WO2017195717A1 - 基地局及び無線端末 - Google Patents
基地局及び無線端末 Download PDFInfo
- Publication number
- WO2017195717A1 WO2017195717A1 PCT/JP2017/017345 JP2017017345W WO2017195717A1 WO 2017195717 A1 WO2017195717 A1 WO 2017195717A1 JP 2017017345 W JP2017017345 W JP 2017017345W WO 2017195717 A1 WO2017195717 A1 WO 2017195717A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- information
- wireless terminal
- enb
- base station
- transmission
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/14—Separate analysis of uplink or downlink
- H04W52/146—Uplink power control
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B17/00—Monitoring; Testing
- H04B17/10—Monitoring; Testing of transmitters
- H04B17/101—Monitoring; Testing of transmitters for measurement of specific parameters of the transmitter or components thereof
- H04B17/102—Power radiated at antenna
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B17/00—Monitoring; Testing
- H04B17/30—Monitoring; Testing of propagation channels
- H04B17/309—Measuring or estimating channel quality parameters
- H04B17/354—Adjacent channel leakage power
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/10—Scheduling measurement reports ; Arrangements for measurement reports
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/18—TPC being performed according to specific parameters
- H04W52/24—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/18—TPC being performed according to specific parameters
- H04W52/24—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
- H04W52/241—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters taking into account channel quality metrics, e.g. SIR, SNR, CIR, Eb/lo
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0473—Wireless resource allocation based on the type of the allocated resource the resource being transmission power
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/0005—Control or signalling for completing the hand-off
- H04W36/0083—Determination of parameters used for hand-off, e.g. generation or modification of neighbour cell lists
- H04W36/0085—Hand-off measurements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/08—Closed loop power control
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/38—TPC being performed in particular situations
- H04W52/40—TPC being performed in particular situations during macro-diversity or soft handoff
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W92/00—Interfaces specially adapted for wireless communication networks
- H04W92/16—Interfaces between hierarchically similar devices
- H04W92/20—Interfaces between hierarchically similar devices between access points
Definitions
- This disclosure relates to a base station and a wireless terminal.
- ICIC Inter-cell Interference Coordination
- the base station includes a receiving unit that receives first information transmitted from a wireless terminal based on a measurement result of a received signal from an adjacent cell, and a measurement result of the received signal from the wireless terminal is a threshold value.
- a transmission unit that transmits second information for reducing transmission power of the wireless terminal to the wireless terminal.
- a wireless terminal includes a transmitter that transmits first information to a base station based on a measurement result of a received signal from an adjacent cell, and second information for reducing the transmission power of the wireless terminal.
- a receiving unit that receives from the base station; and a control unit that controls transmission power based on the second information.
- the second information is information transmitted when a measurement result of a received signal from the wireless terminal in the base station exceeds a threshold value.
- FIG. 1 is a diagram illustrating a configuration of an LTE system.
- FIG. 2 is a protocol stack diagram of a radio interface in the LTE system.
- FIG. 3 is a configuration diagram of a radio frame used in the LTE system.
- FIG. 4 is a block diagram of the UE 100.
- FIG. 5 is a block diagram of the eNB 200.
- FIG. 6 is a diagram for explaining the operating environment according to the embodiment.
- FIG. 7 is a sequence diagram for explaining the operation according to the embodiment.
- FIG. 8 is a flowchart for explaining the operation according to the embodiment.
- FIG. 9 is a sequence diagram for explaining an operation according to the first modification of the embodiment.
- FIG. 10 is a sequence diagram for explaining the second modification of the embodiment.
- the base station includes a receiving unit that receives first information transmitted from a wireless terminal based on a measurement result of a received signal from an adjacent cell, and a measurement result of the received signal from the wireless terminal is a threshold value.
- a transmission unit that transmits second information for reducing transmission power of the wireless terminal to the wireless terminal.
- the transmission unit may transmit timer information for measuring a period during which transmission of the first information is restricted to the wireless terminal.
- the reception unit may receive third information from the wireless terminal for the wireless terminal to stop controlling transmission power based on the second information.
- the transmitting unit may transmit the second information to the wireless terminal only when receiving interference control information from another base station.
- the first information may include an identifier indicating the neighboring cell.
- the transmission unit may transmit the second information to the wireless terminal only when the other base station manages the neighboring cell.
- a wireless terminal includes a transmitter that transmits first information to a base station based on a measurement result of a received signal from an adjacent cell, and second information for reducing the transmission power of the wireless terminal. You may provide the receiving part received from the said base station, and the control part which controls transmission power based on the said 2nd information.
- the second information may be information transmitted when a measurement result of a received signal from the wireless terminal in the base station exceeds a threshold value.
- the reception unit may receive timer information for measuring a period during which transmission of the first information is restricted.
- the transmission unit may stop transmitting the first information until a period during which transmission of the first information is restricted expires.
- the control unit may stop the control of the transmission power based on the second information when the measurement result of the received signal from the adjacent cell is less than a threshold value.
- the transmission unit may transmit the third information when the measurement result of the received signal from the adjacent cell is less than a threshold value.
- the third information may be information for the wireless terminal to stop transmission power control based on the second information.
- FIG. 1 is a diagram illustrating a configuration of an LTE system.
- the LTE system includes a UE (User Equipment) 100, an E-UTRAN (Evolved Universal Terrestrial Radio Access Network) 10, and an EPC (Evolved Packet Core) 20.
- UE User Equipment
- E-UTRAN Evolved Universal Terrestrial Radio Access Network
- EPC Evolved Packet Core
- the UE 100 corresponds to a wireless terminal.
- the UE 100 is a mobile communication device.
- UE100 performs radio
- the configuration of the UE 100 will be described later.
- the E-UTRAN 10 corresponds to a radio access network.
- the E-UTRAN 10 includes an eNB 200 (evolved Node-B).
- the eNB 200 corresponds to a base station.
- the eNB 200 is connected to each other via the X2 interface. The configuration of the eNB 200 will be described later.
- ENB 200 manages one or a plurality of cells.
- eNB200 performs radio
- the eNB 200 has a radio resource management (RRM) function, a routing function of user data (hereinafter also referred to as “data”), a measurement control function for mobility control / scheduling, and the like.
- RRM radio resource management
- Cell is used as a term indicating a minimum unit of a wireless communication area. “Cell” may also be used as a term indicating a function of performing wireless communication with the UE 100.
- the EPC 20 corresponds to a core network.
- the EPC 20 may form a network together with the E-UTRAN 10.
- the EPC 20 includes an MME (Mobility Management Entity) 300, an SGW (Serving Gateway) 400, and a PGW (Packet Data Network Gateway) 500.
- MME Mobility Management Entity
- SGW Serving Gateway
- PGW Packet Data Network Gateway
- the MME 300 performs various mobility controls for the UE 100, for example.
- the SGW 400 performs data transfer control.
- MME300 and SGW400 are connected with eNB200 via a S1 interface.
- the PGW 500 performs control to relay user data from an external network (and to the external network).
- FIG. 2 is a protocol stack diagram of a radio interface in the LTE system. As shown in FIG. 2, the radio interface protocol is divided into first to third layers of the OSI reference model.
- the first layer is a physical (PHY) layer.
- the second layer includes a MAC (Medium Access Control) layer, an RLC (Radio Link Control) layer, and a PDCP (Packet Data Convergence Protocol) layer.
- the third layer includes an RRC (Radio Resource Control) layer.
- RRC Radio Resource Control
- the physical layer performs encoding / decoding, modulation / demodulation, antenna mapping / demapping, and resource mapping / demapping.
- Data and control signals are transmitted between the physical layer of the UE 100 and the physical layer of the eNB 200 via a physical channel.
- the MAC layer performs data priority control, retransmission processing by hybrid ARQ (HARQ), random access procedure, and the like. Data and control signals are transmitted between the MAC layer of the UE 100 and the MAC layer of the eNB 200 via a transport channel.
- the MAC layer of the eNB 200 includes a scheduler (MAC scheduler). The scheduler determines the uplink / downlink transport format (transport block size, modulation and coding scheme (MCS)) and the resource blocks allocated to the UE 100.
- MCS modulation and coding scheme
- the RLC layer transmits data to the RLC layer on the receiving side using the functions of the MAC layer and the physical layer. Data and control signals are transmitted between the RLC layer of the UE 100 and the RLC layer of the eNB 200 via a logical channel.
- the PDCP layer performs header compression / decompression and encryption / decryption.
- the RRC layer is defined only in the control plane that handles control signals. Messages for various settings (RRC messages) are transmitted between the RRC layer of the UE 100 and the RRC layer of the eNB 200.
- the RRC layer controls the logical channel, the transport channel, and the physical channel according to establishment, re-establishment, and release of the radio bearer.
- RRC Radio Resource Control
- a NAS (Non-Access Stratum) layer located above the RRC layer performs, for example, session management and mobility management.
- FIG. 3 is a configuration diagram of a radio frame used in the LTE system.
- OFDMA Orthogonal Frequency Division Multiple Access
- SC-FDMA Single Carrier Frequency Division Multiple Access
- the radio frame is composed of 10 subframes arranged in the time direction.
- Each subframe is composed of two slots arranged in the time direction.
- the length of each subframe is 1 ms.
- the length of each slot is 0.5 ms.
- Each subframe includes a plurality of resource blocks (RB: Resource Block) in the frequency direction.
- Each subframe includes a plurality of symbols in the time direction.
- Each resource block includes a plurality of subcarriers in the frequency direction.
- One resource element (RE) is configured by one symbol and one subcarrier.
- a radio resource (time / frequency resource) is allocated to the UE 100.
