WO2019064618A1 - 粉体輸送用の配管および粉体輸送方法 - Google Patents

粉体輸送用の配管および粉体輸送方法 Download PDF

Info

Publication number
WO2019064618A1
WO2019064618A1 PCT/JP2018/003641 JP2018003641W WO2019064618A1 WO 2019064618 A1 WO2019064618 A1 WO 2019064618A1 JP 2018003641 W JP2018003641 W JP 2018003641W WO 2019064618 A1 WO2019064618 A1 WO 2019064618A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
transport path
gas
curved
powder
Prior art date
Application number
PCT/JP2018/003641
Other languages
English (en)
French (fr)
Inventor
伸宏 田中
克浩 村田
哲治 今村
竹田 浩伸
智之 長田
Original Assignee
三菱ケミカルエンジニアリング株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱ケミカルエンジニアリング株式会社 filed Critical 三菱ケミカルエンジニアリング株式会社
Priority to EP18862888.7A priority Critical patent/EP3689797B1/en
Priority to US16/649,678 priority patent/US10947064B2/en
Publication of WO2019064618A1 publication Critical patent/WO2019064618A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/04Conveying materials in bulk pneumatically through pipes or tubes; Air slides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/34Details
    • B65G53/52Adaptations of pipes or tubes
    • B65G53/523Wear protection
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/34Details
    • B65G53/52Adaptations of pipes or tubes
    • B65G53/521Adaptations of pipes or tubes means for preventing the accumulation or for removal of deposits
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/004Joining to walls at other than 90 degrees
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L43/00Bends; Siphons
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L57/00Protection of pipes or objects of similar shape against external or internal damage or wear

