WO2019131665A1 - Système de gestion de tuyau flexible - Google Patents

Système de gestion de tuyau flexible Download PDF

Info

Publication number
WO2019131665A1
WO2019131665A1 PCT/JP2018/047637 JP2018047637W WO2019131665A1 WO 2019131665 A1 WO2019131665 A1 WO 2019131665A1 JP 2018047637 W JP2018047637 W JP 2018047637W WO 2019131665 A1 WO2019131665 A1 WO 2019131665A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
hose
information processing
processing device
individual
Prior art date
Application number
PCT/JP2018/047637
Other languages
English (en)
Japanese (ja)
Inventor
裕児 熊谷
雅巳 田中
智彦 武藤
Original Assignee
株式会社ブリヂストン
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ブリヂストン filed Critical 株式会社ブリヂストン
Priority to CN201880084086.7A priority Critical patent/CN111527511A/zh
Priority to JP2019562042A priority patent/JP7211972B2/ja
Publication of WO2019131665A1 publication Critical patent/WO2019131665A1/fr

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L11/00Hoses, i.e. flexible pipes
    • F16L11/04Hoses, i.e. flexible pipes made of rubber or flexible plastics
    • F16L11/12Hoses, i.e. flexible pipes made of rubber or flexible plastics with arrangements for particular purposes, e.g. specially profiled, with protecting layer, heated, electrically conducting
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management

