WO2018168164A1 - 鋳物砂用のバインダ供給装置及びバインダ供給方法 - Google Patents

鋳物砂用のバインダ供給装置及びバインダ供給方法 Download PDF

Info

Publication number
WO2018168164A1
WO2018168164A1 PCT/JP2017/047210 JP2017047210W WO2018168164A1 WO 2018168164 A1 WO2018168164 A1 WO 2018168164A1 JP 2017047210 W JP2017047210 W JP 2017047210W WO 2018168164 A1 WO2018168164 A1 WO 2018168164A1
Authority
WO
WIPO (PCT)
Prior art keywords
binder
pump
storage tank
foundry sand
supplied
Prior art date
Application number
PCT/JP2017/047210
Other languages
English (en)
French (fr)
Inventor
陽平 野口
Original Assignee
新東工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 新東工業株式会社 filed Critical 新東工業株式会社
Priority to BR112019010806A priority Critical patent/BR112019010806A2/pt
Priority to US16/493,202 priority patent/US20200078855A1/en
Priority to EP17900841.2A priority patent/EP3597326A4/en
Priority to JP2019505723A priority patent/JPWO2018168164A1/ja
Priority to MX2019007201A priority patent/MX2019007201A/es
Priority to CN201780082964.7A priority patent/CN110191772A/zh
Publication of WO2018168164A1 publication Critical patent/WO2018168164A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C5/00Machines or devices specially designed for dressing or handling the mould material so far as specially adapted for that purpose
    • B22C5/18Plants for preparing mould materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D45/00Equipment for casting, not otherwise provided for