Definitions

  • the present invention relates to piping for powder transportation and a powder transportation method.
  • a countermeasure for the powder deposited in the transport path through which the powder to be pneumatically transported passes for example, air blow for the deposited powder, application of pulsation to the air flow for transporting the powder, pipe
  • Various countermeasures can be considered such as air flow blowing from pores formed in the vertical and horizontal directions on the surface.
  • the air blow aiming at the deposited powder is performed by interrupting the pneumatic transportation of the powder, the interruption of the treatment is inevitable when applying the equipment to the continuous processing of the powder, which is troublesome.
  • the application of pulsation to the air flow for transporting the powder unavoidably causes the flow rate of the powder to fluctuate, so the properties of the powder when applied to equipment that performs various treatments such as heating on the powder And may adversely affect quality.
  • the air flow is blown out from the pores formed in the longitudinal and transverse directions on the inner surface of the tube, since the tube itself has a complicated structure, it becomes extremely difficult to clean a small amount of residual powder in the vicinity of the pores. Contamination of the powder can be a problem when applied to equipment in which
  • this invention makes it a solution subject to provide the technique which can suppress deposition of the powder in pneumatic transport by the pipe body of a simple structure.
  • the present invention is a pipe for powder transportation, which has a portion formed by a curved tube, and is formed on the transport path through which the powder to be pneumatically transported passes and the inner circumferential surface of the curved tube. And a blowing path for blowing a gas from the opening into the transport path, wherein the blowing path blows the gas in a direction in which the gas blown into the transport path from the opening becomes a swirling flow along the inner circumferential surface of the curved tube.
  • the blowing path may blow gas along the tangent of the circle forming the cross section of the curved tube.
  • the blowing path may blow gas from the outer peripheral side of the curved pipe toward the central point of the radius of curvature of the curved pipe.
  • the transport route is formed by a 90 degree bent tube, and the blowing route is to blow gas into the transport route from the opening at any part between 30 degrees and 60 degrees of the bent tube.
  • the transport path may be formed by a 90-degree bent tube, and the blowing path may be a gas blown into the transport path from an opening at a 45-degree portion of the bent tube.
  • the transport path may have a plurality of portions formed by curved pipes, and the blowing path may blow gas into the transport paths with time difference from each opening of the inner peripheral surface of the plurality of curved pipes. If the gas blown into the transport path from the blow path in the curved pipe portion is blown in this way, the fluctuation of the air flow in the entire transport path is suppressed.
  • the present invention can also be grasped from the aspect of the method.
  • the present invention relates to a powder transport method, wherein the step of pneumatically transporting powder using a transport path having a portion formed by a curved tube, and an opening formed on the inner circumferential surface of the curved tube, The gas blown into the transport path may blow the gas in the direction of the swirling flow along the inner circumferential surface of the curved tube.
  • FIG. 1 is a figure showing piping concerning an embodiment.
  • FIG. 2 is a cross-sectional view of the pipe taken along the alternate long and short dash line indicated by reference numeral AA in FIG.
  • Drawing 3 is a figure showing piping concerning a comparative example.
  • FIG. 4 is a diagram showing the distribution of the flow velocity of the air flowing through the transport path.
  • FIG. 5 is a diagram showing the direction of the air flow flowing in the transport path by an arrow.
  • FIG. 6 is a first view showing an application example of piping.
  • FIG. 7 is a second view showing an application example of piping.
  • Drawing 1 is a figure showing piping 1 concerning an embodiment.
  • the pipe 1 is a pipe used for pneumatic transportation of powder, and includes a bent pipe 1A and a straight pipe 1B connected to both ends of the bent pipe 1A.
  • the curved pipe 1A and the straight pipe 1B form a transport path 2 through which the powder to be pneumatically transported passes.
  • the bent pipe 1A and the straight pipe 1B may be integrally formed by welding or the like, or may be connected to each other via a flange or the like.
  • FIG. 1 illustrates that the curved pipes 1A connect the straight pipes 1B to each other at an angle of 90 degrees, but the curved pipe 1A connects the straight pipes 1B to each other at an obtuse angle than 90 degrees.
  • straight pipes 1B may be connected at an acute angle of more than 90 degrees.
  • straight pipes 1B may be connected at an acute angle of more than 90 degrees.
  • the other curved pipe may be connected to the both ends or one end of curved pipe 1A.
  • the pipe 1 includes a branch pipe 1C connected to the outer peripheral surface of the curved pipe 1A in addition to the curved pipe 1A and the straight pipe 1B.
  • the branch pipe 1 ⁇ / b> C forms a blow path 3 through which the gas blown into the transport path 2 passes.
  • the branch pipe 1C may be integrally formed with the bent pipe 1A by welding or the like, or may be connected via a flange or the like.
  • the branch pipe 1 ⁇ / b> C is connected to the bent pipe 1 ⁇ / b> A from the side immediately on the outer peripheral side of the bent pipe 1 ⁇ / b> A. Accordingly, the blow path 3 formed by the branch pipe 1C blows gas from the outer peripheral side of the bend pipe 1A toward the central point of the curvature radius of the bend pipe 1A.
  • FIG. 1 shows that the branch pipe 1C is provided at a 45 degree portion of the curved pipe 1A having an angle of 90 degrees, the branch pipe 1C is limited to this form. Absent.
  • the branch pipe 1C may be provided, for example, at any position between 30 degrees and 60 degrees of the bent pipe 1A.
  • the branch pipe 1C is a circular pipe thinner than the curved pipe 1A. Then, in order for the gas blown into the transport path 2 from the blowing path 3 to be a swirling flow along the inner circumferential surface of the curved pipe 1A, the central pipe of the branch pipe 1C is closer to the tangent of the curved pipe 1A. It is connected with the curved tube 1A at the position.
  • FIG. 2 is a cross-sectional view of the pipe 1 taken along an alternate long and short dash line indicated by a symbol AA in FIG.