Definitions

  • the present invention relates to a hose management system.
  • a management system using a non-contact information tag for example, at a construction site where a piping network is laid, related information that can be associated with identification information of piping materials and construction information including construction conditions is read While performing the piping work according to the conditions, automatically detect the site position using GPS etc., store the identification information on the piping material and the position information on the site position, and construct a database as a piping network (See, for example, Patent Document 1).
  • RFID Radio Frequency Identification
  • NFC Near field communication
  • preventive maintenance has been attracting attention in comparison with conventional ex post maintenance (a method of dealing with it after it has been broken). According to the preventive maintenance, it is possible to reduce the failure rate during use by setting in advance a response time such as a replacement time and forcibly replacing parts etc. at the response time. This is because such a thing is required because the impact of downtime due to failure is very large.
  • the invention described in Patent Document 1 aims at collecting site information such as updating of a piping map, and does not assume preventive maintenance. Moreover, the invention described in Patent Document 1 detects the site position (the installation position of the PE pipe) using GPS or the like, and therefore, when the PE pipe is installed in a facility such as a factory or the machine tool, the PE pipe It is difficult to detect the installation position of
  • Patent Document 2 it is possible to record information necessary for an information tag for the purpose of tube replacement and ordering of a new tube.
  • An object of the present invention relates to an individual hose piped to a facility or machine, and a database is created having information related to the hose and the facility or the machine, and the hose and the facility or the machine It is providing a management system of hose which can cope with various problems resulting from the relationship with.
  • hose as used herein includes not only a single hose, a single fitting attached to the hose, but also a combination of a hose and a fitting.
  • the hose management system is attached to a hose piped to a facility or machine, and identification information of the hose, association information for correlating the hose with the facility or the machine, and other information
  • An information tag in which individual hose information is stored, including at least any one, and the individual hose information of the information tag can be read or written in a noncontact manner, and can input / output the individual hose information
  • the information in the database is updated based on the storage unit in which the database having the information is stored and the individual hose information from the input unit. And a control unit,.
  • equipment means equipment installed indoors or outdoors, for example, piping equipment in a factory.
  • machine refers to a machine having a hose piped, and examples thereof include machine tools (for example, industrial robots) intended for processing and construction machines intended for civil engineering and construction work.
  • machine tools for example, industrial robots
  • a database having information in which the hose and the facility or the machine are associated is constructed, and the hose is It is possible to cope with various problems resulting from the relationship between the equipment and the equipment or the machine.
  • the information tag is preferably an IC tag, and the terminal is preferably a reader / writer.
  • the individual hose information of the plurality of information tags can be easily updated.
  • the individual hose information of the information tag and the individual hose information stored in the information processing apparatus connected via the network are butted in the input unit.
  • "to be matched" means to compare the individual hose information of the information tag with the individual hose information stored in the information processing apparatus. In this case, since the individual hose information can be input to the control unit from another information processing apparatus, the information in the database can be updated more accurately.
  • another information processing apparatus is connected to the network, and the information processing apparatus includes a customer-side information processing apparatus, a store-side information processing apparatus, and a maker side. Any one of the three information processing apparatuses with the information processing apparatus, the other information processing apparatus is the remaining two of the three information processing apparatuses, and the database is on the customer side It is preferable that the information processing apparatus can be shared with at least one of the information processing apparatus, the dealer-side information processing apparatus, and the manufacturer-side information processing apparatus. In this case, information exchange such as ordering can be smoothly performed among the customer, the dealer and the manufacturer.
  • control unit is configured to perform the individual hose piping to the facility or the machine based on the individual hose information from the input unit and the information of the database. It is preferable to calculate at least one of the number of times of replacement of the hose and the replacement cycle. In this case, it is possible to grasp the durability of the individual hoses provided to the equipment or the machine according to the hoses.
  • the control unit is configured to perform the individual hose piping to the facility or the machine based on the individual hose information from the input unit and the information of the database.
  • the terminal, the information processing apparatus, or the information processing apparatus acquires the previous replacement time when the hose has been replaced and the replacement cycle of the hose, and before or after the replacement cycle has elapsed from the previous replacement time.
  • a warning is issued to at least one of the customer-side information processing device, the store-side information processing device, and the manufacturer-side information processing device. In this case, it is possible to grasp the failure frequency according to the hose or the individual hoses plumbed to the equipment or the machine and to suppress the stock shortage by warning in advance of the stock shortage.
  • the required number of the hoses per unit period can be calculated for each of the hoses piping to the equipment or the machine from the information on the replacement cycle. In this case, options for subsequent management can be expanded.
  • the management system of a hose which concerns on this invention, it can calculate as an appropriate stock quantity of the said hose based on the required number of the said hose per unit period. For example, the total number obtained by adding the spare number to the required number can be set as the appropriate stock quantity of the hose. In this case, the stock of the hose can be made appropriate for each of the hoses that are piped to the equipment or the machine.
  • the control unit is configured to perform the individual hose piping to the facility or the machine based on the individual hose information from the input unit and the information of the database. If the number of stock hoses is obtained and the number of stock hoses is less than or equal to a certain number, the terminal, the information processor, the customer side information processor, the store side information processor, and the manufacturer side information processor Preferably, at least one warning is issued. In this case, the stock shortage of the hoses can be suppressed in advance for the individual hoses provided to the equipment or machine.
  • the control unit performs at least one of a store-side information processing apparatus and a manufacturer-side information processing apparatus with respect to an individual hose piped to the facility or the machine.
  • automatic ordering of the hose is performed.
  • the stock shortage can be suppressed by placing an order for the individual hoses plumbed to the equipment or machine before the stock shortage of the hoses.