- radio resources frequency resources
- radio resources are configured by resource blocks.
- radio resources (time resources) are configured by subframes (or slots).
- the section of the first several symbols of each subframe is an area that can be used as a physical downlink control channel (PDCCH: Physical Downlink. Control Channel) for transmitting a downlink control signal.
- the remaining part of each subframe is an area that can be used as a physical downlink shared channel (PDSCH) for transmitting downlink data.
- PDCH Physical Downlink control channel
- PDSCH physical downlink shared channel
- both ends in the frequency direction in each subframe are areas that can be used as physical uplink control channels (PUCCH: Physical Uplink Control Channels) for transmitting uplink control signals.
- PUCCH Physical Uplink Control Channels
- the remaining part of each subframe is an area that can be used as a physical uplink shared channel (PUSCH) for transmitting uplink data.
- PUSCH physical uplink shared channel
- FIG. 4 is a block diagram of the UE 100. As illustrated in FIG. 4, the UE 100 includes a receiver (receiver) 110, a transmitter (transmitter) 120, and a controller (controller) 130. The receiver 110 and the transmitter 120 may be an integrated transceiver (transmission / reception unit).
- the receiver 110 performs various types of reception under the control of the controller 130.
- the receiver 110 includes an antenna.
- the receiver 110 converts a radio signal received by the antenna into a baseband signal (received signal).
- the receiver 110 outputs a baseband signal to the controller 130.
- the transmitter 120 performs various transmissions under the control of the controller 130.
- the transmitter 120 includes an antenna.
- the transmitter 120 converts the baseband signal (transmission signal) output from the controller 130 into a radio signal.
- the transmitter 130 transmits a radio signal from the antenna.
- the controller 130 performs various controls in the UE 100.
- the controller 130 includes a processor and a memory.
- the memory stores a program executed by the processor and information used for processing by the processor.
- the processor includes a baseband processor and a CPU (Central Processing Unit).
- the baseband processor performs, for example, modulation / demodulation and encoding / decoding of a baseband signal.
- the CPU performs various processes by executing programs stored in the memory.
- the processor may include a codec that performs encoding / decoding of an audio / video signal.
- the processor executes various processes described later and various communication protocols described above.
- the UE 100 may include a GNSS receiver.
- the GNSS receiver can receive a GNSS signal in order to obtain location information indicating the geographical location of the UE 100.
- the GNSS receiver outputs a GNSS signal to the controller 130.
- UE100 may have a GPS function for acquiring position information of UE100.
- a process executed by at least one of the receiver 110, the transmitter 120, and the controller 130 included in the UE 100 will be described as a process (operation) executed by the UE 100 for convenience.
- FIG. 5 is a block diagram of the eNB 200. As illustrated in FIG. 5, the eNB 200 includes a receiver (reception unit) 210, a transmitter (transmission unit) 220, a controller (control unit) 230, and a network interface 240.
- the transmitter 210 and the receiver 220 may be an integrated transceiver (transmission / reception unit).
- the receiver 210 performs various types of reception under the control of the controller 230.
- the receiver 210 includes an antenna.
- the receiver 210 converts a radio signal received by the antenna into a baseband signal (received signal).
- the receiver 210 outputs a baseband signal to the controller 230.
- the transmitter 220 performs various transmissions under the control of the controller 230.
- the transmitter 220 includes an antenna.
- the transmitter 220 converts the baseband signal (transmission signal) output from the controller 230 into a radio signal.
- the transmitter 220 transmits a radio signal from the antenna.
- the controller 230 performs various controls in the eNB 200.
- the controller 230 includes a processor and a memory.
- the memory stores a program executed by the processor and information used for processing by the processor.
- the processor includes a baseband processor and a CPU.
- the baseband processor performs, for example, modulation / demodulation and encoding / decoding of a baseband signal.
- the CPU performs various processes by executing programs stored in the memory.
- the processor executes various processes described later and various communication protocols described above.
- the network interface 240 is connected to the neighboring eNB 200 via the X2 interface.
- the network interface 240 is connected to the MME 300 and the SGW 400 via the S1 interface.
- the network interface 240 is used for communication performed on the X2 interface and communication performed on the S1 interface, for example.
- a process executed by at least one of the transmitter 210, the receiver 220, the controller 230, and the network interface 240 included in the eNB 200 will be described as a process (operation) executed by the eNB 200 for convenience.
- FIG. 6 is a diagram for explaining the operating environment according to the embodiment.
- FIG. 7 is a sequence diagram for explaining the operation according to the embodiment.
- FIG. 8 is a flowchart for explaining the operation according to the embodiment.
- the UE 100 is located in a cell managed by the eNB 200-1.
- the UE 100 may establish a connection with the eNB 200-1. That is, the UE 100 may be in an RRC connection state.
- the UE 100 may not have established a connection with the eNB 200-1. That is, the UE 100 may be in an RRC idle state.
- the cell managed by the eNB 200-2 adjacent to the eNB 200-1 is adjacent to the cell managed by the eNB 200-1.
- the cell managed by the eNB 200-1 and / or the eNB 200-2 may be a small cell.
- the eNB 200-1 may transmit configuration information (Configuration) to the UE 100.
- the UE 100 may receive setting information from the eNB 200-1.
- the eNB 200-1 may transmit the setting information by broadcasting (for example, SIB: System Information Block).
- SIB System Information Block
- the eNB 200-1 may transmit the setting information by unicast (for example, an RRC connection reconfiguration message).
- the setting information may include a setting for the UE 100 to execute a report described later.
- the setting information may include a condition for triggering the report in step S40, for example.
- the setting information may include first threshold information described later.
- the setting information may include timer information for measuring a period during which report transmission is restricted.
- the setting information may be measurement setting information for handover.
- the setting information may be information different from the measurement setting for handover.
- the UE 100 may store the setting information in advance.
- the UE 100 may perform the operation described later without receiving the setting information from the eNB 200-1.
- step S20 the UE 100 performs measurement.
- the UE 100 can perform measurement according to the setting information from the eNB 200-1.
- the UE 100 measures the reception level (hereinafter, “NC reception level”) of the received signal from the adjacent cell.
- the UE 100 can measure, for example, reception power (RSRP: Reference Signal Received Power) and / or reception quality (RSRQ: Reference Signal Received Quality) as the reception level.
- RSRP Reference Signal Received Power
- RSRQ Reference Signal Received Quality
- UE100 may measure the reception level (henceforth SC reception level) of the received signal from a serving cell.
- the UE 100 may use a measurement result for handover.
- the UE 100 compares the measurement result with the first threshold value.
- UE100 determines whether a measurement result exceeds a 1st threshold value. For example, the UE 100 may determine whether the NC reception level exceeds a first threshold value. That is, the UE 100 may determine whether “NC reception level> first threshold” is satisfied. The UE 100 may determine whether “NC reception level ⁇ SC reception level” exceeds a first threshold value. That is, the UE 100 may determine whether “NC reception level ⁇ SC reception level> first threshold” is satisfied.
- the first threshold value may be a constant value.
- the first threshold value may be a value to be compared with the NC reception level.
- the first threshold value may be a value for comparison with the relative reception level.
- the relative reception level is “NC reception level ⁇ SC reception level” (the relative reception level is represented by “dB”, for example). Therefore, the UE 100 can compare “NC reception level ⁇ SC reception level” with the first threshold.
- the first threshold is a constant value (for example, -2 dB). In this case, the UE 100 determines whether ““ NC reception level ⁇ SC reception level ”> first threshold” is satisfied.
- the UE 100 may compare the NC reception level with the first threshold value.
- the first threshold value to be compared with the NC reception level is a value different from the first threshold value to be compared with “NC reception level ⁇ SC reception level”.
- the first threshold value may be the same value as the threshold value used for triggering the measurement report, or may be a different value.
- the first threshold value may be a value smaller than a threshold value used for triggering the measurement report (a value for performing the report in step S40 before performing the measurement report).
- step S40 performs the process of step S40, when "measurement result> 1st threshold value” is satisfy
- the UE 100 does not execute the process of step S40.
- the UE 100 may execute the process of step S20 when the measurement trigger is satisfied.
- step S40 the UE 100 transmits a report to the eNB 200-1.
- UE100 transmits a report based on the measurement result of the received signal from a neighboring cell.
- This report may be a measurement report for handover.
- the report may be different from the measurement report.
- the report may include the measurement result (for example, the RSRP range and / or the RSRQ range) in step S20.
- the report may not include the measurement result.
- the report may include an identifier of a cell to be measured (Cell ID, ECGI (E-UTRAN Cell Global Identifier), etc.).
- Cell ID Cell ID
- ECGI E-UTRAN Cell Global Identifier
- the UE 100 may include the identifier of the neighboring cell operated by another operator different from the operator of the eNB 200-1 in the report.
- the report may not include the cell identifier.
- the report may include information on the measured frequency.
- the report may not include information on the measured frequency.
- the UE 100 may execute the process in FIG. 8 based on the transmission of the report.
- the UE 100 after transmitting the report, the UE 100 starts a timer for measuring a period during which the transmission of the report is restricted (steps S41 and S42).
- the timer is a timer for measuring a period (for example, 5 minutes) in which transmission of a report is restricted.
- the UE 100 can start a timer based on the timer information received from the eNB 200-1.
- the UE100 determines whether the timer has expired (step S43).
- the UE 100 may determine whether or not the timer has expired when a trigger condition for reporting is satisfied. If the timer has not expired, the UE 100 stops transmitting the report. That is, the UE 100 stops transmitting the report until the period during which the report transmission is restricted expires. Thereby, since UE100 does not need to report frequently, it can suppress consumption of a radio
- the UE100 may stop the measurement in S20 when the timer has not expired. Even when the timer has not expired, the UE 100 may continue to use the measurement result for handover.
