WO2019068229A1 - Coffrage de pile de pont de chemin de fer de type à rainure pouvant être rapidement assemblé et démonté - Google Patents

Coffrage de pile de pont de chemin de fer de type à rainure pouvant être rapidement assemblé et démonté Download PDF

Info

Publication number
WO2019068229A1
WO2019068229A1 PCT/CN2017/105285 CN2017105285W WO2019068229A1 WO 2019068229 A1 WO2019068229 A1 WO 2019068229A1 CN 2017105285 W CN2017105285 W CN 2017105285W WO 2019068229 A1 WO2019068229 A1 WO 2019068229A1
Authority
WO
WIPO (PCT)
Prior art keywords
vertical
stiffening plate
horizontal
bridge pier
formwork
Prior art date
Application number
PCT/CN2017/105285
Other languages
English (en)
Chinese (zh)
Inventor
朱子毅
Original Assignee
朱子毅
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 朱子毅 filed Critical 朱子毅
Priority to PCT/CN2017/105285 priority Critical patent/WO2019068229A1/fr
Publication of WO2019068229A1 publication Critical patent/WO2019068229A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Definitions

  • the invention belongs to the field of railway bridge concrete structure construction, and relates to a grooved railway pier template which can be quickly spliced and disassembled.
  • Steel formwork is currently used more and more for the construction of concrete structures such as bridges, piers, columns, and platforms.
  • the steel formwork has high rigidity, high strength, good flatness and is not easy to be deformed, and the molding effect is good;
  • it can be highly revolving, requires less external support, and can be recycled.
  • the large-scale steel formwork splicing adopts straight seam splicing, and the seam fastening bolts are used to ensure the upper and lower and left and right butt joints are stitched and compacted.
  • the combination template is always there, there is always a gap between the top and bottom and the left and right butt joints.
  • the intersection of the corners is wrong, the positioning and the docking are long, and the effect is not high, which makes the mold adjustment difficult.
  • the template is easy to be deformed or the joint is not dense, resulting in leakage of slurry and poor appearance of the concrete.
  • the frame is often framed by the frame, and the removal of the frame often requires the use of tools such as hammers and crowbars.
  • the template itself taps and taps to loosen the template.
  • Road pier template to improve railway pier steel splice site and disassembly efficiency, closed seams, reduce dislocation, saving manpower and equipment investment.
  • the problem to be solved by the present invention is to provide a bevel-type railway bridge template that can be quickly spliced and disassembled, in order to overcome the inconsistency, corner misalignment, positioning and docking of the "ten" word template joint.
  • the technical solution adopted by the present invention to solve the technical problem is: it comprises a formwork panel, a horizontal stiffener, a vertical stiffener, a connecting hole, a horizontal stiffener is arranged at the edge of the horizontal direction of the formwork panel, and the vertical stiffener is set.
  • the vertical stiffener is provided with a groove, the horizontal stiffening
  • the plate is provided with a groove matching the vertical stiffening plate;
  • the connecting hole is evenly arranged on the horizontal stiffening plate or the vertical stiffening plate;
  • the template plate is stitched two by two, and the adjacent template horizontal stiffening plate or vertical
  • the connecting holes on the straight stiffening plate are opposite to each other, and the bolt is screwed into the connecting hole;
  • the groove is set to an external tilting groove of 6 ⁇ 10°;
  • the horizontal stiffening plate is a thick 8mm steel plate, the width is 100mm, the vertical step
  • the horizontal stiffening plate is fixed on the outer side of the die face of the formwork panel;
  • the vertical stiffened slats are fixed on the outer side of the die face of the formwork panel;
  • the vertical stiffener is 8 mm thick Steel plate, width 100mm, straight step step 600mm, curve step step 400 ⁇ 500mm;
  • the connecting hole is provided with longitudinal and transverse frame
  • the invention can quickly improve the speed and precision of the steel splicing of the steel bridge pier steel slab, and has a large buckle pressure at the joint seam, which can quickly increase the speed of disassembly of the steel slab of the railway bridge pier, and the stress release of the joint of the vertical joint of the detachment The effect, the template collapses automatically, saving the manpower and equipment investment.
  • Figure 1 is a plan view of an assembled stencil of a beveled railway pier template of the present invention which can be quickly spliced and disassembled.
  • FIG. 2 is a front elevational view of a beveled railway pier template of the present invention that can be quickly spliced and disassembled.
  • the present invention relates to a bevel type railway pier template which can be quickly spliced and disassembled, which comprises a formwork panel 1, water a flat stiffener 2, a vertical stiffener 3, a connecting hole 4, the two vertical splicing of the vertical stiffening plate 3 is provided with an outward tilting groove of 6 ⁇ 10°, and the horizontal stiffening plate 2 is provided with the vertical
  • the matching grooves of the stiffening plates 3 are also fastened between the horizontal stiffening plates 2 and the vertical stiffening plates 3 of the butt joint positions of the two joined formwork panels 1 by means of evenly arranged bolts 5.
  • the horizontal stiffener 2 is horizontally beam-shaped and fixed to the outside of the die face of the formwork panel 1.
  • the horizontal stiffening plate 2 is a steel plate having a thickness of 8 mm, a width of 100 mm, and a vertical step distance of 600 to 700 mm.
  • the vertical stiffening plates are fixed to the outside of the die face of the formwork panel 3 by three ribs.
  • the vertical stiffening plate 3 is a steel plate with a thickness of 8 mm, a width of 100 mm, a step distance of 600 mm in a straight section, and a step distance of 400 to 500 mm in a curved section.
  • the bolts 5 are screwed into the connecting holes 4, and the connecting holes 4 are provided with a longitudinal and transverse frame amount of the bolts 5, so as to cope with the drilling deviation and the staggering of the splicing boring, and improve the adaptability of the stencil assembling splicing.
  • the bolt 5 is a (J) 20 mm ordinary bolt, and the length is divided into 50 mm and 70 mm.
  • the horizontal seam fastening bolt 5 has a length of 50 mm, and the vertical direct seam fastening bolt 5 has a length of 70 mm.
  • the connecting holes 4 are evenly arranged on the vertical stiffening plate 3 and the horizontal stiffening plate 2 around the formwork panel 1 to function as a flange for fixing the formwork panel 1.
  • the connecting hole 4 has a round end shape, a length of 40 to 60 mm, a hole diameter of 22 mm, and an arrangement pitch of 250 to 300 mm.
  • the pre-tightening force generated by the vertical joint gives the demolding effect of the disassembly ⁇ , but when the groove angle is greater than 10°, the bolt 5
  • the problem of insufficient length is more obvious.
  • the aperture of the connecting hole 4 is constant, the angle of the bolt 5 and the connecting hole 4 is larger.
  • the loss of the movable frame is getting larger and larger, which leads to more and more bolts that cannot be penetrated. This requires expanding the hole diameter of the connecting hole 4 and increasing the length of the bolt 5, so the processing cost and the bolt input of the punch press are increased. Fastening and troublesome.
  • the invention can quickly improve the speed and precision of the steel splicing of the steel bridge pier steel slab, and has a large buckle pressure at the joint seam, which can quickly increase the speed of disassembly of the steel slab of the railway bridge pier, and the stress release of the joint of the vertical joint of the detachment The effect, the template collapses automatically, saving the manpower and equipment investment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