  • the branch pipe 1 ⁇ / b> C is a circular pipe thinner than the curved pipe 1 ⁇ / b> A.
  • branch pipe 1C forms blow-in path 3 which blows gas into transport path 2 from opening 4 formed in inner skin of bent pipe 1A.
  • the branch pipe 1C is connected to the bend pipe 1A at a position where the central axis is closer to the tangent of the bend pipe 1A. Therefore, as shown by the arrow in FIG. 2, the gas blown into the transport path 2 from the blow path 3 becomes a swirling flow along the inner circumferential surface of the bent pipe 1A.
  • the powder in the pneumatic transport in the transport path 2 receives the air flow from the blowing path 3 blown into the transport path 2 from the opening 4 on the way through the bent pipe 1A, and the swirling flow in the transport path 2 It becomes.
  • FIG. 3 is a view showing a pipe 101 according to a comparative example.
  • the pipe 101 is the same as the pipe 1 except that the branch pipe 1C is omitted. That is, the pipe 101 includes the curved pipe 101A and the straight pipe 101B which form the transport path 102 in the same manner as the pipe 1.
  • FIG. 4 is a view showing the distribution of the flow velocity of the air flowing through the transport path 2, 102.
  • the low flow velocity region is generated in the downstream portion from around the 45 degree portion of the bent pipe 101A having an angle of 90 degrees.
  • the comparative example and the example are compared, it can be seen that the low flow velocity region appearing in the transport path 102 in the comparative example is almost eliminated in the case of the example.
  • the reason why the low flow velocity region appearing in the transport path 102 in the comparative example is eliminated in the case of the example will be described below.
  • FIG. 5 is a diagram showing the direction of the air flow flowing in the transport path 102 by an arrow.
  • the fluid flowing through the transport path 102 gradually changes its path along the curvature of the curved pipe 101A when entering the curved pipe 101A from the straight pipe 101B.
  • two symmetrical spiral flows are formed across a plane including the central axis of the curved transport path 102 formed by the curved tube 101A. This spiral flow is hereinafter referred to as "secondary flow" in the present application.
  • the pipe 1 Since the pipe 1 is used for pneumatic transportation of powder, it is also premised in the present verification that a solid-gas mixed phase flow in which gas and solid particles are mixed flows in the transport path 2 102.
  • the flow of solid particles in the solid-gas mixed phase flow is not necessarily the same as the flow of gas carrying the solid particles.
  • a solid particle having a large particle diameter is less susceptible to the flow of gas than a solid particle having a small particle diameter
  • the secondary flow generated in the bent pipe 101A by the solid-gas mixed phase flow flowing in the transport path 102 entering the bent pipe 101A from the straight pipe 101B causes the straight arrows in FIG. 5B in the bent pipe 101A.
  • the inner peripheral portion of the curved pipe 101A shown there is a portion where the secondary flow faces each other across a plane including the central axis of the curved transport path 102 formed by the curved pipe 101A.
  • a stagnation point occurs at the inner peripheral portion of the curved tube 101A, and solid particles are deposited.
  • the low flow velocity region shown by "comparative example" in FIG. 4 can be said to be a site where such a stagnation point is expressed. Therefore, in the pipe 101, solid particles are deposited on the downstream side of the 45-degree portion of the bent pipe 101A.
  • the branch pipe 1 ⁇ / b> C is provided at a 45 degree portion of the bent pipe 1 ⁇ / b> A.
  • a swirling flow along the inner circumferential surface of the curved pipe 1A is generated in the transport path 2. Therefore, in the portion downstream of the 45-degree portion of the curved pipe 1A, the secondary flow as expressed in the pipe 101 is eliminated, and the generation of the stagnation point as shown in "Example” in FIG. Is suppressed. Therefore, in the pipe 1, deposition of solid particles in the bent pipe 1A is prevented.
  • FIG. 6 is a first view showing an application example of the pipe 1.
  • FIG. 7 is a second view showing an application example of the pipe 1.
  • the pipe 1 can be used, for example, in the dryer 12 of the drying unit 11 used for continuous production of a preparation as shown in FIG.
  • the dryer 12 is formed of a spiral pipe 1 formed in a substantially rectangular shape in top view, and a straight pipe 1B constituting a straight portion, a curved pipe 1A constituting a corner portion, and a branch connected to the curved pipe 1A It has a tube 1C.
  • the dryer 12 is provided with the header 14 and the solenoid valve 15 which supply compressed air to 1 C of branch pipes.
  • the drying unit 11 dries the particles granulated in the granulation unit 21 in the spiral pipe 1 forming the dryer 12.
  • the drying unit 11 further includes a cyclone 13 for sorting the particle size on the downstream side of the dryer 12 where the particles granulated in the granulation unit 21 which is the upper apparatus flow in by pneumatic conveyance.
  • any one of the four solenoid valves 15 is opened so that the compressed air of the header 14 is sequentially supplied to the four branch pipes 1C respectively connected to the branch pipes 1C at the four corners of the dryer 12 Control of the valve 15 is performed.
  • the four solenoid valves 15 are sequentially opened at fixed time intervals by a timer.
  • gas is blown into the transport path 2 from the openings 4 on the inner peripheral surface of the plurality of curved pipes 1A in the pipe 1 with a time difference. Therefore, as compared with the case where the four solenoid valves 15 are simultaneously opened, the fluctuation of the flow rate given to the solid-gas mixed phase flow passing through the transport path 2 in the pipe 1 is suppressed.
  • the piping 1 of the above embodiment has, for example, a simple tube structure as compared with a configuration in which an air flow is blown out from pores formed in the inner and outer surfaces of the tube, so that contamination of powder remaining in the tube can be prevented. It is less likely to Moreover, since the piping 1 of the said embodiment is preventing the remaining of powder by the gas blown from the blowing path
  • the piping 1 of the said embodiment is not limited to application to the location as shown in FIG.
  • the piping 1 of the said embodiment is applicable to the various installation in which pneumatic transport of powder is performed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Air Transport Of Granular Materials (AREA)