- the UE100 can restart transmission of a report, when a timer expires (step S44). Therefore, the UE 100 can transmit a report when a trigger condition for reporting is satisfied after the timer expires.
- the UE 100 may transmit the measurement report even if the timer has not expired.
- the eNB 200-1 receives the report.
- the eNB 200-1 may execute the process of step S50 in response to receiving the report.
- step S50 the eNB 200-1 determines whether the measurement result of the received signal (uplink radio signal) from the UE 100 exceeds the threshold value.
- the eNB 200-1 determines whether or not the reception level of the reception signal from the UE 100 (hereinafter, UE reception level) exceeds the second threshold. That is, the eNB 200-1 determines whether “UE reception level> second threshold” is satisfied.
- the UE reception level is, for example, reception power of a reception signal (for example, a reference signal) from the UE 100.
- the UE reception level may be SINR (Signal to Interference and Noise Ratio).
- the received signal from the UE 100 may be a radio signal used for the report in step S40.
- the second threshold is a value equal to or higher than the UE reception level (minimum UE reception level) necessary for the eNB 200-1 to successfully receive a radio signal from the UE 100.
- the second threshold value is a value that can ensure communication quality between the eNB 200-1 and the UE 100.
- the second threshold value is a minimum signal level value for maintaining the MCS currently in communication between the eNB 200-1 and the UE 100.
- the second threshold is a value that does not affect the transmission performance of the UE 100.
- the second threshold value may be ⁇ 100 dBm.
- the second threshold (SINR) may be 3 dB.
- the eNB 200-1 can determine based on the UE reception level that can be measured (calculated) in the eNB 200-1. Therefore, even when the report from the UE 100 does not include the measurement result measured in the UE 100, the eNB 200-1 can execute the determination in step S50.
- the eNB 200-1 executes the process in step S60 when the UE reception level exceeds the second threshold.
- the eNB 200-1 ends the process when the UE reception level is equal to or lower than the second threshold.
- step S60 the eNB 200-1 transmits power control information to the UE 100.
- the UE 100 receives power control information.
- the eNB 200-1 transmits power control information by unicast.
- the power control information is information for reducing the transmission power of the UE 100.
- the eNB 200-1 determines the content of the power control information based on the difference between the UE reception level and the second threshold. For example, the eNB 200-1 can set the power reduction value of the UE 100 to a value ( ⁇ 5 dB) smaller than the difference (for example, 5 dB) between the UE reception level and the second threshold value. That is, the eNB 200-1 determines the content of the power control information so that the UE reception level after executing power control does not become less than the second threshold.
- the power control information may include a TPC (Transmission Power Control) command for reducing the transmission power of the UE 100.
- the power control information may include parameters for power control (for example, target received power level P0 and path loss correction coefficient ⁇ ).
- the parameter is, for example, P0 (P0_UE target received power level [dBm]) applied individually to the UE.
- the parameter may be a value for lowering P0 currently set in UE100.
- the parameter may be ⁇ (path loss correction coefficient).
- the parameter may be a value for lowering ⁇ currently set in the UE 100.
- the eNB 200-1 can calculate (adjust) the necessary transmission power (value) of the UE 100.
- the eNB 200-1 can determine the parameter (P0 and / or ⁇ ) based on the calculation result.
- the eNB 200-1 can transmit power control information including the determined parameter to the UE 100.
- step S70 the UE 100 controls transmission power based on the power control information.
- the UE 100 applies a parameter (for example, P0 and / or ⁇ ) included in the power control information to the transmission power calculation formula.
- the UE 100 performs communication with the eNB 200-1 with transmission power based on the calculation result.
- a transmission power value lower than the current transmission power value is set in the UE 100.
- the transmission power (value) of the UE 100 is reduced.
- Modification 1 Modification 1 according to the embodiment will be described with reference to FIG.
- FIG. 9 is a sequence diagram for explaining the first modification according to the embodiment.
- UE100 which received the above-mentioned power control information may perform the process in FIG.
- Step S110 in FIG. 9 corresponds to S70.
- Step S120 corresponds to step S20.
- the UE 100 compares the measurement result with the third threshold value. For example, the UE 100 may determine whether the NC reception level is less than the third threshold value. That is, the UE 100 may determine whether “NC reception level ⁇ third threshold” is satisfied. The UE 100 may determine whether “NC reception level ⁇ SC reception level” is less than a third threshold value. That is, the UE 100 may determine whether or not “NC reception level ⁇ SC reception level ⁇ third threshold” is satisfied.
- the third threshold value may be a constant value.
- the third threshold value may be a value to be compared with the NC reception level.
- the third threshold value may be a value for comparison with the relative reception level.
- the third threshold value to be compared with the NC reception level is different from the third threshold value to be compared with “NC reception level ⁇ SC reception level”.
- the third threshold value may be the same as the first threshold value.
- the third threshold value may be different from the first threshold value.
- the third threshold value when the third threshold value is compared with “NC reception level ⁇ SC reception level (RSRP)”, the third threshold value may be a value smaller than ⁇ 3 dB, for example.
- UE100 can perform the process of step S140, when "measurement result ⁇ 3rd threshold value" is satisfy
- the UE 100 does not execute the process of step S140 when “measurement result ⁇ third threshold value” is not satisfied. In this case, the UE 100 may execute the process of step S120 when the measurement trigger is satisfied.
- step S140 the UE 100 transmits stop information to the eNB 200-1.
- the eNB 200-1 may include information (for example, indication) indicating special power control information based on the determination in step S50 in the power control information (power control information in step S60).
- the UE 100 may transmit the stop information to the eNB 200 only when the power control information is based on the determination in step S50 based on the indication.
- the UE 100 may execute the operation in Step S130 (and / or Step S120) based on the indication.
- Stop information is information for the UE 100 to stop control of transmission power based on the power control information.
- the stop information may be information for requesting the UE 100 to stop control of transmission power based on the power control information in Step S60 (that is, the determination in Step S150).
- the stop information may be the measurement result in step S130.
- the cancellation information may be the same information as the report in step S40.
- the eNB 200-1 receives the cancellation information. In response to the reception of the cancellation information, the eNB 200-1 can execute control for returning the transmission power (value) of the UE 100 to normal.
- the power control information may include a parameter (target reception power level P0 and / or path loss correction coefficient ⁇ ) for returning to a normal value. Good.
- the eNB 200-1 may calculate the necessary transmission power (value) of the UE 100 for returning to a normal value.
- the eNB 200-1 may determine the parameter (P0 and / or ⁇ ) based on the calculation result.
- step S150 the eNB 200-1 can transmit power control information including the determined parameters to the UE 100.
- step S160 the UE 100 controls transmission power based on the power control information. Specifically, the UE 100 can execute control for returning the transmission power value to the normal value.
- the eNB 200-1 transmits power control information for reducing the transmission power to the UE 100.
- the UE 100 controls transmission power based on the power control information.
- the eNB 200-1 does not receive interference control information from another eNB (for example, the eNB 200-2), and does not interfere with the other eNB.
- the transmission power of the UE 100 that may give Power control information can be sent only to the UE 100 that may cause interference to neighboring cells. As a result, even when complex control is not performed between cells, inter-cell interference can be reduced.
- the UE 100 When the measurement result is less than the threshold, the UE 100 notifies the eNB 200-1 of the transmission power control stop information. Thereby, UE100 can transmit an uplink signal with normal transmission power, when not giving interference to an adjacent cell.
- FIG. 10 is a sequence diagram for explaining the second modification of the embodiment. Description of the same parts as described above will be omitted as appropriate.
- steps S210 to S240 correspond to steps S10 to S40.
- the eNB 200-1 may receive the interference control information from the eNB 200-2.
- the interference control information may include, for example, UL interference overload indication (UL Interference Overload Indication).
- UL Interference Overload Indication UL Interference Overload Indication
- the UL interference overload indication provides an interference overload report for each physical resource block (PRB).
- the eNB 200-1 may transmit the interference control information to the eNB 200-2.
- the eNB 200-1 may exchange interference control information with the eNB 200-2.
- the eNB 200-1 can execute the process of step S260 in response to reception of the interference control information.
- the eNB 200-1 may omit the process of step S260 and execute the process of step S270.
- step S260 the eNB 200-1 determines whether another eNB (eNB 200-2) has received interference from the interference control information. If the eNB 200-1 determines from the interference control information that the other eNB (eNB 200-2) has not received interference, the eNB 200-1 ends the process. The eNB 200-1 may execute the process of step S270 only when it is determined that another eNB has received interference.
- the eNB 200-1 may determine the determination target in step S270 based on the interference control information. For example, when the cell identifier included in the report of the UE 100 (report in step S240) indicates a cell (neighbor cell) managed by the eNB 200-2 that is the transmission source of the interference control information, the eNB 200-1 The UE 100 may be determined as a determination target.
- the eNB 200-1 may determine the UE 100 that is the transmission source of the report as a determination target.
- the eNB 200-1 When the UE 100 using the radio resource (time resource (for example, subframe) / frequency resource (for example, physical resource block)) that is interfered by the interference information transmits a report, the eNB 200-1 The UE 100 may be determined as a determination target.
- time resource for example, subframe
- frequency resource for example, physical resource block
- Steps S270 to S290 correspond to steps S50 to S70.
- step S280 when the cell identifier included in the report of the UE 100 does not indicate the cell managed by the eNB 200-1 that is the transmission source of the interference control information, the eNB 200-1 stops transmitting the power control information to the UE 100 May be.
