係る作業者情報生成装置の構成を示すブロック図 実施の形態に係る作業内容データベースの内容を示す図 実施の形態に係る作業準備時間データベースの内容を示す図 実施の形態に係る作業時間データベースの内容を示す図 実施の形態に係るサプライヤ情報生成装置の構成を示すブロック図 実施の形態に係る部品・材料データベースの内容を示す図 実施の形態に係る納期データベースの内容を示す図 実施の形態に係る供給能力データベースの内容を示す図 実施の形態に係る搬送情報生成装置の構成を示すブロック図 実施の形態に係る搬送物データベースの内容を示す図 実施の形態に係る搬送時間データベースの内容を示す図 実施の形態に係る搬送量データベースの内容を示す図 実施の形態に係る輸送情報生成装置の構成を示すブロック図 実施の形態に係る輸送物データベースの内容を示す図 実施の形態に係る輸送時間データベースの内容を示す図 実施の形態に係る輸送量データベースの内容を示す図 実施の形態に係る拠点Aに対応するローカル資源管理装置の構成を示すブロック図 実施の形態に係る拠点Bに対応するローカル資源管理装置の構成を示すブロック図 実施の形態に係る拠点Aに対応するローカルデータベースの内容を示す図 実施の形態に係る拠点Bに対応するローカルデータベースの内容を示す図 実施の形態に係るグローバル資源管理装置の構成を示すブロック図 実施の形態に係るグローバルデータベースの内容を示す図 実施の形態に係るモデル生成装置の構成を示すブロック図 実施の形態に係るサプライチェーンモデル生成システムの動作を示すシーケンス図 実施の形態に係るサプライチェーンモデル生成システムの動作を示すシーケンス図 実施の形態に係る装置情報生成装置、作業者情報生成装置、サプライヤ情報生成装置、搬送情報生成装置および輸送情報生成装置が実行する資源情報生成処理の流れの一例を示すフローチャート 実施の形態に係るローカル資源管理装置が実行するローカルデータベース更新処理の流れの一例を示すフローチャート 実施の形態に係るグローバル資源管理装置が実行するグローバルデータベース更新処理の流れの一例を示すフローチャート 実施の形態に係るモデル生成装置が実行するモデル生成処理の流れの一例を示すフローチャート 変形例に係るグローバル資源管理装置の構成を示すブロック図 変形例に係るグローバル資源管理装置が実行するグローバルデータベース更新処理の流れの一例を示すフローチャート 変形例に係るローカル資源管理装置の構成を示すブロック図 変形例に係るローカル資源管理装置が実行するローカルデータベース更新処理の流れの一例を示すフローチャート 変形例に係るモデル生成装置の構成を示すブロック図 変形例に係る所要時間算出装置の構成を示すブロック図 変形例に係る実績データベースの内容を示す図 変形例に係る所要時間データベースの内容を示す図 変形例に係るサプライチェーンモデル生成システムの動作の一部を示すシーケンス図 変形例に係るモデル生成装置が実行するモデル生成処理の流れの一例を示すフローチャート 変形例に係る所要時間算出装置が実行する平均所要時間・経路安定性指標値算出処理の流れの一例を示すフローチャート 変形例に係る所要時間算出装置が実行する所要時間提示処理の流れの一例を示すフローチャート
 以下、本発明の一実施の形態に係るサプライチェーンモデル生成システムについて図面を参照して詳細に説明する。本実施の形態に係るサプライチェーンモデル生成システムは、複数の拠点それぞれに配置された、部品または材料の処理、拠点内搬送或いは他の拠点への輸送を実行する複数の資源を使用した製品の生産に最適なサプライチェーンをモデル化したサプライチェーンモデルを生成するシステムである。このサプライチェーンモデル生成システムは、ローカル資源管理装置とグローバル資源管理装置とを備える。ローカル資源管理装置は、複数の拠点それぞれおける資源に関する資源情報を管理する拠点資源管理装置である。グローバル資源管理装置は、複数の拠点全体における資源に関する資源情報を管理する複数拠点資源管理装置である。そして、グローバル資源管理装置は、ローカル資源管理装置が管理する資源情報が更新されると、資源情報が更新された拠点を特定し、特定した拠点の資源情報の更新に追従して、グローバル資源管理装置が管理する複数の拠点全体の資源情報を更新する。このようにして、グローバル資源管理装置が管理する複数の拠点全体の資源情報が、製品のサプライチェーンの実態に即した形で維持される。
 本実施の形態に係るサプライチェーン生成システムは、図1に示すように、製品を製造する2つの拠点A、Bに亘って配置される。拠点Aは、例えば日本国内に位置する工場であり、拠点Bは、例えば海外に位置する工場である。拠点Aには、資源情報生成装置として、生産装置51に関する生産装置情報を生成する装置情報生成装置5と、作業者に関する作業者情報を生成する作業者情報生成装置6と、サプライヤに関するサプライヤ情報を生成するサプライヤ情報生成装置7と、拠点A内で移動する搬送装置84に関する搬送情報を生成する搬送情報生成装置8と、が配置されている。また、拠点Bには、資源情報生成装置として、拠点Bから拠点Aへ部品または材料を輸送するための輸送手段に関する輸送情報を生成する輸送情報生成装置2008が、配置されている。装置情報生成装置5には、例えばPLC(Programmable Logic Controller)51aを備える生産装置51が接続されている。作業者情報生成装置6には、拠点Aで作業を行う作業者が作業記録を作業者情報生成装置6へ入力するための端末装置61が接続されている。サプライヤ情報生成装置7には、拠点Aに供給される部品または材料を管理する購買部門に属するユーザが部品または材料の手配書に関する情報をサプライヤ情報生成装置7へ入力するための端末装置71が接続されている。搬送情報生成装置8には、拠点A内で移動する搬送装置84を制御する搬送制御装置81が接続されている。輸送情報生成装置2008には、拠点Bにおいて拠点Aへの部品または材料の供給を管理する生産管理部門に属するユーザが輸送業者の種類および輸送日程の記録を示す情報を輸送情報生成装置2008へ入力するための端末装置2081が接続されている。
 また、拠点Aには、拠点Aに配置された生産装置51、作業者および搬送装置84または拠点Aへ部品または材料を供給するサプライヤのような拠点Aの複数種類の資源に関する資源情報を管理するローカル資源管理装置3が配置されている。拠点Bには、拠点Bから拠点Aへの輸送手段のような拠点Bの資源に関する資源情報を管理するローカル資源管理装置2003が配置されている。更に、拠点Aには、拠点A、B全体についての資源情報を管理するグローバル資源管理装置2が配置されている。そして、拠点Aには、拠点A、Bで製造される部品または材料を用いて製造される製品のサプライチェーンについての最適なモデルを生成するモデル生成装置1が配置されている。ローカル資源管理装置3、2003は、例えば各拠点A、Bの製造部門に配置され、グローバル資源管理装置2およびモデル生成装置1は、例えば拠点Aの生産管理部門に配置される。装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8、ローカル資源管理装置3、グローバル資源管理装置2およびモデル生成装置1は、拠点Aに敷設されたネットワークNT1に接続されている。また、輸送情報生成装置2008およびローカル資源管理装置2003は、拠点Bに敷設されたネットワークNT2に接続されている。ネットワークNT1、NT2は、例えばイーサネット(登録商標)規格に適合したLAN(Local Area Network)である。更に、拠点AのネットワークNT1と拠点BのネットワークNT2とは、それぞれファイアウオール装置10、2010を介して広域ネットワークWNTに接続されている。装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8、ローカル資源管理装置3、2003、グローバル資源管理装置2およびモデル生成装置1には、それぞれIPアドレスが設定されている。このIPアドレスには、例えばIPv6規格に基づく固定グローバルIPアドレスが採用されてもよい。ファイアウオール装置10、2010は、例えば3G、4G規格に適合した通信方式により広域ネットワークを介して互いに通信する。
 装置情報生成装置5は、例えば汎用のパーソナルコンピュータから構成され、図2に示すように、CPU(Central Processing Unit)501と、主記憶部502と、補助記憶部503と、装置通信部505と、ネットワーク通信部506と、これらを相互に接続するバス509と、を備える。主記憶部502は、揮発性メモリから構成され、CPU501の作業領域として用いられる。補助記憶部503は、磁気ディスク、半導体フラッシュメモリ等の不揮発性メモリから構成され、装置情報生成装置5の各種機能を実現するためのプログラムを記憶する。装置通信部505は、生産装置51のPLC51aから各種装置パラメータが入力されると、それに応じた情報を生成してCPU501へ通知する。また、装置通信部505には、生産装置51に取り付けられたタグ53と通信することにより生産装置51の位置を測定する測位装置52が接続されている。そして、装置通信部505は、測位装置52から入力される生産装置51の位置を示す位置情報をCPU501へ通知する。ネットワーク通信部506は、拠点A内に敷設されたネットワークNT1に接続されている。なお、装置情報生成装置5は、1つの生産装置51に対して1つ設けられ、その1つの生産装置51のみの装置情報を生成するものであってもよい。或いは、装置情報生成装置5が、複数の生産装置51に対して1つ設けられ、それら複数の生産装置51それぞれの装置情報を生成するものであってもよい。
 CPU501は、補助記憶部503が記憶するプログラムを主記憶部502に読み出して実行することにより、装置情報生成部511、位置取得部512および送信部513として機能する。また、補助記憶部103は、生産装置51で実行される処理の内容を示す情報を記憶する処理内容データベース(以下、「DB」と称する。)531と、生産装置51のリードタイムを示す情報を記憶するリードタイムDB532と、生産装置51のサイクルタイムを示す情報を記憶するサイクルタイムDB533とを有する。処理内容DB531は、例えば図3Aに示すように、記録日時情報と投入部品・材料識別情報と排出加工品識別情報とを、生産装置51を識別する装置識別情報に対応づけて記憶する。ここで、記録日時情報は、生産装置51に関する各種情報が記録された日時を示す情報である。投入部品・材料識別情報は、生産装置51へ投入される部品または材料を識別する情報である。排出加工品識別情報は、生産装置51から排出される加工品を識別する情報である。リードタイムDB532は、例えば図3Bに示すように、生産装置51により加工を行う前の段取りに要する加工前段取り時間を示す情報と、生産装置51により加工を行った後の段取りに要する加工後段取り時間を示す情報とを、装置識別情報に対応づけて記憶する。サイクルタイムDB533は、例えば図3Cに示すように、生産装置51のサイクルタイム、即ち、生産装置51による加工時間を示す情報を、装置識別情報に対応づけて記憶する。加工前段取り時間を示す情報、加工後段取り時間を示す情報および加工時間を示す情報は、生産装置51という資源による処理に要する処理時間を示す処理時間情報に相当する。
 図2に戻って、装置情報生成部511は、資源情報生成部であり、生産装置51のPLC51aから入力される各種装置パラメータを用いて、装置識別情報、投入部品・材料識別情報、排出加工品識別情報、加工前段取り時間を示す情報、加工後段取り時間を示す情報、加工時間を示す情報の各種資源情報を生成する。また、装置情報生成部511は、前述の各種資源情報を生成した日時に基づいて、記録日時情報を生成する。そして、装置情報生成部511は、生成した各種資源情報を用いて、処理内容DB531、リードタイムDB532およびサイクルタイムDB533それぞれの内容を更新する。位置取得部512は、測位装置52から装置通信部505を介して生産装置51の位置情報を取得する。送信部513は、処理内容DB531、リードタイムDB532およびサイクルタイムDB533から各種資源情報を取得する。そして、送信部513は、取得した各種資源情報と、位置取得部512が取得した生産装置51の位置情報とを含むパケットを生成してローカル資源管理装置3へ送信する。
 作業者情報生成装置6は、図4に示すように、装置情報生成装置5と同様に、CPU601、主記憶部602、補助記憶部603、装置通信部605、ネットワーク通信部606およびバス609を備える。補助記憶部603は、作業者情報生成装置6の各種機能を実現するためのプログラムを記憶する。装置通信部605は、端末装置61から作業者の作業記録を示す情報が入力されると、それに応じた情報を生成してCPU601へ通知する。また、装置通信部605には、作業者が保持するタグ63と通信することにより作業者の位置を測定する測位装置62が接続されている。そして、装置通信部605は、測位装置62から入力される作業者の位置座標を示す位置情報、即ち、資源位置情報をCPU601へ通知する。ネットワーク通信部606は、拠点A内に敷設されたネットワークNT1に接続されている。なお、作業者情報生成装置6は、1人の作業者に対して1つ設けられ、その1人の作業者のみの作業者情報を生成するものであってもよい。或いは、作業者情報生成装置6が、複数人の作業者に対して1つ設けられ、それら複数人の作業者それぞれの作業者情報を生成するものであってもよい。
 CPU601は、補助記憶部603が記憶するプログラムを主記憶部602に読み出して実行することにより、作業者情報生成部611、位置取得部612および送信部613として機能する。また、補助記憶部603は、作業者が行う作業の内容を示す情報を記憶する作業内容DB631と、作業者が作業準備に要する時間を示す情報を記憶する作業準備時間DB632と、作業者の作業時間を示す情報を記憶する作業時間DB633とを有する。作業内容DB631は、例えば図5Aに示すように、記録日時情報と受け入れ部品・材料識別情報と完了加工品識別情報とを、作業者を識別する作業者識別情報に対応づけて記憶する。ここで、記録日時情報は、作業者に関する各種情報が記録された日時を示す情報である。受け入れ部品・材料識別情報は、作業者が受け入れた部品または材料を識別する情報である。完了加工品識別情報は、作業者が作業を完了して得られる加工品を識別する情報である。作業準備時間DB632は、例えば図5Bに示すように、作業者が作業を行う前の準備に要する作業準備時間を示す情報と、作業者が作業完了後片付けを行うのに要する片付け時間を示す情報とを、作業者識別情報に対応づけて記憶する。作業時間DB633は、例えば図5Cに示すように、作業者の作業時間を示す情報を、作業者識別情報に対応づけて記憶する。作業準備時間を示す情報、片付け時間を示す情報および作業時間を示す情報は、作業者という資源による処理に要する処理時間を示す処理時間情報に相当する。
 図4に戻って、作業者情報生成部611は、資源情報生成部であり、端末装置61から入力される作業者の作業記録を示す情報を用いて、作業者識別情報、受け入れ部品・材料識別情報、完了加工品識別情報、作業準備時間を示す情報、片付け時間を示す情報、作業時間を示す情報の各種資源情報を生成する。また、作業者情報生成部611は、各種資源情報を生成した日時に基づいて、記録日時情報を生成する。そして、作業者情報生成部611は、生成した各種資源情報を用いて、作業内容DB631、作業準備時間DB632および作業時間DB633それぞれの内容を更新する。位置取得部612は、測位装置62から装置通信部605を介して作業者の位置情報を取得する。送信部613は、作業内容DB631、作業準備時間DB632および作業時間DB633から各種資源情報を取得する。そして、送信部613は、取得した各種資源情報と、位置取得部612が取得した作業者の位置情報とを含むパケットを生成してローカル資源管理装置3へ送信する。
 サプライヤ情報生成装置7は、図6に示すように、装置情報生成装置5と同様に、CPU701、主記憶部702、補助記憶部703、装置通信部705、ネットワーク通信部706およびバス709を備える。補助記憶部703は、サプライヤ情報生成装置7の各種機能を実現するためのプログラムを記憶する。装置通信部705は、端末装置71からサプライヤへ部品または材料を手配した記録を示す情報が入力されると、それに応じた情報を生成してCPU701へ通知する。ネットワーク通信部706は、拠点A内に敷設されたネットワークNT1に接続されている。なお、サプライヤ情報生成装置7は、1つのサプライヤに対して1つ設けられ、その1つのサプライヤのみのサプライヤ情報を生成するものであってもよい。或いは、サプライヤ情報生成装置7が、複数のサプライヤに対して1つ設けられ、それら複数のサプライヤそれぞれのサプライヤ情報を生成するものであってもよい。
