WO2018101259A1 - ビルジ排出促進パイプ - Google Patents

ビルジ排出促進パイプ Download PDF

Info

Publication number
WO2018101259A1
WO2018101259A1 PCT/JP2017/042616 JP2017042616W WO2018101259A1 WO 2018101259 A1 WO2018101259 A1 WO 2018101259A1 JP 2017042616 W JP2017042616 W JP 2017042616W WO 2018101259 A1 WO2018101259 A1 WO 2018101259A1
Authority
WO
WIPO (PCT)
Prior art keywords
bilge
pipe
cargo
hold
bilge discharge
Prior art date
Application number
PCT/JP2017/042616
Other languages
English (en)
French (fr)
Inventor
伸也 山崎
慧 野間
加藤 亮
憲 茅本
Original Assignee
川崎汽船株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 川崎汽船株式会社 filed Critical 川崎汽船株式会社
Priority to KR1020187038002A priority Critical patent/KR102049365B1/ko
Priority to BR112019010860-2A priority patent/BR112019010860B1/pt
Publication of WO2018101259A1 publication Critical patent/WO2018101259A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B13/00Conduits for emptying or ballasting; Self-bailing equipment; Scuppers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/04Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods solid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J4/00Arrangements of installations for treating ballast water, waste water, sewage, sludge, or refuse, or for preventing environmental pollution not otherwise provided for
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow from or in pipes or hoses