Definitions

  • the present invention relates to a binder supply apparatus and a binder supply method for supplying a liquid binder to foundry sand.
  • a binder supply device for supplying a liquid binder to foundry sand is known, for example, from Patent Document 1.
  • the flow rate of the liquid binder flowing in the flow path is measured by a flow meter.
  • a highly accurate flow rate measurement cannot be performed because an error in the measured flow rate increases every time the liquid temperature (the temperature of the liquid binder) changes.
  • the present invention has been made to solve the above-mentioned problems, and is intended for foundry sand that can measure the flow rate with high accuracy by keeping the liquid temperature constant and reducing the error of the measured flow rate. It is an object to provide a binder supply apparatus and a binder supply method.
  • the present invention provides a binder supply device that supplies a liquid binder to foundry sand, a storage tank that stores the binder, a first pump that supplies the binder to the storage tank, and a storage A temperature adjusting means for adjusting the temperature of the binder in the tank to a predetermined temperature; a second pump for circulating the binder by discharging the binder from the storage tank to the flow path and supplying it to the storage tank again; and the flow path And a binder discharge port for discharging the binder for kneading with foundry sand.
  • the flow meter is disposed downstream of the second pump, and further disposed downstream of the flow meter, and the direction in which the binder supplied from the second pump flows is supplied to the storage tank. And a three-way valve for switching between the supply side to the binder discharge port.
  • the present invention preferably further includes a bypass flow path for removing air mixed in the binder, the bypass flow path being connected to the downstream side of the second pump and the storage tank, and the flow rate. It is arranged to bypass the meter.
  • the present invention preferably further includes an on-off valve disposed on the upstream side adjacent to the binder discharge port.
  • the foundry sand is preferably core sand for core molding.
  • the core sand is preferably core sand for forming an inorganic core.
  • the present invention is a binder supply method for supplying a liquid binder to foundry sand, the step of supplying a binder to a storage tank by a first pump, and the second pump discharging the binder from the storage tank to a flow path.
  • the process of circulating the binder again by supplying it to the storage tank, the process of adjusting the temperature of the binder in the storage tank to a predetermined temperature by the temperature adjusting means, and the flow rate of the binder flowing through the flow path by the flow meter are measured. And a step of performing.
  • the direction in which the binder supplied from the second pump flows by the three-way valve disposed downstream of the second pump via the flow meter is further supplied to the storage tank and the binder discharge port. And switching to the supply side.
  • the binder supplied from the second pump when the binder supplied from the second pump is discharged from the binder discharge port, it is discharged from the binder discharge port by measuring the flow rate of the binder supplied from the second pump by a flow meter. The amount of the binder is grasped, and when the amount of the discharged binder reaches a set amount set by an amount smaller than the target discharge amount, the second pump is changed to the operation of one pulse at a time.
  • the binder supplied from the second pump is circulated by being supplied to the storage tank, except when the binder supplied from the second pump is discharged from the binder discharge port.
  • the flow rate of the binder supplied from the second pump is decreased for each pulse by operating the second pump one pulse at a time and adjusting the pulse period.
  • the temperature of the binder can be kept constant even in a space where the room temperature changes.
  • Various effects such as reduction in size and the ability to measure the flow rate with high accuracy are achieved.
  • FIG. 1 denotes a binder storage container (in this embodiment, a drum can).
  • the storage container 1 is connected to a first pump 3 (in this embodiment, a pneumatic diaphragm pump) through a pipe 2.
  • the first pump 3 is connected to the inlet side of the storage tank 5 through a pipe 4.
  • On-off valves 6 and 7 are disposed upstream and downstream of the first pump 3 and in the middle of the pipes 2 and 4.
  • a thermometer 25 is attached to the side surface of the storage tank 5, and the temperature of the binder is measured by the thermometer 25 (a thermocouple in this embodiment).
  • a level switch 26 is attached in the storage tank 5, and “level” and “full” in the storage tank 5 can be detected by this level switch 26.
  • the binder supply device includes a temperature adjusting device 8 that adjusts the temperature of the binder in the storage tank 5 to a predetermined temperature.
  • the temperature adjusting device 8 includes a circulating fluid temperature adjusting device 8a, and the circulating fluid discharged from the circulating fluid temperature adjusting device 8a is supplied with two stainless steels accommodated in the storage tank 5 from the inlet side pipe 8b. It is supplied to the snake tube 8c. The circulating fluid passes through the serpentine tube 8c, and is then returned from the outlet side piping 8d to the circulating fluid temperature adjusting device 8a. By repeating such binder circulation, heat exchange is performed in the portion of the snake tube 8c, and the temperature of the binder is adjusted.
  • the outlet side of the storage tank 5 is connected to a second pump 10 (in this embodiment, an electromagnetic diaphragm pump) through a pipe 9.
  • the second pump 10 is connected to a flow meter 12 (in this embodiment, a Coriolis flow meter) through a pipe 11.
  • On-off valves 13 and 14 are disposed upstream and downstream of the second pump 10 and in the middle of the pipes 9 and 11.
  • the flow meter 12 is connected to the inlet side of the three-way valve 16 through a pipe 15.
  • An outlet on one side of the three-way valve 16 is connected to the inlet side of the storage tank 5 through a pipe 17.
  • An outlet on the other side of the three-way valve 16 is connected to a binder discharge port 19 through a pipe 18.
  • the three-way valve 16 is pneumatically operated. By supplying pilot air from a solenoid valve (not shown) to the three-way valve 16, the direction in which the binder supplied from the second pump 10 flows is directed to the supply side (pipe 17 side) to the storage tank 5 and the binder discharge port 19. It can be switched to the supply side (pipe 18 side).