 CPU701は、補助記憶部703が記憶するプログラムを主記憶部702に読み込んで実行することにより、サプライヤ情報生成部711、位置取得部712および送信部713として機能する。また、補助記憶部703は、サプライヤから納品される部品に関する情報を記憶する部品・材料DB731と、サプライヤの納期に関する情報を記憶する納期DB732と、サプライヤから拠点Aへの部品または材料の供給能力を示す情報を記憶する供給能力DB733とを有する。部品・材料DB731は、例えば図7Aに示すように、記録日時情報と手配書識別情報と納品物識別情報とを、サプライヤを識別するサプライヤ識別情報に対応づけて記憶する。ここで、記録日時情報は、サプライヤに関する各種情報が記録された日時を示す情報である。手配書識別情報は、サプライヤに部品または材料を手配させるための手配書を識別する情報である。納品物識別情報は、サプライヤから拠点Aへ納品される部品または材料を識別する情報である。納期DB732は、例えば図7Bに示すように、製造前準備時間を示す情報と製造時間を示す情報と製造後納品時間を示す情報とを、サプライヤ識別情報に対応づけて記憶する。ここで、製造前準備時間は、サプライヤへ手配書が届いてから手配書に係る部品または材料の製造を開始するまでの準備に要する時間に相当する。製造時間は、サプライヤにおいて手配書に係る部品または材料を製造するのに要する時間に相当する。製造後納品時間はと、サプライヤにおいて手配書に係る部品または材料を製造した後、拠点Aへ製造した部品または材料を納品するまでの時間に相当する。供給能力DB733は、例えば図7Cに示すように、サプライヤから拠点Aへの部品または材料の供給可能数を示す情報を、サプライヤ識別情報に対応づけて記憶する。製造前準備時間を示す情報、製造時間を示す情報および製造後納品時間を示す情報は、サプライヤという資源による処理に要する処理時間を示す処理時間情報に相当する。
 図6に戻って、サプライヤ情報生成部711は、資源情報生成部であり、端末装置71から入力されるサプライヤへ部品または材料を手配した記録を示す情報を用いて、サプライヤ識別情報、手配書識別情報、納品物識別情報、製造前準備時間を示す情報、製造時間を示す情報、製造後納品時間を示す情報および供給可能数を示す情報の各種資源情報を生成する。また、サプライヤ情報生成部711は、各種情報を生成した日時に基づいて、記録日時情報を生成する。そして、サプライヤ情報生成部711は、生成した各種資源情報を用いて、部品・材料DB731、納期DB732および供給能力DB733それぞれの内容を更新する。位置取得部712は、例えばサプライヤが保有するサーバから広域ネットワークWNT、ネットワークNT1およびネットワーク通信部706を介してサプライヤの位置情報を取得する。送信部713は、部品・材料DB731、納期DB732および供給能力DB733から各種資源情報を取得する。そして、送信部713は、取得した各種資源情報と、位置取得部712が取得したサプライヤの位置情報とを含むパケットを生成してローカル資源管理装置3へ送信する。
 搬送情報生成装置8は、図8に示すように、装置情報生成装置5と同様に、CPU801、主記憶部802、補助記憶部803、装置通信部805、ネットワーク通信部806およびバス809を備える。補助記憶部803は、搬送情報生成装置8の各種機能を実現するためのプログラムを記憶する。装置通信部805は、搬送制御装置81から搬送装置84に関する情報が入力されると、それに応じた情報を生成してCPU801へ通知する。また、装置通信部805には、搬送装置84に内蔵されたタグ83と通信することにより搬送装置84の位置座標を測定する測位装置82が接続されている。そして、装置通信部805は、測位装置82から入力される搬送装置84の位置座標を示す位置情報、即ち、資源位置情報をCPU801へ通知する。ネットワーク通信部806は、拠点A内に敷設されたネットワークNT1に接続されている。なお、搬送情報生成装置8は、1つの搬送装置84に対して1つ設けられ、その1つの搬送装置84のみの搬送情報を生成するものであってもよい。或いは、搬送情報生成装置8が、複数の搬送装置84に対して1つ設けられ、それら複数の搬送装置84それぞれの搬送情報を生成するものであってもよい。
 CPU801は、補助記憶部803が記憶するプログラムを主記憶部802に読み出して実行することにより、搬送情報生成部811、位置取得部812および送信部813として機能する。また、補助記憶部803は、搬送装置84が搬送する搬送物に関する情報を記憶する搬送物DB831と、搬送装置84による搬送時間に関する情報を記憶する搬送時間DB832と、搬送装置84の搬送量に関する情報を記憶する搬送量DB833とを有する。搬送物DB831は、例えば図9Aに示すように、記録日時情報と搬送前搬送物識別情報と搬送後搬送物識別情報とを、搬送装置84を識別する搬送装置識別情報に対応づけて記憶する。ここで、記録日時情報は、搬送装置84に関する各種情報が記録された日時を示す情報である。搬送前搬送物識別情報は、搬送前の搬送物を識別する情報である。搬送後搬送物識別情報は、搬送後の搬送物を識別する情報である。ここで、搬送前搬送物識別情報と搬送後搬送物識別情報とは、例えば搬送前の梱包されていない状態の部品と、搬送後の梱包された状態の部品とを区別して識別できるように設定されている。搬送時間DB832は、例えば図9Bに示すように、搬送物を搬送する前に行う段取りに要する搬送前段取り時間を示す情報と、搬送物の搬送時間を示す情報と、搬送物を搬送した後に行う段取りに要する搬送後段取り時間を示す情報とを、搬送装置識別情報に対応づけて記憶する。搬送量DB833は、例えば図9Cに示すように、搬送装置84が一回の搬送で搬送可能な量を示す搬送可能量を示す情報を、搬送装置識別情報に対応づけて記憶する。搬送前段取り時間を示す情報、搬送時間を示す情報および搬送後段取り時間を示す情報は、搬送装置84という資源による拠点A内搬送に要する搬送時間を示す搬送時間情報に相当する。
 図8に戻って、搬送情報生成部811は、資源情報生成部であり、搬送制御装置81から入力される搬送装置84に設定された各種パラメータを示すパラメータ情報を用いて、搬送装置識別情報、搬送前搬送物識別情報、搬送後搬送物識別情報、搬送前段取り時間を示す情報、搬送時間を示す情報、搬送後段取り時間を示す情報の各種資源情報を生成する。また、搬送情報生成部811は、各種情報を生成した日時に基づいて、記録日時情報を生成する。そして、搬送情報生成部811は、生成した各種資源情報を用いて、搬送物DB831、搬送時間DB832および搬送量DB833それぞれの内容を更新する。位置取得部812は、測位装置82から装置通信部805を介して搬送装置84の位置情報を取得する。送信部813は、搬送物DB831、搬送時間DB832および搬送量DB833から各種資源情報を取得する。そして、送信部813は、取得した各種資源情報と、位置取得部812が取得した搬送装置84の位置情報とを含むパケットを生成してローカル資源管理装置3へ送信する。
 輸送情報生成装置2008は、図10に示すように、装置情報生成装置5と同様に、CPU2801、主記憶部2802、補助記憶部2803、装置通信部2805、ネットワーク通信部2806およびバス2809を備える。補助記憶部2803は、輸送情報生成装置2008の各種機能を実現するためのプログラムを記憶する。装置通信部2805は、端末装置2081から拠点Bから拠点Aへの部品または材料の輸送を行う輸送業者の種類およびその輸送日程の記録を示す情報が入力されると、それに応じた情報を生成してCPU2801へ通知する。ネットワーク通信部2806は、拠点B内に敷設されたネットワークNT2に接続されている。なお、輸送情報生成装置2008は、1つの輸送手段に対して1つ設けられ、その1つの輸送手段のみの輸送情報を生成するものであってもよい。或いは、輸送情報生成装置2008が、複数の輸送手段に対して1つ設けられ、それら複数の輸送手段それぞれの搬送情報を生成するものであってもよい。
 CPU2801は、補助記憶部2803が記憶するプログラムを主記憶部2802に読み込んで実行することにより、輸送情報生成部2811、位置取得部2812および送信部2813として機能する。また、補助記憶部2803は、拠点Bから拠点Aへ輸送する輸送物に関する情報を記憶する輸送物DB2831と、輸送手段による輸送時間に関する情報を記憶する輸送時間DB2832と、輸送手段の輸送量に関する情報を記憶する輸送量DB2833とを有する。輸送物DB2831は、例えば図11Aに示すように、記録日時情報と輸送前輸送物識別情報と輸送後輸送物識別情報とを、輸送手段を識別する輸送手段識別情報に対応づけて記憶する。ここで、記録日時情報は、輸送手段に関する各種情報が記録された日時を示す情報である。輸送前輸送物識別情報は、輸送前の輸送物を識別する情報である。輸送後輸送物識別情報は、輸送後の輸送物を識別する情報である。ここで、輸送前輸送物識別情報と輸送後輸送物識別情報とは、例えば輸送前の梱包されていない状態の部品と、輸送後の梱包された状態の部品とを区別して識別できるように設定されている。輸送時間DB2832は、例えば図11Bに示すように、輸送物を輸送する前に行う段取りに要する輸送前段取り時間を示す情報と、輸送物の輸送時間を示す情報と、輸送物を輸送した後に行う段取りに要する輸送後段取り時間を示す情報とを、輸送手段識別情報に対応づけて記憶する。輸送量DB2833は、例えば図11Cに示すように、輸送手段が一回の輸送で輸送可能な量を示す輸送可能量を示す情報を、輸送手段識別情報に対応づけて記憶する。輸送前段取り時間を示す情報、輸送時間を示す情報および輸送後段取り時間を示す情報は、輸送手段という資源による拠点Aから拠点Bへの輸送に要する輸送時間を示す輸送時間情報に相当する。
 図10に戻って、輸送情報生成部2811は、資源情報生成部であり、端末装置2081から入力される輸送業者の種類および輸送日程の記録を示す情報を用いて、輸送手段識別情報、輸送前輸送物識別情報、輸送後輸送物識別情報、輸送前段取り時間を示す情報、輸送時間を示す情報、輸送後段取り時間を示す情報および輸送可能量を示す情報の各種資源情報を生成する。また、輸送情報生成部2811は、各種資源情報を生成した日時に基づいて、記録日時情報を生成する。そして、輸送情報生成部2811は、生成した各種資源情報を用いて、輸送物DB2831、輸送時間DB2832および輸送量DB2833それぞれの内容を更新する。位置取得部2812は、例えば輸送手段に設けられた端末装置(図示せず)から広域ネットワークWNT、ネットワークNT2およびネットワーク通信部2806を介して輸送手段の位置座標を示す位置情報、即ち、資源位置情報を取得する。送信部2813は、輸送物DB2831、輸送時間DB2832および輸送量DB2833から各種資源情報を取得する。そして、送信部2813は、取得した各種資源情報と、位置取得部2812が取得した輸送手段の位置情報とを含むパケットを生成してローカル資源管理装置2003へ送信する。
 ローカル資源管理装置3は、例えば汎用のパーソナルコンピュータから構成され、図12Aに示すように、CPU301と、主記憶部302と、補助記憶部303と、ネットワーク通信部306と、これらを相互に接続するバス309と、を備える。補助記憶部303は、ローカル資源管理装置3の各種機能を実現するためのプログラムを記憶する。ネットワーク通信部306は、拠点Aに敷設されたネットワークNT1に接続されている。
 CPU301は、補助記憶部303が記憶するプログラムを主記憶部302に読み出して実行することにより、取得部311、第1更新部312、フラグ設定部313および送信部314として機能する。また、補助記憶部303は、拠点Aの複数の資源に関する情報を一括して記憶するローカルDB331と、フラグDB332と、を有する。
 ローカルDB331は、例えば図13Aに示すように、記録日時情報とインプット識別情報とアウトプット識別情報と動作前処理時間を示す情報と動作後処理時間を示す情報と動作時間を示す情報と処理数を示す情報とを、拠点Aの資源を識別する資源識別情報に対応づけて記憶する。ここで、資源識別情報は、前述の装置識別情報、作業者識別情報、サプライヤ識別情報および搬送装置識別情報のいずれかに相当する。インプット識別情報は、資源へ投入される投入物を示す投入物情報であり、前述の投入部品・材料識別情報、受け入れ部品・材料識別情報、手配書識別情報および搬送前搬送物識別情報のいずれかに相当する。アウトプット識別情報は、資源から排出される排出物を示す排出物情報であり、前述の排出加工品識別情報、完了加工品識別情報、納品物識別情報および搬送後搬送物識別情報のいずれかに相当する。動作前処理時間を示す情報は、前述の加工前段取り時間、作業準備時間、製造前準備時間および搬送前段取り時間のいずれかを示す情報に相当する。動作後処理時間を示す情報は、前述の加工後段取り時間、片付け時間、製造後納品時間および搬送後段取り時間のいずれかを示す情報に相当する。動作時間を示す情報は、前述のサイクル時間、作業時間、製造時間および搬送時間のいずれかを示す情報に相当する。処理数を示す情報は、資源による処理可能数を示す処理数情報または資源による搬送可能数を示す搬送数情報に相当する。また、ローカルDB331は、拠点Aの各資源の位置を示す位置情報を、資源識別情報に対応付けて記憶する。フラグDB332は、ローカルDB331が更新されたか否かを示すフラグ情報を記憶するフラグ記憶部である。
 図12Aに戻って、取得部311は、装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7および搬送情報生成装置8それぞれからネットワークNT1を通じて各種資源情報を取得する。第1更新部312は、取得部311により取得された各種資源情報を用いて、ローカルDB331を更新する。ここで、第1更新部312は、新たに取得した各種資源情報の中の資源識別情報と同じ資源識別情報に対応する各種資源情報が既にローカルDB331が記憶されているか否かを判定する。そして、第1更新部312は、新たに取得した各種資源情報と資源識別情報が一致する各種資源情報が記憶されている場合、両者の資源識別情報に対応する記録日時情報を比較し、記録日時情報が示す記録日時が古いほうの資源情報をローカルDB331から削除する。
 フラグ設定部313は、第1更新部312によりローカルDB331が更新される毎に、フラグDB332が記憶するフラグをオンに設定する。また、フラグ設定部313は、ローカルDB331が更新された後、ローカルDB331が記憶する各種情報がグローバル資源管理装置2へ送信されると、フラグをオフに設定する。送信部314は、ローカルDB331が記憶する各種資源情報を、グローバル資源管理装置2へ送信する。
 ローカル資源管理装置2003は、図12Bに示すように、ローカル資源管理装置3と同様に、CPU2301と、主記憶部2302と、補助記憶部2303と、ネットワーク通信部2306と、これらを相互に接続するバス2309と、を備える。補助記憶部2303は、ローカル資源管理装置2003の各種機能を実現するためのプログラムを記憶する。ネットワーク通信部2306は、拠点Bに敷設されたネットワークNT2に接続されている。
 CPU2301は、補助記憶部2303が記憶するプログラムを主記憶部2302に読み出して実行することにより、取得部2311、第1更新部2312、フラグ設定部2313および送信部2314として機能する。また、補助記憶部2303は、拠点Bの複数の資源に関する情報を一括して記憶するローカルDB2331と、ローカルDB2331が更新されたか否かを示すフラグを記憶するフラグDB2332と、を有する。
 ローカルDB2331は、例えば図13Bに示すように、ローカルDB331と同様に、各種情報を、拠点Bの資源を識別する資源識別情報に対応づけて記憶する。ここで、資源識別情報には、前述の輸送手段識別情報が含まれる。インプット識別情報には、前述の輸送前輸送物識別情報が含まれる。アウトプット識別情報には、前述の輸送後輸送物識別情報が含まれる。動作前処理時間を示す情報には、前述の輸送前段取り時間を示す情報が含まれる。動作後処理時間を示す情報には、前述の輸送後段取り時間を示す情報が含まれる。動作時間を示す情報には、前述の輸送時間を示す情報が含まれる。処理数を示す情報は、資源による輸送可能数を示す輸送数情報に相当する。