Definitions

  • the present invention relates to a bilge discharge promotion pipe, and more particularly to a bilge discharge promotion pipe used to discharge water contained in a cargo loaded on a cargo fleet of a ship to a bilge well.
  • a ship such as a cargo ship that transports iron ore or the like
  • water contained in a load of iron ore or the like hereinafter also referred to as cargo
  • a cargo pit hereinafter also referred to as hold
  • bilge is discharged out of the ship through a bilge well provided near the bottom of the ship (see, for example, Patent Document 1).
  • the wire mesh strainer (filter) provided at the discharge port to the bilge well is clogged, and the bilge is not discharged into the bilge well and may remain around the cargo. is there. If the bilge remains, the bilge drainage treatment or the like must be performed at the time of unloading, resulting in poor work efficiency. As a result, the unloading work takes time.
  • FIG. 4 is a schematic diagram of the hold.
  • FIG. 4A shows the hold of a bulk carrier
  • FIG. 4B shows the hold of an ore dedicated ship.
  • the conventional bilge discharge promotion pipe 11 disclosed in Patent Document 1 is effective when iron ore is loaded on a general bulk carrier. This is because the iron ore 201 is not fully loaded in the hold 101 due to restrictions on the loading capacity, specific gravity, and the like, and is loaded in a shape where the central portion is raised in the vicinity of the center of the hold 101 (FIG. 4 ( A)).
  • the load of iron ore relative to the volume of the hold 102 is larger than that of cargo ships other than the ore ship.
  • the above-described conventional bilge discharge promotion pipe 11 is buried by the cargo 202 (see FIG. 4B), and the bilge is discharged when iron ore is loaded, not limited to Carajas Fine. Is not done enough.
  • the present invention has been made in view of the above-described problems, and an object of the present invention is a bilge discharge promoting pipe for discharging bilge contained in iron ore to a bilge well, and loading iron ore with respect to the hold volume.
  • the object of the present invention is to provide a bilge discharge promoting pipe suitable for use in an ore carrier having a large amount.
  • the bilge discharge promotion pipe of the present invention is provided in the cargo tub and discharges bilge contained in iron ore which is a load loaded in the cargo ridge to the bilge well.
  • This bilge discharge promotion pipe is configured to include a first part, a second part, and a third part, which are connected in order.
  • the first part is provided in the lower stool that supports the bulkhead that divides the ship into a plurality of cargo poles.
  • the second part is connected to the first part, is provided vertically along the partition wall, and includes a plurality of holes communicating with the hollow part on the side surface.
  • the third portion is connected to the second portion and is provided in the upper stool that supports the partition wall, and the end opposite to the end connected to the second portion reaches the upper deck.
  • the hole provided in the second part is provided from the first part side to at least a position higher than the upper surface of the load.
  • the bilge discharge promoting pipe of the present invention the bilge is sent into the bilge discharge promoting pipe from the hole provided in the second part, and is discharged to the bilge well through the first part.
  • the work of discharging the bilge in the cargo shed is unnecessary or reduced when unloading.
  • FIG. 1 is a schematic diagram of a bilge discharge promoting pipe.
  • Drawing 2 is a mimetic diagram which looked at the part where a bilge discharge promotion pipe is attached from the upper surface.
  • FIG. 3 is a schematic view of the bilge discharge promoting pipe, particularly the second portion.
  • a cargo ship has a bilge well near the bottom of the cargo hold. Water (bilge) contained in the cargo (cargo) is sent to the bilge well through a drain outlet provided on the bottom surface of the hold. The bilge sent to the bilge well is discharged out of the ship as needed depending on the situation.
  • Water (bilge) contained in the cargo (cargo) is sent to the bilge well through a drain outlet provided on the bottom surface of the hold.
  • the bilge sent to the bilge well is discharged out of the ship as needed depending on the situation.
  • the ship In the ore dedicated ship, the ship is divided into a plurality of holds 100 by bulkheads 130. Further, a bilge well 110 is provided near the bottom of the boat below the hold 100.
  • the partition wall 130 is supported by a lower stool (Lower Tool) 120 on the bottom surface (also referred to as Tanktop) 110a side of the hold 100.
  • the partition wall 130 is supported by an upper stool 140 on the deck (also referred to as an upper deck) 100b side.
  • the partition wall 130 is formed of a corrugated plate, for example.
  • the partition formed by the corrugated plate is also referred to as “corrugated bulkhead”.
  • the water (bilge) contained in the cargo (cargo) 200 is sent to the bilge well 110 through a drain port (not shown) provided on the bottom surface 110 a of the hold 100.
  • the bilge sent to the bilge well 110 is discharged out of the ship as needed depending on the situation.
  • a wire mesh-like strainer (filter) provided at the discharge port to the bilge well 110 is clogged, so that the bilge is not discharged to the bilge well 110 and the periphery of the cargo 200 is May remain.
  • the upper surface 200a of the cargo 200 reaches a high position from the bottom surface 110a of the hold 100. For this reason, it is assumed that it is difficult to discharge the bilge from the drain outlet to the bilge well 110 as compared to the bulk carrier.
  • the bilge discharge promoting pipe 10 of this embodiment is configured by connecting the first portion 20, the second portion 30, and the third portion 40 in this order.
  • the bilge discharge promoting pipe 10 is configured using a tubular member (pipe) made of any suitable material. A plurality of pipes are connected and processed as necessary to form a bilge discharge promoting pipe 10 having a predetermined shape.
  • the bilge discharge promoting pipe 10 will be described as a structure in which the first portion 20, the second portion 30, and the third portion 40 are connected, but is not limited thereto.
  • the first portion 20, the second portion 30, and the third portion 40 may be configured by connecting a plurality of pipes, respectively, or the first portion 20, the second portion 30, and the third portion 40 may be one.