  • a check valve 20 and an on-off valve 21 are provided in the middle of the piping 18.
  • the on-off valve 21 is disposed at an upstream position adjacent to the binder discharge port 19.
  • the on-off valve 21 is normally closed and is opened when pilot air is supplied from a solenoid valve (not shown).
  • the pipe 22 branched from the pipe 11 and arranged in parallel with the flow meter 12 so as to bypass the flow meter 12 is connected in communication with the inlet side of the storage tank 5.
  • This pipe 22 forms a bypass flow path for removing air mixed in the binder.
  • an opening / closing valve 23 is disposed at a position parallel to the flow meter 12, and an opening / closing valve 24 is disposed near the inlet side of the storage tank 5.
  • the on-off valves 6, 7, 13, 14 are opened, the on-off valves 23, 24 are closed, and the on-off valve 21 is closed.
  • the three-way valve 16 the direction in which the binder flows is switched to the supply side to the storage tank 5.
  • the first pump 3 When the level switch 26 described above detects that the storage tank 5 is “empty”, the first pump 3 is activated to supply the binder in the storage container 1 to the storage tank 5. When it is detected that “full”, the operation of the first pump 3 is stopped.
  • the second pump 10 is operated. As a result, the binder is discharged from the storage tank 5, and the binder is supplied to the storage tank 5 again via the pipe 17. In this way, the binder is circulated and this circulation is repeated.
  • the circulating fluid temperature adjusting device 8a While circulating the binder, the circulating fluid temperature adjusting device 8a is operated, and heat is exchanged in the serpentine tube 8c. Thereby, the temperature of the binder in the storage tank 5 is adjusted to a predetermined temperature. At this time, since the binder circulates, the temperature of the storage tank 5 and the binder in each pipe can be kept constant.
  • the three-way valve 16 is switched so that the direction in which the binder flows is on the side where the binder discharge port 19 is supplied. Then, the on-off valve 21 is opened. As a result, the binder is sent to the binder discharge port 19 via the pipe 18 and discharged from the binder discharge port 19. The discharged binder is supplied to a kneader (not shown).
  • the flow rate of the binder supplied from the second pump 10 is measured by the flow meter 12. Thereby, the amount of the binder discharged from the binder discharge port 19 is grasped.
  • the second pump 10 is changed to one pulse operation. Thereby, the amount of the binder discharged from the binder discharge port 19 can be finely adjusted, and the binder can be discharged with high accuracy.
  • the operation of the second pump 10 by one pulse means that the supply and stoppage of the binder from the second pump 10 are repeatedly discharged and sucked from the second pump 10 every predetermined pulse period (predetermined time). is there.
  • the on-off valve 21 is closed. Then, the three-way valve 16 is switched so that the direction in which the binder flows is on the supply side to the storage tank 5. Thus, until the binder is discharged from the binder discharge port 19 next time, the binder supplied from the second pump 10 is circulated again, and the temperature of the binder in the storage tank 5 and each pipe is kept constant. It is.
  • the binder supplied to a kneading machine (not shown) is kneaded together with foundry sand, powdered binder, etc. in the kneading machine to form wet sand.
  • an inorganic core is formed by an inorganic core molding machine (not shown).
  • the binder supply device includes the pipe 22 that is a bypass flow path for removing air mixed in the binder.
  • the binder supply apparatus according to the present embodiment there is an advantage that the binder can be circulated at high speed using the pipe 22 and air mixed in the binder can be extracted at high speed.
  • the on-off valves 23 and 24 are opened. Then, the binder is supplied to the inlet side of the storage tank 5 through the pipe 22 without reducing the flow rate by the flow meter 12.
  • the air mixed in the binder is removed from the storage tank 5.
  • the flow rate of the binder supplied from the second pump 10 per pulse is decreased by operating the second pump 10 one pulse at a time and adjusting the pulse period to be shortened. May be. In this way, there is an advantage that the amount of the binder that is throttled by the thin pipe in the flow meter 12 is reduced, and the efficiency of the second pump 10 can be improved.
  • the pulse period is the elapsed time from this pulse to the next pulse.
  • the pulse period of the second pump 10 is long, the flow rate of one pulse period from the second pump 10 increases. For this reason, the amount of the binder squeezed by the thin pipe in the flow meter 12 increases, and the efficiency of the second pump 10 deteriorates. Therefore, specifically, adjustment is made to shorten the pulse period of the second pump 10. If it does in this way, the flow volume for every 1 pulse from the 2nd pump 10 will decrease, and the quantity of the binder squeezed by the thin piping in the flow meter 12 will also decrease. As a result, the efficiency of the second pump 10 can be improved.
  • a flow meter 12 is disposed downstream of the second pump 10, and a three-way valve 16 is disposed downstream of the flow meter 12, and is supplied from the second pump 10 by the three-way valve 16.
  • the direction in which the binder flows is switched between a side for supplying to the storage tank 5 and a side for supplying to the binder discharge port 19.
  • the on-off valve 21 is disposed at the upstream position adjacent to the binder discharge port 19, there is an advantage that dripping from the binder discharge port 19 can be suppressed.
  • each piping forms the flow path of a binder, a material, a structure, etc. will not ask
  • a pipe member or a hose may be used.
  • both the on-off valves 23 and 24 are opened.
  • the present invention is not limited to this.
  • One of the on-off valves 23 and 24 may be opened.
  • the present invention is not limited to this.
  • it is a process that needs to supply a binder to core sand, it may be applied to a core molding process other than inorganic core molding.
  • it is a process which needs to supply a binder to green sand, you may apply to the mold making process by green sand.
  • it is a process which needs to supply a binder to self-hardening foundry sand, you may apply to a self-hardening mold making process.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Coating Apparatus (AREA)
  • Accessories For Mixers (AREA)
  • Adhesives Or Adhesive Processes (AREA)
  • Mold Materials And Core Materials (AREA)