 図12Bに戻って、取得部2311は、輸送情報生成装置2008からネットワークNT2を通じて各種資源情報を取得する。第1更新部2312は、取得部2311により取得された各種資源情報を用いて、ローカルDB2331を更新する。送信部2314は、ローカルDB2331が記憶する各種資源情報を、グローバル資源管理装置2へ送信する。フラグ設定部2313は、第1更新部2312によりローカルDB2331が更新される毎に、フラグDB2332が記憶するフラグをオンに設定する。また、フラグ設定部2313は、ローカルDB2331が更新された後、ローカルDB2331が記憶する各種情報が広域ネットワークWNTを介してグローバル資源管理装置2へ送信されると、フラグをオフに設定する。
 グローバル資源管理装置2は、例えば汎用のパーソナルコンピュータから構成され、図14に示すように、CPU201と、主記憶部202と、補助記憶部203と、ネットワーク通信部206と、これらを相互に接続するバス209と、を備える。補助記憶部203は、グローバル資源管理装置2の各種機能を実現するためのプログラムを記憶する。ネットワーク通信部206は、拠点Aに敷設されたネットワークNT1に接続されている。
 CPU201は、補助記憶部203が記憶するプログラムを主記憶部202に読み出して実行することにより、特定部211、取得部212および第2更新部213として機能する。また、補助記憶部203は、グローバルDB231と、各拠点のローカル資源管理装置3、2003の拠点識別情報のリストを記憶するローカルリストDB232と、を有する。グローバルDB231は、拠点A、Bそれぞれに配置された複数の資源それぞれについて生成された各種資源情報と位置情報、即ち、資源位置情報とを記憶する複数拠点資源記憶部である。グローバルDB231は、例えば図15に示すように、ローカル資源管理装置3、2003から取得した、記録日時情報とインプット識別情報とアウトプット識別情報と動作前処理時間を示す情報と動作後処理時間を示す情報と動作時間を示す情報と処理数を示す情報と資源の位置情報とを、資源を識別する資源識別情報に対応づけて記憶する。ローカルリストDB232は、拠点A、Bに対応するローカルDB331、2331の内容が更新されたか否かを示すフラグ情報を、拠点A、Bの拠点識別情報に対応づけて記憶している。
 図14に戻って、特定部211は、拠点A、Bそれぞれに対応するローカル資源管理装置3、2003のフラグDB332、2332が記憶するフラグ情報に基づいて、ローカルDB331、2331が記憶する各種資源情報が更新された拠点を特定する。特定部211は、拠点A、Bそれぞれに対応するローカル資源管理装置3、2003のフラグDB332、2332から定期的にフラグ情報を取得することにより、フラグDB332、2332が記憶するフラグ情報をチェックする。
 取得部212は、特定部211により特定された拠点A、Bに対応するローカル資源管理装置3、2003が有するローカルDB331、2331から、第1更新部312、2312により更新された各種資源情報と位置情報とを取得する。取得部212は、特定部211により特定された拠点A、Bに対応するローカル資源管理装置3、2003へ、更新後の各種資源情報を送信するよう要求する送信要求情報を含むパケットを生成して送信する。そして、取得部212は、送信要求情報の送信先のローカル資源管理装置3、2003から更新後の各種資源情報を含むパケットを受信すると、そのパケットに含まれる各種資源情報を抽出する。第2更新部213は、取得部212が取得した各種資源情報と位置情報とを用いて、グローバルDB231が記憶する各種資源情報を更新する。
 モデル生成装置1は、例えば汎用のパーソナルコンピュータから構成され、図16に示すように、CPU101と、主記憶部102と、補助記憶部103と、ユーザインタフェース104と、ネットワーク通信部106と、これらを相互に接続するバス109と、を備える。補助記憶部103は、モデル生成装置1の各種機能を実現するためのプログラムを記憶する。ユーザインタフェース104は、例えばキーボード、タッチパネル等のような入力部と液晶ディスプレイのような表示部とを有する。ネットワーク通信部106は、拠点Aに敷設されたネットワークNT1に接続されている。
 CPU101は、補助記憶部103が記憶するプログラムを主記憶部102に読み出して実行することにより、サプライチェーンモデルの生成要求を受け付ける受付部111、選択部112およびモデル生成部113として機能する。また、補助記憶部103は、グローバルDB231から選択した資源に関する各種資源情報を記憶する選択資源DB131と、生成されたサプライチェーンモデルを記憶するモデルDB132と、を有する。選択資源DB131は、受け付けたサプライチェーンモデル生成要求に対応するサプライチェーンを実現するために選択された複数の資源それぞれについての各種資源情報と位置情報とを記憶する。モデルDB132は、モデル生成部113により生成されたサプライチェーンモデルを示す情報を記憶する。
 受付部111は、例えば生産管理部門に属するユーザがユーザインタフェース104を介して入力したモデル生成要求情報を受け付ける。モデル生成要求情報には、対象となる最終製品を識別する識別情報と、対象となる最終製品の需要予測量を示す情報とが含まれている。選択部112は、受付部111が受け付けたモデル生成要求情報に基づいて、最適なサプライチェーンを実現するために必要な複数の資源の候補となる資源を選択する。ここで、選択部112は、まず、グローバルDB231が記憶する各種資源情報の送信を要求する送信要求情報をグローバル資源管理装置2へ送信することにより、グローバルDB231が記憶する各種資源情報を取得する。そして、選択部112は、モデル生成要求情報と取得した各種資源情報とに基づいて資源を選択する。そして、選択部112は、選択した資源に対応する各種資源情報を選択資源DB131に記憶させる。
 モデル生成部113は、選択部112により選択された複数の資源に対応する各種資源情報を用いて、対象となる最終製品を需要予測量だけ生産するのに最適なサプライチェーンモデルを生成する。ここで、モデル生成部113は、例えば線形計画法、逐次線形計画法、混合整数計画法等の最適化ツールを利用して、利益が最大となる最適なサプライチェーンモデルを生成する。そして、モデル生成部113は、生成したサプライチェーンモデルを示す情報をモデルDB132に記憶させる。
 次に、本実施の形態に係るサプライチェーンモデル生成システムの動作について図17および図18を参照しながら説明する。まず、装置情報生成装置5において処理内容DB531、リードタイムDB532またはサイクルタイムDB533が更新されると(ステップS1)、更新後の各種資源情報を含む生産装置情報が、装置情報生成装置5からローカル資源管理装置3へ送信される(ステップS2)。
 一方、ローカル資源管理装置3は、生産装置情報を受信すると、生産装置情報に含まれる各種資源情報を用いて、ローカルDB331を更新する(ステップS3)。続いて、ローカル資源管理装置3は、フラグDB332が記憶するフラグ情報をオンに設定する(ステップS4)。
 ここで、グローバル資源管理装置2によるローカル資源管理装置3、2003のフラグDB332、2332が記憶するフラグ情報をチェックする時期が到来したとする。この場合、フラグ情報が、ローカル資源管理装置3、2003からグローバル資源管理装置2へ送信される(ステップS5、S6)。一方、グローバル資源管理装置2は、受信したフラグ情報を、拠点A、Bの拠点識別情報に対応づけてローカルリストDB232に記憶させ、ローカルリストDB232が記憶するフラグ情報を検索してローカルDB331が更新された拠点Aを特定する(ステップS7)。その後、更新後のローカルDB331が記憶する各種資源情報の送信を要求する送信要求情報が、グローバル資源管理装置2から特定された拠点Aのローカル資源管理装置3へ送信される(ステップS8)。次に、ローカル資源管理装置3が、送信要求情報を受信すると、ローカルDB331が記憶する各種資源情報が、ローカル資源管理装置3からグローバル資源管理装置2へ送信される(ステップS9)。続いて、ローカル資源管理装置3は、フラグDB332が記憶するフラグ情報をオフに設定する(ステップS10)。一方、グローバル資源管理装置2は、ローカル資源管理装置3から各種資源情報を受信すると、受信した各種資源情報を用いて、グローバルDB231を更新する(ステップS11)。
 次に、作業者情報生成装置6において作業内容DB631、作業準備時間DB632または作業時間DB633が更新されると(ステップS12)、更新後の各種資源情報を含む作業者情報が、作業者情報生成装置6からローカル資源管理装置3へ送信される(ステップS13)。
 一方、ローカル資源管理装置3は、作業者情報を受信すると、作業者情報に含まれる各種資源情報を用いて、ローカルDB331を更新する(ステップS14)。続いて、ローカル資源管理装置3は、フラグDB332が記憶するフラグ情報をオンに設定する(ステップS15)。
 その後、サプライヤ情報生成装置7において部品・材料DB731、納期DB732または供給能力DB733が更新されると(ステップS16)、更新後の各種資源情報を含むサプライヤ情報が、サプライヤ情報生成装置7からローカル資源管理装置3へ送信される(ステップS17)。
 一方、ローカル資源管理装置3は、作業者情報を受信すると、作業者情報に含まれる各種資源情報を用いて、ローカルDB331を更新する(ステップS18)。このとき、ローカル資源管理装置3は、フラグDB332が記憶するフラグ情報をオンで維持する(ステップS19)。
 次に、搬送情報生成装置8において搬送物DB831、搬送時間DB832または搬送量DB833が更新されると(ステップS20)、更新後の各種資源情報を含む搬送装置情報が、搬送情報生成装置8からローカル資源管理装置3へ送信される(ステップS21)。
 一方、ローカル資源管理装置3は、搬送装置情報を受信すると、搬送装置情報に含まれる各種資源情報を用いて、ローカルDB331を更新する(ステップS22)。このとき、図18に示すように、ローカル資源管理装置3は、フラグDB332が記憶するフラグ情報をオンで維持する(ステップS23)。
 続いて、拠点Bの輸送情報生成装置2008において輸送物DB2831、輸送時間DB2832または輸送量DB2833が更新されると(ステップS24)、更新後の各種資源情報を含む輸送情報が、輸送情報生成装置2008から拠点Bのローカル資源管理装置2003へ送信される(ステップS25)。
 一方、ローカル資源管理装置2003は、輸送情報を受信すると、輸送情報に含まれる各種資源情報を用いて、ローカルDB2331を更新する(ステップS26)。その後、ローカル資源管理装置2003は、フラグDB2332が記憶するフラグ情報をオンに設定する(ステップS27)。
 ここで、グローバル資源管理装置2によりフラグ情報をチェックする時期が到来したとする。この場合、フラグ情報が、ローカル資源管理装置3、2003からグローバル資源管理装置2へ送信される(ステップS28、S29)。一方、グローバル資源管理装置2は、受信したフラグ情報に基づいて、ローカルDB331、2331が更新された拠点A、Bを特定する(ステップS30)。その後、送信要求情報が、グローバル資源管理装置2から特定された拠点A、Bのローカル資源管理装置3、2003へ送信される(ステップS31、S32)。その後、ローカル資源管理装置3が、送信要求情報を受信すると、ローカルDB331が記憶する各種資源情報が、ローカル資源管理装置3からグローバル資源管理装置2へ送信される(ステップS33)。次に、ローカル資源管理装置3は、フラグDB332が記憶するフラグ情報をオフに設定する(ステップS34)。また、ローカル資源管理装置2003が、送信要求情報を受信すると、ローカルDB2331が記憶する各種資源情報が、ローカル資源管理装置2003からグローバル資源管理装置2へ送信される(ステップS35)。続いて、ローカル資源管理装置2003は、フラグDB2332が記憶するフラグ情報をオフに設定する(ステップS36)。一方、グローバル資源管理装置2は、ローカル資源管理装置3、2003それぞれから各種資源情報を受信すると、受信した各種資源情報を用いて、グローバルDB231を更新する(ステップS37)。
 その後、モデル生成装置1が、サプライチェーンモデルの生成を要求するモデル生成要求を受け付けたとする(ステップS38)。この場合、最適なサプライチェーンを実現するために選択された複数の資源それぞれに対応する各種資源情報を要求する送信要求情報が、モデル生成装置1からグローバル資源管理装置2へ送信される(ステップS39)。一方、グローバル資源管理装置2が送信要求情報を受信すると、送信要求情報に対応する複数の資源それぞれに対応する各種資源情報が、グローバル資源管理装置2からモデル生成装置1へ送信される(ステップS40)。一方、モデル生成装置1は、各種資源情報を受信すると、受信した各種資源情報を用いて、サプライチェーンモデルを生成する(ステップS41)。
 このように、本実施の形態に係るサプライチェーンモデル生成システムでは、グローバル資源管理装置2が、フラグチェック時期が到来する毎に、各拠点A、Bに対応するローカル資源管理装置3、2003からフラグ情報を取得する。そして、グローバル資源管理装置2は、フラグ情報がオンに設定されている拠点のみから各種資源情報を取得する。これにより、グローバル資源管理装置2が、ローカルDB331、2331の内容が更新されていないにも関わらず、全てのローカルDB331、2331から各種資源情報を無駄に取得することを防止できる。従って、例えば拠点数が増加した場合であってもグローバル資源管理装置2の処理負荷の増大が抑制されるという利点がある。
 次に、本実施の形態に係る装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8および輸送情報生成装置2008それぞれが実行する資源情報生成処理について図19を参照しながら説明する。この資源情報生成処理は、例えば装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8および輸送情報生成装置2008へ電源が投入されたことを契機として開始される。
 まず、装置情報生成部511、作業者情報生成部611、サプライヤ情報生成部711、搬送情報生成部811または輸送情報生成部2811は、生産装置51、端末装置61、71、2081または搬送制御装置81から新たな情報の入力が有ったか否かを判定する(ステップS101)。装置情報生成部511、作業者情報生成部611、サプライヤ情報生成部711、搬送情報生成部811または輸送情報生成部2811により新たな情報の入力が無いと判定されると(ステップS101:No)、そのまま後述のステップS105の処理が実行される。
 一方、装置情報生成部511、作業者情報生成部611、サプライヤ情報生成部711、搬送情報生成部811または輸送情報生成部2811が、新たな情報の入力が有ったと判定したとする(ステップS101:Yes)。この場合、装置情報生成部511、作業者情報生成部611、サプライヤ情報生成部711、搬送情報生成部811または輸送情報生成部2811は、入力された情報を用いて各種資源情報を生成し、生成した各種資源情報を用いて各種DBを更新する(ステップS102)。
 ここで、装置情報生成部511は、生産装置51のPLC51aから入力される各種装置パラメータ情報を用いて、装置識別情報、投入部品・材料識別情報、排出加工品識別情報、加工前段取り時間を示す情報、加工後段取り時間を示す情報、加工時間を示す情報および記録日時情報を生成する。そして、装置情報生成部511は、生成した各種情報を、処理内容DB531、リードタイムDB532およびサイクルタイムDB533それぞれの内容を更新する。作業者情報生成部611は、端末装置61から入力される作業者の作業記録を示す情報を用いて、作業者識別情報、受け入れ部品・材料識別情報、完了加工品識別情報、作業準備時間を示す情報、片付け時間を示す情報、作業時間を示す情報および記録日時情報を生成する。そして、作業者情報生成部611は、生成した各種資源情報を用いて、作業内容DB631、作業準備時間DB632および作業時間DB633それぞれの内容を更新する。サプライヤ情報生成部711は、端末装置61から入力されるサプライヤへ部品または材料を手配した記録を示す情報を用いて、サプライヤ識別情報、手配書識別情報、納品物識別情報、製造前準備時間を示す情報、製造時間を示す情報、製造後納品時間を示す情報および供給可能数を示す情報および記録日時情報を生成する。そして、サプライヤ情報生成部711は、生成した各種資源情報を用いて、部品・材料DB731、納期DB732および供給能力DB733それぞれの内容を更新する。搬送情報生成部811は、搬送制御装置81から入力される搬送装置84に設定された各種パラメータを示すパラメータ情報を用いて、搬送装置識別情報、搬送前搬送物識別情報、搬送後搬送物識別情報、搬送前段取り時間を示す情報、搬送時間を示す情報、搬送後段取り時間を示す情報および記録日時情報を生成する。そして、搬送情報生成部811は、生成した各種資源情報を用いて、搬送物DB831、搬送時間DB832および搬送量DB833それぞれの内容を更新する。輸送情報生成部2811は、端末装置2081から入力される輸送業者の種類および輸送日程の記録を示す情報を用いて、輸送手段識別情報、輸送前輸送物識別情報、輸送後輸送物識別情報、輸送前段取り時間を示す情報、輸送時間を示す情報、輸送後段取り時間を示す情報および輸送可能量を示す情報および記録日時情報を生成する。そして、輸送情報生成部2811は、生成した各種資源情報を用いて、輸送物DB2831、輸送時間DB2832および輸送量DB2833それぞれの内容を更新する。