  • the pipe may be integrally formed.
  • the first portion 20 is mainly provided in the lower stool 120.
  • One end (first end) 22 of the first portion 20 is provided so as to be located in the bilge well 110.
  • the other end portion (second end portion) 24 of the first portion 20 is provided so as to be positioned near the upper surface 120 a of the lower stool 120.
  • the second portion 30 is provided vertically along the partition wall 130 from the upper surface 120a of the lower stool 120 to the vicinity of the lower surface 140a of the upper stool 140.
  • One end portion (first end portion) 32 of the second portion 30 is connected to the second end portion 24 of the first portion 20.
  • the other end portion (second end portion) 34 of the second portion 30 is provided so as to be positioned near the lower surface 140 a of the upper stool 140.
  • the bilge discharge promotion pipe 10 is provided in the part between this corrugated board. That is, the bilge discharge promotion pipe 10 is provided so as not to protrude from the corrugated bulkhead.
  • the second portion 30 includes a plurality of holes 38 communicating with the hollow portion 36 on the side surface.
  • the plurality of holes 38 can be formed by any suitable means.
  • the diameter of the hole 38 is small, clogging may occur.
  • the diameter of the hole 38 is large, iron ore may enter a large amount into the bilge discharge promoting pipe 10 at the time of loading or unloading and there is a possibility that good performance may not be exhibited.
  • the diameter of the hole 38 was set to 10 mm. As long as good performance is exhibited, the diameter of the hole 38 may be smaller than 10 mm or larger than 10 mm.
  • Four holes 38 are provided at equal intervals on the circumference of the cross section perpendicular to the longitudinal direction of the second portion 30. That is, they are provided at positions of 0 degrees, 90 degrees, 180 degrees, and 270 degrees with respect to the center of the cross section.
  • the four holes 38 as a set are provided at intervals of 100 mm in the longitudinal direction of the second portion 30.
  • the positions of adjacent pairs of holes 38 are shifted by 45 degrees with respect to the center of the cross section. Therefore, for example, when the positions of a pair of holes 38 are 0 degrees, 90 degrees, 180 degrees, and 270 degrees with respect to the center of the cross section, the positions of the pairs of holes 38 adjacent in the longitudinal direction are It becomes 45 degrees, 135 degrees, 225 degrees, and 315 degrees with respect to the center. Note that the arrangement and number of holes are not limited to the above-described configuration as long as good performance is exhibited.
  • These holes 38 are provided from the first end portion 32 side to the second end portion 34 side of the second portion 30 to at least a position higher than the upper surface 200a of the cargo 200, that is, a position higher than the loading height. .
  • the loading height refers to the height of the upper surface 200a of the cargo 200 from the bottom surface 110a of the hold 100 in the partition wall 130.
  • the static angle is the maximum angle that collapses when stacked at a higher angle, and the static angle of iron ore is said to be about 36 degrees.
  • the loading coefficient SF Voltageage Factor
  • the stationary angle is 25 degrees
  • the loading height is, for example, 11.8 m.
  • the loading factor SF of general iron ore is 13.0 to 13.5, but it is preferable that the loading factor SF can be discharged up to 15. For this reason, in this embodiment, the hole 38 is provided from the bottom face 110a of the hold 100 to a position higher than the height of 13.2 m.
  • the loading coefficient SF is determined by the shape of the hold, the iron ore production area, the brand, and the like.
  • the loading height is determined by the loading amount of the cargo 200 and the stationary angle.
  • the third portion 40 is mainly provided in the upper stool 140.
  • One end (first end) 42 of the third portion 40 is connected to the second end 34 of the second portion 30.
  • the other end portion (second end portion) 44 of the third portion 40 is provided near the upper surface of the upper stool 140, that is, near a position reaching the upper deck 100b.
  • FIG. 1 shows an example in which the first end 42 of the third portion 40 is provided below the lower surface 140a of the upper stool 140, and the second end 44 of the third portion 40 is provided on the upper deck 100b.
  • the first end portion 42 and the second end portion 44 may be provided in the upper stool 140.
  • the bilge is sent into the bilge discharge promoting pipe 10 from the hole 38 provided in the second portion 30, and is discharged to the bilge well 110 through the first portion 20.
  • the work of discharging the bilge in the cargo shed is unnecessary or reduced when unloading.
  • the first part 20 of the bilge discharge promoting pipe 10 is provided in the lower stool 120, and the second part 30 is provided so as not to protrude from the corrugated bulkhead when the partition wall 130 is a corrugated bulkhead. For this reason, the unloading work is not hindered by the bilge discharge promoting pipe 10.
  • iron ore may enter the pipe 10 from the hole 38 provided in the second portion 30, and there is a possibility that good performance may not be exhibited. Therefore, the maintenance work etc. which remove the iron ore in the pipe 10 are needed.
  • the first portion 20 is provided in the lower stool 120 and the third portion 40 is provided in the upper stool 140.
  • the 2nd part 30 is 10 m or more in length. For this reason, it is not easy to perform maintenance inspections during operation.
  • the second end 44 of the third portion 40 is provided in the vicinity of the upper deck 110b, so that an operator who performs this maintenance work can easily access.
  • the second end portion 44 of the third portion 40 it is preferable to seal the second end portion 44 of the third portion 40 by a removable sealing means. According to this configuration, the work is performed by removing the sealing means of the second end portion 44 only when water injection into the pipe is necessary, and in other cases, it is unnecessary by sealing. It is possible to prevent objects from entering the pipe.
  • Bilge emission promotion pipe 20 1st part 22,32,42 1st end part 24,34,44 2nd end part 30 2nd part 36 hollow part 38 hole 40 Third part 100 Hold 110 Bilge well 120 Lower stool 130 Bulkhead 140 Upper stool 200 Cargo