Abstract

本発明は、気力輸送中の粉体の堆積を簡単な構造の管体で抑制可能な技術を提供することを解決課題とする。本発明は、粉体輸送用の配管であって、曲管で形成される部位を有し、気力輸送される粉体が通過する輸送経路と、曲管の内周面に形成された開口から輸送経路へ気体を吹き込む吹込経路と、を備え、吹込経路は、開口から輸送経路へ吹き込まれた気体が曲管の内周面に沿った旋回流となる方向へ気体を吹き込む。

Description

粉体輸送用の配管および粉体輸送方法
 本発明は、粉体輸送用の配管および粉体輸送方法に関する。
 気力輸送される粉体が通過する輸送経路には、粉体の堆積を抑制するための各種技術が用いられている(例えば、特許文献1-4を参照)。
特開平06-286874号公報 特開平09-072499号公報 特開平09-278183号公報 特開平01-220638号公報
 気力輸送される粉体が通過する輸送経路内に堆積する粉体への対応策としては、例えば、堆積した粉体を狙ったエアーブローや、粉体を輸送する気流への脈動の付与、管内面に縦横に形成された細孔からの気流の吹き出しといった各種の対応策が考えられる。しかし、堆積した粉体を狙ったエアーブローは、粉体の気力輸送を中断して行われるので、粉体の連続的な処理を意図した設備に適用する場合は処理の中断が不可避となり煩わしい。また、粉体を輸送する気流への脈動の付与は、粉体の流量を不可避的に変動させることになるので、粉体に加熱等の各種処理を施す設備に適用する場合は粉体の性状や品質に悪影響を及ぼす可能性がある。また、管内面に縦横に形成された細孔から気流を吹き出す場合、管体自体が複雑な構造となるが故に、細孔付近における微量な残留粉体の清浄化が著しく困難となり、多品種生産が行われる設備に適用する場合は粉体のコンタミネーションが問題となる可能性がある。
 そこで、本発明は、気力輸送中の粉体の堆積を簡単な構造の管体で抑制可能な技術を提供することを解決課題とする。
 上記課題を解決するため、本発明では、粉体が通過する輸送経路の曲管において、内周面に沿った旋回流となる方向へ気体を吹き込むことにした。
 詳細には、本発明は、粉体輸送用の配管であって、曲管で形成される部位を有し、気力輸送される粉体が通過する輸送経路と、曲管の内周面に形成された開口から輸送経路へ気体を吹き込む吹込経路と、を備え、吹込経路は、開口から輸送経路へ吹き込まれた気体が曲管の内周面に沿った旋回流となる方向へ気体を吹き込む。
 上記の配管には曲管で形成される部位があるものの、当該曲管部分においては吹込経路から輸送経路への気体の吹き込みが行われている。そして、この吹込経路からの気体は、曲管の内周面に沿った旋回流となっている。よって、このような吹込経路からの気体の吹き込みが無い場合に生ずる、曲線状の輸送経路の中心軸を含む平面を挟んで対称な2つの螺旋流の形成が防止され、主に曲管の内周部分に発現し得るよどみ点の発生が可及的に抑制される。この結果、上記配管においては、曲管内における固体粒子の堆積が防止されることになる。
 なお、吹込経路は、曲管の断面を形成する円の接線沿いに気体を吹き込むものであってもよい。また、吹込経路は、曲管の外周側から曲管の曲率半径の中心点へ向けて気体を吹き込むものであってもよい。また、輸送経路は、90度の曲管で形成されており、吹込経路は、曲管の30度から60度までの間の何れかの部位にある開口から輸送経路へ気体を吹き込むものであってもよい。また、輸送経路は、90度の曲管で形成されており、吹込経路は、曲管の45度の部位にある開口から輸送経路へ気体を吹き込むものであってもよい。曲管部分において吹込経路から輸送経路へ吹き込まれる気体がこのように吹き込まれれば、曲線状の輸送経路の中心軸を含む平面を挟んで対称な2つの螺旋流の形成が効果的に防止されるので、曲管内における固体粒子の堆積を可及的に防止することが可能である。
 また、輸送経路は、曲管で形成される部位を複数有し、吹込経路は、複数ある曲管の内周面の各開口から時間差で輸送経路へ気体を吹き込むものであってもよい。曲管部分において吹込経路から輸送経路へ吹き込まれる気体がこのように吹き込まれれば、輸送経路全体の気流の変動が抑制される。
 また、本発明は、方法の側面から捉えることもできる。例えば、本発明は、粉体輸送方法であって、曲管で形成される部位を有する輸送経路を用いて粉体を気力輸送するステップと、曲管の内周面に形成された開口から、輸送経路へ吹き込まれた気体が曲管の内周面に沿った旋回流となる方向へ気体を吹き込むものであってもよい。
 上記の粉体輸送用の配管および粉体輸送方法であれば、気力輸送中の粉体の堆積を簡単な構造の管体で抑制可能である。
図1は、実施形態に係る配管を示した図である。 図2は、図1において符号A-Aで示した一点鎖線における配管の断面図である。 図3は、比較例に係る配管を示した図である。 図4は、輸送経路を流れる気流の流速の分布を示した図である。 図5は、輸送経路内を流れる気流の方向を矢印で示した図である。 図6は、配管の適用例を示した第1の図である。 図7は、配管の適用例を示した第2の図である。
 以下、実施形態について説明する。以下に示す実施形態は、単なる例示であり、本開示の技術的範囲を以下の態様に限定するものではない。
 図1は、実施形態に係る配管1を示した図である。配管1は、粉体の気力輸送に用いられる配管であり、曲管1A、及び、曲管1Aの両端に繋がる直管1Bを備える。曲管1A及び直管1Bは、気力輸送される粉体が通過する輸送経路2を形成する。曲管1Aと直管1Bは、溶接等で一体的に形成されていてもよいし、或いは、フランジ等を介して互いに連結されていてもよい。また、図1では、曲管1Aが直管1B同士を90度の角度で繋いでいる様子が図示されているが、曲管1Aは、90度よりも鈍角で直管1B同士を繋ぐものであってもよいし、或いは、90度よりも鋭角で直管1B同士を繋ぐものであってもよい。また、図1では、曲管1Aが直管1B同士を繋いでいる様子が図示されているが、曲管1Aの両端または一端には、他の曲管が繋がっていてもよい。
 配管1は、曲管1Aと直管1Bの他に、曲管1Aの外周面に繋がる枝管1Cを備える。枝管1Cは、輸送経路2へ吹き込む気体が通過する吹込経路3を形成する。枝管1Cは、曲管1Aに対し、溶接等で一体的に形成されていてもよいし、或いは、フランジ等を介して連結されていてもよい。枝管1Cは、曲管1Aの外周側において曲管1Aに対し真横から繋がっている。よって、枝管1Cが形成する吹込経路3は、曲管1Aの外周側から曲管1Aの曲率半径の中心点へ向けて気体を吹き込むことになる。
 なお、図1では、90度の角度を有する曲管1Aの45度の部位に枝管1Cが設けられている様子が図示されているが、枝管1Cは、この形態に限定されるものではない。枝管1Cは、例えば、曲管1Aの30度から60度までの間の何れかの部位に設けられていてもよい。
 ところで、枝管1Cは、曲管1Aよりも細い円管である。そして、吹込経路3から輸送経路2へ吹き込まれた気体が曲管1Aの内周面に沿った旋回流となるようにするため、枝管1Cは、中心軸が曲管1Aの接線寄りとなる位置で曲管1Aと繋がっている。図2は、図1において符号A-Aで示した一点鎖線における配管1の断面図である。
