WO2019092773A1 - スクリューロータの加工方法及びスクリューロータのリード補正計算装置 - Google Patents

スクリューロータの加工方法及びスクリューロータのリード補正計算装置 Download PDF

Info

Publication number
WO2019092773A1
WO2019092773A1 PCT/JP2017/040050 JP2017040050W WO2019092773A1 WO 2019092773 A1 WO2019092773 A1 WO 2019092773A1 JP 2017040050 W JP2017040050 W JP 2017040050W WO 2019092773 A1 WO2019092773 A1 WO 2019092773A1
Authority
WO
WIPO (PCT)
Prior art keywords
lead
screw rotor
correction
error
rotor
Prior art date
Application number
PCT/JP2017/040050
Other languages
English (en)
French (fr)
Inventor
敏夫 山中
幸治 内海
青木 久
芳行 山田
秀太朗 栢沼
Original Assignee
日立ジョンソンコントロールズ空調株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立ジョンソンコントロールズ空調株式会社 filed Critical 日立ジョンソンコントロールズ空調株式会社
Priority to EP17930163.5A priority Critical patent/EP3708839A4/en
Priority to JP2018555709A priority patent/JP6450895B1/ja
Priority to PCT/JP2017/040050 priority patent/WO2019092773A1/ja
Priority to CN201780075067.3A priority patent/CN110073107B/zh
Publication of WO2019092773A1 publication Critical patent/WO2019092773A1/ja
Priority to US16/434,190 priority patent/US11890721B2/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B49/00Measuring or gauging equipment for controlling the feed movement of the grinding tool or work; Arrangements of indicating or measuring equipment, e.g. for indicating the start of the grinding operation
    • B24B49/02Measuring or gauging equipment for controlling the feed movement of the grinding tool or work; Arrangements of indicating or measuring equipment, e.g. for indicating the start of the grinding operation according to the instantaneous size and required size of the workpiece acted upon, the measuring or gauging being continuous or intermittent
    • B24B49/04Measuring or gauging equipment for controlling the feed movement of the grinding tool or work; Arrangements of indicating or measuring equipment, e.g. for indicating the start of the grinding operation according to the instantaneous size and required size of the workpiece acted upon, the measuring or gauging being continuous or intermittent involving measurement of the workpiece at the place of grinding during grinding operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B5/00Machines or devices designed for grinding surfaces of revolution on work, including those which also grind adjacent plane surfaces; Accessories therefor
    • B24B5/02Machines or devices designed for grinding surfaces of revolution on work, including those which also grind adjacent plane surfaces; Accessories therefor involving centres or chucks for holding work
    • B24B5/16Machines or devices designed for grinding surfaces of revolution on work, including those which also grind adjacent plane surfaces; Accessories therefor involving centres or chucks for holding work for grinding peculiarly surfaces, e.g. bulged
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C18/00Rotary-piston pumps specially adapted for elastic fluids
    • F04C18/08Rotary-piston pumps specially adapted for elastic fluids of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing
    • F04C18/082Details specially related to intermeshing engagement type pumps
    • F04C18/084Toothed wheels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C18/00Rotary-piston pumps specially adapted for elastic fluids
    • F04C18/08Rotary-piston pumps specially adapted for elastic fluids of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing
    • F04C18/12Rotary-piston pumps specially adapted for elastic fluids of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing of other than internal-axis type
    • F04C18/14Rotary-piston pumps specially adapted for elastic fluids of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing of other than internal-axis type with toothed rotary pistons
    • F04C18/16Rotary-piston pumps specially adapted for elastic fluids of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing of other than internal-axis type with toothed rotary pistons with helical teeth, e.g. chevron-shaped, screw type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C2/00Rotary-piston machines or pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C29/00Component parts, details or accessories of pumps or pumping installations, not provided for in groups F04C18/00 - F04C28/00
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C29/00Component parts, details or accessories of pumps or pumping installations, not provided for in groups F04C18/00 - F04C28/00
    • F04C29/06Silencing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B19/00Single-purpose machines or devices for particular grinding operations not covered by any other main group
    • B24B19/02Single-purpose machines or devices for particular grinding operations not covered by any other main group for grinding grooves, e.g. on shafts, in casings, in tubes, homokinetic joint elements
    • B24B19/022Single-purpose machines or devices for particular grinding operations not covered by any other main group for grinding grooves, e.g. on shafts, in casings, in tubes, homokinetic joint elements for helicoidal grooves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C2230/00Manufacture
    • F04C2230/10Manufacture by removing material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C2240/00Components
    • F04C2240/20Rotors