 次に、位置取得部512、612、712、812、2812は、対応する各資源の位置情報を取得する(ステップS103)。ここで、位置取得部512は、測位装置52から、生産装置51の位置情報を取得する。位置取得部612は、測位装置62から作業者の位置情報を取得する。位置取得部712は、サプライヤが保有するサーバからサプライヤの位置情報を取得する。位置取得部812は、測位装置82から搬送装置84の位置情報を取得する。位置取得部2812は、輸送手段に設けられた端末装置から輸送手段の位置情報を取得する。
 続いて、送信部513、613、713、813、2813は、更新後の各種DBから各種資源情報を取得し、取得した各種資源情報と位置情報とを含むパケットを生成してローカル資源管理装置3、2003へ送信する(ステップS104)。
 ここで、送信部513は、処理内容DB531、リードタイムDB532およびサイクルタイムDB533から各種情報を取得し、取得した各種情報と生産装置51の位置情報とを含むパケットを生成してローカル資源管理装置3へ送信する。送信部613は、作業内容DB631、作業準備時間DB632および作業時間DB633から各種資源情報を取得し、取得した各種資源情報と作業者の位置情報とを含むパケットを生成してローカル資源管理装置3へ送信する。送信部713は、部品・材料DB731、納期DB732および供給能力DB733から各種資源情報を取得し、取得した各種資源情報とサプライヤの位置情報とを含むパケットを生成してローカル資源管理装置3へ送信する。送信部813は、搬送物DB831、搬送時間DB832および搬送量DB833から各種資源情報を取得し、取得した各種資源情報と搬送装置84の位置情報とを含むパケットを生成してローカル資源管理装置3へ送信する。送信部2813は、輸送物DB2831、輸送時間DB2832および輸送量DB2833から各種資源情報を取得し、取得した各種資源情報と輸送手段の位置情報とを含むパケットを生成してローカル資源管理装置2003へ送信する。
 その後、装置情報生成部511、作業者情報生成部611、サプライヤ情報生成部711、搬送情報生成部811または輸送情報生成部2811は、資源情報生成処理を終了させるよう指令する終了指令が有ったか否かを判定する(ステップS105)。この終了指令は、例えばユーザにより装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8および輸送情報生成装置2008を停止させるための操作が行われた場合に発生する。装置情報生成部511、作業者情報生成部611、サプライヤ情報生成部711、搬送情報生成部811または輸送情報生成部2811により終了指令が無いと判定されると(ステップS105:No)、再びステップS101の処理が実行される。一方、装置情報生成部511、作業者情報生成部611、サプライヤ情報生成部711、搬送情報生成部811または輸送情報生成部2811が、終了指令有りと判定すると(ステップS105:Yes)、資源情報生成処理が終了する。
 次に、本実施の形態に係るローカル資源管理装置3、2003が実行するローカルDB更新処理について図20を参照しながら説明する。このローカルDB更新処理は、例えばローカル資源管理装置3、2003へ電源が投入されたことを契機として開始される。
 まず、取得部311、2311は、装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8または輸送情報生成装置2008から各種資源情報を受信したか否かを判定する(ステップS201)。取得部311、2311が各種資源情報を受信していないと判定すると(ステップS201:No)、後述のステップS207の処理が実行される。
 一方、取得部311、2311が各種資源情報を受信したと判定したとする(ステップS201:Yes)。この場合、第1更新部312、2312が、取得部311、2311が取得した各種資源情報を用いて、ローカルDB331、2331の内容を更新する(ステップS202)。ここで、第1更新部312、2312は、新たに取得した各種資源情報の中の資源識別情報と同じ資源識別情報に対応する各種資源情報が既にローカルDB331が記憶されているか否かを判定する。そして、第1更新部312は、新たに取得した各種資源情報と資源識別情報が一致する各種資源情報が記憶されている場合、両者の資源識別情報に対応する記録日時情報を比較し、記録日時情報が示す記録日時が古いほうの資源情報をローカルDB331から削除する。
 次に、フラグ設定部313、2313は、フラグDB332、2332が記憶するフラグ情報をオンに設定する(ステップS203)。
 続いて、送信部314、2314は、グローバル資源管理装置2から送信要求情報を受信したか否かを判定する(ステップS204)。送信部314、2314が送信要求情報を受信していないと判定すると(ステップS204:No)、後述のステップS207の処理が実行される。
 一方、送信部314、2314は、送信要求情報を受信したと判定すると(ステップS204:Yes)、ローカルDB331が記憶する更新後の各種資源情報を、グローバル資源管理装置2へ送信する(ステップS205)。その後、フラグ設定部313、2313は、フラグDB332、2332が記憶するフラグ情報をオフに設定する(ステップS206)。
 次に、送信部314、2314は、グローバル資源管理装置2からフラグ情報の送信を要求するフラグ要求情報を受信したか否かを判定する(ステップS207)。送信部314、2314によりフラグ要求情報を受信していないと判定されると(ステップS207:No)、そのまま後述の再びステップS209の処理が実行される。一方、送信部314、2314は、フラグ要求情報を受信したと判定すると(ステップS207:Yes)、フラグ情報をフラグDB332、2332から取得してグローバル資源管理装置2へ送信する(ステップS208)。
 続いて、取得部311、2311は、ローカルDB更新処理を終了させるよう指令する終了指令が有ったか否かを判定する(ステップS209)。この終了指令は、例えばユーザによりローカル資源管理装置3、2003を停止させるための操作が行われた場合に発生する。取得部311、2311は、終了指令が無いと判定すると(ステップS209:No)、再びステップS201の処理を実行される。一方、取得部311、2311により終了指令有りと判定されると(ステップS209:Yes)、ローカルDB更新処理が終了する。
 次に、本実施の形態に係るグローバル資源管理装置2が実行するグローバルDB更新処理について図21を参照しながら説明する。このグローバルDB更新処理は、グローバル資源管理装置2へ電源が投入されたことを契機として開始される。
 まず、特定部211は、フラグチェック時期が到来したか否かを判定する(ステップS301)。ここで、ローカル資源管理装置3、2003が管理するフラグチェック時期は、ローカル資源管理装置3、2003が管理するフラグチェック時期に比べて予め設定された遅延時間の範囲内で同期している。特定部211によりフラグチェック時期が到来していないと判定されると(ステップS301:No)、そのまま後述のステップS310の処理が実行される。
 一方、特定部211は、フラグチェック時期が到来したと判定すると(ステップS301:Yes)、ローカル資源管理装置3、2003それぞれのフラグDB332、2332が記憶するフラグ情報の送信を要求するフラグ要求情報を送信する(ステップS302)。次に、特定部211は、ローカル資源管理装置3、2003からフラグ情報を受信すると、そのフラグ情報をローカルリストDB232に記憶させる(ステップS303)。続いて、特定部211は、ローカルリストDB232が記憶するフラグ情報についてオンに設定されたフラグ情報を検索する(ステップS304)。その後、特定部211は、ローカルリストDB232が記憶するフラグ情報の中に、オンに設定されたフラグ情報が有るか否かを判定する(ステップS305)。特定部211によりオンに設定されたフラグ情報が無いと判定されると(ステップS305:No)、そのまま後述のステップS310の処理が実行される。
 一方、特定部211は、オンに設定されたフラグ情報が有ると判定すると(ステップS305:Yes)、オンに設定されたフラグ情報に対応する拠点A、Bを特定する(ステップS306)。次に、取得部212は、ローカルDB331、2331が記憶する各種資源情報の送信を要求する送信要求情報を、特定部211により特定された拠点A、Bに対応するローカル資源管理装置3、2003へ送信する(ステップS307)。続いて、取得部212が、ローカル資源管理装置3、2003から各種資源情報を受信すると(ステップS308)、第2更新部213が、受信した各種資源情報を用いてグローバルDB231の内容を更新する(ステップS309)。
 その後、特定部211は、グローバルDB更新処理を終了させるよう指令する終了指令が有ったか否かを判定する(ステップS310)。この終了指令は、例えばユーザによりグローバル資源管理装置2を停止させるための操作が行われた場合に発生する。特定部211により終了指令が無いと判定されると(ステップS310:No)、再びステップS301の処理が実行される。一方、特定部211が、終了指令有りと判定すると(ステップS310:Yes)、グローバルDB更新処理が終了する。
 次に、本実施の形態に係るモデル生成装置1が実行するモデル生成処理について図22を参照しながら説明する。このモデル生成処理は、例えばモデル生成装置1へ電源が投入されたことを契機として開始される。
 まず、受付部111は、ユーザインタフェース104からモデル生成要求情報を受け付けたか否かを判定する(ステップS401)。受付部111がモデル生成要求情報を受け付けていないと判定すると(ステップS401:No)、そのまま後述のステップS406の処理が実行される。
 一方、受付部111がモデル生成要求情報を受け付けると(ステップS401:Yes)、選択部112は、グローバルDB231が記憶する各種資源情報の送信を要求する送信要求情報をグローバル資源管理装置2へ送信し(ステップS402)、グローバルDB231が記憶する各種資源情報を取得する(ステップS403)。選択部112は、取得した各種資源情報を例えば主記憶部102に一時的に記憶させる。
 次に、選択部112は、モデル生成要求情報と取得した各種資源情報とに基づいて、最適なサプライチェーンを実現するために必要な複数の資源の候補となる資源を選択する(ステップS404)。選択部112は、選択した資源に対応する各種資源情報を選択資源DB131に記憶させる。
 続いて、モデル生成部113は、選択部112により選択された複数の資源に対応する各種資源情報を用いて、対象となる最終製品を需要予測量だけ生産するのに最適なサプライチェーンモデルを生成する(ステップS405)。そして、モデル生成部113は、生成したサプライチェーンモデルを示す情報をモデルDB132に記憶させる。
 その後、受付部111は、モデル生成処理を終了させるよう指令する終了指令が有ったか否かを判定する(ステップS406)。この終了指令は、例えばユーザによりモデル生成装置1を停止させるための操作が行われた場合に発生する。受付部111により終了指令が無いと判定されると(ステップS406:No)、再びステップS401の処理が実行される。一方、受付部111が、終了指令有りと判定すると(ステップS406:Yes)、モデル生成処理が終了する。
 以上説明したように、本実施の形態に係るサプライチェーンモデル生成システムでは、複数拠点資源管理装置が、複数の拠点それぞれに対応する拠点資源管理装置のフラグ情報に基づいて、資源情報が更新された拠点を特定し、特定した拠点に対応する拠点資源記憶部から、更新された資源情報を取得する。また、複数拠点資源管理装置は、取得した資源情報を用いて、複数拠点資源記憶部が記憶する資源情報を更新する。そして、モデル生成装置は、複数拠点資源記憶部が記憶する資源情報と資源位置情報とを用いて、サプライチェーンモデルを生成する。これにより、拠点資源記憶部が記憶する資源情報が更新される毎に、それに追従して複数拠点資源記憶部が記憶する資源情報も更新される。従って、サプライチェーンの構成要素である資源に関する資源情報の変化に追従して、複数拠点資源記憶部が記憶する資源情報も更新されるので、サプライチェーンの実態に即したサプライチェーンモデルが生成されるという利点がある。
 また、本実施の形態に係るローカル資源管理装置3、2003では、第1更新部312、2312が、記録日時情報と複数の資源それぞれの資源識別情報とに基づいて、ローカルDB331、2331が記憶する資源情報を更新する。具体的には、第1更新部312、2312が、第1更新部312は、新たに各種資源情報を取得すると、新たに取得した各種資源情報の中の資源識別情報と同じ資源識別情報に対応する各種資源情報が既にローカルDB331、2331に記憶されているか否かを判定する。そして、第1更新部312、2312は、新たに取得した各種資源情報と資源識別情報が一致する各種資源情報が記憶されている場合、両者の資源識別情報に対応する記録日時情報を比較し、記録日時情報が示す記録日時が古いほうの資源情報をローカルDB331から削除する。これにより、ローカルDB331、2331には、常に最新の各種資源情報のみが記憶されるので、その分、ローカルDB331、2331に要求される記憶容量を低減することができる。
 以上、本発明の実施の形態について説明したが、本発明は前述の実施の形態の構成に限定されるものではない。例えば、グローバル資源管理装置2が、ローカル資源管理装置3、2003から受信した、グローバルDB231を更新するよう要求する更新要求情報に従って、グローバルDB231を更新することができるものであってもよい。即ち、ローカル資源管理装置3、2003が、グローバル資源管理装置2へ更新要求情報を送信することにより、グローバルDB231の内容を更新することができるものであってもよい。更新要求情報は、例えばグローバルDB231を更新するためのコマンド情報と、更新後のローカルDB331、2331が記憶する各種資源情報と、を含んでいる。
 本変形例に係るグローバル資源管理装置3002は、例えば図23に示すように、許可拠点リストDB3233と抽出部3214と照合部3215とを有する。なお、図23において、実施の形態と同様の構成については図14と同一の符号を付している。また、本変形例に係るサプライチェーンモデル生成システムは、図1に示す実施の形態に係るサプライチェーンモデル生成システムにおいて、グローバル資源管理装置2を本変形例に係るグローバル資源管理装置3002に置き換えたものに相当する。許可拠点リストDB3233は、更新要求情報を送信することによりグローバルDB231の内容を更新することが許可されている拠点、例えば拠点Aに対応するローカル資源管理装置、例えばローカル資源装置3の識別情報である拠点識別情報のリストである許可拠点リスト情報を記憶する許可拠点リスト記憶部である。
 抽出部3214は、ローカル資源管理装置3、2003から受信した更新要求情報に含まれるコマンド情報と送信元のローカル資源管理装置3、2003の拠点識別情報とを抽出する。また、抽出部3214は、更新要求情報に含まれる各種資源情報を抽出する。照合部3215は、許可拠点リストDB3233が記憶するローカル資源管理装置、例えばローカル資源管理装置3の拠点識別情報を含む許可拠点リスト情報と、抽出部3214により更新要求情報から抽出されたその送信元の拠点識別情報とを照合する。そして、照合部3215は、更新要求情報から抽出された送信元の拠点識別情報が、許可拠点リスト情報の中に含まれているか否かを判定する。
 次に、本変形例に係るグローバル資源管理装置3002が実行するグローバルDB更新処理について図24を参照しながら説明する。なお、図24において、実施の形態に係るグローバルDB更新処理と同様の処理については図21と同一の符号を付している。ステップS301からS309までの一連の処理が実行された後、取得部212は、ローカル資源管理装置3、2003から更新要求情報を受信したか否かを判定する(ステップS3001)。取得部212により更新要求情報を受信していないと判定されると(ステップS3001:No)、そのままステップS310以降の処理が実行される。