 図2に示されるように、枝管1Cは、曲管1Aよりも細い円管である。そして、枝管1Cは、曲管1Aの内周面に形成された開口4から輸送経路2へ気体を吹き込む吹込経路3を形成している。また、枝管1Cは、中心軸が曲管1Aの接線寄りとなる位置で曲管1Aと繋がっている。よって、図2において矢印で示されるように、吹込経路3から輸送経路2へ吹き込まれた気体は、曲管1Aの内周面に沿った旋回流となる。この結果、輸送経路2を流れる気力輸送中の粉体は、曲管1Aを通過する途中で開口4から輸送経路2内へ吹き込まれる吹込経路3からの気流を受け、輸送経路2内で旋回流となる。
 配管1の効果を検証したので、その検証結果を以下に示す。図3は、比較例に係る配管101を示した図である。配管101は、枝管1Cが省略されている点以外は配管1と同様である。すなわち、配管101は、配管1と同様、輸送経路102を形成する曲管101A及び直管101Bを備える。
 本検証では、輸送経路2,102を流れる気流の分布について比較した。図4は、輸送経路2,102を流れる気流の流速の分布を示した図である。図4に示されるように、比較例においては、90度の角度を有する曲管101Aの45度の部位の辺りから下流側の部分に低流速域が発生している。そして、比較例と実施例とを見比べると、比較例において輸送経路102内に出現している低流速域が、実施例の場合にはほとんど解消していることが判る。比較例において輸送経路102内に出現している低流速域が、実施例の場合に解消する理由を以下に説明する。
 図5は、輸送経路102内を流れる気流の方向を矢印で示した図である。輸送経路102を流れる流体は、直管101Bから曲管101Aへ進入すると、曲管101Aの曲率に沿って進路を徐々に変更する。そして、図5(B)に示されるように、曲管101Aが形成する曲線状の輸送経路102の中心軸を含む平面を挟んで対称な2つの螺旋流が形成される。この螺旋流を、以下、本願では「二次流れ」と呼ぶことにする。
 配管1は粉体の気力輸送に用いられるものであるため、本検証においても、輸送経路2,102には気体と固体粒子が混合して流れる固気混相流が流れることを前提としている。ここで、固気混相流における固体粒子の流れは、固体粒子を搬送する気体の流れと同一であるとは限らない。例えば、粒径の大きい固体粒子は、粒径の小さい固体粒子に比べて気体の流れの影響を受けにくいため、直管101Bから曲管101Aへ進入する場面において、曲管101Aの外周側の管壁へ向かって直線的に進むことになる。しかし、例えば、コンタミネーションが特に忌避される薬剤のような微粒粉の気力輸送においては、気体の流れから大きく外れた粉体の流れは生じにくい。また、気体の流れから大きく外れる粉体は概して大粒径であり、微粒粉を管内に堆積せしめる固気混相流と管壁との間の摩擦によって生ずる静電気による吸着力とは無縁のこのような大粒径の固体粒子の堆積によるコンタミネーションの問題は、例えば、製剤のような分野において要求される水準に比べれば問題となりにくい。よって、本検証では、気力輸送される固体粒子も気体と同じ流れを辿るという前提で考察を行う。
 輸送経路102を流れる固気混相流が直管101Bから曲管101Aへ進入することによって曲管101A内で生ずる二次流れにより、曲管101A内では、図5(B)において直線状の矢印で示される曲管101Aの内周部分において、曲管101Aが形成する曲線状の輸送経路102の中心軸を含む平面を挟んで二次流れが対峙する部位が生じる。この結果、曲管101Aの内周部分によどみ点が発生し、固体粒子が堆積する。図4において「比較例」で示す低流速域は、このようなよどみ点が発現した部位といえる。したがって、配管101においては、曲管101Aの45度の部位の辺りから下流側の部分に固体粒子が堆積する。
 一方、配管1では、枝管1Cが曲管1Aの45度の部位に設けられている。そして、枝管1Cが形成する吹込経路3から輸送経路2へ吹き込まれる気体により、輸送経路2では曲管1Aの内周面に沿った旋回流が発生する。したがって、曲管1Aの45度の部位の辺りから下流側の部分においては、配管101において発現するような二次流れが解消され、図4において「実施例」で示したようによどみ点の発生が抑制される。したがって、配管1においては、曲管1A内における固体粒子の堆積が防止される。
 図6は、配管1の適用例を示した第1の図である。また、図7は、配管1の適用例を示した第2の図である。配管1は、例えば、図6に示されるような、製剤の連続生産に用いる乾燥ユニット11のドライヤ12に用いることができる。ドライヤ12は、上面視略矩形状に形成された螺旋状の配管1で形成されており、直線部分を構成する直管1B、角の部分を構成する曲管1A、及び曲管1Aに繋がる枝管1Cを備える。また、ドライヤ12は、枝管1Cへ圧縮空気を供給するヘッダ14と電磁弁15を備える。乾燥ユニット11は、造粒ユニット21において造粒された粒子を、ドライヤ12を形成する螺旋状の配管1内で乾燥させる。なお、乾燥ユニット11は、上位装置である造粒ユニット21において造粒された粒子が気力搬送によって流入するドライヤ12よりも下流側に、粒度の仕分けを行うサイクロン13を更に擁する。
 乾燥ユニット11においては、ドライヤ12の四隅において枝管1Cに各々繋がる4つの枝管1Cへヘッダ14の圧縮空気が順に供給されるよう、4つの電磁弁15のうち何れか1つが開くような電磁弁15の制御が行われる。4つの電磁弁15は、タイマーにより一定の時間間隔で順に開く。4つの電磁弁15が一定の時間間隔で順に開くことにより、配管1に複数ある曲管1Aの内周面の開口4から時間差で輸送経路2へ気体が吹き込まれる。よって、4つの電磁弁15が同時に開く場合に比べると、配管1内の輸送経路2を通過する固気混相流に与える流量変動が抑制される。
 上記実施形態の配管1は、例えば、管内面に縦横に形成された細孔から気流を吹き出すような形態に比べると管体の構造が簡単なため、管体に残留する粉体のコンタミネーションを招く可能性が低い。また、上記実施形態の配管1は、吹込経路3から吹き込む気体で粉体の残留を防いでいるため、堆積した粉体を狙ったエアーブローのような粉体の気力輸送の中断を必要としない。また、上記実施形態の配管1は、吹込経路3から内周面沿いの旋回流の気体を吹き込んでいるため、例えば、粉体を輸送する気流を脈動させるような場合に比べて粉体の輸送量の変動が小さい。よって、例えば、薬剤の連続生産のように粉体の性状や品質に及ぼす影響の可及的な除去が望まれる設備に好適である。
 なお、上記実施形態の配管1は、図6に示したような箇所への適用に限定されるものでない。上記実施形態の配管1は、粉体の気力輸送が行われる各種設備に適用可能である。
1,101・・配管:1A,101A・・曲管:1B,101B・・直管:1C・・枝管:2,102・・輸送経路:3・・吹込経路:4・・開口:11・・乾燥ユニット:12・・ドライヤ:13・・サイクロン:14・・ヘッダ:15・・電磁弁:21・・造粒ユニット