  • the control unit is configured to perform the individual hose piping to the facility or the machine based on the individual hose information from the input unit and the information of the database.
  • at least one of the information processing device, the store information processing device, and the maker information processing device is notified that the hose has been replaced.
  • identification information of the hose is input to the input unit, and the control unit can know the history of the hose by the identification information of the hose, check the date and time when the hose was checked, and the hose Record individual information of Even when there is an abnormality in the condition of the hose, the checked date and time are recorded, so that the replacement cycle of the hose connected to the apparatus or machine can be known.
  • the terminal and the information processing apparatus may be integrated.
  • the information can be processed directly in the information processing apparatus by the operation of the terminal without remotely transmitting the information from the terminal.
  • a database having information relating to the hose and the equipment or the machine is constructed, and the hose and the equipment or the machine It is possible to provide a hose management system capable of coping with various problems resulting from the relationship between the two.
  • FIG. 1 is a diagram schematically showing the configuration of a hose management system 100 according to an embodiment of the present invention.
  • the management system 100 relates to the individual hoses 10 piped to a facility or machine, and constructs a database having information related to the hose 10 and the facility or the machine, and the hose 10 and the facility or machine or It is possible to cope with various problems caused by the relationship with the machine.
  • the hose 10 is a pressure hose which is piped to piping equipment in the factory on the customer side.
  • the hose 10 is composed of a hose body 11 and two connection fittings 12. Each of the connection fittings 12 is fixed to the end of the hose body 11 by using a fixing method such as caulking.
  • the management system 100 basically includes an information tag 1, a terminal 2, and an information processing device 3. In the present embodiment, the management system 100 further includes the information processing devices 4, 5 and 6.
  • the information tag 1 is attached to the hose 10 on the customer side, and individual hose information is stored.
  • the individual hose information includes identification information of the hose 10, association information for associating the hose 10 with equipment or a machine, and other information.
  • identification information is information for specifying the said hose 10 itself.
  • a product ID number may be mentioned.
  • the product ID number is a number associated with information for identifying a product, such as a product number and a product name.
  • relationship information is information for specifying the said hose 10 in relation to the said installation or the said machine about the individual hose 10 piping to the installation or a machine.
  • association information for example, an installation position number indicating the installation position of the hose 10 allocated in relation to the position of the predetermined part of the equipment or the machine, and a plurality of hoses from the predetermined position of the equipment or machine The number etc. which show the order when piping 10 sequentially are mentioned.
  • other information is information other than the identification number and the association information.
  • inspection time information indicating the inspection time when the hose 10 was inspected
  • installation time information indicating the installation time when the hose 10 was installed
  • the hose 10 were replaced
  • the hose 10 stored in the database is accessed (replacement) information on replacement time information indicating the time of replacement, stock number assigned to recognize the stock quantity of hose 10, and information on hose 10 Information for retrieving information on
  • the individual hose information of the information tag 1 can be read in a non-contact manner.
  • the information tag 1 include a barcode tag, a QR code (registered trademark) tag and other two-dimensional tags, an IC tag, and the like.
  • specific examples of the IC tag include an RFID tag and an NFC tag.
  • the information tag 1 is an IC tag. Even when dirt is attached to the IC tag, the information can be read compared to other information tags such as a barcode tag.
  • the information tag 1 is an RFID tag having a long communication distance. In this case, it is possible to read information from a further distance.
  • RFID tags can be divided into an active type that transmits information waves and a passive type that does not transmit information waves.
  • the information tag 1 is a passive RFID tag that does not have a power supply. In this case, power saving can be achieved. An RFID tag with a short communication distance can also be adopted. In this case, there is no fear of dirt as in the case of QR code (registered trademark), and in the case of an RFID tag having a long communication distance, unnecessary data of the hose around it may be read at once. You can prevent points.
  • QR code registered trademark
  • the terminal 2 is a terminal that can read or write the individual hose information of the information tag 1 in a noncontact manner, and can input and output the individual hose information.
  • the terminal 2 is used on the customer side.
  • the terminal 2 include a barcode tag reader, a QR code tag reader, an IC tag reader, a smartphone, a tablet terminal, and the like.
  • an RFID reader and an NFC reader may be mentioned.
  • the terminal 2 is an RFID reader.
  • the RFID reader is an RFID reader / writer (reader / writer) capable of rewriting the individual hose information of the information tag 1.
  • the RFID reader / writer can read and rewrite the individual hose information of the information tag 1 by the radio wave transmitted by itself.
  • the terminal 2 has a display unit 2 a for displaying the individual hose information read from the information tag 1 and an input unit 2 b for rewriting the individual hose information of the information tag 1.
  • the information tag 1 is an IC tag
  • the terminal 2 is a reader / writer.
  • the individual hose information of the plurality of information tags 1 can be read at one time simply by holding the terminal 2 large.
  • the information processing device 3 includes an input unit 3a, a storage unit 3b, a control unit 3c, an output unit 3d, and a display unit 3e.
  • the information processing device 3 is used on the maker (in the present embodiment, a hose maker) side.
  • Specific examples of the information processing apparatus 3 include a computer such as a server and a personal computer.
  • the information processing device 3 is a server.
  • the individual hose information of the information tag 1 is input to the input unit 3a.
  • the input unit 3a inputs / outputs data (the individual hose information) read from the information tag 1 to the control unit 3c.
  • Specific examples of the input unit 3a are an input / output interface and a main storage device (main memory).
  • the output unit 3d outputs the calculation result processed by the control unit 3c and the data stored in the storage unit 3b to the outside.
  • Specific examples of the output unit 3 d are an input / output interface and a main storage device (main memory).
  • the storage unit 3 b stores a database.
  • the database uses the identification information, the association information, and the other information as information.
  • a specific example of the storage unit 3 b is an auxiliary storage device such as a hard disk.
  • the storage unit 3 b can use a part of the storage area as a database storage area.
  • the storage unit 3 b has an individual database corresponding to the hose 10 for the individual hoses 10 piped to a predetermined part of the facility or the machine based on the association information,
  • the identification information of the hose 10 and the other information are individually managed. Further, information of each database can be shared among the databases as information associated with the association information.