- the frequency information included in the report of the UE 100 does not indicate the frequency operated by the eNB 200-1 that is the transmission source of the interference control information, the eNB 200-1 stops transmitting the power control information to the UE 100 May be.
- the eNB 200-1 may perform transmission power control when it can be determined that the UE 100 in the own cell is interfering with another eNB. Thereby, although UE100 in an own cell is not giving interference to other eNB, it can suppress performing transmission power control.
- the UE 100 may not execute the process in FIG. Therefore, the UE 100 may transmit a report every time transmission of the report is triggered. Thereby, the precision of transmission power control can be made high.
- the eNB 200-1 may transmit DCI (Downlink Control Information) to the UE 100 as power control information.
- DCI Downlink Control Information
- the eNB 200-1 can transmit the TPC command to the UE 100 using a unicast DCI format (a DCI format 0/4 for PUSCH, a DCI format 1/2 system for PUCCH).
- the eNB 200-1 may transmit the TPC command to the UEs 100 using the DCI format for group casting (DCI format 3 / 3A).
- DCI format 3 / 3A DCI format 3 / 3A
- the UE 100 may autonomously stop the power control based on the report in S40 (that is, the determination in S50) based on the determination in step S30. That is, the UE 100 may stop the power control without an instruction from the eNB 200-1 (power control information in step S150).
- the UE 100 when receiving power control information including information (indication) indicating special power control information, the UE 100 stores the power setting (the above-described parameter) before receiving the power control information. It may be. UE100 may perform control for returning a transmission power value to a normal value based on the memorize
- the UE 100 may transmit stop information indicating that the transmission power value is returned to the normal value (that is, indicating that the transmission power control based on the special power control information is stopped) to the eNB 200-1.
- UE100 may perform control for returning transmission power value to a normal value, after transmitting stop information.
- the eNB 200-1 can grasp that the UE 100 has stopped transmission power control based on the special power control information.
- the cancellation information may include information (for example, measurement result, cell identifier, etc.) included in the above report.
- the eNB 200-1 may determine a transmission power control method (for example, determination of a parameter to be adjusted) of the UE 100 based on information included in the cancellation information.
- a program for causing a computer to execute each process performed by any of the above-described nodes may be provided.
- the program may be recorded on a computer readable medium. If a computer-readable medium is used, a program can be installed in the computer.
- the computer-readable medium on which the program is recorded may be a non-transitory recording medium.
- the non-transitory recording medium is not particularly limited, but may be a recording medium such as a CD-ROM or a DVD-ROM.
- a chip configured by a memory that stores a program for executing each process performed by either the UE 100 or the eNB 200 and a processor that executes the program stored in the memory may be provided.
- the LTE system has been described as an example of the mobile communication system, but the present invention is not limited to the LTE system, and the content according to the present application may be applied to a system other than the LTE system.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
実施形態に係る基地局は、隣接セルからの受信信号の測定結果に基づいて送信される第1情報を無線端末から受信する受信部と、前記無線端末からの受信信号の測定結果が閾値を超える場合、前記無線端末の送信電力を低減するための第2情報を前記無線端末へ送信する送信部と、を備える。
Description
本開示は、基地局及び無線端末に関する。
移動通信システムの標準化プロジェクトである3GPP(3rd Generation Partnership Project)では、セル間干渉を低減するためにICIC(Inter-cell Interference Coordination)技術が導入されている(非特許文献1参照)。ICIC技術では、使用する無線リソースをセル間で協調することにより、セル間干渉を低減する。
3GPP技術仕様書「TS36.300 V13.3.0」 2016年4月1日
一の実施形態に係る基地局は、隣接セルからの受信信号の測定結果に基づいて送信される第1情報を無線端末から受信する受信部と、前記無線端末からの受信信号の測定結果が閾値を超える場合、前記無線端末の送信電力を低減するための第2情報を前記無線端末へ送信する送信部と、を備える。
一の実施形態に係る無線端末は、隣接セルからの受信信号の測定結果に基づいて第1情報を基地局へ送信する送信部と、前記無線端末の送信電力を低減するための第2情報を前記基地局から受信する受信部と、前記第2情報に基づいて送信電力を制御する制御部と、を備える。前記第2情報は、前記基地局における前記無線端末からの受信信号の測定結果が閾値を超える場合に送信される情報である。
[実施形態の概要]
今後、セルの小型化に伴って、多数のセルが高密度で配置することが想定される。
今後、セルの小型化に伴って、多数のセルが高密度で配置することが想定される。
セル数の増加により、セル間での協調が複雑になる虞がある。その結果、既存のICIC技術では、セル間干渉を十分に低減できない可能性がある。
一の実施形態に係る基地局は、隣接セルからの受信信号の測定結果に基づいて送信される第1情報を無線端末から受信する受信部と、前記無線端末からの受信信号の測定結果が閾値を超える場合、前記無線端末の送信電力を低減するための第2情報を前記無線端末へ送信する送信部と、を備えてもよい。
前記送信部は、前記第1情報の送信が制限される期間を計測するためのタイマ情報を前記無線端末へ送信してもよい。
前記受信部は、前記無線端末が前記第2情報に基づく送信電力の制御を中止するための第3情報を前記無線端末から受信してもよい。
前記送信部は、他の基地局から干渉制御情報を受信した場合にのみ、前記第2情報を前記無線端末へ送信してもよい。
前記第1情報は、前記隣接セルを示す識別子を含んでもよい。前記送信部は、前記他の基地局が前記隣接セルを管理する場合にのみ、前記第2情報を前記無線端末へ送信してもよい。
一の実施形態に係る無線端末は、隣接セルからの受信信号の測定結果に基づいて第1情報を基地局へ送信する送信部と、前記無線端末の送信電力を低減するための第2情報を前記基地局から受信する受信部と、前記第2情報に基づいて送信電力を制御する制御部と、を備えてもよい。前記第2情報は、前記基地局における前記無線端末からの受信信号の測定結果が閾値を超える場合に送信される情報であってもよい。
前記受信部は、前記第1情報の送信が制限される期間を計測するためのタイマ情報を受信してもよい。前記送信部は、前記第1情報の送信が制限される期間が満了するまで、前記第1情報の送信を中止してもよい。
前記制御部は、前記隣接セルからの受信信号の測定結果が閾値未満である場合、前記第2情報に基づく送信電力の制御を中止してもよい。
前記送信部は、前記隣接セルからの受信信号の測定結果が閾値未満である場合、第3情報を送信してもよい。前記第3情報は、前記無線端末が前記第2情報に基づく送信電力の制御を中止するための情報であってもよい。
[第1実施形態]
(移動通信システム)
実施形態に係る移動通信システムであるLTEシステムについて説明する。図1は、LTEシステムの構成を示す図である。