Definitions

  • the present invention relates to a method of processing a screw rotor used in a screw compressor or the like and a lead correction calculation device for a screw rotor.
  • screw compressor which uses a screw rotor constituted by a member of helical shape as one type of a compressor used for a freezing device or an air compressor.
  • a pair of screw rotors are engaged to form a compression chamber, and the pair of screw rotors are relatively rotated in the opposite direction to suck gas fluid such as a refrigerant or air and to set the volume thereof. It is made smaller and compressed.
  • Patent Document 1 JP-A-2016-14369 (Patent Document 1), a slanted grindstone for grinding a rotor of a screw compressor is moved in parallel in the axial direction, and the rotor is rotated to form a predetermined rotor groove shape. It is described that the tooth profile cross-sectional shape of the rotor groove is deformed when processing.
  • the rotor rotation axis is rotated by adding a correction amount to the theoretical value in accordance with the amount of rotation of the tooth profile cross section of the rotor groove due to the grinding force to cancel the influence of the torsional deformation. Is also described.
  • Patent Document 1 shows the deformation of the cross-sectional shape of the screw rotor and the magnitude of the twist, which are caused due to the change of the amount of twisting deformation caused by the change of the grinding force, etc.
  • a method of grinding and finishing by adding a correction amount to the theoretical value in accordance with the lead error is described.
  • the thing of the said patent document 1 is not described about the form of the difference
  • the accuracy of a screw rotor is measured using a three-dimensional measuring device.
  • the three-dimensional measuring instrument is a coordinate measuring instrument, and the error is indicated by the distance from the coordinates (design values) to be originally measured.
  • the amount required to correct the groove lead error is a correction amount related to the twist angle.
  • machining is performed with the amount of movement of the grinding wheel along the axis of the screw rotor synchronized with the rotation angle of the screw rotor.
  • the lead of the screw rotor is determined by the moving amount of the grinding wheel and the rotation angle of the screw rotor.
  • the axial position to start, change, and end lead error correction was determined using the width center of the grinding wheel as a guide, but the important position to measure the lead is the meshing of the male and female rotors called pitch circle. Because of the position, the difference between the meshing positions of the male and female rotors is important for generating the correction data. However, in the thing of patent document 1, it is not considered about the difference in the meshing position of a male-female rotor.
  • the axial position and design of the meshing position (position on the pitch circle) of the male and female rotors obtained by the three-dimensional measuring device The material of the screw rotor was ground and processed again by determining the correction start position and the correction amount by the grinding machine on a trial basis with the error from the value as a standard. Thereafter, the sample prepared again is measured, and if the error exceeds the allowable value, the correction start position and the correction amount by the grinding machine are determined again, the material of the screw rotor is ground and processed, and the sample is measured Was working to repeat the operation.
  • the cycle of grinding the material of the screw rotor by determining the correction start position and the correction amount on a trial basis is repeated many times in a trial-and-error manner until reaching the target accuracy. I was taking
  • this method of screw rotor machining it is difficult to obtain a sufficiently accurate value because the number of trials increases if the target accuracy setting is made high.
  • An object of the present invention is to provide a screw rotor capable of obtaining correction data for obtaining a screw rotor having high-precision leads from lead errors with respect to a reference lead of the screw rotor obtained by grinding and processing the material of the screw rotor And a lead correction calculation apparatus for screw rotors.
  • the present invention is a method of processing a screw rotor that corrects a lead error of the screw rotor and processes the screw rotor, and a material of the screw rotor is ground and manufactured by grinding
  • the lead error for measuring the lead error with respect to the reference lead at the axial position (Z direction position) of the rotor groove portion of the screw rotor is measured as a distance, and lead correction for correcting the lead error based on the lead error measured as this distance.
  • Calculating the amount and the lead correction start position which is the axial position of the screw rotor to start the lead correction, and grinding the screw rotor based on the calculated lead correction amount and the lead correction start position Do.
  • Another feature of the present invention is a screw rotor lead correction calculation device for obtaining correction data for correcting a lead error of a screw rotor, wherein a distance to a reference lead at each position in an axial direction of a rotor groove portion of the screw rotor
  • the lead correction amount for the reference lead and the axial position at which lead correction is started based on the initial data input unit for inputting the error ( ⁇ ) as the distance and the error as the distance input to the initial data input unit
  • a processing machine input correction amount and position output unit that calculates and outputs a certain lead correction start position.
  • a screw having a high accuracy lead from a lead error with respect to a reference lead of the screw rotor obtained by grinding and processing the material of the screw rotor The effect is obtained that correction data for obtaining the rotor can be obtained.
  • FIG. 1 It is a schematic perspective view which shows an example of the processing machine which carries out grinding finishing process of a screw rotor.
  • the processing machine which carries out grinding finishing process of a screw rotor.
  • FIG. 1 When grinding the rotor groove part of a screw rotor, it is explanatory drawing explaining that grinding resistance differs in the right and left of a grindstone in the entrance part and exit part of a grindstone. It is explanatory drawing explaining an example of the lead shape of a screw rotor groove part.
  • FIG. 1 shows an example of the processing machine which carries out grinding finishing process of a screw rotor.
  • FIG. 5 is a diagram for describing an ideal rotation angle ⁇ 1 corresponding to the position of Z1 in the Z-axis direction shown in FIG. 4 and a rotation angle d ⁇ 1 corresponding to an error ⁇ 1 with respect to a reference lead on a reference circle used for measurement. It is a diagram explaining the method of calculating
  • FIG. 1 is a schematic perspective view showing an example of a screw rotor grinding and finishing machine.
  • the processing machine 2 of the screw rotor 1 is provided with centers 2a and 2b for supporting both ends of the screw rotor 1, and the centers 2a and 2b are inserted into one end and the other end of the screw rotor 1, respectively. And the screw rotor 1 is rotatably supported.
  • the processing machine 2 connects the turning metal 2 c fixed to the screw rotor 1 and the driver (turning plate) 2 e fixed to the rotation mechanism 2 d of the processing machine 2 to rotate the screw rotor 1.
  • Reference numeral 3 denotes a grinding wheel rotationally driven by the grinding wheel driver 3a.
  • the grinding wheel 3 is disposed at an angle to the central axis of the screw rotor 1.
  • the screw rotor groove (hereinafter simply referred to as "rotor groove") 2.) It is formed in the whetstone shape which can process the tooth groove shape of 1a.
  • the grindstone 3 is a so-called formed grindstone whose outer peripheral portion is formed by a diamond dresser so that the rotor groove portion 1a can be ground to a final finished shape in an inclined state.
  • a steady rest 2f is provided to support the vicinity of both ends of the rotor groove portion 1a.
  • the steady rest 2 f may not be required when the screw rotor 1 is short.
  • the screw rotor 1 In grinding the rotor groove portion 1a of the screw rotor 1, the screw rotor 1 is rotated by the driver 2e, and the inclined grindstone 3 is moved in parallel along the axis of the screw rotor 1 to process the rotor groove portion 1a.
  • a grinding force which is a force by grinding is generated, and the grinding wheel 3, the screw rotor 1, and a part of the processing machine 2 such as the centers 2a and 2b and the driver 2e are deformed while being processed. If the grinding force is constant, the amount of deformation is also constant, so that it is possible to perform high-precision processing by giving fixed correction data. However, when the grinding force changes, the amount of deformation also changes, so the processing error becomes large.
  • FIG. 2 is an explanatory view for explaining that the grinding resistance is different between the left and the right of the grindstone at the inlet and the outlet of the grindstone when grinding the rotor groove portion 1a of the screw rotor. That is, FIG. 2 is a view schematically showing a state where grinding of the rotor groove portion 1a of the screw rotor 1 is started or a state where grinding is completed, and the end of the groove portion 1a of the screw rotor 1 is in the axial direction. Because of the right-angled shape, the grinding area of the grindstone 3 in contact with the rotor groove portion 1a is different on the left and right of the grindstone.
  • FIG. 2 schematically show the grinding force applied to the rotor groove portion 1 a by the processing by the grindstone 3.
  • the grindstone 3 starts grinding, it will be in the state processed on one side of the grindstone 3 before it will be in the state of FIG. 2, It will transfer to the state shown in FIG. 2 from that state.
  • the force acting on one side (the side having a large grinding area) of the grinding stone 3 is large, and the force acting on the left and right of the grinding stone 3 is constant. Grinding resistance increases until it becomes the state).
  • the contact area of the grindstone 3 is gradually reduced while the grindstone 3 finishes grinding, the force acting on the grindstone 3 also changes.