  • the control unit 3c updates the information in the database based on the individual hose information from the input unit 3a.
  • control unit 3c is a CPU.
  • the information processing device 3 is connected to the network via the input unit 3a.
  • the network is a wireless or wired communication network.
  • an information processing apparatus (other information processing apparatus) 4 and an information processing apparatus (other information processing apparatus) 5 are connected to the network.
  • the information processing device 4 is a personal computer.
  • the input / output from the terminal 2 is input to the information processing device 3 via, for example, a cloud.
  • the individual hose information of the information tag 1 can be input from the terminal 2 to the information processing device 3.
  • the input and output from the terminal 2 can be input to the information processing device 4.
  • the individual hose information of the information tag 1 can be input from the terminal 2 to the information processing device 3 through the information processing device 4.
  • the input unit 3a of the information processing device 3 stores the individual hose information of the information tag 1 and the information stored in the information processing device 4 via the information processing device 4 connected to the network.
  • the individual hose information is matched.
  • “to be matched” means to compare the individual hose information of the information tag 1 with the individual hose information stored in the information processing device 4.
  • the information of the database stored in the information processing device 3 is It can be updated.
  • the individual hose information can be input also from the information processing device 4, the information of the database can be updated more accurately.
  • the individual hose information can be input also from the information processing apparatus 5 by using a keyboard or the like.
  • the information processing device 3 is a manufacturer-side information processing device.
  • the information processing apparatus 3 is one of three information processing apparatuses: a customer side information processing apparatus, a store side information processing apparatus, and a manufacturer side information processing apparatus.
  • the information processing device 4 is a customer side information processing device.
  • an information processing apparatus 5 is connected to the network.
  • the information processing device 5 is a personal computer.
  • the information processing device 5 is a store side information processing device.
  • the database can be shared with at least one of the customer-side information processing device, the store-side information processing device, and the manufacturer-side information processing device. In this case, information exchange such as ordering can be smoothly performed among the customer, the dealer and the manufacturer.
  • control unit 3c of the information processing device 3 is piped to a predetermined portion of the facility or the machine based on the individual hose information from the input unit 3a and the information of the database. For each individual hose 10, it is possible to calculate at least one of the number of replacement of the hose 10 and the replacement cycle. In this case, it is possible to grasp the durability of the individual hoses 10 piped to a predetermined part of the equipment or the machine according to the hoses 10. The input of the number of times of replacement and the attachment timing or removal timing of the hose for calculating the replacement cycle may be written by the terminal 2 or may be manually input directly to the information processing apparatus 3 by using a keyboard or the like as described above. .
  • FIG. 3 is a flowchart showing an example of the exchange information acquisition operation of the information processing device 3 according to the present embodiment. It is assumed that the process in FIG. 3 is triggered by the input of the individual hose information of the information tag 1 to the input unit 3a of the information processing device 3 as a trigger.
  • the control unit 3c acquires individual hose information of the information tag 1 from the input unit 3a (Step 101).
  • the individual hose information for example, the identification number, the installation position number of the hose 10 as the association information, and the replacement time information as the other information are acquired.
  • control unit 3c acquires information from the database from the storage unit 3b (step 102).
  • information from the database for example, based on the association information acquired from the input unit 3a, identification of the hose 10 piped to a predetermined portion of the facility or the machine from a database associated with the association information.
  • the identification number stored in the database corresponding to the hose 10 and the replacement time information stored in the database are acquired.
  • control unit 3c controls the hose 10 piped to a predetermined part of the facility or the machine based on the individual hose information of the information tag 1 acquired from the input unit 3a and the information acquired from the database. At least one of the number of exchanges and the exchange cycle is acquired (step 103).
  • the presence or absence of replacement of the hose 10 piped to a predetermined part of the equipment or the machine may be determined, for example, from the identification number acquired from the input unit 3a and the database associated with the hose 10 It can be determined by comparing with the acquired identification number. Alternatively, it can be determined from the exchange time information acquired from the input unit 3a.
  • the identification number acquired from the input unit 3a does not match the identification number acquired from the database, different hoses 10 are installed at the same site of the facility or the machine, and are installed at the site. It is determined that the hose 10 has been replaced.
  • the number of times of replacement of the hose 10 can be calculated by counting the number of times of determination that the hose 10 has been replaced.
  • the determination that the hose 10 has been replaced is stored in the database as the previous replacement time, and it is determined from the determination that the hose 10 is newly replaced. It can be calculated by measuring the time until In the present embodiment, the replacement cycle of the hose 10 can be stored in the database as information of the database.
  • the control unit 3c of the information processing device 3 selects the individual hoses piped to the facility or the machine based on the individual hose information from the input unit 3a and the information of the database. 10, when the previous replacement time when the hose 10 was replaced and the replacement cycle of the hose 10 were acquired, and when the replacement cycle passed from the previous replacement time, the terminal 2, the information processing device 3 ( A warning can be issued to at least one of the maker side information processing device), the information processing device 4 (customer side information processing device), and the information processing device 5 (store side information processing device). In this case, the failure frequency according to the hose 10 can be grasped about the individual hoses 10 piping to the equipment or the machine, and the stock shortage can be suppressed by warning in advance of the stock shortage.
  • FIG. 4 is a flowchart showing an example of the warning / ordering operation of the information processing apparatus 3 according to the present embodiment. It is assumed that the process in FIG. 4 is triggered by the fact that the individual hose information of the information tag 1 is input to the input unit 3a of the information processing device 3.
  • the control unit 3c acquires individual hose information of the information tag 1 from the input unit 3a (step 201).
  • the individual hose information for example, the identification number, the installation position number of the hose 10 as the association information, and the replacement time information as the other information are acquired.
  • control unit 3c acquires information from the database from the storage unit 3b (step 202).