L'invention concerne un coffrage de pile de pont de chemin de fer de type à rainure pouvant être rapidement assemblé et démonté. Le coffrage de pile de pont de chemin de fer de type à rainure comprend un panneau de coffrage (1), une plaque de renforcement horizontale (2), une plaque de renforcement verticale (3) et des trous de liaison (4), dans lequel la plaque de renforcement horizontale (2) est agencée au niveau du bord horizontal du panneau de coffrage (1), la plaque de renforcement verticale (3) est agencée au niveau du bord vertical du panneau de coffrage (1), la plaque de renforcement verticale (3) comporte une rainure, et la plaque de renforcement horizontale (2) comporte une rainure correspondant à la plaque de renforcement verticale (3) ; et les trous de liaison (4) sont mis en œuvre de manière uniforme dans la plaque de renforcement horizontale (2) ou la plaque de renforcement verticale (3). Le coffrage de pile de pont de chemin de fer de type à rainure peut considérablement augmenter la vitesse et la précision de l'assemblage sur place des coffrages de pile de pont de chemin de fer, et pendant le démontage, un effet de libération de contrainte se produit au niveau d'un assemblage de couture verticale, de telle sorte que les coffrages sont automatiquement divisés, ce qui permet des économies d'investissement en termes de travail et d'équipement.
PCT/CN2017/105285 2017-10-08 2017-10-08 Coffrage de pile de pont de chemin de fer de type à rainure pouvant être rapidement assemblé et démonté WO2019068229A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/105285 WO2019068229A1 (fr) 2017-10-08 2017-10-08 Coffrage de pile de pont de chemin de fer de type à rainure pouvant être rapidement assemblé et démonté

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/105285 WO2019068229A1 (fr) 2017-10-08 2017-10-08 Coffrage de pile de pont de chemin de fer de type à rainure pouvant être rapidement assemblé et démonté

Publications (1)

Publication Number Publication Date
WO2019068229A1 true WO2019068229A1 (fr) 2019-04-11