 一方、取得部212が、更新要求情報を受信したと判定すると(ステップS3001:Yes)、抽出部3214が、更新要求情報から拠点識別情報を抽出する(ステップS3002)。次に、照合部3215は、許可拠点リストDB3233が記憶する拠点識別情報と更新要求情報から抽出された送信元の拠点識別情報とを照合する(ステップS3003)。続いて、照合部3215は、更新要求情報から抽出された送信元の拠点識別情報が、許可拠点リスト情報の中に含まれているか否かを判定する(ステップS3004)。照合部3215により更新要求情報の送信元の拠点識別情報が、許可拠点リスト情報の中に含まれていないと判定されたとする(ステップS3004:No)。この場合、第2更新部213が、受信した更新要求情報を破棄し(ステップS3005)、その後、ステップS310以降の処理が実行される。
 一方、照合部3215により更新要求情報の送信元の拠点識別情報が、許可拠点リスト情報の中に含まれていると判定されると(ステップS3004:Yes)、抽出部3214は、更新要求情報からコマンド情報と各種資源情報とを抽出する(ステップS3006)。次に、第2更新部213は、受信した更新要求情報に含まれるコマンド情報に従って、各種資源情報を用いてグローバルDB231の内容を更新する(ステップS3007)。続いて、ステップS310以降の処理が実行される。
 本構成によれば、例えばグローバル資源管理装置3002が配置された拠点以外の拠点に居るユーザがローカル資源管理装置2003を使用してグローバルDB231の内容を更新することができる。従って、グローバルDB231の保守性を向上させることができる。
 実施の形態に係るローカル資源管理装置3、2003において、ローカル資源管理装置3、2003への情報の送信元に応じて、受信した情報の選別を行う機能を有するものであってもよい。
 本変形例に係るローカル資源管理装置4003は、例えば図25に示すように、採用送信元リストDB4333と抽出部4315と照合部4316とを有する。なお、図25において、実施の形態と同様の構成については図12Aと同一の符号を付している。また、本変形例に係るサプライチェーンモデル生成システムは、図1に示す実施の形態に係るサプライチェーンモデル生成システムにおいて、例えばローカル資源管理装置3を本変形例に係るローカル資源管理装置4003に置き換えたものに相当する。採用送信元リストDB4333は、各種資源情報の生成に採用することができる生産装置情報、作業者情報等の各種情報の送信元の識別情報のリストである採用送信元リスト情報を記憶する。送信元は、装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7または搬送情報生成装置8である。
 抽出部4315は、装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7または搬送情報生成装置8から受信した各種情報に含まれる送信元の識別情報を抽出する。照合部4316は、採用送信元リストDB4333が記憶する採用送信元リスト情報と、抽出部4315により抽出された送信元の識別情報とを照合する。そして、照合部4316は、抽出された送信元の識別情報が、採用送信元リスト情報の中に含まれているか否かを判定する。
 次に、本変形例に係るローカル資源管理装置4003が実行するローカルDB更新処理について図26を参照しながら説明する。なお、図26において、実施の形態に係るローカルDB更新処理と同様の処理については図20と同一の符号を付している。まず、ステップS201において、取得部311が各種資源情報を受信したと判定すると(ステップS201:Yes)、抽出部4315が、各種資源情報を含むパケットのヘッダ部から各種資源情報の送信元の識別情報を抽出する(ステップS4001)。
 次に、照合部4316は、採用送信元リストDB4333が記憶する採用送信元リスト情報と、抽出部4315により抽出された送信元の識別情報とを照合する(ステップS4002)。続いて、照合部4316は、抽出された送信元の識別情報が、採用送信元リスト情報の中に含まれているか否かを判定する(ステップS4003)。照合部4316により送信元の識別情報が、採用送信元リスト情報の中に含まれていないと判定されたとする(ステップS4003:No)。この場合、第1更新部312は、受信した各種資源情報を破棄し(ステップS4004)、その後、ステップS207以降の処理が実行される。
 一方、照合部4316により送信元の識別情報が、採用送信元リスト情報の中に含まれていると判定されたとする(ステップS4003:Yes)。この場合、第1更新部312が、受信した各種資源情報を用いて、ローカルDB331の内容を更新する(ステップS202)。その後、ステップS203以降の処理が実行される。
 本構成によれば、例えば装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7または搬送情報生成装置8になりすました装置から受信した各種資源情報を用いて、ローカルDB331の内容が更新されることが抑制される。従って、ローカルDB331のセキュリティ性能を向上させることができる。
 実施の形態に係るサプライチェーン生成システムにおいて、例えばモデル生成装置1が、最終製品が発注されてからサプライチェーンモデルに従って最終製品を供給するまでに要する所要時間の理論値を算出するものであってもよい。そして、サプライチェーンシステムが、最終製品が発注されてからサプライチェーンモデルに従って最終製品が発注元へ供給されるまでに要する所要時間の実績値の平均である平均所要時間および所要時間の理論値に対する平均所要時間の比率である経路安定性指標値を算出する所要時間算出装置を備えるものであってもよい。この所要時間算出装置は、例えばモデル生成装置1とともに拠点Aの生産管理部門に配置される。また、所要時間算出装置は、ユーザインタフェースを備えるものであってもよい。この場合、所要時間算出装置は、例えば拠点Aの生産管理部門に属するユーザがユーザインタフェースを介して最終製品が発注されてから1つのサプライチェーンモデルに従って最終製品を供給するまでに要する所要時間を問合せるための操作を行うと、それに応じて前述の平均所要時間と経路安定性指標値とをユーザに提示するものであってもよい。
 本変形例に係るモデル生成装置4001は、例えば図27に示すように、CPU101と、主記憶部102と、補助記憶部103と、ユーザインタフェース104と、ネットワーク通信部106と、これらを相互に接続するバス109と、を備える。なお、図27において実施の形態と同様の構成については図16と同一の符号を付している。そして、CPU101は、補助記憶部103が記憶するプログラムを主記憶部102に読み出して実行することにより、受付部111、選択部112、モデル生成部113および所要時間理論値算出部4114として機能する。また、補助記憶部103は、選択資源DB131と、モデルDB132と、生成した各サプライチェーンモデルに対応する所要時間の理論値を示す所要時間理論値情報を記憶する所要時間理論値DB4133と、を有する。所要時間理論値DB4133は、各サプライチェーンモデルに対応する所要時間理論値情報を、サプライチェーンモデルを識別するモデル識別情報に対応づけて記憶する。
 所要時間理論値算出部4114は、選択資源DB131が記憶する選択部112により選択された資源に関する各種資源情報と、モデルDB132が記憶するサプライチェーンモデルと、に基づいて、各サプライチェーンモデルに対応する所要時間理論値を算出する。所要時間理論値算出部4114は、サプライチェーンモデル毎に、サプライチェーンモデルを構成する複数の資源それぞれに対応する動作前時間、動作後時間、動作時間および処理数から、最終製品の発注からサプライチェーンモデルに従って最終製品を発注元へ供給するまでの所要時間理論値を算出する。所要時間理論値算出部4114は、算出した所要時間理論値を示す所要時間理論値情報を、モデル識別情報に対応づけて所要時間理論値DB4113に記憶させる。
 所要時間理論値送信部4115は、所要時間算出装置4009から所要時間理論値情報を送信するよう要求する理論値要求情報を受信すると、理論値要求情報に含まれるモデル識別情報が示すサプライチェーンモデルに対応する所要時間理論値情報を特定する。そして、所要時間理論値送信部4115は、特定した所要時間理論値情報を、所要時間算出装置4009へ送信する。
 所要時間算出装置4009は、例えば汎用のパーソナルコンピュータから構成され、例えば図28に示すように、CPU4901と、主記憶部4902と、補助記憶部4903と、ユーザインタフェース4904と、ネットワーク通信部4906と、これらを相互に接続するバス4909と、を備える。補助記憶部4903は、所要時間算出装置4009の各種機能を実現するためのプログラムを記憶する。ユーザインタフェース4904は、実施の形態で説明したユーザインタフェース104と同様である。ネットワーク通信部4906は、例えば拠点Aに敷設されたネットワークNT1に接続されている。
 CPU4901は、補助記憶部4903が記憶するプログラムを主記憶部4902に読み出して実行することにより、サプライチェーンモデルに対応する所要時間の実績値を示す所要時間実績値情報を取得する実績値取得部4911、理論値取得部4912、平均所要時間算出部4913、安定性指標値算出部4914、問合せ受付部4915および所要時間提示部4916として機能する。また、補助記憶部4903は、実績DB4931と、所要時間DB4932と、を有する。実績DB4931は、例えば図29Aに示すように、最終製品が発注されてからサプライチェーンモデルに従って最終製品が発注元へ供給されるまでの実際の所要時間を示す所要時間実績値情報を、対応する最終製品の供給実績を識別する実績識別情報と、その供給実績が発生した日時を示す実績発生日時情報と、採用されたサプライチェーンモデルのモデル識別情報と、適用されたサプライチェーンモデルに対応する所要時間理論値を示す所要時間理論値情報と、対応づけて記憶する。所要時間DB4932は、前述の実際の所要時間の平均所要時間を示す平均所要時間情報と、サプライチェーンモデルに従った流通経路の経路安定性を示す経路安定性指標値情報と、を、サプライチェーンモデルが適用された月、時間帯毎に区別して記憶する。所要時間DB4932は、例えば図29Bに示すように、平均所要時間情報と経路安定性指標値情報とを、サプライチェーンモデルが適用される月を示す適用月情報、サプライチェーンモデルが適用される時間帯を示す適用時間帯情報およびモデル識別情報と対応づけて記憶する。
 図28に戻って、実績値取得部4911は、例えば生産管理部門に属するユーザがユーザインタフェース4904を介して入力した所要時間実績値或いはグローバル資源管理装置2が管理する所要時間実績値を示す所要時間実績値情報を取得する。この所要時間実績値情報は、対応するサプライチェーンモデルを識別するモデル識別情報を含む。実績値取得部4911は、取得した所要時間実績値情報を実績DB4931に記憶させる。
 理論値取得部4912は、所要時間理論値情報の送信を要求する理論値要求情報をモデル生成装置4001へ送信することにより、モデル生成装置4001から所要時間理論値情報を取得する。ここで、理論値取得部4912は、所要時間実績値情報からモデル識別情報を抽出し、抽出したモデル識別情報を含む理論値要求情報を生成してモデル生成装置4001へ送信する。理論値取得部4912は、取得した所要時間理論値情報を、実績値取得部4911が取得した所要時間実績値情報に対応づけて実績DB4931に記憶させる。
 平均所要時間算出部4913は、所要時間実績値に基づいて、所要時間実績値の平均値である平均所要時間を、所要時間実績値の代表値として算出する代表値算出部である。平均所要時間算出部4913は、所要時間実績値情報を、対応するサプライチェーンモデルが適用された月と時間帯との組み合わせで分類する。そして、平均所要時間算出部4913は、サプライチェーンモデルが適用された月と時間帯との組み合わせ毎に、所要時間実績値情報が示す所要時間実績値の平均値である平均所要時間を算出する。そして、平均所要時間算出部4913は、算出した平均所要時間を示す平均所要時間情報を、モデル識別情報、月および時間帯と対応づけて所要時間DB4932に記憶させる。
 安定性指標値算出部4914は、サプライチェーンモデルが適用された月と時間帯との組み合わせ毎に、前述の所要時間理論値に対する前述の平均所要時間の比率に相当する経路安定性指標値を算出する。この経路安定性指標値は、100%に近いほど平均所要時間が所要時間理論値に近くサプライチェーンモデルに従った流通経路が安定していることを示す。安定性指標値算出部4914は、算出した経路安定性指標値を示す経路安定性指標値情報を、モデル識別情報、月および時間帯と対応づけて所要時間DBに記憶させる。
 問合せ受付部4915は、ユーザインタフェース4904からサプライチェーンモデルに対応する所要時間の問合せを行うための所要時間問合せ情報を受け付けたか否かを判定する。ここで、問合せ受付部4915は、ユーザがユーザインタフェース4904を介して所要時間を問合せるための操作を行うと、所要時間問合せ情報を受け付ける。所要時間問合せ情報は、ユーザからの問合せに係るサプライチェーンモデルのモデル識別情報、それを適用する月および時間帯を示す情報と、を含む。
 所要時間提示部4916は、所要時間DB4932が記憶する平均所要時間情報の中に、所要時間問合せ情報に含まれるモデル識別情報とサプライチェーンモデルを適用する月および時間帯との組み合わせに対応する平均所要時間情報が存在するか否かを判定する。そして、所要時間提示部4916は、所要時間DB4932が記憶する平均所要時間情報の中に前述の平均所要時間情報が存在すると判定すると、平均所要時間情報が示す平均所要時間とそれに対応する経路安定性指標値情報が示す経路安定性指標値とをユーザインタフェース4904を介して提示する。また、所要時間提示部4916は、所要時間DB4932が記憶する平均所要時間情報の中に前述の平均所要時間情報が存在しないと判定すると、モデル生成装置4001から取得された所要時間理論値情報が示す所要時間理論値を、ユーザインタフェース4904を介して提示する。
 次に、本変形例に係るサプライチェーンモデル生成システムの動作の一部について図30を参照しながら説明する。なお、図30において、実施の形態で説明したサプライチェーンモデル生成システムと同様の処理については図18と同一の符号を付している。ステップS41までの一連の処理が実行された後、モデル生成装置4001は、生成したサプライチェーンモデルに対応する所要時間理論値を算出し、算出した理論値を前述の所要時間理論値DB4133に記憶させる(ステップS4001)。
 次に、所要時間算出装置4009が、所要時間実績値情報を取得すると(ステップS4002)、モデル生成装置4001に対して所要時間理論値情報を送信するよう要求するための理論値要求情報を生成する(ステップS4003)。続いて、生成された理論値要求情報が、所要時間算出装置4009からモデル生成装置4001へ送信される(ステップS4004)。この理論値要求情報には、所要時間実績値情報に含まれるモデル識別情報が含まれる。一方、モデル生成装置4001は、理論値要求情報に含まれるモデル識別情報が付与されたサプライチェーンモデルに対応する所要時間理論値情報を特定する(ステップS4005)。続いて、特定された所要時間理論値情報が、モデル生成装置4001から所要時間算出装置4009へ送信される(ステップS4006)。
 一方、所要時間算出装置4009は、所要時間理論値情報を受信すると、受信した所要時間理論値情報を、所要時間実績値情報に対応づけて実績DB4931に記憶させる(ステップS4007)。
 その後、所要時間算出装置4009は、取得した所要時間実績値情報の実績発生日時が属する適用月および適用時間帯に対応する平均所要時間を算出する(ステップS4008)。所要時間算出装置4009は、算出した平均所要時間を示す平均所要時間情報を所要時間DB4932に記憶させる。次に、所要時間算出装置4009は、所要時間理論値に対する平均所要時間の比率に相当する経路安定性指標値を算出する(ステップS4009)。所要時間算出装置4009は、算出した経路安定性指標値を示す経路安定性指標値情報を、平均所要時間情報およびモデル識別情報に対応づけて所要時間DB4932に記憶させる。