  • information from the database for example, based on the association information acquired from the input unit 3a, identification of the hose 10 piped to a predetermined portion of the facility or the machine from a database associated with the association information.
  • the identification number stored in the database corresponding to the hose 10 and the replacement time information stored in the database are acquired.
  • control unit 3c controls the hose 10 piped to the predetermined part of the facility or the machine based on the individual hose information of the information tag 1 acquired from the input unit 3a and the information acquired from the database. Then, the previous replacement time when the hose 10 was replaced and the replacement cycle of the hose 10 are acquired (step 203).
  • the previous replacement time and replacement cycle can be calculated in the same manner as step 102 in FIG.
  • the control unit 3c determines whether the replacement cycle has passed from the previous replacement time (step 204).
  • whether or not the replacement cycle has passed since the previous replacement time is, for example, the input of information from the current input unit 3a from the previous replacement time calculated from the replacement time information acquired from the input unit 3a. It can be determined by measuring the time until the time there is an event and comparing the time with the exchange cycle. In this case, when the time is longer than the replacement cycle, it is determined that the replacement cycle has passed since the previous replacement time.
  • the control unit 3c determines that the replacement cycle has elapsed since the previous replacement time, the terminal 2, the information processing device 3 (manufacturer-side information processing device), the information processing device 4 (customer-side information processing device), information A warning is issued to at least one of the processing devices 5 (store side information processing device) (step 205).
  • the control unit 3c can display a warning by color on, for example, at least one display unit of the terminal 2, the information processing device 3, the information processing device 4, and the information processing device 5.
  • the display unit 3 e of the information processing device 3 is an image display of the personal computer 6 connected to the information processing device 3.
  • the display units of the information processing device 4 and the information processing device 5 are also displays for the respective images.
  • the information processing device 3 (manufacturer-side information processing device) and information processing together with the warning or in place of the warning.
  • Automatic ordering of the hose 10 piped to a predetermined part of the equipment or the machine is performed in at least one of the devices 5 (store side information processing device) (step 205). In this case, it is possible to suppress the stock shortage by placing an order before the stock shortage of the hoses 10 with respect to the individual hoses 10 piped to a predetermined part of the facility or machine.
  • the warning / ordering operation of the information processing device 3 is ended as it is.
  • the necessary number of hoses 10 per unit period can be calculated for each of the hoses 10 piped to the equipment or the machine from the information of the replacement cycle.
  • options for subsequent management can be expanded.
  • calculation can be performed as the appropriate stock quantity of the hose based on the required number of the hoses 10 per unit period.
  • the total number obtained by adding the spare number to the required number can be set as the appropriate stock quantity of the hose 10.
  • the stock number of the hoses 10 can be made appropriate for each of the hoses 10 that are piped to the equipment or the machine.
  • the control unit 3c of the information processing device 3 is piped to a predetermined portion of the facility or the machine based on the individual hose information from the input unit 3a and the information of the database.
  • the stock number of the hose 10 is acquired for each individual hose 10, and when the stock number is equal to or less than a certain number, the terminal 2, the information processing device 3 (manufacturer-side information processing device), the information processing device 4 ( A warning can be issued to at least one of the customer side information processing device) and the information processing device 5 (store side information processing device).
  • the stock shortage of the hoses 10 can be suppressed in advance with respect to the individual hoses 10 piped to a predetermined part of the facility or machine.
  • FIG. 5 is a flowchart showing another example of the warning / ordering operation of the information processing apparatus 3 according to the present embodiment. It is assumed that the process of FIG. 5 is triggered by the input of the individual hose information of the information tag 1 to the input unit 3a of the information processing device 3 as a trigger.
  • the control unit 3c acquires individual hose information of the information tag 1 from the input unit 3a (step 301).
  • the individual hose information for example, the identification number, the installation position number of the hose 10 as the association information, and the inventory number as the other information are acquired.
  • control unit 3c acquires information from the database from the storage unit 3b (step 302).
  • information from the database for example, based on the association information acquired from the input unit 3a, identification of the hose 10 piped to a predetermined portion of the facility or the machine from a database associated with the association information.
  • the control unit 3c controls the hose 10 piped to the part of the facility or the machine based on the individual hose information of the information tag 1 acquired from the input unit 3a and the information acquired from the database.
  • the stock quantity of the hose 10 is acquired (step 303).
  • the stock quantity of the hose 10 can be calculated from the stock number acquired from the input unit 3a. Then, when placed in a facility or machine, the stock number is deleted, the installation position number according to each placement location is assigned, and it is rewritten on the database.
  • control unit 3c determines whether or not the stock quantity of the hoses 10 is equal to or less than a certain number (step 304). In the present embodiment, whether or not the stock quantity of the hose 10 is equal to or less than a certain number is determined by comparing the stock number acquired from the input unit 3a with a predetermined stock number stored in advance in the database. It can be judged.
  • control unit 3c determines that the inventory quantity is equal to or less than a predetermined number, the control unit 3c issues a warning to at least one of the terminal 2, the information processing device 3, the information processing device 4, and the information processing device 5 (step 305). In the present embodiment, the control unit 3c issues the same warning as in step 205 to at least one of the terminal 2, the information processing device 3, the information processing device 4, and the information processing device 5.
  • the control unit 3c determines that the stock quantity is equal to or less than a certain number
  • the information processing device 3 manufactured-side information processing device
  • the information processing device 5 sales
  • the automatic order similar to step 205 is performed for the hose 10 piped to a predetermined part of the equipment or the machine in at least one of the store-side information processing devices (step 305).
  • the stock shortage can be suppressed by placing an order before the stock shortage of the hose 10 with respect to the individual hoses 10 piped to a predetermined portion of the equipment or the machine.
  • the warning / ordering operation of the information processing device 3 is ended as it is.
  • the control unit 3c of the information processing device 3 is piped to a predetermined portion of the facility or the machine based on the individual hose information from the input unit 3a and the information of the database.