  • the change of the force acting on the grindstone 3 is synonymous with the change of the force acting on the rotor groove portion 1a.
  • FIG. 3A is an explanatory view for explaining an example of the lead shape of the screw rotor groove portion, and schematically showing the spiral lead shape of the screw rotor groove portion 1a.
  • 1 b is a curve showing a spiral-shaped lead of the screw rotor. The relationship with the position in the Z direction (axial direction) when the rotation angle ⁇ in this curve 1b is 2 ⁇ , that is, the distance that one point on the curve 1b moves in the axial direction when the screw rotor makes one revolution It is called.
  • FIG. 3A is a curve in which between both end surfaces of the rotor groove portion 1 a of the screw rotor 1 is drawn by the same lead. The design value of this lead is referred to as a reference lead.
  • FIG. 3B is an external view showing an example of a three-dimensional measuring device for measuring a lead of a screw rotor groove.
  • the three-dimensional measuring device 4 includes a probe 4a and a rotating table 4b.
  • the screw rotor 1 is placed on the rotating table 4b of the three-dimensional measuring device 4 to measure the lead. That is, the probe 4 a and the rotary table 4 b are controlled so that the probe 4 a moves along the reference lead of the screw rotor 1.
  • the three-dimensional measuring device 4 outputs the difference (distance) between the coordinate value of the measured lead of the screw rotor obtained thereby and the coordinate value on the reference lead corresponding to the coordinate value.
  • the difference between the measured coordinate value of the lead and the coordinate value of the reference lead is an error (lead error) of the lead of the screw rotor 1.
  • a three-dimensional measuring device without the rotary table or a three-dimensional measuring device of a method in which the probe 4a of the three-dimensional measuring device touches the measurement position one by one is used instead of such a three-dimensional measuring device.
  • the lead of the screw rotor 1 may be measured. Further, while rotating the screw rotor 1, the lead may be measured by a displacement meter such as an electric micrometer.
  • FIG. 4 is a diagram for explaining an example of a read error output from the three-dimensional measuring device, and is an example of a measurement result output from the three-dimensional measuring device 4 described in FIG. 3B. That is, FIG. 4 is a diagram showing a broken line B showing a reference lead which is an ideal curve of the screw rotor 1 in the Z direction (axial direction) and line segments 51 to 55 showing the measured leads of the screw rotor 1; The error of the measured lead of screw rotor 1 to each position (Z1, Z2, Z3, ...) of the reference lead in the Z direction is shown. The measurement result indicating the error of the measurement lead with respect to such a reference lead is calculated by the three-dimensional measuring device 4, and generally printed on paper and output.
  • 62 to 67 are measurement points at which the actual lead of the screw rotor is measured, and an example showing an error of the lead at each measurement point with respect to the reference lead. Since the positions at which the leads of the rotor groove portion 1a of the screw rotor 1 are measured are on the left and right sides of the rotor groove portion 1a, two measured leads are shown in FIG. 4, but these left and right leads are equal. Therefore, in the following description, the values of measurement points 62 to 67 of the lead on one side are used.
  • Reference numeral 61 corresponds to the movement start point of the moving grindstone 3
  • reference numeral 68 corresponds to the end point.
  • the measurement point 62 position Z1 in the Z direction which is the inlet of the rotor groove portion 1a of the screw rotor 1 in the traveling direction Zg of the grindstone 3
  • the error with respect to the broken line B is large, and thereafter, as shown by line segments 51 and 52, the error gradually decreases in the traveling direction Zg of the grinding wheel 3.
  • the reference lead substantially matches, but the error increases again near the outlet of the grinding wheel 3 (the outlet of the rotor groove), and the error increases up to the measurement point 67 at the outlet of the rotor groove.
  • the pattern of the lead error of the screw rotor shown in FIG. 4 is an example.
  • the measurement result of the lead error in the screw rotor is output as an error with respect to the broken line B (reference lead) at each position (Z1, Z2, Z3,...) In the Z direction, that is, as a distance from the broken line B.
  • the distance at which the measurement point 62 deviates from the broken line B is taken as an error ⁇ 1.
  • the error as the distance at the measurement point 63 is ⁇ 2, and at the measurement point 63, the error as the distance is zero.
  • produces with respect to the broken line B is a change of the grinding resistance demonstrated using FIG.
  • grinding is performed by controlling the advancing position of the grindstone 3 in the Z direction and the rotational direction position (rotation angle ⁇ ) of the rotor groove portion 1a of the screw rotor 1.
  • adjustment is added to the control in the grinding processing machine 2 and the adjustment amount to eliminate the error is not considered.
  • an adjustment amount (lead correction amount) for correcting so as to eliminate the error in the grinding machine 2 is determined by the method described below, and this adjustment amount is given to the grinding machine 2. , And control to grinding process.
  • FIGS. 5A to 5C are diagrams for explaining an example of a method of correcting a lead error of a screw rotor, and correcting a lead having an error measured at each measurement point 62 to 64 shown in a portion A of FIG. 4. It is a figure which shows a concept.
  • the ideal rotation angle corresponding to the position Z1 in the Z direction shown in FIG. 4 is ⁇ 1
  • the point 72 on the reference circle C corresponds.
  • the axial position Z1 of the measurement point 62 shown in FIG. 4 can be converted to a point 72 on the reference circle C in FIG. 5A.
  • FIG. 5B is a line 56 indicating the reference lead P 0, read the corrected containing lead correction amount dP 1 (P 0 + dP 1 ) the relationship between the rotation angle ⁇ and Z direction position on line 57 indicating the (corrected read)
  • FIG. A point 62a corresponding to the measurement point 62 advanced by “ ⁇ 1 + d ⁇ 1” from the origin 61a of the rotation angle shown in FIG. 5A is a point having an angular error of d ⁇ 1 from the ideal point 72 on the line 56 indicating the reference lead.
  • Point 62a (measurement point 62) is a point including an error ⁇ 1 resulting from the unbalance of the grinding force applied by the grindstone 3.
  • the correction lead (P 0 + dP 1 ) is data that can be input to the grinding machine 2 shown in FIG. 1, and the position of the screw rotor 1 corresponding to the measurement point 62 (position Z1) is By grinding, the point 62a (measurement point 62) including the rotation angle d ⁇ 1 corresponding to the error ⁇ 1 can be made the ideal point 72 on the reference lead 54. Therefore, although the measurement point 62 shown in FIG. 4 includes the error ⁇ 1 as a distance, this error ⁇ 1 can be eliminated.
  • this correction lead is It may be used to grind the portion. Specifically, it is as follows.
  • a point 63a is a point including a rotation angle d ⁇ 2 corresponding to the error ⁇ 2 of the measurement point 63 shown in FIG. 4, and a method of obtaining a correction lead for correcting the error of the point 63a (measurement point 63) Will be explained.
  • a point 63a (measurement point 63) including a rotation angle d ⁇ 2 corresponding to the error ⁇ 2, with respect to a line 56 showing a reference lead shown by a solid line.
  • the grinding wheel 3 may be controlled to process the tooth groove along the line 58 indicating the corrected correction lead (P 0 -dP 2 ) so as to process the correction point 76 in which the ⁇ d ⁇ 2 is corrected.
  • Example of FIG. 5C grinding the position of the screw rotor 1 corresponding to the at reference lead P 0 from the dashed line 56 showing the dP 2 minutes only a small correction leads through the modified point 73 the measurement point 63 (position Z2) that Thus, it is possible to obtain a screw rotor having a lead whose error ⁇ 2 has been corrected.
  • the line 58 indicating the correction lead is a line passing through the previous correction point 73 and the current correction point 76.
  • dP 2 is a lead correction amount with respect to the reference lead 56.
  • correction lead should be found and processed at a position where the angle is further advanced than the measurement point 63, it is sufficient to obtain correction lead by the same method as described above and it is possible to process in the same manner. Is omitted.
  • the pattern in which the lead changes in two or three steps is described, but the pattern of the read error is an example. . Although fewer patterns and more patterns may be generated than this example, it is possible to apply lead correction as described above.
  • the lead correction amount dP (dP 1 , dP 2 ,...) Can be obtained by the following (Equation 1 ). That is, the rotation angle to be corrected at the position of the rotation angle ⁇ i on the reference lead is d ⁇ i , the distance of the Z direction position in the axial direction is Z i , the lead correction amount is dP, and the reference lead is P 0 Then, the lead correction amount dP can be obtained by the following equation.
  • FIG. 6 is a flowchart for explaining an example of a method of calculating data for correcting a lead error of a screw rotor.
  • step S101 the material of the screw rotor is ground using a grinding machine 2 as shown in FIG. 1 to produce a sample.
  • step S102 the lead of the manufactured sample is measured by a three-dimensional measuring instrument or the like as shown in FIG. 3B, and an error ⁇ with respect to the reference lead in the Z direction of the rotor groove is measured.
  • the errors ( ⁇ 1, ⁇ 2,%) From the reference lead in Z1, Z2.
  • step S103 using the method of correcting the lead error of the screw rotor described with reference to FIGS. 4 and 5A to 5C, the rotation angle ⁇ of the portion where the error is to be corrected and the amount of the error (error ⁇ ) Determination of the rotation angle d ⁇ ) corresponding to