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Toxicology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Ship Loading And Unloading (AREA)
  • Revetment (AREA)
  • Sewage (AREA)

Abstract

ビルジをビルジウェルに排出させるビルジ排出促進パイプであって、ホールドの容積に対する鉄鉱石の積載量が大きい鉱石専用船に用いて好適なビルジ排出促進パイプを提供する。 順に接続された、第1部分20と、第2部分30と、第3部分40とを備えて構成される。第1部分は、船艙を複数の貨物艙に区分する隔壁130を支持する下部スツール120内に設けられる。第2部分は、第1部分と接続され、隔壁に沿って鉛直に設けられ、側面に中空部分と連通する複数の穴38を備える。第3部分は、第2部分と接続され、隔壁を支持する上部スツール140内に設けられ、第2部分と接続される端部と反対側の端部44が、上部デッキ110bに達する。ここで、第2部分が備える穴は、第1部分側から、少なくとも、積荷の上面よりも高い位置まで設けられる。

Description

ビルジ排出促進パイプ
 この発明は、ビルジ排出促進パイプに関するものであって、特に、船舶の貨物艙に積まれた積荷に含まれる水を、ビルジウェルに排出するのに用いられるビルジ排出促進パイプに関する。
 鉄鉱石等を輸送する貨物船などの船舶では、貨物艙(以下、ホールドと称することもある。)に積まれた鉄鉱石等の積荷(以下、カーゴと称することもある。)に含まれる水(以下、ビルジと称することもある。)を、船底付近に設けられたビルジウェルを経て、船外に排出している(例えば、特許文献1参照)。
 ここで、ブラジルのPDM(Ponta Da Madeira)港で積まれるカラジャスファイン(Carajas Fine)と呼ばれる鉄鉱石は、ビルジを多く含んでいることが知られている。
 積荷がカラジャスファインである場合、ビルジウェルへの排出口に設けられた金網状のストレーナー(フィルタ)が目詰まりし、これにより、ビルジがビルジウェルに排出されず、カーゴの周囲に残存してしまうことがある。ビルジが残存していると、荷揚げ時に、ビルジの排水処理等を行わなければならないため作業効率が悪く、その結果、荷揚げ作業に時間がかかってしまう。
 この課題に鑑みて発明された、ビルジを効率よく、ビルジウェルに排出するためのビルジ排出促進パイプがある(例えば、特許文献1参照)。
特開2011-162072号公報
 ここで、図4は、ホールドの概略図である。図4(A)は、ばら積み船のホールドを示し、図4(B)は、鉱石専用船のホールドを示している。
 特許文献1に開示されている従来のビルジ排出促進パイプ11は、一般のばら積み船に鉄鉱石を積載する場合には有効である。これは、鉄鉱石201は、積載量の制限や比重などから、ホールド101内に満載されず、ホールド101の中央付近に、中央部が高く盛り上がった形状で積載されるためである(図4(A)参照)。
 しかしながら、いわゆる鉱石専用船では、ホールド102の容積に対する鉄鉱石の積載量が、鉱石専用船以外の貨物船に比べて大きい。このため、鉱石専用船では、上述の従来のビルジ排出促進パイプ11が、カーゴ202により埋まってしまい(図4(B)参照)、カラジャスファインに限らず、鉄鉱石を積載した場合にビルジの排出が十分に行われない。
 この発明は、上述の問題点に鑑みてなされたものであり、この発明の目的は、鉄鉱石に含まれるビルジをビルジウェルに排出させるビルジ排出促進パイプであって、ホールドの容積に対する鉄鉱石の積載量が大きい鉱石専用船に用いて好適なビルジ排出促進パイプを提供することにある。
 上述した目的を達成するために、この発明のビルジ排出促進パイプは、貨物艙内に設けられ、貨物艙に積み込まれた積荷である鉄鉱石に含まれるビルジを、ビルジウェルに排出する。
 このビルジ排出促進パイプは、順に接続された、第1部分と、第2部分と、第3部分とを備えて構成される。
 第1部分は、船艙を複数の貨物艙に区分する隔壁を支持する下部スツール内に設けられる。第2部分は、第1部分と接続され、隔壁に沿って鉛直に設けられ、側面に中空部分と連通する複数の穴を備える。第3部分は、第2部分と接続され、隔壁を支持する上部スツール内に設けられ、第2部分と接続される端部と反対側の端部が、上部デッキに達する。ここで、第2部分が備える穴は、第1部分側から、少なくとも、積荷の上面よりも高い位置まで設けられる。
 この発明のビルジ排出促進パイプによれば、ビルジが、第2部分に設けられた穴からビルジ排出促進パイプ内に送られ、第1部分を経てビルジウェルに排出される。この結果、荷揚げ時に貨物艙内のビルジの排出作業が不要になる、もしくは軽減される。
ビルジ排出促進パイプの模式図である。 ビルジ排出促進パイプが取り付けられる箇所を上面から見た模式図である。 ビルジ排出促進パイプの第2部分の模式図である。 ホールドの概略図である。