Claims (7)

  1.  曲管で形成される部位を有し、気力輸送される粉体が通過する輸送経路と、
     前記曲管の内周面に形成された開口から前記輸送経路へ気体を吹き込む吹込経路と、を備え、
     前記吹込経路は、前記開口から前記輸送経路へ吹き込まれた気体が前記曲管の内周面に沿った旋回流となる方向へ前記気体を吹き込む、
     粉体輸送用の配管。
  2.  前記吹込経路は、前記曲管の断面を形成する円の接線沿いに気体を吹き込む、
     請求項1に記載の粉体輸送用の配管。
  3.  前記吹込経路は、前記曲管の外周側から前記曲管の曲率半径の中心点へ向けて気体を吹き込む、
     請求項1または2に記載の粉体輸送用の配管。
  4.  前記輸送経路は、90度の曲管で形成されており、
     前記吹込経路は、前記曲管の30度から60度までの間の何れかの部位にある前記開口から前記輸送経路へ気体を吹き込む、
     請求項1から3の何れか一項に記載の粉体輸送用の配管。
  5.  前記輸送経路は、90度の曲管で形成されており、
     前記吹込経路は、前記曲管の45度の部位にある前記開口から前記輸送経路へ気体を吹き込む、
     請求項1から3の何れか一項に記載の粉体輸送用の配管。
  6.  前記輸送経路は、前記曲管で形成される部位を複数有し、
     前記吹込経路は、複数ある前記曲管の内周面の各開口から時間差で前記輸送経路へ気体を吹き込む、
     請求項1から5の何れか一項に記載の粉体輸送用の配管。
  7.  曲管で形成される部位を有する輸送経路を用いて粉体を気力輸送するステップと、
     前記曲管の内周面に形成された開口から、前記輸送経路へ吹き込まれた気体が前記曲管の内周面に沿った旋回流となる方向へ前記気体を吹き込む、
     粉体輸送方法。
PCT/JP2018/003641 2017-09-29 2018-02-02 粉体輸送用の配管および粉体輸送方法 WO2019064618A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP18862888.7A EP3689797B1 (en) 2017-09-29 2018-02-02 Pipe for transport of granular matter and granular matter transport method
US16/649,678 US10947064B2 (en) 2017-09-29 2018-02-02 Pipe for transporting powder and method for transporting powder