 また、例えば生産管理部門に属するユーザが、ユーザインタフェースを介して、所要時間を問合せるための操作を行ったとする。この場合、所要時間算出部4009は、所要時間問合せ情報を受け付ける(ステップS4010)。続いて、所要時間算出装置4009は、所要時間DB4932が記憶する所要時間情報を検索して、所要時間問合せ情報に含まれるモデル識別情報とサプライチェーンモデルを適用する月および時間帯との組み合わせに対応する平均所要時間情報が存在すると判定したとする(ステップS4011)。この場合、所要時間算出装置4009は、所要時間DB4932から平均所要時間情報および経路安定性指標値情報を取得し、取得した平均所要時間情報が示す平均所要時間と経路安定性指標値情報が示す経路安定性指標値とをユーザインタフェース4904を介して提示する(ステップS4012)。
 次に、本変形例に係るモデル生成装置4001が実行するモデル生成処理について図31を参照しながら説明する。なお、図31において実施の形態で説明したモデル生成処理と同様の処理については図22と同一の符号を付している。
 まず、ステップS401からS405までの一連の処理が実行された後、所要時間理論値算出部4114は、モデル生成部113により生成されたサプライチェーンモデルに対応する所要時間理論値を算出し、所要時間理論値DB4133に記憶させる(ステップS4401)。次に、所要時間理論値送信部4115は、所要時間算出装置4009から前述の理論値要求情報を受信したか否か判定する(ステップS4402)。所要時間理論値送信部4115により理論値要求情報を受信していないと判定されると(ステップS4402:No)、ステップS406の処理が実行される。一方、所要時間理論値送信部4115は、理論値要求情報を受信したと判定されると(ステップS4402:Yes)、理論値要求情報に含まれるモデル識別情報が示すサプライチェーンモデルに対応する所要時間理論値情報を特定する(ステップS4403)。続いて、所要時間理論値送信部4115は、特定した所要時間理論値情報を、所要時間算出装置4009へ送信する(ステップS4404)。その後、ステップS406の処理が実行される。
 次に、本変形例に係る所要時間算出装置4009が実行する平均所要時間・経路安定性指標値算出処理について図32を参照しながら説明する。この平均所要時間・経路安定性指標値算出処理は、例えば所要時間算出装置4009へ電源が投入されたことを契機として開始される。まず、実績値取得部4911は、所要時間実績値情報を取得したか否か判定する(ステップS4901)。実績値取得部4911が所要時間実績値情報を取得していないと判定すると(ステップS4901:No)、そのまま後述のステップS4907の処理が実行される。
 一方、実績値取得部4911は、所要時間実績値情報を取得すると(ステップS4901:Yes)、取得した所要時間実績値情報を実績DB4931に記憶させる(ステップS4902)。次に、理論値取得部4912は、所要時間実績値情報からモデル識別情報を抽出し、抽出したモデル識別情報を含む理論値要求情報を生成してモデル生成装置4001へ送信する(ステップS4903)。続いて、理論値取得部4912は、モデル生成装置4001から所要時間理論値情報を取得し、取得した所要時間理論値情報を所要時間DB4932に記憶させる(ステップS4904)。
 その後、平均所要時間算出部4913は、取得した所要時間実績値情報を、対応するサプライチェーンモデルが適用された月と時間帯との組み合わせで分類する(ステップS4905)。次に、平均所要時間算出部4913は、サプライチェーンモデルが適用された月と時間帯との組み合わせ毎に、所要時間実績値情報が示す所要時間実績値の平均値である平均所要時間を算出し、算出した平均所要時間を示す平均所要時間情報を、モデル識別情報、月および時間帯と対応づけて所要時間DBに記憶させる(ステップS4906)。続いて、安定性指標値算出部4914は、サプライチェーンモデルが適用された月と時間帯との組み合わせ毎に、所要時間理論値に対する平均所要時間の比率に相当する経路安定性指標値を算出し、算出した経路安定性指標値を示す経路安定性指標値情報を所要時間DB4932に記憶させる(ステップS4907)。
 その後、実績値取得部4911は、平均所要時間・経路安定性指標値算出処理を終了させるよう指令する終了指令が有ったか否かを判定する(ステップS4908)。この終了指令は、例えばユーザにより所要時間算出装置4009を停止させるための操作が行われた場合に発生する。実績値取得部4911により終了指令が無いと判定されると(ステップS4908:No)、再びステップS4901の処理が実行される。一方、実績値取得部4911が、終了指令有りと判定すると(ステップS4908:Yes)、平均所要時間・経路安定性指標値算出処理が終了する。
 次に、本実施の形態に係る所要時間算出装置4009が実行する所要時間提示処理について図33を参照しながら説明する。この所要時間提示処理は、例えば所要時間算出装置4009へ電源が投入されたことを契機として開始される。
 まず、問合せ受付部4915は、ユーザインタフェース4904からサプライチェーンモデルに対応する所要時間の問合せを行うための所要時間問合せ情報を受け付けたか否かを判定する(ステップS4951)。ここで、問合せ受付部4915は、ユーザがユーザインタフェース4904を介して所要時間を問合せるための操作を行うと、所要時間問合せ情報を受け付ける。問合せ受付部4915が所要時間問合せ情報を受け付けていないと判定する限り(ステップS4951:No)、ステップS4951の処理が繰り返し実行される。
 一方、問合せ受付部4915が、所要時間問合せ情報を受け付けたとする(ステップS4951:Yes)。この場合、所要時間提示部4916は、所要時間DB4932が記憶する所要時間情報を検索して、所要時間問合せ情報に含まれるモデル識別情報とサプライチェーンモデルを適用する月および時間帯を示す情報との組み合わせに対応する平均所要時間情報が存在するか否かを判定する(ステップS4952)。
 所要時間提示部4916が、所要時間DB4932が記憶する所要時間情報の中に、前述のモデル識別情報と適用する月および時間帯を示す情報との組み合わせに対応する平均所要時間情報が存在すると判定したとする(ステップS4952:Yes)。この場合、所要時間提示部4916が、所要時間DB4932から平均所要時間情報および経路安定性指標値情報を取得し、取得した平均所要時間情報が示す平均所要時間と経路安定性指標値情報が示す経路安定性指標値とをユーザインタフェース4904を介して提示する(ステップS4953)。
 一方、所要時間提示部4916が、所要時間DB4932が記憶する所要時間情報の中に、前述のモデル識別情報と適用する月および時間帯を示す情報との組み合わせに対応する平均所要時間情報が存在しないと判定したとする(ステップS4952:No)。この場合、理論値取得部4912は、所要時間問合せ情報からモデル識別情報を抽出し、抽出したモデル識別情報を含む理論値要求情報を生成してモデル生成装置4001へ送信する(ステップS4954)。次に、理論値取得部4912は、モデル生成装置4001から所要時間理論値情報を取得する(ステップS4955)。続いて、所要時間提示部4916は、理論値取得部4912が取得した所要時間理論値情報が示す所要時間理論値を、ユーザインタフェース4904を介して提示する(ステップS4956)。
 本構成によれば、最終製品の発注からサプライチェーンモデルに従って最終製品を発注元へ供給するまでの所要時間をユーザに提示することができるので、ユーザが最終製品の供給を受ける時期を把握し易くなるという利点がある。また、本構成によれば、サプライチェーンモデルに従った流通経路の安定性の指標値をユーザに提示することができるので、ユーザがサプライチェーンモデルに従った流通経路の安定性を考慮して適用するサプライチェーンモデルを選択することが可能となるという利点もある。
 なお、本変形例では、所要時間実績値の平均値である平均所要時間を、所要時間実績値の代表値として算出する平均所要時間算出部4913を備えるサプライチェーンモデル生成システムの例について説明した。但し、これに限らず、例えばサプライチェーンモデル生成システムが、所要時間実績値の最大値、中間値または最小値を、所要時間実績値の代表値として算出する代表値算出部を備えるものであってもよい。
 実施の形態では、ネットワークNT1、NT2がイーサネット(登録商標)規格に適合したLANである例について説明したが、これに限らす、例えば電力線通信ネットワークであってもよい。或いは、装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8、輸送情報生成装置2008、ローカル資源管理装置3、2003、グローバル資源管理装置2およびモデル生成装置1が、無線モジュールを備えるとする。この場合、ネットワークNT1、NT2が、アクセスポイントを介した無線通信ネットワークであってもよい。この場合、装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8、輸送情報生成装置2008、ローカル資源管理装置3、2003、グローバル資源管理装置2およびモデル生成装置1が、例えばBluetooth(登録商標)のような短距離無線通信規格に適合した通信方式でアクセスポイントと通信するようにしてもよい。また、装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8、輸送情報生成装置2008、ローカル資源管理装置3、2003、グローバル資源管理装置2およびモデル生成装置1が、赤外線通信モジュールを備えるとする。この場合、ネットワークNT1、NT2が、IR-DR規格に適合した赤外線通信を介したネットワークであってもよい。
 実施の形態では、測位装置52、62、82が、タグ53、63、83との通信を行うことにより、生産装置51、作業者または搬送装置84の位置を測定する例について説明した。但し、これに限らず、例えば測位装置52が、GPS信号を利用して生産装置51、作業者または搬送装置84の位置を測定するものであってもよいし、生産装置51、作業者または搬送装置84から送信されるBluetooth(登録商標)のような短距離無線通信規格に適合した電波を利用して生産装置51、作業者または搬送装置の位置を測定するものであってもよい。或いは、測位装置52、62、82が、A-GPS信号または音波を利用して生産装置51、作業者または搬送装置84の位置を測定するものであってもよい。
 或いは、実施の形態において、測位装置52、62、82およびタグ53、63、83が存在しないものであってもよい。この場合、例えば装置情報生成装置5、作業者情報生成装置6および搬送情報生成装置8がユーザインタフェースを有し、ユーザがユーザインタフェース装置介して、生産装置51、作業者、搬送装置84の位置情報を直接装置情報生成装置5、作業者情報生成装置6および搬送情報生成装置8へ入力するようにしてもよい。
 実施の形態では、受付部111が、対象となる最終製品の需要予測量を示す情報を含むモデル生成要求情報を受け付ける例について説明した。但し、これに限らず、例えば受付部111が、例えば対象となる最終製品の識別情報を受け付けると、その最終製品の販売実績情報を管理するサーバ(図示せず)から販売実績情報を取得し、取得した販売実績情報から将来の販売量を予測するものであってもよい。ここで、受付部111は、例えば線形回帰法、指数平滑法、重み付き移動平均法、ホルツ/ウィンター法等の周知の予測方法を利用して将来の対象となる最終製品の販売量を予測してもよい。
 また、本発明に係る装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8、輸送情報生成装置2008、ローカル資源管理装置3、2003、グローバル資源管理装置2およびモデル生成装置1の各種機能は、専用のシステムによらず、通常のコンピュータシステムを用いて実現可能である。例えば、ネットワークに接続されているコンピュータに、上記動作を実行するためのプログラムを、コンピュータシステムが読み取り可能な非一時的な記録媒体(CD-ROM(Compact Disc Read Only Memory)等)に格納して配布し、当該プログラムをコンピュータシステムにインストールすることにより、上述の処理を実行する装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8、輸送情報生成装置2008、ローカル資源管理装置3、2003、グローバル資源管理装置2およびモデル生成装置1を構成してもよい。
 また、コンピュータにプログラムを提供する方法は任意である。例えば、プログラムは、通信回線の掲示版(BBS(Bulletin Board System))にアップロードされ、通信回線を介してコンピュータに配信されてもよい。そして、コンピュータは、このプログラムを起動して、OS(Operating System)の制御の下、他のアプリケーションと同様に実行する。これにより、コンピュータは、上述の処理を実行する装置情報生成装置5、作業者情報生成装置6、サプライヤ情報生成装置7、搬送情報生成装置8、輸送情報生成装置2008、ローカル資源管理装置3、2003、グローバル資源管理装置2およびモデル生成装置1として機能する。
 本発明は、本発明の広義の精神と範囲を逸脱することなく、様々な実施形態及び変形が可能とされるものである。また、上述した実施形態は、この発明を説明するためのものであり、本発明の範囲を限定するものではない。すなわち、本発明の範囲は、実施形態ではなく、特許請求の範囲によって示される。そして、特許請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、この発明の範囲内とみなされる。
 本出願は、2018年1月12日に出願された日本国特許出願特願2018-003059号に基づく。本明細書中に日本国特許出願特願2018-003059号の明細書、特許請求の範囲および図面全体を参照として取り込むものとする。
 本発明は、製品の生産および物流を管理する部門において実施されるサプライチェーンマネジメントに好適である。
1,4001 モデル生成装置、2,3002 グローバル資源管理装置、3,2003,4003 ローカル資源管理装置、5 装置情報生成装置、6 作業者情報生成装置、7 サプライヤ情報生成装置、8 搬送情報生成装置、10,2010 ファイアウオール装置、51 生産装置、51a PLC、52,62,82 測位装置、53,63,83 タグ、61,71,2081 端末装置、81 搬送制御装置、84 搬送装置、101,201,301,501,601,701,801,2301,2801,4901 CPU、102,202,302,502,602,702,802,2302,2802,4902 主記憶部、103,203,303,503,603,703,803,2303,2803,4903 補助記憶部、104,4904 ユーザインタフェース、109,209,309,509,609,709,809,2309,2809,4909 バス、111 受付部、112 選択部、113 モデル生成部、131 選択資源DB、132 モデルDB、211 特定部、212,311,2311 取得部、213 第2更新部、231 グローバルDB、232 ローカルリストDB、3214,4315 抽出部、312,2312 第1更新部、313,2313 フラグ設定部、314,513,613,713,813,2314,2813 送信部、331,2331 ローカルDB、332,2332 フラグDB、505,605,705,805,2805 装置通信部、106,206,306,506,606,706,806,2306,2806,4906 ネットワーク通信部、511 装置情報生成部、512,612,712,812,2812 位置取得部、531 処理内容DB、532 リードタイムDB、533 サイクルタイムDB、611 作業者情報生成部、631 作業内容DB、632 作業準備時間DB、633 作業時間DB、711 サプライヤ情報生成部、731 部品・材料DB、732 納期DB、733 供給能力DB、811 搬送情報生成部、831 搬送物DB、832 搬送時間DB、833 搬送量DB、2008 輸送情報生成装置、2811 輸送情報生成部、2831 輸送物DB、2832 輸送時間DB、2833 輸送量DB、3215,4316 照合部、3233 許可拠点リストDB、4009 所要時間算出装置、4114 所要時間理論値算出部、4115 所要時間理論値送信部、4133 所要時間理論値DB、4333 採用送信元リストDB、4911 実績値取得部、4912 理論値取得部、4913 平均所要時間算出部、4914 安定性指標値算出部、4915 問合せ受付部、4916 所要時間提示部、4931 実績DB、4932 所要時間DB。