Abstract

本発明の鋳物砂に液状のバインダを供給するバインダ供給装置は、バインダを貯留する貯留タンクと、この貯留タンクにバインダを供給する第1ポンプと、貯留タンク内のバインダの温度を所定温度に調整する温度調整装置と、貯留タンクからバインダを流路に排出させて、再度、貯留タンクに供給することにより、バインダを循環させる第2ポンプと、流路を流れるバインダの流量を測定する流量計と、バインダを排出するバインダ排出口と、を有する。

Description

鋳物砂用のバインダ供給装置及びバインダ供給方法
 本発明は、鋳物砂に液状のバインダを供給するバインダ供給装置及びバインダ供給方法に関する。
 従来から、鋳物砂に液状のバインダを供給するバインダ供給装置は、例えば、特許文献1により、知られている。
特開平8-976号公報
 従来、液状バインダ供給装置は、流路内を流れる液状バインダの流量は流量計により測定されている。しかしながら、室温が変わる空間では、液温(液状バインダの温度)が変化するたびに測定流量の誤差が大きくなるため、高精度な流量測定ができないという問題があった。
 そこで、本発明は、上記の問題を解決するためになされたものであり液温を一定に保ち、測定流量の誤差を小さくすることにより、高精度な流量測定をすることができる鋳物砂用のバインダ供給装置及びバインダ供給方法を提供することを目的とする。
 上記の目的を達成するために本発明は、鋳物砂に液状のバインダを供給するバインダ供給装置であって、バインダを貯留する貯留タンクと、この貯留タンクにバインダを供給する第1ポンプと、貯留タンク内のバインダの温度を所定温度に調整する温度調整手段と、貯留タンクからバインダを流路に排出させて、再度、貯留タンクに供給することにより、バインダを循環させる第2ポンプと、流路を流れるバインダの流量を測定する流量計と、鋳物砂と混練するためにバインダを排出するバインダ排出口と、を有することを特徴としている。
 本発明において、好ましくは、流量計は第2ポンプの下流に配設され、さらに、流量計の下流に配設され、第2ポンプから供給されるバインダが流れる方向を、貯留タンクに供給する側とバインダ排出口に供給する側とに切り換える三方弁を有する。
 本発明は、好ましくは、さらに、バインダ内に混入する空気を抜くためのバイパス流路を有し、このバイパス流路は、第2ポンプの下流側と貯留タンクとに連通接続され、且つ、流量計をバイパスするように配設されている。
 本発明は、好ましくは、さらに、バインダ排出口に隣接した上流側に配設された開閉弁を有する。
 本発明において、好ましくは、鋳物砂は中子造型用の中子砂である。
 本発明において、好ましくは、中子砂は無機中子造型用の中子砂である。
 本発明は、鋳物砂に液状のバインダを供給するバインダ供給方法であって、第1ポンプによりバインダを貯留タンクに供給する工程と、第2ポンプにより前記貯留タンクからバインダを流路に排出させて、再度、貯留タンクに供給することにより、バインダを循環させる工程と、温度調整手段により貯留タンク内のバインダの温度を所定温度に調整する工程と、流量計により流路を流れるバインダの流量を測定する工程と、を有する。
 本発明は、好ましくは、さらに、第2ポンプの下流に前記流量計を介して配置された三方弁により第2ポンプから供給されるバインダが流れる方向を、貯留タンクに供給する側とバインダ排出口に供給する側とに切り換える工程と、を有する。
 本発明においては、好ましくは、第2ポンプから供給されるバインダをバインダ排出口から排出する際、流量計により第2ポンプから供給されるバインダの流量を測定することによりバインダ排出口から排出されるバインダの量を把握し、この排出されるバインダの量が目標排出量より少ない量で設定された設定量に到達したとき、第2ポンプを1パルスずつの作動に変更する。
 本発明において、好ましくは、第2ポンプから供給されるバインダをバインダ排出口から排出しているとき以外は、第2ポンプから供給されるバインダは貯留タンクに供給されて循環される。
 本発明において、好ましくは、第2ポンプを1パルスずつ作動させ、パルス周期を調整することにより、前記第2ポンプから供給されるバインダの1パルス毎の流量を減少させる。
 本発明の鋳物砂に液状のバインダを供給するバインダ供給装置及びバインダ供給方法によれば、室温が変わる空間であってもバインダの温度を一定に保つことができ、このため、測定流量の誤差も小さくなり、高精度な流量測定が可能になる等種々の効果が奏される。
本発明の実施形態によるバインダ供給装置を示す全体構成図である。
 以下、図面を参照して、本発明の実施形態によるバインダ供給装置及びバインダ供給方法を説明する。本実施形態では、鋳物砂として無機中子造型用の中子砂(本実施形態では人工砂)を用い、これに液状のバインダ(本実施形態では水ガラス)を供給する例を示す。図1において符号1は、バインダの貯蔵容器(本実施形態ではドラム缶)である。