 以下、図を参照して、この発明の実施の形態について説明するが、各構成要素の形状、大きさ及び配置関係については、この発明が理解できる程度に概略的に示したものに過ぎない。また、以下、この発明の好適な構成例について説明するが、各構成要素の材質及び数値的条件などは、単なる好適例にすぎない。従って、この発明は以下の実施の形態に限定されるものではなく、この発明の構成の範囲を逸脱せずにこの発明の効果を達成できる多くの変更又は変形を行うことができる。
 図1、2及び3を参照して、この実施形態のビルジ排出促進パイプについて説明する。図1は、ビルジ排出促進パイプの模式図である。図2は、ビルジ排出促進パイプが取り付けられる箇所を上面から見た模式図である。図3は、ビルジ排出促進パイプの、特に第2部分の模式図である。
 一般に、貨物船では、貨物艙(ホールド)の下側の船底付近にビルジウェルが設けられている。積荷(カーゴ)に含まれる水(ビルジ)は、ホールドの底面に設けられた排水口を経てビルジウェルに送られる。ビルジウェルに送られたビルジは、状況に応じて、随時船外に排出される。
 鉱石専用船では、船艙が隔壁(Bulkhead)130により複数の貨物艙(ホールド:Hold)100に区分されている。また、ホールド100の下側の船底付近にビルジウェル110が設けられている。
 隔壁130は、ホールド100の底面(Tanktopとも称する。)110a側では、下部スツール(Lower Stool)120により支持される。また、隔壁130は、甲板(上部デッキとも称する。)100b側では、上部スツール(Upper Stool)140により支持される。隔壁130は、例えば、波形の板で形成される。この波形の板で形成された隔壁をCorrugated Bulkheadとも称する。
 積荷(カーゴ)200に含まれる水(ビルジ)は、ホールド100の底面110aに設けられた排水口(図示を省略する。)を経てビルジウェル110に送られる。ビルジウェル110に送られたビルジは、状況に応じて、随時船外に排出される。ここで、カーゴ200がカラジャスファインである場合、ビルジウェル110への排出口に設けられた金網状のストレーナー(フィルタ)が目詰まりし、これにより、ビルジがビルジウェル110に排出されず、カーゴ200の周囲に残存してしまうことがある。
 また、鉱石専用船の場合、カーゴ200の上面200aが、ホールド100の底面110aから高い位置に達する。このため、ビルジをビルジウェル110への排水口から排出するのが、ばら積み船に比べて困難になることが想定される。
 そこで、この実施形態のビルジ排出促進パイプ10は、第1部分20、第2部分30及び第3部分40がこの順に接続されて構成されている。
 ビルジ排出促進パイプ10は、任意好適な材料の管状部材(パイプ)を用いて構成される。複数のパイプを連結して、また、必要に応じて加工して所定の形状のビルジ排出促進パイプ10が形成される。ここでは、ビルジ排出促進パイプ10を、第1部分20、第2部分30、第3部分40が連結された構造として説明するが、これに限定されない。例えば、第1部分20、第2部分30及び第3部分40を、それぞれ複数のパイプを連結して構成してもよいし、第1部分20、第2部分30及び第3部分40を1本のパイプとして一体に構成してもよい。
 第1部分20は、主に下部スツール120内に設けられている。第1部分20の一方の端部(第1端部)22は、ビルジウェル110内に位置するように設けられる。第1部分20の他方の端部(第2端部)24は、下部スツール120の上面120a付近に位置するように設けられる。
 第2部分30は、下部スツール120の上面120aから、上部スツール140の下面140a付近まで、隔壁130に沿って鉛直に設けられる。第2部分30の一方の端部(第1端部)32は、第1部分20の第2端部24と接続される。また、第2部分30の他方の端部(第2端部)34は、上部スツール140の下面140a付近に位置するように設けられる。
 なお、隔壁130がCorrugated Bulkheadである場合は、図2に示すように、ビルジ排出促進パイプ10は、この波形の板の間の部分に設けられる。すなわち、ビルジ排出促進パイプ10は、Corrugated Bulkheadから突出しないように、設けられる。
 第2部分30は、側面に中空部分36と連通する複数の穴38を備えている。この複数の穴38は、任意好適な手段で形成することができる。ここで、穴38の直径が小さいと、目詰まりを起こす可能性がある。一方、穴38の直径が大きいと、積み込み時や荷揚げ時に、鉄鉱石がビルジ排出促進パイプ10内に多量に入ってしまうなどして、良好な性能を示さない恐れがある。
 そこで、ここでは、穴38の直径を10mmとした。なお、良好な性能を示すのであれば、穴38の直径を10mmより小さくしてもよいし、10mmより大きくしてもよい。