Claims (7)

  1.  複数の拠点それぞれに配置された、部品または材料の処理、拠点内搬送或いは他の拠点への輸送を実行する複数の資源を使用した製品の生産に最適なサプライチェーンをモデル化したサプライチェーンモデルを生成するサプライチェーンモデル生成システムであって、
     前記複数の拠点のうちのいずれか1つに配置された複数の資源それぞれに関する資源情報を生成する資源情報生成部と、前記資源の拠点内における位置座標を測定する測位装置から前記資源の拠点内における位置座標を示す資源位置情報を取得する位置取得部と、を有する資源情報生成装置と、
     前記資源情報と前記資源位置情報とを、前記資源情報生成装置が前記資源情報を生成した日時を示す日時情報と対応づけて記憶する拠点資源記憶部と、前記日時情報に基づいて、前記資源情報と前記資源位置情報とを更新する第1更新部と、前記第1更新部により前記拠点資源記憶部が記憶する資源情報と資源位置情報とが更新されたか否かを示すフラグ情報を記憶するフラグ記憶部と、を有する拠点資源管理装置と、
     前記複数の拠点それぞれに配置された複数の資源それぞれについて生成された資源情報と資源位置情報とを記憶する複数拠点資源記憶部と、前記複数の拠点それぞれに対応する拠点資源管理装置のフラグ記憶部が記憶するフラグ情報に基づいて、拠点資源記憶部が記憶する資源情報と資源位置情報とが更新された拠点を特定する特定部と、前記特定部により特定された拠点に対応する拠点資源管理装置が有する拠点資源記憶部から、前記第1更新部により更新された資源情報と資源位置情報とを取得する取得部と、前記取得部が取得した資源情報と資源位置情報とを用いて、前記複数拠点資源記憶部が記憶する資源情報と資源位置情報とを更新する第2更新部と、を有する複数拠点資源管理装置と、
     前記第2更新部により更新された前記複数拠点資源記憶部が記憶する前記資源情報と前記資源位置情報とを用いて、前記サプライチェーンモデルを生成するモデル生成部を有するモデル生成装置と、を備える、
     サプライチェーンモデル生成システム。
  2.  前記資源情報は、前記複数の拠点のうちのいずれか1つに配置された複数の資源それぞれについて、前記資源へ投入される投入物を示す投入物情報と、前記資源から排出される排出物を示す排出物情報と、前記資源による処理に要する処理時間を示す処理時間情報と、前記資源による拠点内搬送に要する搬送時間を示す搬送時間情報と、前記資源による他の拠点への輸送に要する輸送時間を示す輸送時間情報と、前記資源による処理可能数を示す処理数情報と、前記資源による搬送可能数を示す搬送数情報と、前記資源による輸送可能数を示す輸送数情報と、のうちの少なくとも1つを含む、
     請求項1に記載のサプライチェーンモデル生成システム。
  3.  前記複数拠点資源管理装置は、
     前記複数拠点資源記憶部が記憶する資源情報の更新を許可する拠点に対応する拠点資源管理装置を識別する拠点識別情報の許可拠点リストを記憶する許可拠点リスト記憶部と、
     複数の拠点の少なくとも1つから、資源情報を含み前記複数拠点資源記憶部が記憶する資源情報の更新を要求する更新要求情報を受信すると、前記更新要求情報の送信元の拠点識別情報と前記許可拠点リストに含まれる拠点識別情報とを照合する照合部と、を更に有し、
     前記第2更新部は、前記照合部により前記更新要求情報の送信元の拠点識別情報が前記許可拠点リストに含まれると判定されると、前記更新要求情報に含まれる資源情報を用いて、前記複数拠点資源記憶部が記憶する資源情報を更新し、前記照合部により前記更新要求情報の送信元の拠点識別情報が前記許可拠点リストに含まれないと判定されると、前記更新要求情報を破棄する、
     請求項1または2に記載のサプライチェーンモデル生成システム。
  4.  前記第1更新部は、前記日時情報とともに前記複数の資源それぞれを識別する資源識別情報に基づいて、前記資源情報を更新する、
     請求項1から3のいずれか1項に記載のサプライチェーンモデル生成システム。
  5.  前記製品の発注から前記サプライチェーンモデルに従って発注元へ前記製品を供給するまでの所要時間の理論値である所要時間理論値を算出する所要時間理論値算出部と、
     前記所要時間の実績値である所要時間実績値を取得する実績値取得部と、
     前記所要時間実績値に基づいて、前記所要時間実績値の代表値を算出する代表値算出部と、
     前記所要時間理論値と前記代表値とに基づいて、前記サプライチェーンモデルに従った流通経路の経路安定性の指標値を算出する安定性指標値算出部と、を更に備える、
     請求項1から4のいずれか1項に記載のサプライチェーンモデル生成システム。
  6.  複数の拠点それぞれに配置された、部品または材料の処理、拠点内搬送或いは他の拠点への輸送を実行する複数の資源を使用した製品の生産に最適なサプライチェーンをモデル化したサプライチェーンモデルを生成するサプライチェーンモデル生成システムを使用したサプライチェーンモデル生成方法であって、
     前記複数の拠点のうちのいずれか1つに配置された複数の資源それぞれに関する資源情報を生成するステップと、
     前記資源の拠点内における位置座標を測定する測位装置から前記資源の拠点内における位置座標を示す資源位置情報を取得するステップと、
     前記資源情報を、前記資源情報が生成された日時を示す日時情報と対応づけて拠点資源記憶部に記憶させるステップと、
     前記日時情報に基づいて、前記資源情報と前記資源位置情報とを更新するステップと、
     前記拠点資源記憶部が記憶する資源情報と資源位置情報とが更新されたか否かを示すフラグ情報をフラグ記憶部に記憶させるステップと、
     前記複数の拠点それぞれに配置された複数の資源それぞれについて生成された資源情報と資源位置情報とを複数拠点資源記憶部に記憶させるステップと、
     前記複数の拠点それぞれに対応するフラグ記憶部が記憶するフラグ情報に基づいて、拠点資源記憶部が記憶する資源情報と資源位置情報とが更新された拠点を特定するステップと、
     特定された拠点に対応する拠点資源記憶部から、更新された資源情報と資源位置情報とを取得するステップと、
     取得した資源情報を用いて、前記複数拠点資源記憶部が記憶する資源情報と資源位置情報とを更新するステップと、
     前記複数拠点資源記憶部が記憶する前記資源情報と前記資源位置情報とを用いて、前記サプライチェーンモデルを生成するステップと、を含む、
     サプライチェーンモデル生成方法。
  7.  コンピュータを、
     複数の拠点のうちのいずれか1つに配置された、部品または材料の処理、拠点内搬送或いは他の拠点への輸送を実行する複数の資源それぞれに関する資源情報を生成する資源情報生成部、
     前記資源の拠点内における位置座標を測定する測位装置から前記資源の拠点内における位置座標を示す資源位置情報を取得する位置取得部、
     前記資源情報を、前記資源情報が生成された日時を示す日時情報と対応づけて記憶する拠点資源記憶部が記憶する日時情報に基づいて、前記資源情報と前記資源位置情報とを更新する第1更新部、
     前記複数の拠点それぞれに対応する前記第1更新部により前記拠点資源記憶部が記憶する資源情報と前記資源位置情報とが更新されたか否かを示すフラグ情報を記憶するフラグ記憶部が記憶するフラグ情報に基づいて、拠点資源記憶部が記憶する資源情報と前記資源位置情報とが更新された拠点を特定する特定部、
     前記特定部により特定された拠点に対応する拠点資源管理装置が有する拠点資源記憶部から、前記第1更新部により更新された資源情報と前記資源位置情報とを取得する取得部、
     前記取得部が取得した資源情報と資源位置情報とを用いて、前記複数の拠点それぞれに配置された複数の資源それぞれについて生成された資源情報と資源位置情報とを記憶する複数拠点資源記憶部が記憶する資源情報と資源位置情報とを更新する第2更新部、
     前記複数拠点資源記憶部が記憶する前記資源情報と前記資源位置情報とを用いて、サプライチェーンモデルを生成するモデル生成部、
     として機能させるためのプログラム。
PCT/JP2019/000546 2018-01-12 2019-01-10 サプライチェーンモデル生成システム、サプライチェーンモデル生成方法およびプログラム WO2019139086A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2019564740A JP6873279B2 (ja) 2018-01-12 2019-01-10 サプライチェーンモデル生成システム、サプライチェーンモデル生成方法およびプログラム
CN201980005983.9A CN111615710B (zh) 2018-01-12 2019-01-10 供应链模型生成系统、供应链模型生成方法及记录介质