  • step S104 based on the determination result of the rotation angle ⁇ of the portion to be corrected of the error obtained in step S103 and the error amount d ⁇ of the portion, the corrected rotation angle for inputting to the grinding machine 2 (error A correction amount “ ⁇ d ⁇ ” with respect to the rotation angle) ⁇ of the portion to be corrected is obtained.
  • step S105 the correction lead and the lead correction amount are calculated based on the correction amount "-d ⁇ " obtained in step S104, and the control data (the lead correction amount and the lead correction position) of the grinding machine 2 are corrected.
  • the material of the new screw rotor is ground by the processing machine 2 to which the correction data is input as described above, and a second sample is manufactured (step S106).
  • step S107 lead measurement of the created second sample is performed, and the same process as step S102 is performed.
  • step S108 it is determined whether the second sample is within the reference value of the target lead with respect to the reference lead. If it is within the reference value of the target lead, the preparation of the sample by the processing machine 2 is finished. If the reference value of the target lead is not reached, the process returns to step S103 again, and the operation of steps S103 to S108 is performed based on the error (Z value and ⁇ value) from the reference lead of the previously created sample. The same operation is repeated until a sample within the lead reference value is manufactured.
  • step S109 production of a screw rotor is started using data on which a sample within the target lead standard value is manufactured.
  • the lead correction calculation apparatus 100 shown in FIG. 7 is configured of, for example, a personal computer (PC) or the like, and software (calculation program) for lead correction calculation is installed.
  • FIG. 7 shows an example of a display screen (a screen displayed on a monitor or the like of a PC) of the lead correction calculation apparatus 100.
  • the lead correction calculation device 100 is an initial data input unit 101 that inputs initial data such as measured values measured by the three-dimensional measuring device 4 or the like described above, and leads when the measured lead is not within the reference value of the target lead. Calculates data such as lead correction amount and lead correction start position to be input to the control unit (not shown) of the grinding machine 2 shown in FIG. 1 and the correction amount addition unit 102 for additionally inputting the correction amount of error , And a processing machine input correction amount / position output unit 103 for outputting.
  • the initial data input unit 101 performs lead correction calculation on basic data previously input and stored based on design data, such as reference lead, groove length, etc. of the model by selecting the model by pull-down etc.
  • design data such as reference lead, groove length, etc. of the model by selecting the model by pull-down etc.
  • the calculation program of the device 100 is configured to be called.
  • the error or Z of the measurement lead shown in FIG. Data for performing a scale operation to convert the distance such as the directional position into the actual dimension, that is, a scale is also displayed.
  • the initial data input unit 101 is also provided with a scale input unit 105 for inputting the scale.
  • the “position” in the scale input unit 105 is a scale of the position in the Z direction, and the “correction amount” is a scale of the lead error.
  • the initial data input unit 101 is a lead measurement value input unit for inputting the position in the Z direction where the lead should be corrected and the lead correction amount at that position (corresponding to the error ⁇ with respect to the reference lead of the measurement lead).
  • lead measurement data of eight measurement points P1 to P8 can be input.
  • measurement data corresponding to measurement points 61 to 68 shown in FIG. 4 are input to the measurement points P1 to P8.
  • P1 to P4 correspond to the grinding start part
  • P5 to P8 correspond to the grinding end part.
  • not only the data of the measurement lead of one surface (L1) of the rotor groove portion 1b, but also the data of the measurement lead of the other surface (L2) can be input.
  • the correction amount adding unit 102 inputs data for correcting the initial data of the initial data input unit 101 when it does not fall within the reference value of the target lead in step S108 of FIG. 6 (in the case of No). It is.
  • the processing machine input correction amount / position output unit 103 is an area for calculating and outputting (displaying) data to be input to the grinding processing machine 2 shown in FIG. 1, and # 1 to # 3 of the lead correction amount column are The lead correction amount at the grinding start portion (corresponding to measurement points 62 to 64) and # 4 to # 6 output the lead correction amount corresponding to the grinding end portion (corresponding to measurement points 65 to 67).
  • the lead correction amount at each position in the Z direction can be calculated using (Equation 1) described above based on the theory described with reference to FIGS. 5A to 5C.
  • # 11 to # 13 indicate positions (positions in the Z direction) to which the lead correction amounts # 1 to # 3 corresponding to the grinding start portion are to be applied.
  • the # 14 to # 16 indicate the positions to which the above-mentioned # 4 to # 6 lead correction amounts corresponding to the grinding end portion are to be applied.
  • a selection button 104 for instructing output selection is provided so that it is possible to select which surface of the rotor groove portion 1b the lead correction amount and its lead correction position are to be calculated.
  • the lead correction can be performed.
  • the grinding machine can perform grinding according to the added control data.
  • the screen of the lead correction calculation apparatus 100 shown in FIG. 7 is an example, and the number of input measurement data and the number of data output calculation results are not limited to those shown in FIG. Although the number may be smaller or larger, a larger number can provide a more accurate screw rotor.
  • the initial data input unit 101 for inputting measurement data and the processing machine input correction amount and position output unit 103 for outputting correction data for correcting the grinding machine 2 are provided on the screen, the minimum functions are possible.
  • the correction amount adding unit 102 may be omitted.
  • data for correction control of the grinding machine 2 can be easily obtained simply by inputting the measured values obtained from the three-dimensional measuring device 4 into the initial data input unit 101. be able to. For this reason, it is possible to easily use a screw rotor production plant without requiring a special technology, and to efficiently produce a highly accurate screw rotor.
  • the measurement data may be automatically input to the lead correction calculation apparatus 100.
  • an interface (not shown) provided in the lead correction calculation device 100 with correction data (read correction amount and lead correction position) output to the processing machine input correction amount and position output unit 103 of the lead correction calculation device 100.
  • the obtained correction data may be delivered to the grinding machine 2 via a memory medium such as a flash memory.
  • the initial data input unit 101, correction amount adding unit 102, processing machine input correction amount and position output unit 103, etc. are displayed with the screen configuration shown in FIG. There is no need to do so, and it is also possible to display a status such as "in measurement data input” or "correction data output”. However, it is preferable to have a display function of the input data and the output data shown in FIG.
  • FIG. 8 is an explanatory view showing a screw rotor manufactured by applying the present invention in comparison with that manufactured by a conventional processing method.
  • the left column shows an example of the lead measurement result of the screw rotor manufactured by the conventional method ground by the lead correction amount obtained by trial and error.
  • Reference numerals 201 and 202 are lines (lead measurement lines) indicating measurement leads on the left and right tooth surfaces of the rotor groove, and errors from the line 54 indicating the reference lead are represented by distances, similarly to the measurement results described in FIG. It is measured and displayed.
  • a lead error of up to 46.3 ⁇ m occurs at the wheel outlet (lower side of the figure).
  • a lead error of up to 35.8 ⁇ m occurs at the inlet portion (upper side of the figure) of the grinding wheel.
  • the output selection button 104 selects L1, and the processing machine input correction amount and position select data obtained from the lead measurement wire 201 of the lead measurement wires 201 and 202 shown in FIG.
  • the control data of the grinding machine 2 is reflected, and the lead measurement result of the screw rotor obtained by grinding the material of the screw rotor is They are lead measurement wires 203 and 204 shown in the right column of FIG.
  • the screw rotor manufactured by applying the present invention can reduce the lead error by about 80%, and the screw rotor manufactured by applying the present invention can achieve a significant improvement in accuracy. did it.
  • the measurement is obtained by the distance between the position Z in the Z direction (axial direction) and the error (lead error) ⁇ in the direction perpendicular to the tooth surface with respect to the reference lead.
  • correction data to be input to the grinding machine 2 can be accurately determined based on theory. Therefore, the errors generated at the inlet and the outlet of the grinding wheel 3 in the grinding process of the screw rotor material can be reduced.
  • the initial data input unit 101 for inputting an error on the screen of the lead correction calculation apparatus 100 and the processing machine input correction amount / position output unit 103 are provided, when processing the screw rotor, it is applied to the grinding processing machine Correction data can be easily obtained.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Automatic Control Of Machine Tools (AREA)
  • Applications Or Details Of Rotary Compressors (AREA)
  • Constituent Portions Of Griding Lathes, Driving, Sensing And Control (AREA)
  • Grinding And Polishing Of Tertiary Curved Surfaces And Surfaces With Complex Shapes (AREA)