(移動通信システム)
実施形態に係る移動通信システムであるLTEシステムについて説明する。図1は、LTEシステムの構成を示す図である。
図1に示すように、LTEシステムは、UE(User Equipment)100、E-UTRAN(Evolved Universal Terrestrial Radio Access Network)10、及びEPC(Evolved Packet Core)20を備える。
UE100は、無線端末に相当する。UE100は、移動型の通信装置である。UE100は、セル(後述するeNB200)と無線通信を行う。UE100の構成については後述する。
E-UTRAN10は、無線アクセスネットワークに相当する。E-UTRAN10は、eNB200(evolved Node-B)を含む。eNB200は、基地局に相当する。eNB200は、X2インターフェイスを介して相互に接続される。eNB200の構成については後述する。
eNB200は、1又は複数のセルを管理する。eNB200は、eNB200が管理するセルとの接続を確立したUE100との無線通信を行う。eNB200は、無線リソース管理(RRM)機能、ユーザデータ(以下、「データ」と称することがある)のルーティング機能、モビリティ制御・スケジューリングのための測定制御機能等を有する。「セル」は、無線通信エリアの最小単位を示す用語として使用される。「セル」は、UE100との無線通信を行う機能を示す用語としても使用されてもよい。
EPC20は、コアネットワークに相当する。EPC20は、E-UTRAN10と共にネットワークを構成してもよい。EPC20は、MME(Mobility Management Entity)300、SGW(Serving Gateway)400及びPGW(Packet Data Network Gateway)500を含む。
MME300は、例えば、UE100に対する各種モビリティ制御を行う。SGW400は、例えば、データの転送制御を行う。MME300及びSGW400は、S1インターフェイスを介してeNB200と接続される。PGW500は、例えば、外部ネットワークから(及び外部ネットワークに)ユーザデータを中継する制御を行う。
図2は、LTEシステムにおける無線インターフェイスのプロトコルスタック図である。図2に示すように、無線インターフェイスプロトコルは、OSI参照モデルの第1層乃至第3層に区分される。第1層は物理(PHY)層である。第2層は、MAC(Medium Access Control)層、RLC(Radio Link Control)層、及びPDCP(Packet Data Convergence Protocol)層を含む。第3層は、RRC(Radio Resource Control)層を含む。
物理層は、符号化・復号、変調・復調、アンテナマッピング・デマッピング、及びリソースマッピング・デマッピングを行う。UE100の物理層とeNB200の物理層との間では、物理チャネルを介してデータ及び制御信号が伝送される。
MAC層は、データの優先制御、ハイブリッドARQ(HARQ)による再送処理、及びランダムアクセス手順等を行う。UE100のMAC層とeNB200のMAC層との間では、トランスポートチャネルを介してデータ及び制御信号が伝送される。eNB200のMAC層は、スケジューラ(MAC スケジューラ)を含む。スケジューラは、上下リンクのトランスポートフォーマット(トランスポートブロックサイズ、変調・符号化方式(MCS:Modulation and Coding Scheme))及びUE100への割当リソースブロックを決定する。
RLC層は、MAC層及び物理層の機能を利用してデータを受信側のRLC層に伝送する。UE100のRLC層とeNB200のRLC層との間では、論理チャネルを介してデータ及び制御信号が伝送される。
PDCP層は、ヘッダ圧縮・伸張、及び暗号化・復号化を行う。
RRC層は、制御信号を取り扱う制御プレーンでのみ定義される。UE100のRRC層とeNB200のRRC層との間では、各種設定のためのメッセージ(RRCメッセージ)が伝送される。RRC層は、無線ベアラの確立、再確立及び解放に応じて、論理チャネル、トランスポートチャネル、及び物理チャネルを制御する。UE100のRRCとeNB200のRRCとの間にRRC接続がある場合、UE100は、RRCコネクティッド状態である。UE100のRRCとeNB200のRRCとの間にRRC接続がない場合、UE100は、RRCアイドル状態である。
RRC層の上位に位置するNAS(Non-Access Stratum)層は、例えば、セッション管理及びモビリティ管理を行う。
図3は、LTEシステムで使用される無線フレームの構成図である。LTEシステムにおいて、下りリンクにはOFDMA(Orthogonal Frequency Division Multiple Access)が適用される。上りリンクにはSC-FDMA(Single Carrier Frequency Division Multiple Access)が適用される。
図3に示すように、無線フレームは、時間方向に並ぶ10個のサブフレームで構成される。各サブフレームは、時間方向に並ぶ2個のスロットで構成される。各サブフレームの長さは1msである。各スロットの長さは0.5msである。各サブフレームは、周波数方向に複数のリソースブロック(RB:Resource Block)を含む。各サブフレームは、時間方向に複数のシンボルを含む。各リソースブロックは、周波数方向に複数のサブキャリアを含む。1つのシンボル及び1つのサブキャリアにより、1つのリソースエレメント(RE:Resource Element)が構成される。UE100には、無線リソース(時間・周波数リソース)が割り当てられる。周波数方向において、無線リソース(周波数リソース)は、リソースブロックにより構成される。時間方向において、無線リソース(時間リソース)は、サブフレーム(又はスロット)により構成される。
下りリンクにおいて、各サブフレームの先頭数シンボルの区間は、下りリンク制御信号を伝送するための物理下りリンク制御チャネル(PDCCH:Physical Downlink. Control Channel)として使用可能な領域である。各サブフレームの残りの部分は、下りリンクデータを伝送するための物理下りリンク共有チャネル(PDSCH:Physical Downlink Shared Channel)として使用可能な領域である。
上りリンクにおいて、各サブフレームにおける周波数方向の両端部は、上りリンク制御信号を伝送するための物理上りリンク制御チャネル(PUCCH:Physical Uplink Control Channel)として使用可能な領域である。各サブフレームにおける残りの部分は、上りリンクデータを伝送するための物理上りリンク共有チャネル(PUSCH:Physical Uplink Shared Channel)として使用可能な領域である。
(無線端末)
実施形態に係るUE100(無線端末)について説明する。図4は、UE100のブロック図である。図4に示すように、UE100は、レシーバ(Receiver:受信部)110、トランスミッタ(Transmitter:送信部)120、及びコントローラ(Controller:制御部)130を備える。レシーバ110とトランスミッタ120とは、一体化されたトランシーバ(送受信部)であってもよい。
実施形態に係るUE100(無線端末)について説明する。図4は、UE100のブロック図である。図4に示すように、UE100は、レシーバ(Receiver:受信部)110、トランスミッタ(Transmitter:送信部)120、及びコントローラ(Controller:制御部)130を備える。レシーバ110とトランスミッタ120とは、一体化されたトランシーバ(送受信部)であってもよい。
レシーバ110は、コントローラ130の制御下で各種の受信を行う。レシーバ110は、アンテナを含む。レシーバ110は、アンテナが受信する無線信号をベースバンド信号(受信信号)に変換する。レシーバ110は、ベースバンド信号をコントローラ130に出力する。
トランスミッタ120は、コントローラ130の制御下で各種の送信を行う。トランスミッタ120は、アンテナを含む。トランスミッタ120は、コントローラ130が出力するベースバンド信号(送信信号)を無線信号に変換する。トランスミッタ130は、無線信号をアンテナから送信する。
コントローラ130は、UE100における各種の制御を行う。コントローラ130は、プロセッサ及びメモリを含む。メモリは、プロセッサにより実行されるプログラム、及びプロセッサによる処理に使用される情報を記憶する。プロセッサは、ベースバンドプロセッサとCPU(Central Processing Unit)とを含む。ベースバンドプロセッサは、例えば、ベースバンド信号の変調・復調及び符号化・復号を行う。CPUは、メモリに記憶されるプログラムを実行することにより、各種の処理を行う。プロセッサは、音声・映像信号の符号化・復号を行うコーデックを含んでもよい。プロセッサは、後述する各種の処理及び上述した各種の通信プロトコルを実行する。
UE100は、GNSS受信機を備えていてもよい。GNSS受信機は、UE100の地理的な位置を示す位置情報を得るために、GNSS信号を受信できる。GNSS受信機は、GNSS信号をコントローラ130に出力する。UE100は、UE100の位置情報を取得するためのGPS機能を有していてもよい。
本明細書では、UE100が備えるレシーバ110、トランスミッタ120及びコントローラ130の少なくともいずれかが実行する処理を、便宜上、UE100が実行する処理(動作)として説明する。
(基地局)
実施形態に係るeNB200(基地局)について説明する。図5は、eNB200のブロック図である。図5に示すように、eNB200は、レシーバ(受信部)210、トランスミッタ(送信部)220、コントローラ(制御部)230、及びネットワークインターフェイス240を備える。トランスミッタ210とレシーバ220は、一体化されたトランシーバ(送受信部)であってもよい。
実施形態に係るeNB200(基地局)について説明する。図5は、eNB200のブロック図である。図5に示すように、eNB200は、レシーバ(受信部)210、トランスミッタ(送信部)220、コントローラ(制御部)230、及びネットワークインターフェイス240を備える。トランスミッタ210とレシーバ220は、一体化されたトランシーバ(送受信部)であってもよい。
レシーバ210は、コントローラ230の制御下で各種の受信を行う。レシーバ210は、アンテナを含む。レシーバ210は、アンテナが受信する無線信号をベースバンド信号(受信信号)に変換する。レシーバ210は、ベースバンド信号をコントローラ230に出力する。
トランスミッタ220は、コントローラ230の制御下で各種の送信を行う。トランスミッタ220は、アンテナを含む。トランスミッタ220は、コントローラ230が出力するベースバンド信号(送信信号)を無線信号に変換する。トランスミッタ220は、無線信号をアンテナから送信する。
コントローラ230は、eNB200における各種の制御を行う。コントローラ230は、プロセッサ及びメモリを含む。メモリは、プロセッサにより実行されるプログラム、及びプロセッサによる処理に使用される情報を記憶する。プロセッサは、ベースバンドプロセッサとCPUとを含む。ベースバンドプロセッサは、例えば、ベースバンド信号の変調・復調及び符号化・復号等を行う。CPUは、メモリに記憶されるプログラムを実行することにより各種の処理を行う。プロセッサは、後述する各種の処理及び上述した各種の通信プロトコルを実行する。
ネットワークインターフェイス240は、X2インターフェイスを介して隣接eNB200と接続される。ネットワークインターフェイス240は、S1インターフェイスを介してMME300及びSGW400と接続される。ネットワークインターフェイス240は、例えば、X2インターフェイス上で行う通信及びS1インターフェイス上で行う通信に使用される。
本明細書では、eNB200が備えるトランスミッタ210、レシーバ220、コントローラ230、及びネットワークインターフェイス240の少なくともいずれかが実行する処理を、便宜上、eNB200が実行する処理(動作)として説明する。
(実施形態に係る動作)