  • the individual hoses 10 obtain the previous replacement time when the hose 10 was replaced and the replacement cycle of the hose 10, and replace them in advance before the replacement cycle has elapsed from the previous replacement time.
  • the necessary hose 10 is determined, and at least one of the terminal 2, the information processing device 3 (manufacturer side information processing device), the information processing device 4 (customer side information processing device), and the information processing device 5 (store side information processing device) It is preferable to notify one or the other in advance.
  • a repair plan can be formulated in advance before replacing the hoses 10 for the individual hoses 10 piped to a predetermined part of the equipment or the machine.
  • FIG. 6 is a flowchart showing an example of the advance notification operation of the information processing apparatus according to the present embodiment. It is assumed that the process of FIG. 6 is triggered by the input of the individual hose information of the information tag 1 to the input unit 3a of the information processing device 3 as a trigger.
  • the control unit 3c acquires individual hose information of the information tag 1 from the input unit 3a (Step 401).
  • acquisition of the individual hose information from the input unit 3a is the same as step 201 in FIG.
  • control unit 3c acquires information from the database (step 402).
  • acquisition of information from the database is similar to step 202 of FIG.
  • control unit 3c controls the hose 10 piped to the part of the facility or the machine based on the individual hose information of the information tag 1 acquired from the input unit 3a and the information acquired from the database.
  • the previous replacement time when the hose 10 was replaced and the replacement cycle of the hose 10 are acquired (step 403).
  • the previous replacement time and replacement cycle can be calculated in the same manner as step 203 in FIG.
  • the control unit 3c determines in advance the hose 10 which needs to be replaced before the replacement cycle has passed from the previous replacement time (step 404).
  • whether or not the replacement cycle has passed from the previous replacement time is calculated, for example, from the replacement time information acquired from the input unit 3a as in step 204 of FIG. It can be determined by measuring the time until the time when the information from the input unit 3a is input this time, and comparing the time with the exchange cycle. In this case, when the time is shorter than the replacement cycle, it is determined that the replacement cycle has not passed since the previous replacement time.
  • warning and automatic ordering are performed in the same manner as step 205.
  • control unit 3c determines in advance the hose 10 that needs to be replaced (step 405). In this embodiment, it is determined whether or not a predetermined time has elapsed from the previous replacement time. If it is determined that a predetermined time has elapsed from the previous replacement time, it is determined in advance that the hose 10 needs to be replaced.
  • the predetermined time is, for example, a time shorter than the preset replacement cycle, and can be set as appropriate.
  • control unit 3 c determines in advance the hose 10 that needs to be replaced, the terminal 2, the information processing device 3 (manufacturer-side information processing device), the information processing device 4 (customer-side information processing device), the information processing device 5 (selling Prior notification is given to at least one of the store-side information processing devices). Moreover, the control part 3c does not perform the said prior notification, when it does not judge beforehand the hose 10 which needs replacement
  • the control unit 3c of the information processing device 3 is piped to a predetermined portion of the facility or the machine based on the individual hose information from the input unit 3a and the information of the database.
  • the individual hoses 10 at least one of the information processing device 3 (manufacturer side information processing device) and the information processing device 5 (store side information processing device) that the hose 10 has been replaced Notification is preferable.
  • the notification can display, for example, a color on at least one display unit of the information processing device 3 and the information processing device 5 as in step 205 of FIG. 4, for example. In this case, duplication of ordering of the hose 10 can be prevented with respect to the individual hoses 10 which are piped to a predetermined part of the equipment or the machine.
  • FIG. 7 is a flowchart showing an example of the notification operation of the information processing device 3 according to the present embodiment. It is assumed that the process of FIG. 7 is triggered by the fact that the individual hose information of the information tag 1 is input to the input unit 3a of the information processing device 3.
  • the control unit 3c acquires individual hose information of the information tag 1 from the input unit 3a (step 501).
  • the individual hose information for example, the identification number and the installation position number of the hose 10 as the association information are acquired.
  • control unit 3c acquires information from the database from the storage unit 3b (step 502).
  • information from the database for example, based on the association information acquired from the input unit 3a, identification of the hose 10 piped to a predetermined portion of the facility or the machine from a database associated with the association information.
  • the identification number stored in the database corresponding to the hose 10 is acquired.
  • control unit 3c controls the individual hoses of the equipment or the predetermined part of the machine based on the individual hose information of the information tag 1 acquired from the input unit 3a and the information acquired from the database. For 10, it is determined whether the hose 10 has been replaced (step 503). In the present embodiment, whether or not the hose 10 has been replaced is determined, for example, in the same manner as in step 102 of FIG. 3.
  • control unit 3c determines that the hose 10 has been replaced, the control unit 3c detects that the replacement has been performed by the information processing device 3 (manufacturer-side information processing device) and the information processing device 5 (voucher-side information processing device). At least one is notified (step 504). When the controller 3c does not determine that the hose 10 has been replaced, the controller 3c ends the notification operation.
  • a database having information in which the hose 10 and the equipment or the machine are associated It is possible to provide a management system of the hose 10 which can be constructed and can cope with various problems caused by the relationship between the hose 10 and the equipment or the machine.
  • identification information of the hose 10 is input to the input unit 3a, and the control unit 3c can know the history of the hose 10 by the identification information of the hose 10.
  • the input of the status information of the hose 10 for example, the result of the inspection work performed on the customer side may be input to the information processing device 3 by the operation of the terminal 2.
  • the terminal 2 and the information processing apparatus 3 can be integrated.
  • the terminal 2 may be a smartphone or a tablet.
  • the information can be processed directly in the information processing apparatus 3 by the operation of the terminal 2 without remotely transmitting the information from the terminal 2.
  • the personal computer 6 connected to the information processing device 3 can be omitted.
  • the information processing device 3 can be replaced with a personal computer.
  • the information processing device 4 has been described as one information processing device, it may be a plurality of information processing devices 4 connected to a network. The same applies to the information processing device 5.
  • the various configurations adopted in each of the above-described embodiments can be combined with each other as appropriate, and can be replaced.
  • Information tag 1: Information tag
  • 2: Terminal 3: Information processing device (manufacturer side information processing device)