Abstract

スクリューロータのリード補正計算装置は、前記スクリューロータのロータ溝部の軸方向の各位置における基準リードに対する距離としての誤差を入力する初期データ入力部と、この初期データ入力部に入力された距離としての誤差に基づいて、前記基準リードに対するリード補正量と、リード補正を開始する軸方向位置であるリード補正開始位置を演算して出力する加工機入力補正量・位置出力部とを備える。これにより、スクリューロータの素材を研削仕上げ加工して得られたスクリューロータの基準リードに対するリード誤差から、高精度のリードを有するスクリューロータを得るための補正データを得ることができる。

Description

スクリューロータの加工方法及びスクリューロータのリード補正計算装置
 本発明は、スクリュー圧縮機等に使用されるスクリューロータの加工方法及びスクリューロータのリード補正計算装置に関する。
 冷凍装置や空気圧縮機に用いられる圧縮機の一形式として、螺旋形状の部材で構成されたスクリューロータを使用するスクリュー圧縮機がある。このスクリュー圧縮機は、一対のスクリューロータを噛み合わせて圧縮室を形成し、一対のスクリューロータを相対的に反対方向へ回転させることにより、冷媒や空気などのガス流体を吸入してその体積を小さくし、圧縮するものである。
 前記スクリューロータに形成される螺旋形状のロータ溝部(歯溝部)を研削仕上げ加工する方法として、前記ロータ溝部の形状に対応した断面に成形した砥石を用いて研削する加工がある。
  スクリューロータの研削仕上げでは、スクリューロータが捩れを有するため、砥石進行方向に対して、砥石の左右の取り代(研磨代)と接触面積が異なる。このため、砥石の左右に加わる力すなわち研削力(研削抵抗)が均等ではない。したがって、研削加工中のスクリューロータには歯形断面形状に変形が生じる。
 この現象に関して、特開2016-14369号公報(特許文献1)には、スクリュー圧縮機のロータを研削する傾斜した砥石を、軸方向に平行移動させると共にロータを回転させて所定のロータ溝形状に加工する場合、ロータ溝部の歯形断面形状が変形することが記載されている。
 この現象に加え、スクリューロータの砥石入口部と出口部では、砥石とロータ溝との接触形態が刻々と変化するため、砥石の左右にかかる研削力も変化して、ロータ溝部に生じる歯形断面形状の変形量が変化する。歯形断面形状が変化すると、スクリューロータの精度を劣化させる原因となる。このため、上記特許文献1のものでは、スクリューロータの吐出側端面近傍を加工する際、研削力によりロータ溝部の断面形状が変形する量に応じて理論値に補正量を加えて加工し、変形の影響を打ち消すことが記載されている。
 また、上記特許文献1のものには、研削力によりロータ溝部の歯形断面形状が回転する量に応じて、ロータ回転軸を理論値に補正量を加えて回転させ、ねじれ変形の影響を打ち消すことも記載されている。
特開2016-14369号公報
 上述したように、特許文献1には、砥石による研削加工中に、研削力の変化により生じるねじれ変形量の変化などが原因で生じる、スクリューロータの断面形状の変形や、ねじれの大きさを示すリードの誤差に応じて、理論値に補正量を加えて研削仕上げ加工する方法が記載されている。
  しかし、上記特許文献1のものには、測定手段により得られる誤差の形態や、その誤差を修正するための補正量についての対応方法について記載されていない。
 通常、スクリューロータの精度は3次元測定器を用いて測定される。3次元測定器は座標測定器であり、誤差は本来測定されるべき座標(設計値)からの距離によって表示される。
 一方、溝のリード誤差を補正するのに必要な量はねじれ角に関わる補正量である。スクリューロータの研削加工機では、砥石がスクリューロータの軸線に沿って移動する量とスクリューロータの回転角を同期させて加工が行われる。スクリューロータのリードは、前記砥石の移動量とスクリューロータの回転角によって決定される。
 このため、スクリューロータの軸線方向の位置における誤差が距離として得られる3次元測定器の測定結果から、リード誤差を修正するために必要な研削加工機の補正制御用データを直接得ることはできなかった。
 また、リード誤差の修正を開始、変化、終了させる軸方向の位置は、砥石の幅中心を目安に決定していたが、リードを測定する重要な位置が、ピッチサークルと称する雄雌ロータの噛み合い位置であるため、雄雌ロータの噛み合い位置の相違が、補正データの作成に重要である。しかし、特許文献1のものでは、雄雌ロータの噛み合い位置の相違について考慮されていない。
 そこで、鋳造などで製作されたスクリューロータの素材を研削加工機により研削仕上げ加工した後、3次元測定器によって得られた雄雌ロータの噛み合い位置(ピッチサークル上の位置)の軸方向位置と設計値との誤差を目安にして、試行的に研削加工機による補正開始位置と補正量を決めて、再度スクリューロータの素材を研削仕上げ加工していた。その後、この再度作成したサンプルを測定し、誤差が許容値を超える場合、再度、研削加工機による補正開始位置と補正量を決めて、スクリューロータの素材を研削仕上げ加工し、そのサンプルを測定するという動作を繰り返す作業をしていた。
 このように従来のものでは、試行的に補正開始位置と補正量を決めてスクリューロータの素材を研削するというサイクルを、目的とする精度以内になるまで、試行錯誤的に何度も繰り返すという手法をとっていた。また、この施行錯誤的なスクリューロータの加工方法では、目的とする精度の設定を高精度にすると試行回数が増えるため、十分高精度な値にすることは困難であった。
 更に、一旦、補正を始める位置と補正量を決めて生産を行っていても、研削力に影響を与える砥石の交換やドレッサの交換などを行うと、再び、試行錯誤的に前記補正開始位置と補正量を決める作業を行う必要があった。
 このように、試行錯誤的な従来の研削仕上げ加工方法では、目的とする精度以内になるまでスクリューロータ素材の研削仕上げ加工と測定を繰り返すため、非効率的で時間を要する作業となり、生産を阻害する要因になっていた。
 また、試行錯誤的な方法で加工機の補正用データを作成するため、任意に決めた補正データにより得られるスクリューロータのリードの精度を、スクリューロータの素材の研削仕上げ加工前に見通しをつけて妥当性を評価することもできなかった。
 本発明の目的は、スクリューロータの素材を研削仕上げ加工して得られたスクリューロータの基準リードに対するリード誤差から、高精度のリードを有するスクリューロータを得るための補正データを得ることのできるスクリューロータの加工方法及びスクリューロータのリード補正計算装置を提供することにある。
 上記目的を達成するため、本発明は、スクリューロータのリード誤差を補正してスクリューロータを加工するスクリューロータの加工方法であって、スクリューロータの素材を研削加工し、この研削加工して製作されたスクリューロータのロータ溝部の軸方向位置(Z方向位置)における基準リードに対するリード誤差を距離として測定し、この距離として測定された前記リード誤差に基づいて、前記リード誤差を補正するためのリード補正量と、そのリード補正を開始するスクリューロータの軸方向位置であるリード補正開始位置を算出し、この算出されたリード補正量とリード補正開始位置に基づいてスクリューロータを研削加工することを特徴とする。
 本発明の他の特徴は、スクリューロータのリード誤差を補正する補正データを得るためのスクリューロータのリード補正計算装置であって、前記スクリューロータのロータ溝部の軸方向の各位置における基準リードに対する距離としての誤差(δ)を入力する初期データ入力部と、この初期データ入力部に入力された距離としての誤差に基づいて、前記基準リードに対するリード補正量と、リード補正を開始する軸方向位置であるリード補正開始位置を演算して出力する加工機入力補正量・位置出力部と、を備えることにある。
 本発明のスクリューロータの加工方法及びスクリューロータのリード補正計算装置によれば、スクリューロータの素材を研削仕上げ加工して得られたスクリューロータの基準リードに対するリード誤差から、高精度のリードを有するスクリューロータを得るための補正データを得ることができるという効果が得られる。
スクリューロータを研削仕上げ加工する加工機の一例を示す概略斜視図である。 スクリューロータのロータ溝部を研削する際に、砥石の入口部と出口部において、研削抵抗が砥石の左右で違うことを説明する説明図である。 スクリューロータ溝部のリード形状の一例を説明する説明図である。 スクリューロータ溝部のリードを測定する3次元測定器の一例を示す外観図である。 3次元測定器が出力するリード誤差の一例を説明する線図である。 測定に用いる基準円上において、図4に示すZ軸方向のZ1の位置に対応する理想の回転角θ1と基準リードに対する誤差δ1に対応する回転角dθ1について説明する線図である。 基準リードに対する誤差を修正するための補正リードを求める手法について説明する線図で、図4に示す測定点62に対する補正リードの求め方を説明する図である。 基準リードに対する誤差を修正するための補正リードを求める手法について説明する線図で、図4に示す測定点63に対する補正リードの求め方を説明する図である。 スクリューロータのリード誤差を補正するデータを算出する方法を説明するフローチャートである。 本発明におけるリード補正計算装置の画面の一例を示す図である。 本発明を適用して製作したスクリューロータを従来の加工方法で製作したものと比較して示す説明図である。
 以下、本発明のスクリューロータの加工方法及びスクリューロータのリード補正計算装置の具体的実施例を、図面を用いて説明する。各図において、同一符号を付した部分は同一或いは相当する部分を示している。
 本発明の実施例1を図1~図8を用いて説明する。
  まず、図1によりスクリューロータの研削仕上げ加工する加工機の一例を説明する。図1は、スクリューロータ研削仕上げ加工機の一例を示す概略斜視図である。
 図1において、スクリューロータ1の加工機2は、前記スクリューロータ1の両端を支持するためのセンタ2a,2bを備えており、前記センタ2a,2bはそれぞれスクリューロータ1の一端及び他端に挿入されて、該スクリューロータ1が回転できるように支持している。
 また、加工機2は、スクリューロータ1に固定された回し金2cと加工機2の回転機構2dに固定されたドライバ(回し板)2eを連結し、スクリューロータ1を回転させる。
  3は砥石ドライバ3aにより回転駆動される砥石で、この砥石3はスクリューロータ1の中心軸に対し傾斜して配置されており、この傾斜角においてスクリューロータ溝部(以下、単に「ロータ溝部」ともいう)1aの歯溝形状を加工できる砥石形状に形成されている。また、前記砥石3は、傾斜状態において前記ロータ溝部1aを最終仕上げ形状に研削できるように、ダイヤモンドドレッサによって外周部が成形されている、いわゆる総形砥石である。
 なお、研削加工時に、スクリューロータ1のたわみを抑制するため、ロータ溝部1aの両端近傍を支持する振れ止め2fが設けられている。この振れ止め2fは、スクリューロータ1が短い場合はなくても良い。
 スクリューロータ1のロータ溝部1aの研削は、スクリューロータ1をドライバ2eで回動させると共に、傾斜した砥石3をスクリューロータ1の軸線に沿って平行移動させ、ロータ溝部1aを加工する。
 研削加工においては、研削による力である研削力が発生し、砥石3、スクリューロータ1、及びセンタ2a,2bやドライバ2e等の加工機2の一部が変形しながら加工することになる。研削力が一定であれば変形量も一定であるため、一定の修正データを付与することで高精度な加工が可能となる。しかし、研削力が変化すると変形量も変化するため、加工誤差が大きくなる。