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-190506 2017-09-29
JP2017190506A JP6767079B2 (ja) 2017-09-29 2017-09-29 粉体輸送用の配管および粉体輸送方法

Publications (1)

Publication Number Publication Date
WO2019064618A1 true WO2019064618A1 (ja) 2019-04-04

Family

ID=65903786

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/003641 WO2019064618A1 (ja) 2017-09-29 2018-02-02 粉体輸送用の配管および粉体輸送方法

Country Status (4)

Country Link
US (1) US10947064B2 (ja)
EP (1) EP3689797B1 (ja)
JP (1) JP6767079B2 (ja)
WO (1) WO2019064618A1 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9868595B1 (en) * 2013-05-20 2018-01-16 James A. Scruggs Vortex effect production device and method of improved transport of materials through a tube, pipe, and/or cylinder structure
EP3757566A4 (en) * 2018-02-22 2021-09-08 Mitsubishi Chemical Engineering Corporation CONTINUOUS MANUFACTURING SYSTEM AND METHOD
CN112340463B (zh) * 2020-10-27 2022-04-29 常州逸盛机电技术有限公司 一种黏性物料气力输送用的防堵塞输送管结构及其防堵塞方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5016112A (ja) * 1973-06-14 1975-02-20
JPS58135032A (ja) * 1982-02-04 1983-08-11 Denka Consult & Eng Co Ltd 大量長距離輸送配管
JPS60103133U (ja) * 1983-12-16 1985-07-13 宇部興産株式会社 空気輸送装置
JPS6236221A (ja) * 1985-08-07 1987-02-17 Kiyoyuki Horii ガス流により粉粒体を輸送する装置
JPH01220638A (ja) 1988-02-29 1989-09-04 Masaaki Koyama 輸送方法及びその装置
JPH06286874A (ja) 1993-03-31 1994-10-11 Sumitomo Metal Ind Ltd 粉体の気体輸送方法
JPH0972499A (ja) 1995-09-05 1997-03-18 Ishikawajima Harima Heavy Ind Co Ltd ガス移送管路
JPH09278183A (ja) 1996-04-16 1997-10-28 Mitsubishi Nuclear Fuel Co Ltd 粉体輸送装置
US20030102038A1 (en) * 2001-12-04 2003-06-05 Lane Darin L. Flow development chamber