 この穴38は、第2部分30の長手方向に直交する断面の円周上に、等間隔に4つ設けられる。すなわち、断面の中心に対して、0度、90度、180度、270度の位置に設けられる。この4つを1組とする穴38は、第2部分30の長手方向に100mm間隔で設けられる。なお、隣り合う組の穴38の位置は、断面の中心に対して、45度ずれている。従って、例えば、ある組の穴38の位置が、断面の中心に対して、0度、90度、180度、270度である場合、長手方向に隣り合う組の穴38の位置は、断面の中心に対して、45度、135度、225度、315度になる。なお、良好な性能を示すのであれば、穴の配置、個数は、上述の構成に限定されない。
 これらの穴38は、第2部分30の第1端部32側から第2端部34側に向けて、少なくとも、カーゴ200の上面200aより高い位置、すなわち、積付高さより高い位置まで設けられる。
 ここで、積付高さは、カーゴ200の上面200aの、隔壁130におけるホールド100の底面110aからの高さを指す。また、静止角は、これ以上の角度で積むと崩れる最大の角度であり、鉄鉱石の静止角は、約36度といわれている。
 ここで、ホールド100に積載される鉄鉱石の重量(単位:MT(metric ton)=1,000kg)と、ホールド100の容積(単位:CFT(cubic feet)=1.133 cubic meter)により与えられる積付係数SF(Stowage Factor)を13.5CFT/MT、静止角を25度と仮定すると、積付高さは、例えば11.8mとなる。
 従って、少なくとも、ホールド100の底面110aから11.8mの高さより高い位置まで、穴38を設ける必要がある。
 なお、積付係数SFが大きくなると、積付高さが高くなる。一般的な鉄鉱石の積付係数SFは13.0~13.5であるが、積付係数SFが15まで排出可能にするのが良い。このため、この実施形態では、ホールド100の底面110aから13.2mの高さより高い位置まで、穴38を設けている。
 ここで、積付係数SFは、ホールドの形状や、鉄鉱石の産地、ブランド等によって定められる。また、積付高さは、これらに加えて、カーゴ200の積載量と、静止角により定められる。
 第3部分40は、主に上部スツール140内に設けられている。第3部分40の一方の端部(第1端部)42は、第2部分30の第2端部34と接続される。第3部分40の他方の端部(第2端部)44は、上部スツール140の上面付近、すなわち、上部デッキ100bに達する位置付近に設けられる。図1では、第3部分40の第1端部42が、上部スツール140の下面140aの下側に設けられ、第3部分40の第2端部44が上部デッキ100b上に設けられる例を示しているが、これら、第1端部42及び第2端部44は、上部スツール140内に設けられてもよい。
 このビルジ排出促進パイプ10によれば、ビルジが、第2部分30に設けられた穴38からビルジ排出促進パイプ10内に送られ、第1部分20を経てビルジウェル110に排出される。この結果、荷揚げ時に貨物艙内のビルジの排出作業が不要になる、もしくは軽減される。
 また、ビルジ排出促進パイプ10の第1部分20は、下部スツール120内に設けられ、第2部分30は、隔壁130がCorrugated Bulkheadである場合は、Corrugated Bulkheadから突出しないように設けられる。このため、ビルジ排出促進パイプ10により、荷揚げ作業が妨げられることはない。
 このビルジ排出促進パイプ10では、第2部分30に設けられている穴38から鉄鉱石がパイプ10内に入ってしまうことがあり、それにより、良好な性能を示さない恐れがある。そのため、パイプ10内の鉄鉱石を取り除く保守作業などが必要になる。
 しかし、このビルジ排出促進パイプ10は、第1部分20が下部スツール120内に設けられ、また、第3部分40が上部スツール140内に設けられている。また、第2部分30は、10m以上の長さである。このため、運航中における、分解しての保守点検等は容易ではない。
 そこで、第3部分40の第2端部44からビルジ排出促進パイプ10内に注水することにより、パイプ内の鉄鉱石をパイプ外へ流す作業が行われる。このビルジ排出促進パイプ10では、第3部分40の第2端部44が上部デッキ110b付近に設けられているので、この保守作業を行う作業員がアクセスしやすい。
 また、第3部分40の第2端部44を、着脱自在の封止手段により、封止しておくのがよい。この構成によれば、パイプ内への注水などが必要なときのみ、第2端部44の封止手段を外して作業を行い、それ以外のときは、封止しておくことで、不要な物がパイプ内に入ってしまうことを防ぐことができる。
 10  ビルジ排出促進パイプ  
 20  第1部分
 22、32、42  第1端部
 24、34、44  第2端部
 30  第2部分  
 36  中空部分
 38  穴  
 40  第3部分
 100  ホールド
 110  ビルジウェル
 120  下部スツール
 130  隔壁
 140  上部スツール
 200  カーゴ