実施形態に係る動作について、図6から図8を用いて説明する。図6は、実施形態に係る動作環境を説明するための図である。図7は、実施形態に係る動作を説明するためのシーケンス図である。図8は、実施形態に係る動作を説明するためのフローチャートである。
実施形態に係る動作について、図6から図8を用いて説明する。図6は、実施形態に係る動作環境を説明するための図である。図7は、実施形態に係る動作を説明するためのシーケンス図である。図8は、実施形態に係る動作を説明するためのフローチャートである。
図6に示すように、UE100は、eNB200-1が管理するセルに在圏している。UE100は、eNB200-1と接続を確立していてもよい。すなわち、UE100は、RRC接続状態であってもよい。UE100は、eNB200-1と接続を確立していなくてもよい。すなわち、UE100は、RRCアイドル状態であってもよい。
eNB200-2は、eNB200-1に隣接するeNB200-2が管理するセルは、eNB200-1が管理するセルに隣接する。eNB200-1及び/又はeNB200-2が管理するセルは、スモールセルであってもよい。
図7に示すように、ステップS10において、eNB200-1は、UE100へ設定情報(Configuration)を送信してもよい。UE100は、eNB200-1から設定情報を受信してもよい。
eNB200-1は、設定情報をブロードキャスト(例えば、SIB:System Information Block)により送信してもよい。eNB200-1は、設定情報をユニキャスト(例えば、RRC接続再設定メッセージ)により送信してもよい。
設定情報は、UE100が後述の報告を実行するための設定を含んでいてもよい。設定情報は、例えば、ステップS40における報告をトリガするための条件を含んでいてもよい。例えば、設定情報は、後述する第1閾値の情報を含んでいてもよい。設定情報は、報告の送信が制限される期間を計測するためのタイマ情報を含んでいてもよい。
設定情報は、ハンドオーバのためのメジャメント設定の情報であってもよい。設定情報は、ハンドオーバのためのメジャメント設定と異なる情報であってもよい。
UE100には、当該設定情報が予め記憶されていてもよい。UE100は、eNB200-1から設定情報を受信しなくても、後述の動作を実行してもよい。
ステップS20において、UE100は、測定を実行する。UE100は、eNB200-1からの設定情報に従って、測定を実行できる。
UE100は、隣接セルからの受信信号の受信レベル(以下、NC受信レベル)を測定する。UE100は、受信レベルとして、例えば、受信電力(RSRP:Reference Signal Received Power)及び/又は受信品質(RSRQ:Reference Signal Received Quality)を測定できる。UE100は、サービングセルからの受信信号の受信レベル(以下、SC受信レベル)を測定してもよい。UE100は、ハンドオーバのための測定結果を利用してもよい。
ステップS30において、UE100は、測定結果と第1閾値とを比較する。UE100は、測定結果が第1閾値を超えるか否かを判定する。例えば、UE100は、NC受信レベルが第1閾値を超えるか否かを判定してもよい。すなわち、UE100は、「NC受信レベル>第1閾値」が満たされるか否かを判定してもよい。UE100は、「NC受信レベル-SC受信レベル」が第1閾値を超えるか否かを判定してもよい。すなわち、UE100は、「NC受信レベル-SC受信レベル>第1閾値」が満たされるか否かを判定してもよい。
第1閾値は、一定値であってもよい。第1閾値は、NC受信レベルと比較されるための値であってもよい。第1閾値は、相対受信レベルと比較するための値であってもよい。例えば、相対受信レベルは、「NC受信レベル-SC受信レベル」(相対受信レベルは、例えば、「dB」で表される)である。従って、UE100は、「NC受信レベル-SC受信レベル」を第1閾値と比較できる。第1閾値は、一定値(例えば、-2dB)である。この場合、UE100は、「「NC受信レベル-SC受信レベル」>第1閾値」が満たされるか否かを判定する。UE100は、NC受信レベルと第1閾値とを比較してもよい。NC受信レベルと比較される第1閾値は、「NC受信レベル-SC受信レベル」と比較される第1閾値とは異なる値である。
第1閾値は、メジャメント報告のトリガに用いられる閾値と同じ値であってもよいし、異なる値であってもよい。第1閾値は、メジャメント報告のトリガに用いられる閾値よりも小さい値(メジャメント報告を行う前にステップS40の報告が行われるための値)であってもよい。
UE100は、「測定結果>第1閾値」が満たされる場合、ステップS40の処理を実行する。UE100は、「NC受信レベル>第1閾値」が満たされない場合、ステップS40の処理を実行しない。この場合、UE100は、測定トリガが満たされた場合、ステップS20の処理を実行してもよい。
ステップS40において、UE100は、報告をeNB200-1へ送信する。UE100は、隣接セルからの受信信号の測定結果に基づいて報告を送信する。
当該報告は、ハンドオーバのためのメジャメント報告であってもよい。当該報告は、メジャメント報告と異なってもよい。
報告は、ステップS20における測定結果(例えば、RSRPの範囲及び/又はRSRQの範囲)を含んでいてもよい。報告は、測定結果を含まなくてもよい。報告は、測定対象であるセルの識別子(Cell ID、ECGI(E-UTRAN Cell Global Identifier)など)を含んでいてもよい。UE100は、eNB200-1のオペレータと異なる他のオペレータが運用する隣接セルの識別子を報告に含めてもよい。報告は、セルの識別子を含まなくてもよい。報告は、測定した周波数の情報を含んでいてもよい。報告は、測定した周波数の情報を含まなくてもよい。
UE100は、報告の送信に基づいて、図8における処理を実行してもよい。
図8において、UE100は、報告を送信した後、報告の送信が制限される期間を計測するためのタイマを起動する(ステップS41、S42)。当該タイマは、報告の送信が制限される期間(例えば、5分)を計測するためのタイマである。UE100は、eNB200-1から受信したタイマ情報に基づくタイマを起動できる。
UE100は、タイマが満了したか否かを判定する(ステップS43)。UE100は、報告するためのトリガ条件が満たされた場合に、タイマが満了したか否かを判定してもよい。UE100は、タイマが満了していない場合、報告の送信を中止する。すなわち、UE100は、報告の送信が制限される期間が満了するまで、報告の送信を中止する。これにより、UE100は、報告を頻繁に行わなくて済むため、無線リソースの消費を抑制できる。UE100の消費電力を低減できる。
UE100は、タイマが満了していない場合、S20における測定を中止してもよい。UE100は、タイマが満了していない場合であっても、ハンドオーバのための測定結果を継続して利用してもよい。
UE100は、タイマが満了した場合、報告の送信を再開できる(ステップS44)。従って、UE100は、タイマの満了後に、報告するためのトリガ条件が満たされた場合に、報告を送信できる。
UE100は、ハンドオーバのためのメジャメント報告がトリガされた場合には、タイマが満了していなくても、メジャメント報告を送信してもよい。
図7において、eNB200-1は、報告を受信する。eNB200-1は、報告の受信に応じて、ステップS50の処理を実行してもよい。
ステップS50において、eNB200-1は、UE100からの受信信号(上りリンク無線信号)の測定結果が閾値を超えるか否かを判定する。
eNB200-1は、UE100からの受信信号の受信レベル(以下、UE受信レベル)が第2閾値を超えるか否かを判定する。すなわち、eNB200-1は、「UE受信レベル>第2閾値」が満たされるか否かを判定する。
UE受信レベルは、例えば、UE100からの受信信号(例えば、参照信号)の受信電力である。UE受信レベルは、SINR(Signal to Interference and Noise Ratio)であってもよい。UE100からの受信信号は、ステップS40における報告に用いられる無線信号であってもよい。
第2閾値は、eNB200-1がUE100からの無線信号の受信に成功するために必要であるUE受信レベル(最低UE受信レベル)以上の値である。例えば、第2閾値は、eNB200-1とUE100との間の通信品質を確保できる値である。例えば、第2閾値は、eNB200-1とUE100との間で現在通信中のMCSを維持するための最低信号レベル値である。第2閾値は、UE100の伝送性能に影響を与えない値である。例えば、第2閾値は、-100dBmであってもよい。第2閾値(SINR)は、3dBであってもよい。
eNB200-1は、eNB200-1において測定(算出)できるUE受信レベルに基づいて判定できる。従って、UE100からの報告が、UE100において測定された測定結果を含まない場合であっても、eNB200-1は、ステップS50における判定を実行できる。
eNB200-1は、UE受信レベルが第2閾値を超える場合、ステップS60における処理を実行する。eNB200-1は、UE受信レベルが第2閾値以下である場合、処理を終了する。
ステップS60において、eNB200-1は、電力制御情報をUE100へ送信する。UE100は、電力制御情報を受信する。eNB200-1は、ユニキャストにより電力制御情報を送信する。
電力制御情報は、UE100の送信電力を低減するための情報である。eNB200-1は、UE受信レベルと第2閾値との差に基づいて、電力制御情報の内容を決定する。例えば、eNB200-1は、UE100の電力低減値を、UE受信レベルと第2閾値との差(例えば、5dB)よりも小さい値(<5dB)に設定することができる。すなわち、eNB200-1は、電力制御を実行した後のUE受信レベルが第2閾値未満にならないように電力制御情報の内容を決定する。
電力制御情報は、UE100の送信電力を低減するためのTPC(Transmission Power Control)コマンドを含んでいてもよい。電力制御情報は、電力制御のためのパラメータ(例えば、目標受信電力レベルP0及びパスロス補正係数α)を含んでいてもよい。パラメータは、例えば、UEに個別に適用されるP0(P0_UE目標受信電力レベル[dBm])である。具体的には、パラメータは、UE100に現在設定されているP0を低くするための値であってもよい。パラメータは、α(パスロス補正係数)であってもよい。具体的には、パラメータは、UE100に現在設定されているαを低くするための値であってもよい。
例えば、eNB200-1は、UE100の必要送信電力(値)を算出(調整)できる。eNB200-1は、算出結果に基づいて、パラメータ(P0及び/又はα)を決定できる。eNB200-1は、決定したパラメータを含む電力制御情報をUE100へ送信することができる。
ステップS70において、UE100は、電力制御情報に基づいて送信電力を制御する。例えば、UE100は、電力制御情報に含まれるパラメータ(例えば、P0及び又はα)を送信電力の算出式に適用する。UE100は、算出結果に基づく送信電力でeNB200-1との通信を実行する。このように、UE100には、現在の送信電力値よりも低い送信電力値が設定される。その結果、UE100の送信電力(値)が低減される。
(変更例1)
実施形態に係る変更例1について、図9を用いて説明する。図9は、実施形態に係る変更例1を説明するためのシーケンス図である。
実施形態に係る変更例1について、図9を用いて説明する。図9は、実施形態に係る変更例1を説明するためのシーケンス図である。
上述の電力制御情報を受信したUE100は、図9における処理を実行してもよい。
図9のステップS110は、S70に対応する。ステップS120は、ステップS20に対応する。
ステップS130において、UE100は、測定結果と第3閾値とを比較する。例えば、UE100は、NC受信レベルが第3閾値未満であるか否かを判定してもよい。すなわち、UE100は、「NC受信レベル<第3閾値」が満たされるか否かを判定してもよい。UE100は、「NC受信レベル-SC受信レベル」が第3閾値未満であるか否かを判定してもよい。すなわち、UE100は、「NC受信レベル-SC受信レベル<第3閾値」が満たされるか否かを判定してもよい。
第3閾値は、一定値であってもよい。第3閾値は、NC受信レベルと比較されるための値であってもよい。第3閾値は、相対受信レベルと比較するための値であってもよい。
NC受信レベルと比較される第3閾値は、「NC受信レベル-SC受信レベル」と比較される第3閾値とは異なる値である。