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL297010A (ja) * 1962-08-24
DE1556309A1 (de) * 1967-08-25 1970-03-12 Waeschle Maschf Gmbh Verfahren und Anlage zum Foerdern von Schuettgut durch eine Luftfoerderanlage mit senkrechten und waagerechten Leitungsabschnitten
US3507296A (en) * 1968-06-25 1970-04-21 Philco Ford Corp Fluid flow control apparatus
FI48684C (fi) * 1972-09-12 1974-12-10 Fazer Ab Oy Karl Pneumaattisissa siirtolaitteistoissa käytettävä seulalaite
US4259988A (en) * 1979-09-17 1981-04-07 Avco Everett Research Laboratory, Inc. Vortex-diode check valve with flexible diaphragm
US4387914A (en) * 1981-06-08 1983-06-14 Hammertek Corporation Short radius, low wear elbow
US4630975A (en) * 1983-10-11 1986-12-23 Becker John H Air encasement system for transportation of particulates
JPS60103133A (ja) 1983-11-11 1985-06-07 Nippon Steel Corp 金属ストリツプの連続熱処理方法およびその装置
FR2587310B1 (fr) * 1985-09-18 1990-11-16 Commissariat Energie Atomique Chaine de transfert d'une suspension de particules en quantite constante en vue de leur conditionnement.
JPH0811625B2 (ja) * 1988-06-17 1996-02-07 フクビ化学工業株式会社 短繊維集塊の解繊・搬送方法
US5232314A (en) * 1991-08-20 1993-08-03 Central Pharmaceuticals, Inc. Particle conveying apparatus
NO301778B1 (no) * 1994-06-22 1997-12-08 Norsk Hydro As Punktmater for dosering av pulvermateriale
US20030044332A1 (en) * 1997-10-09 2003-03-06 Conrad Wayne E. Fluid contact chamber
US6609871B2 (en) * 2001-06-18 2003-08-26 Young Industries, Inc. System for handling bulk particulate materials
GB0211314D0 (en) * 2002-05-17 2002-06-26 Accentus Plc Valve system
US7338521B2 (en) * 2002-06-13 2008-03-04 World Heart, Inc. Low profile inlet for an implantable blood pump
FR2858972B1 (fr) * 2003-08-19 2006-02-17 Inst Francais Du Petrole Dispositif pour le transport de particules solides granulaires avec un debit controle
GB2451285B (en) * 2007-07-26 2012-07-11 Hydro Int Plc A vortex flow control device
JP5459471B2 (ja) * 2009-07-16 2014-04-02 富士ゼロックス株式会社 送液方法及び分級方法
KR100960963B1 (ko) * 2010-01-26 2010-06-03 주식회사 덕영엔지니어링 분체/입체 공기 이송시스템
US8834074B2 (en) * 2010-10-29 2014-09-16 General Electric Company Back mixing device for pneumatic conveying systems
CN102466104B (zh) * 2010-11-08 2015-08-26 通用电气公司 管道及输送方法
US8985150B2 (en) * 2011-05-03 2015-03-24 Halliburton Energy Services, Inc. Device for directing the flow of a fluid using a centrifugal switch
FI123720B (fi) * 2011-10-17 2013-10-15 Maricap Oy Pneumaattisen materiaalinsiirtojärjestelmän erotuslaite ja menetelmä
CN105339066B (zh) * 2013-05-06 2017-09-19 Fmc分离系统公司 流化单元和排放系统
US9868595B1 (en) * 2013-05-20 2018-01-16 James A. Scruggs Vortex effect production device and method of improved transport of materials through a tube, pipe, and/or cylinder structure
JP2016188582A (ja) * 2015-03-30 2016-11-04 いすゞ自動車株式会社 Egr配管の接続構造、内燃機関、及びegrガス流入方法
DE102017206842A1 (de) * 2017-04-24 2018-10-25 Coperion Gmbh Verfahren zur pneumatischen Förderung von Kunststoffgranulat
US11105726B2 (en) * 2018-01-18 2021-08-31 Industrial Technology Research Institute Calibrated particle analysis apparatus and method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5016112A (ja) * 1973-06-14 1975-02-20
JPS58135032A (ja) * 1982-02-04 1983-08-11 Denka Consult & Eng Co Ltd 大量長距離輸送配管
JPS60103133U (ja) * 1983-12-16 1985-07-13 宇部興産株式会社 空気輸送装置
JPS6236221A (ja) * 1985-08-07 1987-02-17 Kiyoyuki Horii ガス流により粉粒体を輸送する装置
JPH01220638A (ja) 1988-02-29 1989-09-04 Masaaki Koyama 輸送方法及びその装置
JPH06286874A (ja) 1993-03-31 1994-10-11 Sumitomo Metal Ind Ltd 粉体の気体輸送方法
JPH0972499A (ja) 1995-09-05 1997-03-18 Ishikawajima Harima Heavy Ind Co Ltd ガス移送管路
JPH09278183A (ja) 1996-04-16 1997-10-28 Mitsubishi Nuclear Fuel Co Ltd 粉体輸送装置
US20030102038A1 (en) * 2001-12-04 2003-06-05 Lane Darin L. Flow development chamber

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3689797A4

Also Published As

Publication number Publication date
US20200255233A1 (en) 2020-08-13
EP3689797A1 (en) 2020-08-05
US10947064B2 (en) 2021-03-16
EP3689797B1 (en) 2024-03-27
EP3689797A4 (en) 2021-06-23
JP6767079B2 (ja) 2020-10-14
JP2019064783A (ja) 2019-04-25

Similar Documents

Publication Publication Date Title
WO2019064618A1 (ja) 粉体輸送用の配管および粉体輸送方法
US6960128B2 (en) Air shower apparatus
US10302104B2 (en) Helix amplifier fittings
TWI481542B (zh) Non - contact conveyor
US8960572B2 (en) Air manifold having nozzles
US7670399B2 (en) Exhaust pipe having turbulence wings and an exhaust system
JPS58500910A (ja) 小曲率半径、低摩耗エルボ管
JPH03244895A (ja) エルボ
US11460056B2 (en) Helix amplifier fittings
JPS61215890A (ja) ベンド管
US20170197166A1 (en) Dust collector bag filter cleaning system having two control valves separated from each other and two compressed air pipes separated from each other
JP2012030207A (ja) 流体混合器、流体混合輸送路および流体混合方法
JP2011124424A (ja) バルブおよびこれを用いた半導体製造装置
KR20140064867A (ko) 가스 스트림을 처리하기 위한 장치
JPS63150500A (ja) 二重筒コアンダスパイラルフロ−装置
US10889454B2 (en) Diverter assembly for a pneumatic transport system
JP6690966B2 (ja) 粉体搬送システム、流量調整弁及び流量計
JP2011124416A (ja) 気化器ユニット、これを含むガス輸送路および半導体処理システム
JP2000079534A (ja) 金属切屑搬送路
US11002386B2 (en) Low erosion fluid conduit with sharp section geometry
JPS63310420A (ja) 空気輸送装置
CN105650389B (zh) 一种供气均衡的分压气缸
TWM635256U (zh) 雙相分離裝置
TWM474567U (zh) 氣體混合瓶
JP2643987B2 (ja) 流体輸送装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18862888

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2018862888

Country of ref document: EP

Effective date: 20200427