 貯蔵容器1は配管2を介して第1ポンプ3(本実施形態では空気式のダイヤフラムポンプ)に連通接続されている。第1ポンプ3は配管4を介して貯留タンク5の入口側に連通接続されている。第1ポンプ3を作動させることにより、貯蔵容器1内のバインダが貯留タンク5に供給される。第1ポンプ3の上流側及び下流側、且つ、配管2、4の配管途中には開閉弁6、7が配設されている。貯留タンク5の側面には温度計25が装着され、この温度計25(本実施形態では熱電対)によりバインダの温度が測定される。さらに、貯留タンク5内にはレベルスイッチ26が取り付けられ、このレベルスイッチ26により、貯留タンク5内の「空」と「満」が検知できるようになっている。
 本実施形態によるバインダ供給装置は、貯留タンク5内のバインダの温度を所定の温度に調整する温度調整装置8を備えている。この温度調整装置8は、循環液温度調整装置8aを備え、この循環液温度調整装置8aから吐出された循環液は、入口側配管8bから、貯留タンク5内に収容されたステンレス製の二つの蛇管8cに供給される。循環液は蛇管8cを通った後、出口側配管8dから循環液温度調整装置8aに戻される。このようなバインダの循環が繰り返されることにより、蛇管8c部において熱交換がなされ、バインダの温度が調整される。
 また、貯留タンク5の出口側は配管9を介して第2ポンプ10(本実施形態では電磁式のダイヤフラムポンプ)に連通接続されている。第2ポンプ10は配管11を介して流量計12(本実施形態ではコリオリ式流量計)に連通接続されている。第2ポンプ10を作動させることにより、貯留タンク5からバインダが排出される。第2ポンプ10の上流側及び下流側、且つ、配管9、11の配管途中には開閉弁13、14が配設されている。
 流量計12は、配管15を介して三方弁16の入口側に連通接続されている。三方弁16の一方側の出口は配管17を介して貯留タンク5の入口側に連通接続されている。三方弁16の他方側の出口は配管18を介してバインダ排出口19に連通接続されている。三方弁16は空気操作式である。図示されない電磁弁から三方弁16にパイロットエアーが供給されることによって、第2ポンプ10から供給されるバインダが流れる方向が、貯留タンク5に供給する側(配管17側)とバインダ排出口19に供給する側(配管18側)とに切り換えられるようになっている。
 配管18の配管途中には、逆止弁20及び開閉弁21が配設されている。開閉弁21はバインダ排出口19に隣接した上流側の位置に配設されている。開閉弁21は通常は閉じており、図示されない電磁弁からパイロットエアーが供給されることによって開くようになっている。
 また、配管11から分岐し、且つ、流量計12と並列に配置されることにより流量計12をバイパスするように配設された配管22は、貯留タンク5の入口側に連通接続されている。この配管22は、バインダ内に混入する空気を抜くためのバイパス流路を形成している。配管22の配管途中において、流量計12と並列する位置には開閉弁23が配設されており、貯留タンク5の入口側付近には開閉弁24が配設されている。
 次に、上述した本実施形態によるバインダ供給装置の動作及び本実施形態によるバインダ供給方法について説明する。スタート時、開閉弁6、7、13、14は開かれ、開閉弁23、24は閉じられ、開閉弁21は閉じられている。三方弁16は、バインダが流れる方向が、貯留タンク5に供給する側に切り換えられている。
 上述したレベルスイッチ26により、貯留タンク5内が「空」であることを検知したら、第1ポンプ3を作動させ、貯蔵容器1内のバインダを貯留タンク5に供給する。「満」であることを検知したとき、第1ポンプ3の作動を停止させる。
 次に、第2ポンプ10を作動させる。これにより、貯留タンク5からバインダを排出させて、配管17を介して再度、バインダを貯留タンク5に供給する。このようにしてバインダを循環させると共にこの循環を繰り返す。
 バインダを循環させている間、循環液温度調整装置8aを作動させ、蛇管8cにおいて熱交換を行う。これにより、貯留タンク5内のバインダの温度を所定温度に調整する。この際、バインダは循環しているので、貯留タンク5及び各配管内のバインダの温度を一定に保つことができる。
 次に、三方弁16の切り換えを行い、バインダが流れる方向を、バインダ排出口19に供給する側にする。そして、開閉弁21を開く。これにより、バインダは、配管18を介してバインダ排出口19に送られ、バインダ排出口19から排出される。排出されたバインダは図示されない混練機に供給される。