Claims (2)

  1.  積荷である鉄鉱石に含まれるビルジを、ビルジウェルに排出するビルジ排出促進パイプであって、
     順に接続された、
     船艙を複数の貨物艙に区分する隔壁を支持する下部スツール内に設けられた第1部分と、
     前記第1部分と接続され、前記隔壁に沿って鉛直に設けられ、側面に中空部分と連通する複数の穴を備える第2部分と、
     前記第2部分と接続され、前記隔壁を支持する上部スツール内に設けられ、前記第2部分と接続される端部と反対側の端部が、上部デッキに達する第3部分と
    を備え、
     前記第2部分が備える穴は、前記第1部分側から、少なくとも、前記積荷の上面よりも高い位置まで設けられる
    ことを特徴とするビルジ排出促進パイプ。
  2.  前記第3部分の端部であって、前記第2部分と連結される端部と反対側の端部が、着脱自在の封止手段により、封止されている
    ことを特徴とする請求項1に記載のビルジ排出促進パイプ。
PCT/JP2017/042616 2016-11-29 2017-11-28 ビルジ排出促進パイプ WO2018101259A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020187038002A KR102049365B1 (ko) 2016-11-29 2017-11-28 빌지 배출 촉진 파이프
BR112019010860-2A BR112019010860B1 (pt) 2016-11-29 2017-11-28 Tubo de facilitação de descarga de esgoto

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016-231468 2016-11-29
JP2016231468A JP6378293B2 (ja) 2016-11-29 2016-11-29 ビルジ排出促進パイプ

Publications (1)