Family

ID=65994194

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/105285 WO2019068229A1 (fr) 2017-10-08 2017-10-08 Coffrage de pile de pont de chemin de fer de type à rainure pouvant être rapidement assemblé et démonté

Country Status (1)

Country Link
WO (1) WO2019068229A1 (fr)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5317807B2 (fr) * 1975-05-22 1978-06-10
CN101858054A (zh) * 2009-04-09 2010-10-13 株式会社大宇建设 镶合浇筑用模板及利用该模板的组合式预制桥墩施工方法
CN201648972U (zh) * 2010-03-31 2010-11-24 中铁十五局集团第二工程有限公司 一种桥墩用钢模板
CN102031755A (zh) * 2010-11-26 2011-04-27 哈尔滨工程大学 梁桥重力式桥墩用多功能永久模板
CN202519586U (zh) * 2012-04-07 2012-11-07 重庆亲禾预制品有限公司 一种钢木组合式清水砼桥墩模板结构
CN107100069A (zh) * 2017-06-12 2017-08-29 广西路建工程集团有限公司 一种混凝土圆柱墩盖梁和系梁逆序施工方法
CN107542034A (zh) * 2017-10-08 2018-01-05 中铁五局集团第二工程有限责任公司 可快速拼接、拆卸的坡口式铁路桥墩模板
CN207314127U (zh) * 2017-10-08 2018-05-04 中铁五局集团第二工程有限责任公司 可快速拼接、拆卸的坡口式铁路桥墩模板

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5317807B2 (fr) * 1975-05-22 1978-06-10
CN101858054A (zh) * 2009-04-09 2010-10-13 株式会社大宇建设 镶合浇筑用模板及利用该模板的组合式预制桥墩施工方法
CN201648972U (zh) * 2010-03-31 2010-11-24 中铁十五局集团第二工程有限公司 一种桥墩用钢模板
CN102031755A (zh) * 2010-11-26 2011-04-27 哈尔滨工程大学 梁桥重力式桥墩用多功能永久模板
CN202519586U (zh) * 2012-04-07 2012-11-07 重庆亲禾预制品有限公司 一种钢木组合式清水砼桥墩模板结构
CN107100069A (zh) * 2017-06-12 2017-08-29 广西路建工程集团有限公司 一种混凝土圆柱墩盖梁和系梁逆序施工方法
CN107542034A (zh) * 2017-10-08 2018-01-05 中铁五局集团第二工程有限责任公司 可快速拼接、拆卸的坡口式铁路桥墩模板
CN207314127U (zh) * 2017-10-08 2018-05-04 中铁五局集团第二工程有限责任公司 可快速拼接、拆卸的坡口式铁路桥墩模板

Similar Documents

Publication Publication Date Title
CN203712840U (zh) 小箱梁混凝土浇筑模具
CN110206295A (zh) 一种木框承接板
CN207314127U (zh) 可快速拼接、拆卸的坡口式铁路桥墩模板
CN206346398U (zh) 一种高层建筑钢柱拼接结构
CN113738145B (zh) 建筑加固工程结构及其施工方法
CN103963146A (zh) 混凝土模板组成的柱模施工方法
WO2019068229A1 (fr) Coffrage de pile de pont de chemin de fer de type à rainure pouvant être rapidement assemblé et démonté
WO2019068232A1 (fr) Module de route et de pont de type à rainure à angle d'inclinaison
CN107542034A (zh) 可快速拼接、拆卸的坡口式铁路桥墩模板
CN207812625U (zh) 异形排水沟模板一体化装置
CN115419255A (zh) 用于清水混凝土墙的模板及不打眼不裁模板的施工方法
CN110056187B (zh) 一种钢组合模板的搭设结构
CN205243526U (zh) 一种双铰耳结构隧道二次衬砌端模工装设备
CN109555310B (zh) 一种墙柱的整体式模板及其施工方法
CN210370700U (zh) 自锁式隧道二次衬砌台车端头封堵模板
CN106592964A (zh) 一种模板快拆装置
CN211974332U (zh) 一种构造柱浇筑口可周转的简易装置
CN212201285U (zh) 一种钢筋混凝土框架柱截面控制装置
CN207032853U (zh) 双层共挤中空建筑用模板
CN214785946U (zh) 一种梁、墙、板面组合快装早拆结构
CN203769321U (zh) 钢模板的退模结构
CN219973899U (zh) 一体式施工折叠卡具水沟模板
CN210828346U (zh) 一种反坎加固装置
CN220621030U (zh) 一种新型后浇带持续支撑体系
CN113107199B (zh) 一种便于梁底调节定位的梁墙快装早拆梁结构

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17927879

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17927879

Country of ref document: EP

Kind code of ref document: A1