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018003059 2018-01-12
JP2018-003059 2018-01-12

Publications (1)

Publication Number Publication Date
WO2019139086A1 true WO2019139086A1 (ja) 2019-07-18

Family

ID=67219532

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/000546 WO2019139086A1 (ja) 2018-01-12 2019-01-10 サプライチェーンモデル生成システム、サプライチェーンモデル生成方法およびプログラム

Country Status (3)

Country Link
JP (1) JP6873279B2 (ja)
CN (1) CN111615710B (ja)
WO (1) WO2019139086A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002029611A (ja) * 2000-07-12 2002-01-29 Omron Corp 商品の物流に関するシステム及び方法
JP2003219453A (ja) * 2002-01-17 2003-07-31 Toshiba Corp 所在管理システム、プログラム、所在管理方法
JP2004517378A (ja) * 2000-07-13 2004-06-10 マニュギスティックス・インコーポレイテッド 出荷および輸送を最適化するシステムおよび方法
JP2010170484A (ja) * 2009-01-26 2010-08-05 Panasonic Electric Works Co Ltd 統合サーバ、統合システム
WO2016002278A1 (ja) * 2014-07-03 2016-01-07 株式会社日立製作所 サプライチェーン業務プロセス最適化装置、サプライチェーン業務プロセス最適化方法及びプログラム
WO2016113844A1 (ja) * 2015-01-13 2016-07-21 株式会社日立製作所 サプライチェーン設計装置、サプライチェーン設計方法およびプログラム

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002215858A (ja) * 2001-01-18 2002-08-02 Hitachi Ltd サプライチェーンモデル作成システム
US8170899B2 (en) * 2002-05-29 2012-05-01 Oracle International Corporation Supply chain reservation
JP2004035219A (ja) * 2002-07-05 2004-02-05 Toshiba Corp サプライチェーン・マネージメント支援方法及びその装置、サプライチェーン・マネージメント支援プログラム
WO2006046486A1 (ja) * 2004-10-27 2006-05-04 Nec Corporation 資源管理システム、資源情報提供方法、及び、プログラム
JP2007265127A (ja) * 2006-03-29 2007-10-11 Konica Minolta Holdings Inc サプライチェーンの最適化支援方法
JP2008097330A (ja) * 2006-10-12 2008-04-24 Konica Minolta Holdings Inc サプライチェーンの効率化支援方法
JP2009140140A (ja) * 2007-12-05 2009-06-25 Konica Minolta Holdings Inc サプライチェーン最適化システム及びサプライチェーン最適化方法
CN101655941A (zh) * 2009-09-24 2010-02-24 北京英思沃工业科技有限公司 一种供应链管理方法
JP5028469B2 (ja) * 2009-12-14 2012-09-19 株式会社日立製作所 情報処理装置、リソーススケジュール方法、リソーススケジュールプログラム
JP6591351B2 (ja) * 2016-06-10 2019-10-16 株式会社日立製作所 生産計画作成支援装置および生産計画作成支援方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002029611A (ja) * 2000-07-12 2002-01-29 Omron Corp 商品の物流に関するシステム及び方法
JP2004517378A (ja) * 2000-07-13 2004-06-10 マニュギスティックス・インコーポレイテッド 出荷および輸送を最適化するシステムおよび方法
JP2003219453A (ja) * 2002-01-17 2003-07-31 Toshiba Corp 所在管理システム、プログラム、所在管理方法
JP2010170484A (ja) * 2009-01-26 2010-08-05 Panasonic Electric Works Co Ltd 統合サーバ、統合システム
WO2016002278A1 (ja) * 2014-07-03 2016-01-07 株式会社日立製作所 サプライチェーン業務プロセス最適化装置、サプライチェーン業務プロセス最適化方法及びプログラム
WO2016113844A1 (ja) * 2015-01-13 2016-07-21 株式会社日立製作所 サプライチェーン設計装置、サプライチェーン設計方法およびプログラム

Also Published As

Publication number Publication date
JP6873279B2 (ja) 2021-05-19
CN111615710A (zh) 2020-09-01
CN111615710B (zh) 2023-07-21
JPWO2019139086A1 (ja) 2020-07-30

Similar Documents

Publication Publication Date Title
US20210090024A1 (en) System and Method for Managing and Optimizing Delivery Networks
CN104217233B (zh) 一种条码扫描系统及方法
KR20180056258A (ko) 가구 관련 업무 대행 서비스 제공 장치 및 방법
CN111260330A (zh) 基于区块链的协同平台、方法、设备及可读存储介质
KR20150131742A (ko) 물류 배송지 및 수령지의 동적 스케줄링 방법
KR20220051131A (ko) 다중 도메인 네트워크에서 중앙 집중식 상태 모니터링
US20220245547A1 (en) Method for providing information on whether an item can be ordered and apparatus thereof
KR20170077495A (ko) 택배 배송 방법
KR102677402B1 (ko) 풀필먼트 센터 우선순위 값에 기초한 아웃바운드 예측을 위한 시스템 및 방법
US10771555B2 (en) Relay device and computer-readable medium
US20130297461A1 (en) Method, system and apparatus for integrating order management and warehouse management
KR20210056983A (ko) 우편 번호 매핑에 기초하여 아웃바운드를 예측하기 위한 시스템 및 방법
WO2019139086A1 (ja) サプライチェーンモデル生成システム、サプライチェーンモデル生成方法およびプログラム
KR20210058230A (ko) 창고센터 최적화 운용 서버 및 그 방법
JP6884315B2 (ja) 物流支援方法、システム及びプログラム
CN112817773A (zh) 一种数据处理方法、装置及系统
CN111429072B (zh) 用于处理器具需求信息的方法和装置
KR102421046B1 (ko) 자동으로 발주서를 생성하는 약국 단말 및 약국 단말의 동작 방법
JP2005060108A (ja) 物流管理システム
KR20220168912A (ko) 배송기사를 배정하는 물류관제시스템 및 배송기사를 배정하는 방법
KR20220082376A (ko) 맞춤형 스마트 팩토리 기기 관리 장치
KR20200050367A (ko) 반품 또는 역영업을 위한 택배 시스템 및 방법
KR20090114241A (ko) 자원 공급 수행 성능 분석 시스템
KR20230083588A (ko) 주문관리 서비스를 제공하는 방법 및 그 전자장치
KR20090076259A (ko) 전자태그와 유비쿼터스 센서네트워크를 이용한 물류 관리시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19738586

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019564740

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19738586

Country of ref document: EP

Kind code of ref document: A1