Publication Number Publication Date
WO2018101259A1 true WO2018101259A1 (ja) 2018-06-07

Family

ID=62242135

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/042616 WO2018101259A1 (ja) 2016-11-29 2017-11-28 ビルジ排出促進パイプ

Country Status (4)

Country Link
JP (1) JP6378293B2 (ja)
KR (1) KR102049365B1 (ja)
BR (1) BR112019010860B1 (ja)
WO (1) WO2018101259A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7252281B2 (ja) * 2021-07-21 2023-04-04 株式会社新来島どっく 波形隔壁タンク上部スツール内配管構造

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009241861A (ja) * 2008-03-31 2009-10-22 Mitsui Eng & Shipbuild Co Ltd 船舶
JP2011162072A (ja) * 2010-02-10 2011-08-25 Kawasaki Kisen Kaisha Ltd ビルジ排出促進パイプ

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009241861A (ja) * 2008-03-31 2009-10-22 Mitsui Eng & Shipbuild Co Ltd 船舶
JP2011162072A (ja) * 2010-02-10 2011-08-25 Kawasaki Kisen Kaisha Ltd ビルジ排出促進パイプ

Also Published As

Publication number Publication date
BR112019010860A2 (pt) 2019-12-17
JP2018086951A (ja) 2018-06-07
KR102049365B1 (ko) 2019-11-28
KR20190010667A (ko) 2019-01-30
JP6378293B2 (ja) 2018-08-22
BR112019010860B1 (pt) 2023-09-26

Similar Documents

Publication Publication Date Title
WO2018101259A1 (ja) ビルジ排出促進パイプ
CN103625612B (zh) 集装箱船
JP2009241861A (ja) 船舶
JP5557917B2 (ja) 乾燥ばら積み貨物船を準備する方法
KR101897727B1 (ko) 액화 가스 탱크의 선체 지지 구조 및 액화 가스 운반선
JP4740376B1 (ja) ビルジ排出促進パイプ
KR101359246B1 (ko) 사일로용 기둥 접합 구조 및 이를 이용하는 사일로
WO2014013584A1 (ja) 船舶
KR101110836B1 (ko) 밸러스트 탱크의 침전물 배출 구조체
CN102372068A (zh) 大型船舶抗泥沙型压载水舱
JP2007537907A (ja) 海洋船舶のためのガス拡張トランク
JPS6246405Y2 (ja)
KR20110096879A (ko) 안티 힐링 시스템을 포함하는 선박
KR102176545B1 (ko) 선각화 실린더형 탱크 및 그 실린더형 탱크의 설치방법
KR100650607B1 (ko) 부분 수평 종재 및 부분 종방향 형재를 구비한 이중 선체선박
KR102125104B1 (ko) 해치 구조물 및 이를 구비한 드릴십
CN104003079A (zh) 一种粉粒物料运输车用罐体
KR101185927B1 (ko) 원통형 펌프타워 및 이를 포함하는 선박
JP4541116B2 (ja) 船舶におけるウォーターコースの構造
US3400832A (en) Workshop
KR20130004716A (ko) 부유식 안벽
KR840002451Y1 (ko) 상갑판위에 복수개의 액상 화학제품 수납용 탱크를 구비한 운반선
JPS6233680Y2 (ja)
US3033150A (en) Cargo vessel
TW202300403A (zh) 在海上船舶中支撐負載的設備、貨物船舶及在海上船舶中提供負載支撐的方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17876274

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20187038002

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112019010860

Country of ref document: BR

REG Reference to national code

Ref country code: BR

Ref legal event code: B01E

Ref document number: 112019010860

Country of ref document: BR

Free format text: ESCLARECA O NOME CORRETO DO DEPOSITANTE, JUNTANDO DOCUMENTACAO COMPROBATORIA, SE NECESSARIO, POIS HA DIVERGENCIA ENTRE AS GRAFIAS NO FORMULARIO FQ003/PROCURACAO E NA DECLARACAO DE PRIORIDADE.

ENP Entry into the national phase

Ref document number: 112019010860

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20190528

122 Ep: pct application non-entry in european phase

Ref document number: 17876274

Country of ref document: EP

Kind code of ref document: A1