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Mechanical Engineering (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

L'invention concerne un système de gestion de tuyau flexible dans lequel il est possible de construire une base de données ayant des informations, un tuyau flexible posé dans une installation, etc., et l'installation, etc., étant corrélés ; ledit système résolvant un problème découlant d'une relation entre le tuyau et l'installation, etc. La présente invention comprend : une étiquette (1) comprenant au moins une information d'identification concernant un tuyau flexible (10), des informations de corrélation qui mettent en corrélation le tuyau (10) avec une installation, etc, et d'autres informations ; un terminal (2) qui est capable de lire les informations de l'étiquette (1) par un système sans contact et également capable d'entrer et d'émettre les informations ; et un dispositif de traitement d'informations (3). Le dispositif de traitement d'informations (3) comprend : une unité d'entrée dans laquelle sont entrées les informations de l'étiquette (1); une unité de stockage dans laquelle est stockée une base de données ayant les informations d'identification, les informations de corrélation et les autres informations en tant qu'informations constituant la base de données ; et une unité de commande pour mettre à jour les informations de la base de données en fonction des informations provenant de l'unité d'entrée.
PCT/JP2018/047637 2017-12-26 2018-12-25 Système de gestion de tuyau flexible WO2019131665A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201880084086.7A CN111527511A (zh) 2017-12-26 2018-12-25 软管的管理系统
JP2019562042A JP7211972B2 (ja) 2017-12-26 2018-12-25 ホースの管理システム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017250245 2017-12-26
JP2017-250245 2017-12-26