 第2ポンプ10から供給されるバインダをバインダ排出口19から排出する際、流量計12により第2ポンプ10から供給されるバインダの流量を測定する。これにより、バインダ排出口19から排出されるバインダの量を把握する。そして、この排出されるバインダの量が目標排出量より少ない量で設定された設定量に到達したとき、第2ポンプ10を1パルスずつの作動に変更する。これにより、バインダ排出口19から排出されるバインダの量を微調整することができ、高精度なバインダ排出が可能になる。なお、第2ポンプ10を1パルスずつ作動させるとは、所定のパルス周期(所定時間)毎に第2ポンプ10からのバインダの供給と供給停止を第2ポンプ10の吐出と吸引を繰り返すことである。
 その後、該排出されるバインダの量が目標排出量に到達したとき、開閉弁21を閉じる。そして、三方弁16の切り換えを行い、バインダが流れる方向を、貯留タンク5に供給する側にする。これにより、次にバインダ排出口19からのバインダの排出が行われるまでは、第2ポンプ10から供給されるバインダは再び循環され、貯留タンク5及び各配管内のバインダの温度は一定に保たれる。
 ここで、図示されない混練機に供給されたバインダは、混練機において、鋳物砂、粉状のバインダ等と一緒に混練されて湿態砂にされる。この湿態砂を用い、図示されない無機中子造型機により無機中子が造型される。
 また、上述したように、本実施形態によるバインダ供給装置は、バインダ内に混入する空気を抜くためのバイパス流路である配管22を備えている。本実施形態によるバインダ供給装置によれば、配管22を用いてバインダを高速で循環させ、バインダ内に混入する空気を高速で抜くことができるという利点がある。この空気抜きを行う場合は開閉弁23、24を開く。そうすると、バインダは流量計12により流量を絞られることなく配管22を通って貯留タンク5の入口側に供給される。このバインダの供給の際に、貯留タンク5内でバインダ内に混入する空気が抜かれることになる。
 さらに、本実施形態では、第2ポンプ10を1パルスずつ作動させ、パルス周期を短くするように調整することにより、第2ポンプ10から供給されるバインダの1パルス毎の流量を減少させるようにしてもよい。このようにすると、流量計12内の細い配管で絞られるバインダの量が少なくなり、第2ポンプ10の効率を良くできるという利点がある。なお、パルス周期とは、このパルスから次のパルスまでの経過時間のことである。
 より詳しく説明すると、第2ポンプ10のパルス周期が長いと第2ポンプ10からの1パルス周期の流量は多くなる。このため、流量計12内の細い配管で絞られるバインダの量が多くなり、第2ポンプ10の効率が悪くなる。したがって、具体的には第2ポンプ10のパルス周期を短くするように調整する。このようにすると、第2ポンプ10からの1パルス毎の流量は少なくなり、流量計12内の細い配管で絞られるバインダの量も少なくなる。その結果、第2ポンプ10の効率を良くできる。
 本実施形態では、第2ポンプ10の下流に流量計12が配設され、この流量計12の下流に、三方弁16が配設され、この三方弁16により、第2ポンプ10から供給されるバインダが流れる方向を、貯留タンク5に供給する側とバインダ排出口19に供給する側とに切り換えるようになっている。このような構成により、第2ポンプ10から供給されるバインダをバインダ排出口19から排出しているとき以外は、第2ポンプ10から供給されるバインダは貯留タンク5に供給して循環させることができるという利点がある。
 また、バインダはバインダ排出口19から排出しているとき以外は、常に循環しているため、撹拌機等を別に設置しなくても、貯留タンク5及び各配管内のバインダの温度を一定に保つことができるという利点がある。
 また、本実施形態では、バインダ排出口19に隣接した上流側の位置に開閉弁21を配設しているので、バインダ排出口19からの液だれを抑制することができるという利点がある。
 なお、本実施形態のバインダ供給装置において、各配管は、バインダの流路を形成するものであれば、材料や構造等は特に問わない。例えば、管部材であってもよいし、ホース等であってもよい。
 また、本発明の実施形態では、バインダ内に混入する空気を抜く際、開閉弁23、24の両方を開くようにしたが、これに限定されるものではない。開閉弁23、24のどちらか一方を開くようにしてもよい。
 さらに、上述の本発明の実施形態では、無機中子造型用の中子砂にバインダを供給する例を示したが、本発明は、これに限定されるものではない。例えば、中子砂にバインダを供給する必要があるプロセスならば、無機中子造型以外の中子造型プロセスに適用してもよい。また、生型砂にバインダを供給する必要があるプロセスならば、生型砂による鋳型造型プロセスに適用してもよい。また、自硬性鋳物砂にバインダを供給する必要があるプロセスならば、自硬性鋳型造型プロセスに適用してもよい。
3 第1ポンプ
5 貯留タンク
8 温度調整装置
10 第2ポンプ
12 流量計
16 三方弁
19 バインダ排出口
21 開閉弁
22 配管(バイパス流路)