 図2は、スクリューロータのロータ溝部1aを研削する際に、砥石の入口部と出口部において、研削抵抗が砥石の左右で違うことを説明する説明図である。即ち、図2は、スクリューロータ1のロータ溝部1aを研削し始める状態、或いは研削が終了する状態を模式的に示している図で、スクリューロータ1の溝部1aの端部が軸方向に対して直角の形状を成しているため、ロータ溝部1aに接触する砥石3の研削面積が砥石の左右で異なる。
 図2に示す矢印は砥石3による加工により、ロータ溝部1aに加わる研削力を模擬的に示している。砥石3が、研削を開始する場合、図2の状態になる前は砥石3の片側で加工する状態となり、その状態から図2に示す状態に移行する。この図2の状態では、砥石3の片側(研削面積が大きい側)に作用する力が大きくなり、砥石3が進行して左右に作用する力が一定の定常状態(研削面積が左右同等になる状態)になるまで研削抵抗は増大していく。また、砥石3が研削を終了する状態では反対に、砥石3の接触面積が次第に減少してため、砥石3に作用する力も変化していく。砥石3に作用する力が変化することは、ロータ溝部1aに作用する力が変化することと同義である。
 図3Aは、スクリューロータ溝部のリード形状の一例を説明する説明図で、スクリューロータ溝部1aの螺旋形状のリード形状を模式的に示す図である。1bはスクリューロータの螺旋形状のリードを示す曲線である。この曲線1bにおける回転角θが2πである時のZ方向(軸方向)の位置との関係、即ちスクリューロータが1回転したときに曲線1b上のある1点が軸方向に移動した距離がリードと称される。また、この図3Aは、スクリューロータ1のロータ溝部1aの両端面間を同一リードで描いた曲線である。このリードの設計値を基準リードと称する。
 図3Bは、スクリューロータ溝部のリードを測定する3次元測定器の一例を示す外観図である。3次元測定器4は、プローブ4aと回転テーブル4bを備え、この3次元測定器4の回転テーブル4b上にスクリューロータ1を載置してリードの測定は行われる。即ち、前記スクリューロータ1の基準リードに沿って前記プローブ4aが移動するように、前記プローブ4aと前記回転テーブル4bを制御する。これにより得られるスクリューロータの測定されたリードの座標値と、その座標値に対応する前記基準リード上の座標値との差異(距離)を前記3次元測定器4は出力する。前記測定されたリードの座標値と前記基準リードの座標値との前記差異が前記スクリューロータ1のリードの誤差(リード誤差)となる。
 なお、このような3次元測定器によらず、前記回転テーブルを備えない3次元測定器や、3次元測定器のプローブ4aが測定位置を1点毎にタッチする方式の3次元測定器を用いて、スクリューロータ1のリードを測定するようにしても良い。また、スクリューロータ1を回転させながら、電気マイクロメータなどの変位計でリードを測定するようにしても良い。
 図4は3次元測定器が出力するリード誤差の一例を説明する線図であり、図3Bで説明した3次元測定器4が出力した測定結果の一例である。すなわち、図4は、Z方向(軸方向)におけるスクリューロータ1の理想曲線である基準リードを示す破線Bと、測定されたスクリューロータ1のリードを示す線分51~55を示す図であり、Z方向の基準リードの各位置(Z1,Z2,Z3,…)に対する測定されたスクリューロータ1のリードの誤差を示している。このような基準リードに対する測定リードの誤差を示す測定結果は3次元測定器4で演算され、一般には紙に印刷されて出力される。
 図4において、62~67が実際のスクリューロータのリードを測定した測定点で、基準リードに対する各測定点でのリードの誤差を示す一例である。スクリューロータ1のロータ溝部1aのリードを測定する位置は、前記ロータ溝部1aの左右両側にあるため、図4では2本の測定されたリードを表示しているが、これら左右のリードは同等であるので、以後の説明では一方の側のリードの測定点62~67の値を用いて説明する。
 61は、移動する砥石3の移動開始点に相当し、68は終点に相当する。測定するスクリューロータにリード誤差がない場合、前記移動開始点61と前記終点68を結んだ破線B(基準リード)上に、スクリューロータのリードを測定した測定値が表示される。
 しかし、研削加工機2(図1参照)で加工されたスクリューロータ1においては、砥石3の進行方向Zgにおいて、スクリューロータ1のロータ溝部1aの入口となる測定点62(Z方向の位置Z1)で前記破線Bに対する誤差が大きく、その後線分51,52で示されるように、砥石3の進行方向Zgに向かって前記誤差は徐々に小さくなる。
 測定点64以降では基準リードにほぼ合致するようになるが、砥石3の出口(ロータ溝部の出口)近傍になると前記誤差は再び大きくなり、ロータ溝部の出口の測定点67まで前記誤差は増加していく。なお、この図4に示すスクリューロータのリード誤差のパターンは一例である。
 このように、スクリューロータにおけるリード誤差の測定結果は、Z方向の各位置(Z1,Z2,Z3,…)における破線B(基準リード)に対する誤差、即ち破線Bとの距離として出力される。例えば、図4に示すように、測定点62が破線Bから乖離した距離をもって誤差δ1とする。測定点63における距離としての誤差はδ2であり、測定点63では距離としての誤差は0となっている。
  なお、破線Bに対する前記誤差が発生する最大の要因は、図2を用いて説明した研削抵抗の変化である。
 図1に示す研削加工機2では、砥石3のZ方向の進行位置と、スクリューロータ1のロータ溝部1aの回転方向位置(回転角θ)を制御して研削を行うが、図4に示す線図のものでは、研削加工機2での制御に調整を加えて、前記誤差を解消するような調整量については考慮されていない。
  本実施例は、以下説明する手法により、研削加工機2において、前記誤差を解消するように補正するための調整量(リード補正量)を求め、この調整量を前記研削加工機2に与えて、研削加工するように制御するものである。
 図5A~図5Cは、スクリューロータのリード誤差を修正する手法の一例を説明する線図であり、図4のA部に示す各測定点62~64で測定された誤差を有するリードを修正する概念を示す図である。
  図5Aにおいて、測定に用いた基準円(ピッチサークル)C上において、図4に示すZ方向の位置Z1に対応する理想の回転角がθ1で、基準円C上の点72が対応する。この図5Aにおける回転角θの原点は、図4に示す点61に対応するZ方向位置(Z=0)にあり、基準円C上の点61aが対応する。
 ここで、図4に示す測定点62の軸方向位置Z1は、図5Aにおいて、基準円C上の点72に変換できる。前記測定点62は、理想点(基準リード)から距離で示される誤差δ1を含む点であるが、この誤差δ1は、図5Aにおいては、基準円C上で角度dθ1に変換できる。即ち、図4に示す位置Z1の距離の長さと図5の基準演算装置C上に示す回転角θ1との関係に基づいて、図4に示す誤差δ1の距離に対応する角度dθ1を求めることができる(dθ1=θ1・δ1/Z1)。従って、前記測定点62は、図5Aにおいて、回転角θの原点61aから「θ1+dθ1」だけ進んだ点62aに変換できる。
 図5Bは、基準リードPを示す線56と、リード補正量dPを含む補正後のリード(P+dP)(補正リード)を示す線57における回転角θとZ方向位置との関係を示す線図である。図5Aに示す回転角の原点61aから「θ1+dθ1」だけ進んだ測定点62に対応する点62aは、基準リードを示す線56上の理想点72からdθ1の角度誤差を有する点となる。点62a(測定点62)は、砥石3により加えられた研削力のアンバランスから生じた誤差δ1を含んだ点である。
 従って、この誤差δ1を修正するには、基準リードを示す線56上の理想点72に対応する回転角θ1から前記誤差δ1に対応する回転角dθ1の正負を逆転(反転)させた回転角-dθ1を差分とした修正点73を通るように、砥石3が通過する軌跡を設定すれば、研削力のアンバランスにより、誤差δ1に対応する回転角dθ1だけ戻されるので、砥石3は基準リード上の理想点72を加工することが可能となる。
 次に、図5Aと図5Bを用い、上述した手法により、前記誤差δ1に対応する回転角dθ1を解消できることを、更に詳しく説明する。
  図5Bに示すように、原点61aと、「θ1-dθ1」の回転角に対応する修正点73を通る線が補正リードを示す線57となり、その補正リードの大きさは「P+dP」となる。dPはリード補正量となる。
 前記補正リード(P+dP)は、図1に示す研削加工機2に入力可能なデータであり、この補正リードを用いて前記測定点62(位置Z1)に対応するスクリューロータ1の位置を研削することにより、前記誤差δ1に相当する回転角dθ1を含んだ点62a(測定点62)を、基準リード54上の理想点72にすることが可能となる。従って、図4に示す測定点62は、距離としての誤差δ1を含むが、この誤差δ1を解消させることができる。
 以下、図5Cに示すように、研削仕上げ加工したサンプルを測定して得られたリードにおける前記リードが変化する他の部分においても同様の手法を適用して、補正リードを求め、この補正リードを用いて、当該部分を研削していけば良い。具体的には以下のようにする。
 図5Cにおいて、点63aは、図4に示す測定点63の誤差δ2に対応する回転角dθ2を含んだ点で、この点63a(測定点63)の誤差を修正するための補正リードの求め方について説明する。
 図4、図5Cに示すZ方向の位置Z2では、前記誤差δ2に相当する回転角dθ2を含んだ点63a(測定点63)を修正するために、実線で示す基準リードを示す線56に対して-dθ2を補正した修正点76を加工するように、修正した補正リード(P-dP)を示す線58に沿って、砥石3が歯溝を加工するように制御すれば良い。
 この図5Cの例は、前記修正点73を通る基準リードPを示す破線56からdP分だけ小さい補正リードで前記測定点63(位置Z2)に対応するスクリューロータ1の位置を研削することにより、誤差δ2を補正したリードを有するスクリューロータを得ることができる。前記補正リードを示す線58は、前回の修正点73と今回の修正点76通る線である。なお、dPは基準リード56に対するリード補正量となる。
 測定点63よりもさらに角度が進んだ位置にも補正リードを求めて加工すべき点はあるが、上記と同様の手法により補正リードを求め、同様に加工していけば良いので、以後の説明は省略する。
  また、図4及び図5A~図5Cを用いて説明したリード誤差の修正の説明では、2段階または3段階でリードが変化するパターンで説明しているが、このリード誤差のパターンは一例である。この例より少ないパターンや多いパターンも発生するが、上述した手段を適用して同様にリード補正することが可能である。
 ここで、補正すべき回転角をdθ、基準リードをPとすると、以下の(数1)によりリード補正量dP(dP,dP,…)を求めることが可能である。即ち、前記基準リード上の回転角θの位置における補正すべき回転角をdθ、軸方向であるZ方向位置の距離をZ、リード補正量をdPとし、さらに基準リードをPとしたとき、前記リード補正量dPを次式により求めることができる。
Figure JPOXMLDOC01-appb-M000002
 但し、添え字iは、ロータ溝部のZ方向位置における基準リードに対するリード誤差を測定した測定点の順序を示し、「i=0」は回転角またはZ方向位置の原点に対応する。また、「i=1」はZ1の位置またはθ1の位置に対応する。
 以上説明したスクリューロータのリードを補正して加工するスクリューロータの加工方法を実施するための手順について、図6を用いて以下説明する。図6はスクリューロータのリード誤差を補正するデータを算出する方法の一例を説明するフローチャートである。
 まず、ステップS101においては、図1に示すような研削加工機2を用いて、スクリューロータの素材を研削加工し、サンプルを製作する。次にステップS102では、製作した前記サンプルのリードを、図3Bに示すような3次元測定器等で測定し、ロータ溝のZ方向における基準リードに対する誤差δを測定し、Z方向の各位置(Z1,Z2…)における基準リードとの誤差(δ1,δ2,…)を取得する。