第3閾値は、第1閾値と同じであってもよい。第3閾値は、第1閾値と異なってもよい。例えば、第3閾値が、「NC受信レベル-SC受信レベル(RSRP)」と比較される場合、第3閾値は、例えば、-3dBより小さい値であってもよい。
UE100は、「測定結果<第3閾値」が満たされる場合、ステップS140の処理を実行できる。すなわち、UE100は、UE100からの無線信号が他のeNB(隣接セル)へ干渉を与えないと判定できた場合に、ステップS140の処理を実行できる。
UE100は、「測定結果<第3閾値」が満たされない場合、ステップS140の処理を実行しない。この場合、UE100は、測定トリガが満たされた場合、ステップS120の処理を実行してもよい。
ステップS140において、UE100は、中止情報をeNB200-1へ送信する。
eNB200-1は、電力制御情報(ステップS60における電力制御情報)に、ステップS50における判定に基づく特別な電力制御情報であることを示す情報(例えば、インディケーション)を含めてもよい。UE100は、インディケーションに基づいて、ステップS50における判定に基づく電力制御情報である場合にのみ、中止情報をeNB200へ送信してもよい。UE100は、インディケーションに基づいて、ステップS130(及び/又はステップS120)における動作を実行してもよい。
中止情報は、UE100が電力制御情報に基づく送信電力の制御を中止するための情報である。例えば、中止情報は、UE100がステップS60における電力制御情報(すなわち、ステップS150における判定)に基づく送信電力の制御の中止を要求するための情報であってもよい。中止情報は、ステップS130における測定結果であってもよい。中止情報は、ステップS40における報告と同様の情報であってもよい。
eNB200-1は、中止情報を受信する。eNB200-1は、中止情報の受信に応じて、eNB200-1は、UE100の送信電力(値)を正常に戻すための制御を実行できる。eNB200-1は、UE100の必要送信電力を算出(調整)していた場合、正常な値に戻すためのパラメータ(目標受信電力レベルP0及び/又はパスロス補正係数α)を電力制御情報に含めてもよい。eNB200-1は、正常な値に戻すためのUE100の必要送信電力(値)を算出してもよい。eNB200-1は、算出結果に基づいて、パラメータ(P0及び/又はα)を決定してもよい。
ステップS150において、eNB200-1は、決定したパラメータを含む電力制御情報をUE100へ送信することができる。
ステップS160において、UE100は、電力制御情報に基づいて送信電力を制御する。具体的には、UE100は、送信電力値を正常値に戻すための制御を実行できる。
以上により、eNB200-1は、報告を送信したUE100のUE受信レベルが第2閾値を越える場合、送信電力を低減するための電力制御情報をUE100へ送信する。UE100は、電力制御情報に基づいて、送信電力を制御する。これにより、UE100からeNB200-1への通信品質が良好である場合に、eNB200-1は、他のeNB(例えば、eNB200-2)から干渉制御情報を受信しなくても、他のeNBへ干渉を与える虞のあるUE100の送信電力を低減できる。隣接セルへ干渉を与える可能性のあるUE100にのみ電力制御情報を送ることができる。その結果、セル間で複雑な制御が実行されない場合であっても、セル間干渉を低減できる。
UE100は、測定結果が閾値未満である場合、送信電力の制御の中止情報をeNB200-1に通知する。これにより、UE100は、干渉を隣接セルへ与えない場合には、通常の送信電力で上りリンク信号を送信できる。
(変更例2)
実施形態の変更例2に係る動作について、図10を用いて説明する。図10は、実施形態の変更例2を説明するためのシーケンス図である。上述と同様の部分は、説明を適宜省略する。
実施形態の変更例2に係る動作について、図10を用いて説明する。図10は、実施形態の変更例2を説明するためのシーケンス図である。上述と同様の部分は、説明を適宜省略する。
図10において、ステップS210からS240は、ステップS10からS40に対応する。
ステップS250において、eNB200-1は、eNB200-2から干渉制御情報を受信してもよい。干渉制御情報は、例えば、UL干渉過負荷インディケーション(UL Interference Overload Indication)を含んでいてもよい。UL干渉過負荷インディケーションは、物理リソースブロック(PRB:Physical Resource Block)毎に干渉過負荷の報告を提供する。
eNB200-1は、干渉制御情報をeNB200-2へ送信してもよい。eNB200-1は、eNB200-2と干渉制御情報を交換してもよい。eNB200-1は、干渉制御情報の受信に応じて、ステップS260の処理を実行できる。eNB200-1は、干渉制御情報の受信に応じて、ステップS260の処理を省略し、ステップS270の処理を実行してもよい。
ステップS260において、eNB200-1は、干渉制御情報から、他のeNB(eNB200-2)が干渉を受けたか否かを判定する。eNB200-1は、干渉制御情報から、他のeNB(eNB200-2)が干渉を受けていないと判定した場合、処理を終了する。eNB200-1は、他のeNBが干渉を受けたと判定した場合にのみ、ステップS270の処理を実行してもよい。
eNB200-1は、干渉制御情報に基づいて、ステップS270の判定対象を決定してもよい。例えば、eNB200-1は、UE100の報告(ステップS240における報告)に含まれるセル識別子が、干渉制御情報の送信元のeNB200-2が管理するセル(隣接セル)を示す場合、当該報告の送信元のUE100を判定対象に決定してもよい。
eNB200-1は、報告に含まれる周波数の情報が、eNB200-2が干渉を受けている周波数を示す場合、当該報告の送信元のUE100を判定対象に決定してもよい。
eNB200-1は、干渉情報によって干渉を受けている無線リソース(時間リソース(例えば、サブフレーム)/周波数リソース(例えば、物理リソースブロック))を使用したUE100が、報告を送信していた場合、当該UE100を判定対象に決定してもよい。
ステップS270からS290は、ステップS50からS70に対応する。ステップS280において、eNB200-1は、UE100の報告に含まれるセル識別子が干渉制御情報の送信元のeNB200-1が管理するセルを示さない場合には、当該UE100への電力制御情報の送信を中止してもよい。同様に、eNB200-1は、UE100の報告に含まれる周波数の情報が干渉制御情報の送信元のeNB200-1が運用する周波数を示さない場合には、当該UE100への電力制御情報の送信を中止してもよい。
以上により、eNB200-1は、自セル内のUE100が他のeNBに干渉を与えていると判定できた場合に、送信電力制御を実行してもよい。これにより、自セル内のUE100が他のeNBに干渉を与えていないにもかかわらず、送信電力制御を実行すること抑制できる。
[その他の実施形態]
上述した実施形態によって、本出願の内容を説明したが、この開示の一部をなす論述及び図面は、本出願の内容を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなろう。
上述した実施形態によって、本出願の内容を説明したが、この開示の一部をなす論述及び図面は、本出願の内容を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなろう。
上述において、UE100は、図8における処理を実行しなくてもよい。従って、UE100は、報告の送信がトリガされる度に、報告を送信してもよい。これにより、送信電力制御の精度を高くすることができる。
上述において、eNB200-1は、電力制御情報としてDCI(Downlink Control Information)をUE100へ送信してもよい。例えば、eNB200-1は、TPCコマンドをユニキャスト用のDCIフォーマット(PUSCH用のDCIフォーマット0/4、PUCCH用のDCIフォーマット1系/2系)を用いてUE100へ送信できる。eNB200-1は、TPCコマンドをグループキャスト用のDCIフォーマット(DCIフォーマット3/3A)を用いて(複数の)UE100へ送信してもよい。これにより、eNB200-1は、グループを構成する複数のUE100の全てのUE受信レベルが第2閾値を超える場合、複数のUE100の送信電力を一括して制御することができる。
上述において、UE100は、ステップS30の判定に基づいて、S40における報告(すなわち、S50における判定)に基づく電力制御を自律的に中止してもよい。すなわち、UE100は、eNB200-1からの指示(ステップS150における電力制御情報)なく、当該電力制御を中止してもよい。
例えば、UE100は、特別な電力制御情報であることを示す情報(インディケーション)を含む電力制御情報を受信した場合に、当該電力制御情報を受信する前の電力設定(上述のパラメータ)を記憶していてもよい。UE100は、ステップS130における条件(測定結果<第3閾値)が満たされた場合、記憶された電力設定に基づいて、送信電力値を正常値に戻すための制御を実行してもよい。
UE100は、送信電力値を正常値に戻すことを示す(すなわち、特別な電力制御情報に基づく送信電力制御を中止したことを示す)中止情報をeNB200-1へ送信してもよい。UE100は、中止情報を送信した後に、送信電力値を正常値に戻すための制御を実行してもよい。eNB200-1は、中止情報に基づいて、UE100が特別な電力制御情報に基づく送信電力制御を中止したと把握できる。
中止情報は、上述の報告に含まれる情報(例えば、測定結果、セル識別子など)を含んでいてもよい。eNB200-1は、中止情報に含まれる情報に基づいて、UE100の送信電力制御方法(例えば、調整するパラメータの決定)を判定してもよい。
上述した各実施形態に係る動作は、適宜組み合わせて実行されてもよい。上述した各シーケンスにおいて、必ずしも全ての動作が必須の構成ではない。例えば、各シーケンスにおいて、一部の動作のみが実行されてもよい。
上述した各実施形態では特に触れていないが、上述した各ノード(UE100、eNB200など)のいずれかが行う各処理をコンピュータに実行させるプログラムが提供されてもよい。プログラムは、コンピュータ読取り可能媒体に記録されていてもよい。コンピュータ読取り可能媒体を用いれば、コンピュータにプログラムをインストールすることが可能である。ここで、プログラムが記録されたコンピュータ読取り可能媒体は、非一過性の記録媒体であってもよい。非一過性の記録媒体は、特に限定されるものではないが、例えば、CD-ROMやDVD-ROM等の記録媒体であってもよい。
UE100、及びeNB200のいずれかが行う各処理を実行するためのプログラムを記憶するメモリ及びメモリに記憶されたプログラムを実行するプロセッサ)によって構成されるチップが提供されてもよい。
上述した実施形態では、移動通信システムの一例としてLTEシステムを説明したが、LTEシステムに限定されるものではなく、LTEシステム以外のシステムに本出願に係る内容を適用してもよい。
日本国特許出願第2016-093980号(2016年5月9日出願)の全内容が、参照により、本願明細書に組み込まれている。
Claims (9)
- 基地局であって、
隣接セルからの受信信号の測定結果に基づいて送信される第1情報を無線端末から受信する受信部と、
前記無線端末からの受信信号の測定結果が閾値を超える場合、前記無線端末の送信電力を低減するための第2情報を前記無線端末へ送信する送信部と、を備える基地局。 - 前記送信部は、前記第1情報の送信が制限される期間を計測するためのタイマ情報を前記無線端末へ送信する請求項1に記載の基地局。
- 前記受信部は、前記無線端末が前記第2情報に基づく送信電力の制御を中止するための第3情報を前記無線端末から受信する請求項1に記載の基地局。
- 前記送信部は、他の基地局から干渉制御情報を受信した場合にのみ、前記第2情報を前記無線端末へ送信する請求項1に記載の基地局。
- 前記第1情報は、前記隣接セルを示す識別子を含み、
前記送信部は、前記他の基地局が前記隣接セルを管理する場合にのみ、前記第2情報を前記無線端末へ送信する請求項1に記載の基地局。 - 無線端末であって、
隣接セルからの受信信号の測定結果に基づいて第1情報を基地局へ送信する送信部と、