Claims (11)

  1.  鋳物砂に液状のバインダを供給するバインダ供給装置であって、
     バインダを貯留する貯留タンクと、
     この貯留タンクにバインダを供給する第1ポンプと、
     前記貯留タンク内のバインダの温度を所定温度に調整する温度調整手段と、
     前記貯留タンクからバインダを流路に排出させて、再度、前記貯留タンクに供給することにより、バインダを循環させる第2ポンプと、
     前記流路を流れるバインダの流量を測定する流量計と、
     鋳物砂と混練するためにバインダを排出するバインダ排出口と、
     を有することを特徴とする鋳物砂用のバインダ供給装置。
  2.  前記流量計は第2ポンプの下流に配設され、さらに、前記流量計の下流に配設され、前記第2ポンプから供給されるバインダが流れる方向を、前記貯留タンクに供給する側と前記バインダ排出口に供給する側とに切り換える三方弁を有する請求項1記載の鋳物砂用のバインダ供給装置。
  3.  さらに、前記バインダ内に混入する空気を抜くためのバイパス流路を有し、このバイパス流路は、前記第2ポンプの下流側と前記貯留タンクとに連通接続され、且つ、前記流量計をバイパスするように配設されている請求項1又は請求項2に記載の鋳物砂用のバインダ供給装置。
  4.  さらに、前記バインダ排出口に隣接した上流側に配設された開閉弁を有する請求項1又は請求項2に記載の鋳物砂用のバインダ供給装置。
  5.  前記鋳物砂は中子造型用の中子砂である請求項1又は請求項2に記載の鋳物砂用のバインダ供給装置。
  6.  前記中子砂は無機中子造型用の中子砂である請求項5記載の鋳物砂用のバインダ供給装置。
  7.  鋳物砂に液状のバインダを供給するバインダ供給方法であって、
     第1ポンプによりバインダを貯留タンクに供給する工程と、
     第2ポンプにより前記貯留タンクから前記バインダを流路に排出させて、再度、前記貯留タンクに供給することにより、バインダを循環させる工程と、
     温度調整手段により前記貯留タンク内のバインダの温度を所定温度に調整する工程と、
     流量計により前記流路を流れるバインダの流量を測定する工程と、
     を有することを特徴とする鋳物砂用のバインダ供給方法。
  8.  さらに、前記第2ポンプの下流に前記流量計を介して配置された三方弁により前記第2ポンプから供給される前記バインダが流れる方向を、前記貯留タンクに供給する側とバインダ排出口に供給する側とに切り換える工程と、を有する請求項7記載の鋳物砂用のバインダ供給方法。
  9.  前記第2ポンプから供給されるバインダを前記バインダ排出口から排出する際、前記流量計により前記第2ポンプから供給されるバインダの流量を測定することにより前記バインダ排出口から排出されるバインダの量を把握し、この排出されるバインダの量が目標排出量より少ない量で設定された設定量に到達したとき、前記第2ポンプを1パルスずつの作動に変更する請求項7又は請求項8に記載の鋳物砂用のバインダ供給方法。
  10.  前記第2ポンプから供給されるバインダを前記バインダ排出口から排出しているとき以外は、前記第2ポンプから供給されるバインダは前記貯留タンクに供給されて循環される請求項7又は請求項8に記載の鋳物砂用のバインダ供給方法。
  11.  前記第2ポンプを1パルスずつ作動させ、パルス周期を調整することにより、前記第2ポンプから供給されるバインダの1パルス毎の流量を減少させる請求項7又は請求項8に記載の鋳物砂用のバインダ供給方法。
PCT/JP2017/047210 2017-03-17 2017-12-28 鋳物砂用のバインダ供給装置及びバインダ供給方法 WO2018168164A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
BR112019010806A BR112019010806A2 (pt) 2017-03-17 2017-12-28 dispositivo e método de fornecimento de ligante
US16/493,202 US20200078855A1 (en) 2017-03-17 2017-12-28 Binder supply apparatus and binder supply method for foundry sand
EP17900841.2A EP3597326A4 (en) 2017-03-17 2017-12-28 FOUNDRY SAND BIN FEEDING DEVICE AND BIN FEEDING PROCESS
JP2019505723A JPWO2018168164A1 (ja) 2017-03-17 2017-12-28 鋳物砂用のバインダ供給装置及びバインダ供給方法
MX2019007201A MX2019007201A (es) 2017-03-17 2017-12-28 Aparato de suministro de aglutinante y metodo de suministro de aglutinante para arena de fundicion.
CN201780082964.7A CN110191772A (zh) 2017-03-17 2017-12-28 型砂用的粘合剂供给装置和粘合剂供给方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-052005 2017-03-17
JP2017052005 2017-03-17

Publications (1)

Publication Number Publication Date
WO2018168164A1 true WO2018168164A1 (ja) 2018-09-20

Family

ID=63522006

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/047210 WO2018168164A1 (ja) 2017-03-17 2017-12-28 鋳物砂用のバインダ供給装置及びバインダ供給方法

Country Status (7)