Publications (1)

Publication Number Publication Date
WO2019131665A1 true WO2019131665A1 (fr) 2019-07-04

Family

ID=67063642

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/047637 WO2019131665A1 (fr) 2017-12-26 2018-12-25 Système de gestion de tuyau flexible

Country Status (3)

Country Link
JP (1) JP7211972B2 (fr)
CN (1) CN111527511A (fr)
WO (1) WO2019131665A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113408748A (zh) * 2020-02-28 2021-09-17 株式会社普利司通 管理装置以及管理系统
WO2023248501A1 (fr) * 2022-06-22 2023-12-28 横浜ゴム株式会社 Système et procédé de surveillance de tuyau marin

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116166194B (zh) * 2023-01-16 2023-11-03 广州辰创科技发展有限公司 一种装备保障维修维护管理方法及系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003167966A (ja) * 2001-11-29 2003-06-13 Mitsubishi Electric Corp 定期保守管理システム
JP2008059067A (ja) * 2006-08-29 2008-03-13 Matsushita Electric Ind Co Ltd 期日管理方法、期日管理システムおよびその関連技術
JP2008077684A (ja) * 2001-01-22 2008-04-03 Tokyo Electron Ltd 機器の生産性を向上させる方法
JP2014006716A (ja) * 2012-06-25 2014-01-16 Nec Fielding Ltd 端末装置、icタグ、機器保守システム、処理方法、プログラム

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004263724A (ja) * 2003-02-14 2004-09-24 Ntn Corp Icタグを用いた機械部品
JP2005322124A (ja) * 2004-05-11 2005-11-17 Nec Fielding Ltd Icタグを組み込んだ電子機器の保守/再生システム及びその保守/再生方法
US7575160B2 (en) * 2006-09-15 2009-08-18 Ncr Corporation Security validation of machine components
CN106022403B (zh) * 2016-05-11 2018-08-21 华中科技大学 一种基于rfid的车间生产设备检修记录系统和方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008077684A (ja) * 2001-01-22 2008-04-03 Tokyo Electron Ltd 機器の生産性を向上させる方法
JP2003167966A (ja) * 2001-11-29 2003-06-13 Mitsubishi Electric Corp 定期保守管理システム
JP2008059067A (ja) * 2006-08-29 2008-03-13 Matsushita Electric Ind Co Ltd 期日管理方法、期日管理システムおよびその関連技術
JP2014006716A (ja) * 2012-06-25 2014-01-16 Nec Fielding Ltd 端末装置、icタグ、機器保守システム、処理方法、プログラム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113408748A (zh) * 2020-02-28 2021-09-17 株式会社普利司通 管理装置以及管理系统
WO2023248501A1 (fr) * 2022-06-22 2023-12-28 横浜ゴム株式会社 Système et procédé de surveillance de tuyau marin

Also Published As

Publication number Publication date
JPWO2019131665A1 (ja) 2020-12-24
JP7211972B2 (ja) 2023-01-24
CN111527511A (zh) 2020-08-11

Similar Documents

Publication Publication Date Title
US10430754B2 (en) Monitoring parts in a facility
WO2019131665A1 (fr) Système de gestion de tuyau flexible
US10210476B2 (en) Out of stock item tracking at retail sales facilities
JP6725063B2 (ja) 設備管理システム
US20160224927A1 (en) Work information modelling
JP4911386B2 (ja) 保守作業支援システム及びその方法
CN105794180A (zh) 用于资产监控的通用无线平台的方法和系统
JP2006209594A (ja) メインテナンス支援システム
JP5878262B1 (ja) 配送管理システム及び配送管理方法
WO2013120209A1 (fr) Techniques de traçabilité des actifs pour infrastructure pétrolière et gazière
WO2016164522A1 (fr) Système et procédé de gestion du cycle de vie d'un produit
KR20110025828A (ko) 생산 환경에서 소모품의 모니터, 제어 및 인출을 위한 시스템 및 프로세스
JP2007323497A (ja) 進捗管理システム及び管理サーバ
KR20140070817A (ko) 선박 의장 공정 및 자재 관리를 위한 실시간 모니터링 시스템
JP5153217B2 (ja) 空調及び衛生設備の管理システム
CN111595081A (zh) 维护检修方法、维护检修系统和信息终端
JP5461265B2 (ja) 保守作業支援システム
KR20150138958A (ko) Nfc 기반 플랜트 관리 시스템
JP2022163608A5 (fr)
JP2007213311A (ja) プラントの予防保全支援システム
JP2018179792A (ja) リターナブル容器の修理支援システム及び方法
JP6090965B2 (ja) 在庫部品管理システム及び在庫部品管理方法
KR20170014936A (ko) 배관재 관리 시스템 및 그 방법
US20230237431A1 (en) Distributed device usage for planogram generation
JP2005234942A (ja) プラントの予防保全システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18894542

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2019562042

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18894542

Country of ref document: EP

Kind code of ref document: A1