前記無線端末の送信電力を低減するための第2情報を前記基地局から受信する受信部と、
前記第2情報に基づいて送信電力を制御する制御部と、を備え、
前記第2情報は、前記基地局における前記無線端末からの受信信号の測定結果が閾値を超える場合に送信される情報である無線端末。 - 前記受信部は、前記第1情報の送信が制限される期間を計測するためのタイマ情報を受信し、
前記送信部は、前記第1情報の送信が制限される期間が満了するまで、前記第1情報の送信を中止する請求項6に記載の無線端末。 - 前記制御部は、前記隣接セルからの受信信号の測定結果が閾値未満である場合、前記第2情報に基づく送信電力の制御を中止する請求項6に記載の無線端末。
- 前記送信部は、前記隣接セルからの受信信号の測定結果が閾値未満である場合、第3情報を送信し、
前記第3情報は、前記無線端末が前記第2情報に基づく送信電力の制御を中止するための情報である請求項6に記載の無線端末。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018516991A JP6766141B2 (ja) | 2016-05-09 | 2017-05-08 | 基地局及び無線端末 |
US16/184,327 US11032776B2 (en) | 2016-05-09 | 2018-11-08 | Base station and radio terminal |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016093980 | 2016-05-09 | ||
JP2016-093980 | 2016-05-09 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/184,327 Continuation US11032776B2 (en) | 2016-05-09 | 2018-11-08 | Base station and radio terminal |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017195717A1 true WO2017195717A1 (ja) | 2017-11-16 |
Family
ID=60267235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2017/017345 WO2017195717A1 (ja) | 2016-05-09 | 2017-05-08 | 基地局及び無線端末 |
Country Status (3)
Country | Link |
---|---|
US (1) | US11032776B2 (ja) |
JP (1) | JP6766141B2 (ja) |
WO (1) | WO2017195717A1 (ja) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008035290A (ja) * | 2006-07-28 | 2008-02-14 | Kyocera Corp | 無線通信方法及び無線通信端末 |
JP2010199902A (ja) * | 2009-02-24 | 2010-09-09 | Kyocera Corp | 無線基地局および送信電力制御方法 |
JP2011077964A (ja) * | 2009-10-01 | 2011-04-14 | Sharp Corp | 通信システム、干渉調整方法、基地局装置及び移動局装置 |
JP2013187909A (ja) * | 2012-03-05 | 2013-09-19 | Samsung Electronics Co Ltd | 協力通信方法及び装置 |
WO2015078771A1 (en) * | 2013-11-28 | 2015-06-04 | Ntt Docomo, Inc. | Macro-cell assisted small cell discovery and resource activation |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9031599B2 (en) * | 2009-12-08 | 2015-05-12 | Futurewei Technologies, Inc. | System and method for power control |
CN110087298A (zh) * | 2011-04-01 | 2019-08-02 | 三菱电机株式会社 | 无线通信系统及基站 |
WO2013009054A2 (en) * | 2011-07-10 | 2013-01-17 | Lg Electronics Inc. | Method and apparatus for performing handover in wireless communication system |
JP5914918B2 (ja) * | 2011-08-02 | 2016-05-11 | シャープ株式会社 | 基地局、端末および通信方法 |
KR20130104500A (ko) * | 2012-03-14 | 2013-09-25 | 삼성전자주식회사 | 단말의 상향 링크 송신 전력을 제어하는 방법 및 장치 |
US10200139B2 (en) * | 2013-03-22 | 2019-02-05 | Lg Electronics Inc. | Method and apparatus for performing interference coordination in wireless communication system |
CN104349441B (zh) * | 2013-08-07 | 2020-03-17 | 夏普株式会社 | 主基站、用户设备及其控制方法 |
JP6006775B2 (ja) * | 2014-12-04 | 2016-10-12 | ソフトバンク株式会社 | 基地局装置 |
JP2018023040A (ja) * | 2016-08-04 | 2018-02-08 | 富士通株式会社 | 基地局、無線通信システムおよび基地局の動作方法 |
-
2017
- 2017-05-08 WO PCT/JP2017/017345 patent/WO2017195717A1/ja active Application Filing
- 2017-05-08 JP JP2018516991A patent/JP6766141B2/ja active Active
-
2018
- 2018-11-08 US US16/184,327 patent/US11032776B2/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008035290A (ja) * | 2006-07-28 | 2008-02-14 | Kyocera Corp | 無線通信方法及び無線通信端末 |
JP2010199902A (ja) * | 2009-02-24 | 2010-09-09 | Kyocera Corp | 無線基地局および送信電力制御方法 |
JP2011077964A (ja) * | 2009-10-01 | 2011-04-14 | Sharp Corp | 通信システム、干渉調整方法、基地局装置及び移動局装置 |
JP2013187909A (ja) * | 2012-03-05 | 2013-09-19 | Samsung Electronics Co Ltd | 協力通信方法及び装置 |
WO2015078771A1 (en) * | 2013-11-28 | 2015-06-04 | Ntt Docomo, Inc. | Macro-cell assisted small cell discovery and resource activation |
Also Published As
Publication number | Publication date |
---|---|
JPWO2017195717A1 (ja) | 2019-03-07 |
JP6766141B2 (ja) | 2020-10-07 |
US11032776B2 (en) | 2021-06-08 |
US20190098581A1 (en) | 2019-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9781587B2 (en) | Base station, user terminal, and processor | |
US11743818B2 (en) | User terminal, communication control apparatus, and processor | |
JP6125939B2 (ja) | ユーザ端末及びプロセッサ | |
US20130100916A1 (en) | Apparatus and method of reporting power headroom in wireless communication system | |
JP6670929B2 (ja) | 無線端末及び基地局 | |
KR20120124442A (ko) | 무선 통신 시스템, 이동국 장치, 무선 통신 방법 및 집적 회로 | |
JP6010341B2 (ja) | 基地局装置、移動局装置、測定方法、および集積回路 | |
JP6741966B2 (ja) | 通信装置 | |
JP5926613B2 (ja) | 通信システム、基地局装置、移動局装置、測定方法、および集積回路 | |
US20160029401A1 (en) | Mobile communication system and user terminal | |
EP2861009A1 (en) | Mobile communication system and user terminal | |
WO2018173805A1 (ja) | 通信制御方法及び無線端末 | |
WO2015005315A1 (ja) | ネットワーク装置及びユーザ端末 | |
US20160150470A1 (en) | Base station and communication control method | |
US20170195997A1 (en) | Base station and user terminal | |
US20170019892A1 (en) | Communication control method, base station, and user terminal | |
US10813056B2 (en) | Radio terminal and base station | |
JP2017188931A (ja) | 移動通信システム、ユーザ端末、及びプロセッサ | |
JP6538026B2 (ja) | ネットワーク選択制御方法、基地局、及びユーザ端末 | |
JP6034956B2 (ja) | 移動通信システム、基地局及びユーザ端末 | |
JP2017143565A (ja) | 移動通信システム、基地局、プロセッサ及びユーザ端末 | |
US11032776B2 (en) | Base station and radio terminal | |
WO2014157397A1 (ja) | 通信制御方法、ユーザ端末、及び基地局 | |
US20160157079A1 (en) | User terminal, network apparatus, and processor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ENP | Entry into the national phase |
Ref document number: 2018516991 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17796078 Country of ref document: EP Kind code of ref document: A1 |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 17796078 Country of ref document: EP Kind code of ref document: A1 |