 ステップS103では、上記図4及び図5A~図5Cを用いて説明したスクリューロータのリード誤差を修正する手法を用いて、誤差を補正すべき箇所の回転角θとその箇所の誤差量(誤差δに対応する回転角dθ)の判定を行う。
 ステップS104では上記ステップS103で得られた誤差を補正すべき箇所の回転角θとその箇所の誤差量dθの判定結果を基に、前記研削加工機2に入力するための補正回転角(誤差を補正すべき箇所の回転角)θに対する補正量「-dθ」を求める。
 ステップS105では、上記ステップS104により求めた補正量「-dθ」を基に、補正リードとリード補正量を演算し、研削加工機2の制御データ(リード補正量とリード補正位置)を修正する。このように修正データが入力された加工機2により、新たなスクリューロータの素材を研削加工して2個目のサンプルを製作する(ステップS106)。次に、ステップS107では、作成した2個目のサンプルのリード測定を行い、上記ステップS102と同様の処理を行う。
 ステップS108では、上記2個目のサンプルが基準リードに対して目標リードの基準値以内になっているか否かを判定する。目標リードの基準値以内であれば、加工機2によるサンプルの作成は終了する。目標リードの基準値に達していない場合には、再びステップS103に戻り、前回作成したサンプルの基準リードとの誤差(Z値及びδ値)を基にステップS103~S108の動作を実施し、目標リードの基準値以内のサンプルが製作されるまで、同様の動作を繰り返す。
 製作したサンプルが目標リードの基準値に達すると、ステップS109に進み、目標リードの基準値以内のサンプルが製作されたデータを用いて、スクリューロータの生産を開始する。
 次に、上述したスクリューロータのリード誤差を補正するデータを算出するためのリード補正計算装置を図7により説明する。図7に示すリード補正計算装置100は、例えばパーソナルコンピュータ(PC)等で構成され、リード補正計算のためのソフトウェア(計算プログラム)がインストールされているものである。図7はこのリード補正計算装置100の表示画面(PCのモニタ等に表示される画面)の一例を示している。
 リード補正計算装置100は、上述した3次元測定器4等で測定された測定値等の初期データを入力する初期データ入力部101、測定されたリードが目標リードの基準値以内にない場合にリード誤差の補正量を追加入力するための補正量追加部102、図1に示す研削加工機2の制御部(図示せず)に入力するためのリード補正量とリード補正開始位置等のデータを演算して出力する加工機入力補正量・位置出力部103を備える。
 前記初期データ入力部101では、機種をプルダウンなどで選択することにより、当該機種の基準リード、溝長さ等、設計データに基づいて予め入力して記憶させておいた基本データを、リード補正計算装置100の計算プログラムに呼び出せるように構成されている。
 なお、図3Bに示す3次元測定器4から出力される測定結果(図4に示すような紙面に印刷された測定結果の図)には、図示されている測定リードの基準リードに対する誤差やZ方向位置等の距離を実寸法に変換するスケール演算を行うためのデータ、即ち尺度も表示されている。前記初期データ入力部101には前記尺度を入力するための尺度入力部105も設けられている。この尺度入力部105に「位置」とあるのはZ方向の位置の尺度であり、「補正量」とあるのはリード誤差の尺度である。
 また、前記初期データ入力部101には、リードを補正すべきZ方向の位置と、その位置におけるリード補正量(測定リードの基準リードに対する誤差δに相当)を入力するためのリード測定値入力部106があり、この例では8か所の測定ポイントP1~P8のリード測定データを入力できるようになっている。前記測定ポイントP1~P8には、例えば、図4に示す測定点61~68に対応する測定データを入力する。また、P1~P4は研削開始部分に対応し、P5~P8は研削終了部に対応する。
  また、前記ロータ溝部1bの一方の面(L1)の測定リードのデータだけでなく、他方の面(L2)の測定リードのデータも入力できるように構成されている。
 補正量追加部102は、図6のステップS108で目標リードの基準値以内に入らなかった場合(Noの場合)に、前記初期データ入力部101の初期データを修正するためのデータを入力する部分である。
 加工機入力補正量・位置出力部103は、図1に示す研削加工機2に入力するためのデータを計算して出力(表示)するエリアで、リード補正量の欄の#1~#3は研削開始部(測定点62~64に対応)のリード補正量を、#4~#6は研削終了部(測定点65~67に対応)に対応するリード補正量を出力する。
 Z方向の各位置における前記リード補正量については、図5A~図5Cを用いて説明した理論に基づいて、前述した(数1)を用いて、計算することができる。
 また、#11~#13は研削開始部に対応する上記#1~#3のリード補正量を付与する位置(Z方向の位置)を表示する。#14~#16は研削終了部に対応する上記#4~#6のリード補正量を付与する位置を表示する。
  さらに、リード補正量とそのリード補正位置を、ロータ溝部1bのどちらの面のデータで計算するかを選択できるように、出力選択を指示する選択ボタン104を備えている。
 上記計算結果であるリード補正量#1~#6、及びリード補正量を付与するリード補正位置#11~#16の値を用いて、研削加工機2の制御データを補正すれば、リード補正が加味された制御データにより前記研削加工機は研削を行うことができる。
  以上説明したスクリューロータの加工方法或いはスクリューロータのリード補正計算装置を用いることにより、リード精度の高いスクリューロータを容易に得ることができる効果が得られる。
 なお、図7に示したリード補正計算装置100の画面は一例であり、測定データを入力する数や計算結果を出力するデータの数などは、図7に示すものには限られず、その数は少なくても多くても良いが、多い方がより精度の高いスクリューロータを得ることができる。
 また、測定データを入力する初期データ入力部101と、研削加工機2を補正するための補正データを出力する加工機入力補正量・位置出力部103を画面上に備えていれば最低限の機能は果たせるので、前記補正量追加部102については省略しても良い。
 図7に示したリード補正計算装置100によれば、初期データ入力部101に3次元測定器4から得られた測定値を入力するだけで、研削加工機2の補正制御用データを容易に得ることができる。このため、特別な技術を必要とせず、スクリューロータの生産工場で容易に使用することができ、精度の高いスクリューロータを効率的に生産することが可能となる。
 なお、3次元測定機4から得られた測定データからリード誤差を測定し、初期データ入力部101に人為的に数値入力する例を説明したが、3次元測定器4のソフトウェアと連動させることにより、測定データを、自動的に前記リード補正計算装置100に入力させるようにしても良い。また、前記リード補正計算装置100の加工機入力補正量・位置出力部103に出力される補正データ(リード補正量とリード補正位置)を、前記リード補正計算装置100に備えるインターフェース(図示せず)を介して前記研削加工機2に自動転送して、研削加工機2の制御装置へ自動的に入力できるように構成しても良い。或いは、得られた前記補正データを、フラッシュメモリなどのメモリ媒体を介して、前記研削加工機2に補正データを受け渡す方式としても良い。
 上記のように補正データの入力と出力を自動化した場合、図7に示した画面構成で初期データ入力部101、補正量追加部102、加工機入力補正量・位置出力部103などは敢えて表示する必要はなくなり、「測定データ入力中」、「補正データ出力中」などの状態表示にすることも可能である。しかし、選択ボタンなどにより図7に示す入力データや出力データの確認ができるように、それらの表示機能を備えていることが好ましい。
 図8は、本発明を適用して製作したスクリューロータを従来の加工方法で製作したものと比較して示す説明図である。
  図8において、左欄は、試行錯誤的に求めたリード補正量で研削した従来の手法により製作したスクリューロータのリード測定結果の一例である。201,202はロータ溝部の左右の歯面における測定リードを示す線(リード測定線)で、基準リードを示す線54からの誤差を距離で表わしており、図4で説明した測定結果と同様に測定して表示したものである。
 この従来の手法により製作されたスクリューロータでは、最大46.3μmのリード誤差が砥石出口部(図の下側)に生じている。また、砥石の入口部(図の上側)では最大35.8μmのリード誤差が生じている。
 この測定結果を基に、図7に示すリード補正計算装置100の画面の初期データ入力部101に必要データを入力した。出力選択ボタン104はL1を選択し、加工機入力補正量・位置は、図8に示すリード測定線201,202のうちのリード測定線201から得られるデータを選択した。
 この結果として前記画面に表示されたリード補正量とリード補正位置を使用し、研削加工機2の制御データに反映させ、スクリューロータの素材を研削して得られたスクリューロータのリード測定結果が、図8の右欄に示すリード測定線203,204である。
 図8に示すように、本発明を適用して製作したスクリューロータは、リード誤差を約80%低減できており、本発明を適用して製作されたスクリューロータは大幅な精度向上を図ることができた。
 以上説明した本実施例によれば、スクリューロータを加工するに際に、Z方向(軸方向)の位置Zと基準リードに対する歯面直角方向の誤差(リード誤差)δの距離で得られた測定結果を用いて、研削加工機2に入力する補正データを理論に基づいて正確に求めることができる。従って、スクリューロータ素材の研削加工における砥石3の入口部と出口部に生じていた誤差を小さくすることができる。
 また、リード補正計算装置100の画面に誤差を入力する初期データ入力部101と加工機入力補正量・位置出力部103を備えているので、スクリューロータを加工する際に、研削加工機に付与する補正データを容易に得ることができる。
 さらに、リード補正計算装置100から出力された補正データを研削加工機2に入力することで、高精度のリード有するスクリューロータを得ることができるから、この高精度のスクリューロータを用いることで、圧縮ガスの漏れ損失が小さく圧縮効率が高いスクリュー圧縮機を容易に得ることができる。
 なお、本発明は上述した実施例に限定されるものではなく、様々な変形例が含まれる。また、上記した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。
 1:スクリューロータ、1a:スクリューロータ溝部(ロータ溝部)、1b:リードを示す曲線、2:研削加工機、2a,2b:センタ、2c:回し金、2d:回転機構、2e:ドライバ(回し板)、2f:振れ止め、3:砥石、3a:砥石ドライバ、4:3次元測定器、4a:プローブ、4b:回転テーブル、51~55:測定点を結ぶ線分、B,56:基準リードを示す線、57,58:補正リードを示す線、61:砥石の移動開始点、61a:回転角の原点、62~67:測定点、68:砥石の終点、62a,63a:点、72:測定点62に対応する基準リード線上の理想点、73:測定点62のリード誤差を補正するための修正点(補正回転角-dθ1)、75:測定点63に対応する基準リード線上の理想点、76:測定点63のリード誤差を補正するための修正点(補正回転角-dθ2)、100:リード補正計算装置、101:初期データ入力部、102:補正量追加部、103:加工機入力補正量・位置出力部、104:選択ボタン、105:尺度入力部、106:リード測定値入力部、201,202:従来のスクリューロータのリード測定線、203,204:本発明を適用して研削したスクリューロータのリード測定線、θ:回転角、δ,δ1:誤差(リード誤差)、dθ1:誤差δ1に対応する回転角、dθ2:誤差δ2に対応する回転角、P0:基準リード、dP1,dP2:リード補正量。