Country Link
US (1) US20200078855A1 (ja)
EP (1) EP3597326A4 (ja)
JP (1) JPWO2018168164A1 (ja)
CN (1) CN110191772A (ja)
BR (1) BR112019010806A2 (ja)
MX (1) MX2019007201A (ja)
WO (1) WO2018168164A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7456372B2 (ja) 2020-12-24 2024-03-27 新東工業株式会社 砂供給装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08976A (ja) 1994-06-24 1996-01-09 Sintokogio Ltd 硅砂および粘結剤の混練機への投入方法およびその装置
JPH1080745A (ja) * 1996-09-06 1998-03-31 Sintokogio Ltd 鋳物砂用バインダ−供給装置

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH541145A (de) * 1971-10-08 1973-08-31 Feddern Horst Verfahren und Einrichtung zur Regelung des Befeuchtungsgrades von körnigem Material, insbesondere von Formsanden
GB1460830A (ja) * 1974-05-24 1977-01-06
US4304289A (en) * 1978-04-24 1981-12-08 Foundry Technology Inc. Apparatus for controlling the moisture content of foundry sand
DD233502A1 (de) * 1984-12-29 1986-03-05 Gisag Veb Verfahren und schaltungsanordnung zur steuerung von durchlaufmischern
US6973827B2 (en) * 2002-03-20 2005-12-13 Mitsui Mining & Smelting Co., Ltd. Flow rate measuring method and flowmeter, flow rate measuring section package used for them and flow rate measuring unit using them, and piping leakage inspection device using flowmeter
WO2007064839A2 (en) * 2005-12-01 2007-06-07 Bassett, Inc. Apparatus and method for preparing foundry sand mixes
CN102935489A (zh) * 2012-07-23 2013-02-20 宁夏共享集团有限责任公司 呋喃树脂液料控制系统
CN106311971A (zh) * 2015-06-30 2017-01-11 共享装备有限公司 混砂机液料控制系统

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08976A (ja) 1994-06-24 1996-01-09 Sintokogio Ltd 硅砂および粘結剤の混練機への投入方法およびその装置
JPH1080745A (ja) * 1996-09-06 1998-03-31 Sintokogio Ltd 鋳物砂用バインダ−供給装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3597326A4

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7456372B2 (ja) 2020-12-24 2024-03-27 新東工業株式会社 砂供給装置

Also Published As

Publication number Publication date
MX2019007201A (es) 2019-09-05
EP3597326A1 (en) 2020-01-22
US20200078855A1 (en) 2020-03-12
JPWO2018168164A1 (ja) 2020-01-16
CN110191772A (zh) 2019-08-30
BR112019010806A2 (pt) 2019-10-01
EP3597326A4 (en) 2020-11-11

Similar Documents

Publication Publication Date Title
CN105797890B (zh) 一种用于结冰模拟设备的喷雾装置
JP3225366B2 (ja) 流体の流れの制御
WO2016111848A3 (en) Fluid dispensing system
WO2005075107A1 (ja) 塗工装置及び塗工装置の洗浄方法
JP2006506608A5 (ja)
WO2017006098A3 (en) A three dimensional printing apparatus, a material dispensing unit therefor and a method
WO2018168164A1 (ja) 鋳物砂用のバインダ供給装置及びバインダ供給方法
KR101200518B1 (ko) 세정 기구를 갖는 도공 장치, 도공 장치의 세정 방법 및도공 장치에 사용하는 세정 기구
JP7335984B2 (ja) 液体混合物を提供するための方法並びに液体混合システム
JP2008089373A (ja) コリオリ流量計による流量計測と流量制御装置
CN101872200B (zh) 流量控制装置
JP4347556B2 (ja) 二液混合方法
EP3583316B1 (en) Method and device for cleaning a channel using a diaphragm pump module
JP2010279895A (ja) ペースト塗布装置
JP2009121980A (ja) 膜式ガスメータ
JP6290058B2 (ja) 塗装装置
JP2020501916A (ja) 砂中子製造装置および方法
JP2014094829A (ja) 充填装置
CN209240290U (zh) 一种胶类中药辅料添加仪器
CN217490457U (zh) 一种在线加料装置
CN211886266U (zh) 新溶剂法纤维素纤维薄膜蒸发器加热系统及薄膜蒸发器
US6640996B2 (en) Method and apparatus for online switching between supply vessels
CN102620786A (zh) 一种阶梯式双孔板差压流体流量测量装置及其测量方法
JP7393143B2 (ja) 液処理装置および流量検出部の校正方法
RU2726037C1 (ru) Способ и устройство для измерения расхода в системе распределения текучей среды, имеющей несколько крановых узлов текучей среды

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17900841

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019505723

Country of ref document: JP

Kind code of ref document: A

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112019010806

Country of ref document: BR

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 112019010806

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20190527

WWE Wipo information: entry into national phase

Ref document number: 2017900841

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2017900841

Country of ref document: EP

Effective date: 20191017