Claims (10)

  1.  スクリューロータのリード誤差を補正してスクリューロータを加工するスクリューロータの加工方法であって、
     スクリューロータの素材を研削加工し、
     この研削加工して製作されたスクリューロータのロータ溝部の軸方向位置における基準リードに対するリード誤差を距離として測定し、
     この距離として測定された前記リード誤差に基づいて、前記リード誤差を補正するためのリード補正量と、そのリード補正を開始するスクリューロータの軸方向位置であるリード補正開始位置を算出し、
     この算出されたリード補正量とリード補正開始位置に基づいてスクリューロータを研削加工することを特徴とするスクリューロータの加工方法。
  2.  請求項1に記載のスクリューロータの加工方法であって、
     前記スクリューロータの素材は砥石を有する研削加工機により研削加工されるものであり、
     前記リード補正量と前記リード補正開始位置は、前記スクリューロータのロータ溝部の軸方向の各位置における基準リードに対するリード補正量と、そのリード補正を開始するリード補正開始位置として算出され、
     この算出されたリード補正量とリード補正開始位置のデータを前記研削加工機に与えて、スクリューロータの素材を研削加工することを特徴とするスクリューロータの加工方法。
  3.  請求項2に記載のスクリューロータの加工方法であって、
     ロータ溝部の軸方向位置における基準リード上の回転角θと、その回転角θの位置におけるリード誤差に対応する回転角dθを求め、
     前記リード誤差に対応する回転角dθの正負を反転させた回転角-dθを、前記回転角θからの差分として修正点を求め、この修正点を通る補正リードから前記リード補正量を求めると共に、前記回転角θから前記リード補正開始位置を求めることを特徴とするスクリューロータの加工方法。
  4.  請求項3に記載のスクリューロータの加工方法であって、
     前記基準リード上の回転角θの位置における補正すべき回転角をdθ、軸方向であるZ方向位置の距離をZ、リード補正量をdPとし、さらに基準リードをPとしたとき、前記リード補正量dPを次式(数1)により求めることを特徴とするスクリューロータの加工方法。
    Figure JPOXMLDOC01-appb-M000001
    (但し、添え字iは、ロータ溝部のZ方向位置における基準リードに対するリード誤差を測定した測定点の順序を示し、「i=0」は回転角またはZ方向位置の原点に対応する。)
  5.  請求項2に記載のスクリューロータの加工方法であって、
     前記リード補正開始位置を、前記スクリューロータ上で前記研削加工機の砥石が接触する位置で決定することを特徴とするスクリューロータの加工方法。
  6.  請求項1に記載のスクリューロータの加工方法であって、
     前記スクリューロータの溝を形成する2面のうち一方側の面のリード誤差の測定データを用いて、前記リード補正量と前記リード補正開始位置を算出することを特徴とするスクリューロータの加工方法。
  7.  スクリューロータのリード誤差を補正する補正データを得るためのスクリューロータのリード補正計算装置であって、
     前記スクリューロータのロータ溝部の軸方向の各位置における基準リードに対する距離としての誤差を入力する初期データ入力部と、
     この初期データ入力部に入力された距離としての誤差に基づいて、前記基準リードに対するリード補正量と、リード補正を開始する軸方向位置であるリード補正開始位置を演算して出力する加工機入力補正量・位置出力部と、を備えることを特徴とするスクリューロータのリード補正計算装置。
  8.  請求項7に記載のスクリューロータのリード補正計算装置において、
     演算された前記リード補正量と前記リード補正開始位置を追加調整するために、前記初期データ入力部に入力された初期データを修正するデータを入力するための補正量追加部を備えることを特徴とするスクリューロータのリード補正計算装置。
  9.  請求項7に記載のスクリューロータのリード補正計算装置において、
     前記スクリューロータのロータ溝部を形成する2面のうちのいずれの面のリード誤差の測定データを用いて、前記リード補正量及び前記リード補正開始位置の演算を行うかを選択する選択ボタンを備えることを特徴とするスクリューロータのリード補正計算装置。
  10.  請求項7に記載のスクリューロータのリード補正計算装置において、
     前記加工機入力補正量・位置出力部は、前記ロータ溝部の軸方向位置における基準リード上の回転角θと、その回転角θの位置におけるリード誤差に対応する回転角dθを求め、前記リード誤差に対応する回転角dθの正負を反転させた回転角-dθを、前記回転角θからの差分として修正点を求め、この修正点を通る補正リードから前記リード補正量を求めると共に、前記回転角θから前記リード補正開始位置を求めることを特徴とするスクリューロータのリード補正計算装置。
PCT/JP2017/040050 2017-11-07 2017-11-07 スクリューロータの加工方法及びスクリューロータのリード補正計算装置 WO2019092773A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP17930163.5A EP3708839A4 (en) 2017-11-07 2017-11-07 PROCESS FOR PROCESSING A SCREW ROTOR AND DEVICE FOR CALCULATING THE SCREW ROTOR FLANK CORRECTION
JP2018555709A JP6450895B1 (ja) 2017-11-07 2017-11-07 スクリューロータの加工方法及びスクリューロータのリード補正計算装置
PCT/JP2017/040050 WO2019092773A1 (ja) 2017-11-07 2017-11-07 スクリューロータの加工方法及びスクリューロータのリード補正計算装置
CN201780075067.3A CN110073107B (zh) 2017-11-07 2017-11-07 螺杆转子的加工方法及螺杆转子的导程补正计算装置
US16/434,190 US11890721B2 (en) 2017-11-07 2019-06-07 Screw rotor processing method and screw rotor lead correction calculation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2017/040050 WO2019092773A1 (ja) 2017-11-07 2017-11-07 スクリューロータの加工方法及びスクリューロータのリード補正計算装置

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US16/434,190 Continuation US11890721B2 (en) 2017-11-07 2019-06-07 Screw rotor processing method and screw rotor lead correction calculation device

Publications (1)

Publication Number Publication Date
WO2019092773A1 true WO2019092773A1 (ja) 2019-05-16

Family

ID=64960286

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/040050 WO2019092773A1 (ja) 2017-11-07 2017-11-07 スクリューロータの加工方法及びスクリューロータのリード補正計算装置

Country Status (5)

Country Link
US (1) US11890721B2 (ja)
EP (1) EP3708839A4 (ja)
JP (1) JP6450895B1 (ja)
CN (1) CN110073107B (ja)
WO (1) WO2019092773A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113211220B (zh) * 2021-05-17 2022-03-22 南京箬升机电制造有限公司 一种空气压缩机高精度螺杆转子制造精加工工艺

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06159271A (ja) * 1992-11-24 1994-06-07 Hitachi Ltd 油冷式スクリュー圧縮機
JP2007262936A (ja) * 2006-03-28 2007-10-11 Hitachi Plant Technologies Ltd スクリュー流体機械
JP2016014369A (ja) 2014-07-03 2016-01-28 日立アプライアンス株式会社 スクリュー圧縮機およびそのロータの研削仕上げ加工方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2881855B2 (ja) * 1989-11-07 1999-04-12 日本精工株式会社 ゴシック・アーク溝の超仕上方法
JP4828974B2 (ja) * 2006-03-16 2011-11-30 株式会社ミツトヨ ねじ測定方法、ねじ測定用プローブ及びそれを用いたねじ測定装置
JP5511263B2 (ja) * 2009-08-24 2014-06-04 三菱重工業株式会社 内歯車加工方法及び内歯車加工機
JP5951126B2 (ja) * 2013-05-31 2016-07-13 トヨタ自動車北海道株式会社 連続創成式歯車研削方法
CN103737491A (zh) * 2014-01-14 2014-04-23 厦门大学 一种基于螺杆转子数控磨床几何误差的补偿方法
JP6363469B2 (ja) * 2014-10-28 2018-07-25 トーヨーエイテック株式会社 歯車研削盤の加工精度修正方法
WO2017057026A1 (ja) * 2015-09-28 2017-04-06 三菱電機株式会社 スクリューロータの加工方法、加工装置及び加工用工具並びにスクリュー圧縮機の製造方法
CN107121116A (zh) * 2017-05-25 2017-09-01 重庆大学 螺杆型面综合性能检测平台

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06159271A (ja) * 1992-11-24 1994-06-07 Hitachi Ltd 油冷式スクリュー圧縮機
JP2007262936A (ja) * 2006-03-28 2007-10-11 Hitachi Plant Technologies Ltd スクリュー流体機械
JP2016014369A (ja) 2014-07-03 2016-01-28 日立アプライアンス株式会社 スクリュー圧縮機およびそのロータの研削仕上げ加工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3708839A4

Also Published As

Publication number Publication date
CN110073107A (zh) 2019-07-30
US11890721B2 (en) 2024-02-06
CN110073107B (zh) 2020-07-07
EP3708839A1 (en) 2020-09-16
US20190283207A1 (en) 2019-09-19
JPWO2019092773A1 (ja) 2019-11-14
JP6450895B1 (ja) 2019-01-09
EP3708839A4 (en) 2021-07-07

Similar Documents

Publication Publication Date Title
CN109465502B (zh) 用于剃齿的方法和设备
US9969018B2 (en) Internal gear machining method and internal gear machining device
EP1835256A1 (en) Screw measuring method, screw measuring probe, and screw measuring apparatus using the screw measuring probe
JP2018516178A (ja) 材料を除去することによって工具を機械加工する方法及び装置
CN102458713A (zh) 采用自适应抛光制造锻件的方法
CN112580160B (zh) 一种用于成形磨齿机在机测量系统标定方法
JP2022168203A (ja) 歯車加工装置及び歯車加工方法
CN112105482A (zh) 用于制作包括螺旋凹槽的工件的方法和研磨机
WO2019092773A1 (ja) スクリューロータの加工方法及びスクリューロータのリード補正計算装置
US9849547B2 (en) Manufacturing apparatus and manufacturing method for manufacturing less unbalanced blower blade
JP3986320B2 (ja) 歯車加工方法及び装置
EP2732918A1 (en) Grinding plate and grinding method
Yang et al. A profile dressing method for grinding worm used for helical gear with higher order modification profile
JP2013071187A (ja) 工具経路算出装置、工具経路算出方法、及び加工装置
TWI645274B (zh) 工件加工方法及其加工系統
Yu et al. Approximation model for longitudinal-crowned involute helical gears with flank twist in continuous generating grinding
JP5061558B2 (ja) 数値制御装置のプログラムの記述方法、数値制御装置、及び加工装置
JP2006517150A (ja) 研磨装置の較正方法
CN105156322A (zh) 一种含有齿面间隙的螺杆端面型线设计方法
WO2023218648A1 (ja) 工作機械の制御装置
Chlost et al. A new method of the positioning and analysis of the roughness deviation in five-axis milling of external cylindrical gear
JP2023170013A (ja) ギヤの位相測定方法および歯車加工装置
JPH11123633A (ja) スクロールラップの加工方法およびその加工装置
CN117140356A (zh) 砂轮试磨测方法及系统
JP2023162649A (ja) 球面研削方法および球面研削装置

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018555709

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17930163

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2017930163

Country of ref document: EP

Effective date: 20200608